Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Permit B94-0085 - BOEING #21-05 - FENCE
City ofT%kwila. (206) 431-3670 Community Development / Public Works • 6300 Southcenter Boulevard, Sulte 100 • Tukwila, Washington 98188 BUILDING PERMIT Permit No: B94 -0085 Type: B -BUILD Category: ACOM Address: 3417 S 120 PL Location: Parcel #: 102304 -9069 Zoning: M1 M2 Type Const: III -N Gas /Elec: Wetlands: Water: 125 Contractor License No.: BOEINC294ML CM Status: ISSUED Issued: 03/15/1994 Expires: 09/11/1994 Suite: Type of Occupancy: WAREHOUSE Slopes: Y Sewer: VAL VUE TENANT BOEING #21 -05 3417 S 120 PL, SEATTLE, WA 98124 OWNER SABEY CORPORATION 201 ELLIOTT AVE. WEST, SUITE 400, SEATTLE WA 98119 CONTRACTOR BOEING INC. Phone: 206 544 -2975 9725 EAST MARGINAL WY S, SEATTLE, WA 981242207 CONTACT TERRY BENNETT Phone: 206 544 -2975 P.O. BOX 3707, M/S 46 -87, SEATTLE, WA 98124 ******************************************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Permit Description: INSTALLATION OF SHOP FENCING. SETBACKS Units: 001 Front: .0 Back: .0 Buildings: 001 Left: .0 Right: .0 Fire Protection: SPRINKLERED UBC Edition: 1991 Valuation: 8,000.00 Total Permit Fee: 167.85 ******************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** ln -9 Permit Center Authorized Signature Date I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign for and obtain this buildj.ng per Signature:_,/ Print Name: _( -e-,t J 1� i _' Title: Date: ,,,,, /-c 0 7 This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from. the last inspection. All PERMITS ISSUED FOR NEW CONSTRUCTION, REMODELING, OR DEMOLITION PROJECTS REQUIRE CONSTRUCTION, DEMOLITION AND LANDCLEARING WASTE MATERIAL FROM THESE PROJECTS TO BE RECYCLED AT A KING COUNTY LICENSED OR APPROVED FACILITY, OR TAKEN TO REGIONAL DISPOSAL FACILITIES. CITY OF TUKWII /1 Department of C .. nunity Development — Permit Genii.. 6300 Southcenter Boulevard - #100, Tukwila, WA 98188 (206) 431 -3670 Building Permit Application Tracking PLAN CHECK NUMBER 1594-ocifE, PROJECT NAME EJ 'ink l -O5 SITE ADDRESS SUITE NO. INSTRUCTIONS TO STAFF • Contacts with applicants or requests for information should be summarized in writing by staff so that the status of the project may be ascertained at any time. • Plan corrections shall be completed and approved prior to sending to the next department. • Any conditions or requirements for the permit shall be noted in the Sierra system or summarized concisely in the form of a formal letter or memo, which will be attached to the permit. • Please fill out your section of the tracking chart completely. Where information requested is not applicable, so note by using "N /A ", date and initial. DEPARTMENTAL REVIEW "X" in box indicates which departments need to review the project. DEPARTMEN' . BUILDING - initial review XFIRE O PLANNING :DATE IN DATE, PROVED:: I1 cm( OUTED // 9 9 INIT: QUIR:EMENTS.../ COMMENT CONSULTANT: Date Sent Date Approved - INIT: V Cn-- FIRE PROTECTION: (♦ Sprinklers FIRE DEPT. LETTER DATED: INSPECTOR: ZONING: BAR/LAND USE CONDITIONS? REFERENCE FILE NOS.: N/A MINIMUM SETBACKS: N- S- O PUBLIC WORKS INIT: -- UTILITY PERMITS REQUIRED? ▪ Yes PUBLIC WORKS LETTER DATED: O OTHER XBUILDING - final review ttXBUILDING OFFICIAL REVIEW COMPLETED TYPE OF CONSTRUCTION: (SP-v.) CERT. OF OCCUPANCY? OYes'No UBC EDITION (year): AMOUNT (� CONTACTED _• I // ll `""I e. (,� ` BY: I (init. BY: (init.) DATE NOTIFIED r � ik 1 / a' III 2nd NOTIFICATION 3RD NOTIFICATION BY: (init.) 01/08/93 BUILDIk PERMIT APPLICATION CITY OF TUKWILA Department of Community Development - Building Division 6300 Southcenter Boulevard, Tukwila WA 98188 (206) 431 -3670 PLAN CHECK --1-03.N' 0:10412.° Tess NUMBER 4-700S- e o U -CO DESCRIPTION BUILDING PERMIT FEE PLAN CHECK FEE. BUILDING SURCHARGE AMOUNT RCPT # DATE OTHER: TOTAL - SITE ADDRESS SUITE # -2?4 \1 k-zo PL , t c-, s °o VALUE OF CONSTRUCTION - $ go - ASSESSOR ACCOUNT # 1o2: -9ary. i (commercial) ii Demolition (building) 0 Other PROJECT NAME/TENANT BOEING DEFENSE AND SPACE GROUP TYPE OF 0 New Building 0-Addition IN4Tenant Improvement WORK: U Rack Storage 0 Reroof 0 Remodel (residential) DESCRIBE WORK TO BE DONE: 1L) S"C, . -a W OF ?