HomeMy WebLinkAboutRes 0689 - 1980-1985 Comprehensive Transportation Program
RESOLUTION NO 689
A RESOLUTION ADOPTING A REVISED AND EXTENDED COMPREHENSIVE
TRANSPORTATION PROGRAM IN ACCORDANCE WITH R.C.W. 35.77 AND
R.C.W. 36.81.
WHEREAS, the City of Tukwila has previously adopted a Comprehensive
Transportation Program pursuant to R.C.W. 35.77 and R.C.W. 36.81, and
WHEREAS, the City is required annually to review the work accomplished
under said Program and to determine current City street needs, and
WHEREAS, a public hearing was held on the Comprehensive Transportation
Program on Monday, July 2, 1979, at 7:00 P.M. in the Tukwila City Hall before
the Tukwila City Council.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON
DO ORDAIN AS FOLLOWS:
Section 1. Pursuant to R.C.W. 35.77 and R.C.W. 36.81 and the
public hearing on July 2, 1979, the attached documents, incor-
porated herein by reference as Exhibit A, are declared and adopted
as the Revised Six Year Transportation Improvement Program for
the City of Tukwila.
Section 2. This Resolution and Exhibit shall be filed with the
Director of Transportation of the State of Washington no later
than July 30, 1979 after its adoption as required by R.C.W. 35.77
and R.C.W. 37.81.
Section 3. This Resolution and Exhibit shall be submitted to the
Urban Arterial Board as required by R.C.W. 35.77.
Section 4. This Resolution and Exhibit shall be submitted to the
Puget Sound Council of Governments as the designated Metropolitan
Planning Organization pursuant to the FHWA Federal -aid Highway
Program Manual Vol. 4, Chapter 4, Section 6.
PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON
at a regular meeting thereof this 1979.
City /County Tukwila /Kina
City No. 1320
County No. 17
PROJECT IDENTIFICATION a Total o OBLIGATION SCHEDULE FUNDING SOURCE
TOTAL
z Title, Route, Rood Log No., Section No., V Length o. YEAR FEDERAL FUNDS Location /Termini, Doscrlption of Work, o o Code 7,- n r
Beginning Milepost a Bridge No. (Mlle e) Ist 2nd 3rd 4 5 g UAB LOCAL
ANNUAL
ELEMENT AMOUNT PROGRAM
(PLEASE DOUBLE SPACE BETWEEN PROJECTS)
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
_j Southcenter Blvd. 62nd Avenue So. to SR 181 2 A,B,D, 0.53 S U X 1,028.0 852.6 FAUS 175.4 1,028.0
Grading, drainage, illumination, paving, sidewalks F,G,H,
J,K
2 Grade Way Bridge
Preliminary engineering, surveying, construction
3 Grady Way
Realignment from west end of Bridge to SR 181
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 19 80 to 19 35
OBLIGATION PROGRAM
Interconnect traffic signals on Southcenter Parkway
from I -5 off ramp to Strander Blvd. (3 signals
one City and two State.)
Listed twice to designate potential for FAUS LAB funds.
