Loading...
HomeMy WebLinkAboutCOW 2013-06-10 Item 5A - Resolution - 2014-2019 Transportation Improvement ProgramCOUNCIL AGENDA SYNOPSIS Initials Meeting Date Pr oared by _ , Ma pr's revie Council review 06/10/13 BG '0 /'1 CATEGORY a Discussion 06/17/13 BG ►1 Resolution t ❑ Bid Award Mtg Date // Public Hearing ❑ Other Mtg Date Mtg Date Mtg Date 06/17/13 Mtg Date 06/10/13 SPONSOR ❑ Council ❑ Mayor ❑ Adm Svcs ❑ DCD ❑ Finance ❑ Fire ❑ Legal ❑ P&R ❑ Police // PW SPONSOR'S The Transportation Improvement Program (TIP) is required by RCW to be updated SUMMARY annually. The TIP is primarily a finanical planning document for projects competing for grants. A Public Hearing is scheduled on June 10, 2013 for the 2014 - 2019 TIP. After the Public Hearing, the TIP is adopted by resolution and is then incorporated into the Regional and State TIPS. ITEM INFORMATION ITEM No. 4& 5.A. CAS NUMBER: STAFF SPONSOR: BOB GIBERSON ORIGINAL AGENDA DATE: 6/10/13 AGENDA IIEM TITLE Resolution adopting the Six -Year Transportation Improvement Program 2014 - 2019 CATEGORY a Discussion 06/10/13 ❑ Motion Mtg Date ►1 Resolution ❑ Ordinance Mtg Date ❑ Bid Award Mtg Date // Public Hearing ❑ Other Mtg Date Mtg Date Mtg Date 06/17/13 Mtg Date 06/10/13 SPONSOR ❑ Council ❑ Mayor ❑ Adm Svcs ❑ DCD ❑ Finance ❑ Fire ❑ Legal ❑ P&R ❑ Police // PW SPONSOR'S The Transportation Improvement Program (TIP) is required by RCW to be updated SUMMARY annually. The TIP is primarily a finanical planning document for projects competing for grants. A Public Hearing is scheduled on June 10, 2013 for the 2014 - 2019 TIP. After the Public Hearing, the TIP is adopted by resolution and is then incorporated into the Regional and State TIPS. REVIEWED BY ❑ COW Mtg. ❑ CA &P Cmte ❑ F &S Cmte ❑ Utilities Cmte ❑ Arts Comm. ❑ Parks DAI'E: 5/29/13 COMMITTEE // Transportation Cmte Comm. ❑ Planning Comm. CHAIR: KATE KRULLER RECOMMENDATIONS: SPONSOR /ADMIN. COMMITTEE Public Works Unanimous Approval; Forward to Committee of the Whole COST IMPACT / FUND SOURCE EXPENDITURE REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED $0.00 $0.00 $0.00 Fund Source: Comments: MTG. DATE RECORD OF COUNCIL ACTION 6/10/13 6/17/13 MTG. DATE ATTACHMENTS 6/10/13 Informational Memorandum dated 05/24/13 Draft Resolution Draft 2014 — 2019 TIP Spreadsheet Current Adopted 2013 — 2018 TIP Minutes from the Transportation Committee meeting of 05/29/13 6/17/13 1 2 TO: City of Tukwila Jim Haggerton, Mayor INFORMATIONAL MEMORANDUM Mayor Haggerton Transportation Committee FROM: Bob Giberson, Public Works Director BY: Cyndy Knighton, Senior Engineer DATE: May 24, 2013 SUBJECT: Resolution for Six -Year Transportation Improvement Program (2014 -2019) ISSUE Resolution to adopt the annual update of the Six -Year Transportation Improvement Program for 2014 -2019. BACKGROUND The Transportation Improvement Program (TIP) is updated annually as required by the Revised Code of Washington (RCW). The TIP is adopted by resolution after a public hearing at the local agency level and incorporated into regional and state TIPs. The TIP is primarily a financial planning document for projects competing for grants. Any project submitted for federal grant funding must be included in the local, regional and state adopted TIPs. The TIP is a rolling plan showing various funding sources: grants, developer and local funds. Projects "roll" as funds or stages occur (design report, final design and construction). Tukwila's TIP and Capital Improvement Program (CIP) list many of the same transportation - related projects. The TIP generally lists only those transportation - related projects planned within the next six years that are deemed regionally significant or that have grant funding awarded or expected. The City's CIP lists transportation projects planned in the next six years and beyond, as well as water, sewer, surface water, and capital facilities projects. The TIP is required to be adopted by June 30 on an annual basis, while the CIP is prepared during Summer /Fall in conjunction with the City's budget preparation. Differences between the two may be due to priority changes, funding availability changes, or other factors which normally occur during the time between adoptions of each document. ANALYSIS The attached spreadsheet is the "Draft" 2014 - 2019 TIP and was created by modifying the 2013 - 2018 TIP to add or remove projects and adjust project costs. No prioritization was assigned and the list of projects is presented in alphabetical order. Prioritization of projects is reflected in the CIP. Added: Americans with Disabilities Act (ADA) Improvements (CIP Page 17), BNSF Regional Center Access (CIP Page 13), Strander Blvd /SW 27th St Phase III (CIP Page 29) Deleted: Neighborhood Traffic Calming (CIP Page 6) Modified: Andover Park West (Tukwila Pkwy — Strander Blvd), Boeing Access Rd Bridge Rehabilitation, Interurban Ave S (S 143rd St - Ft Dent Way), S 133rd St / SR 599 Ramps Intersection, S 144th St (Phase II), S 178th St Realignment, TUC/TOD Pedestrian Improvements, TUC - Transit Center, TUC - Ped /Bike Bridge, W Valley Hwy / S 156th St RECOMMENDATION The Council is being asked to approve the resolution for the 2014 -2019 Six -Year Transportation Improvement Program and consider this item at the