HomeMy WebLinkAboutRes 1797 - 2014-2019 Transportation Improvement ProgramCity of Tukwila
Washington
Resolution No. 1797
A RESOLUTION OF THE CITY COUNCIL OF THE CITY
OF TUKWILA, WASHINGTON, ADOPTING A SIX -YEAR
TRANSPORTATION IMPROVEMENT PROGRAM (2014-
2019), AND DIRECTING THE SAME TO BE FILED WITH
THE STATE SECRETARY OF TRANSPORTATION AND
THE TRANSPORTATION IMPROVEMENT BOARD.
WHEREAS, pursuant to the requirements of RCW Chapters 35.77 and 47.26 as
amended, the City Council of the City of Tukwila has previously adopted a
Transportation Improvement Program and thereafter periodically modified said
Transportation Improvement Program by resolution; and
WHEREAS, the City Council has reviewed the work accomplished under said
program, determined current and future City street and arterial needs and, based upon
these findings, has prepared a Six -Year Transportation Improvement Program for the
ensuing six calendar years (2014- 2019); and
WHEREAS, on June 10, 2013, a public hearing was held regarding the City's Six -
Year Transportation Improvement Program;
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA,
WASHINGTON, HEREBY RESOLVES AS FOLLOWS:
Section 1. Program Adopted. A six -year Transportation Improvement Program
for the calendar years 2014 -2019 is hereby adopted.
Section 2. Filing of Program. The City Clerk is hereby authorized and directed to
file a copy of this resolution, together with the exhibit attached hereto, with the
Secretary of Transportation and the Transportation Improvement Board of the State of
Washington.
W: \Word Processing- City \Resolutions \TIP 2014 -2019 5 -23 -13
CK:bjs
Page 1 of 2
PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON,
at a Regular Meeting thereof this / 7TH day of `J (AA) e._ , 2013.
ATTEST /AUTHENTICATED:
I� y( '
7
Christy O'Flah Y, MMC, City Cler
APPROVED AS TO FORM BY:
cuLa
Shelley M. Kerslake, City Attorney
Filed with the City Clerk:
Passed by the City Council:
Resolution Number: If) Cif?
Exhibit: City of Tukwila Six -Year Transportation Improvement Program from 2014 to 2019
W: \Word Processing- City \Resolutions \TIP 2014 -2019 5 -23 -13
CK:bjs
Page 2of2
shington State
Department of Transportation.
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2014 to 2019
N Outside
m
c
0
m 3
t2 m
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
m
°+
,o
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
00
WA -05405
Americans with Disabilities Act (ADA) Improvements
Various locations
to
Design and construct ADA compliant upgrades to City infrastructure in conjunction
with a City developed plan.
06/10/13
06/17/13
06
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
ALL
2014
0
0
541,000
541,000
Totals
0
0
541,000
541,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
ALL
63,000
63,000
63,000
63,000
126,000
Totals
63,000
63,000
63,000
63,000
126,000
Report Date: May 31, 2013
Page 1
Washington State
tr (Department of 'ratnsporta
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2014 to 2019
N Outside
Functional
Class
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
=
m
a
m
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
16
WA -03766
Andover Park E /Industry Drive Signal
Andover Park E
Industry Drive to
Design and construct a traffic signal and intersection improvements
06/10/13
06/17/13
05
C G O P S
TW
0.190
CE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
PE
2014
0
0
100,000
100,000
P
CN
2018
0
0
575,000
575,000
Totals
0
0
675,000
675,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
100,000
0
0
0
0
CN
0
0
0
575,000
0
Totals
100,000
0
0
575,000
0
Report Date: May 31, 2013
Page 2
shington State
partment of Transportation.
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2014 to 2019
N Outside
iagwnN Alpolid
A. PIN /Project No.
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description
B. STIP ID
G. Structure ID
luewpuawy
0
0
0
0
z
0
8E14 luawanoidw1
0.
3D
adA1 Ieluawuonnu3
16
Andover Park E /Minkler Blvd. Intersection
Andover Park E
Minkler Blvd to
Design and construct intersection and traffic signal improvements and widening for
left turn pockets
WA -03764 06/10/13 06/17/13
03
0.190 CE No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
PE
2014
0
0
120,000
120,000
P
PE
2019
0
0
20,000
20,000
P
CN
2018
0
0
602,000
602,000
Totals
0
0
742,000
742,000
Expenditure Schedule
Phase
1 st
2nd
3rd
4th
5th & 6th
PE
75,000
45,000
0
0
20,000
CN
0
0
0
0
602,000
Totals
75,000
45,000
0
0
622,000
Report Date: May 31, 2013
Page 3
Washington State
department of Iransportation.
