Loading...
HomeMy WebLinkAboutPermit 0818 - Val Vue Sewer District - Utility Building• CITY Of TUKWILA BUILDING DEPARTMENT 6230 Southcenter Blvd. Tukwila, Washington 98067 Phone: (206) 242 -2177 LOCATION OF WORK / NUMBER & STREET LOT OWNER 17036 - 53rd Ave. South BLOCK PERMIT NUMBER No 818 SUBDIVISION Val Vue Sewer District ADDRESS 14816 Military Rd. So. Seattle, Wash. PHONE 242 -3236 NAME OF BUILDER Frank . Col ucci o Construction STATE LICENSE NO. SALES TAX NO. e .-%g.. 1.2...s-- z L>/ ADDRESS 9600 Empire Way South Seattle, Wash. 98118 PHONE 71Z,2 4 INSPECTION RECORD FOOTINGS BUILDING PERMIT VOID IF WORK IS NOT COMMENCED IN 120 DAYS 11/14/75 ESTIMATED VALUE COMPLETED WORK $ 4,000.00 FOUNDATION PERMIT FEE $ 28.00 FRAMING PLAN CHECK FEE $ PERMIT FEE,, $ 28.00 TOTAL FEE lrGl. $ 56.00 TYPE OF CONST. OCCUPANCY GROUP DATE ISSUED 11/14/75 FIRE ZONE USE ZONE EXPIRATION DAZE FINAL FIRE SPRINKLERS REQUIRED MAX. OCC. LOAD ■ Yes 1111No DESCRIPTION OF WORK: 15' x 21' metal building to house standby generator subject to conditions noted in letter of 11/7/75 from Secretary of the Board of Adjustment. THIS PERMIT DOES NOT AUTHORIZE ANY WORK IN PUBLIC RIGHT-OF-WAY OR ON UTILITY EASEMENTS. SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, HEATING, VENTILATING OR AIR CONDITIONING. I HEREBY CERTIFY THAT NO WORK IS TO BE DONE EXCEPT AS DESCRIBED ABOVE AND IN APPROVED PLANS AND SPECIFICATIONS AND THAT ALL WORK IS TO CONFORM TO TUKWILA CODES AND ORDINANCES. CALL FOR INSPECTION BEFORE WORK IS CONCEALED OR POURING CONCRETE PHONE 242-2177 FINAL INSPECTION BEFORE OCCUPANCY APPLICANT BY SUBJECT TO COMPL NCE ITH THE ORDINAN' - THE CITY INFORMATION FE�DAHE - WITH, THIS PERMIT I GRA TED. BUILDING DIRECTOR r /v %VAK BY A AND CITY r- TUKKWILA BUILDING DEPL ENT 6230 Southcenter Blvd. Tukwila, Washington 98067 Phone: (206) 242 -2177 LOCATION OF WORK / NUMBER & STREET LOT Fl o. GVA Ave. S. BLOCK SUBDIVISION OWNER ADDRESS W wQ PHONE NAME OF BUILDER ADDRESS Ced••443.0, DESCRIPTION OF WORK: qr! APPLICATION FOR BUILDING PERMIT . T /"-/D (7,- ^J / EXPIRATION DAIS STATE LICENSE NO. SALES TAX NO. PHONE ESTIMATED VALUE /��n COMPLETED WORK $ / %00v 0:1 PERMIT FEE PLAN CHECK FEE LATE PERMIT FEE TOTAL FEE TYPE OF CONST. f'L OCCUPANCY GROUP FIRE ZONE USE ZONE FIRE SPRINKLERS REQUIRED ❑Yes DNo MAX. OCC. LOAD i4e4iiriti k qv «.ptg4 a_ ,€. tf7"'irb► $ti %J 274reer 77j Egil , Ttofe &e !-r[ 474. D P c /21C 40 Iry J ..' Name of Tenant: Nature of Business: THIS PERMIT DOES NOT AUTHORIZE ANY WORK IN PUBLIC RIGHT -OF -WAY OR ON UTILITY EASEMENTS. SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, HEATING, VENTILATING OR AIR CONDITIONING. I HEREBY CERTIFY THAT NO WORK IS TO BE DONE EXCEPT AS DESCRIBED ABOVE AND IN APPROVED PLANS AND SPECIFICATIONS AND THAT ALL WORK IS TO CONFORM TO TUKWILA CODES AND ORDINANCES. APPLICANT Inv Frank Todd, Mayor CITY or T U KW I LA 6230 SOUTHCENTER BLVD. TUKWI LA, WASHINGTON 98067 PLANNING DEPARTMENT BOARD OF ADJUSTMENT Minutes of the meeting, 6 November 1975. The regular November meeting of The Tukwila Board of Adjustment was called to order at 8:00 P.M. by Vice- Chairperson Altmayer. Members present: Mrs. Crain, Mr. Bauch and Mrs. Altmayer. Gary Crutchfield, Assistant Planner, represented the Planning Department. Vice - Chairperson Altmayer called for approval of the October minutes. Motion by Mr. Bauch, seconded by Mrs. Crain and carried to approve the minutes of the October meeting as prepared. OLD BUSINESS III A Expiration of Variance - Val -Vue Sewer District Mr. Crutchfield read the Staff Report briefly stating the background and the fact the variance granted in November 1974 was about to expire due to the fact the grantee had not fulfilled the variance stipulations as required by Section 18.72.020 (TMC). Further explained three alternatives for action, one of which the Board should utilize at this meeting. Brief discussion among Board members led to general conclusion that simply extending the original variance would be a fruitless alternative.. Mr. Bauch stated that additional public monies should not be spent for structural alterations, however, the use of the building should be restricted to housing the emergency generator only. Mrs. Altmayer asked if Val -Vue Sewer District had approached the Planning Depart- ment in any manner since the granting of the original variance to attempt to comply with any of the original stipulations? Mr. Crutchfield stated he was not aware of any kind of effort on the part of Val -Vue Sewer District. Mr. Bauch pointed out the building was erected to protect