INFORMATIONAL MEMORANDUM
Mayor Haggerton
Finance and Safety Committee
FROM: Bob Giberson, Public Works Director
DATE: May 17, 2013
SUBJECT: City Facilities Needs Assessment and Feasibility Study
Project No. 91230201
Consultant Selection and Agreement
ISSUE
Approve consultant agreement with Rice Fergus Miller for architectural services for the City
Facilities Needs Assessment and Feasibility Study.
BACKGROUND
As part of the 2013 -2014 biennial budget and CIP, City Council approved $500,000 for the City
Facilities Project. Staff advertised a Request for Proposals on February 8 and 15, 2013 with a
proposal deadline of February 22, 2013. The selection committee met to evaluate the two (2)
proposals received from the Beckwith Consulting Group and Rice Fergus Miller. Interviews were
held on March 12 and 18 and references were then checked. Both consultants scored very well
in the overall process, however, Rice Fergus Miller ranked higher. Staff has negotiated a scope
of work and fee with Rice Fergus Miller for the City Facilities Needs Assessment and Feasibility
Study.
DISCUSSION
The Rice Fergus Miller team includes BERK, Inc., Reid Middleton, Matson /Carlson, and Long Bay
Enterprises as sub - consultants for the project. The proposed scope of work includes four phases of
work to produce the Needs Assessment and Feasibility Study. Exhibit A to the consultant
agreement provides details of all the work tasks proposed for these four phases:
• Phase 1 Visioning and Information Gathering
• Phase 2 Development of Need and Prioritization of Findings
• Phase 3 Feasibility Study
• Phase 4 Risk Assessment
BUDGET SUMMARY
The proposed contract amount of $349,135.00 is well within the $500,000.00 budget.
RECOMMENDATION
The Council is being asked to approve the consultant agreement with Rice Fergus Miller in the
amount of $349,135.00 for the City Facilities project and consider this item at the May 28, 2013
Committee of the Whole meeting and subsequent June 3, 2013 Regular Meeting.
Attachments: Proposed Project Work Plan
Team Organization Chart
Consultant Agreement
City Facilities page 73, 2013 CIP
w: \pw eng \projects \a - bg projects \city facilities (91230201)\ information memo rfm selection_scope_fee.doc
1
p
Proposed Project Work Plan
FACILITY NEED ANALYSIS
FEASIBILITY STUDY
2 months
• Identify steering committee
and stakeholders
• Present and gain approval of
project work plan /schedule
• Define /tabulate and reach
consensus on community
values and organizational
philosophies
• Review /document existing
facilities and tabulate space
utilization
• Develop space need
projections (10, 25, 50 yrs.)
• Steering committee and
City Council meeting for
confirmation
• Adjust as required
• Gain phase approval - move
to next phase
2 months
• Update and present work
plan /schedule
• Match projected needs
to space currently utilized
- document overage/
shortcoming
• Develop criteria for
establishing prioritization of
City services
• Establish prioritization based
on public safety criteria
• Steering committee &
City Council presentation/
confirmation
• Adjust as required
• Gain phase approval -
move to next phase
2 months
• Update and present work
plan /schedule
• Determine needs justification
for new space (renovated /and
or new)
• Engage commercial real
estate firm to develop property
listing for examination
• Generate test to fit block
diagrams for candidate parcels/
buildings
• Evaluate and summarize
findings
• Steering committee and
City Council presentation/
confirmation
• Adjust as required
• Gain phase approval -
move to next phase
2 months
• Apply costing matrix to
solutions
• Draft review of anticipated
study option costs and risk
assessment prioritization
• Strategize funding scenarios
for proposed options
• Assemble draft report
• Steering committee and City
Council presentation
• Adjust as required
• Submit final document
Rice Fergus Miller
BERK
Reid Middleton
- Work plan schedule
- Space needs
- Confirm existing building
conditions
- Statement of community
values and organizational
philosphy
Rice Fergus Miller
BERK
Reid Middleton
Rice Fergus Miller
BERK
Reid Middleton
Long Bay Enterprises
- Prioritization of need
- Final needs assessment
- Evaluation of property
response to need
- New vs. existing
Rice Fergus Miller
BERK
Carlson / Matson
Long Bay Enterprises
- Financial analysis
- Confirmation of prioritization
- Analysis and feasibility study
into final document
- Recommendations
- Issual final report
- Merge facility needs
3
p
Team Organization Chart
CITY OF TUKWILA
TEAM LEADER
David Fergus
Comprehensive Review
Principal -in- Charge
Rice Fergus Miller
MANAGEMENT
Ron Easterday
Need Assessment/
Feasiblity Input
Project Manager
Rice Fergus Miller
PLANNING
Bob Hutchinson
Planning and Concept
Development
Project Architect
Rice Fergus Miller
PROJECT COORDINATION
Hope Zorrozua
Project Coordinator
Rice Fergus Miller
FEASIBILITY FACILITATION
Michael Hodgins
Finance Policy
BERK, Inc.
Dawn Couch
Public Engagement
BERK, Inc.
Erik Runde!!
Policy and GIS Analyst
BERK, Inc.
STRUCTURAL ANALYSIS
Dave Swanson
Principal Engineer
Reid Middleton
Corbin Hammer
Senior Engineer
Reid Middleton
Suzie Brendle
Senior Engineer
Reid Middleton
COST ESTIMATING
Sandra Matson
Cost Estimating
Matson / Carlson
LAND USE EXPERTISE
Cynthia Berne
Real Estate Advisory Input
Long Bay Enterprises
5
p
City of Tukwila
6200 Southcenter Boulevard, Tukwila WA 98188
Contract Number:
CONSULTANT AGREEMENT FOR
ARCHITECTURAL SERVICES
THIS AGREEMENT is entered into between the City of Tukwila, Washington, hereinafter
referred to as "the City ", and Rice Fergus Miller, Inc., hereinafter referred to as "the Consultant ", in
consideration of the mutual benefits, terms, and conditions hereinafter specified.
1. Project Designation. The Consultant is retained by the City to perform Architectural services
in connection with the project titled Facility Needs Assessment and Feasibility Study.
2. Scope of Services. The Consultant agrees to perform the services, identified on Exhibit "A"
attached hereto, including the provision of all labor, materials, equipment and supplies.
