Loading...
HomeMy WebLinkAboutRes 1495 - 2003-2008 Transportation Improvement Program i tt �J1L y�'„ ti ...1,s, „-ra://r i .(1)\.. n i1........ ....-0/ 1 rso C ity T kwila f u o Washington Resolution No. `7' C L-5 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, ADOPTING A SIX -YEAR TRANSPORTATION IMPROVEMENT PROGRAM, AND DIRECTING THE SAME TO BE FILED WITH THE STATE SECRETARY OF TRANSPORTATION AND THE TRANSPORTATION IMPROVEMENT BOARD. WHEREAS, pursuant to the requirements of RCW Chapters 35.77 and 47.26 as amended, the City Council of the City of Tukwila has previously adopted a Comprehensive Street Program and thereafter periodically modified said Comprehensive Street Program by resolution; and WHEREAS, the City Council has reviewed the work accomplished under said program, determined current and future City street and arterial needs, and based upon these findings has prepared a Six -Year Transportation Improvement Program for the ensuing six (6) calendar years (2003 2008); and WHEREAS, a public hearing was held on the said Six -Year Transportation Improvement Program on June 24, 2002; NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, HEREBY RESOLVES AS FOLLOWS: Section 1. Filing of Program. The City Clerk is hereby authorized and directed to file a copy of this resolution, together with the exhibit attached hereto, with the Secretary of Transportation and the Transportation Improvement Board of the State of Washington. PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, at a Special Meeting thereof this 2i-P" day of (1 LLI' L_' 2002. 0 Richard Simpson, Coucil President ATTEST/AUTHENTICATED: AUTHE NTICATED: C_._.,.ti�,c_, al .e E. Cantu, CMC, City Clerk AP ROVED AS TO FORM: B y ,1> �F Office of the City Attorney Filed with the City Clerk: DID° 2W 0Z, Passed by the City Council: O(�=�21 Resolution Number '-1 TIP 2003 -08 6/20/02. Doc AWL Washington State Department of Transportation Agency Tukwila Co. No.. 17 Co. Name: King Co City No.. 1320 MPO /RTPO: PSRC Project Identification A. Federal Aid No. B. Bridge No. o N C. Project Title o E D. StreetfRoad Name or Number Z E. Beginning MP or road Ending MP or road F Describe Work to be Done 14 1 P -STPUL TA96(097) 16 07 S Overlay and Repair Program Various City Streets from: to: Repair, rehabilitate, and overlay City streets as needed in an annual program. 16 4 19 5 CBD Transit Center Central Business District from: Construct transit center. to: Pedestrian Safety Program Various City Streets from: to: Pave and /or stripe shoulder for walkway and other pedestrian safety improvements. 14 6 Bridge Program Various City Streets from: to: 21 P 12 S 11 S Page 1 Six Year Transportation Improvement Program From 2003 to 2008 Hearing Date: 6/24/2002 Adoption Date: 6/24/2002 Amend Date: Resolution No.: 1495 Project Costs in Ihousands of Dollars Federally Funded r a Fund Source Information Expenditure Schedule Projects Only m y (Local Agency) d m Federal Funding RtW E a Phase Federal Federal State 4th Required c u State Local Total Envir. Date m Start Fund Cost by Fund 1 2nd 3rd Thru (mm/ddyyyy) Code Phase Code Funds Funds Funds 6th Type (M>7 0 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 03 S 5,000 Ft C ON 9/1/2002 STP(U) 2500 TPP 500 1000 4000 4000 Tukwila Intl Blvd (Phase 1) G P from: S 138 St to: S 152 St W Paving, curb gutter, sidewalk, drainage, illumination, T landscaping, and utility undergrounding. S Totals 2500 500 1000 4000 4000 14 1998(024 CN 3/1/2002 DEMO 1000 TPP 2500 4000 7500 7500 