Loading...
HomeMy WebLinkAboutOrd 0996 - 1977-1982 Comprehensive Street Program 4 CITY goo OF TUK WILA WASHINGTON ORDINANCE NO. 996 99� AN ORDINANCE ADOPTING A REVISED AND EXTENDED COMPREHENSIVE STREET PROGRAM IN ACCORDANCE WITH RCW 35.77. WHEREAS, The City of Tukwila has previously adopted a Comprehensive Street Program pursuant to RCW 35.77., and WHEREAS, The City is required annually to review the work accomplished under said Program and to determine current City Street needs, and WHEREAS, A public hearing was held on the Comprehensive Street Program on Monday, October 4, 1976, at 7:00 p.m. in the Tukwila City Hall, before the Tukwila City Council, NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, DO ORDAIN AS FOLLOWS: Section 1. Pursuant to RCW 35.77 and the public hearing on October 4, 1976, the attached documents, marked "Exhibit A" and incorp- orated herein by reference, are declared and adopted as the Revised Six Year Comprehensive Street Program for the City of Tukwila. Section 2. This Ordinance and exhibit shall be filed with the Director of Highways of the State of Washington within thirty days after its adoption as required by RCW 35.77. Section 3. This Ordinance and exhibit shall be submitted to the Urban Arterial Board as required by RCW 35.77. PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, at a regular meeting thereof this 1st day of November 1976. (4.v i,9 Mayo November 2, 1976 Date Approved ATTEST: i6/ l Gz-6-0u i City Clerk Pro Tem AF!proved as to for 44 C Attorney J�,�,,, Published: 0 ecord Chroo,c,/e. 11-5 6 EyIBIT A ITEM NO. LOCAL NAME OF ROAD OR STREET HEARING DATE 1„ Southcenter Blvd. A I -5 to 62nd Ave. So. State 70,000 by Highway Dept. 181 B. 62nd Ave. So. over I C. 62nd Ave. So. 2. Interurban So. 58th So. 9020 C X 3 SR 181iStranderptv)• 9023 M X (State Hwy. De 4, So. 152nd Rd from Macadam Rd. to 700` East of 57th Ave. So. 9007 A X 9009 A X 152nd St. 57th Ave. So. from So. 5. to 350' So. 9037 6. Christianson Road o So. 180th St. Tukwila Parkway 7. Southcenter Parkway Strander Blvd. So. 130th Sections of entire length only) 3 53rd Avenue So. 144th St Macadam to So. ROAD F C U R OR U L R STREET C ABR NO. 5 A A T S N L 9005 SIX YEAR CONSTRUCTION PROGRAM. 1977 1932 RESOLUTION 902.4 C ADOPT ION D ATE TYPE OF WORK X Gr, D Pave, Swk, Illum Gr, Drs Pave, Swk, Ilium, R/A Pedestrian Bridge R/ Traffic Signals Traffic Signals Gr, Dr, Pave, Swk, Ilium, R/4 Gr, Dr, Pave, Swk, I11um, R/A Dr, Pave, Ped, and Bikeway X Gr, Pave, Curb 9003 C X Pave (Overlay) LENGTH 1978 IN 19 77 MILES 0.2 10,000 (COITY)Y) CITY OF TUK 1LP. ESTIMATE OF COST 1979 0.6 206,000 160,000 175,000 150,00 0.2 0.1 69,000 0.1 80,000 0. 3 282,00 0.1 38,000 1.3 193,000 0.5 100,000 100,000 1$0.82 TOTAL i 206 ,000 335 ,000 150,00 69,000 30,000 282,000 38,000 198,000 200,000 1 ITEM NO. LOCAL NAME OF ROAD OR STREET 9. Utility Program See Exhibit "A" (1) 1973 (1783') 1974 1975 1976 1977 1978 1979 1980 1981 (2171') (2735') (2518') (3388') (4452') (4424') (2990') (4780') 10. Strander Blvd. (1) Christianson Andover Park (2) Andover Park to Andover Park 11. Andover Park East Strander Blvd. to Tukwila Parkway HEARING DATE Rd. to East East West ROAD F C U R OR U L R U STREET N AB R NO. C S A A T S N L A X A X A X A X A X A/C X A/C X A/C X A/C X SIX YEAR CONSTRUCTION PROGRAM 1977 -1982 ADOPTION DATE (1) Utility U /G, Illum. (2) Gr, Dr, Pave, Curb, Swk Gr, Pave, Curb Gr, Pave, Curb TYPE OF WORK RESOLUTION NO LENGTH IN MILES 1977 1. 50,000 2. 177,000 0.4 1. 65,000 0.5 1. 72,000 0.5 1. 79,000 0.6 1. 87,000 0.8 0.8 0.6 0.9 0.2 0.4 (COUNTY) (CITY) CITY OF TUKWILA 1978 ESTIMATE OF COST 1979 2. 215,000 2. 271,000 2. 2. 1. 95,000 2. 1. 1. 1. 25,000 42,000 19 80 82 250,000 336,000 441,000 105 ,000 115,000 127,000 84,000 Page 2 or' TOTAL 227,000 280,000 343,000 329 ,000 423,000 536,000 105,000 115 ,000 127,000 25,000 42,000 84,000 TOTALS 10.6 1,513,000 595,000 633,000 1,458,000 4,204,000