3. Duration of Agreement; Time for Performance. This Agreement shall be in full force and
effect for a period commencing upon execution and ending January 27, 2014, unless sooner
terminated under the provisions hereinafter specified. Work under this Agreement shall
commence upon written notice by the City to the Consultant to proceed. The Consultant shall
perform all services and provide all work product required pursuant to this Agreement no later
than January 27, 2014 unless an extension of such time is granted in writing by the City.
4. Payment. The Consultant shall be paid by the City for completed work and for services
rendered under this Agreement as follows:
A. Payment for the work provided by the Consultant shall be made as provided on Exhibit
"B" attached hereto, provided that the total amount of payment to the Consultant shall not
exceed $349,135.00 without express written modification of the Agreement signed by the
City.
B. The Consultant may submit vouchers to the City once per month during the progress of
the work for partial payment for that portion of the project completed to date. Such
vouchers will be checked by the City and, upon approval thereof, payment shall be made
to the Consultant in the amount approved.
C. Final payment of any balance due the Consultant of the total contract price earned will be
made promptly upon its ascertainment and verification by the City after the completion of
the work under this Agreement and its acceptance by the City.
D. Payment as provided in this section shall be full compensation for work performed,
services rendered, and for all materials, supplies, equipment and incidentals necessary to
complete the work.
E. The Consultant's records and accounts pertaining to this Agreement are to be kept
available for inspection by representatives of the City and the state of Washington for a
period of three (3) years after final payments. Copies shall be made available upon
request.
7
5. Ownership and Use of Documents. All documents, drawings, specifications and other
materials produced by the Consultant in connection with the services rendered under this
Agreement shall be the property of the City whether the project for which they are made is
executed or not. The Consultant shall be permitted to retain copies, including reproducible
copies, of drawings and specifications for information, reference and use in connection with
the Consultant's endeavors. The Consultant shall not be responsible for any use of the said
documents, drawings, specifications or other materials by the City on any project other than
the project specified in this Agreement.
6. Compliance with Laws. The Consultant shall, in performing the services contemplated by
this Agreement, faithfully observe and comply with all federal, state, and local laws,
ordinances and regulations, applicable to the services rendered under this Agreement.
7. Indemnification. The Consultant shall defend, indemnify and hold the City, its officers,
officials, employees and volunteers harmless from any and all claims, injuries, damages,
losses or suits including attorney fees, arising out of or resulting from the acts, errors or
omissions of the Consultant in performance of this Agreement, except for injuries and
damages caused by the sole negligence of the City.
Should a court of competent jurisdiction determine that this Agreement is subject to RCW
4.24.115, then, in the event of liability for damages arising out of bodily injury to persons or
damages to property caused by or resulting from the concurrent negligence of the Consultant
and the City, its officers, officials, employees, and volunteers, the Consultant's liability
hereunder shall be only to the extent of the Consultant's negligence. It is further specifically
and expressly understood that the indemnification provided herein constitutes the Consultant's
waiver of immunity under Industrial Insurance, Title 51 RCW, solely for the purposes of this
indemnification. This waiver has been mutually negotiated by the parties. The provisions of
this section shall survive the expiration or termination of this Agreement.
8. Insurance. The Consultant shall procure and maintain for the duration of the Agreement,
insurance against claims for injuries to persons or damage to property which may arise from
or in connection with the performance of the work hereunder by the Consultant, its agents,
representatives, or employees. Consultant's maintenance of insurance as required by the
agreement shall not be construed to limit the liability of the Consultant to the coverage
provided by such insurance, or otherwise limit the City's recourse to any remedy available at
law or in equity.
A. Minimum Amounts and Scope of Insurance. Consultant shall obtain insurance of the
types and with the limits described below:
1. Automobile Liability insurance with a minimum combined single limit for bodily
injury and property damage of $1,000,000 per accident. Automobile Liability
insurance shall cover all owned, non - owned, hired and leased vehicles. Coverage
shall be written on Insurance Services Office (ISO) form CA 00 01 or a substitute
form providing equivalent liability coverage. If necessary, the policy shall be
endorsed to provide contractual liability coverage.
CA revised : 1 -2013
8
Page 2
2. Commercial General Liability insurance with limits no less than $1,000,000 each
occurrence, $2,000,000 general aggregate. Commercial General Liability
insurance shall be written on ISO occurrence form CG 00 01 and shall cover
liability arising from premises, operations, independent contractors and personal
injury and advertising injury. The City shall be named as an insured under the
Consultant's Commercial General Liability insurance policy with respect to the
work performed for the City.
3. Workers' Compensation coverage as required by the Industrial Insurance laws of
the State of Washington.
4. Professional Liability with limits no less than $1,000,000 per claim and
$1,000,000 policy aggregate limit. Professional Liability insurance shall be
appropriate to the Consultant's profession.
B. Other Insurance Provision. The Consultant's Automobile Liability and Commercial
General Liability insurance policies are to contain, or be endorsed to contain that they
shall be primary insurance with respect to the City. Any Insurance, self- insurance, or
insurance pool coverage maintained by the City shall be excess of the Consultant's
insurance and shall not be contributed or combined with it.
C. Acceptability of Insurers. Insurance is to be placed with insurers with a current A.M.
Best rating of not less than A:VII.
D. Verification of Coverage. Consultant shall furnish the City with original certificates and
a copy of the amendatory endorsements, including but not necessarily limited to the
additional insured endorsement, evidencing the insurance requirements of the Consultant
before commencement of the work. Certificates of coverage and endorsements as required
by this section shall be delivered to the City within fifteen (15) days of execution of this
Agreement.
E. Notice of Cancellation. The Consultant shall provide the City with written notice of any
policy cancellation, within two business days of their receipt of such notice.
F. Failure to Maintain Insurance. Failure on the part of the Consultant to maintain the
insurance as required shall constitute a material breach of contract, upon which the City
may, after giving five business days notice to the Consultant to correct the breach,
immediately terminate the contract or, at its discretion, procure or renew such insurance
and pay any and all premiums in connection therewith, with any sums so expended to be
repaid to the City on demand, or at the sole discretion of the City, offset against funds due
the Consultant from the City.
9. Independent Contractor. The Consultant and the City agree that the Consultant is an
independent contractor with respect to the services provided pursuant to this Agreement.
