Loading...
HomeMy WebLinkAboutRes 0591 - Rehabilitation Agreement - Southcenter Boulevard (65th Avenoue South to Interurban Avenue South)RESOLVE AS FOLLOWS: CITY OF TUKWIL AI as to Form: WASHINGTON RESOLUTION NO. 591 AUTHORIZING THE MAYOR TO SIGN AN AGREEMENT WITH THE STATE OF WASHINGTON DEPARTMENT OF HIGHWAYS FOR THE REHABILITATION OF SOUTHCENTER BOULEVARD FROM 65TH AVENUE SOUTH TO HIGHWAY 181 (INTERURBAN AVENUE SOUTH). THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, DO That the Mayor is hereby authorized to sign an agreement with the State of Washington Depart- ment of Highways for the rehabilitation of Southcenter Boulevard from 65th Avenue South to Highway 181 (Interurban Avenue South). at a regular meeting thereof this 5th day of July 1977 ATTEST: Agreement is attached as reference. AGENCY FEDERAL AID PROJECT NUMBER STATE OF WASHINGTON DEPARTMENT OF HIGHWAYS CITY /COUNTY AGREEMENT DATE The local agency having complied, or hereby agreeing to comply, with the terms and conditions set forth in (1) Title 23, U.S. Code, Highways, (2) The regulations issued pursuant thereto, (3) The Policies and Procedures promulgates by the Department of Highways and, (4) The Federal -aid Project Agreement entered into between the State and Federal Government, relative to the above project, the Department of Highways will authorize the local agency to proceed on the project by a separate notification. Federal funds which are to be obligated for the Project may not exceed the amount shown herein, without written authority by the State, subject to the approval of the Federal Highway Administrator. The balance of the estimated total cost shall be the obligation of the local agency. Nam• Termini Description of Work dad Xlitio yor CTT OF TIIKWT A HWY FORM 140 -039 REVISED 3/7J CITY OF TUKWILA PROJECT DESCRIPTION Southcenter Blvd. Rehabilitation 65th Ave. So. To SR 181 (Interurban Ave. So.) Widen roadway, install lighting, curb and gutter, sidewalks, storms drainage, safety barrier and restriping. CONSTRUCTION METHOD OF FINANCING 1 AGREEMENT NUMBER FUNDING TYPE OF WORK State Project Agency 1 Federal I Work Order 1. P.E. (AGENCY) a. Direct Salary Cost 2,690 b. Payroll Additives 1,345 c. Admin.Overhead 1,.345 d. Contracture! Services (Consultant) 2.0..179 e. Non-Salary costs 1,345 P.E. (D.O.H) a. Plan Review Misc. Asst b. PS& E Process., Bid Ad Contract Award 2,0.0.Q. c. Audit 0 d. Other (1 Total Estimated Preliminary Engineering Cost 1 126,904 1 1 2,000 2. Rightof-Wey (AGENCY) a. Agency Work 0 0 0 b. Dept. of Highway Assistance c. Audit Total Estimated Right-of-Way Cost 1 1 U 1 0 1 1) 3. Construction Contract pp 27,498 10 7, 0 3 2 _l5 Engineering Agency Force 16 r yy 1,79 16,179 20,179 State Force 3.r.Q00 3,00Q. Audit 1,000 1 1.000 Total 1 Estimated Construction Cost 1 1 z.� 67 1107 .032 1 4.000 TOTAL ESTIMATED COST OF THE PROJECT 1 170,581 107,032 I 6,000 STATE AD AWARD METHOD A Partial Payment 15% of Total Construction Project Cost (3) METHOD B Withhold Approximately Monthly Payments Agency Share of Total Construction Project Cost (3) LOCAL FORCE OR LOCAL AD AWARD METHOD C X Agency Cost Incurred with Partial Reimbursement (3) The local agency further stipulates that pursuant to said Title 23, regulations and policies and procedures, and as a condition to pay- ment of the federal funds obligated, it accepts and will comply with the applicable provisions set forth on the reverse hereof. Adopted by official action on 19 Resolution /Ordinance No. AGENCY OFFICIAL STATE OF WASHINGTON DEPARTMENT OF HIGHWAYS Assistant Director for State Aid r F 1 ate Ezeci)ted e Length 28