HomeMy WebLinkAboutPermit B94-0165 - IPTN - AWNINGCity of T%ikwila
(206) 431 -3670
Community Development / Public Works • 6300 Southcenter Boulevard, Suite 100 • Tukwila, Washington 98188
BUILDING PERMIT
Permit No: B94 -0165
Type: B -BUILD
Category: ACOM
Address: 1035 ANDOVER PK W
Location:
Parcel #: 883650 -0010
Zoning: CM
Type Const: N/A
Gas /Elec:
Wetlands:
Water: N/A
Contractor License No.: PUGETST150DE
TENANT I.P.T.N.
Status: ISSUED
Issued: 05/04/1994
Expires: 10/31/1994
Suite:
Type of Occupancy: OFFICE
Slopes: N
Sewer: N/A
OWNER THE SOUTHLAND CORP
2828 NORTH HASKELL, 21745 SOUTHLAN, DALLAS TX 75204
CONTRACTOR PUGET SOUND TENT & AWNING Phone: 206 622 -8219
620 SOUTH INDUSTRIAL WAY, SEATTLE, WA 98108
CONTACT SEAN CHIPMAN Phone: 206 622 -8219
620 S INDUSTRIAL WY, SEATTLE, WA 98108
******************************************** * * * * * * * * * * * * * * ** * * * * * * * * * * * * * **
Permit Description:
INSTALL AND MAINTAIN ONE AWNING WITH NO GRAPHICS
OR LIGHTING.
Units: 001
Buildings: 001
Fire Protection: N/A
UBC Edition: 1991
Front :
Left:
SETBACKS
.0 Back:
.0 Right:
Valuation: 1,253.00
Total Permit Fee: 55.65
******************************************* * * * * * * * * * * * * ** * * * * * * * * * * * * * * * **
C --
Permit Center Authorized Signature Date
I hereby certify that I have read and examined this permit and know the
same to be true and correct. All provisions of law and ordinances
governing this work will be complied with, whether specified herein or not.
The granting of this permit does not presume to give authority to violate
or cancel the provisions of any other state or local laws regulating
construction or he perform e of work. I am authorized to sign for and
obtain this bu ding permi
Signature:
Date: 5-1-q4
Print Name: 5/�Lm Title:
This permit shall become null and void if the work is not commenced within
180 days from the date of issuance, or if the work is suspended or
abandoned for a period of 180 days from the last inspection.
All PERMITS ISSUED FOR NEW CONSTRUCTION, REMODELING, OR DEMOLITION PROJECTS
REQUIRE CONSTRUCTION, DEMOLITION AND LANDCLEARING WASTE MATERIAL FROM THESE
PROJECTS TO BE RECYCLED AT A KING COUNTY LICENSED OR APPROVED FACILITY,
OR TAKEN TO REGIONAL DISPOSAL FACILITIES.
CITY OF TUKWII. 4
Department of Cc., tmunity Development — Permit Center,
6300 Southcenter Boulevard - #100, Tukwila, WA 98188
(206) 431 -3670
Building Permit Application Tracking
PLAN CHECK
NUMBER
N1-1-01(05
PROJECT NAME
CONTACTED
f �, - In
1_ _�C�Y
SITE ADDRESS
SUITE NO.
INSTRUCTIONS TO STAFF
• Contacts with applicants or requests for information should be summarized in writing by staff so
that the status of the project may be ascertained at any time.
• Plan corrections shall be completed and approved prior to sending to the next department.
• Any conditions or requirements for the permit shall be noted in the Sierra system or summarized
concisely in the form of a formal letter or memo, which will be attached to the permit.
• Please fill out your section of the tracking chart completely. Where information requested is not
applicable, so note by using "N /A ", date and initial.
DEPARTMENTAL REVIEW
"X" in box indicates which departments need to review the project.
:.DEPARTME
r.:
ATE; I
DATE;��>
PROVED
UIR:EME:NT ..
BUILDING -
initial review
FIRE
O PLANNING
5,A.i
�27`g4R
(ROUTED)
INITh t^- �/t)
CONSULTANT: Date Sent -
,�MMEN
........... .