June 10, 2013 Committee of the Whole with a Public Hearing and subsequent June 17, 2013 Regular Meeting. Attachments: Draft Resolution 2014 — 2019 "Draft" Transportation Improvement Program (TIP) Spreadsheet Current Adopted 2013 — 2018 TIP W: \PW Eng \PROJECTS\A- RW & RS Projects \TIP \Info Memo TIP 2014.docx 3 4 FT A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, ADOPTING A SIX -YEAR TRANSPORTATION IMPROVEMENT PROGRAM (2014- 2019), AND DIRECTING THE SAME TO BE FILED WITH THE STATE SECRETARY OF TRANSPORTATION AND THE TRANSPORTATION IMPROVEMENT BOARD. WHEREAS, pursuant to the requirements of RCW Chapters 35.77 and 47.26 as amended, the City Council of the City of Tukwila has previously adopted a Transportation Improvement Program and thereafter periodically modified said Transportation Improvement Program by resolution; and WHEREAS, the City Council has reviewed the work accomplished under said program, determined current and future City street and arterial needs and, based upon these findings, has prepared a Six -Year Transportation Improvement Program for the ensuing six calendar years (2014 - 2019); and WHEREAS, on June 10, 2013, a public hearing was held regarding the City's Six - Year Transportation Improvement Program; NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, HEREBY RESOLVES AS FOLLOWS: Section 1. Program Adopted. A six -year Transportation Improvement Program for the calendar years 2014 -2019 is hereby adopted. Section 2. Filing of Program. The City Clerk is hereby authorized and directed to file a copy of this resolution, together with the exhibit attached hereto, with the Secretary of Transportation and the Transportation Improvement Board of the State of Washington. W: \Word Processing- City\Resolutions \TIP 2014 -2019 5 -23 -13 CK:bjs Page 1 of 2 5 PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, at a Regular Meeting thereof this day of , 2013. ATTEST /AUTHENTICATED: Christy O'Flaherty, MMC, City Clerk Kathy Hougardy, Council President APPROVED AS TO FORM BY: Filed with the City Clerk: Passed by the City Council: Resolution Number: Shelley M. Kerslake, City Attorney Exhibit: City of Tukwila Six -Year Transportation Improvement Program from 2014 to 2019 W:\Word Processing- City\Resoiutions \TIP 2014 -2019 5 -23 -13 CK:bjs 6 Page 2 of 2 DRAFT 2014 - 2019 TIP SUMMARY FUNDING SOURCES 0 Developer Unsecured m F- a) Ta- a7 a LL J 0 F- O) O N ca O O N N a ca N 7 f` L 0 I- N C N 0 O c0 N N .O a N N 0 N CL 0 Z U co (°v a PROJECT TITLE co o r• o O (O 7 0 0) 0) V N- 0 0 0 00 0( 7 0 0 0 0) (0 0 0 M (f) 0 0 N 0 0 :4 _ N- 0 CO )f) LO 0) N c0 0) 0 0 M 0 V 0 V c0 0 V (O 0 00 r n M V O 0) co o co N r` t0 0) "a- 00 O M co N t` 0) O N a0 to co r` 0 r 0 N M N N (00 00 coo 00 00 00 00 00 00 O N 10 (O 0) c- M (0 LL) V 0 0 N M O N O 0 (O 0 0 'l) r- N. 00) U) (0 0)) V 0 0 N M N N c0 0` r (O 0) • 0 O O O^ aO O V cO c0 tri r O co O c0 O co O co co (00 co ev- 0 U ON a- m N 0) W 10 N 0 0 (f) 0 0 0) 0 O r- 0 0 0 O O c_0 V N 0 0 0) 0 0 (O 00 0 (f) 0 0 r- (O (O O 0 M (0 O N V M 0 (O 0 V 0 0 V (0 0 0 0) N t- 0 M 0) 0 CO O N. O f` O t-- a- W M f` O 0) M N O 00 N co N O (O O r in co c0 (O c0 co c- O) 0) M O N 0 N M M 7 V N 00 M (f) N 0 (O 0 0 0 0) 0 0 0 0 0 0 0 0 0 V 0 0 0 CO 0 0 0 Y') 0 0 0 0 0. O t` N M N (O M 0 V' CO 0 0') O (0 0 V O N CO n M :h Y7 (O M r CO M O 0) N N O N- N N 0 0 0 0 0 CO 0 M N N M M V (,.) 0 0 0 M 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O M c0O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 N N f0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 CO N. N LO 0 0 0 0 0 00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7 0 0 0 0 N. 0 NV 0 0 0 CO •et LO N r 0) M (O 0 0 0 0 0 0 0 0 n 0 0 0 0 0 00 0. 0 0 0 0 0 0 0 0 0 0) 0 0 '1) O (O h 0 0 (O 0 N (O 0 M N N 0 0) � 0 N (O (• M (0 (O O M O 0) N (O N N 0 0 M M N N N M (c) 7 CO N CO Cr 'Cr ' (0+) N M M OOD M CO N M C0') NI CO T 2 a a N. Ti" 7 M * d r. E O y W c ° o) vi a 0@ m 0 d 0 d � m in 0) o c a c 2 0 a :° m �Q _ 0E m E @m Q rn E N 0 N r v) d w a) a) o@ a) ! Cj d~ m _ fn @ cn r ' a) 3 co O a) > N O m E (n C .. Y a) C U C C O O cu N LL C a C co C >C a L O `O j 3>. Z N m N 2 N >, m Y C d U Q) aa) YO m !n co N •;, . > co !n .O d a a) (0 N d p fn `m 7 o n y-0 o Q v m in E a3i c `m (O aNi c m E~ (n n maY ati °) cm`wm mot. ',0.) ��' 3 Ea"N o oa(n� d a) 0Tr;.o y E y c U a@ m N rn_ m N m aci aci Z= w > U> .5 in F M in o N LL c O .c co w e a) °° U U m n Naaa� > m0> Ty a) m�m0_(0 < m ami cammU -2� o a>)= • c a) °1 c E m a in 0) .c a) 0 0 — >, @ a) a> a) -- @a @ 7au)zinintin"o a`) Tcn0 m m @ m m @ 45000av a a a C C <n a) N N C . 0) M a0 N 00 m O V Y Y Y Y Y Y 07 mm°c)w E2 2zmmUcnUv)cUi)in1- 1-1-F- F- FF-F7- N M V «) c0 n 00 0.) O N M V 10 (0 c0 0) O N M . (O (0 r 00 CO O N N N N N N N N N N N M M M M :h Neighborhood Traffic Calming Program N c a) E a) > 2 -,:-.3. T C o Q _ c 0 2 _ �n m 0 < N N a i_ a a a E, ro O y _c a v CO 7 U N m (/) ix 0 O_ O 0) a 01 • 2 a' - Y m > -.