2/3 cost sltrpd with W S.fl_n_T
DISTRIBUTION
I COPY DISTRICT STATE AID ENGINEER
PROJECT COSTS IN THOUSANDS OF DOLLARS
1 L 0.3 M U X 304 3,700 3,203.2 BRM
1 A,B,D,F 0.4 M U 115 1,150
G,H,I,J
K,M,N,0
115 1,150
1,012.0 FAUS
Hearing Date Jul y 2, 1979
Adoption Dote Jul v 2 1Q7Q
Resolution Number Res_ #FRB
800.8 4,004
253.0 1,265
1,138.5 126.5 1,265
4 59th Avenue South So. 147th St. to 58th Avenue So. 4 A,B,D, 0.4 A U X 423.7 423.7 423.7
and South 142nd St. F,G,J
Lighting, grading, paving, sidewalk, curb gutter
5` Southcenter Parkway I -5 off ramp to Strander Blvd. 6 I S U 50 50
6 Intersection Southcenter Parkway So. 180th Street 6 I S U 30 30 30
Signal modification channelization
Intersection Strander Blvd. and Andover Park West 6 I S U 35 35 35
Increase street to five lanes and provide left
turn signalization to both north and south legs
City /County Tukwila /King
City No. 1320
County No. 3
S1X YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1980 to 19 85
OBLIGATION PROGRAM
PROJECT IDENTIFICATION o Total 2 OBLIGATION SCHEDULE FUNDING SOURCE TOTy
z Title Route, Road Lo No, Section No. 3 Work o„
Length m YFAR
th FEDERAL
e Location /Termini, Description of Work, 0. Cod a o FUI\
Beginning Milepost a Bridge No. (Miles) w v °a 1st 2nd 3rd 4, 5 E'<.6th UAB LOCAL
(PLEASE DOUBLE SPACE BETWEEN PROJECTS) (ELEMENT
AMOUNT PROGRAM
2 3 4 5 6 7 8 9 10 II 12 13 14 15 16 17
Hearing Date July 2_ 1g7Q
Adoption Dale July 2, 1979
Resolution Number Res. #689
PROJECT COSTS IN THOUSANDS OF DOLLARS
8 Andover Park West Tukwila Parkway to Strander Blvd. 4 C,F,G, 0.4 A U X 60 60 60
Planing, curbs, overlay, sidewalk, channelization H,J,K
(in conjunction with intersection modification)
9z Tukwila Parkway and I -405 On Ramp 6 H,I,K 92
Provide right turn lane on east leg. restripe pave- S U
ment, relocate light poles, provide ramp metering
and signalization (W.S.D.O.T. project)
91 Tukwila Parkway Andover Park East to Andover Park 6 H,K 0.2 S U 2
West
Channelization and restripe pavement
9c. Intersection Tukwila Parkway and Andover Park West 6 I S U 55
New installation for signalization
10 Southcenter Parkway At entrance to 17520 Southcenter 6 I S U 55 *r
Parkway (Parkway Plaza Building)
New installation for signalization
11 Intersection So. 180th St. and Andover Park East 6 I S U 45 10
New installation for signalization
12 Intersection Strander Blvd. and Andover Park East 6 I S U 30
Increase street to five lanes and provide left
turn signalization to both north and south legs
Listed twice to designate potential for FAUS UAB funds.
Funded by developer.
DISTRIBUTION
92 92
2 2
55 55
55
55 55
30 30
City County Tukwila /King
City No. 1320
County No. 1 7
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM (9, to (9
OBLIGATION PROGRAM Hearing Dote July 2_ 1Q7Q
Adoption Date July 2, 1979
Resolutlon Number RP Rq
PROJECT COSTS IN THOUSANDS OF DOLLARS
o PROJECT IDENTIFICATION o Total c 8 OBLIGATION SCHEDULE
z Title, Route, Road Lo No., Section No., U3 Work _`oN 2
Length o o m YEAR
Location /Termini, Description of Work,
0,-- Code co a
Beginning Milepost a Bridge No. o (Noes) oa 1st 2nd 3rd 4, 5 8.6th
(PLEASE DOUBLE SPACE BETWEEN PROJECTS) a 1 ANNUAL
ELEMENT
2
Local improvement district /developer agreement imprcvemc,nt.
D1r3Tr mUTION
FUNDING SOURCE
FEDERAL
AMOUNT PROGRAM
UAB LOCAL
TOT,
FUN[
3 4 5 6 7 8 9 10 II 12 13 14 15 16 17
13t Tukwila Parkway at the "S" Line Bridge (61st Ave. So.) 6 I S U 10 10 10
Signal modification and channelization
13I> Southcenter Blvd. at the "S" Line Bridge 6 I S U 7 7 7
Pedestrian signal modification and signal modifica-
tion and pole relocations
14 Intersection SR, 181 and Grady Way 6 I '11 U 7 7 7
Signal modification and rechannelization (W.S.D.O.T.
project).
15 South 166th Street 54th Avenue So. to North of 53rd 4 A,B,D, 0.1 A U X 80.0 80.0 80.
Ave. So. F,G,
Grading, drainage, paving, curbs, gutters, sidewalks
,o South 164th Street 51st Ave. So. to terminus 4 A,B,D, 0.1 A U X 92.4 92.1 92.