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2014 to 2019
N Outside
Functional
Class
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
,
3
,o
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
16
WA -03760
Andover Park West Widening
Andover Park West
Strander Blvd to Tukwila Pkwy
Complete widening for center turn pockets and landscape median for access control,
widen sidewalks, upgrade ADA facilities, modify signal operation, upgrade street
lighting, install pedestrian lighting.
06/10/13
06/17/13
04
C G O P S
TW
0.400
CE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
CN
2014
0
TIB
1,420,000
339,000
1,759,000
Totals
0
1,420,000
339,000
1,759,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
CN
1,050,000
0
0
0
0
Totals
1,050,000
0
0
0
0
Report Date: May 31, 2013
Page 4
firWashington State
Department of Transpo►tation.
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2014 to 2019
N Outside
Functional
Class
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
ro
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
14
WA -03731
Annual Bridge Inspections and Repairs
Various City Street
to
Perform load ratings and bi- annual inspections as well as construct necessary
repairs and maintenance
06/10/13
06/17/13
06
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
ALL
2014
0
0
1,555,000
1,555,000
Totals
0
0
1,555,000
1,555,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
ALL
270,000
270,000
270,000
270,000
670,000
Totals
270,000
270,000
270,000
270,000
670,000
Report Date: May 31, 2013
Page 5
ANIL
Washington State
*(� Department of Transportation
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2014 to 2019
N Outside
Functional
Class
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
3
a
m
3
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
16
WA -03733
Annual Overlay and Repair Program
Various City Streets
to
Repair, rehabilitate, and overlay City streets as needed in an annual program
06/10/13
06/17/13
06
C G O P S
TW
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
ALL
2014
0
0
9,655,000
9,655,000
Totals
0
0
9,655,000
9,655,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
ALL
1,500,000
1,550,000
1,560,000
1,650,000
3,395,000
Totals
1,500,000
1,550,000
1,560,000
1,650,000
3,395,000
Report Date: May 31, 2013
Page 6
AMR
Washington State
7% Qepartment of Transportation
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2014 to 2019
N Outside
m
e
o ,-,
m o
m d
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin 8 End Termini
F. Project Description G. Structure ID
m
Adopted
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
00
WA -05409
BNSF Regional Center Access
New Facility
to
Construct a new access to the BNSF Regional Distribution Center, relocating the
900+ daily truck trips from residential streets in Allendtown.
06/10/13
06/17/13
08
EIS
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2019
FMSIB
950,000
0
300,000
1,250,000
P
CN
2019
FMSIB
10,812,500
0
1,687,500
12,500,000
Totals
11,762,500
0
1,987,500
13,750,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th 8 6th
PE
0
0
0
0
1,250,000
CN
0
0
0
0
12,500,000
Totals
0
0
0
0
13,750,000
Report Date: May 31, 2013
Page 7
shington State
Department or Transportation
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2014 to 2019
N Outside
Functional
Class
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
D
c
-o
a
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
14
TUK -52
Boeing Access Road Bridge Rehabilitation
Boeing Access Road
Interstate 5 to Airport Way South
Rehabilitate the existing Boeing Access Road bridge structure over the Burlington
Norther and Union Pacific Railroads. Work will include rehabilitation of the bridge
sub - structure, seismic retrofit, and construction of a new bridge deck including
pedestrian /bicycle amenities.
06/10/13
06/17/13
14
0.200
DCE
Yes
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
PE
2014
BR
800,000
0
200,000
1,000,000
S
CN
2014
BR
8,880,000
0
2,220,000
11,100,000
Totals
9,680,000
0
2,420,000
12,100,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
1,000,000
0
0
0
0
CN
2,100,000
9,000,000
0
0
0
Totals
3,100,000
9,000,000
0
0
0
Report Date: May 31, 2013
Page 8
Washington State
War Department of Transportation
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2014 to 2019
N Outside
Functional
Class
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
m
Adopted
2
2
a
3
A
2
M
e
o
v
ii
<
3
a
1
C
»_
—'
0
0
m
1
8
r
m
o
0
m
xi
73
2
5 o.
