Loading...
HomeMy WebLinkAboutPermit B95-0093 - BOEING #7-600 - NEW WALLCity of 7lctkwila (206) 431-3670 Community Development / Public Works • 6300 Southcenter Boulevard, Suite 100 • Tukwila, Washington 98188 Permit No: Type: Category: Address: Location: Parcel #: Zoning: Type Const: Gas/Elec: BUILDING PERMIT B95-0093 B-BUILD ACOM 600 ANDOVER PK W 262304-9123 CM V-N Status: ISSUED Issued: 04/18/1995 Expires: 10/15/1995 Suite: Type of Occupancy: OFFICE Wetlands: Slopes: N Water: N/A Sewer: N/A Contractor License No.: SCHUCC*121NC TENANT OWNER CONTACT CONTRACTOR BOEING *7-600 600 ANDOVER PK W, TUKWILA, WA 98188 CIRCLE V ASSOCIATES THREE Phone: 405 114TH AVE SE *201, BELLEVUE WA 98004 LISA WILBER Phone: P.O. BOX 3707, M/S 3U-EH, SEATTLE, WA 98124 SCHUCHART CORPORATION Phone: 1904 THIRD AVENUE SUITE 1030, SEATTLE, WA 98101 (206)451-9703 206 657-6505 206 682-3030 *************************************************************************** Permit Description: CONSTRUCT NEW WALL. Units: 001 Buildings: 001 Fire Protection: SPRINKLERED UBC Edition: 1991 Front: Left: SETBACKS .0 Back: .0 .0 Right: .0 Total Valuation: Permit Fee: 6,000.00 138.15 ************************************************************************** Permit Cen Authorized Signature Date 1 hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign for and obtain this building permit. • Signature:_ 44.II. ,, r Date: 4 , 8-9c- Print Name:__ J SULL/✓/ Title: r� 1 r i /7OrttN r s 2-)P-4-?a2 This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. All PERMITS ISSUED FOR NEW CONSTRUCTION, REMODELING, OR DEMOLITION PROJECTS REQUIRE CONSTRUCTION, DEMOLITION AND LANDCLEARING WASTE MATERIAL FROM THESE PROJECTS TO BE RECYCLED AT A KING COUNTY LICENSED OR APPROVED FACILITY, OR TAKEN TO REGIONAL DISPOSAL FACILITIES. °�` -- � w ''s2 . CITY OF TUKWIL.4 --. - El : Uopartment of Cod; aunity Development — Permit Cente 41► i a. 6300 Southcenter Boulevard - #100, Tukwila, WA 98188 7 190E .' (206) 431 -3670 Building Permit Application Tracking - PLAN CHECK PROJECT NAME y NUMBER ,1 .\� J �1-- SITE ADDRESS �. SUITE NO. 6 — 03 , C-P • kiv,kw.P y PK � - ---- l , ' INSTRUCTIONS TO STAFF f» Contacts with applicants or requests for information should be summarized in writing by staff so that the status of the project may be ascertained at any time. • Plan corrections shall be completed and approved prior to sending to the next department. • Any conditions or requirements for the permit shall be noted in the Sierra system or summarized concisely in the form of a formal letter or memo, which will be attached to the permit. • Please fill out your section of the tracking chart completely. Where information requested is not applicable, so note by using "N /A ", date and initial. DEPARTMENTAL REVIEW "X" in box indicates which departments need to review the project. DATE DEPARTMENT DATE IN REQUIREMENTS l • COMMENTS A VE D BUILDING - ,� �� /CONSULTANT: Date Sent - Date Approved - initial review 31 G ( OU - fED) A FIRE ✓ �. S~ INIT: -3 1441/-P0 5' FIRE PROTECTION: �) Sprinklers C� Detectors L) N/A CI) FIRE DEPT. LETTER DATED: 4/-- $'- 5 }- INSPECTOR: ,1 w1 +9s % o O PLANNING ZONING: BAR/LAND USE CONDITIONS? Yes No REFERENCE FILE NOS.: N . N . MI NIMUM SETBACKS: N- S- E- W- O PUBLIC N A UTILITY PERMITS REQUIRED? �� No WORKS I �, J INIT: PUBLIC WORKS LETTER DATED: O OTHER INIT: f 4 BUILDING - I , p ti T OF CONSTRUCTION: CERT. OF OCCUPANCY? UBC EDITION (year): ,,` / ''� (i'_) OYes 4No 1 i� final review INIT: MT: �f- -B UILDING t � 6• .$,, OFFICIAL ,� INIT: . REVIEW COMPLETED AMOUNT CONTACTED OWING: Lefi- inQ �`�� n fer ------- DATE NOTIFIED _ rr ((�� B !� 0 1.5 (init.) ...De 2nd NOTIFICATION BY: (init.) cb 3RD NOTIFICATION BY: (init.) 01/00/93 ■ • (1 BUILDINJ PERMIT !'' y ;) :; k,.h A PPLICATION p er'.. %lfi .,,; ,, t ? '.,.: '. ;� CITY OF TUKWILA Department of Community Development - Building Division 6300 Southcenter Boulevard, Tukwila WA 98188 DESCRIPTION ' AMOUNT RCPT .# , DATE (206) 431 -3670 BUILDING PERMIT FEE.: ".$t On PLAN CHECK PLAN CHECK FEE NUMBER l'.. - CO. ILDING SURCHARGE ' p,'.y: iii:.i::A:�'��Y i %�iri ::'1: fiji 'Yl f ::: . . ��i :i .r.:., y . =� ,'.�r +r,..4S�z <: b } .. ,r /1 . /,t., /.,.r'� t, l i yi >cr,.,;;:' :,y,i <y:;;,r'y � rY y ? ?:%:` OM i : 3' Il : ;�4 C {�` 3 . r<}r rtr ✓.. - �rJ{(/ /y��/�wy. :if} 3 ` 'Eb: i' i PR '�• ' `' RYI ° .' ^gn. {r r . ;. $, s,s: 111111161.d$001416. � � ,��> >x ,::<,>:�x��;;�<::tv.. °�<;�.,;� OTHCR. �fJ1`1 /, ::..:....-:...TOTAL ; ! }... A ;' < i .! .ri •?+ L `�.� SITE ADDRESS SUITE # VALUE OF CONSTRUCTION - $ 60O AN1DoVE 12 fAk.K. W . _L6oEirn)6 7 - 6°0) 4 (, 000 PROJECT NAME/TENANT ASSESSOR ACCOUNT # BOEit.16 21 9623 TYPE OF 0 New Building 0 Addition r(` .Tenant Improvement (commercial) 0 Demolition (building) WORK: 0 Rack Storage 0 Reroof 0 Remodel (residential) 0 Other: DESCRIBE WORK TO BE DONE: ConAS i 2UGT , J ELM LJ A L-L ' PROPERTY OWNER HOME EL Lr CTRIC Co . PHONE 455 - 134 / ADDRESS P O 80A a 3 LLLL`•VU.E UI P ZIP %009 CONTRACTOR PHONE ADDRESS ZIP . WA. ST. CONTRACTOR'S LICENSE # EXP. DATE ARCHITECT BOC /NG Su 'p - i - 5L e i t e S PHONE � .. 