Loading...
HomeMy WebLinkAboutRes 0689 - 1980-1985 Comprehensive Transportation Program RESOLUTION NO 689 A RESOLUTION ADOPTING A REVISED AND EXTENDED COMPREHENSIVE TRANSPORTATION PROGRAM IN ACCORDANCE WITH R.C.W. 35.77 AND R.C.W. 36.81. WHEREAS, the City of Tukwila has previously adopted a Comprehensive Transportation Program pursuant to R.C.W. 35.77 and R.C.W. 36.81, and WHEREAS, the City is required annually to review the work accomplished under said Program and to determine current City street needs, and WHEREAS, a public hearing was held on the Comprehensive Transportation Program on Monday, July 2, 1979, at 7:00 P.M. in the Tukwila City Hall before the Tukwila City Council. NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON DO ORDAIN AS FOLLOWS: Section 1. Pursuant to R.C.W. 35.77 and R.C.W. 36.81 and the public hearing on July 2, 1979, the attached documents, incor- porated herein by reference as Exhibit A, are declared and adopted as the Revised Six Year Transportation Improvement Program for the City of Tukwila. Section 2. This Resolution and Exhibit shall be filed with the Director of Transportation of the State of Washington no later than July 30, 1979 after its adoption as required by R.C.W. 35.77 and R.C.W. 37.81. Section 3. This Resolution and Exhibit shall be submitted to the Urban Arterial Board as required by R.C.W. 35.77. Section 4. This Resolution and Exhibit shall be submitted to the Puget Sound Council of Governments as the designated Metropolitan Planning Organization pursuant to the FHWA Federal -aid Highway Program Manual Vol. 4, Chapter 4, Section 6. PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON at a regular meeting thereof this 1979. City /County Tukwila /Kina City No. 1320 County No. 17 PROJECT IDENTIFICATION a Total o OBLIGATION SCHEDULE FUNDING SOURCE TOTAL z Title, Route, Rood Log No., Section No., V Length o. YEAR FEDERAL FUNDS Location /Termini, Doscrlption of Work, o o Code 7,- n r Beginning Milepost a Bridge No. (Mlle e) Ist 2nd 3rd 4 5 g UAB LOCAL ANNUAL ELEMENT AMOUNT PROGRAM (PLEASE DOUBLE SPACE BETWEEN PROJECTS) 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 _j Southcenter Blvd. 62nd Avenue So. to SR 181 2 A,B,D, 0.53 S U X 1,028.0 852.6 FAUS 175.4 1,028.0 Grading, drainage, illumination, paving, sidewalks F,G,H, J,K 2 Grade Way Bridge Preliminary engineering, surveying, construction 3 Grady Way Realignment from west end of Bridge to SR 181 SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 19 80 to 19 35 OBLIGATION PROGRAM Interconnect traffic signals on Southcenter Parkway from I -5 off ramp to Strander Blvd. (3 signals one City and two State.) Listed twice to designate potential for FAUS LAB funds. 