19
WA -03795
Cascade View Safe Routes to School
S 140th St/33rd Ave S
to
Construct an off- street paved shard use path, sidewalks, and a traffic circle at the
intersection of 33rd Ave S and S 140th Street.
06/10/13
06/17/13
ALL
28
0.190
CE
No
0
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
ALL
2018
839,000
0
WSDOT
750,000
89,000
839,000
Totals
0
750,000
89,000
839,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
ALL
0
0
0
839,000
0
Totals
0
0
0
839,000
0
Report Date: May 31, 2013
Page 9
Washington State
VW Department of Transportation
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2014 to 2019
N Outside
iagwnry Alpoud
A. PIN /Project No.
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description
B. STIP ID
G. Structure ID
m
10
a
0
0.
luawpuawy
m
0
0
z
0
ad Ai luawanoJdw1
-4
m
to
0•
adbtj ieluawuoiinu3
pannnbaa MiI
16
East Marginal Way
E Marginal Way
Boeing Access Road to S 112th St
Design and construct widening to 3 lanes including curb & gutter, sidewalks,
drainage, landscaping, and utility undergrounding.
WA -03770
06/10/13
06/17/13
03
PSTW
0.280
CE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
PE
2014
0
0
50,000
50,000
P
PE
2019
0
0
170,000
170,000
P
RW
2019
0
0
700,000
700,000
P
CN
2019
STP
1,300,000
0
1,130,000
2,430,000
Totals
1,300,000
0
2,050,000
3,350,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
50,000
0
0
0
170,000
RW
0
0
0
0
700,000
CN
0
0
0
0
2,430,000
Totals
50,000
0
0
0
3,300,000
Report Date: May 31, 2013
Page 10
1Alashingtoa -State
V% Department at Transportation
Agency: Tukwila
County: King
MPOIRTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2014 to 2019
N Outside
JagwnN /4u0ud
A. PIN /Project No.
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description
B. STIP ID
G. Structure ID
0.
9
n
)uewpuawy
0
0
r
0
z
0
adAj;uewanoidwi
c
0.
N
adAj iquawuonnu3
0
c
0.
14
Interurban Avenue South (S 143 St to Fort Dent Way)
Interurban Avenue South
S 143 St to Fort Dent Way
Reconstruct and overlay the existing roadway and construct curb and gutter,
drainage, sidewalk, landscaping, illumination, utility burying, channelization, signing,
and signal interconnect.
TUK-40
06/10/13
06/17/13
06
0.900
CE
Yes
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
CN
2014
STP(U)
2,145,954
TIE
5,000,000
3,554,046
10,700,000
Totals
2,145,954
5,000,000
3,554,046
10,700,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
CN
10,700,000
0
0
0
Totals
10,700,000
0
0
0
0
Report Date: May 31, 2013
Page 11
Washington State
Var Department of Transpowtat
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2014 to 2019
N Outside
Functional
Class
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
17
Local Funds
WA -03763
Macadam Road /S 144th St Intersection
Macadam Road
S 144th Street to
Widen Macadam Road to add a northbound left turn lane
06/10/13
06/17/13
2014
03
0.190
CE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
PE
2014
0
0
17,000
17,000
P
PE
2018
0
0
90,000
90,000
P
RW
2018
0
0
90,000
90,000
P
CN
2018
0
0
430,000
430,000
Totals
0
0
627,000
627,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
17,000
0
0
0
90,000
RW
0
0
0
0
90,000
CN
0
0
0
0
430,000
Totals
17,000
0
0
0
610,000
Report Date: May 31, 2013
Page 12
Washington State
Department of Transportation
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2014 to 2019
N Outside
Functional
Class
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
No.
Improvement Type
Utility Codes
Total Length
Environmental Type
Required
17
4th
WA -03773
Minkler Blvd
Minkler Blvd
Southcenter Pkwy to Andover Park W
Construct widening for 3 lanes including curb 8 gutter, sidewalk, drainage and
landscaping
06/10/13
06/17/13
03
P S T W
0.400
CE
No
0
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2018
Totals
0
0
0
75,000
75,000
P
CN
2018
940,000
0
0
865,000
865,000
Totals
0
0
940,000
940,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
0
0
0
0
75,000
CN
0
0
0
0
865,000
Totals
0
0
0
0
940,000
Report Date: May 31, 2013
Page 13
Washington State
Vf/ Department of Transportation.