� IX (n N O) m 0 U Q C — Z<0min ¢m =(n mps Intersection PROJECTS REVISED FROM 2013 -2018 TIP F- w w 2 rY a- u_ U O w LI o N 0 M o N F- z U Z W w M Occ Et 0 U W Valley Hwy / S 156 St 7- mprovement Program Six Year Transportation 8 From 2013 to 2018 Agency: Tukwila d ; 0 z a MPO /RTPO: RW Required Environmental Type w 0 0 O 0 Total Length a 0 Utility Codes 0 0f.. Improvement Type o Resolution No. 0 n r Amendment N Adopted 00 0 N Hearing 7- a) 0 A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID WA -03766 Andover Park E /Industry Drive Signal Andover Park E Industry Drive to Design and construct a traffic signal and intersection improvements Priority Number Functional co Class Total Funds 0 0 0 N m 0 0 0 Local Funds 0 0 0 n u� 0 0 0 m 0 State Funds 0 0 State Fund Code 0 Federal Funds 0 0 Federal Fund Code Phase Start Year (YYYY) O N N r a a z 0 0) y N a m m 0 1 Expenditure Schedule Report Date: June 20, 2012 mprovement Program Six Year Transportation 1.g Gt a IF: From 2013 to 2018 Agency: Tukwila N 0 0 z } RW Required z Environmental Type w 0 0 _0 O Total Length Utility Codes Improvement Type "o Resolution No. 0 n r Amendment N Adopted m Lo Hearing N F a, 0 A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID WA -03764 Andover Park E /Minkler Blvd. Intersection Andover Park E Minkler Blvd to Design and construct intersection and traffic signal improvements and widening for left turn pockets Priority Number Functional o Class 00 0 O Total Funds 00 O O N 00 0 O 0 Local Funds 0 0 0 N O 0 0 N 0 0 0 a n 0 State Funds 0 0 0 State Fund Code 0 Federal Funds 0 0 O Federal Fund Code Phase Start Year (YYYY) M 0 N o 0 N CO 0 N y r a w a a z 0 0 N a a Expenditure Schedule 00 O N 00 0 N N (0 0 0 O 0 M 0 O 0 0 0 N 0 0 O e O m L a a z 0 Report Date: June 20, 2012 9 mprovement Program Six Year Transportation co ig c c 4D 10 From 2013 to 2018 Agency: Tukwila N 0 z MPO /RTPO: PSRC RW Required z Environmental Type w 0 Total Length 0 0 0 O co a 0 Utility Codes 0 0i Improvement Type 0a Resolution No. 0 N. Amendment N Adopted F m 0 Hearing N CB 0 A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID WA- 03760I Andover Park West Widening Andover Park West Strander Blvd to Tukwila Pkwy Complete widening for center turn pockets and landscape median for access control, widen sidewalks, upgrade ADA facilities, modify signal operation, upgrade street lighting, install pedestrian lighting. Priority Number Functional o Class a c li O 0 0 of N N C LL R O F 0 0 0 ei 0 0 0 Local Funds 0 0 0 0 0 0 0 N State Funds 0 0 0 0 N e State Fund Code 0 Federal Funds 0 Federal Fund Code Phase Start Year (YYYY) M O N d L c a z 0 0 H N m A 0 1— Expenditure Schedule Report Date: June 20, 2012 mprovement Program Six Year Transportation a From 2013 to 2018 Agency: Tukwila c 0 U a 0 0 z m 0 } MPO /RTPO: PSRC RW Required z Environmental Type Total Length Utility Codes Improvement Type o Resolution No. 0 r- r- Amendment N Adopted E 0 0 N Hearing 0 CD 0 A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID WA -03731 Annual Bridge Inspections and Repairs Various City Street to Perform load ratings and bi- annual inspections as well as construct necessary repairs and maintenance Priority Number Functional - Class Total Funds 0 0 0 0 N N Local Funds 0 0 0 10 10 0 0 0 n 0 State Funds 0 State Fund Code 0 Federal Funds 0 Federal Fund Code Phase Start Year (YYYY) N L a 0 N N Expenditure Schedule 0 0 v N O 0 N 0 O 0 1 N 0 0 0 0 0 0 0 N 0 0 0 0 n N N O O N A a J N N O Report Date: June 20, 2012 11 mprovement Program Six Year Transportation O:- h m� r Q Et 3a 1674 12 From 2013 to 2018 Agency: Tukwila 0 v Q z RW Required Environmental Type Total Length a 0 Utility Codes o OF Improvement Type o Resolution No. 0 Amendment N Adopted m 0 N Hearing 0 co 0 A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID WA -03733 Annual Overlay and Repair Program Various City Streets to Repair, rehabilitate, and overlay City streets as needed in an annual program Priority Number Functional <c Class Total Funds 0 O 0 0 0 0 0 m M A Local Funds 0 0 0 0 0) 0 0 0 0 M 0) 0 State Funds 0 State Fund Code 0 0 a c 0 LL 70. 9 N LL 0 Federal Fund Code Phase Start Year (YYYY) M O N m L a 0 U1 co Expenditure Schedule Report Date: June 20, 2012 mprovement Program Six Year Transportation From 2013 to 2018 Agency: Tukwila 0 "U) J 0 z MPO /RTPO: PSRC RW Required z Environmental Type Total Length Utility Codes a 0 Improvement Type c Resolution No. 0 n n Amendment N Adopted o m 0 N Hearing 7- m 0 A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID WA -03732 Boeing Access Road Bridge Rehabilitation Boeing Access Road Airport Way to 1 -5 Reconstruct bridge 08002500 Priority Number Functional o Class m 0 0 LL Total Funds 0 O 0 0 0 C') 0 0 O 0 0 0 0 0 0 0 0 N N C LL A O O J O 0 0 O 0 0 co 0 0 0 (N N N 0 0 0 O N N 0 State Funds O 0 0 State Fund Code Federal Funds 0 O O O O O O O Federal Fund Code cc m co m Phase Start Year (YYYY) O N 0 L 0. a cc Z 0 0 N a a a Expenditure Schedule 0 0 0 0 L a 0 O O O M O O O O N O O 0 N a a Z U Report Date: June 20, 2012 13 mprovement Program Six Year Transportation 1 From 2013 to 2018 14 0 0 a o N J 0 MPO /RTPO: RW Required z Environmental Type w 0 0 0 0 0 r" 0 N 0 m_ 9 c 0 Total Length 0 Utility Codes 0 Improvement Type N Resolution No. o 0 O r r- Amendment Adopted o o 0 0 Hearing N F o 0 A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID WA- 03795' Cascade View Safe Routes to School S 140th St/33rd Ave S to Construct an off - street paved shard use path, sidewalks, and a traffic circle at the intersection of 33rd Ave S and