6 -- ADDRESS p U gcX, 3 707 Nis 3t S E /-l T"t vtik ZIP clg t 24 1 : HEREBY:; CERTIFY THAT 1 HAVE READ >AND EXAMINED: APPLICATION :AND: KNOW THE SAME TO BE TRUE'AND CORRECT, AND 1 AM`AUTHORIZED TO APPLY FOR THIS >PERMI1 BUILDING OWNER SIGNATURE DATE OR AUTHORIZED PRINT NAME M 4244-1144/6-----s. SU L L 1 VA-r/ PHONE ( _44,27 AGENT ADDRESS p 0 8o 3707 x115 3u-EH CITY/ZIP ff ..1- 78(24 L CONTACT PERSON I S A W l L r3 C Q PHONE 6 5 7- 6 SoS APPLICATION SUBMITTAL In order to ensure that your application is accepted for plan review, please make sure to fill out the application completely and follow the plan submittal checklist on the reverse side of this form. Handouts are available at the Building counter which provide more detailed information on application and plan submittal requirements. Application and plans must be complete in order to be accepted for plan review. VALUATION OF CONSTRUCTION Valuation for new construction and additions are calculated by the Department of Community Development prior to application submittal. Contact the Permit Coordinator at 431 -3670 prior to submitting application. In all cases, a valuation amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Building Division to comply with current fee schedules. BUILDING OWNER / AUTHORIZED AGENT If the applicant is other than the owner, registered architect/engineer, or contractor licensed by the State of Washington, a notarized letter from the property owner authorizing the agent to submit this permit application and obtain the permit will be required as part of this submittal. EXPIRATION OF PLAN REVIEW Applications for which no permit is issued within 180 days following the date of application shall expire by limitations. The building official may extend the time for action by the applicant for a period not exceeding 180 days upon written request by the applicant as defined In Section 304(d) of the Uniform Building Code (current edition). • No application shall be extended more than once. • If you have any questions about our process or plan submittal requirements, please contact the Department of Community Development Building Division at 431 -3670. DATE APPLICATION ACCEPTED DATE APPLICATION EXPIRES 3 _Gs q - mo o- a3/,a „, r — . . . . . . SU ' . B CHECKLIS COMMERCIAL .".•..".....•..-...:.•::::::::,::::.:::,:::::,::.::::::....::::::-:::::::::::,.::........-.. ... . • ••••••••••••••'''":...-rhANi imF90v...0....E..:'..tiTs•...,....:::::.:'.•:;::j:::::'...:,:.......i:',.:::.::.:...i!,ii.•-•.:,'.1::::ii,..;i'i.:.6::::..6;.i.,..ii.:::::,,•:i.ii,,i1.:•.,:.:;:::::::::::::::.: 1 — Assossor Account Number ,.....,._. __......... ..., .... .,.. ,.......: .coMMR911! L , .... . ., ,,. .. s . .......... f' ....,.......'iii;ti,/6iii.fai*.qaCh t11!1•,...;.......-:„.„,-,,:::;,:-:::.:::::,;.::,.::,::, hIEW. C 1 :t 6.0. )S R B,. UlLDIN GS /ADD !,r1N 7 . ... ,:, ........, .;,. .. ..,...‘.. .... 06.,.n.i. 019..te...0.. :.6.,:u 11c0„‘.n...g.„...peirril.„.....1..]:...7pp!1a.a.:.:.:,4:;::;:.!-':i:i.:i.:1'.:::':Iii',.. '' .::..;;:.iil'1......::::.i.'•.::;:::.':,'N:!:.:;;;;:i::?:?;I:Ci.::!,11i'•::'!'.:..1"..::;1:::],11::11: , ,, „i..:,Ioil tritature)::••••••••:;•::. •::.‘7.7.7,:tenant),:::::',..:::••::::',.:::::::::::::::::::::::••••:'.::::•::::i.•':••'.:::.::•:::,:::',:::,,.:1:•:::::::::.::::::::::;•,:.:•.::::::::.:::„.::•:::.::•..:.:'...,:',:i4i:::::.....•:„.1:::,,•::::::::.i,:i:::: ” " ''''''...:;'•'•• ': • ••'•••• '• .• - mit applicat '' ''' ...... "''' .::-.:- ' ::.*:• ' :::::;':.::';''''::::::: A '... Nurata(:•'•:•:••:'‘••::';'-':••:,•,•:"'::::•:::','•:::::,..:••;::':::•'i•:•.::.:•::::':•;•:.:::::::';'.1::::',:::*•::•:::::'•••1:.•.:',1•',:::::•:'.:::::'"i.'.'1';'::‘:':::•:::':'.'• Assessor • COmpieted building PaT - •••••• • :.. •••„:: •••.:•.:•:••:••:::••.:• ••:':•"••• .::•.::•:Yi•••:,:•••:••:.:'•:••: .; • •• Two sets ( .... followirig Two (2) sets of construcbon pTans which inc)ude ---- Specifications • ••:•:•:,• .•,• ...„...-.....".". ;,..............::, ......•.:•: -.,..:......,„ •• : Ii _ nsed :.....i... ......,,,.... ' •,.,...:Ex . .. ta PcIrkiriq '':..''''..•::.-:..iiiii.(i:of..i.4.6).:.:.:::''::::::.::'•::-...,:.:::::•'':.::'::::'•:. il (0 iii41061P .,. :ri , •• ::....: ..,:::.....:.:'.:::::::.::::',::::::'...::::::;:,•:::•.::::i:.:;:?..'.:...: [ site plan engIneQ • ------ S tructural calculations s , !-',r.,t.:.::Y%!.1..!:.tP!'::r::..:.::?:7t.:.!:::!:.:':H.7.',::::.':.'::::'..:',:i;':..':':'-'i-:... •-.:..,::.: „...:......:::„........„,,,..::,:.:::.:....::::::.:,:i:::::::::::.:...: a . . !Ai .: : as ' h l.. ; : a . . :• g, ' t . O . a ::.8 :. : i; 2 . 1 . ' t: 0 : :' . .. 1 : 16 0! ,• : . ,. ' ...00 .a ... 6g,n r. .,,r,...iii..!.6,.uiiiid.riin:,:ig pl4iif,...:;n...:,:.::...:i„.......i:.:.....,:.:....:„.......:,....,.:.i!.ii,..:,:i....::::,..,,,:.;,..,:....:.....H:.,„.i.1:::::.,:::.c.,...:',..:..itl.g..1'::;::.i::::1:1::::::::1:11j.11]::::1::''':i4iil TopographcaI survey I Beilsragat's tmped by a ... ' . ::.;:::.. 1......:::: frl ' f'adjeCent (COMriionlY■0 • ft i tio ..... , ....„ . ... i ..,.... i . , .... , . ::.. . :i::....,.... ... <....,,.:....,..... . .. ... of builcling orsclu rP.,...:•.-•:,•:• -.::••••::::.:::.:::........,:•:•:•,..•..„..,:••,......:::::: ,.....1 ... ..Floo't !pfan'ef:Piopea1.....1e......a..iNainth...1:::C..0 f:0'....lao''..h •.r...;901:..••:•:•1a......1'°...:,.:...,..iie0:,::..,....1:.:11i::.:1:iii':,•••':1..E.Fi:;.;:i1"‘.1.••:i•"i::::::::::".•:1 nergy ...'...' ' tid by a WashingtonStatelice n ... ! ...:, ,..