Grading, drainage, paving, curbs, gutters, sidewalks F,G
17 South 163rd Place 51st Avenue S. easterly to terminus 4 A,B,D, 0.1 A U X 80.0 80.0 80.
Grading, drainage, paving, curbs gutters, sidewalks F,G
�r
181 South 152nd Street Macadam Road to 700' east of 2 A,B,D, 0.3 A U X 517.0* 517.C' 517.
57th Avenue South* F,J
Grading, drainage, illumination, sanitary sewer,
paving, sidewalks (LID 28)
City County
City No.
County No.
d
x
E
O
Tukwila /King OBLIGATION PROGRAM
1320
17
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM I9 to 19 fl
PROJECT IDENTIFICATION
Title, Route, Road Log No., Section No.,
Location /Termini, Description of Work,
Beginning Milepost a Bridge No.
(PLEASE DOUBLE SPACE BETWEEN PROJECTS)
19 58th Avenue South Southerly terminus, south 500' 2 A,B,D, 0.1 A U X 75.0*
New street. (Potential LID) F,J
2
18L 57th Avenue South So. 152nd St. to 350' south
Grading, drainage, illumination, paving, sidewalks
(LID 28)
20 53rd Avenue South Southcenter Blvd. to southern
terminus
Grading, drainage, illumination, paving, sidewalks
(Potential LID)
21 Southcenter Parkway (57th Ave. So.) So. 180th St. to 2 A,B,D, 0.81 S U X
south City limits (potential joint project with King F,G,H.
County to improve 57th Ave. So. to approx. So. 200th St.) J,K
Grading, drainage, lighting, curbs, gutters, sidewalks,
paving
Southcenter Parkway
22 South 178th Street Southcenter Parkway to City
limits (potential joint project with King County
improving So. 176th St. from City limits to Hwy. 99)
Right -of -way, grading, drainage, curbs, gutters,
sidewalks, paving, lighting
u,
v
Work
o Code
6
Local improvement district /developer agreement imp•ovement.
Listed twice to designate potential for FAUS UAB funds.
DISTRIDUTION
3 4 5 6 7 8
4 A,B,D, 0.1 A U X 78.0*
F,J
4 B,D,F, 0.1 A U 80.0*
G,J
II
2 A,B,D, 0.40 C U
F,G,H,
J,K
C X
Total .0
,q
Length vg m
co o ti 0
a
(Mlles) te IS 2nd 3rd 4, 5 &.6th
ANNUAL
ELEMENT
OBLIGATION SCHEDULE
9 10 11
1,200
1,200*
600.0
YEAR
South 178th Street Southcenter Parkway II 600.0Y
PROJECT COSTS IN THOUSANDS OF DOLLARS
12 13 14
995.6 FAUS
497.8 FAUS
Hearing Dote J l v 2___1070
Adoption Dote July 2, 1979
Resolution NumberRes. #689
FUNDING SOURCE
FEDERAL
AMOUNT PROGRAM
LOCAL
15 16
UAB
102.2 600
TOT))
FUN[
540.0 60.0 600
17_
78.0 78.0
75.0 75.0
80.0 80.0
204.4 1,200.
1,080.0 120.0 1.,200.
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 198o to 19 85
Tukwila /King OBLIGATION PROGRAM Hearing Dote July 2. 197Q
1320 Adoption Date July 2. 1Q7Q
Resoiution Numbe rRes #689
PROJECT COSTS IN THOUSANDS OF DOLLARS
PROJECT IDENTIFICATION
o Total g
OBLIGATION SCHEDULE FUNDING SOURCE IOTA
z Title Q o. Route Road Lo N Sectlon No. 3 Work o N D m YEAR
Location /Termini, Description of Work, o Length 132 o Code ;o o o� FEDERAL
Ist 2nd 3rd 4,5a.6th UAB LOCAL FUNC
Beginning Milepost Et Bridge No. (Mlles) w a
ANNUALI AMOUNT PROGRAM
(PLEASE DOUBLE SPACE BETWEEN PROJECTS) ELEMENT/
i 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
23 Intersection So. 180th St. and Andover Park West 6 I S U 10 10 10
Signal modification to 6 -phase system
2LP 56th Place South So. 141st to So. 139th Street 4 ,B,D, 0.2 A U X 158.9 153.9 158
Lighting, curb, gutter, drainage, sidewalk, paving F,G,J
241 56th Avenue South So. 141st to So. 139th Street 4 ■,B,D, 0.2 A U X 158.9 1 158.9 158.