S 140th Street. Priority Number Functional rn Class Report Date: June 20, 2012 N O 0 o 0 0 n 0 839,0001 0 0 0 r" 0 N 9 c 0 0 0 0 0 LL o o 0 0 0 O 5 o o 0 7 o 0 o 0 u 0 H 0) N N o o 0 0 0 O o 0 0 0 co m 0 C 7 41, 78, Q) Phase LL ce 1 CN ALL Totals) A 0 0 J O O O N O State Funds N 7 1,1 State Fund Code WSDOT WSDOT WSDOT WSDOT Federal Funds o o 0 0 0 Federal Fund Code 0) 0 Phase Start Y O N 201 201 O N Phase 1 a RW CN ALL M Status a a a o_ 0 a Report Date: June 20, 2012 5th & 0th O O 0 839,0001 839,000 r 4th 0 0 0 0 0 3rd o o 0 0 0 o o 0 7 o 0 o 0 u 0 0) N N O O 0 0 0 m 41, 78, Q) Phase w a ce 1 CN ALL Totals) Report Date: June 20, 2012 mprovement Program Six Year Transportation From 2013 to 2018 Agency: Tukwila N v 0 O z RW Required z Environmental Type 0 0 0 0 n 700,0001 w 0 3,350,000 0 co o Total Length 0 0 0 0 Utility Codes 0 a Improvement Type o Resolution No. o 0 0 n 0 N- Amendment N Adopted Federal Funds o 0 0 0 N Hearing 0 m 0 A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID WA -03770 East Marginal Way E Marginal Way Boeing Access Road to S 112th St Design and construct widening to 3 lanes including curb & gutter, sidewalks, drainage, landscaping, and utility undergrounding. Priority Number STP Functional <o Class 2018 C a a Total Funds 50,0001 0 0 0 0 n 700,0001 3,350,000 Local Funds 50,000 0 0 0 0 700,000 1,130,000 2,050,000 State Funds o o 0 0 0 State Fund Code Federal Funds o o 0 0 0 0 0 cn0 1,300,000 Federal Fund Code STP Vl A O F Phase Start Year (YYYY) 2014 2018 2018 2018 Phase W a W a 7j o: CN Status <n d d a_ Expenditure Schedule 00 0 O 00 o co 0 0 M lh M 0 L 0 0 0 0 9 tD 0 0 O 0 0 0 0 N 0 0 0 0 0 0 N O N O O O m a Lt.! z 0 W 0 Report Date: June 20, 2012 15 mprovement Program Six Year Transportation 0 SE i1; 16 From 2013 to 2018 N v 0 0 z } MPO /RTPO: RW Required Environmental Type w 0 Total Length Utility Codes Improvement Type N Resolution No. 0 h- t••• Amendment Adopted N CO 0 Hearing N 0 0 A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID WA -03783 Greenbelt & Multipurpose Trails to Design and construct safe connections to public trails to promoste pedestrian and bicycle modes of transportation in lieu of motorized vehicles Priority Number Functional o Class ° 0 0 0 N Total Funds 0 0 0 N 0 0 0 Local Funds 0 0 0 0 0 0 a n 0 State Funds 0 0 State Fund Code 0 Federal Funds 0 0 Federal Fund Code Phase Start Year (YYYY) M 0 0 W a z 0 2 3 5, m 0 F Expenditure Schedule Report Date: June 20, 2012 mprovement Program Six Year Transportation From 2013 to 2018 Agency: Tukwila 0 ti m 0 Z N a c } MPO /RTPO: PSRC RW Required a�i Environmental Type w 0 Total Length 0 u" 0 0 u) a 0 Utility Codes O OF Improvement Type o Resolution No. 0 r r- Amendment Adopted (V <o 0 Hearing N 0) 6 0 A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID WA -03771 Interurban Ave S Interurban Ave S S 143rd St to Fort Dent Way Reconstruct street including paving, curb & gutter, drainage, illumination, sidewalk, and landscaping Priority Number Functional Class Total Funds 0 0 0 0 0 N- O 0 0 0 Local Funds O O 0 00 O O O 00 N 0 c 5 LL d A N 0 0 0 0 0 0 O 0 0 O 0 0 0 State Fund Code m 1- 0 Federal Funds 0 0 0 0 0 0 0 0 O 0 O 0 0 0 0 Federal Fund Code a r Phase Start Year (YYYY) a O N d L a a Z 0 5 rn a a R 0 Expenditure Schedule 0 0 0 O O L O O O 0 v i0 0 O O O O 0 0 O O O 0 O O O O N y O d L a a Z 0 O 1- Report Date: June 20, 2012 17 mprovement Program Six Year Transportation 18 From 2013 to 2018 Agency: Tukwila m v 0 0 z C MPO /RTPO: PSRC RW Required O z Environmental Type w U Total Length Utility Codes Improvement Type 0 Resolution No. O n Amendment Adopted N 0 O Hearing N 0 0 O G. Structure ID 0 M Macadam Road /S 144th St Intersection Macadam Road S 144th Street to Widen Macadam Road to add a northbound left turn lane Priority Number Functional Class N. 0 c 'v 0 0 O O Total Funds 0 O O 0 0 0 N O O O 0 0m O 0 0 O O 0 N O O State Funds O O O O State Fund Code O Federal Funds O O O O Federal Fund Code Phase Start Year (YYYY) cn 0 N CO 0 N m 0 N m 0 N a a U 2 y N a a a A O F Expenditure Schedule O O 0 O O 0 O O O 0 O O O O O N O O O O O O O d N a a z U m 1- Report Date: June 20, 2012 mprovement Program Six Year Transportation 1� From 2013 to 2018 Agency: Tukwila County: King 0 0 .y J 0 z MPO /RTPO: PSRC RW Required 2 Environmental Type w 0 Total Length 0 0 v O 1- Utility Codes co a Improvement Type o Resolution No. O n N- Amendment N Adopted o 0 N Hearing 0 0 A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID WA -03773 Minkler Blvd Minkler Blvd Southcenter Pkwy to Andover Park W Construct widening for 3 lanes including curb & gutter, sidewalk, drainage and landscaping Priority Number Functional r Class 0 0 LL 7,7 1- 0 0 0 0 0 m N 9 0 LL A 0 0 J 0 O 0 0) 0 0 0 CO CO 0 State Funds 0 O State Fund Code O Federal Funds 0 Federal Fund Code Phase Start Year (YYYY) m O 0 .0 0. a z 0 0 0 w a a 0 A O Expenditure Schedule 00 0 0 c0 0 00 0 a 0' 0 0 O 0 0 0 O N O O O 0 O O W a z 0 CNJ N cc ca a Report Date: June 20, 2012 19 mprovement Program Six Year Transportation E 20 From 2013 to 2018 Agency: Tukwila N z 5 0 } MPO /RTPO: PSRC RW Required z Environmental Type Total Length Utility Codes Improvement Type v Resolution No. 0 n r Amendment Adopted cc o 0 N Hearing m co 0 