Resolution No. `7' C L-5
A RESOLUTION OF THE CITY COUNCIL OF THE CITY
OF TUKWILA, WASHINGTON, ADOPTING A SIX -YEAR
TRANSPORTATION IMPROVEMENT PROGRAM, AND
DIRECTING THE SAME TO BE FILED WITH THE STATE
SECRETARY OF TRANSPORTATION AND THE
TRANSPORTATION IMPROVEMENT BOARD.
WHEREAS, pursuant to the requirements of RCW Chapters 35.77 and 47.26 as
amended, the City Council of the City of Tukwila has previously adopted a
Comprehensive Street Program and thereafter periodically modified said
Comprehensive Street Program by resolution; and
WHEREAS, the City Council has reviewed the work accomplished under said
program, determined current and future City street and arterial needs, and based upon
these findings has prepared a Six -Year Transportation Improvement Program for the
ensuing six (6) calendar years (2003 2008); and
WHEREAS, a public hearing was held on the said Six -Year Transportation
Improvement Program on June 24, 2002;
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA,
WASHINGTON, HEREBY RESOLVES AS FOLLOWS:
Section 1. Filing of Program. The City Clerk is hereby authorized and directed
to file a copy of this resolution, together with the exhibit attached hereto, with the
Secretary of Transportation and the Transportation Improvement Board of the State of
Washington.
PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON,
at a Special Meeting thereof this 2i-P" day of (1 LLI' L_' 2002.
0
Richard Simpson, Coucil President
ATTEST/AUTHENTICATED: AUTHE NTICATED:
C_._.,.ti�,c_,
al .e E. Cantu, CMC, City Clerk
AP ROVED AS TO FORM:
B y ,1> �F
Office of the City Attorney
Filed with the City Clerk: DID° 2W 0Z,
Passed by the City Council: O(�=�21
Resolution Number '-1
TIP 2003 -08 6/20/02. Doc
AWL
Washington State Department of Transportation
Agency Tukwila
Co. No.. 17 Co. Name: King Co
City No.. 1320 MPO /RTPO: PSRC
Project Identification
A. Federal Aid No. B. Bridge No.
o N C. Project Title
o E D. StreetfRoad Name or Number
Z E. Beginning MP or road Ending MP or road
F Describe Work to be Done
14 1 P -STPUL TA96(097)
16 07 S
Overlay and Repair Program
Various City Streets
from: to:
Repair, rehabilitate, and overlay City streets as needed in an
annual program.
16 4
19 5
CBD Transit Center
Central Business District
from:
Construct transit center.
to:
Pedestrian Safety Program
Various City Streets
from: to:
Pave and /or stripe shoulder for walkway and other pedestrian
safety improvements.
14 6
Bridge Program
Various City Streets
from: to:
21 P
12 S
11 S
Page 1 Six Year Transportation Improvement Program
From 2003 to 2008
Hearing Date: 6/24/2002 Adoption Date: 6/24/2002
Amend Date: Resolution No.: 1495
Project Costs in Ihousands of Dollars Federally Funded
r a Fund Source Information Expenditure Schedule Projects Only
m