Date Approved -
FIRE PROTECTION:
FIRE DEPT. LETTER DATED:
Sprinklers (� Detectors
N/A
INIT: �C&t-
ZONING:
REFERENCE FILE NOS.:
!BAR/LAND USE CONDITIONS? LJYes (i No
MINIMUM SETBACKS: N-
S-
E-
O PUBLIC
WORKS
UTILITY PERMITS REQUIRED?
Yes (1 No
INIT:
PUBLIC WORKS LETTER DATED:
O OTHER
INIT:
IX BUILDING -
final review
BUILDING
OFFICIAL
`/ / /q4 TYPE OF CONSTRUCTION:
INIT. C/A-
INIT: �V
CERT. OF OCCUPANCY?
OYes ONo
UBC EDITION (year):
REVIEW COMPLETED
AMOUNT
OWING:
0 .
CONTACTED
f �, - In
1_ _�C�Y
aaQ.
DATE NOTIFIED
5-1A
BY:
(init.) ,
2nd NOTIFICATION
BY:
(init.)
3RD NOTIFICATION
BY:
(init.)
t OT P CAN( S'KQo4 3 2. l3?"cUnt Aw nt.nVC �- PA2 KrnrC S'/ 4C6 Fo
as' C t 2.CuC. A 7 rant A fre-cr.
01l0BF93
CITY OF TUKWILA
Department of Community Development - Building Division
6300 Southcenter Boulevard, Tukwila WA 98188 DESCRIPTION
(206) 431 -3670
BUILDII'3 PERMIT
APPLICATION
PLAN CHECK • �� L
�
NUMBER 5
AMOUNT AMOUNT
RCPT #
DATE
BUILDING PERMIT FEE
L
PLAN CHECK FEE
BUILDING SURCHARGE
SITE ADDRESS SUITE #
/) j'g.". vc� /�.��h' W6:37---- 8
VALUE OF CONSTRUCTION - $
/. 2 �� , ° a .
ASSESSOR ACCOUNT #
g ?6 --d - oc�/ O
(commercial) Li Demolition (building)
® Other ,i/ T4 zc f ,_,. ∎,v/A,G .
PROJECT NAME/TENANT
17/e T,
TYPE OF U New Building U Addition Tenant Improvement
WORK: O Rack Storage O Reroof Remodel (residential)
DESCRIBE WORK TO BE DONE: t
/A/d7./7G L 7` /77,5/'» 42/4/ / /9G'/iy /,vG /1/l77) 6'/r'/9/�/i
/C- r• //f!D e /6 //T f
BUILDING USE (office, warehouse, etc.)
NATURE OF BUSINESS /x rycc z:/v6-A„,.. /Z ///77
•
requirements may need to be met. Please explain:
WILL THERE BE A CHANGE IN USE? 121- No 0 Yes If Yes, new building
SQUARE FOOTAGE - Building:/ or,/ Tenant Space:c2dao ;2";r� Area of Construction: 30 Sy,
W.I - THERE BE STORAGE OR USE F FLAMMABLE, COMBUSTIBLE OR HAZARDOUS MATERIALS IN THE BUILDING?
JCJ No 0 Yes IF YES, EXPLAIN:
PROPERTY OWNER /a TAN C'CJ//e,
P
PHONES -76
PHONEG �
6.---,,s-6-2
ZIP �� /�'�
-��
ZIP r��� p�
ADDRESS, /0,3.`C' ,9�rgiU�;m ir' I � /�.. - C_ .
,_.,t
CONTRACTOR 6CT .SoU/sr.o Teivi 7 /w.v /4 •
ADDRESSE D • s' //1//y0.5,2_4,//9e Gv / s.�777l-
WA. ST. CONTRACTOR'S LICENSE #vr'(J6-� %, r7 - s.- �J/
EXP. DATE Z2 _ ��-
PHONE
ARCHITECT
ADDRESS
ZIP
I: HEREBY CERTIFY: THAT
BE:;TRUE ;AND. CORRECT,
VE READ AND;EXAMINED THIS APPLICATION, AND;.;KN'
l AM TI ORIZED TO APPLY FOR. THIS °;PERMIT:. :.. .