Nothing in this Agreement shall be considered to create the relationship of employer and
employee between the parties hereto. Neither the Consultant nor any employee of the
Consultant shall be entitled to any benefits accorded City employees by virtue of the services
provided under this Agreement. The City shall not be responsible for withholding or
otherwise deducting federal income tax or social security or for contributing to the state
industrial insurance program, otherwise assuming the duties of an employer with respect to
the Consultant, or any employee of the Consultant.
CA revised : 1 -2013
Page 3
9
10. Covenant Against Contingent Fees. The Consultant warrants that he has not employed or
retained any company or person, other than a bonafide employee working solely for the
Consultant, to solicit or secure this contract, and that he has not paid or agreed to pay any
company or person, other than a bonafide employee working solely for the Consultant, any
fee, commission, percentage, brokerage fee, gifts, or any other consideration contingent upon
or resulting from the award or making of this contract. For breach or violation of this warrant,
the City shall have the right to annul this contract without liability, or in its discretion to
deduct from the contract price or consideration, or otherwise recover, the full amount of such
fee, commission, percentage, brokerage fee, gift, or contingent fee.
11. Discrimination Prohibited. The Consultant, with regard to the work performed by it under
this Agreement, will not discriminate on the grounds of race, religion, creed, color, national
origin, age, veteran status, sex, sexual orientation, gender identity, marital status, political
affiliation or the presence of any disability in the selection and retention of employees or
procurement of materials or supplies.
12. Assignment. The Consultant shall not sublet or assign any of the services covered by this
Agreement without the express written consent of the City.
13. Non - Waiver. Waiver by the City of any provision of this Agreement or any time limitation
provided for in this Agreement shall not constitute a waiver of any other provision.
14. Termination.
A. The City reserves the right to terminate this Agreement at any time by giving ten (10)
days written notice to the Consultant.
B. In the event of the death of a member, partner or officer of the Consultant, or any of its
supervisory personnel assigned to the project, the surviving members of the Consultant
hereby agree to complete the work under the terms of this Agreement, if requested to do
so by the City. This section shall not be a bar to renegotiations of this Agreement
between surviving members of the Consultant and the City, if the City so chooses.
15. Applicable Law; Venue; Attorney's Fees. This Agreement shall be subject to, and the
Consultant shall at all times comply with, all applicable federal, state and local laws,
regulations, and rules, including the provisions of the City of Tukwila Municipal Code and
ordinances of the City of Tukwila. In the event any suit, arbitration, or other proceeding is
instituted to enforce any term of this Agreement, the parties specifically understand and agree
that venue shall be properly laid in King County, Washington. The prevailing party in any
such action shall be entitled to its attorney's fees and costs of suit. Venue for any action
arising from or related to this Agreement shall be exclusively in King County Superior Court.
16. Severability and Survival. If any term, condition or provision of this Agreement is declared
void or unenforceable or limited in its application or effect, such event shall not affect any
other provisions hereof and all other provisions shall remain fully enforceable. The provisions
of this Agreement, which by their sense and context are reasonably intended to survive the
completion, expiration or cancellation of this Agreement, shall survive termination of this
Agreement.
CA revised : 1 -2013
10
Page 4
17. Notices. Notices to the City of Tukwila shall be sent to the following address:
City Clerk
City of Tukwila
6200 Southcenter Boulevard
Tukwila, WA 98188
Notices to Consultant shall be sent to the following address:
Rice Fergus Miller, Inc
275 Stn Street, Suite 100
Bremerton, WA 98337
18. Entire Agreement; Modification. This Agreement, together with attachments or addenda,
represents the entire and integrated Agreement between the City and the Consultant and
supersedes all prior negotiations, representations, or agreements written or oral. No
amendment or modification of this Agreement shall be of any force or effect unless it is in
writing and signed by the parties.
DATED this
CITY OF TUKWILA
Mayor, Jim Haggerton
Attest /Authenticated:
day of , 20
CO ' ' LTANT
By:
Printed Name: 3frsIIb Motif
Title: POW /1/L1Haelft/
Approved as to Form:
City Clerk, Christy O'Flaherty Office of the City Attorney
CA revised : 1 -2013
Page 5
11
p
RICeJ"guAVIILIER
ExhibitA ARCHITECTURE & PLANNING
City of Tukwila Facility Needs Analysis and Feasibility Study
Scope of Work 4/23/13
Phase 1: Visioning and Information Gathering
Task 1: Kickoff Meeting and Project Plan Presentation /Refinement
• Discuss overall project engagement, process design and identify the members of the steering
committee and the stakeholders that will be part of the decision making process. Define
appropriate level of engagement for the following groups:
o Internal stakeholders (both departmental leads as well as broader staff)
o Decision makers (primarily senior management, the Mayor and Council)
o External stakeholders and community interests
o The broader public
• Review and revise the project work plan, clarifying the responsibilities of Rice Fergus Miller
(RFM) and City staff. Determine how to best communicate and work together and codify means
and methods of communication.
• Discuss components of a Community Outreach Plan strategy and how it will be implemented.
Identify key roles of City Staff and RFM team in conducting plan and expected deliverables.
• Based on these discussions, prepare a final task - loaded schedule for the entire project scope.
Task 2: Steering Committee Meeting
• Introductions, presentation and agreement of operating principals, and discussion of work plan,
schedule, and end product.
• Discuss what project success would look like.
• Define methodology for soliciting staff and community input, means of conflict resolution, and
presenting reviewed information back. Define iterations of process allowed to maintain
schedule milestones.
o, Strategies for Information Gathering
• Stakeholder interviews
• Online surveys
• Website presentation of project status
• Gather comments /revisions for edits to plan and submission to Steering Committee for record.
1
RICeYCYgZISMILLER
ExhibitA ARCHITECTURE E. PLANNING.
Task 3: Executive Staff Work Session
• First presentation of schedule, work plan and expectations for the planning process. Gather
comments /revisions for edits to plan and submission to Steering Committee.
Task 4: Compiling Information on Existing City Facilities
• Review City records and ask Department Heads to tabulate square footage of use by
department.
• Research City records and obtain all available drawings of buildings currently in use.
• Obtain staffing organizational chart for each department that is part of study.
• Physically survey each department to confirm how space is utilized.
Task 5: Develop Space Needs Projections (10, 25 and 50 year Benchmarks)
• Kickoff Meeting with Department Heads to discuss process and methodology of approach.
