Loading...
HomeMy WebLinkAboutPermit 0814 - NordstromThis record contains information which is exempt from public disclosure pursuant to the Washington State Public Records Act, Chapter 42.56 RCW as identified on the Digital Records Exemption Log shown below. Nordstrom 1201 Andover Park East RECORDS DIGITAL D- ) EXEMPTION LOG THE ABOVE MENTIONED PERMIT FILE INCLUDES THE FOLLOWING REDACTED INFORMATION Page Code Exemption = 8rlef E plainatoty Desclriptim Statuteftle The Privacy Act of 1974 evinces Congress' intent that social security numbers are a private concern. As such, individuals' social security Personal Information — numbers are redacted to protect those Social Security Numbers individuals' privacy pursuant to 5 U.S.C. sec. 5 U.S.C. sec. 2,3 DR1 Generally — 5 U.S.C. sec. 552(a), and are also exempt from disclosure 552(a); RCW 552(a); RCW under section 42.56.070(1) of the Washington 42.56.070(1) 42.56.070(1) State Public Records Act, which exempts under the PRA records or information exempt or prohibited from disclosure under any other statute. Redactions contain Credit card numbers, debit card numbers, electronic check numbers, credit Personal Information — expiration dates, or bank or other financial RCW DR2 Financial Information — account numbers, which are exempt from 42.56.230(5) RCW 42.56.230(4 5) disclosure pursuant to RCW 42.56.230(5), except when disclosure is expressly required by or governed by other law. CITY OF TUKWILA BUILDING DEPARTMENT 6230 Southcenter Blvd. Tukwila, Washington 98067 Phone: (206) 242 -2177 LOCATION OF WORK / NUMBER & STREET LOT OWNER 1201 Andover Park East BLOCK PERMIT NUMBER No 814 SUBDIVISION See Attached Nordstrom, Inc. ADDRESS 1501 Fifth Avenue Seattle, Washington 98101 PHONE 628 -2111 NAME OF BUILDER McCann Construction Company, Inc. STATE LICENSE NO. SALES TAX NO, C-178-12495 ADDRESS 8013 Perimeter Road South Seattle, Washington 98108 PHONE 762 -2555 INSPECTION RECORD FOOTINGS BUILDING PERMIT VOID IF WORK IS NOT COMMENCED IN 120 DAYS 11/10/75 ESTIMATED VALUE COMPLETED WORK 469,790.00 FOUNDATION PERMIT FEE $ 842. 00 FRAMING PLAN CHECK FEE $ 547.30 LATE PERMIT FEE $ TOTAL FEE oci $1,389.30 CF 1II —N CONST. GROUP OCCUPANCY F -2 DATE ISSUED 5/10/76 ZONE 3 USE ZONE EXPIRATION DATE FINAL FIRE SPRINKLERS REQUIRED MAX. OCC. LOAD I.I Yes ONo DESCRIPTION OF WORK: Warehouse addition to Nordstrom Distribution Center THIS PERMIT DOES NOT AUTHORIZE ANY WORK IN PUBLIC RIGHT -OF -WAY OR ON UTILITY EASEMENTS. SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, HEATING, VENTILATING OR AIR CONDITIONING. I HEREBY CERTIFY THAT NO WORK IS TO BE DONE EXCEPT AS DESCRIBED ABOVE AND IN APPROVED PLANS AND SPECIFICATIONS AND THAT ALL WORK IS TO CONFORM TO TUKWILA CODES AND ORDINANCES. APPLICANT "//L CALL FOR INSPECTION BEFORE WORK IS CONCEALED OR POURING CONCRETE PHONE 242-2177 FINAL INSPECTION BEFORE OCCUPANCY BY SUBJECT TO COMPLIANC WITH THE ORDINAN INFORMATION F . ;I 'EWITH, THIS PER BUILDING DIRECTOR BY E CITY I - ANTED. UKWILA.1D ! Y u6' 6U(L,.JU L UEr1 L U ttlEtV o 6230 Southcenter Blvd. Tukwila, Washington 98067 Phone: (206) 242 -2177 CATION OF WORK / NUMBER & STREET 1201 Andover Park East - Tukwila, Washington 98188 BLOCK 1 SUBDIVISION Southcenter.Industrial Park VNER Nordstrom, Inc. 