Loading...
HomeMy WebLinkAboutTrams 2013-02-12 COMPLETE AGENDA PACKETCity of Tukwila Transportation Committee ®;. Kate Kruller, Chair Joe Duffie Dennis Robertson Distribution: K. Kruller J. Duffle K. Hougardy D. Robertson Mayor Haggerton D. Cline K. Matej B. Giberson F. I riarte R. Tischmak G. Labanara S. Kerslake Clerk File Copy 2 Extra e -mail pkt pdf to A. Le e -mail cover to: C. O'Flaherty, D. Almberg, B. Saxton, S. Norris, M. Hart AGENDA TUESDAY, FEBRUARY 12, 2013 Time: 5:00 PM Place: Conference Room #1 (6300 Building) Item Recommended Action Page 1. PRESENTATION(S) 2. BUSINESS AGENDA a) Tukwila Urban Center Access Project (Klickitat) a) Forward to 2/19/13 Regular Pg. 1 Project Completion and Acceptance Consent Agenda b) 2012 Overlay and Repair Program b) Forward to 2/19/13 Regular Pg. 5 Project Completion and Acceptance Consent Agenda c) TUC Pedestrian /Bicycle Bridge c) Discussion Only Pg. 7 Project Update 3. SCATBd 4. MISCELLANEOUS 5. ANNOUNCEMENTS Future Agendas: Next Scheduled Meeting: Tuesday, February 26, 2013 IS. The City of Tukwila strives to accommodate individuals with disabilities. Please contact the Public Works Department at 206 - 433 -0179 for assistance. p TO: FROM: BY: DATE: SUBJECT: City of Tukwila Jim Haggerton, Mayor INFORMATIONAL MEMORANDUM Mayor Haggerton Transportation Committee Bob Giberson, Public Works Director Peter Lau, Senior Engineer February 8, 2013 Tukwila Urban Center Access Project (Klickitat) Project No. 98410419, Contract No. 11 -001 Project Completion and Acceptance ISSUE Accept contract as complete and authorize release of retainage. BACKGROUND The Notice to Proceed for Contract No. 11 -001 with Guy F. Atkinson Construction, LLC of Renton, Washington was issued on March 14, 2011 for the Tukwila Urban Center Access Project (Klickitat). The TUC Access project constructed 2,500 linear feet of street improvements on Southcenter Parkway from Bahama Breeze to south of Strander Boulevard. The street improvements included a new bridge at the Klickitat Drive intersection over 2 southbound lanes in a tunnel, including storm drainage, water lines, sanitary sewer, concrete sidewalks, retaining walls, asphalt paving, street lighting, traffic signals, signage, and roadway re- channelization. ANALYSIS Construction was physically completed with conditions on August 28, 2012. Seventy -one (71) change orders were executed for the project due to various changes on unexpected site conditions, unanticipated utility conflicts, acceleration of construction schedule, and ADA standards. Unit price under -runs were due to force account items not completely utilized during construction. A retainage bond was used by Guy F. Atkinson for the TUC Access Project. The construction budget was $13,306,216.00. Construction Contract Amount Change Order Nos. 1 - 71 Unit Price Under -runs Sales Tax Paid $10,824,700.00 1,484,126.90 (138,035.66) 55,190.33 Total Amount Paid (including retainage) $12,225,981.57 RECOMMENDATION The Council is being asked to formally accept and authorize the release of retainage, subject to standard claim and lien release procedures, for the Tukwila Urban Center Access Project (Klickitat) with Guy F. Atkinson Construction, LLC in the final amount of $12,225,981.57, and to consider this item on the Consent Agenda of the February 19, 2013 Regular Meeting. Attachment: Notice of Completion W: \PW Eng \ PROJECTS \A- RW & RS Projects \TUC Access (Klickitat) ( 98410419) \Construction\Atkinson \Info Memo - Closeout Atkinson 2- 08- 13.docx 1 NOTICE OF COMPLETION OF PUBLIC WORKS CONTRACT Name & Address of Public Agency City of Tukwila 6200 Southcenter Boulevard Tukwila, WA 98188 UBI Number: 179 000 208 Contractor's UBI Number: 602 085 504 Date: December 17, 2012 Department Use Only Assigned to: Date Assigned: Notice is hereby given relative to the completion of contract or project described below Project Name Tukwila Urban Access