y (Local Agency)
d m Federal Funding RtW
E a Phase Federal Federal State 4th Required
c u State Local Total Envir. Date
m Start Fund Cost by Fund 1 2nd 3rd Thru
(mm/ddyyyy) Code Phase Code Funds Funds Funds 6th Type (M>7
0
4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
03 S 5,000 Ft C ON 9/1/2002 STP(U) 2500 TPP 500 1000 4000 4000
Tukwila Intl Blvd (Phase 1) G
P
from: S 138 St to: S 152 St W
Paving, curb gutter, sidewalk, drainage, illumination, T
landscaping, and utility undergrounding. S Totals 2500 500 1000 4000 4000
14 1998(024 CN 3/1/2002 DEMO 1000 TPP 2500 4000 7500 7500
2 HP 01 S 1,200 Ft W
S 180 St RR Underpass (UP /BNSF) T
S
from: Oakesdale Ave to: 72 Ave S p
Construct a new grade separated crossing at S 180 St and the 0
UPRR, BNSF RR, and Interurban Trail. G Totals 1000 2500 4000 7500 7500
6650 66501 1050 1050 1050' 3500
C AL 9/1/2002
L
G
0
P
T Totals
T PE
W
P
S
1/1/2003
Totals
'AL 1
L
6650 6650 1050 1050 1050 3500
10 101 10
Perform load ratings and bi- annual inspections as well as
construct necessary repairs and maintenance. Totals 735 735 100 100 185 350
CE
No
8/1/01
CE
No
6/29/01
No
No
10 10 10
600 60Q r -loo too 100 300
No
Totals 600 600 100 100 100 300
AL 1/1/2003 735 7351 100 100 185 350
L No
Supersedes previous editions
Washington State Department of Transportation
Agency Tukwila
ency Tukwila
Co. No.. 17 Co. Name: King Co
City No.. 1320 MPO!RTPO: PSRC
o C
E
c U z
l 0 Z
Project Identification
A. Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or road Ending MP or road
F Describe Work to be Done
14 1 P STPUL TA96(097) 03 S 5.000 Ft C CN 9/1/2002 STP(U) 2500 TPP 500 1000 4000 4000
Tukwila Intl Blvd (Phase 1) G
P
from: S 138 St to: S 152 St W
.Paving, curb gutter, sidewalk, drainage, illumination, T
landscaping, and utility undergrounding. s Totals 2500 500 1000 4000 4000
2 4 HP- 1998(02
14 2 01 S 1,200 Ft W CN 37112002 DEMO 1000 TPP 2500 4000 7500 7500
S 180 St RR Underpass (UP /BNSF) T
S
from: Oakesdale Ave to: 72 Ave S p
Construct a new grade separated crossing at S 180 St and the 0
UPRR, BNSF RR, and Interurban Trail. G Totals 1000 2500 4000 7500 7500
16 3 07 S C AL
9/1/2002 6650 66501 1050 1050 1050' 3500
L
Overlay and Repair Program G
Various City Streets 0
from: to: p
Repair, rehabilitate, and overlay City streets as needed in an S
annual program. T Totals 6650 6650 1050 1050 1050 3500
16 4 21 P T PE 1/1/2003 10' io] 10
19 5
CBD Transit Center
Central Business District
from:
Construct transit center.
to:
12 S
Pedestrian Safety Program
Various City Streets
from: to:
Pave and/or stripe shoulder for walkway and other pedestrian
safety improvements.
14 6
11 S
Bridge Program
Various City Streets
from: to:
Perform bad ratings and bi- annual inspections as well as
construct necessary repairs and maintenance.