„,...,-,.,..,:•....,...... —. engineer or architect ., .. , . .. , . . ...,... ...,..:. .........: [Legal descrip ... . ... . .. .. ' •::: ' •:::••••••••"::••••:-•:•-•:•• :-'', • • :ta Coristruatiorlideta :.::•,,•:,..:...•••••.::::.:,.....•••,•:::,.::•::••:•••-•••••• ... •••• .• ,6:66aiiie • I 1 Working draWinge, stamped . • - • .• . .• .....::. ' .'..:' .:' ......'...: .:: 1......'...:.:''....:::'.... Exit doors. °Ill'clej.Pa 1 te:bedettiollOb existing wall -----i•archltact, which inCluie: • Site plan : ,..• ':•':•'....,.••••": ..... • •••''•• •:•• ' ' '' ' :-. •-•••• •. •••••.• - • •.- • .p showing dtinn..s■kiall•co r ta t P•••'"....::• ' ..,.....:::::::,:::•::•..,.•:•:"?..-.,-%•.:•••:::::::::•:::::•:::::::::•:•••:": ::•••::::::•:•;• ••••••.:.•••••••:•....... ' ••••••:•.:::,..",i.:., .2.:•:••:•;•-•::::::"f::•Cross•s-------,--: ••• • ••••• d..6,Offing•.::.••.••: ,::::::••••••••.:•::','•:•,:::':•::::':••'•:-,•:•:::::..:..:::::::::•;::•:::•:::::::::::.:. nsed.i•-•:••:.-..•••••••••:: . • • •• Architectural draw g ,........, ..........,...:.........,,:,.....,..,,..::,........ .. ::.....,.......,:::;,„.......,:....„....::,....: .... :,...,,,,,.::.::,...:.......::,.O.1611066 6 • • • •• • • ''... ••••••••• •• ta StruCtural, drawings •:.•::•.::::: :•• •::•:::•.•• ::::::::•:•::', .:•„••:.•:::.: '-,..:•:::::•::••••••••••:••••.•••.:..::••••••••."••.:,...::::• :•:•L___:::Strocturalpa.0 bo.ieCiiireidmifpsE4trP:Otby11r1 Washington ,:.•• . .....:::.'...•-11ii...1Ei.,. .!. se Mechanical drawings . ::...:.....:...........,.: ..,-;., .±...,:.,.....:.:,..„:::.....„..i..............:„.......: ....:,.. ..„, .....:.erisiirfiar..mp?'.,.....:....::.,....,.......: ..::: . .: . .::::•]•:::••....,:::.•-•::::'. iiii.aeoaritte , utility parq.11,.:.:::::::.:...:,..::::.'. ' . . • . :: '''....'..• ,..• Ciiiil drawings•••••.. :.......,; ...,.. . ' . '''.' . :)•••• ' •••:':::•••':•::••• .:'''''.•'..•''''''''':::..• •::••• . ?.4 . r d plene....!:.::::::,.:.,,:-.,..:•:•::::.i.:•'::::.::::::::-.:•.':-...:::.•::;::::.::. bi *:.:: ... .;..:..::::::::.::::: ' : . ...::.,....,:. • ... • .. • • • - .... , . . . • . ,'.-.:. -- i Lanciscage P •:.:. ••••••.,.::::::.••••••'•••:' . • . :•:•:•:;•:••::•••;• project) ••-•:;.•;:','.:.::::':::::::•:::: ::aPP/IFa an ...,.:•••• •::•,..,....;;;:••.:.:.:,:•••. . ::• .. : . ,:: . :: . • .. • . ••:.•••:•,•••••••••••••• ...... • ...... :,...... . . . ... .. •••-....-:.-:-.:•:;.:,••••'•:•••••:•.'., . .•;. . : :',H • ..' •• • •••• .....• • -••: ' '' . ' ;:iiniblicationlene:.fOrernrO:.7!.7-:-...-. -.',.',. .,.:.......,:.: . - . '.:.,*:-:• ...,,,:-........:.„..,..- ;_,......-.- . - .. - ...... . .. ....... ,..,,,, ",,,,:..... ,,,......,,,,:-...-:1-,:•-..,:;:::...,':::,:.:-.:-:::-'::': . .:: . ..:-.'.-::':::::::.::::::',:'..--:-: 60MPletqdUti14YPer7:::..'' .....:.....,:..;.•::',.:::.....,........:......;:::::..;::•:::,'..::.::::::::::','..:.<:::::.:::":;.:.::::........:::',::•:••.':•:.:::: ...,..' .-- ' - ..,--' - :,•......,,.,::..-6ie):::::::::::....... — Sii.(6).sets of civil ,... ..., , .,........,....:: .... ......., , . . C ii iitility:::.:;:"::':.,::.: .:.1 1' '. i tec .. ...,..... ...,.......:..... . ,•:.,.......:.......,...,... .....„. NOTE ...•:.:•....sae..t11/4;:ermit'aPPI'c't'•°11-:!?„.••......,.....?...,....:.:•.....:::::::•.:,..,..,........:.•,.....„.,....i,,:,:::...;...........::::..,•,:. •,.: ! 1 ::::..„::.....„,...:.........„ ........ Ac - Nurnher . ...i. , .. , :::::.....: : :.:: : ,...... : ,. : ............. .. .. . .„ :.::, . . . i.....: .......,,... ......,..„:., ..:.:::,.....,.......,..,, • SUbrnitialrequreirints...: •• . . • .1 '''A°S8°17:. ..' (3XIS116:..10-9.1)::..... m '..._: ...:.!'?ei96..:63, ii. ..6Ye.:.d:..7! rate !:,:.:_:.:...1::1'...:':':' .„...... :. . . . .-: . . .. ....: ..: ..... '' '''..... :''..L....':''.:::h.'...:':...H:'...:::.....: '... Narrative . being. 9 ' 1 . • ... ... . ..:: '''. . . ' .. ''' ..: .:::'..:: ... '... '...:.' .... ...' • ' ' • . ' ..'Ulnid prior to ' fin // .. ..;.:...,•...,... . :,..,..,...:::...,....-..,, - ....•. • RACK STORAGE I : '''. :.:, ''•. ;. :.:,: .: . :.''... ; :•••::::::' . ..•.- - ..,:' : ...::': , ... , .:.y .1.. ..„. ...„ .... . ... . .., , . . N O T E i..re9. ... .. ,.. , . .:... . :,..... , ,.. . .,:,. ...... ........ .. ,.......:::::. : ..,: :: ....:.... blinding permit,ePP ..,:••....•:.• ,...........,..:. . ..:: . ....•:,:-,:••::•:::. ... ..,. :. ....... . . ... ... . . . ... ...... .. . , :..,...:„...::.... ......„: — AsSossor:ACcOuau7ber o ff o f t op •••••.... .• .: , .... , •••:.;...:i..-.:.'• - •••-...• • :::•••••:•:: -...:•::::::': . ::.:'::"::•.:......-.•.::::-..:•::::::::.• ..: ..,.:.' ••••• • ..... ANTEN NA/SATELLITE .DIS171P1.•-....••••• :,::•.;.'......:•:::.,.::',:i.:::•.:::,:.,;:.:'•:.;: :.::'.',..'.: ;.:::.:.:.:::,::".',...:: ...• .•...i.i .....:....... '.:i •:...•:.:.•T' w•-••••di::•'().:•‘i9f:...pfa...rl. $ inClUde ...'. ...!:......:,',,,::::.....".....;.:,..i...:.::.:H.::.,:::.,,:,..::::,:: . ; . :::::.',1.-..::,• ... ..: .,,.,. ...,..‘..., .,„,,...,. .. . : ' ... • - • armitapplithation::..:••••:::::;:•.•••:::•••::.":::::::••;•,:•.; •••:•.,:,::::::',•:.- ••••••::::::•••....• :•••••;•.'••••••"•:•••:-:•••".::•••••:•,:'::::::...:::•:".•'-':'• ' Completed building 17 7 ) ,.... :-.,::, , .•'.::•.:"....E.:•••:•••• •:',:,•••.::.:'•.::•::::„••.,::::.••••••••••.i,..,,,•••„'-::••••.:::::::.,,,y".:•••••::•••':'::::: • 1_ j: Building floor P . . , . , ... ... .... .: , , Exu doors . ' . .