Improvement Project (Klickitat) Contract Number 11 -001 Job Order Contracting • Yes X No Description of Work Done /Include Jobsite Address(es) Construction of roughly 2,500 linear feet of street improvements on Southcenter Boulevard. The street improvements include a new bridge at the Klickitat waterlines, sanitary sewer, concrete sidewalks, retaining walls, asphalt paving, Federally funded road transportation project? f Yes Parkway Drive intersection street from Bahama Breeze vicinity to south of Strander over 2 southbound lanes in a tunnel, storm drainage, lighting, traffic signals, signing, rechannelization, etc. U No Contractor's Name Guy F. Atkinson Construction, LLC Telephone Number 425 - 255 -7551 Contractor Address 707 South Grady Way, Suite 500, Renton, WA 98057 If Retainage is Bonded, List Surety's Name (or attach a copy) Travelers Casualty and Surety Company of America /Federal Insurance Company /Fidelity and Deposit Company of Maryland Surety Agent's Address 1501 4th Avenue, Suite 1650, Seattle, WA 98101 Date Contract Awarded November 22, 2010 Date Work Commenced March 14, 2011 Date Work Completed August 28, 2012 Date Work Accepted Contract Amount Additions (+ ) Reductions ( - ) Sub -Total Amount of Sales Tax Paid at 9.5% (If various rates apply, please send a breakdown) $ 10,824,700.00 $ 1,484,126.90 $ 138,035.66 $ 12,170,791.24 $ 55,190.33 Liquidated Damages $ 0.00 Amount Disbursed $ 12,225,981.57 Amount Retained $ 0.00 TOTAL $ 12,225,981.57 NOTE: These two totals must be equal Please List all Subcontractors Below: TOTAL $ 12,225,981.57 Subcontractor's Name: UBI Number: Affidavit ID (if known) American Engineering 601 423 415 385661 Brundage Bone 600 630 026 380938 Central Steel 600 514 550 394513 City Transfer, Inc. 173 005 384 410013 Corona Stud & Deck, LLC 603 079 287 413854 DBE Electric 602 952 513 Not obtained yet Garrison Creek Landscaping 602 461 104 Not obtained yet John Wayne Construction 601 111 682 372016 P215 -038 -000 08 -2011 REV 31 0020e (08/25/11) Continued on page 2 2 Please List all Subcontractors Below: Subcontractor's Name: UBI Number: Affidavit ID (if known) Johnson Western Gunite Company 600 470 724 402417 KODO Construction 179 019 926 411954 Lakeside Industries 601 106 847 Not obtained yet Meyer Brothers Roofing 600 620 120 377010 Northwest Construction 601 253 872 Not obtained yet Petersen Brothers, Inc. 600 072 474 367722 Purcell Painting & Coatings 602 440 422 400251 Pyramid Grinding, LLC 602 778 944 360185 Richardson Rocks 603 138 622 412595 Salinas Sawing & Sealing, Inc. 601 717 158 411086 Santa, Inc. 602 664 556 Not obtained yet Stripe Rite, Inc. 601 048 084 Not obtained yet Versatile Drilling 600 556 269 345201 Comments: , Contact Name: Diane Jaber Email Address: Diane.Jaber @TukwilaWA.gov Title: Fiscal Specialist Phone Number: (206) 433 -1871 x1871 Note: The Disbursing Officer must submit this completed notice immediately after acceptance of the work done under this contract. NO PAYMENT SHALL BE MADE FROM RETAINED FUNDS until receipt of all release certificates. Submitting Form: Please submit the completed form to all three agencies below. For a faster response. please submit by e -mail. raWashington State Department of Revenue Public Works Section PO Box 47474 Olympia WA 98504 -7474 (360)725 -7588 FAX (360) 664 -4159 PWC @dor.wa.gov Washington State Department of Labor and Industries Contract Release PO Box 44274 Olympia, WA 98504 -4272 (360)902 -4754 FAX (360) 902 -6897 ContractRelease@Ini.wa.gov Washington State Employment Security Department Specialized Collections Unit PO Box 9046 Olympia WA 98507 -9046 (360) 902-9780 Fax (360) 902 -9287 publicworks@esd.wa.gov For tax assistance or to request this document in an alternate format, visit http: / /dor.wa.gov or call 1- 800 - 647 -7706. Teletype (TTY) users may call (360) 705 -6718. F215- 038 - 000 08 -2011 REV 31 0020e (08/25/11) 3 4 TO: FROM: BY: DATE: SUBJECT: City of Tukwila Jim Haggerton, Mayor INFORMATIONAL MEMORANDUM Mayor Haggerton Transportation Committee Bob Giberson, Public Works Director Peter Lau, Senior Engineer February 8, 2013 2012 Overlay and Repair Program Project No. 91210401, Contract No. 12 -091 Project Completion and Acceptance „RJ ISSUE Accept contract as complete and authorize release of retainage. BACKGROUND The Notice to Proceed for Contract No. 12 -091 with ICON Materials of Pacific, Washington was issued on August 6, 2012 for the 2012 Overlay and Repair Project. This overlay project provided hot mix asphalt (HMA) paving at 2 locations: Tukwila Parkway from Southcenter Parkway to Andover Park West and Andover Park West from Midland Drive to South 180th Street. The street improvements included pavement and paving; removing and replacing concrete curbs, gutters, sidewalks and ADA ramps; installing traffic loops and junction boxes; adjusting surface utilities to grade; and installing new roadway channelization. ANALYSIS Construction was physically completed with condition on December 31, 2012. Four (4) change orders were executed for the project due to unexpected site conditions discovered during construction. Unit price under -runs were due to bid item quantities not fully utilized during construction. Retainage is being held by the City for this project in the amount of $48,446.37. The construction budget was $1,071,684.90 with a 10% contingency. Construction Contract Amount Change Order Nos. 1 — 4 Unit Price Under -runs No Sales Tax Paid Total Amount Paid $974,259.00 31,438.96 (36,770.60) 0.00 $968,92736 RECOMMENDATION The Council is being asked to formally accept and authorize the release of retainage, subject to standard claim and lien release procedures, for the 2012 Overlay and Repair Project with ICON Materials in the final amount of $968,927.36 and to consider this item on the Consent Agenda of the February 19, 2013 Regular Meeting. Attachment: Notice of Completion W: \PW Eng \ PROJECTS \A- RW & RS Projects \2012 Overlay & Repair Program (91210401) \Construction\After Con \Info Memo - 2012 Overlay Closeout, 2- 5- 13.docx 5 NOTICE OF COMPLETION OF PUBLIC WORKS CONTRACT Contractor's UBI Number: 601 006 854 Name & Address of Public Agency City of Tukwila 6200 Southcenter Boulevard Tukwila, WA 98188 UBI Number: 179 000 208 Notice is Date: January 10, 2013 Department Use Only Assigned to: Date Assigned: ereby given relative to the completion of contract or project described below Project Name 2012 Overlay Program Contract Number 12 -091 Job Order Contracting IN Yes El No Description of Work Done/Include Jobsite Address(es) Provide hot mix asphalt (HMA) overlay at 2 locations in Tukwila: Tukwila Parkway from Southcenter Parkway to Andover Park West, and Andover Park West from Midland Drive to South 180th Street. The street improvements include planing bituminous pavement, removing pavement, providing pavement repairs, and paving with HMA at the stated streets; removing and replacing concrete curbs, gutters, sidewalks and ADA ramps; installing traffic loops and junction boxes; adjusting surface utilities to grade; and installing new channelization. Federally funded road transportation project? ❑ Yes [Vi No Contractor's Name ICON Materials Telephone Number 206- 575 -3200 Contractor Address 1508 Valentine Avenue SE, Pacific, WA 98047 If Retainage is Bonded, List Surety's Name or attach a copy) Surety Agent's Address Date Contract Awarded July 2, 2012 Date Work Commenced August 6, 2012 Date Work Completed December 31, 2012 Date Work Accepted Contract Amount Additions (+ ) Reductions (- ) Sub -Total Amount of Sales Tax Paid at 0% $ 974,259.00 $ 31,438.96 $ 36,770.60 $ 968,927.36 (If various rates apply, please send a breakdown) $ 0,00 s TOTAL $ two 7.36 NOTE: Thhese ese t totals must be equal iV-1rt.,c_etL Please List all Subcontractors Below: Liquidated Damages $ Amount Disbursed $ Amount