Hearing Date: 6/24/2002 Adoption Date: 6/24/2002
Amend Date: Resolution No.: 7495
Project Costs in Thousands or Do,lars Federally Funded
Expenditure Schedu
d .c Fund Source Information P Projects Only
a ro (Local Agency) tu
m 0 Federal Funding RAN
r c 6 P Phase Federal Federal State 4th Required
E~ w m Start Fund Cost Fund State Local Total Envir. Date
o y Funds Funds Funds 1st 2nd 3rd Type (Amply
a (mm/dd/yyyy) Code Phase Code 6th
4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
W
P
S
Totals 10 10 10
AL 1/1/2003 600 600[ 100 100 100 300
L
Totals 600 600 100 100 100 300
AL 1!1/2003 735 735( 100 100 185 350
L No
Totals
Page1 Six Year Transportation improvement Program
From 2003 to 2008
735 735 100 100 185 350
CE
No
8/1/01
CE
No
6/29/01
No
No
No
Supersedes previous editions
P Washington State Department of Transportation Page 2 Six Year Transportation Improvement Program
Agency Tukwila From 2003 to 2008
Co. No.. 17 Co. Name: King Co Hearing Date: 6/24/2002 Adoption Date: 6/24/2002
City No.. 1320 MPO /RTPO: PSRC Amend Date: Resolution No.. 1495
Project Identification Project Costs in i housands or i)o.Iars Federally Funded
Fund Source Information Expenditure Schedule Projects Only
A. Federal Aid No. B. Bridge No. m v (Local Agency)
1 d C. Project Title d c 3 0 z Federal Funding RNV
o E D. Street/Road Name or Number a� rn A a Phase Federal Federal State 4th Required
2 o 0- z E. Beginning MP or road Ending MP or road E I- m Start Fu Cost by Fund State Local Total Envir. Date
c y Funds Funds Funds 1st 2nd 3rd Thnl Type (Nj y)
F Describe Work to be Done o (mm/dd Code Phase Code 6th
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
14 7 STPUL 1027(004) 08541800 12 0. Mi G CN 1/1/2003 STP(U) 1073, 317 1390 1390 CE
Interurban Ave Bridge Widening 0 No
P
from: 1,000 ft n/o Ft Dent to: Southcenter Blvd 6/29/01
Construct additional northbound left tum lane for HOV from T
Interurban Ave to SB 1-405. w Totals 1073 317 1390 1390
00 8 STPE 1320(001) 01 0.25 Mi CN 1/12003 STP(E) 409 2416501 650 CE
•Interurban Trail Bike /Ped Bridge No
from: S Grady Way to: Green River
Construct trail and trail connection (including bridge over the
Green River) between the Interurban Trail and Green River Trail. Totals
14 9 08002500 09 P 1,000 Ft, T PE 1/1/2003
Boeing Access Rd Bridge Replacement P
0
from: Airport Way to: 1 -5
Reconstruct bridge.
Totals
P -STPUL T A96(157)
14 10 12 S 2,000 Ft W CN 9/15/2002 STP(U)
West Valley Hwy Strander Blvd P
14 11
409
241 650 650
100 1001 100
100 100 100
6 50i 50
CE
S
from: 1,000 Ft North to: 1,000 Ft South G
Construct additional northbound left tum lane from West Valley 0
Hwy to Strander Blvd. T Totals 44 6 50 50
CN 10/1/2002 CMAQ 147 23' 1701 170 CE
Green River Valley Signal Coordination
12 S
6/29/01
No
No
7/1/01
No
from: West Valley Corridor to: S 180 St Corridor
Design and construct signal coordination improvements,
monitoring equipment, and control upgrages. Total 147 23 170 170
14 12 03 P G PE 9/1/2002 STP(U) 300 500 500 CE
Tukwila Intl Blvd (Phase 2) 0 CN 111 200 TPP
6700 3765
/2005 10465 10465 No
P
from: S 116 St to: S 132 St S
Construct overlay curb gutter, sidewalks, illumination, T
drainage, landscaping. and utility undergrounding. w Totals 200 300 10465 10965 500 6700 3765
Supersedes previous editions
Washington State Department of Transportation
Agency Tukwila
Co. No.. 17 Co. Name'
City No.. 1320 MPO /RTPO•
Project Identification
A. Federal Aid No. B. Bridge No.
m C. Project Title
of
1
14 7
00 8
14 9
D. Street/Road Name or Number
a Z E. Beginning MP or road Ending MP or road
F Describe Work to be Done
STPUL 1027(004) 08541800
Interurban Ave Bridge Widening
from: 1,000 ft No Ft Dent to: Southcenter Blvd
Construct additional northbound left turn lane for HOV from
Interurban Ave to SB 1.405.
STPE-1320(001)
Interurban Trail Bike /Ped Bridge
from: S Grady Way to: Green River
Construct trail and trail connection (including bridge over the
Green River) between the Interurban Trail and Green River Trail.
08002500
Boeing Access Rd Bridge Replacement
from: Airport Way to: 1 -5
Reconstruct bridge.