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2014 to 2019
N Outside
Functional
Class
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
=
m
m
io
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
00
WA -03783
Multipurpose Trails
to
Design and construct safe connections to public trails to promoste pedestrian and
bicycle modes of transportation in lieu of motorized vehicles
06/10/13
06/17/13
28
CE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2015
0
0
50,000
50,000
P
CN
2019
0
0
280,000
280,000
Totals
0
0
330,000
330,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
0
50,000
0
0
0
CN
0
0
0
280,000
0
Totals
0
50,000
0
280,000
0
Report Date: May 31, 2013
Page 14
tileshington State
Department ..o Transportation:
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2014 to 2019
N Outside
JagwnN IG!ioud
A. PIN /Project No.
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description
B. STIP ID
G. Structure ID
0.
a
0.
;uewpuawy
0
0
057
0
2
0
adAl ;uawanoidwi
c
r)
0
0
N
edAl Ie ;uawuonnu3
19
Nelsen Place
Nelsen Place
S 156th St to S 158th St
Design and construct paving, curb & gutter, sidewalks, drainage, and illumination
WA -03780
06/10/13
06/17/13
05
0.110
CE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2019
0
0
20,000
20,000
P
CN
2019
0
0
180,000
180,000
Totals
0
0
200,000
200,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
0
0
0
0
20,000
CN
0
0
0
180,000
Totals
0
0
0
0
200,000
Report Date: May 31, 2013
Page 15
,rllia,
Washington State
WI Department or Transportation.
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2014 to 2019
N Outside
Functional
Class
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
m
su
m
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
16
WA -03769
S 133rd St/SR 599 SB Ramps Intersection
S 133rd Street
SR 599 SB Ramps to
Design and construct intersection improvements including a new traffic signal.
06/10/13
06/17/13
06
000 P S
TW
0.190
CE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
PE
2014
0
0
20,000
20,000
P
PE
2018
0
0
60,000
60,000
P
CN
2018
STP
460,000
0
110,000
570,000
Totals
460,000
0
190,000
650,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
20,000
0
0
0
60,000
CN
0
0
0
0
570,000
Totals
20,000
0
0
0
630,000
Report Date: May 31, 2013
Page 16
Washington State
Repartment of Transportation.
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2014 to 2019
N Outside
Functional
Class
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
17
4th
WA -03782
S 144th St Bridge Sidewalks
S 144th Street
51st Ave S to 53rd Ave S
Widen existing sidewalks on bridge over 1 -5 between 51st Ave S and 53rd Ave S
06/10/13
06/17/13
28
0.250
CE
No
0
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2019
0
0
100,000
100,000
Totals
0
0
100,000
100,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
0
0
0
0
100,000
Totals
0
0
0
0
100,000
Report Date: May 31, 2013
Page 17
Washington State
Yip Department of Transportation.
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2014 to 2019
N Outside
Functional
Class
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
m
m
2
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
17
Total Funds
WA -03762
S 144th St Phase 2
S 144th Street
42nd Ave S to Tukwila International Blvd
Design and construct paving, curb & gutter, sidewalks, drainage, illumination, and
utility undergrounding. Coordinate with Tukwila Village development. May include
on- street parking and bike lanes
06/10/13
06/17/13
03
C G O P S
TW
0.190
CE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
PE
2014
0
0
68,000
68,000
P
PE
2018
0
0
230,000
230,000
P
RW
2018
0
0
40,000
40,000
P
CN
2018
0
TIB
1,000,000
480,000
1,480,000
Totals
0
1,000,000
818,000
1,818,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
68,000
0
0
0
230,000
RW
0
0
0
0
40,000
CN
0
0
0
0
1,480,000
Totals
68,000
0
0
0
1,750,000
Report Date: May 31, 2013
Page 18
Washington State
VW Department at Trnt1sportation.
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2014 to 2019
N Outside
JagwnN i4' °! d
A. PIN /Project No.
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description
B. STIP ID
G. Structure ID
x
ID
0
a
auawpuewy
0
0
z
0
add(1;uawanoidwg
c
r)
0.
N
v
0
m
adAl ie ;uawuonnu3
paJinbaa Ma
00
S 168th St
S 168th St
Southcenter Pkwy to Andover Park E
Design and construct new roadway including curb & gutter, sidewalk, drainiage,
illumination, on- street parking, landscaping, and underground utilities.