A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID WA -03679 Neighborhood Traffic Calming Program Various city street to Program to address neighborhood traffic concerns using striping, signage, roadway improvements, traffic calming, and education to reduce speeding and improve safety Priority Number Functional � Class Total Funds Local Funds 0 State Funds 0 State Fund Code 0 Federal Funds 0 Federal Fund Code Phase Start Year (YYYY) O N 2 A H 0 Expenditure Schedule Report Date: June 20, 2012 mprovement Program Six Year Transportation From 2013 to 2018 Agency: Tukwila c Y 0 0 0 0 z 0 } MPO /RTPO: PSRC RW Required 2 Environmental Type w 0 0 ZZ O Total Length Utility Codes Improvement Type o Resolution No. 0 1.... Amendment Adopted N r. 0 0 N Hearing 7 0 0 0 A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID WA -03780 Nelsen Place Nelsen Place S 156th St to S 158th St Design and construct paving, curb & gutter, sidewalks, drainage, and illumination Priority Number Functional 0 Class m 0 li O 0 0 0 N Total Funds 0 0 0 0 O 0 0 0 0 N Local Funds 0 0 0 N 0 0 0 W 0 O O 00 N 0 State Funds 0 O State Fund Code O Federal Funds O 0 Federal Fund Code CO O N 0) O 0 0 .0 a W z 0 0 0 rn a a Expenditure Schedule O 0 N 00 0 00 O 0 N 0 0 0 0 13. 0 O 0 N O O O N O O m A a a Z 0 0 A O Report Date: June 20, 2012 21 mprovement Program Six Year Transportation SE St a 41) 22 From 2013 to 2018 Agency: Tukwila c c 0 N 0 0 z MPO /RTPO: PSRC RW Required z Environmental Type w 0 Total Length 0 _) 0 co a 0 Utility Codes 0 0I_ Improvement Type o Resolution No. 0 n n Amendment Adopted o m 0 Hearing N (0 0 A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin ti End Termini F. Project Description G. Structure ID WA -03769 S 133rd St/SR 599 SB Ramps Intersection S 133rd Street SR 599 SB Ramps to Design and construct intersection improvements including a new traffic signal. Priority Number Functional o Class 0 0 Total Funds 0 0 0 0 0 0 0 0, 0 0 0 0 Local Funds 0 0 0 0 0 0 0 rn 0 State Funds 0 0 0 State Fund Code 0 Federal Funds 0 0 0 0 0 0 0 0 e Federal Fund Code 71 0 N m 0 N ao 0 N W a W a Z 0 0 y 5) a a Expenditure Schedule Report Date: June 20, 2012 mprovement Program Six Year Transportation From 2013 to 2018 Agency: Tukwila 0 0 } MPO /RTPO: PSRC RW Required z Environmental Type w 0 0 N O Total Length Utility Codes Improvement Type N Resolution No. 0 n n Amendment N Adopted 0 0 Hearing N CD 0 A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID WA -03782 S 144th St Bridge Sidewalks S 144th Street 51st Ave S to 53rd Ave S Widen existing sidewalks on bridge over 1 -5 between 51st Ave S and 53rd Ave S Priority Number Functional n Class 0 0 0 0 0 Total Funds 0 0 0 Local Funds 0 0 0 00 0 0 0 0 0 State Funds 0 State Fund Code 0 Federal Funds 0 Federal Fund Code Phase Start Year (YYYY) CO O m L W a 0 m to a Expenditure Schedule 00 0 O 0 00 0 0 L v 0 0 0 O N O Y! O 0 CO a a. A 0 1- Report Date: June 20, 2012 23 mprovement Program Six Year Transportation 24 From 2013 to 2018 Agency: Tukwila c Y 0 0 N 0 Z MPO /RTPO: PSRC RW Required z° Environmental Type w 0 Total Length 0 rn 0 1,818,0001 co a 68,0001 0 Utility Codes 0 818,000 01_ Improvement Type o Resolution No. 00 0 o o oo 0 o 0 0 State Funds Ps h- Amendment 0 N Adopted a, 0 N Hearing 0) m 0 A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID WA -03762 S 144th St Phase 2 S 144th Street 42nd Ave S to Tukwila International Blvd Design and construct paving, curb & gutter, sidewalks, drainage, illumination, and utility undergrounding. Coordinate with Tukwila Village development. May include on- street parking and bike lanes Priority Number 0 Functional r-- Class Expenditure Schedule Report Date: June 20, 2012 Total Funds 1 68,0001 230,0001 40,0001 1,480,0001 1,818,0001 Local Funds 68,0001 230,000 40,000 480,000 818,000 0 0 0 00 0 o o oo 0 o 0 State Funds 0 0 State Fund Code TIB Federal Funds 0 0 0 0 0 Federal Fund Code C) tl 0 01 01 01 N Phase Q. a ry CN C a c li Status 1 CO a a a Expenditure Schedule Report Date: June 20, 2012 mprovement Program Six Year Transportation From 2013 to 2018 Agency: Tukwila c 0 N v 0 0 z 0) a MPO /RTPO: PSRC RW Required Y Environmental Type w 0 Total Length 0 O m O Utility Codes a 0 0 Improvement Type c Resolution No. O N. N. Amendment Adopted N m <o 0 Hearing N i o m 0 A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID WA -03778 S 168th St S 168th St Southcenter Pkwy to Andover Park E Design and construct new roadway including curb & gutter, sidewalk, drainiage, illumination, on- street parking, landscaping, and underground utilities. Priority Number Functional Class o ° O 0 0 N Total Funds 0 0 0 N N- an v N 0 c LL R V O J O 0 0 N- 01 O 0 O O r 0 0 N N1 N O State Funds 0 0 0 State Fund Code 0 Federal Funds O O 0 Federal Fund Code Phase Start Year (YYYY) O O N O O N o O N N a W a z 0 2 m co a a a Expenditure Schedule L co N! r N O L O O 0 O M 0 0 0 O 0 N O 0 O N O O O N a a z 0 N O H Report Date: June 20, 2012 25 mprovement Program Six Year Transportation 4 41) 26 From 2013 to 2018 Agency: Tukwila c Y c U 1) 0 0 0 z 0 } MPO /RTPO: PSRC RW Required z Environmental Type 0 O a 0 Total Length Utility Codes Improvement Type o Resolution No. 0 n n Amendment N Adopted o 0 0 N Hearing o ro 0 A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID WA -03784 S 178th St Realignment S 178th St Southcenter Pkwy to W City Limits Realign S 178th St from current intersection of Southcenter Pkwy /S 180th St to intersect with Segale Park Dr C and add a new traffic signal at the new intersection. Priority Number Functional o Class Total Funds 0 0 0 N 0, 0) Local Funds 0 0 0 ri 0 0 n r ri State Funds 0 0 0 0, N O 0 0 0 0, N N State Fund Code W 2 O 0 Federal Funds 0 Federal Fund Code N R 0 f O N O r a z 0 a Expenditure Schedule Report Date: June 20, 2012 mprovement Program Six Year Transportation From 2013 to 2018 Agency: Tukwila c r 0 d a 0 0 Z MPO /RTPO: PSRC RW Required z Environmental Type w 0 0 0 O Total Length Utility Codes Improvement Type "o Resolution No. O n r Amendment N Adopted to 0 N Hearing iTi O A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID WA -03781 S 180th St/Andover Park W Intersection S 180th Street Andover Park W to Widen for north /south left turn pockets Priority Number Functional o Class c LL 0 0 0 0) cn Total Funds 0 0 0 0) O 0 0 O 0 0 0 0 0 0 c) Local Funds 0 0 0 ui 0 0 0 0 N 0 State Funds 0 0 0 State Fund Code O Federal Funds 0 0 0 Federal Fund Code Phase Start Year (YYYY) CO O N O 0 N O O N t 0. a z 0 5 A y a a a R 0 f Expenditure Schedule 0 00 L m r un O 0 0 ID 0 0 0 N O L 0 0 0 0 0 0 0 O N O O O N O O O m N a a cc z 0 0 N a) co a Report Date: June 20, 2012 27 mprovement Program Six Year Transportation 28 From 2013 to 2018 Agency: Tukwila 0> 0 0 0 v o 0 z MPO /RTPO: PSRC RW Required Environmental Type w 0 Total Length m o_ O Utility Codes 0 0 f. Improvement Type 0 Resolution No. 0 n Amendment N Adopted o ro m O Hearing N 0) w 0 O A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID WA -03776 Southcenter Blvd Widening Southcenter Blvd 1 -5 to 61st Ave S Widen Southcenter Blvd and the 61st Avenue Bridge to add a lane for future traffic growth. Priority Number Functional v Class 0 v 0 LL Total Funds O 0 O 0 0 1 O 0 O 0 0 O O O 0 0 m 0 O 0 O 0 0 O N N 0 LL A 0 0 J 0 0 0 00 O O O 00 0 0 0 00 Of 0 0 O O 0 O 0 N O State Funds O O O State Fund Code 0 Federal Funds O 0 0 Federal Fund Code Phase Start Year (YYYY) 0) O N 0) O N 0) O N a z 0 a a Expenditure Schedule Report Date: June 20, 2012 mprovement Program Six Year Transportation ii: From 2013 to 2018 Agency: Tukwila MPO /RTPO: PSRC RW Required z Environmental Type w 0 Total Length Utility Codes Improvement Type N Resolution No. 0 n- n- Amendment N Adopted ro 0 Hearing N 0 A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID WA -03796 Thorndyke Safe Routes to School S 150th St Tukwila International Blvd to 42nd Ave S Construction of roadway improvements including a new sidewalk on the north side of S 150th St and a new crosswalk in front of Thorndyke Elementary School. Education, enforcement and encouragement elements are included after the construction as part of the Safe Routes to Schools program. Priority Number Functional 0 Class m c a 0 0 0 O Ql Total Funds 0 0 0 0 O 0 N ■ 0 Local Funds 0 0 0 N N O 0 0 N 0 0 0 0 0) State Funds 0 0 0 1- N State Fund Code 1— 0 0 3 0 0 0 Federal Funds 0 0 Federal Fund Code Phase Start Year (YYYY) 0 N 0 N N r a a z 0 4, m N a a N A O H Expenditure Schedule 0 0 0 0 0 O 0 0 0 0, 0 0 O 0 e O O N O O O N N O 0 N d L a a z 0 Report Date: June 20, 2012 29 mprovement Program Six Year Transportation 30 From 2013 to 2018 Agency: Tukwila d } MPO /RTPO: PSRC RW Required 2 Environmental Type Total Length Utility Codes Improvement Type N Resolution No. O N. Amendment Adopted N C0 0 N Hearing 0 ro 0 0 A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID WA -03775 Traffic Signal Interconnect Program Various City Streets to Design and install hard wire interconnect system between traffic signals and the Traffic Operations Center Priority Number Functional o Class rn c a LL 0 0 O Total Funds 0 0 0 0 r N O 0 0 0 0 0 vi N 9 7 LL V O J 0 0 0 00 C.) O 0 0 00 LL) 0 0 0 00 0 O State Funds O O State Fund Code 0 Federal Funds 0 0 O 0 0 0 0 0 N Federal Fund Code a N Phase Start Year (YYYY) 0 O 0 O N m L a a Z 0 0) 3 01) a a N R O H Expenditure Schedule Report Date: June 20, 2012 mprovement Program Six Year Transportation From 2013 to 2018 Agency: Tukwila c 5. U d -o N J 0 z v } MPO /RTPO: PSRC RW Required 2 Environmental Type w 0 Total Length 0 0 N. o Utility Codes Improvement Type N Resolution No. 0 r- Amendment N Adopted 0 Hearing o N CO 0 A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID WA -03772 TUC/TOD Pedestrian Improvements Baker Blvd (if extended) Andover Park W to E City Limits Design and construct bike and pedestrian connection between the Tukwila Urban Center and the Commuter Rail Station/TOD area. Priority Number Functional N. Class c u. 0 0 0 Total Funds Local Funds O 0 0 O0 C) O 0 0 00 ■ N 0 0 0 O u 0 State Funds 0 0 0 State Fund Code 0 Federal Funds 0 0 0 0 0 0 N O 0 0 0 O N Federal Fund Code W a u) Phase Start Year (YYYY) O N CO O N CO O N N a a ce z 0 0 0) y a. 0. a A O H Expenditure Schedule 00 0 0 0 L i0 r N O 00 0 0 0 00 0 0 O 0 0 0 0 0 O 0 O N O O O O N O O O m N a W a z 0 N 0 Report Date: June 20, 2012 31 mprovement Program Six Year Transportation 0; 32 From 2013 to 2018 Agency: Tukwila v .y 0 z RW Required z Environmental Type w 0 0 O O Total Length co Utility Codes a 