the generator and if the generator is not required to be there then the building does not need to exist. BOARD OF ADJUSTMENT Page 2 Minutes of the Meeting 6 November 1975 Mr. Terry Matelich, Val -Vue Sewer District, explained the generator is absolutely necessary until some other viable technology can replace it. Motion by Mr. Bauch to extend the original variance for a period of four months. Motion was seconded by Mrs. Crain for purpose of discussion. Board members briefly discussed the intent of the motion. Motion failed for lack of majority vote. Motion by Mrs. Altmayer and seconded by Mr. Bauch to extend the variance for the life of the building with the following stipulations: 1. Obtain a building permit from the Tukwila Building Director to include any authorized punitive fees. 2. Design a specific landscape plan, to be approved by the Planning Department, including dense evergreen plantings. 3. That the building only be used for protection and housing of the emergency generator necessary to protect the lift- station. Motion by Mrs. Altmayer to amend original motion to require the building permit be obtained and the landscape plan approved within thirty (30) days. Motion to amend seconded by Mrs. Crain. Motion to amend original motion carried. Original motion, as amended, carried. III B Board Vacancies Vice - Chairperson Altmayer pointed out the Mayor had reacted to the Board's letter by appointing two persons to our Board. The appointments are currently in the Council committee for recommendation. Mrs. Crain asked why the Doce's signs are still in existence if they do not conform to the Sign Code. Mr. Crutchfield pointed out the City is currently adhering to all procedures required by the Sign Code and that the signs must be removed by 14 November 1975 or an application for variance must be filed by 14. November 1975. IV A PUBLIC HEARING - Variance - Underground Utilities (Seattle City Light) Mr. Crutchfield read the affidavit of publication and noted the hearing had been duly posted and property owners notified. Vice- Chairperson Altmayer opened the Public Hearing at 8:30 P.M. BOARD OF ADJUSTMENT Page 3 Minutes of the Meeting 6 November 1975 Mr. Tom Pace, 15215 - 51st Avenue South, stated that although he lived outside the City he was curious as to what effect the additional overhead facilities would have primarily on ameteur radio reception? Mr. Tom O'Brien, Seattle City Light, stated technology has improved the insul- ation of electrical lines considerably over the past few years and this addi- tional line should have no noticeable effect. However, any problems would be solved by Seattle City Light. Mr. O'Brien further pointed out that Seattle City Light has been considering for several years the trading of this service area to Puget Power in exchange for another service area of Puget Power. Mr. Pace asked why three -phase service is needed? Mr. O'Brien stated three -phase service is necessary to provide adequate service to the commercial property south of Southcenter Boulevard between 51st Avenue and I -5. Mr. Crutchfield read the Staff Report in its entirety including Findings, Conclusions and Recommendation. Also noted the method of financing the under- ground installation of the electrical service apparently has not been throughly examined by either the utility company or the property owners as Chapter 13,08 specifically requires such undergrounding costs to be worked out between the property owner and the utility company. Mr. Bauch asked what the cost would be to provide service to the residences existing on the commercially -zoned property? Mr. O'Brien estimated the cost to be in excess of $500 each. Mrs. Altmayer pointed out that if the variance is granted and three -phase service is provided overhead along Southcenter Boulevard, then Seattle City Light would never have to locate the lines underground as they could simply provide three -phase service to future commercial developments in the vicinity without any additional rebuild or relocation which would necessitate undergrouding. There being no further comments from the audience, Vice - Chairperson Altmayer closed the Public Hearing at 9:25 P.M. Motion by Mr. Bauch that variance be denied based on the findings and conclu- sions of the Staff Report. Motion seconded by Mrs. Crain and carried unani- mously. Motion by Mrs. Crain, seconded by Mr. Bauch and carried to adjourn the regular November meeting. Vice - Chairperson Altmayer adjourned the meetigg at 9:35 P.M. ary Crutchf ld, Secretary Tukwila Boar of Adjustment