__ .t1^I PHONE BUILDING USE (office, warehouse, etc.) MAWFACCUra I d NATURE OF BUSINESS: AIRS ANFS requirements may need to be met. Please explain: WILL THERE BE A CHANGE IN uSt? f No 0 Yes If Yes, new building SQUARE FOOTAGE - Building: V0 6 4.40 Tenant Space: l `g 1 oto Area of Construction: 1 l $ I WILL THERE BE STORAGE OR USE OF FLAMMABLE, COMBUSTIBLE OR HAZARDOUS MATERIALS IN THE BUILDING? 0 No 0 Yes IF YES, EXPLAIN: FIRE PROTECTION FEATURES: D S•rinklers (Automatic Fire Alarm System PROPERTY OWNER BOEING DEFENSE AND SPACE GROUP PHONE SIGNATURE ADDRESS P.O. BOX 3707 M/S 46 -87 SEATTLE, WA. PHONE ZIP 98 1 24 -22 0i CONTRACTOR SAME ADDRESS ZIP 544 -2975 98124 -2207 544 -2975 WA. ST. CONTRACTOR'S LICENSE # BOE INC -294ML EXP. DATE CONTACT PERSON TERRY BENNETT ` 9 ARCHITECT PHONE ADDRESS ZIP I HEREBY •CERTIFY:.THAT 1 HAVE' READ: AND EXAMINED;: THIS. APPLICATION ;'AND; KNOW :THE. SAME TO BE TRUE AND CORRECT, AND I AM.:'AUTHORIZ _ TO 'APPLY ;FORT IS PERMIT. ' ::: BUILDING OWNER OR AUTHORIZED AGENT SIGNATURE .ems ,....- DATE 1) l I l ' PRINT NAME TERRY BENNETT PHONE CITY/ZIP PHONE 544 -2975 98124 -2207 544 -2975 ADDRESS PO BOX 3707 M/S 46 -87 SEATTLE, WA, CONTACT PERSON TERRY BENNETT APPLICATION SUBMITTAL In order to ensure that your application is accepted for plan review, please make sure to fill out the application completely and follow the plan submittal checklist on the reverse side of this form. Handouts are available at the Building counter which provide more detailed information on application and plan submittal requirements. Application and plans must be complete in order to be accepted for plan review. VALUATION OF CONSTRUCTION Valuation for new construction and additions are calculated by the Department of Community Development prior to application submittal. Contact the Permit Coordinator at 431 -3670 prior to submitting application. In all cases, a valuation amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Building Division to comply with current fee schedules. BUILDING OWNER / AUTHORIZED AGENT If the applicant is other than the owner, registered architect/engineer, or contractor licensed by the State of Washington, a notarized letter from the property owner authorizing the agent to submit this permit application and obtain the permit will be required as part of this submittal. EXPIRATION OF PLAN REVIEW Applications for which no per mtt is issued within 180 days following the date of application shall expire by limitations. The building official may extend the time for action by the applicant for a period not exceeding 180 days upon written request by the applicant as defined in Section 304(d) of the Uniform Building Code (current edition). No application shall be extended more than once. If you have any questions about our process or plan submittal requirements, please contact the Department of Community Development Building Division at 431 -3670. DATE APPLICATION ACCEPTED -9u DATE APPLICATION EXPIRES T J. COMMERCIAL NEW COMMERCIAL BUILDINGS /ADDITIONS L� Completed building permit application (one for each structure) I 1 Assessor Account Number Two sets (2) of the following: Specifications MAMMAL CHECKLIST Structural calculations stamped by a Washington State licensed engineer riSoils report stamped by a Washington State licensed engineer piTopographical survey Energy calculations stampod by a Washington State licensed engineer or architect Pi Legal description LJ Working drawings, stamped by a Washington State licensed architect, which include: • Site plan • Architectural drawings • Structural drawings • Mechanical drawings • Elevations • Civil drawings • Landscape plan Completed utility permit application (one for entire project) Six (6) sets of civil drawings NOTE: See utility permit application and checklist for specific utility submittal requirements. RACK STORAGE 1-1 Completed building permit application Assessor Account Number Two (2) sets of plans, which include: Li Building floor plan showing: • Entire space where racks will be located • Exit doors' • Dimensions of all aisles riTenant space floor plan showing rack storage layout, aisles and exits. NOTE: Include dimensions of racks (height, width and length), aisles and exit ways on