HomeMy WebLinkAboutTrans 2013-05-14 Item 2B - Supplemental Agreement #11 - 2013 Bridge Program / Fort Dent Bridge with King CountyTO: City of Tukwila Jim Haggerton, Mayor INFORMATIONAL MEMORANDUM Mayor Haggerton Transportation Committee FROM: Bob Giberson, Public Works Director By: Grant Griffin, Senior Program Manager DATE: May 10, 2013 SUBJECT: 2013 Bridge Program — Fort Dent Bridge Project No. 91310402, Contract 10- 022.13, Supplement No. 11 King County Discretionary Work Request # TK -009 ISSUE Approve Supplement No. 11 (TK -009) with King County for the 2013 Bridge Program. BACKGROUND The City executed an Interlocal Agreement with King County in 2010, Contract No. 10 -022, under which, upon request by the City, King County could perform certain services within the abilities of the King County Road Services Division. This agreement renews automatically from year to year unless written termination is agreed to by both parties. For Supplement No. 11 to the contract, Tukwila has requested that King County provide bridge repair services for Fort Dent Park Bridge over the Green River as part of the 2013 Bridge Repair Program. The south approach on the Fort Dent Bridge has settled, causing increased traffic impact to the bridge, as well as tripping hazards on the sidewalks. The proposed bridge repair will correct the tripping hazards, as well as smooth the roadway approach, eliminating traffic impact issues. DISCUSSION King County has provided an estimated cost of $40,355.00 to perform the work as part of the 2013 Annual Bridge Program. The estimated project costs are within the total $275,000 budget. For 2013, we have obligated $34,800 for 2013 Bridge inspections, $23,000 for the Klickitat Bridge and, with the Fort Dent Bridge at $45,355, the remaining balance is $171,845.00. Estimate Budget Work Request #TK -009 $40,355.00 $ 200,000.00 Construction Management 5,000.00 75,000.00 Total $45.355.00 $275.000.00 RECOMMENDATION Approve Supplement No. 11 (Discretionary Work Request #TK -009) to Contract 10 -022 with King County for the Fort Dent Bridge as part of the 2013 Bridge Repair Program in the amount of $40,355.00 and consider this item on the Consent Agenda at the May 20, 2013 Regular Council Meeting. Attachment: Discretionary Work Request # TK -009 W:,PW Eng,PROJECTS'A- RW & RS Projects'Bridge Inspections 2013 (91310402) \Fort Dent Bridge \Info Memo #TK -009 Fort Dent Br Sup #1 I.docx 11 Fort Dent Bridge photos Discretionary Work Request for FORM A City of: Tukwila Request Number: TK -009 King County Road Services X13 ;r4 ■ Problem Description: Settlement has occurred on the sidewalk approaches and the asphalt a proaches to the bridge causing vertical differential. Date: 03/12/2013 Nature of Request: Grind and overlay asphalt approaches to match the bridge deck elevation, repair the north concrete bridge abutment (cracked /broken), remove and replace sidewalk panels, and place a grout overlay on sidewalk panels to eliminate vertical differential. Location: Bridge crossing the Green River at the entrance to Fort Dent Park. Attachments: City Priority: Medium Special scheduling requirements: Repairs must be scheduled to avoid conflict with soccer events at Starfire Sports Complex. City Project Manager - Telephone Number: Robin Tischmak - 206 - 431 -2455 Authorized By: Robin Tischmak Date: 03/12/2013 FORM B ARMS Project #: EBS Project #: Work Order #: Form B Sent to City Date: 05/03/2013 Recommended Action: Saw cut existing sidewalk and remove with jackhammers (machine may not reach area). Prepare base, set forms and pour new concrete. Cover as needed with plywood for foot traffic. Remove forms, debris and reseed disturbed area. Grind or needle gun existing joint to expose acceptable material. Epoxy coat area to be patched; patch with high strength material. Grind bridge approaches and repave fora smoother transition. Proposed Schedule: May 2013 County Project Manager: Ross Pettit/Ken Thurman Cost Estimate: $40,355.00 Authorized By (City if > $500): Date: Mayor Comments: Plans were previously provided to King County staff for review. 13