2/3 cost sltrpd with W S.fl_n_T DISTRIBUTION I COPY DISTRICT STATE AID ENGINEER PROJECT COSTS IN THOUSANDS OF DOLLARS 1 L 0.3 M U X 304 3,700 3,203.2 BRM 1 A,B,D,F 0.4 M U 115 1,150 G,H,I,J K,M,N,0 115 1,150 1,012.0 FAUS Hearing Date Jul y 2, 1979 Adoption Dote Jul v 2 1Q7Q Resolution Number Res_ #FRB 800.8 4,004 253.0 1,265 1,138.5 126.5 1,265 4 59th Avenue South So. 147th St. to 58th Avenue So. 4 A,B,D, 0.4 A U X 423.7 423.7 423.7 and South 142nd St. F,G,J Lighting, grading, paving, sidewalk, curb gutter 5` Southcenter Parkway I -5 off ramp to Strander Blvd. 6 I S U 50 50 6 Intersection Southcenter Parkway So. 180th Street 6 I S U 30 30 30 Signal modification channelization Intersection Strander Blvd. and Andover Park West 6 I S U 35 35 35 Increase street to five lanes and provide left turn signalization to both north and south legs City /County Tukwila /King City No. 1320 County No. 3 S1X YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1980 to 19 85 OBLIGATION PROGRAM PROJECT IDENTIFICATION o Total 2 OBLIGATION SCHEDULE FUNDING SOURCE TOTy z Title Route, Road Lo No, Section No. 3 Work o„ Length m YFAR th FEDERAL e Location /Termini, Description of Work, 0. Cod a o FUI\ Beginning Milepost a Bridge No. (Miles) w v °a 1st 2nd 3rd 4, 5 E'<.6th UAB LOCAL (PLEASE DOUBLE SPACE BETWEEN PROJECTS) (ELEMENT AMOUNT PROGRAM 2 3 4 5 6 7 8 9 10 II 12 13 14 15 16 17 Hearing Date July 2_ 1g7Q Adoption Dale July 2, 1979 Resolution Number Res. #689 PROJECT COSTS IN THOUSANDS OF DOLLARS 8 Andover Park West Tukwila Parkway to Strander Blvd. 4 C,F,G, 0.4 A U X 60 60 60 Planing, curbs, overlay, sidewalk, channelization H,J,K (in conjunction with intersection modification) 9z Tukwila Parkway and I -405 On Ramp 6 H,I,K 92 Provide right turn lane on east leg. restripe pave- S U ment, relocate light poles, provide ramp metering and signalization (W.S.D.O.T. project) 91 Tukwila Parkway Andover Park East to Andover Park 6 H,K 0.2 S U 2 West Channelization and restripe pavement 9c. Intersection Tukwila Parkway and Andover Park West 6 I S U 55 New installation for signalization 10 Southcenter Parkway At entrance to 17520 Southcenter 6 I S U 55 *r Parkway (Parkway Plaza Building) New installation for signalization 11 Intersection So. 180th St. and Andover Park East 6 I S U 45 10 New installation for signalization 12 Intersection Strander Blvd. and Andover Park East 6 I S U 30 Increase street to five lanes and provide left turn signalization to both north and south legs Listed twice to designate potential for FAUS UAB funds. Funded by developer. DISTRIBUTION 92 92 2 2 55 55 55 55 55 30 30 City County Tukwila /King City No. 1320 County No. 1 7 SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM (9, to (9 OBLIGATION PROGRAM Hearing Dote July 2_ 1Q7Q Adoption Date July 2, 1979 Resolutlon Number RP Rq PROJECT COSTS IN THOUSANDS OF DOLLARS o PROJECT IDENTIFICATION o Total c 8 OBLIGATION SCHEDULE z Title, Route, Road Lo No., Section No., U3 Work _`oN 2 Length o o m YEAR Location /Termini, Description of Work, 0,-- Code co a Beginning Milepost a Bridge No. o (Noes) oa 1st 2nd 3rd 4, 5 8.6th (PLEASE DOUBLE SPACE BETWEEN PROJECTS) a 1 ANNUAL ELEMENT 2 Local improvement district /developer agreement imprcvemc,nt. D1r3Tr mUTION FUNDING SOURCE FEDERAL AMOUNT PROGRAM UAB LOCAL TOT, FUN[ 3 4 5 6 7 8 9 10 II 12 13 14 15 16 17 13t Tukwila Parkway at the "S" Line Bridge (61st Ave. So.) 6 I S U 10 10 10 Signal modification and channelization 13I> Southcenter Blvd. at the "S" Line Bridge 6 I S U 7 7 7 Pedestrian signal modification and signal modifica- tion and pole relocations 14 Intersection SR, 181 and Grady Way 6 I '11 U 7 7 7 Signal modification and rechannelization (W.S.D.O.T. project). 