HomeMy WebLinkAboutPermit 0814 - NordstromThis record contains information which is exempt from public disclosure
pursuant to the Washington State Public Records Act, Chapter 42.56 RCW
as identified on the Digital Records Exemption Log shown below.
Nordstrom
1201 Andover Park East
RECORDS DIGITAL D- ) EXEMPTION LOG
THE ABOVE MENTIONED PERMIT FILE INCLUDES THE FOLLOWING REDACTED INFORMATION
Page Code Exemption = 8rlef E plainatoty Desclriptim Statuteftle
The Privacy Act of 1974 evinces Congress'
intent that social security numbers are a private
concern. As such, individuals' social security
Personal Information —
numbers are redacted to protect those
Social Security Numbers
individuals' privacy pursuant to 5 U.S.C. sec.
5 U.S.C. sec.
2,3
DR1
Generally — 5 U.S.C. sec.
552(a), and are also exempt from disclosure
552(a); RCW
552(a); RCW
under section 42.56.070(1) of the Washington
42.56.070(1)
42.56.070(1)
State Public Records Act, which exempts under
the PRA records or information exempt or
prohibited from disclosure under any other
statute.
Redactions contain Credit card numbers, debit
card numbers, electronic check numbers, credit
Personal Information —
expiration dates, or bank or other financial
RCW
DR2
Financial Information —
account numbers, which are exempt from
42.56.230(5)
RCW 42.56.230(4 5)
disclosure pursuant to RCW 42.56.230(5),
except when disclosure is expressly required by
or governed by other law.
CITY OF TUKWILA BUILDING DEPARTMENT
6230 Southcenter Blvd.
Tukwila, Washington 98067
Phone: (206) 242 -2177
LOCATION OF WORK / NUMBER & STREET
LOT
OWNER
1201 Andover Park East
BLOCK
PERMIT NUMBER
No 814
SUBDIVISION
See Attached
Nordstrom, Inc.
ADDRESS
1501 Fifth Avenue Seattle, Washington 98101
PHONE
628 -2111
NAME OF BUILDER
McCann Construction Company, Inc.
STATE LICENSE NO.
SALES TAX NO, C-178-12495
ADDRESS
8013 Perimeter Road South Seattle, Washington 98108
PHONE
762 -2555
INSPECTION RECORD
FOOTINGS
BUILDING
PERMIT
VOID IF WORK IS NOT
COMMENCED IN 120 DAYS
11/10/75
ESTIMATED VALUE
COMPLETED WORK 469,790.00
FOUNDATION
PERMIT FEE $ 842. 00
FRAMING
PLAN CHECK FEE $ 547.30
LATE PERMIT FEE $
TOTAL FEE oci $1,389.30
CF 1II —N
CONST.
GROUP OCCUPANCY
F -2
DATE ISSUED
5/10/76
ZONE 3
USE
ZONE
EXPIRATION DATE
FINAL
FIRE SPRINKLERS
REQUIRED
MAX.
OCC. LOAD
I.I Yes ONo
DESCRIPTION OF WORK:
Warehouse addition to Nordstrom Distribution Center
THIS PERMIT DOES NOT AUTHORIZE ANY WORK IN PUBLIC RIGHT -OF -WAY OR ON UTILITY EASEMENTS.
SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, HEATING, VENTILATING OR AIR CONDITIONING.
I HEREBY CERTIFY THAT NO WORK IS TO BE DONE EXCEPT AS DESCRIBED ABOVE AND IN APPROVED PLANS AND
SPECIFICATIONS AND THAT ALL WORK IS TO CONFORM TO TUKWILA CODES AND ORDINANCES.
APPLICANT "//L
CALL FOR INSPECTION
BEFORE WORK IS CONCEALED OR
POURING CONCRETE
PHONE
242-2177
FINAL INSPECTION BEFORE OCCUPANCY
BY
SUBJECT TO COMPLIANC WITH THE ORDINAN
INFORMATION F . ;I 'EWITH, THIS PER
BUILDING DIRECTOR
BY
E CITY
I - ANTED.
UKWILA.1D
!
Y u6' 6U(L,.JU L UEr1 L U ttlEtV o
6230 Southcenter Blvd.
Tukwila, Washington 98067
Phone: (206) 242 -2177
CATION OF WORK / NUMBER & STREET
1201 Andover Park East - Tukwila, Washington
98188
BLOCK
1
SUBDIVISION
Southcenter.Industrial Park
VNER
Nordstrom, Inc.
'DRESS 1501 Fifth Avenue -.Seattle
Washington 98101
PHONE
628 -2111
%ME OF BUILDER
McCann Construction Company, Inc.
STATE LICENSE NO.
)DRESS
8013 Perimeter Road South - Seattle, Wn. 98108
SALES TAX NO.
PHONE
C178 -12495
206/762 -2555
WILLIAM L. SCHAIBLE, P.E.