Lighting, curb gutter, drainage, sidewalk, paving
25 57th Avenue Soutb So. 141st St. to So. 147th St. 4 4,B,C, 0.2 A U X 347.4 347.4 347.
Curb gutter, drainage, sidewalk, paving 7,G
26 South 160th Street 51st Ave. So. to 53rd Ave. So. 4 A,B,D, 0.2 A U X 158.4 158.4 158.
Grading, drainage, paving, curbs,& gutters, sidewalks =,G
54th Avenue South Slade Way So. 166th St. 4 a,B,D, 0.2 A U X 158.4 158.4 158•
Grading, drainage, paving, curbs gutters, sidewalks -,G
28 Southcenter Blvd. 65th Avenue So. over I -405 9 L 0.2 A U X 200 165.9 FAUS 34.1 200
Pedestrian bridge
Southcenter Blvd. 65th Ave. So. over I -405 200 180 20.0 200
29 Foster Golf Links Bridge 1 L A U 150 120.0 BRM 30.0 150
Preliminary engineering, construction
City County
City No.
County No.
17
Listed twice to designate potential for FAUS UAB Funds.
omTrnr-A i
City County Tukwila /King
City No. 1320
County No. 1
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM I9 Rn to 19.
OBLIGATION PROGRAM
Macadam Road Southcenter Blvd. to So. 144th St. 1,350.0
31 Southcenter Blvd. (So. 154th St.) 53rd Ave. So. to 2 A,B,D, 0.2 C U 300.0
west City limits (potential joint project with King F,G,H,
County to improve So. 154th St. to Hwy. 99) J,K
Grading, drainage, lighting, paving, sidewalks
Southcenter Blvd. 53rd Ave. So. to west City limits 300.0-'
intersection Tukwila Parkway and Andover Park East 6 1 S U 55
New installation for signalization
33 South 141st Street 56th Ave. So. to 57th Ave. So. 4 A,B,D, 0.1 A U X 96.5
Grading, drainage, paving, sidewalk F,G
34 South 142nd Street 58th Ave. So. to 57th Ave. So. 4 A,B,D, 0.1 A U X 96.5
Grading, paving, sidewalk, curb, gutter, drainage F,G
35 South 144th Street 58th Ave. So. to eastern terminus 4 A,B,D, 0.1 A U X 96.5
Grading, paving, sidewalk, curb gutter, drainage F,G
Listed twice to designate potential for FAUS and UAB funling.
DISTRIBUTION
Hearing Dale July 2. 1g7A
Adoption Dote July 2, 1979
Resolution Numbs rRes. #689
PROJECT COSTS IN THOUSANDS OF DOLLARS
PROJECT IDENTIFICATION o Total c OBLIGATION SCHEDULE FUNDING SOURCE IOTA
z Title Route, Road Log No. Section No, 0 3 W or k m YEAR
Location /Termini, Descriptiori of Work, o Code Length cU o r FEDERAL FUNC
Beginning Milepost 61 Bridge No. o (Milos) a �n. Ist 2nd 3rd 4, 5 OE 6th UAB LOCAL
r AMOUNT PROGRAM
(PLEASE DOUBLE SPACE BETWEEN PROJECTS) ELEMENT
ij 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17.
i
30 Macadam Road Southcenter Blvd. to So. 144th St. 2 A,B,D, 0.85 C U X 1,350.0 1,120.1 FAUS 229.9 1,350.(
Lighting, grading, paving, sidewalks, curbs gutters F,G,H,
J,K
248.9 FAUS 51.1 300.(
1,215.0 135.0 1,350.(
270.0 30.0 300.(
5 5
55
96.5 96.!
96.5 96.!
96.5 96.!