0 Improvement Type o Resolution No. 0 Amendment N Adopted o m 0 N Hearing 0 m 0 A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID WA -03774 Tukwila International Blvd (Phase 4) Tukwila International Blvd Boeing Access Road to S 116th St Design and construct widening including paving, curb & gutter, sidewalk, drainage, lillumination, landscaping, and utility undergrounding. Priority Number Functional Class 0 0 0 Total Funds O 0 0 N M 0 0 0 m N Local Funds 0 0 O r N 0 0 0 N CO 0 0 O 0 State Funds 0 0 0 0 0 0 ri 0 0 0 0 0 N ei State Fund Code 0 H 0 Federal Funds 0 0 Federal Fund Code Phase Start Year (YYYY) O O 5) O N a. a a z 0 c0 N a a Expenditure Schedule Report Date: June 20, 2012 mprovement Program Six Year Transportation From 2013 to 2018 Agency: Tukwila MPO /RTPO: PSRC RW Required z Environmental Type w 0 0 0 v O Total Length Utility Codes a Improvement Type c Resolution No. 0 1- n Amendment N Adopted 10 0 Hearing N 10 ro 0 A. PIN /Project No. 8. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID WA -03777 Tukwila International Blvd /S 116th St/SR 599 On -ramp Tukwila International Blvd S 116th St/SR 599 On -ramp to Design and construct southbound left turn lane, pedestrian signalization and lighting Priority Number Functional Class Of 0 0 U. Total Funds 0 0 0 vi N N O 0 0 uS O Local Funds O State Funds O O 0 N O O 0 N State Fund Code 1- 0 Federal Funds 0 0 O Federal Fund Code a 1- Phase Start Year (YYYY) CO O N O O N m t a a Z 0 a a R 0 Expenditure Schedule 00 (.6 N N L to ob r 00 co V O L v O O 0 M 0 O O 0 N O O O N O O m a a Z 0 A 0 Report Date: June 20, 2012 33 mprovement Program Six Year Transportation n�n n4 P45 st la �jt 6 is 4D 34 From 2013 to 2018 Agency: Tukwila rn c c 0 0 .y z MPO /RTPO: PSRC RW Required z Environmental Type w 0 Total Length Utility Codes Improvement Type N Resolution No. 0 r- n Amendment Adopted N co 0 Hearing —"0...5 0 0 A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID WA -03798 Tukwila Manufacturing Industrial Center "Street Smart" Non - motorized Project Various City Streets to 1. Planning study of non - motorized improvement options along Boeing Access Road, to provide safe bicycle and pedestrian travel alternatives. 2. PE & CN of bike facilities on E Marginal Way S between Boeing Access Road and SR 599. 3. PE & CN of bike lanes and shared use path on Airport Way from Boeing Access Road /E Marginal Way S to the northern City limit. Priority Number Functional O. Class c 7 LL 0 0 Total Funds 0 0 0 0 CO 0 m M 0 Local Funds 0 0 0 0 0 State Funds 0 0 0 0 0 0 N State Fund Code H 0 0 0 Federal Funds 0 0 0 0 CO 0 (e M n Federal Fund Code a 0 U Phase Start Year (YYYY) 0 N M 0 N • a. a a a 0 to Q_ 0 Expenditure Schedule Report Date: June 20, 2012 mprovement Program Six Year Transportation From 2013 to 2018 Agency: Tukwila c c U m v 5 O N Y MPO /RTPO: PSRC RW Required m Environmental Type w 0 Total Length co a 0 Utility Codes O 0i Improvement Type N Resolution No. O r n Amendment N Adopted E 0 0 N Hearing �- 0 m 0 A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID WA -03734 Tukwila Urban Center - Transit Center Andover Park W Strander Blvd to Tukwila Pkwy Design and construct a transit center Priority Number Functional o Class Total Funds o o 0 N 0 0 0 0 N h 9 o C 0 LL A O 0 J o 0 0 0) 0 0 1 State Funds 0 0 O 0 ci 0 0 O I M r ri State Fund Code Federal Funds 0 0 0 0 0 0 0 O 0 O a Federal Fund Code Phase Start Year (YYYY) M O N m a. a Z 0 0 3 Expenditure Schedule 0 t .0 0 a 0 0 a M 0 O O N Z 0 m F Report Date: June 20, 2012 35 mprovement Program Six Year Transportation c t 41) 36 From 2013 to 2018 Agency: Tukwila d a 0 z v } 0) Y c 0 5 c d � H 0 6 O 2 RW Required m Environmental Type w 0 0 V co o Total Length Utility Codes Improvement Type N Resolution No. 0 N. N. Amendment N Adopted o CO 0 N Hearing i 0 A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID /1320(002) TUK -50 Tukwila Urban Center Pedestrian /Bicycle Bridge over Green River New bridge over the Green River, approximately between Baker Blvd (if extended) and Longacres Way (if extended) Near Riverside office complex to Best Western hotel 15901 WVHwy Design and preliminary engineering of a new pedestrian /bicycle bridge across the Green River, connecting the Tukwila Urban Center 'core' to the Sounder Commuter Rail /Amtrak Station and surrounding neighborhood of transit- oriented development. Priority Number Functional o Class ° rn 0) LL M O Total Funds O 0 O O O 0 O 0 0 Local Funds 0 0 0 M N 0 O O m N N 0 0 0 r to N O State Funds 0 0 0 0 0 00 0 State Fund Code 0 0 M 00 0 Federal Funds 0 0 0 0 0 0 N N Federal Fund Code 0 0 0 Phase Start Year (YYYY) C) 0 0 N 0, 0 N m L a a z 0 co a a N A O Expenditure Schedule Report Date: June 20, 2012 mprovement Program Six Year Transportation SE .6t From 2013 to 2018 Agency: Tukwila c c 5 N 0 z MPO /RTPO: PSRC RW Required z Environmental Type Total Length Utility Codes Improvement Type N Resolution No. O n r- Amendment N Adopted o FE, 0 N Hearing E 0 A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID WA -03761 Walk & Roll Plan (Nonmotorized Transportation Plan Various City Streets to Select, design, and construct non - motorized projects including bike lanes, sidewalks and trails Priority Number Functional r- Class 