14 10 P -STPUL TA96(150
West Valley Hwy Strander Blvd
King Co.
PSRC
from: 1,000 Ft North to: 1,000 Ft South
Construct additional northbound left turn lane from West Valley
Hwy to Strander Blvd.
14 11
14 12
Green River Valley Signal Coordination
from: West Valley Corridor to: S 180 St Corridor
Design and construct signal coordination improvements,
monitoring equipment, and control upgrages.
Tukwila Intl Blvd (Phase 2)
from: S 116 St to: S 132 St
Construct overlay, curb gutter, sidewalks, illumination,
drainage, landscaping, and utility undergrounding.
12 S
03 P
0
5
09 P 1.000 Ft T
P
0
Phase Federal
Start Fund
(mmiddyyyy) Code
m
n
4 5 6 7 8 9 10
1/1/2003
12 S 0.38 Mi G CN
0
P
S
T
W Totals
01 S 0.25 Mi CN 1/1/2003 STP(E)
Totals
PE 1/1/2003
CN 1/1/2005
0
W Totals
STP(U)
Totals
CN 9/15/2002 STP(U)
12 S 2,000 Ft W
P
S
G
O
T Totals
CN 10/1/2002 CMAQ
Page 2
Project Costs in f housanos of Dollars
Fund Source Information
Federal Funding
Federal State
Cost by Fund
Phase Code
11 12 13 14 15
PE 9/1/2002 STP(U) 200 TPP 300
Six Year Transportation improvement Program
Hearing Date: 6/24/2002
Amend Date:
State Local Total
Funds Funds Funds
1073 317 1390 1390
1073 317 1390 1390
409 241 6501 650
409 241 650 650
100 1001 100
44
44
147
100 100 100
6 501 50
6 50 50
23' 1701 170
Totals 147 23 170 170
200 300 10465 10965
10465 10465
500 1 500
From 2003 to 2008
Adoption Date: 6/24/2002
Resolution No.. 1495
Expenditure Schedule
(Local Agency)
R/W
4th Required
Envir. Date
1st 2nd 3rd Thru T ype (MM/YY)
6th
16 17 18 19 20 21
6700 3765
500 6700 3765
Federally Funded
Projects Only
CE
CE
CE
No
6/29/01
CE
No
6/29/01
No
No
7/1/01
CE
No
Supersedes previous editions
No
Washington State Department of Transportation
Page 3 Six Year Transportation Improvement Program
Agency Tukwila From 2003 to 2008
Co. No.. 17 Co. Name: King Co. Hearing Date: 6//24/2002 Adoption Date: 6/24/2002
City No.. 1320 MPO /RTPO• PSRC Amend Date: Resolution No.. 1495
Project identification
A. Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or road Ending MP or road
F Describe Work to be Done
a0
a
E
a"
Z
17 13
S 144 St
from: Tukwila Intl Blvd to: Military Road
Design and construct paving, curb gutter, sidewalks, drainage,
illumination, and utility undergrounding.
16 14
CBD Traffic Signal Interconnect
CBD Streets
from: to:
Design and install hard wire interconnect system between traffic
signals in the CBD.
Project Costs in housands of Dollars Federally Funded
Fund Source Information Expenditure Schedule Projects Only
m_ a d (Local Agency)
m m F ederal Funding RPN
°2 r A' o_ Phase Federal Federal State 4th Required
c State Local Total Envir
co- r 5 a) Start Fund Cost by Fund 1st 2nd 3rd Thru Date
(mm /dd/yyyy) Code Phase Code Funds Funds Funds 6th Type (MM
o_
4 5 -6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
03 S 1,650 Ft W
T
S
P
G
C Totals
12 P W AL 11112004
L
CN 1/1/2004 1955 1955 1955
T
G
C
S Totals
1/1/2004
1955 1955 1955
850 8501 70 780
850 850 70 780
580 5801 580
14 15 05 P 0.5 Mii W L i
West Valley Highway 1 T
S
from: 1-405 to: Strander Blvd 1 p
Design and construct widening to 7 lanes including curb gutter, G
sidewalks, illumination, and drainage. Totals 580 580 580
16 16 12 P 1,000 Ft W AL 1/172004 350 3501 30 320
L
S 133 St SR 599 Ramps Intersection T
S
from: 500 Ft on each leg to: 500 Ft on each leg G
Design and construct intersection improvements including a new C
traffic signal. P Totals
14 17 04 P A l. 1
L
Tukwila Intl Blvd S 116 St
from: SR99 Bridge to: SR599
Design and construct widening on Tukwila Intl Blvd and
intersection improvements at T.I.B. /S 116 St.
