HomeMy WebLinkAboutPermit 0818 - Val Vue Sewer District - Utility Building•
CITY Of TUKWILA BUILDING DEPARTMENT
6230 Southcenter Blvd.
Tukwila, Washington 98067
Phone: (206) 242 -2177
LOCATION OF WORK / NUMBER & STREET
LOT
OWNER
17036 - 53rd Ave. South
BLOCK
PERMIT NUMBER
No 818
SUBDIVISION
Val Vue Sewer District
ADDRESS
14816 Military Rd. So. Seattle, Wash.
PHONE
242 -3236
NAME OF BUILDER
Frank . Col ucci o Construction
STATE LICENSE NO.
SALES TAX NO. e .-%g.. 1.2...s-- z L>/
ADDRESS
9600 Empire Way South Seattle, Wash. 98118
PHONE
71Z,2 4
INSPECTION RECORD
FOOTINGS
BUILDING
PERMIT
VOID IF WORK IS NOT
COMMENCED IN 120 DAYS
11/14/75
ESTIMATED VALUE
COMPLETED WORK $ 4,000.00
FOUNDATION
PERMIT FEE $ 28.00
FRAMING
PLAN CHECK FEE $
PERMIT FEE,, $ 28.00
TOTAL FEE lrGl. $ 56.00
TYPE OF
CONST.
OCCUPANCY
GROUP
DATE ISSUED
11/14/75
FIRE
ZONE
USE
ZONE
EXPIRATION DAZE
FINAL
FIRE SPRINKLERS
REQUIRED
MAX.
OCC. LOAD
■ Yes 1111No
DESCRIPTION OF WORK:
15' x 21' metal building to house standby generator subject to
conditions noted in letter of 11/7/75 from Secretary of the Board
of Adjustment.
THIS PERMIT DOES NOT AUTHORIZE ANY WORK IN PUBLIC RIGHT-OF-WAY OR ON UTILITY EASEMENTS.
SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, HEATING, VENTILATING OR AIR CONDITIONING.
I HEREBY CERTIFY THAT NO WORK IS TO BE DONE EXCEPT AS DESCRIBED ABOVE AND IN APPROVED PLANS AND
SPECIFICATIONS AND THAT ALL WORK IS TO CONFORM TO TUKWILA CODES AND ORDINANCES.
CALL FOR INSPECTION
BEFORE WORK IS CONCEALED OR
POURING CONCRETE
PHONE
242-2177
FINAL INSPECTION BEFORE OCCUPANCY
APPLICANT
BY
SUBJECT TO COMPL NCE ITH THE ORDINAN' - THE CITY
INFORMATION FE�DAHE - WITH, THIS PERMIT I GRA TED.
BUILDING DIRECTOR r /v %VAK
BY
A AND
CITY r- TUKKWILA BUILDING DEPL ENT
6230 Southcenter Blvd.
Tukwila, Washington 98067
Phone: (206) 242 -2177
LOCATION OF WORK / NUMBER & STREET
LOT
Fl o.
GVA Ave. S.
BLOCK SUBDIVISION
OWNER
ADDRESS
W
wQ
PHONE
NAME OF BUILDER
ADDRESS
Ced••443.0,
DESCRIPTION OF WORK:
qr!
APPLICATION
FOR
BUILDING PERMIT .
T /"-/D (7,- ^J /
EXPIRATION DAIS
STATE LICENSE NO.
SALES TAX NO.
PHONE
ESTIMATED VALUE /��n
COMPLETED WORK $ / %00v 0:1
PERMIT FEE
PLAN CHECK FEE
LATE PERMIT FEE
TOTAL FEE
TYPE OF
CONST.
f'L
OCCUPANCY
GROUP
FIRE
ZONE
USE
ZONE
FIRE SPRINKLERS
REQUIRED ❑Yes DNo
MAX.
OCC. LOAD
i4e4iiriti k qv «.ptg4 a_ ,€. tf7"'irb► $ti
%J 274reer 77j Egil , Ttofe &e !-r[ 474. D P
c /21C 40 Iry J ..'
Name of Tenant:
Nature of Business:
THIS PERMIT DOES NOT AUTHORIZE ANY WORK IN PUBLIC RIGHT -OF -WAY OR ON UTILITY EASEMENTS.
SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, HEATING, VENTILATING OR AIR CONDITIONING.
I HEREBY CERTIFY THAT NO WORK IS TO BE DONE EXCEPT AS DESCRIBED ABOVE AND IN APPROVED PLANS AND
SPECIFICATIONS AND THAT ALL WORK IS TO CONFORM TO TUKWILA CODES AND ORDINANCES.
APPLICANT
Inv
Frank Todd, Mayor
CITY or T U KW I LA
6230 SOUTHCENTER BLVD.
TUKWI LA, WASHINGTON 98067
PLANNING DEPARTMENT
BOARD OF ADJUSTMENT
Minutes of the meeting, 6 November 1975.
The regular November meeting of The Tukwila Board of Adjustment was called
to order at 8:00 P.M. by Vice- Chairperson Altmayer. Members present: Mrs.
Crain, Mr. Bauch and Mrs. Altmayer. Gary Crutchfield, Assistant Planner,
represented the Planning Department.