• ' •••:.; ''' ''' ' ' ---;—• A ecsar AccOdht NYff!1?qr •'......::: , .. -, ..: . ...' .. ..'.....' . ..:::.:::. . :,::.....,.....-:-":•:.:':;:'.:';'''.1%:.::•:;:;.:;:.-:,::.E::::;H::.%:::::.::: h lalUde:::i-E:y'.:•:::.-',):.?-:::::,:.:,;..$.:-.'i.';'::::.:::::::::.:-::,,::::•:,...::',:•::-:.:•-:::::.-,::: : •, : • - '.- . Entiro space ... , • ed ... •..: . ......:...........,..••......, .... - ... -, - ,...-.. „. , :-..(2) s ets at oitiris.,:w..1 9 9 ..:.; .:.,:,,..:•:•,:...,...,,.....•-• . : . ... • . tii•••:.: • '.. .. . :..:',..„. DimOnSionS•91•,!1. ........•, ' •• :•• •:•::••••••••• •:•• I— • - . lit ! •• • iiele . S.end,..:',.•-...•.:•::',:l .:t—••••••'• .''' (showing 'Otiliding ;4!?51•••1c?c1ti--.6•••n•••••••i?!;:a6••:•!e•''n••••n•••••:41:';‘•sa:•,:•!7''.1!•:!t:•...e..!•'•::i.:i!!.:. Site plan shoWing• rack storage layout .••., ,:• ........".......1 1 :,.. ": : • aisles f Tenant space'ficor . .., . exits.'••:• - ••• . : • :: •••••-••''. ••• • .• • • •••" • .-.•::: •',:••• wi dth and lerigthi...?11°$:::',::. ..:1' .. P -:: 9 '.: tal -. 1.'' 8.. :: a:.: .. n : ' I.: 6. ..:. ri : n: ... al : .: : 6.. f: e : : 1i 1 : t : e .'; ' CI : i. : :hE ...r '!' : : 1 °.: 7.....h..):16... Wash i n gton ):.. S tate 1 ;e r i; '. C •. :1 ; .''''' t?alculationsa .:..,....: ... .. . :.: '' ... i' .:....•.: ..:.,..:.:.•.: .... . :...' .. ' de dimensions o! .. . : .. ... . .. ... ... ... ... H., NOTE: -Indus oh.pian. , . . ..:::. ,..,,. , ,., .: .,................ :... :. ........,..;,,:,... i:,, L.. S tr u ctural ' and exit ways ... , .: ... .„. . • Statelicensed•:. 1 Structural . S'•and*.over)............, .., ,.., ... I calculations stamOod,•.by - a •Waottington , ........ . •.,..• . . . ..,.... . .•:...,.... ....•..,.: ... ... ... . , ,......:... .. .:.• ..... :.. • • . , .. . ... .. . • • . '---- • engineer:frock,storage ...... .. . -:,..,.... •••• • . • •• •:::-. • . • .... •• . . . ... • • , . • . „ . . .. : .. •••-•......• .• ...... . .• ••• RESIDENTIAL .... ....:::..,..,:..,...:,....:... :: : • :::::::::::...:':•:::,: . , ,. .......::....:: : :,.. : ,• . y :- R ESIDEWT1AL REMODELS ...H . .: . .:.:',•:,......,---,-, s tructure) application ..,..- •• h. structure •••"•::::. '''• . .... . „. „ . .. .. .. ••(60P,:tPr..:9, :: . •:'•.::: . ......, -. 6''foi....cia . cti'.....:...... ,. , ,__ ...., ssor Account Num 9 ,.. . ,:.:. . .:.„,,,,...:::..,,,.....,.:::,..',..,:.,...:,....,:i....::,:::.:::.:.::-.,:::.:•.....::::::,:.:.;•:.::::i-::...,,',•:..:-:,:::?....:::i:.,... CoinOloted building 13eta."..:. ( , • .........*......:::•.i..„.....:•; ::::...::.::::,::.„::.::„:•.:.„:,•••:•••••,,,".i:•: :•:•I •::::::•.::,:•::::::••,::::::::•••-••:',.:•••:.•••:•••.:••• ,.•i •• , ... ...: which .,:it?.. . ....:::.....::::.,;:.:::::.:.::,,:;:::%.:-:::::::,.::::::::::,:::::::,..,:.:•.:::: . .,,, ; . '..,... ' ..••••., ..i : .: :.:: :. : .'.:.:- • '•..: ..,...••...':..?:.:..:.::,•..;:i',':.....:::::1..::.:..,:'.::.:..:".......:::.:...:::::: .Li.TWol2j:a9ia ° IY 1/91 :7....P.:: draw : :.::::::::::::•':::::: . ::•:::!.:.:::••::....,:;::•:;,.::::•:•••••:•.-:::::........:::::::::'....::...?::::::::::'•:::.2.•:::::,..:;.::.:::.;:::..:;.:.:i. •• : : 1 1. Le descnption ..: ....• .: .::::,....::..::::••:::-:::::....:::•!::::.:::.*:,.....:::.....,..::......::::. . • . .........:....::.:•,i...::•.:.: ..,.....,..,:•::;:. . .-..::.:.:::::::::::<.::...Filari•::::::!..:.'•;:••?'• ..... . i:. . .:: j A ;%`;'...?ni,..t1.6".'. Nu m b e r :. ''''''''' .:.:)...''.:::•''''''':...'••••:":':::•:•:-...-....::::.:',.:::',....•.',.',::' ....:•:';:••••,.....:':',..-1,;,••••••••••....-.:::::Fuuilqut.lur..(111!1:::,..::..:..,:,..:::....',.......,...i.,:::::::.:::.,..,•&•::::•:::::.,,,::,..:•,::::::5;:::Rq••••••:•pliEuiR.Tgt;,,,..,,.., :.::.: ., ,: ..,...:;, :.:.: :-. •••• • :•;:.:•.':,::•::::••• . ,•:.:,.,H . ..: : :.:: : , :: : .....:::•••••••:::,.•:,•::::: • . .•...: . •,...• ::..:::,.....•::•.. ....,,:.,•::::;.i.::::::.:•.:',::::::::::-PloOr.gia.a.'".:••••:•':',••:::'•':::::::•i:::•:,:•::'::::<:::••::.:::::::::::•'::"i'•'',:•':::"•:::::•••::::!::••:,:::.:i.::::::::••:1:::•:'::::::::•.•,•Aii.,::::.::::::::g::::::"::::::.••• ' . .,. .. :, : . : • : :::' :::' . ' • . ' .. • - • ' . • s ' whic r l ': I f Ic ! u 'P .. ::',...::.:..::::•...,::: : ::.::. ... . .....::,...::•,..........;:...,......,....1.: ...,..:.:..,,:.......,:::::....:.:,..;:,. . .,......:;•.:......... I. • ..;::::::;.::',.:: j:'..:.-.,i':;.,::::.:;••.,....•:.:,,ii,.....-..,::::::.,,,i.:':::.::.::.,:.,;::,:.::>::.:::.,:i:::::::i:',:::::::::,::::.::::',.;:.::':..::::i.::::',..:::: — §1t6 Twosea: (2) F'.....• .• :••• ••• ''.: • ' •• " ••• ".•••' '''"'''''''' •:•• h diarit.location:::::•:•...,....., •.•:::•.::.:::..:.:.......:::::•::.:,•:....:,.:-.::• •,. 1 '- . - ' " Id • g,•elevauol•q?•••:•••••::. :::,:,...:,•:••:::::::::::::,:,:f.:.:::: .. ,:.• .•: . ;:i: • •:. : •:::.....:•:;•::::::::::::: , : :::::,......:::::: : :: :: .••:•: : : ::: : : ;: i ....,.„ . .....:::-,::: bOlkniig,•strwirv•:•"•:•• ••'•:-:••:':::•:',••••••••'''''•••":':"'":"•rk.-ICIng ,„ 1 orass-!sePtiao:::::•:•:,':::•:••••:•::,::::••••:::::::::,i,:,::•:•.,::::•,',:•:••••:::::::::,::::,:::::::::::::•::::-:•,...::::::•,:••••:::::••::::::::::::,•:: • " ... •••,:- • Site. plan '-----777,7, "•••• •::::,:inciudeacceSs : . to ••;,•„fil•000ss).