• Discuss and document future projected needs with each Department Head.
• Distribute and discuss survey form to be distributed to staff by Department Heads, and schedule
follow -up discussion with each Department Head to discuss results and reconcile conflicts.
Task 6: Strategize Funding Opportunities for Future City Development
• Extract demographic information and financial projections from the Tukwila Strategic Plan to
serve as a springboard for supporting funding discussion.
• Conduct workshop with Steering Committee to discuss current fiscal situation and the long -term
capital funding needs city wide. This will provide important context for developing facility plans
that reflect the future as envisioned by the City and to set realistic budgetary goals to drive
development.
• Document consensus reached in workshop for fiscal projections.
Task 7: Outreach and Stakeholder Engagement
• Prepare public information materials summarizing:
o Project purpose
o Schedule and phases
o Next Steps
Task 8: City Council Work Session
• Solicit input from Steering Committee in preparation for a Council Study Session presentation.
• Adjust presentation of data to reflect comments.
• Present to Council in study session. Revise as needed for task 8 presentation to full City Council.
2
Exhibit A
RICe1^gZlSMILLER
A R C H I T E C T U R E & P L A N N I N G
Task 9: Present and Obtain City Council Acceptance of Phase 1 Facility Needs Analysis
Deliverables:
• Work plan and task loaded schedule.
• Space needs tabulation by Department (current and projected to 10, 25 and 50 year
benchmark). •
• Department organizational charts that illustrate current occupancy, current need, and projected
need to a 10, 25 and 50 year benchmark.
• Summary of the current fiscal situation and Tong -term capital funding needs to establish
financial boundaries of City property development.
RFM Site Visits Included in Phase 1:
• 14
RFM Meetings included in Phase 1:
• 7
Assumptions:
• All client /meeting coordination will occur from RFM's office through the internet and WebEx
conferencing.
3
15
p
Exhibit A
RICfeI"gUAV1ILLER
ARCHITECTURE & PLANNING
City of Tukwila Facility Needs Analysis and Feasibility Study
Scope of Work 4/23/13
Phase 2: Development of Need and Prioritization of Findings
Task 1: Update and Present Work Plan and Schedule
• Present and discuss deliverable from Phase 1 with Steering Committee.
• Reach consensus /confirm dates required for City input and participation relative to tasks in this
phase.
Task 2: Projected Needs vs. Existing Facilities Occupancy
• Overlay future needs projections with existing facilities occupied and document projected
shortfall /overage. Present results in conceptual level floor plans.
• Review 2008 Reid Middleton survey of City- occupied buildings and confirm applicability for
continued use.
• Present findings to Steering Committee for comment /agreement.
• Refine space needs analysis based on Steering Committee input.
Task 3: Outreach and Stakeholder Engagement
• Prepare summary public information materials summarizing:
o Project purpose
o Schedule and phases
o The results of the Needs vs Existing Facilities analysis
o Next Steps
• As needed, provide support at public meetings, where the Facilities Study can be added to a
broader agenda (i.e. Comp Plan meeting)
Task 4: Executive Staff Work Session
• Present space need projections and prioritization findings. Incorporate comments and submit
revisions to Steering Committee as needed.
1
17
Exhibit A
RICeI"gZI,AVIILLER
ARCHITECTURE & PLANNING
Task 5: Present and Obtain City Council Acceptance of Phase 2 Facility Needs Projections
• Present space need projections in regular session of City Council.
• Incorporate City Council comments and submit to Steering Committee /City Council for
review /acceptance.
Deliverables:
• Documented City space needs for 10, 25, and 50 year benchmarks with conceptual level floor
plans..
• Confirmation of existing City facilities defined by 2008 Reid Middleton survey.
RFM Site Visits Included in Phase 2:
• 7
RFM Meetings Included in Phase 2:
• 4
Assumptions:
• All client /meeting coordination will occur from RFM's office through the internet and WebEx
conferencing.
2
18
Exhibit A
RICergZI,AVIILIER
ARCHITECTURE & PLANNING
City of Tukwila Facility Needs Analysis and Feasibility Study
Scope of Work 4/23/13
Phase 3: Feasibility Study
Task 1: Update and Present Work Plan and Schedule
• Present and discuss deliverable from Phase 2 with Steering Committee.
• Reach consensus /confirm dates required for City input and participation relative to tasks in this
phase.
Task 2: Determine Needs Justification for New Construction /Existing Facility Purchase /New
Construction
• Conduct test -to -fit plan /site examinations for the capacity of existing facilities to accommodate
projected future needs. Document deficiencies due to site, building size /condition, seismic and
locational constraints.
• Evaluate current and future space needs against buildings currently in the City inventory and
determine if Department shifts make sense logistically and provide relief.
• Assemble test -to -fit graphics and discuss results in a workshop with the Steering committee to
narrow initial range of options.
• If need demands new property acquisition(s) and /or construction of new facilities, proceed as
follows;
o Find and conceptually analyze suitable properties in locations that are mutually
determined to be suitable. Block diagram needs onto candidate parcel(s) and evaluate.
o Present results of accommodating projected City needs to Steering Committee in a
vetting process prior to cost analyzing options.
Task 3: Produce a Costing Matrix for Proposed Development Options
• Provide cost of development summaries for the options as discussed in task 2.
• Present development summaries to the Steering Committee for input. Revise the options as
agreed upon.
1
Exhibit A
Task 4: Threshold Funding Assessment
RICe1^gZISMILLER
ARCHITECTURE & PLANNING
• Based on the initial fiscal situation assessment, conduct a threshold funding assessment that will
identify financial implications of the options with respect to ongoing operations and capital
investment needs.
• Identify if there are any unique characteristics of any of the options which might present funding
opportunities or otherwise reduce the financial impact to the City.
Task 5: Outreach and Stakeholder Engagement
• Prepare a Phase 3 folio -type public information packet summarizing:
o Project purpose
o Schedule and phases
o The results of the options development process, preliminary cost matrix and threshold
funding assessment
o Next Steps
• As needed, provide support at public meetings, where the Facilities Study can be added to a
broader agenda (i.e. Comp Plan meeting)
• Consider the option of an online survey to solicit feedback on the preliminary options:
o Staff survey
o Community and external stakeholder survey
Task 6: City Council Work Session
• Present the development options with cost summaries for input. Incorporate comments and
submit revisions to Steering Committee as needed.