WA -03778
06/10/13
06/17/13
01
GOPW
0.800
CE
Yes
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2019
0
0
1,372,000
1,372,000
P
RW
2019
0
0
7,500,000
7,500,000
P
CN
2019
0
0
14,372,000
14,372,000
Totals
0
0
23,244,000
23,244,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
0
0
0
0
1,372,000
RW
0
0
0
0
7,500,000
CN
0
0
0
0
14,372,000
Totals
0
0
0
0
23,244,000
Report Date: May 31, 2013
Page 19
Washington State
T,r Department of Transportation
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2014 to 2019
N Outside
Functional
Class
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes'
Total Length
Environmental Type
RW Required
16
WA -03784
S 178th St Realignment
S 178th St
Southcenter Pkwy to W City Limits
Realign S 178th St from current intersection of Southcenter Pkwy /S 180th St to
intersect with Segale Park Dr C and add a new traffic signal at the new intersection.
06/10/13
06/17/13
01
0.400
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
CN
2014
0
0
9,472,000
9,472,000
Totals
0
0
9,472,000
9,472,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
ALL
9,382,000
0
0
0
0
Totals
9,382,000
0
0
0
0
Report Date: May 31, 2013
Page 20
.1A11a.
z�z Washington State
'!w Department of Transportation
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2014 to 2019
N Outside
JagwnN /Guoud
A. PIN /Project No.
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description
B. STIP ID
G. Structure ID
;uawpuawy
.ON uopniosaa
ad (y;uawanoJdwl
r)
c
N
adAl IB ;uawuonnu3
m
.0
o.
16
S 180th St/Andover Park W Intersection
S 180th Street
Andover Park W to
Widen for north /south left turn pockets
WA -03781
06/10/13
06/17/13
03
0.200
CE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2019
0
0
35,000
35,000
P
RW
2019
0
0
15,000
15,000
P
CN
2019
0
0
160,000
160,000
Totals
0
0
210,000
210,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
0
0
0
0
35,000
RW
0
0
0
0
15,000
CN
0
0
0
0
160,000
Totals
0
0
0
0
210,000
Report Date: May 31, 2013
Page 21
Washington State
*411/ Department of Transportation
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2014 to 2019
N Outside
JagwnN A;uoud
A. PIN /Project No.
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description
B. STIP ID
G. Structure ID
;uawpuawy
•oN uoaniosaa
adAl ;uawanoidwi
c
m
u
adAj ie;uewuonnu3
14
Southcenter Blvd Widening
Southcenter Blvd
1 -5 to 61st Ave S
Widen Southcenter Blvd and the 61st Avenue Bridge to add a lane for future traffic
growth.
WA -03776
06/10/13
06/17/13
03
CGOPS
TW
CE
Yes
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2019
0
0
1,700,000
1,700,000
P
RW
2019
0
0
1,400,000
1,400,000
P
CN
2019
0
0
16,900,000
16,900,000
Totals
0
0
20,000,000
20,000,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th 8 6th
PE
0
0
0
0
1,700,000
RW
0
0
0
0
1,400,000
CN
0
0
0
0
16,900,000
Totals
0
0
0
0
20,000,000
Report Date: May 31, 2013
Page 22
Washington State
V Department of Transportation
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2014 to 2019
N Outside
Functional
Class
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
m.
is
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
16
4th
WA -05410
Strander Blvd /SW 27th St Phase III
Strander Boulevard
E City Limits to West Valley Hwy /SR 181
Design and construct 5 -7 lane facility over /under BNSF and UPRR, extending the
current terminus of SW 27th St at the east City limits to West Valley Highway,
including access into the permanent Sound Transit train station
06/10/13
06/17/13
01
0
EIS
No
0
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
ALL
2019
FMSIB
5,000,000
0
0 5,000,000
P
ALL
2019
TIGER IV
27,000,000
0
1,148,800
28,148,800
Totals
32,000,000
0
1,148,800
33,148,800
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
ALL
0
0
0
0
33,148,800
Totals
0
0
0
0
33,148,800
Report Date: May 31, 2013
Page 23
Ark Washington State
Department of Transportation.
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2014 to 2019
N Outside
Functional
Class
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
m
c
c
c
'
o
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
19
WA -03796
Thomdyke Safe Routes to School
S 150th St
Tukwila International Blvd to 42nd Ave S
Construction of roadway improvements including a new sidewalk on the north side of
S 150th St and a new crosswalk in front of Thomdyke Elementary School.