Retained $ 0.00 920,480.99 48,446.37 TOTAL $ 968,927.36 Subcontractor's Name: UBI Number: Affidavit ID (if known) Cascade Channel & Grouting 601 426 821 Not known yet Chandler Construction, Inc. 600 624 758 Not known yet G & G Corporation 601 381 635 Not known yet J & G Concrete Corporation 602 817 010 Not known yet Pyramid Grinding, LLC 602 778 944 411998 Sea -Tac Sweeping Service 601 735 583 Not known yet Stripe Rite, Inc. 601 048 084 Not known yet Tyee Concrete Construction, Inc. 602 123 519 Not known yet F215-038-000 08-2011 REV 31 0020e (08/25/11) Continued on page 2 6 TO: City of Tukwila Jim Haggerton, Mayor INFORMATIONAL MEMORANDUM Mayor Haggerton Transportation Committee FROM: Bob Giberson, Public Works Director. BY: Cyndy Knighton, Senior Engineer DATE: February 8, 2013 SUBJECT: TUC Pedestrian /Bicycle Bridge Project No. 90510403 Project Update ISSUE Update on the design and funding status of the TUC Pedestrian /Bicycle Bridge Project. BACKGROUND Since 2005, staff and consultant design teams of KPFF Engineers and LMN Architects, have been working on planning and design of the Tukwila Urban Center Pedestrian /Bicycle Bridge over the Green River. Council directed staff to design a signature bridge as one of three catalyst projects of the Southcenter subarea plan's Mall -to- Station vision of a dense, urban, transit and pedestrian - friendly live - work -play area. The TUC Transit Center and the TUC Access (Klickitat) Project were the two other catalyst projects listed in the Southcenter Plan. DISCUSSION Design work is progressing and the 30% plans are scheduled to be completed in March, with full design completed before the end of 2013. At this time, funding is not secured for the required ROW or construction. In October 2012, staff submitted a grant application to the WSDOT Regional Mobility Grant Program. After being reviewed and scored, the project was ranked and is now the first contingency project, subject to the State legislature's budgeting process. Staff will know in mid -April if the status of funding will change. Attachment 1 shows projects currently being recommended for funding as well as a brief analysis of what may happen between now and the state's final budget for the 2013 -2015 biennium. The bridge and landing designs are progressing with the Council selected twin tied arch structure. The final alignment and landing locations have been determined, optimizing the crossing length (and shortening it by 20% over earlier designs). The west landing concept is fairly fixed but two landing options are being considered on the east side. Option 1 is a loop and Option 2 is a U- shape. Attachment 2 illustrates the crossing and landing options under consideration, as well as shows the arch bridge. The last page of Attachment 2 points out some of the high level pros and cons of the two east landing options. FINANCIAL IMPACT There is no specific financial impact as both options fall generally within the budget in the current CIP. RECOMMENDATION For discussion only. Attachments: WSDOT Regional Mobility Grant Program Information Bridge Alignment and Landing Alternatives. W: \PW Eng \ PROJECTS \A- RW & RS Projects \TUC Ped Bicycle Bridge (90510403) \Info Menlo - Update & Landing options 2- 8- 13.docx 7 Attachment 1 From: Fldridge, Mark To: dc1(abft.ora; (kmcmullen(abft,oral; rorvis(5 bft,ora; Chuck Green (ChuckG0 c- tran.oral; iulies(@c- tran,ora• normas(ac- tran.org; jrin.Limargo(@kingcountv.gov; Heffernan, Peter; Morrison, David; Natalie Patten (noattenaieffersontransit.coml; rramone(@ieffersontransit.com; Dale O'Brien (dobrien(@skaaittransit.oral; Marcia Smith; steve.walleci.ridaefield.wa.us; aavlvnn .brien(@ci.ridaefield.wa.us; kirk .iohnson(aci.ridaefield.wa.us; Heather McCartney. iallina(aci.mukilteo.wa.us; Bryant, Bill; "dorinda.costa(alseattle.aov" (dorinda.costa(aseattle.aov); Nelson Jan; Kelly Hayden; Barb Hunter (bhunterPoiercetransit.ora); matt.hansen(a�kinacountv.aov; doua.iohnson(@kinacountv.aov; pubwks(10 lanalevwa.ora; portfinance (aoortofsouthwhidbev.com; Brad Windier ( Brad .Windler0)ci.lonaview.wa.usl; ( corev .aldridae(alci.lonaview.wa.usl; tracv.hall(@ci.lonaview.wa.us; sallv.turner@lkingcountv.aov; ( melissa.caulev(3commtrans.oral; Kathryn Rasmussen; erick .beckmanasoundtransit.ora; Wolterink, Lisa; Patoc. Elmer. debbie,astinl@soundtransit.ora; Dennis Bloom; ( BHolman (a�intercitvtransit.coml; lwilliamson (Thintercitvtransit,corrl; AFreeman (alintercitvtransit.com• Suing, Troy; Futrell, Kevin; dbaldoz(a?ci,vakima,wa.us; Kent Vauahan (kvaughan6 kenmorewa,aovl (kvaughanakenmorewa.gov); brandalakenmorewa.aov• Cvndv Knighton; Gail Labanara; Otterstrom, Karl; Howell, Gordon; idonisi(@co.clallam,wa,us; Jamie Collier (iamiec(clallamtransit.coml; James. Rich; Larson, Andy; Clark- Getzin, Wendy A.; Beki Smith (BekiS0 KitsaoTransit.com) Regional Mobility Grant Recommended Project List in Rank Order Tuesday, December 04, 2012 12:07:29 PM Ranked Order List with Continuing Proiects Aoolicant.xlsx Subject: Date: Attachments: Good morning, Please find attached the Regional Mobility Grant Ranked Order List of recommended projects to the legislature. If your application or continuing project is highlighted in green, then you're project is recommend for funding based upon the scoring criteria detailed in the grant application guide. If your project is highlighted in orange, then it's on the contingency list. As you can see from the list the green highlighting ends with the Skagit Transit Everett Connector Expansion at $37,148,863. This means there are not enough program funds for the next project on the list being the City of Tukwila Urban Center Pedestrian - Bicycle Bridge over the Green River. The City of Tukwila project would put us over the top at $41,748,863. The program only gets $40 Million each biennium. We received 27 applications in the current call for projects. A total of seven people reviewed each application in various capacities. The scorers and the scoring process are held to the highest standards out of respect for the effort you have put forth in completing the application. We want every application to get a fair shake. I will be happy to talk with you one on one to discuss your grant application later in the week, as I have a fever at the moment, and plan to go home after I press send. If your project is currently highlighted in orange please do not despair! It's anybody guess what the legislature will do with the recommended list. What happens next? All I can give you are some possible scenarios based upon past experience with the legislature. • The legislature often times does not fully fund the Sound Transit grant requests — That means projects on the contingency list could get funding • The legislature didn't fund any operating or equipment projects in the 2011 -2013 biennium, but kept the ranking the same. They do that again, then construction projects 8 on the contingency list could get funding. • The legislature may give the program more money to fund some projects on the contingency list. We simply won't know the final outcome of all this effort until the legislature releases the list (typically the third week of April), which I will forward to all of you immediately thereafter. Thank you all very much for doing an outstanding job during this call for projects! Mark Eldridge Regional Mobility Grant Program Manager Park and Ride Lot Program Manager 360 -705 -7273 9 Regional Mobility Grant 2013 -2015 Ranked Order List Ranked Order Agency Project Title Project Type 2013 -2015 Request 2013 -2015 Running Total 2015 -2017 Request 2015 -2017 Running Total Total Request 4 Year City of Shoreline N 192nd to 205th St BAT Lanes CN $850,000 $850,000 4 Year City of Tukwila Tukwila Urban Center Transit Center CN $835,000 $1,685,000 Continuing Pr jects 4 Year King County Metro South