•:;:;•::••••,.: :.••::::.....••••;.••••......;..::;,...•••....,•...-• :... • ,... ••• •••,._••••:iiiip •...::::;,........:::...i....:.::::::: 'FOundatiorYO'an'''.:::.::•••, :•••••;,..:.::•••;••.i'vldIfr. an.q1aPP!'.!:'•••...,••••'•:•' '.,....: .: .'.:::::•. •::::::....::::::. .-::::'•::::...::Siilietural•f raft:iig....I .f.:,:::.:.,.:::•::.:::.:-....,::.::,::::::::::::,•,•::::,::,:•-•::. i• on. :''':...:-:::'::. ' • .":'' '''''.:;.:::::'i:::'i-::.:,:l'i.....'::::.:::::'' '...':::''':-.. ..‘•=,' ii • work Is .(0:PP...• done p rovide ..........„..,,,...„:„:;,-..::::::::.....•::.:;:::::::;::::::.:•:.:::::::::::,:•;::,........,.::,::::::,:..::::...:•...::: ....• '.' ... •• .•••••••.,....:,-..••'',..Root:PIPn :••> •••••:•:: '.. (alt views) ::::::4T-i,:•!!:77'.' '6.blidtted,E';;;;:.;',..,:::::::,a,;;':::::];:,'',;:::1:::::':':':::::'....:I....:!.:.:.:...,:.-..........-..-.- • ' - . Buildin • nd.plans t ...... ...,::.. ... ... ..... . • •. .: ,,.:.::,... . • .. '•• '• " hsi • :•••,•:••..":•:".•:::•:.:.•••• .:•:.•:•:.•••,.::.....,......-:-..:::,......:••„:.•;•••::::::.::,..•:•:•::::,.., ::::...,. .: .,...............,...... . ...• .... ..............• ..... . . .. .. , .. .. . ,..,::,, . „.,.,„,..:..::,.:...:..,:.:m.......1...,.::......,..:ii...,:...:.::::....,..i.:....,.....:.,....,;,...,..„,:. : .::::::::.:••••.... ••••••....:•,..; tri ..: ::.. •• •••••••.:•-• hg plans ..::.::-...:....•:,:•,..? .:::. : .:.,..•...:•..-.--- • , ,.....,. . ...,..:::: .,.............:..„...„...,..::::.:: ....... ...„. , ... .,. ...... ,............,..:! . ::.:::::::::::::,.:!,......,,,....:!...]::::........v:.%::...E:,....::::....,:•-is.i:::.::',..:!'.:::::.::::.::::ii;::::::::,•:::::::::::;::::....:.,..,:::-;:-........::::.?::::.......i..:,..; in' tad' building : Perrni! 4PP....,.....•.•,, • • • • •:: •.: •: .:. : : ::::: . : . ::::: ,.. .: . •• - ::::: , ::::::: , .:•••••.: , ..:,:::::::•.:::::::::•.....,.........::: ; -- i. , : ......,..... ..... ...... • . • •••Washillgt°nPtE!.....•.•-• .• .: ..:.. •,••:••::".:',;'.'.•::•'•:'.• •••:•-•>.•::'..,••••.•:::::.:::::•:,.•:•::::......:....:.....:.:•.:::::-..:,iii:g.•:•:.::::::-,••,::::::::::: „E...cprrip..:.:-,:::,..„.:•:,,,:.:::::::.::::::::•::::•.:.:::::.•:,,,,,:.:.:,..,..„...:.::,::::,::::,::„...,,,,,,:::::::::.,:::::::.:..,..,,:.„:A.,:,:::;::::::::::::::.:...,.:::::::.,:g,,,,,..,:::7::::::::::::::.:.:::,::::::::::,...::: • •.............:....:,:::::-) . :•. . -,:,:., .-• ••,:i.e. .iioation :::•.':'':::;:;•:.,,:•'*:- •:;.::::::•:;:',:;"."•:::::•:::•;.::::.•.::::::::;::::::.:.••,.:::::•.••::.;•... :::•• •• :;..: .NLinit:ier :•••,:"....• .:::::.,:•......:,::.....:........ Comp utilitil.peript ... Pl•!... .. ::.. ,•••:•:..:••:,...::•:::••••::••••••:::,•::::,,•:. . •:•.„:„.:::••,:::...:•:...•.;••.:.:.•,.,...„:.........• .,::,,Assessor.„.A ..... ....,,,......, iiiiii5eitici...remoyep,.99....,:.:,: Six (6) sets ht..site plans ,...........,. .... ....:::::.•':•'••••••::"•:•:::••• ::::' . ' ... • •- •••6. iii: see •;:::::•::: •-•. . , teriii :bOirig:Inst!7,„,•...„!.......:.:::........::.i...............:,•:•:„•••••,::::•:::::::•,:•:•-.",••••:•:::::::•••:••••••••••••:•:•;••••:'••••••-•"tfOit! orki,ogn to finatinsp9; ....,........,.....,..,.............. or seecilic e ,.....,..,..., .,..,. :....: . . ... ''••••:..' Hi firm flan letter 1s req hnd.cheaklist • .....•...i . ..•:1:;..:....:.:.:::: ';:-:•::-..<::::;:i-:,...: ,:...;:1;ipTE:.4:pet! ' . ::......:',:::''J:•]':....; ; ;:. :::: : : :: ::::: : : : :;...::: : : : :: , : - :::::: : ::::::::::: : '.:..:::'..,•:. . ..,......i..,:;.::::::::::.,....,............. . . . . ..... .. /41:37"; 'I I; ing .5)tfj ;Alan and htllity.: site pl .. may ar....,.. .. .,. 6filitji ilerMiraPe(fc117...11...--: may be.requirecii(:0■9'...T...:i : . ' .. -;' . - . . . . ........... ,'' b r oh idal and sails JnforrneP . p r i..7,,,. ... , ....:.y. , ........:: . „.„;,i:•••: : : : :::.;,:::.;::.... ; :,. ... ::: , ............- . .. .. • ,•.A d ' El it' is,10.9.hr---.7.....7.:,:..,i,:::.:::,..,..:::,:::::. . ..• :: : . ' . '..:', ..'::: . . '.',............. . : . .. . . w r' 0 • kA hh k` karhk*' h* /chi hir. k• Sk** kiri r• kkA4 A h, k• A• khiri< hk• hk• h *h4kh•.A *•k*•tA4'hdhA GENERA 91.00 CITY OF rut <W3 LA, WA TRANSMIT GENERA 52a6 .i.***• **A **401. *kkA*kN*k* Air* •**A**** Al r** kA h* Ak*+ Ak•A * *•k•kirh•k'k•Ah•A1rir*AA GENERA 4.50 TRANSMIT Number: 94002065 Amount: 1.38.15 03/31/95 10 :35 TOTAL 139.15 Payment Method: CHECK Notation: OOEING In it: ;3Ltl CHEW 138.15 -- ...._._.� ..._... ...:._.:.._,._...;_........ _ ........._............_ .._ CHANGE 0.00 Permit No: 095 0093 Typeu 0--BUILD OUTLtfING 3'EIPAl'f 5 1485A000 '16 :18 Parcel Na: 262304.- 9123 Site Address: 600 ANDOVER Pt( W Total Fees: 138.15 T h i s Payment 138-15 Total ALL Huts: 138.1 Balance: .00 i*** 0*A*, t4A 4A***- Ai*****• h•*,i* 4* *•A *A* * ** * ** ** *i * * **% \ * *AA7k* *0 *A *** Account Code Description Amount 000/322.100 BUILDING - NONRES 81.00 000/345.830 PLAN CHECK - NONREE3 52.65 000/386. 90 4 STATE DUTLDIN3 SURCHARGE 4.50 • i :err ' i .. .... ' •::..u..i «.w.wa•.r. 'sacs' .r a :_:.1err. .u• .•. r« ....,,....._r...:...,JUsfiA....1 .4...,..,.. u�:.n..a: :..:'' ,:..;i't` - :>i::r':e......ii.__ :U r. uF y _, INSPE TI RECQ' pa 95- Retain a copy with permit t . % � q3 • , • •. ERMR CITY OF TUKWILA BUILDING DIVISION ... ' r 6300 Southcenter Blvd., #100, Tukwila, WA 981 : ,t x__._4296) -43- - 670 1 Project: 8 j . 