BUILDING OWNER SIGNATURE
AUTHORIZED PRINT NAME s� �� /� ,9�
AGENT ADDRESS s-. /4 JL7 ,, W7L Gtr/' /
CONTACT PERSON ` A/ C-2h'//'i4-7/9iv •
DATE
PHONE 8�/
CITY /Zl 7,49/&
PHONE - ,2_0.\9/ 9'
APPLICATION SUBMITTAL In order to ensure that your application is accepted for plan review, please make sure to fill out the
application completely and follow the plan submittal checklist on the reverse side of this form. Handouts are available at
the Building counter which provide more detailed information on application and plan submittal requirements.
Application and plans must be complete in order to be accepted for plan review.
VALUATION OF CONSTRUCTION Valuation for new construction and additions are calculated by the Department of
Community Development prior to application submittal. Contact the Permit Coordinator at 431 -3670 prior to submitting
application. In all cases, a valuation amount should be entered by the applicant. This figure will be reviewed and is
subject to possible revision by the Building Division to comply with current fee schedules.
BUILDING OWNER / AUTHORIZED AGENT If the applicant is other than the owner, registered architect/engineer, or contractor
licensed by the State of Washington, a notarized letter from the property owner authorizing the agent to submit this
permit application and obtain the permit will be required as part of this submittal.
EXPIRATION OF PLAN REVIEW Applications for which no permit is issued within 180 days following the date of application shall
expire by limitations. The building official may extend the time for action by the applicant for a period not exceeding 180
days upon written request by the applicant as defined in Section 304(d) of the Uniform Building Code (current edition).
No application shall be extended more than once.
if you have any questions about our process or plan submittal requirements, please
con Nripprtment of Community Development Building Division at 431-
niTY
DATE APPLICATION ACCErTEP0l
itcter—e9T
DATE APPLICATION EXPIRE
�b
6i4
SUEWITTAL CHECKLIST
COMMERCIAL
NEW COMMERCIAL BUILDINGS/ADDITIONS COMMERCIAL TENANT IMPROVEMENTS
El Completed building -permit application (one fc; each struCture
Completed building permit application (one for each structure) •
or
I-1 Assessor Account Number : •:: AssessorAccotint Number••":::::::.-•:::::::*-••••••••• • :
••• •. : : . :: • .•
.. • ••. .. • • . • .• ". • • • ". .. • ..• .• • • .
•••••■■•••■•
Two sets (2) of the following: • •• : " • Two:(2)•sets of construction
Specifications • .
: • : . • .
Structural calculations stamped by a Washington State licensed
engineer • • :
.• • • • . , , " ... ...
•• : ::•••::•••LoCation of tenant space •••.: ;•:.;; :
• .."'• Existing and proposed parking
• ••• ••• Landscape plan (if applicable, te,„change.of use) •
Soils report stamped by a Washington State licensed engineer:
[1 Overall building plan • : • • - : • •
• . . . • .:::Teharit location
•::...UssoS7dJaentco,7 7a• ,l e
!Qprai07irsip,?1 building square .. .
Floor ..„.
plan of proposed tenant space
Topographical survey . • • • •
Energy calculations stamped by a Washington State licensed •
engineer or architect . . • . . •-• •
•
Legal description • . • -• • • : :•. • -•
. . • . •
Working drawings, stamped by a Washington State licensed
architect, which include:
• .• •••...' •• • ' . .
" • • : • . •
Arc'litectural drawings ••••••
• Tenant space plan with use of each .rooni
• Exit doors, egress patterns; .
• New wells, existing wall, and walls to be
.biiiis sections showing wall construction and inettodcf.;:...;:::;:.;......,
: :, .,.. •• . • : • ..,.. • ...• .. .. ........ • .... • :.. . : .... ......,....,. ..• ....: .........