16 18
East Marginal Way S
T
from: Boeing Access Rd to: S 112 St W
350 350 30 320
100 100
Totals 100 loo 100
03 P 1,500 Ft P PE 1/12004
Design and construct widening to 3 lanes induding curb gutter,
sidewalks, drainage, landscaping, and utility undergrounding. Totals 35 35 35
No
No
No
No
Supersedes previous editions
No
No
rni a rnI A O) V Functional p m `�p
Class Z
Z
Priority O O Sc.'
m l m to a w' Number m
ass, r N ag g I ofgi fn o. g r 2 �.O a C7 CI =m 3 rn fN JI�C..
li a 3 a m G 3 x i 31 m �n 3 m m 3 00 m Gf 3 3 p T rn 0 n D o o i m
r a&.-.. E o3 w f6 8,u A i
d m t p y m `6. w m C R N ..t E p co v n i y
D7 .'0 S w N n d JT 461 i O I CD N co n
n a!e a I dam 7 mn° N m S 4 m A ax toN a co CO 8 m °8a z 133 I 8 x1 3 1 and vrn a 3A -1 0 o A
mc 8 y g l?tC 0. I 2 'o m �2 o m- CO 1 E. C an d a
A .c g A o A te m o a f m 1 n 0 3 a 1 D a n X Z A
I iRn i 3 �m E a te° 1 p 3 O Q i
co
s o A g .:1? I m N o m 8 m a Q m o 3 7.
11� i m i o� o3! m a M
d w o 0 1 8 o b �I o o Q I° w o c i N O
oy y o fl W 3 �i� co
a CO
q 0 2 3 2 i e R 1 j c- 1 1 -t
C 11 r 3 o o G m m u 1 m Q. :n
r'i 1 m R m 3 1 m I 3 s I O
A m E I to IT m a I v to
7 I a cp 2 a I I o I a:
p 1 t 1p N j ix, d 7
1 m 1 d m I o' I 0.
I' I i 0 m 0 j m
o 0 0 o Improvement
w A N to N CO p l Type(s)
0 p 0 0 0 (n CA Status
t 3 o o cot Total Length
I
:E -4 CO "0 0GI tnl GI -4 g cn oC)0 :E lc) G) v fn —:E c.4 Utility Codes
I a; m o I r r yl 311 r �I o r g r r-I o 0 mi Project Phase gl
N N N N N 3
opo I E �I p
A
1
2 A i O Si O m, Ol
I
A A' 1 t m
T .72 O C n 1 I W
i l N C. ,31 d C
f0
i I 1 i I0
C' N
1 I T p m O. V
N a il j 7
0. 0 a
I
1 0TCA 0i ro m
O; W CJ
A); a i m c c
N f m n i Q V!
co N
O
I I j 1 J I C 01 ;G K ta i 1 y Ins,
I o' D Z 211
�l i gl o o o'o CO CA
o "o u" A m i a W
I I 0 0 Au
T W N 7
tn O1 O O Q U g C. t" N N I N
i O Ai O
I a P.
