Loading...
HomeMy WebLinkAboutRes 1524 - Bid Award - Wade Perrow Construction for Foster Golf Course Clubhouse 1LA. 1908 X f C ity o Washington Resolution No. 1 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, REJECTING THE BID SUBMITTED BY CDK CONSTRUCTION SERVICES, INC., FOR THE FOSTER GOLF LINKS CONSTRUCTION PROJECT, AND AWARDING THE BID TO WADE PERROW CONSTRUCTION, LLC IN THE AMOUNT OF $3,044,768.00. WHEREAS, sealed bids were received for the Foster Golf Links Clubhouse Project, and WHEREAS, bids were opened and read aloud by the City Clerk's Office on April 21, 2003, and the apparent low bidder was CDK Construction Services, Inc. of Duvall, Washington "CDK whose proposal was in the amount of $2,718,000 00 before taxes, and WHEREAS, upon examination and inquiry by City staff of the CDK bid documents, a mispresentation of fact was discovered on the face of the bid documents. The City of Tukwila has determined that the mispresentation was material, and WHEREAS, a material mispresentation of fact within CDK's bid documents makes CDK's bid unreliable, and as unreliable bids must be rejected in the public's interest, CDK's bid must therefore be rejected as not responsible or responsive as required by the provisions of the "Foster Golf Links Project Manual," and WHEREAS, Wade Perrow Construction, LLC., of Gig Harbor, Washington ("Wade Perrow"), made the next lowest bid of $2,798,500 00 before taxes, and WHEREAS, upon examination and inquiry by City staff, the City of Tukwila determined that the Wade Perrow bid is responsive, NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, HEREBY RESOLVES AS FOLLOWS. Section 1. The above "whereas" recitals are herein adopted as findings of fact. Section 2. The bid submitted by CDK Construction Services, Inc. bid for the Foster Golf Links Clubhouse Project is not reliable due to a material misrepresentation of fact, and is hereby rejected as not responsible or responsive. Section 3 Wade Perrow Construction, LLC., is determined to be the lowest responsive bidder with a bid of $2,798,500 00 before taxes Section 4. The Mayor is hereby authorized to sign a contract with Wade Perrow Construction, LLC., of Gig Harbor, Washington for the Foster Golf Links Clubhouse Project in the amount of $3,044,768 00, which represents the bid of $2,798,500 00 plus Washington State Sales Tax. PASSED BY THE CITY COU�1C& OF THE CITY O TUKWILA, WASHINGTON, at a Special Meeting thereof this C,� day of 2003 ATTEST/ AUTHENTICATED n Pam Carter, Council President Jane E Cantu, CMC, City Clerk PPROVED AS TO FORM BY Filed with the City Clerk: IP Passed by the City Council. Office of the City Attorney Resolution Number Fo= GOLF CONSTRUCTION PROJECT 6/9/03