2 HP 01 S 1,200 Ft W S 180 St RR Underpass (UP /BNSF) T S from: Oakesdale Ave to: 72 Ave S p Construct a new grade separated crossing at S 180 St and the 0 UPRR, BNSF RR, and Interurban Trail. G Totals 1000 2500 4000 7500 7500 6650 66501 1050 1050 1050' 3500 C AL 9/1/2002 L G 0 P T Totals T PE W P S 1/1/2003 Totals 'AL 1 L 6650 6650 1050 1050 1050 3500 10 101 10 Perform load ratings and bi- annual inspections as well as construct necessary repairs and maintenance. Totals 735 735 100 100 185 350 CE No 8/1/01 CE No 6/29/01 No No 10 10 10 600 60Q r -loo too 100 300 No Totals 600 600 100 100 100 300 AL 1/1/2003 735 7351 100 100 185 350 L No Supersedes previous editions Washington State Department of Transportation Agency Tukwila ency Tukwila Co. No.. 17 Co. Name: King Co City No.. 1320 MPO!RTPO: PSRC o C E c U z l 0 Z Project Identification A. Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or road Ending MP or road F Describe Work to be Done 14 1 P STPUL TA96(097) 03 S 5.000 Ft C CN 9/1/2002 STP(U) 2500 TPP 500 1000 4000 4000 Tukwila Intl Blvd (Phase 1) G P from: S 138 St to: S 152 St W .Paving, curb gutter, sidewalk, drainage, illumination, T landscaping, and utility undergrounding. s Totals 2500 500 1000 4000 4000 2 4 HP- 1998(02 14 2 01 S 1,200 Ft W CN 37112002 DEMO 1000 TPP 2500 4000 7500 7500 S 180 St RR Underpass (UP /BNSF) T S from: Oakesdale Ave to: 72 Ave S p Construct a new grade separated crossing at S 180 St and the 0 UPRR, BNSF RR, and Interurban Trail. G Totals 1000 2500 4000 7500 7500 16 3 07 S C AL 9/1/2002 6650 66501 1050 1050 1050' 3500 L Overlay and Repair Program G Various City Streets 0 from: to: p Repair, rehabilitate, and overlay City streets as needed in an S annual program. T Totals 6650 6650 1050 1050 1050 3500 16 4 21 P T PE 1/1/2003 10' io] 10 19 5 CBD Transit Center Central Business District from: Construct transit center. to: 12 S Pedestrian Safety Program Various City Streets from: to: Pave and/or stripe shoulder for walkway and other pedestrian safety improvements. 14 6 11 S Bridge Program Various City Streets from: to: Perform bad ratings and bi- annual inspections as well as construct necessary repairs and maintenance. Hearing Date: 6/24/2002 Adoption Date: 6/24/2002 Amend Date: Resolution No.: 7495 Project Costs in Thousands or Do,lars Federally Funded Expenditure Schedu d .c Fund Source Information P Projects Only a ro (Local Agency) tu m 0 Federal Funding RAN r c 6 P Phase Federal Federal State 4th Required E~ w m Start Fund Cost Fund State Local Total Envir. Date o y Funds Funds Funds 1st 2nd 3rd Type (Amply a (mm/dd/yyyy) Code Phase Code 6th 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 W P S Totals 10 10 10 AL 1/1/2003 600 600[ 100 100 100 300 L Totals 600 600 100 100 100 300 AL 1!1/2003 735 735( 100 100 185 350 L No Totals Page1 Six Year Transportation improvement Program From 2003 to 2008 735 735 100 100 185 350 CE No 8/1/01 CE No 6/29/01 No No No Supersedes previous editions P Washington State Department of Transportation Page 2 Six Year Transportation Improvement Program Agency Tukwila From 2003 to 2008 Co. No.. 17 Co. Name: King Co Hearing Date: 6/24/2002 Adoption Date: 6/24/2002 City No.. 1320 MPO /RTPO: PSRC Amend Date: Resolution No.. 1495 Project Identification Project Costs in i housands or i)o.Iars Federally Funded Fund Source Information Expenditure Schedule Projects Only A. Federal Aid No. B. Bridge No. m v (Local Agency) 1 d C. Project Title d c 3 0 z Federal Funding RNV o E D. Street/Road Name