81 m I
i
n N x IQ
I i o
9 I I i N oa 0=
p I N1 N °I 0 o pl o a o 0 0• �i a D C 9
D I I w 7 o v' o N ^t
7 I 1 i o o o QI I
0. �m c v 0
D I I c o o (D
i A a c„) o c„) 3
1 I to s 5 z� m
I i I
L i m
t 1 0 I o N O
r i i Olt .n O 1 N CD (C1
O O I O O 0 O -N m c g I
5 tD m Z m O pa
I i 1 i a o. 3
Washington State Department of Transportation
Agency Tukwila
Co. No.. 17 Co. Name: King Co
City No.. 1320 MPO /RTPO• PSRC
16 19
Andover Park E Minkler Blvd.
Tukwila Intl Blvd (Phase 3)
from: Southcenter Blvd to: S 158 St
Construct additional northbound left tum lane at S 156 St for
northbound HOV to northbound 1-405.
14 24
from: S 132 St to: S 138 St
'Reconstruct roadway including paving, curb gutter, sidewalks,
illumination, drainage, and utility undergrounding.
Totals
AL
03 P 2,100 Ft G f/112061
C
S
W Totals
Page4 Six Year Transportation Improvement Program
From 2003 to 2008
Hearing Date: 6/24/2002 Adoption Date: 6/24/2002
Amend Date: Resolution No 1495
Project Identitication Project Costs in ihousanas of Uolrars Federally Funded
D. Street/Road Expenditure Schedule Projects Only
6 Fund Source Information P
A. Federal Aid No. B. Bridge No. a m m
m (Local Agency)
o v C. Project Title a J L F ederal Funding RAN Name or Number o.1- ;o Phase Federal Federal State 4th Required
d E. Beginning MP or road Ending MP or road E r m Start Fund Cost by Fund State Local Total Envir Date
u. Z g 9 g p y Funds Funds Funds 1st 2nd 3rd Th Type (MM/Y1')
F Describe Work to be Done .f (mm/dd/yyyy) Code Phase Code 6th
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
12 P 1,000 Ft AL 1/1/2005 200 200 200
L
from: 500 Ft each leg to: 500 Ft each leg
Design and construct intersection and traffic signal improvements
and widening for left turn lanes. Totals 20 200 200
PE 1/1/2006 STP(U) 200 TPP 150 31 381 1 381
16 20 01 P 3,000 Ft W
Southcenter Parkway T
S
Nom: S 180 St to: S City Limits p
Design and construct widening to 4 lanes and center tum lane G
'including curb gutter, sidewalks, drainage, landscaping, and Totals 200 150 31 381 381
:3ikty- undergroundin
16 2 1 01 P 2,000 Ft P AL 1 1/1/2006 775 7751 775
L
S 168 St T
W
from: Southcenter Pkwy to: Andover Park W S
Construct new roadway including curb gutter, sidewalk,
:drainage, illumination, and landscaping. Tot als 775 775 775
14 22
P 4 Ft W PE 1/1/2006 ST P(U) 3 96 1 62 4581 458
Interurban Ave T
S
from: S 143 St to: Ft Dent Way p
Construct paving, curb gutter, drainage, illumination, sidewalk, G
and landscaping. c Totals 396 62 458 458
14 23 1 2 P 1 Ft T AL 1/1/2007 725 72 5x 725
West Valley Hwy S 156 St p L
725 725 725
8033 8035 8035
8035 8035 8035
No
No
No
No
Supersedes previous editions
No
No
4
Washington State Department of Transportation
Agency Tukwila
Co. No.. 17 Co. Name: King Co
City No.. 1320 MPO /RTPO: PSRC
Andover Park E Minkler Blvd.
from: 500 Ft each leg to: 500 Ft each leg
Design and construct intersection and traffic signal improvements
and widening for left tum lanes.
16 20
16 21
Southcenter Parkway
from: S 180 St to: S City Limits
'Design and construct widening to 4 lanes and center tum lane
including curb gutter sidewalks, drainage, landscaping, and
utility undergrounding.