• Structural drawings :.::: :"::::"!•::::::1::::::::::::".:::::::::::::::: . :".::•:"":""::":::::::*::::::":::':::::::::-:::::::"..""':!::: ••• -.....•::,.::::::attachment for floor and ceiling,:•:::::•:::::::::: ":-..:::::::::::::::::•:•::::.:::::•:::::::::::•-•::::::.:-:::.:::::::::::.:.:,•:::::
..:. .
• Mechanical drawings :: :::- : "; ..:•",.. ..., ::,:•:: •:: :..;:-...,....,;:::;::::;:;:::::::::...:
-: Elevations ": -:::::::::::•:.•::".•::•::::::::::::: •:::::::"-::::::::::::::', :'......:":::::::•.:::::::::':::•••••."•••••••••:::"-::::::::::::::::::::::::"•:::::::::::: :: :
:•-. ••••'...ci/ii:o6wirgi.i: • ....:":1 :::::-: l• -.1.::•:::::.;::::::::::::: : ::::::::::::::::,•-:::.:::: ::::::::::: :•:. " '. • :.::::::::::: •: : ::::-
Structural calculations stamped by:aWashington:•State licensed
engineer may be required if struCtuOt1*r}s'is,t6, be done (2
.!.Laridsesipe. plan •
. .
• : • • . ••:• • :• • • :• • . NOTE: any utilityiorfc.ft::io:ba.;donai:...Submit:0004rotkpri1kperipii.::::::,....i:::::,•;•:::::,.
Completed utility permit application (one for entire
Six• • •-••••• • 1•:••• •:•-•':••••••• • .• . . : . . . . . .. . . .
. .• . • of
NOTE: 'See utility permit nee lice tionand checklist for specific utility •• •••: •
submittal requirements. Completed : building : permit application (one for each structure)
• • .:: •• ::: • • : ••••••••.•"::
Completed building permit applcation
Assessor ACCOUntNUrnbei...;:,
..„
• " •••••••
• •••
•• Two (2) sets ofiplans,:WhiCh:inclu
Building floor plan showing. - ..: ...... .:.. ':. . :: •.:'.......:•::::::::::.::::::::::::::':::::::':•::•::.:
• Entire space ": - :- ....- :•'-.'::•:':::•-•:::::.."
. ': .-':',......' ...'. ....::-.::::.'.,...'....... :..::1:.......:•;:i..:..: ....l:'.:•:::.:, ,.-..:.:
• Dimensions • im 9.....•,;f all aisles .....,.....:.: ........:;:,...; ,..;:., .,...-:-;;..........-•:.:...,-....:::::-;•.,..., i:1..;.:;:......::
Li Tenant space floor plan showing rack .7tora7.....1.:7ye.....0 t„....::::::.....7:,..7s.,..:.:.::...:.:7..........:,..........,..,........:::,::,...:::,
exits.. :. :.•••-::•••••.: -•:.. dimensions -...:::.... ::-.:••::-..: ::. ' (h. .ghi • width and P -.• ..
i njih); •piske:....:.....
NOTE: Include . : •;:•.' • ,.. - . • ::::::•::' • .:: ' :'• ' ''• licensed
. :•• :.
and exit ways on plan. : ::.• •:.::: - • :„ ,..: ii Washington state„.:
Structural calculations stamped by . :. :.,.....i:.:,....:: ....
engineer (rack storage 8' and over).. .
. . : . • : . • . .. -:: .... "•::::.,-,:.•.....:.:::::::..,........,::.:.::•::::.
RESIDENTIAL —
NEW SINGLE-FAMILY DWELLINGS/ADDITIONS :
Narrative describing existing roof, material being removed, and
.. •••••:••••••":-: . • •-•::.••••••-•••••• ••••••••.:•:•:::••:•::•••••••••:, .. • . • .. •• • • • .
- material being installed.
NOTE: A certification i letter is required prior to final inspection and sign-
Off of the
. .