Education, enforcement and encouragement elements are included after the
construction as part of the Safe Routes to Schools program.
06/10/13
06/17/13
28
CE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2014
0
WSDOT
90,000
0
90,000
P
CN
2014
0
WSDOT
367,000
255,000
622,000
Totals
0
457,000
255,000
712,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
28,000
14,000
0
0
0
CN
622,000
0
0
0
0
Totals
650,000
14,000
0
0
0
Report Date: May 31, 2013
Page 24
.wit.
Washington State
VIP Department of Transportation
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2014 to 2019
N Outside
JagwnN AyuolJd
A. PIN /Protect No.
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description
B. STIP ID
G. Structure ID
;uawpuewy
ON uoi ;niosaa
ad Ai ;uawanoJdwi
0
vi
adAj ie;uawuonnu3
16
Traffic Signal Interconnect Program
Various City Streets
to
Design and install hard wire interconnect system between traffic signals and the
Traffic Operations Center
WA -03775
06/10/13
06/17/13
24
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2019
0
0
300,000
300,000
P
CN
2019
STP
1,200,000
0
1,500,000
2,700,000
Totals
1,200,000
0
1,800,000
3,000,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
0
0
0
0
300,000
CN
0
0
0
0
2,700,000
Totals
0
0
0
0
3,000,000
Report Date: May 31, 2013
Page 25
.rI111rt
Washington State
VAIV Department at Ttansportatton
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2014 to 2019
N Outside
Functional
Class
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
17
WA -03772
TUC/TOD Pedestrian Improvements
Baker Blvd (if extended)
Andover Park W to E City Limits
Design and construct bike and pedestrian connection between the Tukwila Urban
Center and the Commuter Rail Station/TOD area. Connection may include an
underpass under the UPRR line.
06/10/13
06/17/13
28
0.750
CE
Yes
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
PE
2014
0
0
20,000
20,000
P
PE
2019
0
0
280,000
280,000
P
RW
2019
0
0
100,000
100,000
P
CN
2019
STP(E)
500,000
0
200,000
700,000
Totals
500,000
0
600,000
1,100,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
20,000
0
0
0
280,000
RW
0
0
0
0
100,000
CN
0
0
0
0
700,000
Totals
20,000
0
0
0
1,080,000
Report Date: May 31, 2013
Page 26
,11114
Washington State
Department of Transportation
Agency: Tukwila
County: King
MPOIRTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2014 to 2019
N Outside
JagwnN Aluoud
A. PIN /Project No.
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description
B. STIP ID
G. Structure ID
;uawpuawy
0
0
0
c
0
Z
0
edR j ;uawanoJdwl
0
o.
0
0
r
0
s
adRj le;uawuonnu3
pannbed MLi
14
Tukwila International Blvd (Phase 4)
Tukwila International Blvd
Boeing Access Road to S 116th St
Design and construct widening including paving, curb & gutter, sidewalk, drainage,
illumination, landscaping, and utility undergrounding.
WA -03774
06/10/13
06/17/13
03
OPSW
0.700
CE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2019
0
0
271,000
271,000
P
CN
2019
0
TIB
3,500,000
820,000
4,320,000
Totals
0
3,500,000
1,091,000
4,591,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
0
0
0
0
271,000
CN
0
0
0
0
4,320,000
Totals
0
0
0
0
4,591,000
Report Date: May 31, 2013
Page 27
Washington State
VAIF Department of Transportation.
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2014 to 2019
N Outside
Functional
Class
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted'
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
14
WA -03777
Tukwila International Blvd /S 116th St/SR 599 On -ramp
Tukwila International Blvd
S 116th St/SR 599 On -ramp to
Design and construct southbound left tum lane, pedestrian signalization and lighting
06/10/13
06/17/13
03
P
0.400
CE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2019
0
0
450,000
450,000
P
CN
2019
STP
1,900,000
0
2,325,000
4225,000
Totals
1,900,000
0
2,775,000
4,675,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
0
0
0
0
450,000
CN
0
0
0
0
4,225,000
Totals
0
0
0
0
4,675,000
Report Date: May 31, 2013
Page 28
471 Washington State
Department of Transportation
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2014 to 2019
N Outside
Functional
Class
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
(Ti
7
�'o
Adopted
Amendment)
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
14
WA -03798
Tukwila Manufacturing Industrial Center "Street Smart" Non - motorized Project
Various City Streets
to
1. Planning study of non - motorized improvement options along Boeing Access Road,
to provide safe bicycle and pedestrian travel altematives. 2. PE & CN of bike
facilities on E Marginal Way S between Boeing Access Road and SR 599. 3. PE &
CN of bike lanes and shared use path on Airport Way from Boeing Access Road /E
Marginal Way S to the northern City limit.
