Loading...
HomeMy WebLinkAboutOrd 0953 - 1976-1981 Comprehensive Street Program AI 10 c,A3 tzis CITY OF TUK WASHINGTON ORDINANCE NO. 953 5` AN ORDINANCE ADOPTING A REVISED AND EXTENDED COMPREHENSIVE STREET PROGRAM IN ACCORDANCE WITH RCW 35.77. WHEREAS, The City of Tukwila has previously adopted a Comprehensive Street Program pursuant to RCW 35.77, and WHEREAS, The City is required annually to review the work accomplished under said Program and to determine current City Street needs, and WHEREAS, A public hearing was held on the Comprehensive Street Program on Monday, November 3, 1975, at 7:00 pm, in the Tukwila City Hall, before the Tukwila City Council, NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, DO ORDAIN AS FOLLOWS: Section 1. Pursuant to RCW 35.77 and the public hearing on November 3, 1975, the attached documents, marked "Exhibit A" and incorp- orated herein by reference, are declared and adopted as the Revised Six -Year Comprehensive Street Program for the City of Tukwila. Section 2. This Ordinance and exhibit shall be filed with the Director of Highways of the State of Washington within thirty days after its adoption as required by RCW 35.77. Section 3. This Ordinance and exhibit shall be submitted to the Urban Arterial Board as required by RCW 35.77. PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, at a regular meeting thereof this /7-tiL day of�/�7/f /1975. yor it /a /x5 Date Approved' i Attest: /27,47//' 2 i City Clerk j Approved as to form: v g ;-'::f- _..44 Pit Attorney Published: kecc Chrnnith, /2//2 �,r� 41 \U c smom �1 EX1n C 111 Of 6 YEAR ARTERI AL STREET PROGRAM 1976 w 100 PORTIONS OF 6 YEAR UNDERGROUNDING PROGRAM REGULAR STREET PROGRAM Q r ITEM NO. LOCAL NAME OF ROAD OR STREET 8. Utility Program See Exhibit "A" (1) (2) (3) (4) (5) (6) (7) (8) (9) SA•1 REV. 1/70 1973 1974 1975 1976 1977 1978 1979 1980 1981 (1783') (2171') (2735') (2518') (3388') (4452') (4424') (2990') (4780') 9. Christianson Road 4110 So. 180th St to Tukwila Parkway 10. Southcenter Parkway Strander Blvd. to So. 180th (Sections of entire length only) SIX YEAR CONSTRUCTION PROGRAM 1876 1881� HEARING DATE gkr ADOPTION DATE /1 NO, 9 ROAD F C U R OR U L R U STREET N AB R NO. C S A A T S N L 9037 A X A X A X A X A X A/C X A/C X A/C X A/C X Gr, Pave, Curb TYPE OF WORK (1) Utility U /G, Illum. (2) Gr, Dr, Pave, Curb, Swk Gr, Pave, Ped, and Bikeway LENGTH IN MILES 0.3 0.4 0.5 0.5 0.6 0.8 0.8 0.6 0.9 1.3 77,000 (COUNTY) (CITY) 19 76 1977 (1) 65,000 (1) 72,000 (1) 87,000 CITY OF TUKWILA ESTIMATE OF COST 0.5 100,000 100,000 1978 1979. 81 TOTAL 227 ,000 (2) 215,000 280,000 343,000 (2 )250,000 329,000 423,000 (1) 95,000 536,000 (1) 105,000 105,000 115,000 127,000 77,000 200,000 ITEM NO. 1. Southcenter Blvd. A I -5 to 62nd Ave. So. 110L B 62nd Ave. So. to "T" Line Bridge C 62nd Ave. So. to SR 181 D 62nd Ave. So. over I -40f. 2. Interurban So. 58th So. 3. SR 181 /Strander Blvd. (State Hwy Dept.) 4. So. 152nd St. from Macadam Rd. to 700' East of 57th Ave. So 5. 57th Ave. So. from So. 152nd St. to 350' So. 6. Interurban Ave. So. from 42nd Ave. So. to 870' South 7. 42nd Ave. So. from Inter- urban Ave. So. to So. 133rd St. SA-1 REV. 1/70 LOCAL NAME OF ROAD OR STREET SIX YEAR CONSTRUCTION PROGRAM 1916 -1881 6Ace (COUNTY) HEARING DATE _i0/05 ADOPTION DATE -Rs6t iefit- N0. (CITY) ROAD F C U R OR U L R STREET N A B NO. C 5 A T S N 9005 S X Gr, Dr, Pave, Swk, Illum Pave (Overlay) Gr, Dr, Pave, Swk, Illum, R/W Pedestrian Bridge R/W 9020 C X Traffic Signals 9023 M X Traffic Signals 9007 A X Gr, Dr, Pave, Swk, Illum, R/W 9009 A X Gr, Dr, Pave, Swk, Illum, R/W 9016 S X Pave (Overlay) 9036 C X Pave (Overlay) TYPE OF WORK LENGTH IN MILES 1976 0.6 0.3 0.6 0.2 0.1 0.1 0.3 0.1 0.2 150,000 11,000 69,000 80,000 200,000 41,000 5,500 0.3 12,000 19 77 160,000 CITY OF TUKWILA ESTIMATE OF COST 1978 175,000 150,000 1 979. 1981 TOTAL 150,000 11,000 335,000 150,000 69,000 80,000 200,000 41,000 5,500 12,000