ANTENNA/SATELLITE DISHES
RESIDENTIAL REMODELS -•
F-1 Completed buildinq permit application (one far each structure)
Legal description Assessor•AccoUnt:NUrneer •
• • ...'
• . . ,
Two sets (2) of working 'drawings,
• : • :: • Site plan (on Plap;:• she», closest hydrant
• • • • • • Foundation plan to building, showing
. :• • • Floor.plan
• • Roof
• ,,,, . plan
• Building elevations (all views)
• Building cross-section
• • •• •••••
•
• • Structural framing 'plans
Washington State Energy Code data
• . . • . :
Completed utility permit application
• . -.."
Six (6) sets of site plans showing utilities • ;
••••••'•
I 1
NOTE: Building site plan and utility site plan may be combined. See
for specific submittal ieetilreinents.:
utility permit application and checklist fa, :777
Additional topographical and soils information may be required if unique
site conditions.
Completed for each structure) :
:......:.TW.,....:,O:i.,.:(?),...,..:f:...!.....,.:.:....,;!:Y..:...:::°:, .......................................................................................................................................................................................................
.:::site:glen::::::::..,..:•::::.::::::::::::::::.:::::::i:,,,
:::F°09.••
• ".:Fi.09T::plan i.:::::::::::::::::::::::::::::::"...:::::::::::::',":::::::::'.."0::;-""
":":1E19riiiiPrigi.(46:■:eiiiOti1"44!1"..i30
• Building .:.:"Cipii404t.i.9!(..i!i":;:iin:.•.:
• .::-..;,:.:::::::::::::":;!"•:::::::::,•::"•::::::.:::::,:tiruciiir"a14400:p1P!..:.:::::::::::::".:-..7.'::::::::!.::::,..:::•:::....::: • • ,.....":".::
1:::'":•......)::t'....::;:.1::::',::•:..:::::':::::.:;,::::.,,1.....:,,„:...b;,;rei.'PiOidii.'..0..!itiV...P070(::0,0eif!ff..!:'::::::::
NOTE: If any . utility ,..- 9,.. • , , •-_,: -::.-,...:::::::::.::::::::::::,:•'' ,:.".........,,..,?'"••••••••?..,,,:.:.•••••••• '• ' • . - • •: • • •••:::.:*:...:i.:.:.:•:.
iiiidlg plans .• must 7 7 y..; .; OP.(1PT1!:T.`!:.:::::::::,:::::::.::::::::.......... .,....:::. .. . . .:.:,..,
:::: :•:.' : %: h.. - 14.• :..i.'..0..: ' . . : 0 . ':;;.; ..• o.: ,.....'.:.. f .'..:...: .$
,onp.:..'..............• •e .1•..•.: • ..• : .t•':e,.:,..':..:.:.:, .1.:..:.. :...:. building :...:.:.-...:..::...•::..:.:..:. : :..„ .;..;.M ........ .. ..:.;.'.::.:.!.':.. .:': . :. p..1i.. :. . ...:,;..r.:..::...:.., : ) :.. •. ...:•::.:.. ,.:i..•:.,::.i a ..:„?.i„.....:....:.,p.:,:„.:.....:. l::
:.„i60],
tii.:..„O..,.......,.,n O• r• if...o......;:„r:oeb.:. : h structure)
tructv r 9.
El .,...; ..
- .• "...-:::::".:-..:::::..:...:::::.:..:....:... .
bei*.:::::;'•::::::.::.;.::::H::::::::::::•::,..... . •::::•:::::::::::::::::::::.:::.;;:!.;.::'..,:::... ' '
::•AsSeS..r:.. Account
..:Niii.Tiiti■;■;.1:;1€)bliti.;:iii+iiXII:it...kil.:10.:C:!1‘1..p.:,...11...i.;,,,Ii.l:,....1,.....::::7:!.:.,....•.:,...:::. :::::::::::•.•
,,,,,a;.Er':a.At711Coalet/b:13ca:64:9761:4!.!"9'.7:!..;:::;:::;::::::::;:::.?::::::'::::::,:'::'
i'::::•::::::,:.i.:::::::::-..-:.::::::::„..:.:.:.::. . ::::•:....'•'"':.-•:-.:::::;.)".:..,:".....",":„,.:,.".:i,.iiiEiiiijila.i.iii;:iigiitil/#.0!iFfl:i7&!1.::
off of Pi tt'P:PPif-hil:::::::.•:"::::::"::::::::'::"..:"::::"."::::"."1::::1:::::::::::"...'...::::::::::::::::::::.:::::::::::.:::::.::::.:::: . ..... .. .
