HomeMy WebLinkAboutTrams 2013-02-12 Item 2B - Final Acceptance - 2012 Overlay and Repair with ICON MaterialsTO: FROM: BY: DATE: SUBJECT: City of Tukwila Jim Haggerton, Mayor INFORMATIONAL MEMORANDUM Mayor Haggerton Transportation Committee Bob Giberson, Public Works Director Peter Lau, Senior Engineer February 8, 2013 2012 Overlay and Repair Program Project No. 91210401, Contract No. 12 -091 Project Completion and Acceptance „RJ ISSUE Accept contract as complete and authorize release of retainage. BACKGROUND The Notice to Proceed for Contract No. 12 -091 with ICON Materials of Pacific, Washington was issued on August 6, 2012 for the 2012 Overlay and Repair Project. This overlay project provided hot mix asphalt (HMA) paving at 2 locations: Tukwila Parkway from Southcenter Parkway to Andover Park West and Andover Park West from Midland Drive to South 180th Street. The street improvements included pavement and paving; removing and replacing concrete curbs, gutters, sidewalks and ADA ramps; installing traffic loops and junction boxes; adjusting surface utilities to grade; and installing new roadway channelization. ANALYSIS Construction was physically completed with condition on December 31, 2012. Four (4) change orders were executed for the project due to unexpected site conditions discovered during construction. Unit price under -runs were due to bid item quantities not fully utilized during construction. Retainage is being held by the City for this project in the amount of $48,446.37. The construction budget was $1,071,684.90 with a 10% contingency. Construction Contract Amount Change Order Nos. 1 — 4 Unit Price Under -runs No Sales Tax Paid Total Amount Paid $974,259.00 31,438.96 (36,770.60) 0.00 $968,92736 RECOMMENDATION The Council is being asked to formally accept and authorize the release of retainage, subject to standard claim and lien release procedures, for the 2012 Overlay and Repair Project with ICON Materials in the final amount of $968,927.36 and to consider this item on the Consent Agenda of the February 19, 2013 Regular Meeting. Attachment: Notice of Completion W: \PW Eng \ PROJECTS \A- RW & RS Projects \2012 Overlay & Repair Program (91210401) \Construction\After Con \Info Memo - 2012 Overlay Closeout, 2- 5- 13.docx 5 NOTICE OF COMPLETION OF PUBLIC WORKS CONTRACT Contractor's UBI Number: 601 006 854 Name & Address of Public Agency City of Tukwila 6200 Southcenter Boulevard Tukwila, WA 98188 UBI Number: 179 000 208 Notice is Date: January 10, 2013 Department Use Only Assigned to: Date Assigned: ereby given relative to the completion of contract or project described below Project Name 2012 Overlay Program Contract Number 12 -091 Job Order Contracting IN Yes El No Description of Work Done/Include Jobsite Address(es) Provide hot mix asphalt (HMA) overlay at 2 locations in Tukwila: Tukwila Parkway from Southcenter Parkway to Andover Park West, and Andover Park West from Midland Drive to South 180th Street. The street improvements include planing bituminous pavement, removing pavement, providing pavement repairs, and paving with HMA at the stated streets; removing and replacing concrete curbs, gutters, sidewalks and ADA ramps; installing traffic loops and junction boxes; adjusting surface utilities to grade; and installing new channelization. Federally funded road transportation project? ❑ Yes [Vi No Contractor's Name ICON Materials Telephone Number 206- 575 -3200 Contractor Address 1508 Valentine Avenue SE, Pacific, WA 98047 If Retainage is Bonded, List Surety's Name or attach a copy) Surety Agent's Address Date Contract Awarded July 2, 2012 Date Work Commenced August 6, 2012 Date Work Completed December 31, 2012 Date Work Accepted Contract Amount Additions (+ ) Reductions (- ) Sub -Total Amount of Sales Tax Paid at 0% $ 974,259.00 $ 31,438.96 $ 36,770.60 $ 968,927.36 (If various rates apply, please send a breakdown) $ 0,00 s TOTAL $ two 7.36 NOTE: Thhese ese t totals must be equal iV-1rt.,c_etL Please List all Subcontractors Below: Liquidated Damages $ Amount Disbursed $ Amount Retained $ 0.00 920,480.99 48,446.37 TOTAL $ 968,927.36 Subcontractor's Name: UBI Number: Affidavit ID (if known) Cascade Channel & Grouting 601 426 821 Not known yet Chandler Construction, Inc. 600 624 758 Not known yet G & G Corporation 601 381 635 Not known yet J & G Concrete Corporation 602 817 010 Not known yet Pyramid Grinding, LLC 602 778 944 411998 Sea -Tac Sweeping Service 601 735 583 Not known yet Stripe Rite, Inc. 601 048 084 Not known yet Tyee Concrete Construction, Inc. 602 123 519 Not known yet F215-038-000 08-2011 REV 31 0020e (08/25/11) Continued on page 2 6