or Number a� rn A a Phase Federal Federal State 4th Required 2 o 0- z E. Beginning MP or road Ending MP or road E I- m Start Fu Cost by Fund State Local Total Envir. Date c y Funds Funds Funds 1st 2nd 3rd Thnl Type (Nj y) F Describe Work to be Done o (mm/dd Code Phase Code 6th 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 14 7 STPUL 1027(004) 08541800 12 0. Mi G CN 1/1/2003 STP(U) 1073, 317 1390 1390 CE Interurban Ave Bridge Widening 0 No P from: 1,000 ft n/o Ft Dent to: Southcenter Blvd 6/29/01 Construct additional northbound left tum lane for HOV from T Interurban Ave to SB 1-405. w Totals 1073 317 1390 1390 00 8 STPE 1320(001) 01 0.25 Mi CN 1/12003 STP(E) 409 2416501 650 CE •Interurban Trail Bike /Ped Bridge No from: S Grady Way to: Green River Construct trail and trail connection (including bridge over the Green River) between the Interurban Trail and Green River Trail. Totals 14 9 08002500 09 P 1,000 Ft, T PE 1/1/2003 Boeing Access Rd Bridge Replacement P 0 from: Airport Way to: 1 -5 Reconstruct bridge. Totals P -STPUL T A96(157) 14 10 12 S 2,000 Ft W CN 9/15/2002 STP(U) West Valley Hwy Strander Blvd P 14 11 409 241 650 650 100 1001 100 100 100 100 6 50i 50 CE S from: 1,000 Ft North to: 1,000 Ft South G Construct additional northbound left tum lane from West Valley 0 Hwy to Strander Blvd. T Totals 44 6 50 50 CN 10/1/2002 CMAQ 147 23' 1701 170 CE Green River Valley Signal Coordination 12 S 6/29/01 No No 7/1/01 No from: West Valley Corridor to: S 180 St Corridor Design and construct signal coordination improvements, monitoring equipment, and control upgrages. Total 147 23 170 170 14 12 03 P G PE 9/1/2002 STP(U) 300 500 500 CE Tukwila Intl Blvd (Phase 2) 0 CN 111 200 TPP 6700 3765 /2005 10465 10465 No P from: S 116 St to: S 132 St S Construct overlay curb gutter, sidewalks, illumination, T drainage, landscaping. and utility undergrounding. w Totals 200 300 10465 10965 500 6700 3765 Supersedes previous editions Washington State Department of Transportation Agency Tukwila Co. No.. 17 Co. Name' City No.. 1320 MPO /RTPO• Project Identification A. Federal Aid No. B. Bridge No. m C. Project Title of 1 14 7 00 8 14 9 D. Street/Road Name or Number a Z E. Beginning MP or road Ending MP or road F Describe Work to be Done STPUL 1027(004) 08541800 Interurban Ave Bridge Widening from: 1,000 ft No Ft Dent to: Southcenter Blvd Construct additional northbound left turn lane for HOV from Interurban Ave to SB 1.405. STPE-1320(001) Interurban Trail Bike /Ped Bridge from: S Grady Way to: Green River Construct trail and trail connection (including bridge over the Green River) between the Interurban Trail and Green River Trail. 08002500 Boeing Access Rd Bridge Replacement from: Airport Way to: 1 -5 Reconstruct bridge. 14 10 P -STPUL TA96(150 West Valley Hwy Strander Blvd King Co. PSRC from: 1,000 Ft North to: 1,000 Ft South Construct additional northbound left turn lane from West Valley Hwy to Strander Blvd. 14 11 14 12 Green River Valley Signal Coordination from: West Valley Corridor to: S 180 St Corridor Design and construct signal coordination improvements, monitoring equipment, and control upgrages. Tukwila Intl Blvd (Phase 2) from: S 116 St to: S 132 St Construct overlay, curb gutter, sidewalks, illumination, drainage, landscaping, and utility undergrounding. 