Kirkland Park and Ride Expansion CN $540,000 $2,225,000 4 Year Pierce Transit 112th and Pacific /SR 7 Transit Access Improvements CN $1,115,645 $3,340,645 4 Year Sound Transit S. 200th Intermodal Station and Park and Ride CN $1,613,789 $4,954,434 1 Sound Transit Clean Green Fleet Replacement: Replace Diesel Buses with High Capacil EV 5,000,000 9,954,434 0 0 5,000,000 New Projects 2 Sound Transit Tacoma Trestle Replacement & Capacity Improvements CN 7,000,000 16,954,434 0 0 7,000,000 3 City of Ridgefield Ridgefield Interstate 5 /State Route 501 Interchange Park and Ride CN 1,295,000 18,249,434 0 0 1,295,000 4 King County Metro 1 -405 Corridor Managing Demand CN 941,872 19,191,306 1,456,032 1,456,032 2,397,904 5 Community Transit Double Decker Buses EV 3,978,000 23,169,306 0 1,456,032 3,978,000 6 Intercity Transit Tumwater /DuPont /Lakewood Express Bus Service OP 2,935,636 26,104,942 1,374,648 2,830,680 4,310,284 7 Intercity Transit Olympia - Seattle Express Bus Service OP 530,000 26,634,942 640,000 3,470,680 1,170,000 8 King County Metro RapidRide F Line Service Extension OP 1,286,200 27,921,142 1,547,100 5,017,780 2,833,300 9 City of Mukilteo Mukilteo Multimodal Pedestrian Bridge Project CN 1,000,000 28,921,142 0 5,017,780 1,000,000 10 Seattle DOT 23rd Avenue Transit Improvements CN 4,000,000 32,921,142 0 5,017,780 4,000,000 11 C -TRAN Fourth Plain Bus Rapid Transit CN 3,000,000 35,921,142 0 5,017,780 3,000,000 12 Pierce Transit SR 7 /Pacific Avenue Peak Hour Service Expansion OP 1,105,601 37,026,743 1,263,549 6,281,329 2,369,150 13 Skagit Transit Everett Connector Expansion OP 122,120 37,148,863 130,000 6,411,329 252,120 14 City of Tukwila Urban Center Pedestrian - Bicycle Bridge over the Green River CN 4,600,000 41,748,863 2,270,000 8,681,329 6,870,000 15 Kitsap Transit SR 305 Intersection Improvements at Suquamish Way & Park and Ride CN 2,326 000 44,074,863 0 8,681,329 2,326,000 16 Ben Franklin Transit Park and Ride Richland CN 592,500 44,667,363 0 0 592,500 17 King County Metro Northgate Transit Center Redevelopment CN 1,187,255 45,854,618 2,312,745 2,312,745 3,500,000 18 Spokane Transit West Plains Transit Center CN 1,600,000 47,454,618 6,400,000 8,712,745 8,000,000 19 King County Metro Madison Street Corridor CN 2,440,000 49,894,618 1,640,000 10,352,745 4,080,000 20 City of Kenmore SR 522 West A (61st Ave NE to 65th Ave NE incl. 61st Ave NE Approach CN 5,201,840 55,096,458 0 10,352,745 5,201,840 Contingency 21 Yakima Transit Firing Center park and ride lot expansion CN 240,000 55,336,458 0 10,352,745 240,000 List 22 City of Langley CN, OP, EV 2,634,238 57,970,696 0 10,352,745 2,634,238 Port of South Whidbey Park & Ride Facility with Sunday Bus Service Derr 23 Spokane Transit Central City Line CN 500,000 58,470,696 1,700,000 12,052,745 2,200,000 24 Clallam Transit Kitchen Dick / Highway 101 Park and Ride CN 480,000 58,950,696 0 12,052,745 480,000 25 Snohomish County Mukilteo Park and Ride Plus CN 8,281,146 67,231,842 0 12,052,745 8,281,146 26 Jefferson Transit Jefferson Healthcare Transit Bus Pullout and Shelter CN 160,000 67,391,842 0 12,052,745 160,000 27 RiverCities Transit Transit Service Improvements OP 560,000 67,951,842 0 12,052,745 560,000 28 King County Metro Alaska Way Viaduct Service Enhancements 0 0 67,951,842 0 12,052,745 0 attachment 2 proposed pedestrian signal map east approach option 1 east approach option 1 14 east approach option 2 east approach option 2 17 More length of elevated structure More closed feel to south More complex appearance • • • 0 0 a) a 0 U, a) 0 a E (0 L a) on O J E 0 V 0 _a -0 4-, L) (0 CT CD U um L) C a) = 4-, 0 N on C VI L a (0 CD a) E c OA L (0 a) C 0 L 4 JO G 0 a Z 0 V Z 0 H a 0 0 a a) a 0 Ny W U, O 0 a °, a) V) a E (0 ((0 L L L a) 4 - 0 4-, t _ L CZ W a) 0 4-, U, 4-, (0 U U O � C N a E t 4-, 0 U, 0 4-, (1) C a) a 0 a) 0 2 J Q z z 0 W 0 a 20 DECEMBER 2012 TUKWILA URBAN CENTER PEDESTRIAN & BICYCLE BRIDGE E J 18