0 0 0 0 Total Funds 0 O 0 0 0 0 0 O State Funds 0 State Fund Code 0 Federal Funds 0 Federal Fund Code Phase Start Year (YYYY) O N 0 r a a 5 m y a N A O F Expenditure Schedule 0 0 0 O 0 0 0 0 0 v �n 0 C N 0 0 N 0 m CO r 0. a a 0 Report Date: June 20, 2012 37 mprovement Program Six Year Transportation 1F 38 From 2013 to 2018 Agency: Tukwila c Y C 0 7 m 0 z MPO /RTPO: PSRC RW Required z° Environmental Type w 0 0 0 N 0 Total Length Utility Codes Improvement Type o Resolution No. 0 i, Amendment N Adopted o ro 0 Hearing N CD 0 A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID WA -03779 West Valley Highway SR 181/West Valley Highway 1 -405 to Strander Blvd Design and costruct widening to 7 lanes including curb & gutter, sidewalks, illumination, drainage, and traffic control Priority Number Functional Class 0 0 0 Total Funds 0 0 0 0 0 0 0 n CD 0 0 0 Local Funds 0 0 0 0 In 0 0 0 M d 0 State Funds 0 0 State Fund Code 0 Federal Funds 0 0 Federal Fund Code Phase Start Year (YYYY) o 0 N CO 0 N a z 0 a EL 3, m 0 Expenditure Schedule Report Date: June 20, 2012 mprovement Program Six Year Transportation From 2013 to 2018 Agency: Tukwila 0 O Z MPO /RTPO: PSRC RW Required ! } Environmental Type w 0 Total Length Utility Codes a 0 Improvement Type o Resolution No. 0 N. 1- Amendment N Adopted m 0 N Hearing 10 0 A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin 8 End Termini F. Project Description G. Structure ID WA -03765 West Valley Highway /S 156th St SR181/West Valley Highway Southcenler Blvd to S 158th St Construct additional northbound left turn lanes at S 156th Street for northbound HOV to northbound 1 -405 Priority Number Functional v Class 0 0 0 Total Funds O 0 0 0 Lo 0 0 0 CO 0 O O 0 0 0 0 00 10 O 00 0 O 00 O 0 m 0 0 State Funds 0 0 O State Fund Code 0 Federal Funds 0 0 0 0 0 0 0 0 0 3 Federal Fund Code O U Phase Start Year (YYYY) m O N O O N C1 L o. a a U Z m 0 m m 0. a N A O F Expenditure Schedule 00 0 N t 0 L N 00 N 0 O 0 0 0 0 9 P7 0 0 O c O O O W a Z U A F Total Funds Local Funds State Funds Federal Funds Grand Totals for Tukwila Report Date: June 20, 2012 39 40 TRANSPORTATION COMMITTEE - Meeting Minutes May 29, 2013 — 5:15 p.m. — Conference Room #1 City of Tukwila Transportation Committee PRESENT Councilmembers: Kate Kruller, Chair; Joe Duffie and Dennis Robertson Staff: Bob Giberson, Frank Iriarte, Robin Tischmak, Cyndy Knighton, Laurel Humphrey, Kimberly Matej CALL TO ORDER: Committee Chair Kruller called the meeting to order at 5:15 p.m. I. PRESENTATIONS - No presentations. II. BUSINESS AGENDA A. Resolution for Six -Year Transportation Improvement Program (2014 -2019) Staff is seeking Council adoption via resolution of the 2014 -2019 Six -Year Transportation Improvement Program (TIP), as required by the Revised Code of Washington (RCW). The TIP is a financial planning tool that lists transportation- related projects planned within the next six years that are regionally significant or that have grant funding potential. This annual update to the TIP is generally modified to reflect the City's Capital Improvement Program (CIP), since the two are updated at different times. Differences between the two plans may be due to priority changes, funding availability, or other factors. The memo in the agenda packet clearly outlines the project additions, deletion, and modifications, and staff distributed the finalized 2014 -2019 TIP that will be attached to the resolution. Councilmembers and staff discussed the feasibility of approving the TIP and the CIP on the same annual cycle in an effort to reduce discrepancies. Currently, the CIP is finished by the end of each year, and the TIP must be approved by June 30. Staff will look into aligning these schedules and return with a recommendation at a later date. UNANIMOUS APPROVAL. FORWARD TO JUNE 10 COW FOR DISCUSSION. III. SOUTH COUNTY AREA TRANSPORTATION BOARD (SCATBd ) The April 16, 2013 meeting summary was included in the agenda packet, along with the May 21 agenda. Highlights mentioned by Committee Chair Kruller included the May 21 vote to issue a letter of support for Substitute House Bill 1954, the update on the I- 405 /SR 167 Corridor Project, and the 2012 Statewide VOWS Panel Transportation Survey. The Board discussed tolling and carpool requirements in other areas of the country, and indiciated there may be a future movement to require three or more car occupants for carpool lane access. INFORMATION ONLY. IV. MISCELLANEOUS Councilmember Robertson requested an update on the South 178th Realignment Project. Staff indicated that Segale Properties is now working under an approved grading plan, and that clearing activities have begun. Negotiations with Puget Sound Energy and the Highline Water District are ongoing. Councilmember Robertson shared a concern about the safety of schoolchildren walking on 42 °d Avenue South and wondered if any short-term safety solutions could be implemented. Staff mentioned galvanized steel pedestrian rails as one possibility and will look into it. Councilmember Duffie expressed ongoing concern about aggressive bicyclists on bike trails that intersect with roadways (such as the Green River Tail crossing with South 116th Street), as well as pedestrian safety issues along 531d Avenue South. 41