plan. riStructural calculations stamped by a Washington State licensed engineer (rack storage 8' and over), RESIDENTIAL COMMERCIAL TENANT IMPROVEMENTS Completed building permit application (one for each structure or tenant) Assessor Account Number Two (2) sets of construcdon plans, which include: ri. Site plan • Location of tenant space • Existing and proposed parking • Landscape plan (if applicable, i.e., change of uso) Overall building plan • Tenant location • Use of adjacent (common wall) tenant • Overall dimensions of building or square footage Floor plan of proposed tenant space • Tenant space plan with use of each room labelled. • Exit doors, egress patterns. • New walls, existing wall, and walls to be demolished. Construction details • Cross sections showing wall construction and method of attachment for floor and ceiling. Structural calculations stamped by a Washington State licensed engineer may be required if structural work is to be done (2 sets) NOTE: If any utility work is to be done, submit separate utility permit application and plans. REROOF Completed building permit application (one for each structure) riAssessor Account Number Narrative describing existing roof, material being removed, and material being installed. NOTE: A certification letter is . required prior to final Inspection and sign off of the permit. ANTENNA/SATELLITE DISHES Completed building permit application rAssessor Account Number Two (2) sets of plans, which include: Site Plan (showing building and location of antenna/satellite dish) Details antenna/satellite dish and method of attachment Structural calculations stamped by a Washington State licensed engineer may be required NEW SINGLE- FAMILY DWELLINGS /ADDITIONS JCompleted building permit application (one for each structure) Legal description Assessor Account Number ElTwo sets (2) of working drawings, which include: • • Site plan ---• --•i• (On plan, show closest hydrant location. • Foundation plan Include access to bullding, showing • Floor plan • width and length of access.) • Roof plan • Building elevations (all views) • Building cross - section, • Structural framing plans [1 Washington State Energy.Code data I i Completed utility permit application Six (6) sets of site plans showing utilities NOTE: Building site plan and utility site. plan may be combined.. See .. utility permit application and checklist for specific submittal requirements. Additional topographical and soils information may be required if unique site conditions. RESIDENTIAL REMODELS Completed building permit application (one for each structure) F-1 Assessor Account Number: U Two (2) sets of working drawings, which include: • Site plan • Foundation plan • Floor plan • Roof plan • Building elevations (all views);. • Building cross = section • Structural framing plans NOTE: If any utility! work Is to be done provide utility permit application REROOFS. Completed building permit application (one for each structure) Assessor Account Number Narrative describing existing roof, material being removed, and material being installed • NOTE: A certification letter is required prior to final Inspection and sign -off of the permit: trr- c •. 4 * * * *•k * *•k *** ** * * *•k *h *•k * * *!r* *** * * ** *•* *44**A***A ** ***4 **4 * *k *k 4 *k CITY OF TUICW1 :LA, WA TRANSMIT k* k ** ** * ** 44 ** **4** ****•k* * * ** kk* * * * **•k44 * *** ** * *•k ** *•k *:k* * * *•k * * ** TRANSMIT Number: 94000256 Amount: 167.85 03/07/94 13 :12 Permit No: B94-0085 Type: B-BUILD BUILDING PERMIT Parcel No: 102304 -9069 Site Address: 3417 S 120 PL 03/07/94 Payment Method: CASH Notation: BOEING Init: SL.B **: ******* k******** fr*********** 4** 4*** •A *•k * * *k4 *•k * * * * * **'k * *•4** * ** Account Code 000 /322100 000/345.830 • 000/386.904 Description BUILDING -- NONRES PLAN CHECK -- NONRES • STATE BUILDING SURCHARGE Total (,This Payment): Total Fees: Total All Payments: • B 71 once: 16.7.85 167.85 .00 Paid 99.00 64.35 4.50 167.85 GENERA GENERA GENERA TOTAL CASH 99.00 64.35 4.50 167.85 167.85 CHANGE 0.00 9775A000 22 :41 CITY OF TUKWILA Address: 3417 S 120 PL Permit No: B94-0085 Suite: Tenant: BOEING #21-05 Status: ISSUED Type: B-BUILD Applied: 03/07/1994 Parcel #: 102304-9069 Issued: 03/15/1994 ****************************************kk******kk********M*******Ak***** Permit Conditions: 1. No changes will be made,,to.,-0e:411e6,04ess. approved by the Architect and the Tuk(41AAitil1 1 din'g 'OtViSidni': 2. A11 permits, insAd;df,fbil records, and approvagjOans shall be maintained ava,:qa014 at t114., 10 site prior, to the start of any construca These, odu0onts are to ;AAiimaintAtAg available /14 pi4I flAyAptlaeati on approval Js4rapteCL((t.,, 3 All const,r44,&) on to be 'dope .