0 6Q , 07_600 Type of Ins n:S T'""I 6). ng / Address: 6700 11.. „pa) Date Called: ) Spada! Instructions: Date Wanted: 01- igi11al VI v16 f— i31dy � �.m ', (Ml i. wr ✓£ 1 0p �' : wolf ` Requeste , ' k{ , 54 � j ✓are . . r amr'r t r r' rco o ✓` a be rcl 1Icr], 0 AV” O pto Keno No.: G g lflipproved per applicable codes. ❑ Corrections required prior to approval. COMMENTS: e , rn ,, c_ ... _ _ .. .. . 0 ( . . ..,.__:____. . ,.. s . , 2. _ A 5, ,i i - - - - Th, . . . . , .t 7 . 1, , ••, .,` �. , ... . , , nspectopr 1:i ■ r ...... ,,Ci . .- '• ' ',;„:,-,' ; ..- , ' , , ,,-,.... :.- • ,',',..' ' i • • ,• &INSPECTION RECORD 9/ectS ,'• ' Retain a copy with permit 0 09 10 F_ SP' CTIO '0. PERMIT CITY OF TUKWILA BUILDING DIVISION . I ‘,. • . , • . i : --,,tke,..... , • i ■ ‘.., cl:: ''. i .. f ..;. t : 1 \ , t , - f ' 1.... . 1 nspect ir/IN AI 0 d At .4 ,edlt ,.... - ... 1 JINII' , r , •••••• 1 I • / 0 X 1.00 REINSPECTION FEE REQUIRED. Prior to reinspectlon, fee must be paid at , ,:,1: % :;V:.'` , ,';: , ,,, 3 ,',:%,,,:. "...-!:,,, , ,,, ••••••-,* 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. . , : •,'....:,*;',,,-,'', :.! ',..:, . ,:, ,,,, • 7, - ,, , , ', ,, :,,,, [H eceIN o .: Date: .., I • : • ,i,' • .. .. ' : I ,..... A ee . ‘ . ...... a '. y,' - r. .Y . r ...... ♦•: � . - ...w°wTti++v.... w ......Fw.n. r♦. r .NIP 1p.u..v ry.. NxN i. ::�i' t'{j}� w .".',.'. �-- . N'•'yM•..•+ r .: •zxW.r r ?♦ v. ..N,., ; + o , - } City of Tukwila John W. Rants, Mayor " `\ ktre /z s Fire Department Thomas P. Keefe, Fire Chief 1908 -" TUKWILA FIRE DEPARTMENT FINAL APPROVAL FORM Permit No., / 00'7 JI Project Name �� . / /1( r/ / 6 • 0 _ 1 J C_ Address c �" /` • Suite # Retain current inspection schedule Needs shift inspection Y Approved without correction notice Approved with correction notice issued Sprinklers: ' Fire Alarm: Hood & Duct: Halon: Monitor: Pre -Fire: Permits: _ 11 ( "_ r� -- :.. � ~�d c( / //7/ 9 5''" Authorized Signa ure Date FINALAPP.FRM T.F.D. Form F.P. 85 Headquarters Station: 444 Andover Park East • Tukwila, Washington 98188 • Phone: (206)5754404 • Fax (206) .57.5-4439 CITY OF TUKWILA Address: 600 ANDOVER PK W Permit No: 695 -0093 Suite: . Tenant: BOEING #7 -600 Status: ISSUED • Type: B -BUILD , Applied: 03/31/1995 . Parcel # 262304 -9123 Issued: 04/18/1995 • k• k• k• k• k• k•k*i * * * * **•k ******•k* * * ** ** *• ** 4k• k******• k*' k•k** * *•k* ****** **•4***4*•4 *•k* *4.4.44 Permit Conditions: wo . •No changes w i l l be ma deK ;,td '�51 in ass- ,approved by the Arab itect or. Engine.efi rand th Tukwila -•y 131t1"�1dfittt��g:, Division. 2. . Electrical perri„„tiksh�a`1 be, abla i ned3 through"�`t a Washington State Division,'41,E•Labor,. ant Ipdpz an �i d!ia11 e :a 1} P�% .+'' � �� a. d ,' �r1 t' ust 3 ,tt a;, ` A /'nt c ., , I} " ica1 • work wi 11 be�� . , =1ns•pec,te�i b, }c� t "ghat agehc�1, ,(248;1-41'63Q ) . ;a w 3. Al All mechan ;Cvj,1'" rk ` ,1 1 :J be under ,se.p'arate t` :e r a �l i`ssu > tl�e Ci ,,., t qod y b ty ,q ^ •T u k w 1 1 a:,. " sh :,,, ,,. , , -, ; r' _. , L j,, 4. A1.1 pera t�s, ihsp�ec,,tion <. records; and approved plan sha1` `".be k available at• the .Job 0 .s i to pr 'i'c�r' €tb the start '`o•t ar y cofil ,,;', structitb a. These d,ticument q'a se to , c `l. maintained a °n' • ,,avai tile:.. able l un i1a�f.ina1 ; Inspect ; i�an epprova -i'is granted.`"' ,�> � : a • 5. Any net,' cei 1' grid arSd "'light t i. /tore instal latio•rt sr , \'� 0- r" !'1 a r ea.., , , i'o- t," requ.>ir•,ed. to : m'eet` 1atera;l. brac,inrl' 'regu,irements tor• Se ilc ` \ <`w • 6. Any a ' x posed �'1 n , s u 1 at "'backi mater, 'a 1 1 have a F y re ' � �; , j fi Spr a i Rating of 2.5.,_ ar �l.es5 ,I land nia G'er i t „s'I;�a 11 bear i dQ� ` t = T r �l ff1q li ,ion saw#kn ' the . fi.,ra p e'.rfor an`ce atin thereof .4! :,; ; 'air 7 1 T r: non t�� u�c t fio t u t e"il o n c o n f o't• n c t h a r o" a d ; rx!r.• ?� ` • .plan anr`'egt ire »1ent.s'ot t Y '1 he�,�Unifc Code 0199.1 =0: ?4 �i�.,r�, Ed iti ; on•) ax. ";s a m.endeif. "? ph i fprti' ,e'chan Code (1991 Ed�i t i I i t and x�iiJshingonz+ta " <.t1 ►.:rg° Code�:l(19:: °ti`on) t ' ,� 8. Val' " t er f iiP5mi t. The i sscianc M°of " p r nil -t or apps -ov '1f le Y4 p1a� 4 t and comp ay fain .a1 sh1 ;'):•t be ceino- stru Ito b.e l permit for, or an 'p`�a t \of,< any `io '' #air ' , , of an of h e` s .�, �, provision of the �i ldin c d other 4 , finance ot. pn•'� o p rm-i F r . of an t ' .presuming give at.„ rit - � k,to vio,� late or ca Cry. , b1 tf, � p�K�d u1i.x'' # • , : t1 n s o t h i ,;) code sh �10l ,be va f d. � , , 4 41 • (' r a it �'i. J i" $p f . ii ',+'V!'Qilin , tl 1 . .. �'t - y ' I 4A ;;-... • ''." 44'''''' 4 � i- '. 0" (. fat - . !'