'DRESS 1501 Fifth Avenue -.Seattle Washington 98101 PHONE 628 -2111 %ME OF BUILDER McCann Construction Company, Inc. STATE LICENSE NO. )DRESS 8013 Perimeter Road South - Seattle, Wn. 98108 SALES TAX NO. PHONE C178 -12495 206/762 -2555 WILLIAM L. SCHAIBLE, P.E. Assgaiate & Project Engineer ►Dn �o. j y Company Consulting Engineers & Planners 2100 - 5th Avenue Building Seattle, Washington 98121/623-7950 ESCRIPTION OF WORK: pLICATION FOR '. ILDING PERPIIT ESTIMATED VALUE COMPLETED WORK $ 469 , 790.00' PERMIT FEE 'PLAN CHECK FEE Sfffrz (77 s LATE PERMIT FEE S TOTAL FEE DAI ISSUED . EXPIRATION DAZE TYPE OF I I IN CONST. OCCUPANCY Fz. • GROUP FIRE • ZONE 3 USE ZONE FIRE SPRINKLERS REQUIRED X. Yes ❑No MAX. OCC. LOAD Warehouse addition to Norstrom Distribution Center No. 99. Name of Tenant: Nordstrom, Inc. Nature of Business: Retail clothes. Ci rY OF . TUKWIL4 THIS PERMIT DOES NOT AUTHORIZE ANY WORK IN PUBLIC RIGHT -OF -WAY OR ON UTILITY EASEMENTS. SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, HEATING, VENTILATING OR AIR CONDITIONING. I HEREBY CERTIFY THAT NO WORK IS TO BE DONE EXCEPT AS DESCRIBED ABOVE AND IN APPROVED PLANS AND SPECIFICATIONS AND THAT ALL WORK IS TO CONFORM TO TUKWILA CODES AND ORDINANCES. McCann Construction Company, Inc. APPLICANT FIRE DEPARTMENT CITY of TUKWILA 444 ANDOVER PARK EAST TUKWILA, WASHINGTON 98188 TELEPHONE: (206) 244-7221 Fire Prevention Bureau. October 28, 1975 : Nordstrom D. Addition In reviewing the above mentioned project plans, please note the following items:. All sprinkler drawings shall be prepared by companies licensed to perform this type of work. Drawings shall first be approved by the Washington Survey & Rating Bureau, then by the. Tukwila Fire Dept.. No work shall commence without approved drawings. Hose stations are required'. per City Ordinance #730. Fire extinguisher type, quantity an'd: placement;. shall be per .NFPA' #10:' Please include _these comments: in.your review of the above, mentioned project. Yours: very truly-, Per UFC.Sec. 10:104(b), "All doors in or leading to exits shall be maintained openable from the inside without the use of a key or any special knowledge or effort at all times when the building or area served thereby is occupied ". All doors .:. including exits shall be identified per OSHA, Section 1910,37(q) Exit signs shall have letters 6 inches high.. • :Walls are to be fire stopped per.UBC Seca 2517(f). No draft"curtains. shown. . One more smoke vent" required:" 58,265- 100 = 582 sq. feet • 32sq. ft. per vent '= 18 vents. Also, ask. for specs and approval :(U.L..or F.M. on vents).. B. RICHAL SMITH dt ASSOCIATES CONSULTING ENGINEERS • November 1975 B. RICHAL SMITH GARY M. SWENSON 002 COLMAN BUILDING SEATTLE, WASHINGTON 98104 Tsrsrsosa.(200) 024-8150 City`.of Tukwila Department of Public Works 6230 Southcenter Boulevard .. Tukwila, WA 98067 Attention: Bernard Ruppert, Building Director.. Re: Plan Review No. 75 -S -15 Gentlemen: We have reviewed the structural portions of the additions to the Nordstrom Distribution Center for compliance with chapters _23 through 29 of the Uniform Building Code and have noted no violations. Please call if you have any'questions. Sincerely,' legal description design criteria That portion of Government Lot '1 of•Section 35 and the SE 1/4 of the SE1174 of. Sect-ion 26, Township 23 N., Range 4E., WM, in the City of Tukwila, King County. Washington, . described as follows: Beginning at the RE corner of saki Government Lot 1 of •Section 35; thence h 87°44 +08" W along the north line -of said Government Lot 1 a distance of 949;49 feet to -the true point, of beginning;. thence N 01 °47429" E a distance of 185.61 feet; tbance S RR°08'2.1" E • distance of 470.00 feet to the west margin of - Andover Park East; thence S 01 °47'29" W along the -west margin of Andover 'Park East •e distance of 188,92 feet; thence S 01 °51'39" W along said west margin of Andover Perk East a distance of 459,08 feet; thence h 88°08'21" W a distance of 470.00 feet: thence N 01 °51'39 ". •E a• distance of 4+62.39-feet. to.--t■e true point of beginning. Subject to easements and restrictions of record if any. ALTERATIONS & ADDITIONS TO: NORDSTROM DISTRIBUTION CENTER NO. 99 SEATTLE, WASHINGTON � !T� PLA KI - OCT 2 2 1975