S 168 St
from: Southcenter Pkwy to: Andover Park W
Construct new roadway including curb gutter, sidewalk,
'drainage, illumination, and landscaping.
14 22
Interurban Ave
from: S 143 St to: Ft Dent Way
Construct paving, curb gutter, drainage, illumination, sidewalk
and landscaping.
14 23
West Valley Hwy S 156 St
from: Southcenter Blvd to: S 158 St
Construct additional northbound left tum lane at S 156 St for
Page 4
Six Year Transportation Improvement Program
From 2003 to 2008
Hearing Date: 6/24/2002 Adoption Date: 6/24/2002
Amend Date: Resolution No.. 1495
Project Identification Project Costs in thousands of Dollars Federally Funded
Expenditure Schedule
A. Federal Aid No. B. Bridge No. m d d Fund Source Information p Projects Only
m (Local Agency)
A d C. Project Title o d L Federal Funding RNV fr .B E D. Street/Road Name or Number iii g d Phase Federal Federal Slate 4th Required
U a E. Beginning MP or road Ending MP or road E m Start Fund Cost by Fund State Local Total Envir. Date
LL z 9 9 9 r o y Funds Funds Funds 1st 2nd 3rd Thru Type
Describe Work to be Done o- (mm/ddiyjyy) Code Phase Code 6th yp e (MM/YY)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
16 19 12 P 1,000 Ft AL 1/1/2005 200 200 200
L
Totals
PE 1/1/2006 STP(U) 200 TPP
01 P 3,000 Ft W
T
S
200 200 200
150 31 3811
P
G
Totals 200 150 31 381 381
01 P 2,000 Ft P AL 1/1/2006 775 7751 775
T L
No
W
S
Totals 775 775 775
03 P 4,500 Ft W PE 1/1/2006 STP-(U) 396, 62 4581 458
T No
S
P
C Totals 396 62 458 458
AL 1/1/2007 725 725 725
12 P 1,500 Ft T L
p No
northbound HOV to northbound 1 Totals 725 725
14 24 03 P 2,100 Ft G AL 1/1/2007 8035 8035
L
Tukwila Int'I Blvd (Phase 3) C
S
from: S 132 St to: S 138 St p
Reconstruct roadway including paving, curb gutter, sidewalks, T
illumination, drainage, and utility undergrounding.
w Totals 8035 8035
381
725
8035
8035
No
No
Supersedes previous editions
No
Wi r Washington State Department of Transportation
Agency* Tukwila
Co. No.. 17 Co. Name: King Co.
City No.. 1320 MPO /RTPO: PSRC
g o
T
of
0- z
16 25
14 26
Project Identification
A. Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or road Ending MP or road
F Describe Work to be Done
1 2 3
Minkler Blvd
from: Southcenter Pkwy to: Andover Park W
Consruct widening for 3 lanes inlcuding curb gutter, sidewalk,
drainage, and landscaping.
Tukwila Intl Blvd. (Phase 4)
Hearing Date: 6/24/2002 Adoption Date' 6/24/2002
Amend Date: Resolution No.. 1495
Project Costs in Thousands of Dollars Federally Funded
Expenditure Schedule
c Fund Source Information P Projects Only
m m a y (Local Agency)
d J o L Federal Funding RNV
a m
o� w o Phase Federal Federal State 4th Required
E o a"i Start Fund Cost by Fund State Local Total Envir Date
mm /d y Funds Funds Funds 1st 2nd 3rd Thr
E dyyyy) C ode Phase Code Type (M 6th 1')
a.
4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
04 P 2,000 Ft W AL 1/1/2008
T
S
P
03 P 3,500 Ft P
S
W
Totals
PE 1/1/2008
Page5 Six Year Transportation Improvement Program
From 2003 to 2008
425 425 425
425 425
150 150
425
150
from: Boeing Access Rd to: S 116 St
Design and construct widening including paving, curb gutter,
sidewalk, drainage, illumination, landscaping, and utility Totals 150 150 150
undergrounding.