.. ":* ^ : - .;i1 . ,'fi 4`5 :0. = . ..:,4a� .1 4,:d e,!'7,,,-, . • . ..' ... ..: :'. .. .L.... .'r 1 '.l ^'At w +.: . i...ti.. 1':. fit. w•n .l.. ... ...,.. } ' 1 l : LEGAL UERCRXPPTZON That portion of the northeast quarter of the southeast quarter of Section 26, Township 23 North, Range 4 East, W.M., in King County, Washington, described as follows: Commencing at the southwest corner of the said northeast quarter of the southeast quarter; thence South 88 °12'32" East 30.00 feet to the Point of Origin of the centerline of the P -17 drainage channel, which channel continues South 88 °12'32" East to terminus at the westerly margin of Christensen Road thence continuing South 88'12'32" East 360.00 feet; thence North 01'47'28" East 69.00 feet to the northerly margin of Minkler Boulevard; thence continuing North 01'47'28" East 319.85 feet to the TRUE POINT OF EE GINNING of the parcel to be described herein; thence from said TRUE POINT OF BEGINNING North 88'12'32" West 360.00 feet to the easterly margin of Andover Park West as recorded under Auditor's File No 6355529, Volume 5095, pages 63 and 64, Records of King County, Washington; thence along said easterly margin North 01 °47'28" at 150.00 feet; thence leaving said easterly margin South 88 °12'32" East 360.00 feet; thence South 01'47'28" West 150.00 feet to the TRUE POINT OF BEGINNING. �•' +W W�MMM•.�4r.I•r..Awl.wMrt+ti «Il. . f' �T•r1 ^�T`.•�•T�^•/''T.•b•+r.t ■snoNna*MYlwtV1.WYM • RECEIVED CITY OF TUKWILA PEAR 3 1 1995 PERMIT CENTER ,JvJ llA, � '9S 121. 1j►�- ��% City of Tukwila Y } • John W. Rants, Mayor S ¢ • ' ` •∎ 1—+ s P •••. fit ��j Z.. ; ? Department of Community Development Steve Lancaster, Director •••• •....... • A' 190 _ - Oct 06, 1995 LISA WILBER P.O. BOX 3707, M/S 3U -EH SEATTLE, WA 98124 RE: BOEING #7 -600 Dear Permit Holder: Our records indicate that on Nov 06, 1995, one hundred and eighty days will have passed with no inspections having been called for under Tukwila Building Permit Number B95 -0093. Unless you call for an inspection, or obtain a written extension from the Tukwila Building Official prior to that date, your above referenced permit will become null and void on Nov 06, 1995. If your project has been completed please call for final. If you are actively working on it please notify our office. If you have any questions or need further information to obtain an extension on your permit, please call the Tukwila Building Divison at 431 -3670. Sincerely, "" thi , I Kelcie Peterson Permit Coordinator Department of Community Development 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • (206) 431-3670 • Fax (206) 4313665 %, City of Tukwila 0 z FIRE DEPARTMENT 444 Andover Park East 2' p Tukwila, Washington 98188 -7661 . . (206) 575 -4404 4 7908 John W. Rants, Mayor April 5, 1995 Fire Department Review Control #B95 -0093 (510) Re: Boeing Company Building #7 -600 - 600 Andover Park West Dear Sir: The attached set of building plans have been reviewed by The Fire Prevention Bureau and are acceptable with the following concerns: 1. The total number of fire extinguishers required for your establishment is calculated at one extinguisher for each 3000 sq. ft. of area. The extinguisher(s) should be of the "All Purpose" (2A, 10B:C) dry chemical type. Travel distance to any fire extinguisher must be 75' or less. (NFPA 10, 3 -1.1) Extinguishers shall be installed on the hangers or in the brackets supplied, mounted in cabinets, or set on shelves (NFPA 10, 1 -6.9), and shall be installed so that the top of the extinguisher is not more than 5 feet above the floor. (NFPA 10, 1 -6.9) Extinguishers shall be located so as to be in plain view (if at all possible), or if not in plain view, they shall be identified with a sign stating, "Fire Extinguisher ", with an arrow pointing to the unit. (NFPA 10, 1-6.3) (UFC 10.505A) Fire extinguishers require monthly and yearly inspections. They must have a tag or label securely attached that indicates the month and year that the inspection was performed and shall identify the company or person performing the service. (NFPA 10, 4 -3, 4 -4 and 4 -4.3) Every six years, dry chemical and halon type fire extinguishers shall be emptied and subjected to the applicable recharge procedures. (NFPA J �y�l ILA k,� V ,t ®f Tukwila �..: v p k y� FIRE DEPARTMENT . - .1 444 Andover Park East p Tukwila, Washington 98188 -7661 2 (206) 575 -4404 1 90E . John W. Rants, Mayor Page number 2 10, 4 -4.1) If the required monthly and yearly inspections of the fire extinguisher(s) are not accomplished or the inspection tag is not completed, a reputable fire extinguisher service company will be required to conduct these required surveys. (NFPA 10A -4 -4) 2. No point in a sprinklered building may be more than 200 feet from an exit, measured along the path of travel. (UBC 3303(d)) Exit doors shall be openable from the inside without the use of a key or any special knowledge or effort. Exit doors shall not be locked, chained, bolted, barred, latched or otherwise rendered unusable. All locking devices shall be of an approved type. (UFC 12.106(c)) Dead bolts are not allowed on auxiliary exit doors unless the dead bolt is automatically retracted when the door handle is engaged from inside the tenant space. 3. Maintain sprinkler coverage per N.F.P.A. 13. Addition /relocation of walls, closets or partitions may require relocating and /or adding sprinkler heads. All new sprinkler systems and all modifications to existing sprinkler systems shall have fire department review and approval of drawings prior to installation or modification. New sprinkler systems and all modifications to sprinkler systems involving more than 50 heads shall have the written approval of the W,S.R.B., Factory Mutual, industrial Risk Insurers, Kemper or any other representative designated and /or recognized by The City of Tukwila, prior to submittal to the Tukwila Fire Prevention Bureau. No sprinkler work shall commence without approved drawings. (City Ordinance #1646) 4. All electrical work and eauiament shall conform (4 Tu PARTM ver Par Tukwila, Washington 98188 -7661 (206) 575 -4404 . • . , . . . . . . . „ . . . . . . . . .. , . . , . . . . . . . . . „ . . . • . . . . . . „ . .. . . . • . , • . • , . . . . . . . . . . , . . . . .