15 South 166th Street 54th Avenue So. to North of 53rd 4 A,B,D, 0.1 A U X 80.0 80.0 80. Ave. So. F,G, Grading, drainage, paving, curbs, gutters, sidewalks ,o South 164th Street 51st Ave. So. to terminus 4 A,B,D, 0.1 A U X 92.4 92.1 92. Grading, drainage, paving, curbs, gutters, sidewalks F,G 17 South 163rd Place 51st Avenue S. easterly to terminus 4 A,B,D, 0.1 A U X 80.0 80.0 80. Grading, drainage, paving, curbs gutters, sidewalks F,G �r 181 South 152nd Street Macadam Road to 700' east of 2 A,B,D, 0.3 A U X 517.0* 517.C' 517. 57th Avenue South* F,J Grading, drainage, illumination, sanitary sewer, paving, sidewalks (LID 28) City County City No. County No. d x E O Tukwila /King OBLIGATION PROGRAM 1320 17 SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM I9 to 19 fl PROJECT IDENTIFICATION Title, Route, Road Log No., Section No., Location /Termini, Description of Work, Beginning Milepost a Bridge No. (PLEASE DOUBLE SPACE BETWEEN PROJECTS) 19 58th Avenue South Southerly terminus, south 500' 2 A,B,D, 0.1 A U X 75.0* New street. (Potential LID) F,J 2 18L 57th Avenue South So. 152nd St. to 350' south Grading, drainage, illumination, paving, sidewalks (LID 28) 20 53rd Avenue South Southcenter Blvd. to southern terminus Grading, drainage, illumination, paving, sidewalks (Potential LID) 21 Southcenter Parkway (57th Ave. So.) So. 180th St. to 2 A,B,D, 0.81 S U X south City limits (potential joint project with King F,G,H. County to improve 57th Ave. So. to approx. So. 200th St.) J,K Grading, drainage, lighting, curbs, gutters, sidewalks, paving Southcenter Parkway 22 South 178th Street Southcenter Parkway to City limits (potential joint project with King County improving So. 176th St. from City limits to Hwy. 99) Right -of -way, grading, drainage, curbs, gutters, sidewalks, paving, lighting u, v Work o Code 6 Local improvement district /developer agreement imp•ovement. Listed twice to designate potential for FAUS UAB funds. DISTRIDUTION 3 4 5 6 7 8 4 A,B,D, 0.1 A U X 78.0* F,J 4 B,D,F, 0.1 A U 80.0* G,J II 2 A,B,D, 0.40 C U F,G,H, J,K C X Total .0 ,q Length vg m co o ti 0 a (Mlles) te IS 2nd 3rd 4, 5 &.6th ANNUAL ELEMENT OBLIGATION SCHEDULE 9 10 11 1,200 1,200* 600.0 YEAR South 178th Street Southcenter Parkway II 600.0Y PROJECT COSTS IN THOUSANDS OF DOLLARS 12 13 14 995.6 FAUS 497.8 FAUS Hearing Dote J l v 2___1070 Adoption Dote July 2, 1979 Resolution NumberRes. #689 FUNDING SOURCE FEDERAL AMOUNT PROGRAM LOCAL 15 16 UAB 102.2 600 TOT)) FUN[ 540.0 60.0 600 17_ 78.0 78.0 75.0 75.0 80.0 80.0 204.4 1,200. 1,080.0 120.0 1.,200. SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 198o to 19 85 Tukwila /King OBLIGATION PROGRAM Hearing Dote July 2. 197Q 1320 Adoption Date July 2. 