12 S 03 P 0 5 09 P 1.000 Ft T P 0 Phase Federal Start Fund (mmiddyyyy) Code m n 4 5 6 7 8 9 10 1/1/2003 12 S 0.38 Mi G CN 0 P S T W Totals 01 S 0.25 Mi CN 1/1/2003 STP(E) Totals PE 1/1/2003 CN 1/1/2005 0 W Totals STP(U) Totals CN 9/15/2002 STP(U) 12 S 2,000 Ft W P S G O T Totals CN 10/1/2002 CMAQ Page 2 Project Costs in f housanos of Dollars Fund Source Information Federal Funding Federal State Cost by Fund Phase Code 11 12 13 14 15 PE 9/1/2002 STP(U) 200 TPP 300 Six Year Transportation improvement Program Hearing Date: 6/24/2002 Amend Date: State Local Total Funds Funds Funds 1073 317 1390 1390 1073 317 1390 1390 409 241 6501 650 409 241 650 650 100 1001 100 44 44 147 100 100 100 6 501 50 6 50 50 23' 1701 170 Totals 147 23 170 170 200 300 10465 10965 10465 10465 500 1 500 From 2003 to 2008 Adoption Date: 6/24/2002 Resolution No.. 1495 Expenditure Schedule (Local Agency) R/W 4th Required Envir. Date 1st 2nd 3rd Thru T ype (MM/YY) 6th 16 17 18 19 20 21 6700 3765 500 6700 3765 Federally Funded Projects Only CE CE CE No 6/29/01 CE No 6/29/01 No No 7/1/01 CE No Supersedes previous editions No Washington State Department of Transportation Page 3 Six Year Transportation Improvement Program Agency Tukwila From 2003 to 2008 Co. No.. 17 Co. Name: King Co. Hearing Date: 6//24/2002 Adoption Date: 6/24/2002 City No.. 1320 MPO /RTPO• PSRC Amend Date: Resolution No.. 1495 Project identification A. Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or road Ending MP or road F Describe Work to be Done a0 a E a" Z 17 13 S 144 St from: Tukwila Intl Blvd to: Military Road Design and construct paving, curb gutter, sidewalks, drainage, illumination, and utility undergrounding. 16 14 CBD Traffic Signal Interconnect CBD Streets from: to: Design and install hard wire interconnect system between traffic signals in the CBD. Project Costs in housands of Dollars Federally Funded Fund Source Information Expenditure Schedule Projects Only m_ a d (Local Agency) m m F ederal Funding RPN °2 r A' o_ Phase Federal Federal State 4th Required c State Local Total Envir co- r 5 a) Start Fund Cost by Fund 1st 2nd 3rd Thru Date (mm /dd/yyyy) Code Phase Code Funds Funds Funds 6th Type (MM o_ 4 5 -6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 03 S 1,650 Ft W T S P G C Totals 12 P W AL 11112004 L CN 1/1/2004 1955 1955 1955 T G C S Totals 1/1/2004 1955 1955 1955 850 8501 70 780 850 850 70 780 580 5801 580 14 15 05 P 0.5 Mii W L i West Valley Highway 1 T S from: 1-405 to: Strander Blvd 1 p Design and construct widening to 7 lanes including curb gutter, G sidewalks, illumination, and drainage. Totals 580 580 580 16 16 12 P 1,000 Ft W AL 1/172004 350 3501 30 320 L S 133 St SR 599 Ramps Intersection T S from: 500 Ft on each leg to: 500 Ft on each leg G Design and construct intersection improvements including a new C traffic signal. P Totals 14 17 04 P A l. 1 L Tukwila Intl Blvd S 116 St from: SR99 Bridge to: SR599 Design and construct widening on Tukwila Intl Blvd and intersection improvements at T.I.B. /S 116 St. 16 18 East Marginal Way S T from: Boeing Access Rd to: S 112 St W 350 350 30 320 100 100 Totals 100 loo 100 03 P 1,500 Ft P PE 1/12004 Design and construct widening to 3 lanes induding curb gutter, sidewalks, drainage, landscaping, and utility undergrounding. Totals 35 35 35 No No No No Supersedes previous editions No No rni a rnI A O) V Functional p m `�p Class Z Z Priority O O Sc.' m l m to a w' Number m ass, r N ag g I ofgi fn o. g r 2 �.O a C7 CI =m 3 rn fN JI�C.. li a 3 a m G 3 x i 31 m �n 3 m m 3 00 m Gf 3 3 p T rn 0 n D o o i m r a&.