ORDINANCE NO. 499 9°1 0
AN ORDINANCE adopted pursuant to RCW 35.77.010 adopting a
comprehensive street program for the City of Tukwila for the
ensuing two years.
WHEREAS the City of Tukwila had previously adopted a
comprehensive street program by Ordinance No. 347, and
WHEREAS the City Council of the City of Tukwila has
reviewed the street construction accomplished to date under
the existing comprehensive street program, and determined
current and future street needs for the City of Tukwila, and
WHEREAS the City Council of the City of Tukwila has now
revised and extended the comprehensive street program for the
ensuing two years, and
WHEREAS a public hearing was held on said revisions and
extensions on November 6, 1967 at the City Hall of the City of
Tukwila, NOW THEREFORE
The City Council of the City of Tukwila do ordain as follows:
Section 1: The maps and lists attached hereto, marked as Exhibit
"A and hereby incorporated by reference, are hereby adopted as
the comprehensive street program for the City of Tukwila for the
ensuing two years.
Section 2: In accordance with the provisions of RCW 35.77.010,
a copy of this ordinance, and attachments shall be filed by the
City Clerk with the Director`of Highways of the State of Washington
within thirty (30) days of the date of the adoption of this. ordinance.
PASSED by the City Coun'�il of the City of Tukwila this e7
day of November, 1967. f -C---
ATTES MAYOR
,r1
16.
ARTERIAI. STR.ENT PROGRAM
REVISED TO NOVEMBER 1967
A. Primary Arterials
1. 58th Avenue South Tnterurhan Avenue to South 149th !";treet
widening, sidewalks, curbs, gutters, storm sewers and Trading.
Also paving with Asphalt and street lighting.
$128,360.00
2. 5ith Avenue South from South 149th to a connection with 152nd
street and west to hrac_adam Road procurement of right -of -way,
clearing, grading, storm sewers, curbs, gutters, asphalt paving,
street lighting and sidewalks. X108,475,00
3. South 144th street -53rd Avenue South to 58th :Avenue south
widening, grading, storm sewers, curbs, gutters asphalt
paving, street lighting and sidewalks. 75,000,00
4. 53rd Avenue South and Macadam Road flouth 139th Street to
South 151st. Street widening, grading, storm sewers, curbs,
gutters, asphalt paving, street lighting and sidewalks.
$210,850.00
5. South 180th -Christensen Road to SouthCenter Parkway south
widening, grading, storm sewers, curbs, gutters, asphalt
paving, street lighting and sidewalks. $237,250.00
6. South 180th Street SouthCenter Parkway to west boundary
of City procurement of right -of -way, clearing, grading,
storm sewers, curbs, gutters, asphalt paving, street fight-
ing and sidewalks. $143,800.00
7. Tukwila Parkway west and extension of SouthCenter Partway
South to 188th
grading, storm sewers, curbs, gutters,
asphalt paving, street lighting and sidewalks. $683,600,00
TOTAL COST PRI APY AR.TFRIAIS
1 1,5F7,335.00
B. Secondary Arterials
1. South 151st Street Macadam Road to 57th Avenue south widening,
grading, storm sewers, curbs, gutters, asphalt paving, street
lighting and sidewalks. n 46 000.00
2. South 151st street -57th Avenue South to 62nd Avenue south
procurement of right -of -way, clearing ,grading, storm sewers,
curbs, gutters, asphalt paving, street lighting and sidewalks.
62, 700.00
ARTERIAL STREET PROGRAM (con't)
3. South 151st street -62nd Avenue South to 65th Avenue
South, to South 154th widening, grading, storm sewers,
curbs, gutters, asphalt paving, street lighting and
sidewalks. $117,100.00
4. Andover Park west from Tukwila Parkway to South 180th,
grading, storm sewers, curbs, gutters, asphalt paving,
street lighting and sidewalks. $417,900.00
5. Andover Park East Tukwila Parkway West, grading, storm
sewers, curbs, gutters, asphalt paving, street lighting. $453,6
TOTAL SECONDARY ARTERTALS $1,097,350.00
TOTAL PRIMARY AND SECOAmARY ARTERIALS 2,684,685.00
Exhibit A
Comprehensive Street Program
Maps
(available in vault)