Task 7: Present and Obtain City council acceptance of Phase 3 Feasibility Study
• Present development options with cost summaries in regular session of City Council.
• Incorporate City Council comments and submit to Steering Committee /City Council for
review /acceptance.
Deliverables:
• Documented development options and associated project costs.
RFM Site Visits Included in Phase 3:
• 10
20
2
Exhibit A
RFM Meetings Included in Phase 3:
• 5
RICergUAWILLER
A R C H I T E C T U R E & P L A N N I N G
Assumptions:
• All client /meeting coordination will occur from RFM's office through the internet and WebEx
conferencing.
3
21
p
Exhibit A
RICe1"'�ZSIVIILLER
ARCHITECTURE & PLANNING_
City of Tukwila Facility Needs Analysis and Feasibility Study
Scope of Work 4/23/13
Phase 4: Risk Assessment
Task 1: Update and Present Work Plan and Schedule
• Present and discuss deliverable from Phase 3 with Steering Committee.
• Reach consensus /confirm dates required for City input and participation relative to tasks in this
phase.
Task 2: Conduct a Risk Assessment Analysis of City Services
• Research City records for information and past planning efforts relative to emergency response
to natural /man -made disasters.
o Obtain current flood plain data.
o Obtain current Tukwila Emergency Management Plan.
• Workshop Session with Steering Committee to assess risk /define potential solutions, topics to
include;
o Definition /identification of vulnerable conditions and prioritization within City
boundaries.
• Fire and Emergency services
• Law Enforcement (services)
• Utilities (gas, electricity, water, sewer)
■ Hospitals
■ Public Works
• School
■ Nursing Homes
• Detention Facilities
• Food Distribution
■ Other
• Determine how prioritization of City services reduces risk.
• Illustrate pros /cons of new municipal facilities development and if it will assist in reducing risk
exposure.
• Financial Impacts and potential funding mechanisms.
o Existing resources
o Property tax increase
1
Exhibit A
RICe1"gZIbMILLER
ARCHITECTURE & PLANNING
o Grant opportunities
o Special financing options
o Increased mutual aid opportunities
• Strategies for soliciting public buy -in for supporting proposed solutions.
o Email surveys
o Public open house presentations
Task 3: Examine Optimum Solution Given Phase 1 Financial Parameters, Phase 2 Development
Options, and Phase 3 Risk Assessment Criteria
• Workshop Session with Steering Committee to weigh and evaluate all the potential combination
of options available. Reach consensus on prioritizing approaches and reach conclusion on final
recommendations.
• Document and prioritize options examined.
Task 4: Outreach and Stakeholder Engagement
• Prepare a Phase 4 folio -type public information packet summarizing:
o Project purpose
o Schedule and phases
o The results of the risk assessment analysis
o Next Steps
• Conduct a community workshop to review the risk assessment and gather feedback on the
analysis and choices available.
Task 5: Conceptual -level Phasing and Funding Plan
• Based on the risk assessment, develop a preferred phasing and prioritization plan to guide
future investments in the City's facilities
• Develop a conceptual level funding plan that would identify options for supporting the
investments called for in the phasing and prioritization plan and the operational and
maintenance needs.
Task 6: City Council Work Session
• Present the prioritization of options and final recommendations for input. The analysis will
include the input gathered from the community workshop
2
Exhibit A
RIC27gZftAVIILLER
ARCHITECTURE & PLANNING
Task 7: Present and Obtain City Council Acceptance of Phase 4 Risk Assessment
• Present study options and final recommendations for comment in regular session of City
Council.
• Incorporate City Council comments and submit to Steering Committee /City Council for
review /acceptance.
Task 8: Assemble Draft Document in Final Format for Review by Steering Committee
• Conduct final workshop to review comments.
Task 9: Submit Final Document for City Council Acceptance
Deliverables:
• Final Study with recommendations.
RFM Site Visits Included in Phase 4:
• 8
RFM Meetings Included in Phase 4:
• 6
Assumptions:
• All client /meeting coordination will occur from RFM's office through the internet and WebEx
conferencing.
3
p
CITY OF TUKWILA FEASIBILITY NEEDS ANALYSIS AND FEASIBILITY STUDY
FEE
APRIL 23, 2013
RICE FERGUS MILLER
Exhibit B
wcprergusnniuER
Total Estimated Hours (RFM)
Cost
Subtotal RFM Cost
Subtotal Berk Associates Cost
Subtotal Matson Carlson Cost
Subtotal Reid Middleton Cost
Subtotal Long Bay Cost
10% Consultant Markup
Total (Fixed Fee)
5216,600
$65,070
$14,160
58,590
56,555
$9,438
$320,413
Reimbursement Budget (Rate Schedule Per 2/22/13 - Statement of Qualifications) $15,000
Travel Budget (Assume 61 visits, 108 mi. R.T. @ .565 cents /mi.) 53,722
Owner Contingency
Total Budget
$10,000
$349,135
1,496
$216,600
27
Principal -in-
Charge
Project
Manager
Project
Architect
Project
Coordinator
Graphic
Designer
Total Hours
and
Estimated
Cost by Task
12013 Billing Rates
220
170
160
80
140
Phase 1: Visioning and Information Gathering
Task 1: Kickoff Meeting and Project Plan Presentation / Refinement
8
3
24
8
8
Task 2: Steering Committee Meeting
5
1
14
8
4
Task 3: Executive Staff Work Session
5
14
6
Task 4: Compiling Information on Existing City Facilities
1
34
6
Task 5: Develop Space Needs Projection (10, 25 and 50 year benchmarks)
