CITY OF TUKWIL
AI as to Form:
WASHINGTON
RESOLUTION NO. 591
AUTHORIZING THE MAYOR TO SIGN AN AGREEMENT
WITH THE STATE OF WASHINGTON DEPARTMENT OF
HIGHWAYS FOR THE REHABILITATION OF SOUTHCENTER
BOULEVARD FROM 65TH AVENUE SOUTH TO HIGHWAY 181
(INTERURBAN AVENUE SOUTH).
THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, DO
That the Mayor is hereby authorized to sign
an agreement with the State of Washington Depart-
ment of Highways for the rehabilitation of
Southcenter Boulevard from 65th Avenue South to
Highway 181 (Interurban Avenue South).
at a regular meeting thereof this 5th day of July 1977
ATTEST:
Agreement is attached as reference.
AGENCY FEDERAL AID PROJECT NUMBER
STATE OF WASHINGTON
DEPARTMENT OF HIGHWAYS
CITY /COUNTY AGREEMENT
DATE
The local agency having complied, or hereby agreeing to comply, with the terms and conditions set forth in (1) Title 23, U.S. Code,
Highways, (2) The regulations issued pursuant thereto, (3) The Policies and Procedures promulgates by the Department of Highways
and, (4) The Federal -aid Project Agreement entered into between the State and Federal Government, relative to the above project,
the Department of Highways will authorize the local agency to proceed on the project by a separate notification. Federal funds which
are to be obligated for the Project may not exceed the amount shown herein, without written authority by the State, subject to the
approval of the Federal Highway Administrator. The balance of the estimated total cost shall be the obligation of the local agency.
Nam•
Termini
Description of Work
dad
Xlitio yor
CTT OF TIIKWT A
HWY FORM 140 -039
REVISED 3/7J
CITY OF TUKWILA
PROJECT DESCRIPTION
Southcenter Blvd. Rehabilitation
65th Ave. So. To SR 181 (Interurban Ave. So.)
Widen roadway, install lighting, curb and gutter, sidewalks,
storms drainage, safety barrier and restriping.
CONSTRUCTION METHOD OF FINANCING
1
AGREEMENT NUMBER
FUNDING
TYPE OF WORK
State
Project Agency 1 Federal I Work Order
1. P.E. (AGENCY) a. Direct Salary Cost 2,690
b. Payroll Additives 1,345
c. Admin.Overhead 1,.345
d. Contracture! Services (Consultant) 2.0..179
e. Non-Salary costs 1,345
P.E. (D.O.H) a. Plan Review Misc. Asst
b. PS& E Process., Bid Ad Contract Award 2,0.0.Q.
c. Audit 0
d. Other (1
Total Estimated Preliminary Engineering Cost 1 126,904 1 1 2,000
2. Rightof-Wey (AGENCY) a. Agency Work 0 0 0
b. Dept. of Highway Assistance
c. Audit
Total Estimated Right-of-Way Cost 1 1 U 1 0 1 1)
3. Construction Contract pp 27,498 10 7, 0 3 2
_l5 Engineering Agency Force 16 r yy 1,79 16,179
20,179 State Force 3.r.Q00 3,00Q.
Audit 1,000 1 1.000
Total 1 Estimated Construction Cost 1 1 z.� 67 1107 .032 1 4.000
TOTAL ESTIMATED COST OF THE PROJECT 1 170,581 107,032 I 6,000
STATE AD AWARD
METHOD A Partial Payment 15% of Total Construction Project Cost (3)
METHOD B Withhold Approximately Monthly Payments
Agency Share of Total Construction Project Cost (3)
LOCAL FORCE OR LOCAL AD AWARD
METHOD C X Agency Cost Incurred with Partial Reimbursement (3)
The local agency further stipulates that pursuant to said Title 23, regulations and policies and procedures, and as a condition to pay-
ment of the federal funds obligated, it accepts and will comply with the applicable provisions set forth on the reverse hereof. Adopted
by official action on 19 Resolution /Ordinance No.
AGENCY OFFICIAL STATE OF WASHINGTON
DEPARTMENT OF HIGHWAYS
Assistant Director for State Aid
r F
1
ate Ezeci)ted e
Length 28