1Q7Q Resoiution Numbe rRes #689 PROJECT COSTS IN THOUSANDS OF DOLLARS PROJECT IDENTIFICATION o Total g OBLIGATION SCHEDULE FUNDING SOURCE IOTA z Title Q o. Route Road Lo N Sectlon No. 3 Work o N D m YEAR Location /Termini, Description of Work, o Length 132 o Code ;o o o� FEDERAL Ist 2nd 3rd 4,5a.6th UAB LOCAL FUNC Beginning Milepost Et Bridge No. (Mlles) w a ANNUALI AMOUNT PROGRAM (PLEASE DOUBLE SPACE BETWEEN PROJECTS) ELEMENT/ i 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 23 Intersection So. 180th St. and Andover Park West 6 I S U 10 10 10 Signal modification to 6 -phase system 2LP 56th Place South So. 141st to So. 139th Street 4 ,B,D, 0.2 A U X 158.9 153.9 158 Lighting, curb, gutter, drainage, sidewalk, paving F,G,J 241 56th Avenue South So. 141st to So. 139th Street 4 ■,B,D, 0.2 A U X 158.9 1 158.9 158. Lighting, curb gutter, drainage, sidewalk, paving 25 57th Avenue Soutb So. 141st St. to So. 147th St. 4 4,B,C, 0.2 A U X 347.4 347.4 347. Curb gutter, drainage, sidewalk, paving 7,G 26 South 160th Street 51st Ave. So. to 53rd Ave. So. 4 A,B,D, 0.2 A U X 158.4 158.4 158. Grading, drainage, paving, curbs,& gutters, sidewalks =,G 54th Avenue South Slade Way So. 166th St. 4 a,B,D, 0.2 A U X 158.4 158.4 158• Grading, drainage, paving, curbs gutters, sidewalks -,G 28 Southcenter Blvd. 65th Avenue So. over I -405 9 L 0.2 A U X 200 165.9 FAUS 34.1 200 Pedestrian bridge Southcenter Blvd. 65th Ave. So. over I -405 200 180 20.0 200 29 Foster Golf Links Bridge 1 L A U 150 120.0 BRM 30.0 150 Preliminary engineering, construction City County City No. County No. 17 Listed twice to designate potential for FAUS UAB Funds. omTrnr-A i City County Tukwila /King City No. 1320 County No. 1 SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM I9 Rn to 19. OBLIGATION PROGRAM Macadam Road Southcenter Blvd. to So. 144th St. 1,350.0 31 Southcenter Blvd. (So. 154th St.) 53rd Ave. So. to 2 A,B,D, 0.2 C U 300.0 west City limits (potential joint project with King F,G,H, County to improve So. 154th St. to Hwy. 99) J,K Grading, drainage, lighting, paving, sidewalks Southcenter Blvd. 53rd Ave. So. to west City limits 300.0-' intersection Tukwila Parkway and Andover Park East 6 1 S U 55 New installation for signalization 33 South 141st Street 56th Ave. So. to 57th Ave. So. 4 A,B,D, 0.1 A U X 96.5 Grading, drainage, paving, sidewalk F,G 34 South 142nd Street 58th Ave. So. to 57th Ave. So. 4 A,B,D, 0.1 A U X 96.5 Grading, paving, sidewalk, curb, gutter, drainage F,G 35 South 144th Street 58th Ave. So. to eastern terminus 4 A,B,D, 0.1 A U X 96.5 Grading, paving, sidewalk, curb gutter, drainage F,G Listed twice to designate potential for FAUS and UAB funling. DISTRIBUTION Hearing Dale July 2. 1g7A Adoption Dote July 2, 1979 Resolution Numbs rRes. #689 PROJECT COSTS IN THOUSANDS OF DOLLARS PROJECT IDENTIFICATION o Total c OBLIGATION SCHEDULE FUNDING SOURCE IOTA z Title Route, Road Log No. Section No, 0 3 W or k m YEAR Location /Termini, Descriptiori of Work, o Code Length cU o r FEDERAL FUNC Beginning Milepost 61 Bridge No. o (Milos) a �n. Ist 2nd 3rd 4, 5 OE 6th UAB LOCAL r AMOUNT PROGRAM (PLEASE DOUBLE SPACE BETWEEN PROJECTS) ELEMENT ij 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17. i 30 Macadam Road Southcenter Blvd. to So. 144th St. 2 A,B,D, 0.85 C U X 1,350.0 1,120.1 FAUS 229.9 1,350.( Lighting, grading, paving, sidewalks, curbs gutters F,G,H, J,K 248.9 FAUS 51.1 300.( 1,215.0 135.0 1,350.( 270.0 30.0 300.( 5 5 55 96.5 96.! 96.5 96.! 