='..111 conformance with approVW plans angl'Aledyir'epviits pf' the; lirliform Building cgda''(1.9W,,,, Ed i ti ory,) 4s aliAndAd by the W'aihington State 'BO ftil,ng ''Cdci, 4. Val idtyYyof Permi t, ,, The ,issuance df,' a permit or approval '&f:\ plansfr'!*Adificatyons an.doaputatibriS shall not''be coryv strueCtio :1:14 a permit for, or,'6a,31 Approval of, any violton\:( of Aiixfofrthe provisions of this -codA, or of any other ordli4ncp of the jurisdiction: No Permit presuming ',to give auttIVrit9or OolateH:or-cancel\ the •kolVlsipns of this code W.,1\ shall be va 1.16. „L 1 -,,t -, (t , % ,;,.... i A i .- „ „ i" , ( t %,.,, ( , ,,, ,:, -r,-1, IY,: (i r i ,.7„v.. ii , :i ' - 7 . , ,,,,,,:, P", 1 ,1 1= j' ''''■ 1 : 1 r Y ; : A 1 k t q 17:1, ,, ■ ..,, ,,,, !,,i l'Iti i (= .( j,-_,I, t=7, -.)'=...--'-' tltr'.074ti;. A 0 i> INSPECTION RECORD Retain a copy with permit CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 ,U'9y 9)E.fa •'''• —(2064 1 -3670 •r. Kt — .,-C ypeo ns•:• . -. , Special Instructions; ij c0 / p /' / 5 Date Wanted; Requester. Nhone No.: Approved per applicable COMMENTS: ections required prior to approval. 17.701 IS /V A eh ❑ $30.00 REINSPECTION EE REQUIRED. Prior to reinspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Cali to schedule reinspection. . 77777777771 ":.t.�:t , .. s;.. , ,- ;5^'"TmIT'7n= "y,?;v.. City of Tukwila Fire Department John W. Rants, Mayor TUKWILA FIRE DEPARTMENT FINAL APPROVAL FORM Thomas P. Keefe, Fire Chief Permit No. '394/-002X- T.F.D. / Project Name iS oe4ij } -p Address �l/ 7 /.) © {� % Suite # Retain current inspection schedule Needs shift inspection Approved without correction notice Approved with correction notice issued Sprinklers: Fire Alarm: Hood & Duct: Halon: Monitor: Pre -Fire: Permits: Authorized Signature FINALAPP.FRM fpo 441. J- /J Date Form F.P. 85 Headquarters Station: 444 Andover Park East • Tukwila, Washington 98188 • Phone: (206) 575,4404 • Fax (206) 5754439 (-0" TYP INSTALL (2) 1/2" DIA. HILTI KWIK BOLT MIN. EMBED. • 3 1/2" (AT OPPOSITE ENDS) PROFILE VIEW SCALE: NONE If co NPPR"Eu roA Ili A994 DN\S1ON NOTE: AT Ti coRtvegs AND /err CiATE's USE (4) 4/vctioR 1301-Ts, 16 RECEIVED CITY OF TUKWILA MAR 7 19911 y PERMIT CENTER SECTION A SCALE: NONE GENERAL NOTES: 1. THIS DESIGN REFLECTS U.B.C. 2309 . 2. SHOP FENCE ON CONCRETE FLOOR. DUNN et J. BURKS DATE: 3/3/94 CHECKED vv Appeowo 6-01 -4- / 51- SHOPFENCE iNIOJEOT NO. c*Aa gKit,2B940303 /44444° -4 -<-1 ARIZEAVA7 MUT NO. 1 CITY OF TUKWILA Id: ACTP125 Keyword: UACT User: 1677 Activity Table Processing Permit No: B94 -0085 Tenant: BOEING #21 -05 Status: PENDING Address: 3417 S 120 PL 03/11/94 BUILDING PERMIT Type: B -BUILD Vers: 9101 Screen: 01 Base Information Parcel No: 102304 -9069 Owner: SABEY CORPORATION Validated By: SLB Plan Ck Approved: / / Status: PENDING Applied: 3/ 7/1994 Issued: / / Active /Inactive: A Completed: / / To Expire: / / C of 0 Issued: / / Bus Lic #: Final Notice: / / Nature of Work: INSTALLATION OF SHOP FENCING. Location: Category: ACOM (N= NEW /A= ADD /ALT + SFR,DUP,TRI,APT,MH,COM,IND) Zoning: Mi M2 CM Gas /Elec: Census Code: 437 # of Units: 1 # of Bldgs: 1 Pub Own:N Streams: Slope: Y Wetlands: Water:125 Sewer:VAL VUE Setbacks - North: .0 South: .0 East: .0 West: .0 Valuation: 8,000.00 Fire Protect:SPRINKLERED Type Const: III -N Type Occ:0025 WAREHOUSE UBC Edition: 1991 Occupant Load:n \c Occupancy Grp:B -2 Enter Table Screen Number: 2 or ESC =Exit Table Processing F1 =List Screens CITY OF TUKWILA Id: ROUT130 Keyword: UACT User: 1677 03/11/94 Activity document routing maintenance. BUILDING PERMIT Permit No: B94 -0085 Tenant: BOEING #21 -05 Status: PENDING Address: 3417 S 120 PL Route: 1 Current Route Line: 3 of 5 Packet Units Description Station Status Received Assigned Complete aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa Packet Units Action Station Initials Status Received Assigned Completed BUILD 01 01 C BLDG KEN Approved 03/09/94 03/11/94 03/11/94 Priority (0 /low..9 /high): 0 Regular hours (HH.MM): .00 Overtime Hours(HH.MM): Comments 1[SCOPE OF WORK - INSTALL SHOP FENCING ] 2[EXITS Q.K. ] 3[OCC. LOAD N \C ] 5[FIRE PLEASE REVIEW AND COMMENT. ] 6[ by ken ] 8[ ] 9[ ] ] 10[ ] aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa aaaaaaa F1 =Help, ESC =Exit current screen. �.wr ,.