HomeMy WebLinkAboutUtilities 2013-05-20 Item 2A - Update - East Marginal Way South Emergency Storm Pipe RepairCity of Tukwila Jim Haggerton, Mayor INFORMATIONAL MEMORANDUM TO: Mayor Haggerton Utilities Committee FROM: Bob Giberson, Public Works Director BY: Ryan Larson, Senior Engineer DATE: May 17, 2013 SUBJECT: EMWS Emergency Storm Pipe Repair 11 -19 -12 Project No. 91241206, Contract No. 13 -036 Status Update ISSUE Status update of the East Marginal Way South (EMWS) Emergency Storm Repair 11 -19 -12 Project. BACKGROUND On November 19, 2012, a large sinkhole was created by a break in a 30 -inch storm water line on EMWS just south of S 124th St. The pipe conveys surface water from the east fork of Riverton Creek, as well as local drainage in the area near Group Health. The storm pipe is corrugated metal (CMP) and is approximately 10' deep. ANALYSIS A contract with KPG was issued in April to design a permanent replacement for this failing pipe as soon as practical. The design contract included potholing to determine the exact location of existing utilities and a geotechnical investigation to determine soil conditions. These investigations have revealed additional issues that must be dealt with during design and construction. The issues include contaminated soils consisting of kiln dust, creosote, and petroleum hydrocarbons, a high ground water table that will require the installation of dewatering wells during construction, and a 12" water main that will require relocation by Water District 125. KPG is looking at potential options to reroute the pipe to avoid or minimize the impacts of these issues, but other costs such as traffic impacts and required utility relocations could make an alternate pipe alignment unfeasible. Staff had previously recommended that a portion of the EMWS repair occur this year to reduce the possibility of another pipe failure and potential flooding. With the issues listed above, failure to adequately address subsurface issues during the design process could lead to significant cost over runs during construction and possible permit violations. It is now recommended that construction of the EMWS repair be postponed until 2014 allowing sufficient time to properly design the improvements, relocate impacted utilities, and ensure construction occurs in the allowed fish window. City maintenance crews will continue to monitor the pipe for potential failures until permanent repairs can be made. RECOMMENDATION Information only. Attachments: Consultant construction delay recommendation W ,PW Eng,PROJECTS'A- DR Projects.EMWS Emergency Storm Pipe Repair 11 -19 -12 t91241206jIDesignllnfo Memo Status Update.doc 1 Printed By moaner Print 0ate 3:21 2013 B 16 50 AM Flee Name. J.IE L',,KPG\KPG I6',KPG 1601',Flgures',CAD \KPG 1601 SP dwg I Layout FIGURE 1 0 L A �m ✓ DD O z z c4,)n 52 is r MM 0) o ° 2 05, as zz 00 mm a m r O ° A x. m a to g 0 80 30 9 A a am < a m � a cu 5 Us m Z W 5 co C 01 3 N 9. 0 M / la a "A C J t,t1 4 "'1ntalyh w • B -1 0-0.5' Lawn and Topsoil 0.5- 5' Very Loose to loose , silty SAND, gravel; moist to wet. (SM) 5- 10' Medium Dense to loose, SAND and gravel with silt, with stryrofoam pellets, moist to wet. (SP -SM to GP -GM) 10 -15.0' V. Loose , silty Sand with pockets to lenses of organic silt and peat, wet (SM) 15 -21.5' Loose grading to medium dense SAND (SP) interbedded with sandy silt, wet Groundwater at about 8.5 feet on 4/30/2013 GEo DESIGN 1Sn99wse,l..l. m1..y Suite roe brand On 97374 Off son %a. 1707 fax Self% IOO KPG-16 -01 SITE PLAN MARCH 2013 EAST MARGINAL WAY TUKWILA, WA FIGURE 1 4