1
1
45
24
10
Task 6: Strategize Funding Opportunities for Future City Development
6
2
12
8
Task 7: Outreach and Stakeholder Engagement
1
24
4
8
Task 8: City Council Work Session
6
1
16
6
8
Task 9: Present and Obtain City Council Acceptance of Phase 1 Facility Needs Analysis
4
1
12
6
8
Subtotal Hours
36
10
195
76
46
363
Subtotal Cost
$7,920
51,700
$31,200
$6,080
$6,440
$53,340
Phase 2: Development of Need and Prioritization of Findings
Task 1: Update and Present Work Plan Schedule
5
6
24
6
6
Task 2: Projected Needs vs. Existing Facilities Occupancy
5
1
50
12
12
Task 3: Outreach and Stakeholder Engagement
1
1
14
8
Task 4: Executive Staff Work Session
5
16
8
6
Task 5: Present and Obtain City Council Acceptance of Phase 2 Facility Needs Projections
6
1
20
16
6
Subtotal Hours
22
9
124
50
30
235
Subtotal Cost
$4,840
$1,530
$19,840
$4,000
$4,200
$34,410
Phase 3: Feasibility Study
Task 1: Update and Present Work Plan and Schedule
6
6
24
8
4
Task 2: Determine Needs Justification for New Construction /Existing Facility Purchase /New Const
4
2
40
8
8
Task 3: Produce a Costing Matrix for Proposed Development Options
4
2
24
8
4
Task 4: Threshold Funding Assessment
1
1
6
8
4
Task 5: Outreach and Stakeholder Engagement
1
1
8
12
6
Task 6: City Council Work Session
6
1
16
12
10
Task 7: Present and Obtain City Council Acceptance of Phase 3 Feasibility Study
9
1
16
8
6
Subtotal Hours
31
14
134
64
42
285
Subtotal Cost
$6,820
$2,380
$21,440
$5,120
$5,880
$41,640
Phase 4: Risk Assessment
Task 1: Update and Present Work Plan and Schedule
6
8
24
12
6
Task 2: Conduct a Risk Assessment Analysis of City Services
8
6
50
36
12
Task 3: Examine Optimum Solution Given Phase 1 Financial Parameters, Phase 2 Development Op
6
1
24
8
12
and Phase 3 Risk Assessment Criteria
6
2
36
10
8
Task 4 Outreach and Stakeholder Engagement
2
1
12
8
6
Task 5 Conceptual -level Phasing and Funding Plan
2
1
12
8
2
Task 6: City Council Work Session
6
1
16
6
8
Task 7: Present and Obtain City Council Acceptance of Phase 4 Risk Assessment
6
1
24
12
6
Task 8: Assemble Draft Document in Final Format for Review by Steering Committee
2
2
40
10
54
Task 9: Submit Final Document for City Council Acceptance
2
2
30
30
20
Subtotal Hours
46
25
268
140
134
613
Subtotal Cost
$10,120
54,250
542,880
511,200
518,760
$87,210
Total Estimated Hours (RFM)
Cost
Subtotal RFM Cost
Subtotal Berk Associates Cost
Subtotal Matson Carlson Cost
Subtotal Reid Middleton Cost
Subtotal Long Bay Cost
10% Consultant Markup
Total (Fixed Fee)
5216,600
$65,070
$14,160
58,590
56,555
$9,438
$320,413
Reimbursement Budget (Rate Schedule Per 2/22/13 - Statement of Qualifications) $15,000
Travel Budget (Assume 61 visits, 108 mi. R.T. @ .565 cents /mi.) 53,722
Owner Contingency
Total Budget
$10,000
$349,135
1,496
$216,600
27
CITY OF TUKWILA FACILITY NEEDS ANALYSIS AND FEASIBILITY STUDY
FEE
APRIL 23, 2013
BERK ASSOCIATES
Exhibit B
mcffergusmiu.ER
Total Estimated Hours
Cost
Totals
Subtotal Consultant Cost
5/7/2013
$65,070
471
$65,070
2
Strategic
Advisor
Lead
Analyst&
Facilitator
Survey &
Public
Engagement
Support
Financial
&
Market
Analyst
Supporting
Analyst
Total Hours
and
Estimated
Cost by
Task
2013 Billing Rates
$250
$140
$110
$110
$70
Phase 1: Visioning and Information Gathering
Task 1: Kickoff Meeting and Project Plan Presentation / Refinement
4
4
Task 2: Steering Committee Meeting #1
4
4
Task 3: Executive Staff Work Session
4
Task 4: Compiling Information on Existing City Facilities
Task 5: Develop Space Needs Projection (10, 25 and 50 year benchmarks)
Task 6: Strategize Funding Opportunities for Future City Development
8
24
16
Task 7: Outreach and Stakeholder Engagement
4
16
8
Task 8: City County Work Session
4
4
Task 9: Present and Obtain City Council Acceptance of Phase 1 Facility Needs Analysis
Subtotal Hours
28
28
8
24
16
104
Subtotal Cost
$7,000
$3,920
$880
$2,640
$1,120
$15,560
Phase 2: Development of Need and Prioritization of Findings
Task 1: Update and Present Work Plan Schedule
Task 2: Projected Needs vs. Existing Facilities Occupancy
Task 3: Outreach and Stakeholder Engagement
4
16
24
Task 4: Executive Staff Work Session
4
4
Task 5: Present and Obtain City Council Acceptance of Phase 2 Facility Needs Projections
Subtotal Hours
8
20
24
0
0
52
Subtotal Cost
52,000
$2,800
$2,640
$0
$0
$7,440
Phase 3: Feasibility Study
Task 1: Update and Present Work Plan and Schedule
Task 2: Determine Needs Justification for New Construction /Existing Facility Purchase /New Construction
Task 3: Produce a Costing Matrix for Proposed Development Options
Task 4: Threshold Funding Assessment
12
40
16
Task 5: Outreach and Stakeholder Engagement
16
24
Task 6: City Council Work Session
4
4
8
Task 7: Present and Obtain City Council Acceptance of Phase 3 Feasibility Study
Subtotal Hours
16
20
32
40
16
124
Subtotal Cost
$4,000
$2,800
$3,520
$4,400
$1,120
$15,840
Phase 4: Risk Assessment
Task 1: Update and Present Work Plan and Schedule
Task 2: Conduct a Risk Assessment Analysis of City Services
Task 3: Examine Optimum Solution Given Phase 1 Financial Parameters, Phase 2 Development Options,
8
4
and Phase 3 Risk Assessment Criteria
Task 4: Outreach and Stakeholder Engagement -
24
32
Task 5: Concept Level Phasing and Funding Plan
12
40
Task 6: City Council Work Session
4
4
8
Task 7: Present and Obtain City Council Acceptance of Phase 4 Risk Assessment
Task 8: Assemble Draft Document in Final Format for Review by Steering Committee
3
16
12
24
