HomeMy WebLinkAboutRes 0847 - Interlocal Agreement - Southwest Grady Way Bridge ReplacementCITY OF TUKWILA
WHEREAS, the City of Tukwila on October 7, 1977, entered into
agreement CAG 060 77 with the City of Renton, pursuant to the
Local Intergovernmental Cooperation Act, and
WHEREAS, amendment of the original agreement is necessary to
take into account changes in scope and estimated cost of
construction, federal participation, construction management
requirements, and award and advertising procedures,
NOW, THEREFORE, the City Council of the City of Tukwila,
Washington, do resolve as follows:
"THE MAYOR IS AUTHORIZED TO EXECUTE THE ATTACHED
SUPPLEMENT NO. 1 -83 AGREEMENT NO. CAG 060 77."
PASSED Y THE CITY COUNCIL OF THE CITY OF TUKWILA 22nd day
of February 1983
Approved as to Form:
DANIEL D. WOO,
Deputy City Attorney
RESOLUTION NO. 847
0370B /LEH /DDW
WASHINGTON
RESOLUTION OF THE CITY OF TUKWILA
AUTHORIZING THE MAYOR TO ENTER INTO
SUPPLEMENT NO. 1 -83 TO AGREEMENT NO. CAG 060 77
Mayor Gary Van Dusen
City Clerk Maxine Anderson
SUPPLEMENT NO. 1 -83
to
AGREEMENT NO. CAG 060 -77
Ref.: Joint Project Cities of Renton and Tukwila
SW Grady Way Bridge Replacement
WHEREAS the original Agreement No. CAG 060 -77 was prepared almost five
years in advance of the project construction phase, and
WHEREAS the actual scope and estimated cost of construction has substan-
tially changed and increased, and
WHEREAS items such as federal participation, pro -rated sharing of local
costs and construction management requirements have changed, including the use
of a modified State Advertising Award Procedure,
NOW, THEREFORE, IT IS MUTUALLY AGREED THAT THE FOLLOWING REVISED
AGREEMENT CLAUSES WILL APPLY:
I
The original clause III(d), page 2, is amended to read as follows:
The Construction Phase of the project will be handled in the following
manner, subject to authorization of Federal Bridge Replacement Funding
for construction:
The City of Renton will advertise for Letters of Interest from
Consulting Engineering firms qualified to perform construction
management /inspection. Short listing, interviews and selection
of a finalist will be accomplished jointly by the two cities.
The consultant's work program will include a stipulation that
inspection personnel from each city shall be utilized within
their capabilities whenever possible at the discretion of each
Public Works Director.
WSDOT will advertise for construction bids and approve the contract
award. A State Resident Inspector will be assigned to the project
to provide assistance and to check procedures.
Monthly contractor payment schedules will be reviewed by both
cities after preparation by the consultant, prior to them being
submitted to WSDOT for payment.
WSDOT will submit billings to the City of Renton for °local agency
funding share reimbursements. A copy of each WSDOT Invoice will
be forwarded to Tukwila with a letter explaining the pro -rated
amounts due as Tukwila's share (e.g. 50% of the 20% local match or
50% of an adjusted percentage per WSDOT's liability to pay for some
of the Retaining Wall costs). Tukwila's payment checks will be
forwarded to Renton's Public Works Department for transmittal to
WSDOT together with Renton's own payment warrants.
The City of Renton will forward to Tukwila a copy of each invoice for
services other than contractor payments (e.g. Consultant Fees, Testing
Charges, etc.) with a letter detailing the 50% pro -rated share to be
paid by Tukwila. Tukwila's payment check.will be forwarded to Renton's
Public Works Department for transmittal to the Vendor, together with
Renton's own payment warrant. Renton will submit reimbursement billings
to WSDOT /FHWA to claim the applicable Federal -Aid or State funding.
Tukwila's 50% share of the reimbursement will be sent to Tukwila
Public Works immediately upon receipt by Renton.
II
The original clause IV, page 3, is amended to read:
ATTEST:
a) Plans, Specifications Estimate Phase (PS E):
b) Construction Phase:
Based on the length of the existing bridge structure located in
each city, the City of Renton will pay 53% and the City of
Tukwila will pay 47% of the incurred expenses chargeable to those
Local Funds established by each city to match Federal Funds.
Such expenses will include, but will not be limited to, the
matching ratio of 25% of eligible project costs, with federal
PS E participation being 75
Based on the length of new bridge structure and improved roadway
located in each city, plus the total project administrative
responsibilities assumed by the City of Renton, construction
phase costs will be shared as follows:
Each city will pay SO% of the incurred expenses chargeable to
those Local Funds established by each city to match Federal Funds.
Such expenses will include, but will not be limited to, the
matching ratio of 20% of eligible project costs, with federal
participation in construction being 80
SIGNED THIS 7th day of March 1983
CITY OF RENTON
ATTEST:
CITY OF TUKWILA
1983.