Tukwil 1(il
/County
No, ��1
Six YEAR TRAM OBLIGAT
P
s
OpLiGA�IO
d 4,5 &.6ih M
UNI
n x
0
'TOtOt O N
m y
Length u
ROJ CT COSH
YEAR
3r
T�2nd
Jrit y NO. o Work 1... 13
�3 d 12
Code U f ANNUA
ATIO N°•, (Mi10g1 U a \�lEMer+
T1FiG 10
ROJ�G Road Lod Non of (Work, 6 7 g y— 9 138.6
O
Title,, Route, Road Description N GTSI 1
L Beginning Milepost 6, f ge tl J r o X
_04 gpAGE BE i A u 4
DOU6L i 0.2 1 158•
`pL�AgE 'rte` F ,G
to So. 168th St'
South So. 166th St.
urbs, &gutters, sidewal; 0. 2 A
4 A�g,D, 327.
Avenue Sou paving F X
53rd drainage' P to So. 160th St, si dewalk= U
36 Grading ut ters, 0 3 A
Ave. So cur 9 A,g
Way 54th pa ving St. 4 F,G,3
,7 Slade drainage' St. to So. 140th paving I 125.9
Grading, So 144th sidewalk, P
cub r north of So. 141st in 0 1 A D X
55th Avenue gutter 1
33 Lighting, .O.W. requi areal 4 A,B�D
1250
h i_ 0.1 A U X
South curb g for total A, 1 105.9
39 Lighting requir areal 4
Seattle city Light franchise 56th Place So. F,G
u X
to paving 0.2 A
t Ave. 4 1 1 8,0, 160
1 139th Street u h er drainage, s
S gu tter,
to So. 137th St'• U X
t0 Lighting, curb g
paving
0 4 S
So. 139th St. sidewalk P 4 O,F.G
Avenue South utter, drainage, i 2p0
41 56th curb g S
Lighting park West t° 0 1 A 111 X
I Andover der F31vd' lks, widening 4 A,B�F,
42 Stran rlay, sidewalks K
parkway cur bs, eve to 600' S °ut side- G, Planin9� Tukwila Parkw bs gutter,
anad ht.�ng� 1
1. aF DOLLA=
IN TNOU
Adoption
Resolution Number
FUNOtNG gOURG
°GA
1.1A
FEDER
PROGRAM i f 16
1'I
138.6 138.6
1
153.4 158.4
327.3 327.
1
1'0 11
ZUNI
125.9 125.
53.0
105.9 105.
n u
5�•v
1 160
,2C
Oily County Tukwila /King
City No. 1320
County No.
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM I9 so to I V R5
OBLIGATION PROGRAM
PROJECT IDENTIFICATION o o Total g OBLIGATION SCHEDULE FUNDING SOURCE
Tit Ro Road Lo No., Section No u 3 Work o m YEAR TOTA
e Locution /Termini Descn lion of Work, Length r FEDERAL FUNC
p 1 O w Code c o
Beginning Milepost 8 Bridge No.
(Mlles) h- v 4 n ISt 2nd 3rd 4,58.6 t1A8 LOCAL
(PLEASE DOUBLE SPACE BETWEEN PROJECTS)
ELEMENT AMOUNT PROGRAM
L- 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
45 53rd Avenue South So. 160th St. to northern terminus 4 A,B,D. 0.1 A U
Grading, drainage, paving, lighting, curbs, gutter
sidewalks
Hearing Date July 2 1Q7Q
Adoption Dote July 2. 1979
Resolution NurnberRes. #689
PROJECT COSTS IN THOUSANDS OF DOLLARS
44 Andover'Park East Tukwila Parkway to Strander Blvd. 4 C,F,G 0.4 S U 60 60 60
Planing, curbs, overlay (in conjunction with
intersection modification)
100.0 100.0 100.0
7 46 Andover Park East Tukwila Parkway to So. 180th St. 4 C,F,G 1.1 S U X 385 385 385
Planing, curbs, overlay, sidewalk, channelization
47 Southcenter Parkway Strander Blvd. to So. 180th St. 4 C,F 1.1 S U X 385 385 385
Curbs, planing, overlay
A" Interurban Avenue South at SR 599 off ramp 6 I M U 60 60 60
New installation for signaiization
49 56th Avenue Bridge over Green River 1 L 0.1 A U 1,000 800.0 BRM 200.01,000
(portion is King County's jurisdiction)
Preliminary engineering, surveying, construction
50 Baker Blvd. Andover Park West to Christensen Road 4 C,F,G 0.3 A U X
Planing, curbs, overlay, sidewalk
tW TT?WUTlON
45
45 45