96.5 96.! Tukwil 1(il /County No, ��1 Six YEAR TRAM OBLIGAT P s OpLiGA�IO d 4,5 &.6ih M UNI n x 0 'TOtOt O N m y Length u ROJ CT COSH YEAR 3r T�2nd Jrit y NO. o Work 1... 13 �3 d 12 Code U f ANNUA ATIO N°•, (Mi10g1 U a \�lEMer+ T1FiG 10 ROJ�G Road Lod Non of (Work, 6 7 g y— 9 138.6 O Title,, Route, Road Description N GTSI 1 L Beginning Milepost 6, f ge tl J r o X _04 gpAGE BE i A u 4 DOU6L i 0.2 1 158• `pL�AgE 'rte` F ,G to So. 168th St' South So. 166th St. urbs, &gutters, sidewal; 0. 2 A 4 A�g,D, 327. Avenue Sou paving F X 53rd drainage' P to So. 160th St, si dewalk= U 36 Grading ut ters, 0 3 A Ave. So cur 9 A,g Way 54th pa ving St. 4 F,G,3 ,7 Slade drainage' St. to So. 140th paving I 125.9 Grading, So 144th sidewalk, P cub r north of So. 141st in 0 1 A D X 55th Avenue gutter 1 33 Lighting, .O.W. requi areal 4 A,B�D 1250 h i_ 0.1 A U X South curb g for total A, 1 105.9 39 Lighting requir areal 4 Seattle city Light franchise 56th Place So. F,G u X to paving 0.2 A t Ave. 4 1 1 8,0, 160 1 139th Street u h er drainage, s S gu tter, to So. 137th St'• U X t0 Lighting, curb g paving 0 4 S So. 139th St. sidewalk P 4 O,F.G Avenue South utter, drainage, i 2p0 41 56th curb g S Lighting park West t° 0 1 A 111 X I Andover der F31vd' lks, widening 4 A,B�F, 42 Stran rlay, sidewalks K parkway cur bs, eve to 600' S °ut side- G, Planin9� Tukwila Parkw bs gutter, anad ht.�ng� 1 1. aF DOLLA= IN TNOU Adoption Resolution Number FUNOtNG gOURG °GA 1.1A FEDER PROGRAM i f 16 1'I 138.6 138.6 1 153.4 158.4 327.3 327. 1 1'0 11 ZUNI 125.9 125. 53.0 105.9 105. n u 5�•v 1 160 ,2C Oily County Tukwila /King City No. 1320 County No. SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM I9 so to I V R5 OBLIGATION PROGRAM PROJECT IDENTIFICATION o o Total g OBLIGATION SCHEDULE FUNDING SOURCE Tit Ro Road Lo No., Section No u 3 Work o m YEAR TOTA e Locution /Termini Descn lion of Work, Length r FEDERAL FUNC p 1 O w Code c o Beginning Milepost 8 Bridge No. (Mlles) h- v 4 n ISt 2nd 3rd 4,58.6 t1A8 LOCAL (PLEASE DOUBLE SPACE BETWEEN PROJECTS) ELEMENT AMOUNT PROGRAM L- 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 45 53rd Avenue South So. 160th St. to northern terminus 4 A,B,D. 0.1 A U Grading, drainage, paving, lighting, curbs, gutter sidewalks Hearing Date July 2 1Q7Q Adoption Dote July 2. 1979 Resolution NurnberRes. #689 PROJECT COSTS IN THOUSANDS OF DOLLARS 44 Andover'Park East Tukwila Parkway to Strander Blvd. 4 C,F,G 0.4 S U 60 60 60 Planing, curbs, overlay (in conjunction with intersection modification) 100.0 100.0 100.0 7 46 Andover Park East Tukwila Parkway to So. 180th St. 4 C,F,G 1.1 S U X 385 385 385 Planing, curbs, overlay, sidewalk, channelization 47 Southcenter Parkway Strander Blvd. to So. 180th St. 4 C,F 1.1 S U X 385 385 385 Curbs, planing, overlay A" Interurban Avenue South at SR 599 off ramp 6 I M U 60 60 60 New installation for signaiization 49 56th Avenue Bridge over Green River 1 L 0.1 A U 1,000 800.0 BRM 200.01,000 (portion is King County's jurisdiction) Preliminary engineering, surveying, construction 50 Baker Blvd. Andover Park West to Christensen Road 4 C,F,G 0.3 A U X Planing, curbs, overlay, sidewalk tW TT?WUTlON 45 45 45