Vice - Chairperson Altmayer called for approval of the October minutes. Motion
by Mr. Bauch, seconded by Mrs. Crain and carried to approve the minutes of the
October meeting as prepared.
OLD BUSINESS
III A Expiration of Variance - Val -Vue Sewer District
Mr. Crutchfield read the Staff Report briefly stating the background and the
fact the variance granted in November 1974 was about to expire due to the fact
the grantee had not fulfilled the variance stipulations as required by Section
18.72.020 (TMC). Further explained three alternatives for action, one of which
the Board should utilize at this meeting.
Brief discussion among Board members led to general conclusion that simply
extending the original variance would be a fruitless alternative..
Mr. Bauch stated that additional public monies should not be spent for structural
alterations, however, the use of the building should be restricted to housing the
emergency generator only.
Mrs. Altmayer asked if Val -Vue Sewer District had approached the Planning Depart-
ment in any manner since the granting of the original variance to attempt to
comply with any of the original stipulations?
Mr. Crutchfield stated he was not aware of any kind of effort on the part of
Val -Vue Sewer District.
Mr. Bauch pointed out the building was erected to protect the generator and if
the generator is not required to be there then the building does not need to
exist.
BOARD OF ADJUSTMENT Page 2
Minutes of the Meeting 6 November 1975
Mr. Terry Matelich, Val -Vue Sewer District, explained the generator is
absolutely necessary until some other viable technology can replace it.
Motion by Mr. Bauch to extend the original variance for a period of four
months. Motion was seconded by Mrs. Crain for purpose of discussion.
Board members briefly discussed the intent of the motion. Motion failed for
lack of majority vote.
Motion by Mrs. Altmayer and seconded by Mr. Bauch to extend the variance for
the life of the building with the following stipulations:
1. Obtain a building permit from the Tukwila Building Director to
include any authorized punitive fees.
2. Design a specific landscape plan, to be approved by the Planning
Department, including dense evergreen plantings.
3. That the building only be used for protection and housing of the
emergency generator necessary to protect the lift- station.
Motion by Mrs. Altmayer to amend original motion to require the building
permit be obtained and the landscape plan approved within thirty (30) days.
Motion to amend seconded by Mrs. Crain.
Motion to amend original motion carried.
Original motion, as amended, carried.
III B Board Vacancies
Vice - Chairperson Altmayer pointed out the Mayor had reacted to the Board's
letter by appointing two persons to our Board. The appointments are currently
in the Council committee for recommendation.
Mrs. Crain asked why the Doce's signs are still in existence if they do not
conform to the Sign Code.
Mr. Crutchfield pointed out the City is currently adhering to all procedures
required by the Sign Code and that the signs must be removed by 14 November
1975 or an application for variance must be filed by 14. November 1975.
IV A PUBLIC HEARING - Variance - Underground Utilities (Seattle City Light)
Mr. Crutchfield read the affidavit of publication and noted the hearing had
been duly posted and property owners notified.
Vice- Chairperson Altmayer opened the Public Hearing at 8:30 P.M.
BOARD OF ADJUSTMENT Page 3
Minutes of the Meeting 6 November 1975
Mr. Tom Pace, 15215 - 51st Avenue South, stated that although he lived outside
the City he was curious as to what effect the additional overhead facilities
would have primarily on ameteur radio reception?
Mr. Tom O'Brien, Seattle City Light, stated technology has improved the insul-
ation of electrical lines considerably over the past few years and this addi-
tional line should have no noticeable effect. However, any problems would be
solved by Seattle City Light.
Mr. O'Brien further pointed out that Seattle City Light has been considering
for several years the trading of this service area to Puget Power in exchange
for another service area of Puget Power.
Mr. Pace asked why three -phase service is needed?
Mr. O'Brien stated three -phase service is necessary to provide adequate service
to the commercial property south of Southcenter Boulevard between 51st Avenue
and I -5.
Mr. Crutchfield read the Staff Report in its entirety including Findings,
Conclusions and Recommendation. Also noted the method of financing the under-
ground installation of the electrical service apparently has not been throughly
examined by either the utility company or the property owners as Chapter 13,08
specifically requires such undergrounding costs to be worked out between the
property owner and the utility company.
Mr. Bauch asked what the cost would be to provide service to the residences
existing on the commercially -zoned property?
Mr. O'Brien estimated the cost to be in excess of $500 each.
Mrs. Altmayer pointed out that if the variance is granted and three -phase
service is provided overhead along Southcenter Boulevard, then Seattle City
Light would never have to locate the lines underground as they could simply
provide three -phase service to future commercial developments in the vicinity
without any additional rebuild or relocation which would necessitate undergrouding.
There being no further comments from the audience, Vice - Chairperson Altmayer
closed the Public Hearing at 9:25 P.M.
Motion by Mr. Bauch that variance be denied based on the findings and conclu-
sions
of the Staff Report. Motion seconded by Mrs. Crain and carried unani-
mously.
Motion by Mrs. Crain, seconded by Mr. Bauch and carried to adjourn the regular
November meeting.
Vice - Chairperson Altmayer adjourned the meetigg at 9:35 P.M.
ary Crutchf ld, Secretary
Tukwila Boar of Adjustment