16 27 12 P 1,000 Ft W AL 1/1/2008 2 2201 220
Andover Pk E Industry Signal T L
S
from: 500 Ft on each leg to: 500 Ft on each leg ID
Design and construct a traffic signal and intersection G
improvements. Totals 220 220 220
17 28 03 P 600 Ft AL 1/1/2008 200 2001 200
Nelson Place L
from: S 156 St to: S 158 st
Design and construct paving, curb gutter, sidewalks, drainage,
and illumination. Totals 200 200 200
00 29 32 P PE 1/1/2008 85 881 35
CBD Interurban Trail Connector
from: Interurban Trail to: CBD
Design and construct trail from Interurban Trail to CBD.
Totals 35 35 35
16 30 05 P 1.500 Ft W PE 1/12008 _51 501 50
Southcenter Pkwy T
S
from: 1 Off Ramp to: S 168 St P
Design and construct safety and capacity improvements. G
Totals 50 50 50
Grand Totals fo Tukwila 5969 3450 38925 48344 17575 2065 9335 19369
No
No
No
Supersedes previous editions
No
No
No
Washington State Department of Transportation Page 5 S ix Year Transportation Improvement Program
Agency• Tukwila From 2003 to 2008
Co. No 17 Co. Name: King Co. Hearing Date: 6/24/2002 Adoption Date: 6/24/2002
City No.. 1320 MPO /RTPO: PSRC Amend Date: Resolution No.. 1495
Project Identification Project Costs in thousands of Dollars Federally Funded
Expenditure Schedule
A. Federal Aid No. B. Bridge No. o Fund Source Information P Projects Only
`m d Federal Funding (Local Agency) R
4 E D. Street/Road Name or Number C. Project Title d c� m a Phase Federal Federal State 4th Required
ii E. Beginning MP or road Ending MP or road E 1 5 m Start Fund Cost by Fund State Local Total Envir Dale
o-
o y Funds Funds Funds 1st 2nd 3rd Thru Typ MM/Y1)
F Describe Work to be Done (mm/ddtyyyy) Code Phase Code 6th
1 2 3 4 5 6 7 8 9 10 1i" 12 13 14 15 16 17 18 19 20 21
16 25 04 P 2,000 Ft W AL 1/1/2008 425 425 425
Minkler Blvd T No
S
from: Southcenter Pkwy to: Andover Park W p
Consruct widening for 3 lanes inlcuding curb gutter, sidewalk,
drainage, and landscaping. Totals 425 425 425
14 26 03 P 3,500 Ft P PE 1/1/2008 150 1501 750
Tukwila Int'I Blvd. (Phase 4) S
W
from: Boeing Access Rd to: S 116 St
Design and construct widening including paving, curb gutter,
sidewalk, drainage, illumination, landscaping, and utility
undergrounding.
16 27
17 28
Andover Pk E Industry Signal
from: 500 Ft on each leg to: 500 Ft on each leg
Design and construct a traffic signal and intersection
improvements.
Nelson Place
from: S 156 St to: S 158 st
Design and construct paving, curb gutter, sidewalks, drainage,
and illumination.
00 29
CBD Interurban Trail Connector
12 P 1,000 Ft W
i
S
P
G
03 P 600 Ft
32 P
Totals 150 150 150
Al. 1/1/2008 220 2201 220
L
Totals 220 220 220
AL 1/1/2008 200 2001 200
L
Totals
PE_ 1/1%2008
200 200
1
200
35
from: Interurban Trail to: CBD
Design and construct trail from Interurban Trail to CBD.
Totals 35 35 35
16 30 05 P 1,500 Ft W PE 1/1!2008 50 501 50
Southcenter Pkwy T
S
from: 1 -5 Off Ramp to: S 168 St P
Design and construct safety and capacity improvements. G
Totals 5 0 50 50
50
Totals fo. Tukwila x969 3450 38925 48344 17575 2065 9335 19369