c
*khk•kk**•kkk•k* *A•k* •k 4kk. k**** kk• kA• kkk kkA• kkk •k *•kh•kh *khik•A••kkk•k*kkkkkhk
CITY OF TUKWILA, A TRANSMIT
** ****** *****k **. **• kk k****k• kk*• k• hk• k*•k kkk** k*****•kk•k*kk*k•k*k*•k•k•k *•k
TRANSMIT Number: 94000469 Amount: 55,65 04/25/94 11:43
Permit No Type: B- LIUILD BUILDING PEItMIT
Parcel Na: 883650-0010 04/25/94
Site Address: 1035 ANDOVER PK N
Payment Method: CHECK Notation: PS TENT fii AWNING Iriit: DI.M
*kkkk**** * **k** A'A'***** ** -* A** k**• k*************kkk*kh•k***** *k*1 *
Account Code
• 000/322.100
000/345.830
000/386.904
Description
BUILDING •- NONRES
PLAN CHECK - NONRES
STAVE BUILDING SURCHARGE
Total (This Payment):
Total Fees:
Total All Payments:
Balance:
55.65
55.65
.00
P a i d
31.00
20.15
4.50
55.65
GENERA
GENERA
GENERA
TOTAL
CHECK(
CHANGE
1310A000
31.00
20.15
4.50
55,65
55.65
0.00
21 :14
CITY OF TUKWILA
Address: 1035 ANDOVER•PK W
Suite:
Tenant: I.P. T. N.
Type: B- BUILD
Parcel #:.883650 -0010
Permit No: 894 -0165
Status: ISSUED
Applied: 04/25/1994
Issued: 05/04/1994
* ***** k*********** ****•k **** **•k *** * * ** *** * * *** *• ****•h*•*** ***•k *•k *'k•* *k'k * ** k**
• Permit Conditions:
1 . No' changes will be made cK:is ess. approved by the
the..Tukwila Building•,4D }.iv s -tan':
. All permits, inspeck_Yon rec,or.ds, and , approved ;p.l,ans shall .be
maintained av ,,Ititbfle at} t:he4 job site prior ^•to the 'i art of
any'.,constru. -la 4Thes`e documents are, to j Fe 'mainta;in d�
available un ;l1 f,;inal=:� nspection approvalt'isi gra.nted:�,°a,.oi�,.
. 'All - constt,u'ct 1 o to be done ,;,i-n� conformance wi Gh approVO,d `
plans, an ''3 requ4il'e.ments of the vUni form Bui'l'd ng O'udf"`'`''(19`91
Editio ; ''Sas a`m'ended b it' Wasp ;i gt "o n State.'' `,
��,�, F. y 4� , „o B'u, i 1 c��i n�g { C o d e.;,� ��
'Un'ifor rl'. Mt�,echanica1 Code (1�� 9'1 Edition) , and Was'hin'gton °` State
$Y
+d t v il, i
Energ- ,'.,Cod ,(1'9914Second :,E i'•t i on r. $ ti' j�
4 V 1 i i' o..�f 4. y,
d,� y '�,,,,. P e r m ,i 't : T h'.a` • i s s �i rl c e o f a permit a r a -p p r* v v.a31 � o i�\
pl'ani sp,,eclf-i cat ions - -'and computations shall not bey ca,r�f;f;r
strUe tp be` a,permit- ,6for-,.....o 'ion approve of, any v to 1 a tlfrap I "'
of #0 oft4,.the tirov i s:i:ons.�,of thi s code, o'ff %-oaf zany other {-
ordslinance of the Xri s'ti'i_ctlot Wermi t presuming to give
authority or violate or.� ca d 1 the provi`s1orrs of this:' code
s h a, ii, �r be z,,,v l i d �, • ;,. _... , w - \ l{ '' -; ,.. fi
ai r ttt 5JNt,,� { l is 4u. ?7.4:i:m
! n.Yt V piJ 1�'{ ' ( : f Yi�>' 1, iJ� '
Q?