Task 9: Submit Final Document for City Council Acceptance
Subtotal Hours
27
48
52
64
0
191
Subtotal Cost
$6,750
$6,720
$5,720
$7,040
$0
$26,230
Total Estimated Hours
Cost
Totals
Subtotal Consultant Cost
5/7/2013
$65,070
471
$65,070
2
CITY OF TUKWILA FACILITY NEEDS ANALYSIS AND FEASIBILITY STUDY
FEE
APRIL 23, 2013
MATSON CARLSON
5/7/2013
Exhibit B
wcgrergz+smiuEn
Total Estimated Hours
Cost
Totals
Subtotal Consulant Cost
$14,160
118
$14,160
29
Principal
Total Hours
and
Estimated
Cost by
Task
12013 Billing Rates
$120
Phase 1: Visioning and Information Gathering
Task 1: Kickoff Meeting and Project Plan Presentation / Refinement
Task 2: Steering Committee Meeting
Task 3: Executive Staff Work Session
Task 4: Compiling Information on Existing City Facilities
Task 5: Develop Space Needs Projection (10, 25 and 50 year benchmarks)
Task 6: Strategize Funding Opportunities for Future City Development
Task 7: Outreach and Stakeholder Engagement
Task 8: City County Work Session
Task 9: Present and Obtain C ity Council Acceptance of Phase 1 Facility Needs Analysis
Subtotal Hours
Subtotal Cost
Phase 2: Development of Need and Prioritization of Findings
Task 1: Update and Present Work Plan Schedule
Task 2: Projected Needs vs. Existing Facilities Occupancy
Task 3: Outreach and Stakeholder Engagment
Task 4: Executive Staff Work Session
Task 5: Present and Obtain City Council Acceptance of Phase 2 Facility Needs Projections
Subtotal Hours
Subtotal Cost
Phase 3: Feasibility Study
Task 1: Update and Present Work Plan and Schedule
Task 2: Determine Needs Justification for New Construction /Existing Facility Purchase /New Construction
Task 3: Produce a Costing Matrix for Proposed Development Options
114
Task 4: Threshold Funding Assessment
Task 5: Outreach and Stakeholder Engagement
Task 6: City Council Work Session
Task 7: Present and Obtain City Council Acceptance of Phase 3 Feasibility Study
Subtotal Hours
114
Subtotal Cost
$13,680
Phase 4: Risk Assessment
Task 1: Update and Present Work Plan and Schedule
Task 2: Conduct a Risk Assessment Analysis of City Services
Task 3: Examine Optimum Solution Given Phase 1 Financial Parameters, Phase 2 Development Options,
and Phase 3 Risk Assessment Criteria
Task 4: Outreach and Stakeholder Engagement
Task 5: Concept Level Phasing and Funding Plan
4
Task 6: City Council Work Session
Task 7: Present and Obtain City Council Acceptance of Phase 4 Risk Assessment
Task 8: Assemble Draft Document in Final Format for Review by Steering Committee
Task 9: Submit Final Document for City Council Acceptance
Subtotal Hours
4
Subtotal Cost
$480
Total Estimated Hours
Cost
Totals
Subtotal Consulant Cost
$14,160
118
$14,160
29
CITY OF TUKWILA FACILITY NEEDS ANALYSIS AND FEASIBILTY STUDY
FEE
APRIL 23, 2013
REID MIDDLETON
5/7/2013
Exhibit B
RICFEYg?.[.AVIILLER
Total Estimated Hours
Cost
Totals
Subtotal Consulant Cost
$8,590
59
$8,590
Principal
Senior
Engineer
Total Hours
and
Estimated
Cost by
Task
2013 Billing Rates
$250
$140
Phase 1: Visioning and Information Gathering
Task 1: Kickoff Meeting and Project Plan Presentation / Refinement
1
4
Task 2: Steering Committee Meeting #1
Task 3: Executive Staff Work Session
Task 4: Compiling Information on Existing City Facilities
8
Task 5: Develop Space Needs Projection (10, 25 and 50 year benchmarks)
Task 6: Strategize Funding Opportunities for Future City Development
Task 7: Outreach and Stakeholder Engagement
Task 8: City County Work Session
Task 9: Present and Obtain City Council Acceptance of Phase 1 Facility Needs Analysis
Subtotal Hours
1
12
13
Subtotal Cost
$250
$1,680
$1,930
Phase 2: Development of Need and Prioritization of Findings
Task 1: Update and Present Work Plan Schedule
Task 2: Projected Needs vs. Existing Facilities Occupancy
1
8
Task 3: Outreach and Stakeholder Engagement
Task 4: Executive Staff Work Session
Task 5: Present and Obtain City Council Acceptance of Phase 2 Facility Needs Projection
Subtotal Hours
1
8
9
Subtotal Cost
$250
$1,120
$1,370
Phase 3: Feasibility Study
Task 1: Update and Present Work Plan and Schedule
Task 2: Determine Needs Justification for New Construction /Existing Facility Purchase /New Construction
12
Task 3: Produce a Costing Matrix for Proposed Development Options
Task 4: Threshold Funding Assessment
Task 5: Outreach and Stakeholder Engagement
Task 6: City Council Work Session
Task 7: Present and Obtain City Council Acceptance of Phase 3 Feasibility Study
Subtotal Hours
0
12
12
Subtotal Cost
$0
$1,680
$1,680
Phase 4: Risk Assessment
Task 1: Update and Present Work Plan and Schedule
Task 2: Conduct a Risk Assessment Analysis of City Services
1
16
Task 3: Examine Optimum Solution Given Phase 1 Financial Parameters, Phase 2 Development Options,
8
and Phase 3 Risk Assessment Criteria
Task 4: Outreach and Stakeholder Engagement
Task 5: Conceptual Level Phasing and Funding Planning
Task 6: City Council Work Session
Task 7 : Present and Obtain City Council Acceptance of Phase 4 Risk Assessment
Task 8: Assemble Draft Document in Final Format for Review by Steering Committee
Task 9: Submit Final Document for City Council Acceptance
Subtotal Hours
1
24
25
Subtotal Cost
$250
$3,360
$3,610
Total Estimated Hours
Cost
Totals
Subtotal Consulant Cost
$8,590
59
$8,590
CITY OF TUKWILA FACILITY NEEDS ANALYSIS AND FEASIBILITY STUDY
FEE
APRIL 23, 2013
LONG BAY ENTERPRISES
5/7/2013
Exhibit B
RICf2/"g2l,ANILI.ER
Totals
Subtotal Consulant Cost
6
$6,555
31
Principal
Researcher
Admin Assist.