- 4+;• T. TtFtY '��ie.�,• "v7rxi7'::,••.l'S: l�f„"i4T�. RECEIVED CITY OF TUKWILA MAR 7 1994 PERMIT CENTER j- DETACH TO DISPLAY CERTIFICATE -- 'FA4'4.4 ; .'. ' - 4 .3..:�.....- .....- .:........�.w ..u....... ...a.aaa.i....u...a. u.....a. ++!e.�a•� - .u" ^"'aarw"_ � _ ...w "�... ^`^° -- ._:. —_. _..mow` =•' ... DEPARTMENT OF LABOR AND INDUSTRIES THIS CERTIFIES THAT THE PERSON NAMED HEREON IS REGISTERED AS PROVIDED BY LAW AS A CONST CONT GENERAL.. REGISTRATION NUMBER EXPIRATION OATE 01 BOEINC*294HL, EFFECTIVE DATE 01/01/95 07/1.3/71 BOEING COMPANY, THE P 0 130X 3707 MAIL. STOP IF-09 SEATTLE WA 98124207 STATE OF WASHINGTON F625.052.000(3.921 t DETACH TO DISPLAY CERTIFICATF .'V....MiK...MMnr.Iw1...... X ...MrMMMMbM WeSWIr1.'R.ertwp.._•......_. DG '..OrY....V.4.44:w ..... woweir.awamrnraa..sawm .ww.w�•.- «...___. �.. - 14 -01 \N. VICINITY MAP /.NG COUNTY AIRPORT OFFICE: CENTER (FAA) /Ow. ..r.ow.•...... <.., ....<.•.•....w,...,......a... .. on.....•.. n.:... w.... e».. ar. ww. r....... s ....•.+.........•............+a FROM DOWN rovn �� A i T�.E `a , \`g. _ , OXBOW iO•r EXIT 1 r 1 �Ff ,g 61: Acc \ x;99 I f T MARGINAL WAY \ TUKWILA i EA5 I CORPORATE PARK FROM SEATTLE-TACOMA AIRPORT [-P-76J-E-CT-1 _ Sf DEVELOPMENTAL CEN .4'..f. .tea AVII~ sY 1 IEVI niJ .r..... ....a......,_ _...... FROM KENT ,\ 900 tic AUBURN Y`5 ER NO SCALE r......IMWOw..•If...w aid 16/0M. _.._.._.- .rr....r...wMArwaA ,1~11∎JO.1 ~WdwMMM11.a�v�w�iwll f,w aioiimos•IU/ PWWcwYea a+.+ w. .wrYr.MalICrMI•amwsaSarYwaa.aww. wem.......... ...•.._- ._...__._..___.__.___, errs. r.JE___.1P7Aavw_•__+rw. MUTARY ARK [ES Ezo 5, JOB 147 08=300 EILA 0E1 3. -v '.t TU ILL LO AEA MAP e. y..... r. do. r.•...... w...,s (4...... a., a..e 406..... .r.n«.oa,..a....as..a..rw11PWAL +.wI... r. W,., aawe. a• r+..a....a...a•,w.o..e+ca.r.,•• ••••••....s...,.,.ON ...J...«M..ua..,e. 3LDC. 21---05 A[)9RESS 3417 S0. 1201H ('LAC': TJK \NI Li...A, WA. (EAST MARGINAL WAY CORPOATE. PARK) 121 —G7 1 r) 1 ► 1_ , —03 PROJECT 1 121 - - -05 _ J NO SCALE EAST MARCINAL WAY CORPORATE PARK RV APPRGCVE0 DATE F.;: VIS10N APPR0VFO DATE .2221. yew /.►M...V....;we •.'I.O•7•/.ft••796.44`. WA,!.'.>TJ nr:N Y 1 GE\E:RAL NOT e .,...,.... r,...,.. ao........, ....,.........'.,......,....... /... Ys . .....u................w..•∎=41. n... ....• o .......cam•..••e....a,..8•a,+.. CONSTRUCTION SET OF DOCUMENTS, RE.`1ILWED AND STAMPED BY CITY OF TUKWILA MUST BE ON SI•TL DURING CONSTRUCTION. DU NOT PROCEED ITH CONSTRUCTION W!THOU'T ABOVE MENTIONED SE I OF DOCUMENTS. VERIFY ALII_ DIMENS ON S PRIOR "TO START OF CONSTRUCTION. NOTIFY FA.C•!!.Il Y ENGINEERS SHOULD CONDITIONS REQUIRED DESIGN REVISIONS. REVISION TO BF A! PROVED BY CITY OF TUKWILA PRIOR TO PROCEEDING WITH PROPOSED REVISED WORK. PROJICT CHECKI e.....•.•.�..a.._ . ,..n,....,wooll. CHECK BOX BRIEF PROJECT ARRATIVE Isi 4 INSTALL 7' HIGH SHOP FENCING, STORAGE RACKS, ELECTRICAL MECHA N!CAL IMPROVEMENTS FOR THE INSTAI.LITION OF THE BLANKET SHOP THESE DRAWINGS CONFORM TO fl- {'r_ 1991 U.B C., U.F.C., U.P.C., AND FREE CODE AS ADAPTED OR AMENDED BY LOCAL ORDINANCES, AND CITY OF TUKWILA ZONING. kg COMPLETE BUILDING FLOOR PLAN SHOWING EXITING SYSTEM, DOORS, AND PASSAGEWAYS. O ENGINEERING CALCULATIONS ( IF APPLICABLE ) O ROOMS LABS! c_D PER OCCUPANCY PER U.B C. TABLE 33-A. BR-DING 1 LOO , NUMBER ON PRINT FOR AREA OF CONSTRUCTION. THE 1990 BARRIER COMPLIANCE WI TH CORRIDORS NUMBER OE PRINTS REQUIRED FOR PERMIT PACK A E: O 1. GENERAL PERMIT (SHELL & CORE) 6 SETS OF ENERGY CALCULATIONS 2 SETS OF CIVIL DRAWINGS WITH UTILITIES 2 SETS SOLS REPORTS, STAMPED BY GEOTECHNICAL ENGINEER 2 SETS STRUCTURAL CALCULATIONS 2 SF rs PROJECT CONSTRUCTION SPE ;F HCATIONS 2 SETS TOPOGRAPHICAL SURVEY 2 COPIES OF LEGAL DESCRIPTION 2 SETS OF WORKING DRAWINGS O 2. TENANT IMPROVEMENTS, 2 COMPLETE SETS O 3. MECHANICAL_, 2 COMPLETE SETS O 4. FIRE PROTECTION /SPRINKLERS, 2 COMPLETE SETS .al ef~MEE/0.,.n9.1140%.1.1.14,1•M..w..