-.. E o3 w f6 8,u A i d m t p y m `6. w m C R N ..t E p co v n i y D7 .'0 S w N n d JT 461 i O I CD N co n n a!e a I dam 7 mn° N m S 4 m A ax toN a co CO 8 m °8a z 133 I 8 x1 3 1 and vrn a 3A -1 0 o A mc 8 y g l?tC 0. I 2 'o m �2 o m- CO 1 E. C an d a A .c g A o A te m o a f m 1 n 0 3 a 1 D a n X Z A I iRn i 3 �m E a te° 1 p 3 O Q i co s o A g .:1? I m N o m 8 m a Q m o 3 7. 11� i m i o� o3! m a M d w o 0 1 8 o b �I o o Q I° w o c i N O oy y o fl W 3 �i� co a CO q 0 2 3 2 i e R 1 j c- 1 1 -t C 11 r 3 o o G m m u 1 m Q. :n r'i 1 m R m 3 1 m I 3 s I O A m E I to IT m a I v to 7 I a cp 2 a I I o I a: p 1 t 1p N j ix, d 7 1 m 1 d m I o' I 0. I' I i 0 m 0 j m o 0 0 o Improvement w A N to N CO p l Type(s) 0 p 0 0 0 (n CA Status t 3 o o cot Total Length I :E -4 CO "0 0GI tnl GI -4 g cn oC)0 :E lc) G) v fn —:E c.4 Utility Codes I a; m o I r r yl 311 r �I o r g r r-I o 0 mi Project Phase gl N N N N N 3 opo I E �I p A 1 2 A i O Si O m, Ol I A A' 1 t m T .72 O C n 1 I W i l N C. ,31 d C f0 i I 1 i I0 C' N 1 I T p m O. V N a il j 7 0. 0 a I 1 0TCA 0i ro m O; W CJ A); a i m c c N f m n i Q V! co N O I I j 1 J I C 01 ;G K ta i 1 y Ins, I o' D Z 211 �l i gl o o o'o CO CA o "o u" A m i a W I I 0 0 Au T W N 7 tn O1 O O Q U g C. t" N N I N i O Ai O I a P. 81 m I i n N x IQ I i o 9 I I i N oa 0= p I N1 N °I 0 o pl o a o 0 0• �i a D C 9 D I I w 7 o v' o N ^t 7 I 1 i o o o QI I 0. �m c v 0 D I I c o o (D i A a c„) o c„) 3 1 I to s 5 z� m I i I L i m t 1 0 I o N O r i i Olt .n O 1 N CD (C1 O O I O O 0 O -N m c g I 5 tD m Z m O pa I i 1 i a o. 3 Washington State Department of Transportation Agency Tukwila Co. No.. 17 Co. Name: King Co City No.. 1320 MPO /RTPO• PSRC 16 19 Andover Park E Minkler Blvd. Tukwila Intl Blvd (Phase 3) from: Southcenter Blvd to: S 158 St Construct additional northbound left tum lane at S 156 St for northbound HOV to northbound 1-405. 14 24 from: S 132 St to: S 138 St 'Reconstruct roadway including paving, curb gutter, sidewalks, illumination, drainage, and utility undergrounding. Totals AL 03 P 2,100 Ft G f/112061 C S W Totals Page4 Six Year Transportation Improvement Program From 2003 to 2008 Hearing Date: 6/24/2002 Adoption Date: 6/24/2002 Amend Date: Resolution No 1495 Project Identitication Project Costs in ihousanas of Uolrars Federally Funded D. Street/Road Expenditure Schedule Projects Only 6 Fund Source Information P A. Federal Aid No. B. Bridge No. a m m m (Local Agency) o v C. Project Title a J L F ederal Funding RAN Name or Number o.1- ;o Phase Federal Federal State 4th Required d E. Beginning MP or road Ending MP or road E r m Start Fund Cost by Fund State Local Total Envir Date u. Z g 9 g p y Funds Funds Funds 1st 2nd 3rd Th Type (MM/Y1') F Describe Work to be Done .f (mm/dd/yyyy) Code Phase Code 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 12 P 1,000 Ft AL 1/1/2005 200 200 200 L from: 500 Ft each leg to: 500 Ft each leg Design and construct intersection and traffic signal improvements and widening for left turn lanes. Totals 20 200 200 PE 1/1/2006 STP(U) 200 TPP 150 31 381 1 381 16 20 01 P 3,000 Ft W Southcenter Parkway T S Nom: S 180 St to: S City Limits p Design and construct widening to 4 lanes and center tum lane G 'including curb gutter, sidewalks, drainage, landscaping, and Totals 200 150 31 381 381 :3ikty- undergroundin 16 2 1 01 P 2,000 Ft P AL 1 1/1/2006 775 7751 775 L S 168 St T W from: Southcenter Pkwy to: Andover Park W S Construct new roadway including curb gutter, sidewalk, :drainage, illumination, and landscaping. Tot als 775 775 775 14 22 P 4 Ft W PE 1/1/2006 ST P(U) 3 96 1 62 4581 458 Interurban Ave T S from: S 143 St to: Ft Dent Way p Construct paving, curb