06/10/13
06/17/13
28
CE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
PE
2014
CMAQ
96,960
0
24,240
121,200
5
CN
2015
CMAQ
445,824
0
111,456
557,280
Totals
542,784
0
135,696
678,480
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
121,200
0
0
0
0
CN
0
557,280
0
0
0
Totals
121,200
557,280
0
0
0
Report Date: May 31, 2013
Page 29
Washington State
var Department of Transportation.
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2014 to 2019
N Outside
Functional
Class
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
o
It.
u3
Adopted
Amendment
Resolution No.
Improvement Type
c
rt
o
N
o
=
J
m
0
m
E
1
m
m
B.
a
16
WA -03734
Tukwila Urban Center - Transit Center
Andover Park W
Strander Blvd to Tukwila Pkwy
Design and construct a transit center
06/10/13
06/17/13
23
C G O P S
TW
CE
Yes
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
CN
2014
5309(Bus)
1,400,000
WSDOT
4,735,000
79,000
6,214,000
Totals
1,400,000
4,735,000
79,000
6,214,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
CN
2,500,000
0
0
0
0
Totals
2,500,000
0
0
0
0
Report Date: May 31, 2013
Page 30
7 Washington State
Department of Transportation.
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2014 to 2019
N Outside
Functional
Class
Priority Numbed
J
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
00
CMAQ
/ 1320(002) TUK -50
Tukwila Urban Center Pedestrian /Bicycle Bridge over Green River
New bridge over the Green River, approximately between Baker Blvd (if extended)
and Longacres Way (if extended)
Near Riverside office complex to Best Westem hotel 15901 WVHwy
Design and preliminary engineering of a new pedestrian /bicycle bridge across the
Green River, connecting the Tukwila Urban Center 'core' to the Sounder Commuter
Rail /Amtrak Station and surrounding neighborhood of transit- oriented development.
06/10/13
06/17/13
137,000
1,633,000
28
RW
0.640
CE
Yes
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
PE
2014
CMAQ
1,496,000
0
137,000
1,633,000
P
RW
2014
0 WSDOT
870,000
230,000
1,100,000
P
CN
2014
0 WSDOT
6,000,000
1,485,000
7,485,000
Totals
1,496,000
6,870,000
1,852,000
10,218,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
250,000
0
0
0
0
RW
1,100,000
0
0
0
0
CN
3,743,000
3,742,000
0
0
0
Totals
5,093,000
3,742,000
0
0
0
Report Date: May 31, 2013
Page 31
hiington State
artment of Transportation
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2014 to 2019
N Outside
Functional
Class
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
=
N
i
Adopted
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
17
WA -03761
Walk & Roll Plan (Nonmotorized Transportation Plan
Various City Streets
to
Select, design, and construct non - motorized projects including bike lanes, sidewalks
and trails. First priorities are: sidewalks on S 152nd Street, TIB to 42nd Ave S;
sidewalk on S 130th St, TIB to S 130th St; sidewalk/bike lanes on Macadam, S 144th
St to S 150th St.
06/10/13
06/17/13
28
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2015
0
0
140,000
140,000
Totals
0
0
140,000
140,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
0
140,000
0
0
0
Totals
0
140,000
0
0
0
Report Date: May 31, 2013
Page 32
Mtashington State
71 Department of Transportation.
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2014 to 2019
N Outside
-n
n
n o
g
N
14
JagwnN /quoud
A. PIN /Project No.
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description
B. STIP ID
G. Structure ID
0 0
n.
0
m
c
0
z
0
ed�(1;uawanoidwg
c
0
0
0.
ad61 ie;uawuoJ!nu3
z
m
c
5.
n
WA -03779
West Valley Highway
SR 181/West Valley Highway
1 -405 to Strander Blvd
Design and costruct widening to 7 lanes including curb & gutter, sidewalks,
illumination, drainage, and traffic control
06/10/13
06/17/13
03
0.500
CE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2019
0
0
60,000
60,000
P
CN
2019
0
0
570,000
570,000
Totals
0
0
630,000
630,000
Expenditure Schedule
Phase
1 st
2nd
3rd
4th
5th & 6th
PE
0
0
0
60,000
CN
0
0
0
0
570,000
Totals
0
0
0
0
630,000
Report Date: May 31, 2013
Page 33
duk
Za= itdashington State
Vw Department of Transportation.