•....m,yWRYIN•11191/41,004.7~/Sklin.,.i.,. ..1M .aawvrsn. ..r..aa.. '.111m.,o. Aelr FACiLJTIES DEPARTMENT IA`LIY..,�7/j 'i.� .,•.a.'+, M.M..R.L Mf••i+..':.Ip.P . I S.FV.A..fOM.* o �e 4 r •,7F A Y:. r• 1111111111111111pH' 1111111111 1j11111111I1IJI, 0 le rHs INCH 1 2 1 3 0E 6Z 8e 11111J111 I1t I !$I !ELI I,:.111LJ [ILIfft Li AUBURN, WA. EVERE T, WA, L KENT, WA. \,.J (......] PR TLAkV D, OR. Lj RENTON, WA. SEATTLE, WA. ly.T! 1 J I I I 1 I 1 114 !..:' I '•.I( . 1 I1N y1 . 1 ~' t' f1, 4...1^ 1'_ . . .11� 1I 17.,1f 1..v11:..Y 1 I !^.� I:1f 1rt rt5! . 3 I jt 1 •.l i I f.1 � q '� .'.� .•.�;K ,.1 H? ~1..I, 4 4 I. :I..� I .- ( I I I_ jI �I. I1I ?r" 1 i.j!i ++ ! *."i' ll J I il..�l % I IjII riI°. 1 I 10 11 MADE' lRIMANj< Y ii 11. 12 4 98002 98201 98031 97220 98055 98124 22.2.2.22111 wow. ACCEPTABILITY TrlrS DESIGN AND /OR SPEC Y,ICATION IS APPROVED Af1PRoVED BY DRAWN RY A. SHAPIRO C'4ECKEO EATTL OP FILE COP •..••••f•0..P..■.Y.•v■••. 1 t.rrderstand -that the Plan Check approvals are i;.,i} Ct to errors and orn►$,' -,� -s and approval ot ,�.'Z�. viol-tion of arty I,I°n�; does not aias. •� T of ccrn- Iclopled code or orc ar;c.' yp(),roledgec -1 It 1 < actor's copy o roves p• �y` Date Permit No. r D R A W! N ,) 1 IN ..e....ar...IA•WeeloMMW.1.0.1.0,•••1.... .v..wwo•0.a+..os..w..40.1+ SHEE NO. DWG No. .+r - . .. t SHEET 'rill F `.�r1ErT NO. DWG. No. 51iEc T TIT�F .__A _.._ 21-05-A1 A7_ 21.--05--A2 ____________t. f• TITLE FLUOR PEAN & EXITING PLAN ..............______________________. r i 1 . I 1 L , 1...._ . _... ___.. } • [ , , i_. i art ontwrrfr. COD LAND USE CODE CODE REFERENCES OCCUPANCY GROUP ___ x.e SUMMARY M- -HP 1991 UBC WASHINGTON STATE ENERGY WASHINGTON STATE BARRIER ADDITIONS PER CITY OE TUK B - - -2 OFE;CE /WAREHOUSE, NO KING COUNTY /TUKWILA CODE FEE CODE WILEA CHANGE IN OCCUPANCY FLOOR AREA (ACTUAL) -- ___ _�...__.__ F3UILDING FOOTPRINT — 209,446 SF STORIES: .1 FIRE PROTE.CTIO.S __,......__...– .- ..___- -..._— FULLY AUTOMATIC, WET PIPE THROUGHOUT SEISMIC ZONE __•._______•— ._..�__ 3 FIRE ZONE ___.._w_____.___- _.. --w. PARKING PROVIDED PARKING REOUIRED 3 739 725 ,0\;\17:30N i:�`. RECEIVED CITY OF TUKWILA BAR 7 1J9 PERMIT CENTER NOTE: MECHANICAL AND ELECTRICAL PERMITS ARE TO BE SUBMITTED SEPARATLY FROM THIS PACKAGE, ENGR. 1 ATC A SHAPIRO C; iEC<EO SUB flTLE TITLE I,i�. 21 r �J.1 1�IV.iMf '+. .f•�.MMlva!►l..�L}W!?�..Y•l.q.. +%ib.~.ur »,...!hMr.ar.+.o.vlwWr TIV..,+a.vwt l-. •••••aar..y'...aaa., t1......7.70•.Ai► 4 5 6 7 8 N&TE: If the microfilmed document is Less clear than this notice, it is due to the quality of the original document. LZ 9'Z SZ •'Z ' CZ ZZ 1Z OG 61 61 IIII IIIfiIIII1lIIIfIIIIIIIl111111 Iillliil�(111�i11, IUfIIL�TU�dfi;ILl�l Lillf11lil L.1 • 91 51 VI Cl Z1 11 01, 6 8 Ljj 9( S Ej L 1 0044 Q IIIIIM441 Iff l�(l,�,ILifl. Illllall��Illllllli�f lj !l +�Illl�i {I �fililil�f!,JJI ' ��i�IIiIIIIIIIiIIII�IHIIII1I; IIIIIIIillillil1IIIIIIIiIIIIIIIIIIf1 TITLE SHEET ARCHITECTURAL MASTER MWAS.. .'.wM.s.••�a.K.t J Y+a... AM Vl1•.I.v.SCYO.•�/f•11 LAST REVSSiON SHEET .._. SYMBOL_ Al 147008-00 D.C. DWG N4. 21-05-A1 „.. .oao ......, A SYM sheOlssosis sass. orosss.ssOOsS,Osss silissks• hososk /1■11....nraps. IseSaAsolsalOss/S.M gcstersaSOOsesSIMO*410•O WASSWO.sss. vOsssuss• ArSalltYMIM.MA1C. (3 C1. ••••■■•..**1...•8111.......... ■60.111■111•00(711aSx..... aS 4140 ... sass* 40.a. OiSrlosnol•SssalbsIsms s,VssisoloW•Stsagsnlessalss.s.sPOss -4101.*Iss Assotsoreapsalbss. AM.* sO0.011.6a1117.. ovbasa*ownwommoworruarsomemassuarraanwomstormaleass. *I* wolmeammonamm........a ......17....7.41111.4.72.1... ISSPOSO011t. osegona• wane, ,.......rlanwrodamiminbez*sol9prainsenrarsimocomao.r. . md,Saofeli.......sw.cramitoassonaant - ■ . . , IrNII*161Z1ZWO''‘""'"0611211=12'211rWelrb Tr2rgiertrIMII=Srilt 5 '47.... :4:5=7.. •,.. 5. r. .5. ... ... .i. J • In t... ... ... • ..... . .0 - !, r--.-.