gutter, drainage, illumination, sidewalk, G and landscaping. c Totals 396 62 458 458 14 23 1 2 P 1 Ft T AL 1/1/2007 725 72 5x 725 West Valley Hwy S 156 St p L 725 725 725 8033 8035 8035 8035 8035 8035 No No No No Supersedes previous editions No No 4 Washington State Department of Transportation Agency Tukwila Co. No.. 17 Co. Name: King Co City No.. 1320 MPO /RTPO: PSRC Andover Park E Minkler Blvd. from: 500 Ft each leg to: 500 Ft each leg Design and construct intersection and traffic signal improvements and widening for left tum lanes. 16 20 16 21 Southcenter Parkway from: S 180 St to: S City Limits 'Design and construct widening to 4 lanes and center tum lane including curb gutter sidewalks, drainage, landscaping, and utility undergrounding. S 168 St from: Southcenter Pkwy to: Andover Park W Construct new roadway including curb gutter, sidewalk, 'drainage, illumination, and landscaping. 14 22 Interurban Ave from: S 143 St to: Ft Dent Way Construct paving, curb gutter, drainage, illumination, sidewalk and landscaping. 14 23 West Valley Hwy S 156 St from: Southcenter Blvd to: S 158 St Construct additional northbound left tum lane at S 156 St for Page 4 Six Year Transportation Improvement Program From 2003 to 2008 Hearing Date: 6/24/2002 Adoption Date: 6/24/2002 Amend Date: Resolution No.. 1495 Project Identification Project Costs in thousands of Dollars Federally Funded Expenditure Schedule A. Federal Aid No. B. Bridge No. m d d Fund Source Information p Projects Only m (Local Agency) A d C. Project Title o d L Federal Funding RNV fr .B E D. Street/Road Name or Number iii g d Phase Federal Federal Slate 4th Required U a E. Beginning MP or road Ending MP or road E m Start Fund Cost by Fund State Local Total Envir. Date LL z 9 9 9 r o y Funds Funds Funds 1st 2nd 3rd Thru Type Describe Work to be Done o- (mm/ddiyjyy) Code Phase Code 6th yp e (MM/YY) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 16 19 12 P 1,000 Ft AL 1/1/2005 200 200 200 L Totals PE 1/1/2006 STP(U) 200 TPP 01 P 3,000 Ft W T S 200 200 200 150 31 3811 P G Totals 200 150 31 381 381 01 P 2,000 Ft P AL 1/1/2006 775 7751 775 T L No W S Totals 775 775 775 03 P 4,500 Ft W PE 1/1/2006 STP-(U) 396, 62 4581 458 T No S P C Totals 396 62 458 458 AL 1/1/2007 725 725 725 12 P 1,500 Ft T L p No northbound HOV to northbound 1 Totals 725 725 14 24 03 P 2,100 Ft G AL 1/1/2007 8035 8035 L Tukwila Int'I Blvd (Phase 3) C S from: S 132 St to: S 138 St p Reconstruct roadway including paving, curb gutter, sidewalks, T illumination, drainage, and utility undergrounding. w Totals 8035 8035 381 725 8035 8035 No No Supersedes previous editions No Wi r Washington State Department of Transportation Agency* Tukwila Co. No.. 17 Co. Name: King Co. City No.. 1320 MPO /RTPO: PSRC g o T of 0- z 16 25 14 26 Project Identification A. Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or road Ending MP or road F Describe Work to be Done 1 2 3 Minkler Blvd from: Southcenter Pkwy to: Andover Park W Consruct widening for 3 lanes inlcuding curb gutter, sidewalk, drainage, and landscaping. Tukwila Intl Blvd. (Phase 4) Hearing Date: 6/24/2002 Adoption Date' 6/24/2002 Amend Date: Resolution No.. 1495 Project Costs in Thousands of Dollars Federally Funded Expenditure Schedule c Fund Source Information P Projects Only m m a y (Local Agency) d J o L Federal Funding RNV a m o� w o Phase Federal Federal State 4th Required E o a"i Start Fund Cost by Fund State Local Total Envir Date mm /d y Funds Funds Funds 1st 2nd 3rd Thr E dyyyy) C ode Phase Code Type (M 6th 1') a. 