INSPECTION NO.
o INSPECTION RECORD
Retain a copy with permit
CITY OF TUKWILA BUILDING DIVISION
6300 Southcenter Blvd., #100, Tukwila, WA 98188
(206) 431-3670
Project.
PrA/
Type ofln .pection: A so ryji
_. –1111Pr
•isre
ie_k/ E
Date a e.:
1
94
Special Instructions:
--Alt4
lb• ■ V
rt. ttA El.
vtisk
ft,t4 -
-4 -14* *AI.'
, xtrk, al • A
Date Wanted:
7/'
/
'kt-----.-0
Requester: /
Phone No.:
--49--w-
.2/qi
KApproved per applicable codes.
__,.....
COMMENTS:
OL4o
Corrections required prior to approval.
0 $30.00 REINSPECTION FEE REQUIRED. Prior to reinspection, fee must be paid at
6300 Southcenter Blvd., Suite 100. Call to schedule reinspection.
Receipt No.:
Date:
mete
•.i
INSPECTION RECORD
Retain a copy with permit
CITY OF TUKWILA BUILDING DIVISION
6300 Southcenter Blvd., #100, Tukwila, WA 98188("
0) 10.5
PERMET NO .
(206) 431 -3670
Project: _ p—r A`
Type of Inspection: E j n cL i
Date Called: ['- l' 1 „ 9 (.4
II
Address; 1o3s P\ndwy PKl `
f1 Y �" 1
Special Instructions:
�' �.i 2 C� PS��
n
Q`Wr)1 Y\
`-J
Date Wanted: ' (_ (^ _ 9 (f 1 +nu
�V "I �] am. .m.
Requester: 3-earl C-h't Man
Phone No.: loc Q .,. ,Q t(1
❑ Approved per applicable codes.
Corrections required prior to approval.
COMMENTS: •
fLg,A__A c_trAlk
da:)Qx.. 0..A tor
❑ $30.00 REINSPECTION FEE REQUIRED. Prior to reinspection, fee must be paid at
6300 Southcenter Blvd., Suite 100. Call to schedule reinspection.
CITY OF TUKWILA
6300 SOUTHCENTER BOULEVARD
TUKWILA, WA 98188
* * REVISION SUBMITTAL
DATE // � � / !
RECEIVED
CITY OF TUKWILA
NOV 8 1994
PERMIT CENTER
PROJECT NAME 7 >V J°ve'%rri /% ' - s' % — Cs—
ADDRESS /0\_3S— /524//5--.7c7
CONTACT PERSON K-'%a //T/ i// PHONE .Z..2
ARCHITECT OR ENGINEER
PLAN CHECK/PERMIT NUMBER fe % — 0/6S--
C
TYPE OF REVISION: ,/-7-7,9c-/c/h-7,'.--A, r ,C7 -j _ f f
SHEET NUMBER(S)
"Cloud" or highlight all areas of revisions and date revisions.
SUBMPI"I ED TO: 0
V, o tit O t <i - - Ve.,EAcLa <'At-L *WA
-10 Ni;'cc. -tie cei to izaitrvo &Au . t,c.6ht,(1.- -L.
� 2 cb4
iitykrecfri,c5i,4 p il- i e,44412-47e›
,i0'0f
l
DEAR DUANE GRIFFIN,
THIS IS IN RESPONSE TO OUR CONVERSTATION AT THE TUKWILA BLDG. DEPT.,
THURS. AFTERNOON, 3:30 NOV. 3RD. IT WAS BROUGHT TO LIGHT THAT PERMIT
#894-0185 WAS COMPLETED AND INSALLED, BUT THAT NO INSPECTION HAD BEEN
CALLED FOR AS WE NEEDED TO SUBMIT A REVISION FOR ATTACH. DET.'S.