-5-!.5- - r- ,. :H ' ; 9 ' ' .1/ , ' , . I i i 1 . , (5) 1 I ! !I ..risrcrensesFrarocrwravareertantmearlosi-; 1-(g6ITTANITOA-01 r s.200 L °COPAN TS j PHASE C 05/02/94, &-fe..15.t.e...et 24* raem....—* IRAN Wilif110.93111111‘14$141113 Orrilirii07.41".151.11 ! i Iii4T661,4W10:61:,: 1 10,750 GSF , 53 .00CUPANTS I 'foi . ...... E D 05/09194 ji A FOCCIRAVT LOAD I 20,900 GSrf I , . 1 i H ! 104 °COPAN TS.) ,I I i!I ' - — t- I-- - - -- ! ' HA C 4/02./4 --04/2§194:. PHASE PHASE 1 1/ 0 41 1-8 lif0 4 , . I 1 A I ; b ( 7 emm,,,,,afterwiaiva-InvedmIs5 ermine"' likrAweciroinarasmi 1 :17,400 CSF 87 a;C3P.NIS ( FAIONAFS,OP41./.0.W.4000041.ONSVO.WMOIWYPIM110011001MISSIONSIMPSS4WesporglelOOMOORPOs.4.1....M.Isms L 6.111112.13V•Atr. arsqvirNrxIcerwnikrvis 044 I I ill 1 1 1 i• lj , 1 ; , • I 2Y 11„, • Ne ,....55 • t !!-'rf. 1 -[RAN • r --L - 4- - -)- 1, QiiitragkirJA I ' —arr..-ara:,- r..--..9- ', .1. woo. aZr OS au., t ,,. , ,...aiiiscticireir—ArTm.74VPAITAirrariarai.72.7.1.441"—earal.-Flia.Witi.-Aa iim-i,--N Ale. so.. S. S. MO ONO 0 P 1 I i M. OSP en ma r. ma me al, r ar. Arn am ex me or. Asa an sta !li L I : : . ii • ! ; :11 i — 1 , ' ! , . , 1 1 ! 1 1 ! , ! A ! • I ,, ........._!..1._ K ! , 1 :i ! I i ! , ! LOC____CUIAELLOA.,01 32,30) ;SF ,Cri":.-- 1 LI, 13 11 fSIL-1 Fo-C4,5■F315N676-5q 40 OCCUPANTS]- _,,... .__ .65 OCCALS, j - _ 42 OCt OFOITS j OCCUPANT LOit 19,100 GSF • _ . 95 OCr,UPAlkilii V ,ppmeo oe go re es nol,0,1,0 P'..! fciialieVaiv* AaVrir 1 i • .1 1 .._3, i 1 i M.. %.. ., 1 i PHASE B 04125/94- (-•••• •■•'' ssossisscIrmalssalSts/oa mosso* ssslissOSIlsak.s■Prsonpassessos7¢arpOssosssiosliesP*SS.S. RE VISION osossAiss61.n.s SSP Pftsss........PossessmssissieSsellse...assPossos UsssesallOISSONONSIP • assissaSP,01 Isfospssossusa•le!._••• ot..60.4! iSsferanat BY APPROVCD OAK seolls...1SsstIOSSISPP REVISION BY APPROVED DATE s. s .ILS..NISIOV;;SP • ""' 21-05 EXITING FLOOR PLAN 1■••■••••■• • • .1142•■••■■■••■•■■••••■•■•••••■••1...... SCALE: 1' 30' AmsodnaR...........................ostrocatorimamo .....,■■■■••ftafrapeo,00.0.......... 11ACIWAU FACILITIES DEPARTMENT Li AUBURN, WA. E1 EVERETT, WA. El KENT, WA. L] PORTLAND, OR L.1 RENTON, WA. SEATTLE, WA. 98002 98201 98031 97220 98055 98124 Ps•Ows•SCSPososSIMMos.l.rssouOSOns..00..S0.10.413.4010,700..0700.W/r SPLPSRIS soryloyalsaass.0101, ISPosliall•MsIOSP.OPIesossIssIssimeinasSsr.orst•slasisOlISOOlooSsra ACCEPTABILITY V•IIS DESIGN AND/(W SPEC:WI:MTN 15 APPROVE() AP PROVED EIY 1 oPT. OA TZ: DRAWN BY A. SHAPIRO el-i-ECI<FI 0 MX 1 SUMME ENDA% A. SHAPIRO CHt:C,KED AKTROVED 611. AP PROVED 05 '94 PosilkassssoMOONOSSilssPoss.SYSOISSMOOWPONSINOSIOSsadVaYessoFISsoses•CW.1.14.1.001•11100PS LEGEND EXIT PATH DIRECTION OF EXIT POINT OF EXIT FROM BUONG GENERAL NOTES I, CONSTRUCTION IS TO BE DONE IN FIVE PHASES WITH MOVE IN AND OCCUPANCY TO BE COMPLETED ON A PHASE BY PHASE BASIS, (SEE MOVE IN DATES LISiLD ON THE PLAN), 2 PHASED CONSTRUCTION ACTIVITIES SHALL NOT INTERFER WITH THE EXITING PATH(S) OF OCCUPIED PHASE(S). 3 OCCUPANT LOADS ARE BASED ON 200 PER OCCUPANT , (UBC TABLE 33-A). C,ONSTRUCT 1 ON NOTES 8 H GH SHOP FENCE_ 5 ,27:=> - W I DE SHOP FENCE DOOR 8' WI DE SLIDING SHOP FENCE DOOR 7' HIGH OBR I EN GWB WALL F-7-> 3 WI DE HM DOOR (4-) i;q5131`1 KEY PLAN Asyal*ASPOOSOOPMWSP•PIP.Oras•s*,.....WASSPI.SSPISOPASOSIOP.S.P.O.P:SPOS FIRST FLOOR COMPOSITE EXITING PI...AN RECEIVED CITY OF TUKWILA MAR 7 j994 PERMIT CENTER yo,....a/aPpasr astabiala ARCHITECTURAL MASTER BLDG. 21-05.1 vsslposarlsers.sonsssanasSasOSOSSMOOsSIOnosPeNsPAPIORS/WMAKS•OsISSW/Rsors IIIIII11111111/111111)111 11111 0 16 THS INCH ir 11111 U1414111" 8 4 5 6 7 NOTE: If the microfilmed document is less clear than this notice, it is due to the quality of the original document. 