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 04 P 2,000 Ft W AL 1/1/2008 T S P 03 P 3,500 Ft P S W Totals PE 1/1/2008 Page5 Six Year Transportation Improvement Program From 2003 to 2008 425 425 425 425 425 150 150 425 150 from: Boeing Access Rd to: S 116 St Design and construct widening including paving, curb gutter, sidewalk, drainage, illumination, landscaping, and utility Totals 150 150 150 undergrounding. 16 27 12 P 1,000 Ft W AL 1/1/2008 2 2201 220 Andover Pk E Industry Signal T L S from: 500 Ft on each leg to: 500 Ft on each leg ID Design and construct a traffic signal and intersection G improvements. Totals 220 220 220 17 28 03 P 600 Ft AL 1/1/2008 200 2001 200 Nelson Place L from: S 156 St to: S 158 st Design and construct paving, curb gutter, sidewalks, drainage, and illumination. Totals 200 200 200 00 29 32 P PE 1/1/2008 85 881 35 CBD Interurban Trail Connector from: Interurban Trail to: CBD Design and construct trail from Interurban Trail to CBD. Totals 35 35 35 16 30 05 P 1.500 Ft W PE 1/12008 _51 501 50 Southcenter Pkwy T S from: 1 Off Ramp to: S 168 St P Design and construct safety and capacity improvements. G Totals 50 50 50 Grand Totals fo Tukwila 5969 3450 38925 48344 17575 2065 9335 19369 No No No Supersedes previous editions No No No Washington State Department of Transportation Page 5 S ix Year Transportation Improvement Program Agency• Tukwila From 2003 to 2008 Co. No 17 Co. Name: King Co. Hearing Date: 6/24/2002 Adoption Date: 6/24/2002 City No.. 1320 MPO /RTPO: PSRC Amend Date: Resolution No.. 1495 Project Identification Project Costs in thousands of Dollars Federally Funded Expenditure Schedule A. Federal Aid No. B. Bridge No. o Fund Source Information P Projects Only `m d Federal Funding (Local Agency) R 4 E D. Street/Road Name or Number C. Project Title d c� m a Phase Federal Federal State 4th Required ii E. Beginning MP or road Ending MP or road E 1 5 m Start Fund Cost by Fund State Local Total Envir Dale o- o y Funds Funds Funds 1st 2nd 3rd Thru Typ MM/Y1) F Describe Work to be Done (mm/ddtyyyy) Code Phase Code 6th 1 2 3 4 5 6 7 8 9 10 1i" 12 13 14 15 16 17 18 19 20 21 16 25 04 P 2,000 Ft W AL 1/1/2008 425 425 425 Minkler Blvd T No S from: Southcenter Pkwy to: Andover Park W p Consruct widening for 3 lanes inlcuding curb gutter, sidewalk, drainage, and landscaping. Totals 425 425 425 14 26 03 P 3,500 Ft P PE 1/1/2008 150 1501 750 Tukwila Int'I Blvd. (Phase 4) S W from: Boeing Access Rd to: S 116 St Design and construct widening including paving, curb gutter, sidewalk, drainage, illumination, landscaping, and utility undergrounding. 16 27 17 28 Andover Pk E Industry Signal from: 500 Ft on each leg to: 500 Ft on each leg Design and construct a traffic signal and intersection improvements. Nelson Place from: S 156 St to: S 158 st Design and construct paving, curb gutter, sidewalks, drainage, and illumination. 00 29 CBD Interurban Trail Connector 12 P 1,000 Ft W i S P G 03 P 600 Ft 32 P Totals 150 150 150 Al. 1/1/2008 220 2201 220 L Totals 220 220 220 AL 1/1/2008 200 2001 200 L Totals PE_ 1/1%2008 200 200 1 200 35 from: Interurban Trail to: CBD Design and construct trail from Interurban Trail to CBD. Totals 35 35 35 16 30 05 P 1,500 Ft W PE 1/1!2008 50 501 50 Southcenter Pkwy T S from: 1 -5 Off Ramp to: S 168 St P Design and construct safety and capacity improvements. G Totals 5 0 50 50 50 Totals fo. Tukwila x969 3450 38925 48344 17575 2065 9335 19369 No No No Supersedes previous editions No No