Total
Hours
and
Estimated
Cost by
Task
2013 Billing Rates
$175
$100
$55
Phase 1: Visioning and Information Gathering
Task 1: Kickoff Meeting and Project Plan Presentation / Refinement
Task 2: Steering Committee Meeting
Task 3: Executive Staff Work Session
Task 4: Compiling Information on Existing City Facilities
Task 5: Develop Space Needs Projection (10, 25 and 50 year benchmarks)
Task 6: Strategize Funding Opportunities for Future City Development
Task 7: Outreach and Stakeholder Engagement .
Task 8: City County Work Session
Task 9: Present and Obtain City Council Acceptance of Phase 1 Facility Needs Analysis
Subtotal Hours
Subtotal Cost
Phase 2: Development of Need and Prioritization of Findings
Task 1: Update and Present Work Plan Schedule
Task 2: Projected Needs vs. Existing Facilities Occupancy
Task 3: Outreach and Stakeholder Engagement
Task 4: Executive Staff Work Session
Task 5: Present and Obtain City Council Acceptance of Phase 2 Facility Needs Projections
Subtotal Hours
Subtotal Cost
Phase 3: Feasibility Study
Task 1: Update and Present Work Plan and Schedule
Task 2: Determine Needs Justification for New Construction /Existing Facility Purchase /New Constructioi
25
6
4
Task 3: Produce a Costing Matrix for Proposed Development Options
6
2
2
Task 4: Threshold Funding Assessment
Task 5: Outreach and Stakeholder Engagement
Task 6: City Council Work Session
Task 7: Present and Obtain City Council Acceptance of Phase 3 Feasibility Study
Subtotal Hours
31
8
6
45
Subtotal Cost
$5,425
$800
$330
$6,555
Phase 4: Risk Assessment
Task 1: Update and Present Work Plan and Schedule
Task 2: Conduct a Risk Assessment Analysis of City Services
Task 3: Examine Optimum Solution Given Phase 1 Financial Parameters, Phase 2 Development Options,
and Phase 3 Risk Assessment Criteria
Task 4: Outreach and Stakeholder Engagement
Task 5: Concept Level Funding and Phasing Plan
Task 6: City Council Work Session
Task 7: Present and Obtain City Council Acceptance of Phase 4 Risk Assessment
Task 8: Assemble Draft Document in Final Format for Review by Steering Committee
Task 9: Submit Final Document for City Council Acceptance
Subtotal Hours
Subtotal Cost
Total Estimated Hours
Cost
45
$6,555
Totals
Subtotal Consulant Cost
6
$6,555
31
p
ID
Task Task Name
Mode I
Duration
Start Finish
Predecessors 2uarter
May; Jun
3rd Quarter
4th Quarter
1st Quarte
Jul I Aug] Se.
Oct rNov Dec
Jan
Feb
0
1
Tukwila Schedule 169 days Tue 6/4/13 Mon 1/27/1
Phase One 70 days Tue 6/4/13 Mon 9/9/13
Council Work Session 0 days Mon 8/26/13 Mon 8/26/13
City Council 0 days Mon 9/2/13 Mon 9/2/13
Presentation
./13
1/20
4 1/2;
4 8/26
9/2
w 10/14
v 10/21
v 11/11
11/18
Giiiiiiiiiiiiil
•
4
_ 2
3
4
6
Phase Two 35 days Mon 9/9/13 Fri 10/25/13
7
8
Council Work Session 0 days Mon 10/14/12 Mon 10/14/12
City Council 0 days Mon Mon
Presentation 10/21/13 10/21/13
Phase Three 25 days Fri 10/25/13 Thu 11/28/13
Council Work Session 0 days Mon 11/11/12 Mon 11/11/12
City Council 0 days Mon Mons
Presentation 11/18/13 11/18/13
9
10
11
12
13
14
Phase Four 36 days Mon 11/18/12Sun 1/5/14
15
16
17
18
Council Work Session 0 days Mon 1/13/14 Mon 1/13/14
City Council 0 days Mon 1/20/14 Mon 1/20/14
Presentation
19
20
21
Project Completion 0 days Mon 1/27/14 Mon 1/27/14
Project: Tukwila Schedule
Date: Wed 5/8/13
Task i- ' External Milestone - Manual Summary Rollup •-4• =--rt
Split ,,,,,,..,,,,—.. „.,,,. Inactive Task Manual Summary iipimmomminiiiimp
Milestone • Inactive Milestone Start -only C
Summary Riiiiiiiiiiiiiiiiiiiii4 Inactive Summary Finish -only 3
'•, r-
Project Summary W` Manual Task 1 Deadline 4
"—� —
'
External Tasks •e • < Duration -only Progress
Page 1
p
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2013 to 2018
PROJECT: City Facilities Project No. 91230201
First step is to examine all City facilities to determine priorities with a needs analysis and the possibility
DESCRIPTION: of combining existing structures. Second step is to prioritize those needs based on public safety. Third step
will be to determine prudent financing options. Results may include constructing new combined City Facilities.
JUSTIFICATION: Almost all city buildings have structural and seismic concerns for public safety. Existing facilities are located
throughout the City and could be consolidated for better function, use of space, and service to our citizens.
STATUS: Part of the Facilities Plan.
MAINT. IMPACT: Improves public safety and efficiency for City operations.
COMMENT: Scoping and analysis of all City facilities is scheduled for 2013 and will include Police, Fire, and Public Works.
FINANCIAL Through Estimated
in $000's
2011 2012 2013
2014
2015
2016
2017
2018
BEYOND TOTAL
EXPENSES
Analysis
500
500
Design
2,500
2,500
Land(R/W)
0
Const. Mgmt.
3,500
3,500
Construction
28,500
28,500
TOTAL EXPENSES
0
0
500
0
0
0
0
0
34,500
35,000
FUND SOURCES
Grant
0
Bond
33,500
33,500
Mitigation Expected
0
City Oper. Revenue
0
0
500
0
0
0
0
0
1,000
1,500
TOTAL SOURCES
0
0
500
0
0
0
0
0
34,500
35,000
2013 - 2018 Capital Improvement Program
73
35