0E; 6Z se. Z,Z 9? GZ 47Z SZ z LZ OZ utdottilui Lk!! 6L 81, LL 11 9 10 11' /AK'E I"ERMANY 12' e 91 GI 17L Zit. LI 01, 6 8 4 G 47 £ Z I P4 VI 0 0146 billiYthillja[1114110i111I011111111111.1.111111111110011611140111/11111Olffillitillillilliiihdifillinlidndlill11111111111 IASI RE VSION SHEE T 1 om40.9 NO. A2 147008-000 t NOE 21-05 COL. CORP. ENG M BLDG 21 5, qqe OOBS VICINITY MAP u t{-01 .l KIIO COIMf A T CENTER FROM DOWNTOWN SEATTLE 900 m y0 - EXIT 157 99 EAST MARGINAL MAY CORPORATE PARK FROM SEATTLE - TACOMA AIRPORT 599 TUKWILA FROM KENT & AUBURN PROJECT L SITE DEVELOPMENTAL CENTER NO SCALE BD RY 1► Alb RP C NES j3) BOEING DEVELOPMENTAL CENTER 9725 EAST MARGINAL WAY SOUTH TUKWILLA. WASHINGTON 98108 AREA MAP BLDG. 21 -05 ADDRESS 3417 SO. 12.OTH PLACE TUKWILLA, WA. (EAST MARGINAL WAY CORPORATE PARK) 121 -02 L121-01 r tL r- -1 121 -05 ■ ■ PROJECT] SITE NO SCALE EAST MARGINAL WAY CORPORATE PARK w 0 SE 1 ' Mb NKr GENERAL NOTES CONSTRUCTION SET OF DOCUMENTS, REVIEWED AND STAMPED BY CITY OF TUKWILA MUST BE ON SITE DURING CONSTRUCTION. DO NOT PROCEED WITH CONSTRUCTION WITHOUT ABOVE MENTIONED SET OF DOCUMENTS. VERIFY ALL DIMENSIONS PRIOR TO START OF CONSTRUCTION. NOTIFY FACILITY ENGINEERS SHOULD EXISTING CONDITIONS REQUIRED DESIGN REVISIONS. REVISIONS TO BE APPROVED BY CITY OF TUKWILA PRIOR TO PROCEEDING WITH PROPOSED REVISED WORK. PROJECT CHECKLIST CHECK BOX • BRIEF PROJECT NARRATIVE INSTALL 7' HIGH SHOP FENCING, STORAGE RACKS, ELECTRICAL & MECHANICAL IMPROVEMENTS FOR THE INSTALLITION OF THE BLANKET SHOP • THESE DRAWINGS CONFORM TO THE 1991 U.B.C., U.F.C., U.P.C., AND THE 1990 BARRIER FREE CODE AS ADAPTED OR AMENDED BY LOCAL ORDINANCES, AND COMPLIANCE WITH CITY OF TUKWILA ZONING. • COMPLETE BUILDING FLOOR PLAN SHOWING EXITING SYSTEM, DOORS, CORRIDORS AND PASSAGEWAYS. O ENGINEERING CALCULATIONS ( IF APPLICABLE ) O ROOMS LABELED PER OCCUPANCY PER U.B.C. TABLE 33 -A. O BUILDING FLOOR NUMBER ON PRINT FOR AREA OF CONSTRUCTION. NUMBER OF PRINTS REQUIRED FOR PERMIT PACKAGE: O 1. GENERAL PERMIT (SHELL & CORE) 6 SETS OF ENERGY CALCULATIONS 2 SETS OF CIVIL DRAWINGS WITH UTILITIES 2 SETS SOILS REPORTS, STAMPED BY GEOTECHNICAL ENGINEER 2 SETS STRUCTURAL CALCULATIONS 2 SETS PROJECT CONSTRUCTION SPECIFICATIONS 2 SETS TOPOGRAPHICAL SURVEY 2 COPIES OF LEGAL DESCRIPTION 2 SETS Of WORKING DRAWINGS O 2. TENANT IMPROVEMENTS, 2 COMPLETE SETS O 3. MECHANICAL, 2 COMPLETE SETS O 4. FIRE PROTECTION /SPRINKLERS, 2 COMPLETE SETS Su I understand that the Plan Check approvals are subtotal to errors and amms °Inns and approval of plane does not suthonte Ih0 VI• tion of any Adopted code or ord ante 7 pt of oon- tr actor's sop • rovsdpl� owladpad, DRAWING INDEX SHEET DWG. No. N0. SHEET TITLE SHEET NO. DWG. No. SHEET TITLE Al 21 -05 -A1 TITLE A2 21 -05 -A2 FLOOR PLAN & EXITING PLAN CODE SUMMARY LAND USE CODE CODE REFERENCES OCCUPANCY GROUP FLOOR AREA (ACTUAL) STORIES: FIRE PROTECTIONS SEISMIC ZONE FIRE ZONE PARKING PROVIDED PARKING REQUIRED M HP 1991 UBC KING COUNTY / TUKWILA WASHINGTON STATE ENERGY CODE WASHINGTON STATE BARRIER FEE CODE ADDITIONS NO CHANGE NGE IN OCCUPANCY AP P R0'1 BUILDING FOOTPRINT — 209,446 SF MO ' FULLY AUTOMATIC, WET PIPE THROUGHOUT 3 3 739 725 t IWOwo CITY OF TUKWILA MAR 7 1994 mein' on NOTE: MECHANICAL AND ELECTRICAL PERMITS ARE TO BE SUBMITTED SEPARATLY FROM THIS PACKAGE. t.J IS1O1`► sr 0Att WINIssallf Sir sasrns FACILITIES DEPARTMENT D AUBURN, WA. 98002 D EVERETT, WA. 98201 ❑ KENT, WA. 98031 D PORTLAND, OR. 97220 D RENTON, WA. 98055 • SEATTLE, WA. 98124 ACCEPTANT.? incTreAOlgraiNiraono NAM eV A SHAPIRO aeon TITLE SHEET Mat Ke belt APMOVCO eV otn wtt 03/06/94 AMMO fiat ArMOVt0 2-74+ not 21 -05.1 ARCHITECTURAL MASTER ALL D.C. MU MIL MW Al AN O. es 147006 -00 21 -05 -A1 Mtt 21— 0s EXITING FLOOR PLAN SCALE: 1" = 30' h MR sosrna FACILITIES DEPARTMENT El AUBURN, WA. 98002 0 EVERETT, WA. 98201 p KENT, WA. 98031 p PORTLAND, OR. 97220 p RENTON, WA. 98055 • SEATTLE, WA. 98124 ACCEPTAIITY 1*1 D[YOR NA A. SHAPIRO CIMINO LEGEND M. EXIT PATH DIRECTION OF EXIT POINT OF EXIT FROM BUILDING GENERAL NOTES I. CONSTRUCTION IS TO BE DONE IN FIVE PHASES WITH MOVE IN AND OCCUPANCY TO BE COMPLETED ON A PHASE BY PHASE BASIS, (SEE MOVE IN DATES LISTED ON THE PLAN). 2 PHASED CONSTRUCTION ACTIVITIES SHALL NOT INTERFER WITH THE EXITING PATH(S) OF OCCUPIED PHASE(S). 3. OCCUPANT LOADS ARE BASED ON 200 SF PER OCCUPANT, (UBC TABLE 33 —A). CONSTRUCTION NOTES 8' HIGH SHOP FENCE 3' WIDE SHOP FENCE DOOR 8' WIDE SLIDING SHOP FENCE DOOR 7' HIGH OBRIEN GWB WALL 3' WIDE HM DOOR or la 0 A PROVE M' k cOh 6' O op cP O C5 © 0 0 0 NG ONS1 l maw/A perareM rArA4.444 KEY PLAN FIRST FLOOR COMPOSITE EXITING PLAN arr rl A MAR 7 1994 MN? eillt WP ROM I nwIL MW ol. MR $40,11,0 03/05/M eIrM 4MOVIO - 3.2.114 T ARCHITECTURAL MASTER BLDG. 21 -05.1 COL. CORP. PARK A2 om 147008 -000 �s»a 21 -05