Assgaiate & Project Engineer
►Dn �o.
j y
Company
Consulting Engineers & Planners
2100 - 5th Avenue Building
Seattle, Washington 98121/623-7950
ESCRIPTION OF WORK:
pLICATION
FOR '.
ILDING PERPIIT
ESTIMATED VALUE
COMPLETED WORK $ 469 , 790.00'
PERMIT FEE
'PLAN CHECK FEE
Sfffrz
(77 s
LATE PERMIT FEE S
TOTAL FEE
DAI ISSUED .
EXPIRATION DAZE
TYPE OF I I IN
CONST.
OCCUPANCY Fz. •
GROUP
FIRE •
ZONE
3
USE
ZONE
FIRE SPRINKLERS
REQUIRED X. Yes ❑No
MAX.
OCC. LOAD
Warehouse addition to Norstrom Distribution Center No. 99.
Name of Tenant: Nordstrom, Inc.
Nature of Business: Retail clothes.
Ci rY OF . TUKWIL4
THIS PERMIT DOES NOT AUTHORIZE ANY WORK IN PUBLIC RIGHT -OF -WAY OR ON UTILITY EASEMENTS.
SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, HEATING, VENTILATING OR AIR CONDITIONING.
I HEREBY CERTIFY THAT NO WORK IS TO BE DONE EXCEPT AS DESCRIBED ABOVE AND IN APPROVED PLANS AND
SPECIFICATIONS AND THAT ALL WORK IS TO CONFORM TO TUKWILA CODES AND ORDINANCES.
McCann Construction Company, Inc.
APPLICANT
FIRE DEPARTMENT
CITY of TUKWILA
444 ANDOVER PARK EAST
TUKWILA, WASHINGTON 98188
TELEPHONE: (206) 244-7221
Fire Prevention Bureau.
October 28, 1975
: Nordstrom D.
Addition
In reviewing the above mentioned project plans, please note
the following items:.
All sprinkler drawings shall be prepared
by companies licensed to perform this type
of work. Drawings shall first be approved by
the Washington Survey & Rating Bureau, then
by the. Tukwila Fire Dept.. No work shall commence
without approved drawings.
Hose stations are required'. per City Ordinance #730.
Fire extinguisher type, quantity an'd: placement;.
shall be per .NFPA' #10:'
Please include _these comments: in.your review of the above,
mentioned project.
Yours: very truly-,
Per UFC.Sec. 10:104(b), "All doors in or leading to
exits shall be maintained openable from the inside
without the use of a key or any special knowledge
or effort at all times when the building or area
served thereby is occupied ".
All doors .:. including exits shall be identified per
OSHA, Section 1910,37(q) Exit signs shall have
letters 6 inches high..
• :Walls are to be fire stopped per.UBC Seca 2517(f).
No draft"curtains. shown.
. One more smoke vent" required:"
58,265- 100 = 582 sq. feet • 32sq. ft. per
vent '= 18 vents.
Also, ask. for specs and approval :(U.L..or F.M. on vents)..
B. RICHAL SMITH dt ASSOCIATES
CONSULTING ENGINEERS
•
November
1975
B. RICHAL SMITH
GARY M. SWENSON
002 COLMAN BUILDING
SEATTLE, WASHINGTON 98104
Tsrsrsosa.(200) 024-8150
City`.of Tukwila
Department of Public Works
6230 Southcenter Boulevard ..
Tukwila, WA 98067
Attention: Bernard Ruppert, Building Director..
Re: Plan Review No. 75 -S -15
Gentlemen:
We have reviewed the structural portions of the additions to the Nordstrom
Distribution Center for compliance with chapters _23 through 29 of the
Uniform Building Code and have noted no violations.
Please call if you have any'questions.
Sincerely,'
legal description
design criteria
That portion of Government Lot '1 of•Section 35 and the SE 1/4 of the SE1174
of. Sect-ion 26, Township 23 N., Range 4E., WM, in the City of Tukwila, King
County. Washington, . described as follows: Beginning at the RE corner of
saki Government Lot 1 of •Section 35; thence h 87°44 +08" W along the north
line -of said Government Lot 1 a distance of 949;49 feet to -the true point,
of beginning;. thence N 01 °47429" E a distance of 185.61 feet; tbance
S RR°08'2.1" E • distance of 470.00 feet to the west margin of - Andover Park
East; thence S 01 °47'29" W along the -west margin of Andover 'Park East •e
distance of 188,92 feet; thence S 01 °51'39" W along said west margin of
Andover Perk East a distance of 459,08 feet; thence h 88°08'21" W a distance
of 470.00 feet: thence N 01 °51'39 ". •E a• distance of 4+62.39-feet. to.--t■e true
point of beginning.
Subject to easements and restrictions of record if any.
ALTERATIONS & ADDITIONS TO:
NORDSTROM DISTRIBUTION CENTER
NO. 99
SEATTLE, WASHINGTON
� !T� PLA KI -
OCT 2 2 1975