IT WAS AGREED THAT I HAD NOT DONE THIS IN A TIMELY MANNER, BUT IN THIS
CASE I WAS AT THE VERY LEAST TRYING TO USE THE PROPER PROCEDURE FOR THE
RIGHT REASONS. UPON THIS IT WAS DECIDED TO KEEP THIS PERMIT ALIVE AND I
HAVE ALONG WITH THIS LETTER BROUGHT THE LONG AWAITED ATTACHMENT
REVISIONS. I WILL CALL FOR INSPECTION WITHOUT HESITATION UPON THE O.K. OF
OUR SUBMITTED REVISION. I APPRECIATE YOUR RECOGNITION OF THE SCOPE OF
THIS JOB AND THE SPIRIT IN WHICH IT WAS DONE.
RESPECTFULLY,
SEAN CHIPMAN
P.S.T.A.
822-8219
FAX 822-1396
RECEIVED
CITY OF TUKWILA
NOV 8t994
PERMIT CENTER
v.
10 -27 -94
P.S.T.A
(206) 622 -8219
FAX (206) 622 -1396
ka't�1N•.xnxrv+
Dear Duane Griffin,
In response to the letter asking for inspection request or extension request, for permit /1 B94 -0165,
Puget Sound Tent & Awning Co. request a written extension. Our need is based on the fact that the
method used to attach this awning vories from what was specified on the permit drawing.
The extension would allow us the time needed to submit a rivision to the City of Tukwila and for
the City to approve the revision.
Respectfully,
Sean Chipman
P.S.T.A
620 S INDUSTRIAL WY
SEATTLE WA. 98108
3�i
City of Tukwila
Sep 06, 1994
John W Rants, Mayor
Department of Community Development Rick Beeler, Director
SEAN CHIPMAN
620 S INDUSTRIAL WY
SEATTLE, WA
98108
RE: I.P.T.N.
Dear Permit Holder:
Our records indicate that on Oct 31, 1994, one hundred and eighty days will
have passed with no inspections having been called for under Tukwila
Building Permit Number B94 -0165. Unless you call for an inspection,
or obtain a written extension from the Tukwila Building Official prior to
that date, your above referenced permit will become null and void on
Oct 31, 1994.
If your project has been completed please call for final. If you are
actively working on it please notify our office.
If you have any questions or need further information to obtain an
extension on your permit, please call the Tukwila Building Divison at
431 -3670.
Sincerely,
She ie Bates /Sylv sby
Perm t Technicians
Department of Community Development
6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • (206) 431-3670 • Fax (206) 431-3665
labor and industries
puget sound tent and awning company
-
. ,l
•
841IN
SOUTH ELEV.
1/4' =1' -0•
BUILDING LINE
r
PROFILE VIEW
1/4'•1' -O'
UPPER SANCHION DET.
PLAN VIEW
N
mimic PATH
SOTTO; 1tgR OFS. AWNING
SQ• T.
*14 TEK SCREWS 2 OF
2'X2'X3/16'X6 -3/4'
3 /8'X3'LSG BOLT 2 OF t 3' O.C.
�- MAINFRAME 1'S0. T.S.
FILE COPY
STRUCTURAL HEADER /BEAM
•
21X21(3/16'X6 -3/4' -•—�
WELDED SOLID INTO BACK
BOTTOM BAR Of AWNING
2•x2' STANCHION
WOOD STRUCTURAL COLUMN
t•
•
S/LL CA..n. „•
_pla-:z C:_3 not cut ortdi 11N violation ci t ./
adoptad codo or adorn. IMoolpt of contractor's
copy cf cppr+ojS pi nra sol iSudpt
8U1 INO DIVISION
NOTE= THERE ARE NO GRAPHICS
1035 ANDO
...
•
, ,� _
ts