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2014 to 2019
N Outside
Functional
Class
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
14
WA -03765
West Valley Highway /S 156th St
SR181/West Valley Highway
Southcenter Blvd to S 158th St
Construct additional northbound left turn lanes at S 156th Street for northbound HOV
to northbound 1 -405
06/10/13
06/17/13
03
0 P S T W
CE
Yes
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
PE
2014
0
0
75,000
75,000
P
PE
2018
0
0
50,000
50,000
P
CN
2018
CMAQ
440,000
0
542,000
982,000
Totals
440,000
0
667,000
1,107,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
75,000
0
0
0
50,000
CN
0
0
0
0
982,000
Totals
75,000
0
0
0
1,032,000
Federal Funds
State Funds
Local Funds
Total Funds
Grand Totals for Tukwila
64,827,238
23,732,000
90,912,042
179,471,280
Report Date: May 31, 2013
Page 34
Christy O'Flaherty
From: Christy O'Flaherty
Sent: Tuesday, June 18, 2013 9:27 AM
To: ' LYN N P @wsdot.wa.gov'
Cc: Bob Giberson
Subject: Tukwila Transportation Improvement Program
Attachments: Res 1797 - 2014 -2019 Transportation Improvement Program.pdf
June 18, 2013
LYNN PETERSON, SECRETARY
Washington State Department of Transportation
PO BOX 47316
Olympia, WA 98504 -7316
RE: CITY OF TUKWILA 2014 -2019 TRANSPORTATION IMPROVEMENT PROGRAM
Dear Ms. Peterson:
Enclosed is City of Tukwila Resolution #1797 passed June 17, 2013, adopting the Transportation Improvement
Program for 2014 -2019.
Please contact me with any questions at 206 433 -1855.
Please respond to this email to ensure it was received satisfactorily. Thank you.
Sincerely yours,
Christy O'Flaherty, MMC
City Clerk
Attachment
xc: Bob Giberson, Public Works Director
1
Christy O'Flaherty
From: Christy O'Flaherty
Sent: Tuesday, June 18, 2013 9:32 AM
To: 'GregA @tib.wa.gov'
Cc: Bob Giberson
Subject: Tukwila Transportation Improvement Program 2014 -2019
Attachments: Res 1797 - 2014 -2019 Transportation Improvement Program.pdf
June 18, 2013
TRANSPORTATION IMPROVEMENT BOARD CHAIR
c/o Greg Armstrong, Tukwila Project Engineer
Washington State Transportation Improvement Board
PO BOX 40901
Olympia, WA 98504 -0901
RE: CITY OF TUKWILA 2014 -2019 TRANSPORTATION IMPROVEMENT PROGRAM
Enclosed is City of Tukwila Resolution #1797 passed June 17, 2013, adopting the Transportation Improvement
Program for 2014 -2019.
Please contact me with any questions at 206 433 -1855.
Please respond to this email to ensure it was received satisfactorily. Thank you.
Sincerely yours,
Christy O'Flaherty, MMC
City Clerk
Attachment
xc: Bob Giberson, Public Works Director
i
Christy O'Flaherty
From: Christy O'Flaherty
Sent: Tuesday, June 18, 2013 9:36 AM
To: 'Andi Markley'
Cc: Bob Giberson
Subject: Tukwila Transportation Improvement Program 2014 -2019
Attachments: Res 1797 - 2014 -2019 Transportation Improvement Program.pdf
June 18, 2013
TO: PUGET SOUND REGIONAL COUNCIL
RE: CITY OF TUKWILA 2014 -2019 TRANSPORTATION IMPROVEMENT PROGRAM
Attached is City of Tukwila Resolution #1797 passed June 17, 2013, adopting the Transportation Improvement
Program for 2014 -2019.
Please contact me with any questions at 206 433 -1855.
Please respond to this email to ensure it was received satisfactorily. Thank you.
Sincerely yours,
Christy O'Flaherty, MMC
City Clerk
Attachment
xc: Bob Giberson, Public Works Director
1