• . , . „ .. , . . . . „ . - . , . . . . • , „ - • . . . , . . . • . . • - . . . . . . . , . . . , . . . . . , . , . . . . , . . . . „ . • . • . . . .„ . . . . „ . . . , . , . , , , , . . • „ . , , . • .• • .; . , . . : . . . „ . . . • . • , . • . . . . . . . . • • . , . , . . • . . • . . . „ • . , . . , • . . • . • , • ( iN V.V..: 1%." 4 Wftv...1.4,1.,... r. ,...,......;....,,,.........., o ' rmo oTio1 rmom --- 'MZMUCMIIMT comr, To C::,T00. r.oz I PLEASE DETACH AND SIGN • . CERTIFICATE BEFORE PLACING ..... IN BILLFOLD RECEIVED CITY OF TUKWILA • • . 1 ••• •- ' *-:•-• • ''' ' ••••••'' ' ''" '''' • - ... — - , *' . "4; * — REGISTERED AS PROVIDED BY•LAW AS A: APR 1 8 1995 • :. : la. . PERMIT CENTER - • •• ..• • J . • • ..: / ::: '1 , , REGISTIRATION•NUNIBER'.' . ' ;• • .,, ' ..',..EXPIRATI,ON DATE $.C . C : 67120 !..... 0Aft.. • ......: ,... . .. . SCkUCkART COROORATTON' 1904 3RD.AV 3TL 1a3 st.ATTLF WA oti1C1 SIGNATURE Z __Z • ra7/ :,eledIAI - ISSUED BY DEPARTME H T fl LABOR Atb INDUSTRIES . . . . . . . • • , . . : „ . . „ . . . . . . . . . , . , . . . . . . . . . . . • . . . • . . . , . . . . . . . . . . • . „ . . . „ . . . . . . . . „ . . • . . . . . , . . . • . . • • „ . . . „ . . . . . . : . ' ' , • . . . „ . . . . „ . . . , . . „ . . • . . . „ .... . . .. . •„ , • . „ . . . . . . , . . , . " . . . . . • • , , „ . , „ „ , . . . . . , „ . : . . ., D 0 I SULL ipt L__ __J S I 1 R V C II I 1 S D ► ,00 _ - TT_ T , l , 11 , il�, l tn'* a®�o ¢ooao�l �oo�m000u�omil t , ► � �I I� 1 -' Ir I li�l � I I 1 � �r ►I �. ����' I ''� ip� l kind 1 6 01 11',1 ',1 I WEST TUKWL . II GT PUGET SOUND REGION PROJECT LOCATION PROJECT NOTES 6LACKRWER T I LEGAL DESCR I PT ION CORPORATE DARK r/ A r - BELL ■E�% /' 8 /' // y / // , matzo CAL 9 ,' .EATTLE / // f • � •°E CENTER $ THAT PORTION OF THE NORTHEAST QUARTER OF THE SOUTHEAST QUARTER OF % "° CEN EY�OS DS SECTION 26, TOWNSHIP -23 NORTH, RANGE 4 EAST, W.M. IN COUNTY, • ` /j' I BELLEVUE 1 / BUSINESS PARK WASHINGTON, DESCRIBED FOLLOWS: % '2 j 1% OADV f ''THWEST CORNER OF THE SAID NORTHEAST QUARTER OF THE / / //� � � / ED /., .` PLAZA WAY COMMENCING AT THE SO �i /' � � � ._ �� �� �/ < =oa„x�� S � x �; '- R � 2 OUTHEAST QUART THENCE OUTH 8'12'32 EAST 30.00 HE FEET TO T ,� �/ POINT OF ORGIN OFTHE CENTERLINE OF THE P 17 DRAINAGE CHANNEL, WHICH B777/.':'/-2 '' , j r I , ; ° _ CHANNEL CONTINUES �O TH 88'i2'32 EAST TO TERMINUS AT THE WESTERLY ;i / / ISSAOUAH � � I MARGIN OF CHRISTENSE;! ROAD; THENCE CONTINUING SOUTH 88° 12'32 "' EAST = L� xsxEE. 360.00 FEET; THENCE NORTH 01°47'28" EAST 69.00 FEET TO THE NORTHERLY MARGIN OF MINKLERBOUL- EVARD; THENCE CONTINUING NORTH 01'47'28" EAST , ® � ' %, ao�r "`ENTER � j � 319.00' TO THE TRUE FJ I NT OF BEGINNING OF THE PARCEL TO BE DESCR i BED i ® i � I � °°aES HEREIN; THENCE FROM SAID TRUE POINT OF BEGINNING NORTH 88 °12'32" WEST +. 360.00 FEET ER THE THE EASTERLY MARGIN OF ANDOVER PARK WEST AS RECORDED � y y =' *uKw,u ane.wer :C ceEs ' RENT UNDER AUDI TOR' S FILE N0. 6355529 , VOLUME 5095 , PAGES 63 AND 64, 47. ��' a © � RECORDS OF KING WASHINGTON; S 8 THENCE ALONG SAID EASTERLY Iii l �, a� o �N E S i�ENae,NN MARGIN NORTH 01 ' 47' 28" EAST 150.00 FEET ; THENCE LEAVING SAID EASTERLY , ., . / _ x s, MARGIN SOUTH 88'12'32 EAST 360.00 FEET; THENCE SOUTH 01 °47 "28" WEST ` j , � �Y E E sra.w�Ele � \ BUILDING 7_ -600 150.00 FEET TO THE TRUE POINT OF BEGINNING. °ausLErnEE pERMtT vo � z > .N E: PROJECT S ITE �pAA�E FOR. REQUIRED / j .:m „� P � �— CODE SUMMARY Me /// BUILDING 7 -600 2r,u.E„� -. I ICAL ' Il ® � PROJECT SITE '°Y "NE ® GEE C I © -- >i r " 1 �, = U.B.C. — -- 1988 0 5 O 1 PLUMBING / 1 sY °. o „ m ZONING -- C M (ORIGINAL ZONING) � S pIpING � KENT B -2 (NO CHANGE) rnuN Nc I EN �y , 181 , LV • � OCCUPANCY - -- ILA w.x AUBURN \\ IL ° 1 p CONSTRUCTION TYPE— TYPE V N ( NO C HAN GE) cIT D � IO r, ( 99' ;, " ° g , 0 SITE AREA 54,120 S.F. (1.24 ACRES) � YYL,xx° g 8 � ED. Q SITE COVERAGE i8.7% `' 7 / / ( " � � PARKING PROVIDED 80 STAL ( +9 ADDITIONAL ALLOWED BY RAIL APPROVAL ) N /�� 0 'a' FLOOR AREA ------ - - - - -- LOWER - 9,474 S . F . i ' IIMF° ALGONA C -,' v,�,xs,xEEr sw<,xYSTxEE. UPPER - 10 , 412 S . F . /� / s oE o xeo. TOTAL 19,886 S.F. FI LE COPY ' r '�� / KING CO. sou NcENrEn TO TACOMA PIERCE CO. t , � inde r stand t:l at the Plan Check appr ovals are , . jzct to er rors and omissions and a Of I 1 SiNEEt I I ► � � L „ r 5 I -ns d °s nct aothorize the violati 1 any IODO Bt A /-«,ALLY— a of g b acioPte d co tle %finance. Receip /1 ` ve dplans�ckn n w le dg ed. , _/ I I / t �ceoE�xcti�.c x - -� - Tractor cop of 2pp I I ` ICEx�Ex�E � I I a� / /'' B y IA1� % j Ja.o iv( 4 - I B - 9� F VICINITY MAP SITE PL.A.N+1 P ermit NO a5_____ —�-� NO SCALE NO SCALE i,11Y 043UK � A P P R O V E CITY OP TUKWILA OPP dP illp 1 . _ 5 ... APR � Q 1995 MAR 3 1 1935 PERMIT CENTER BE&C 0 3.30 L INtt gNIS1pN ENGINEERS C 95 SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE SHEET ❑ AUBURN, WA. 98002 A CCEPTABILITY G.M DRAWN I LL BY ER DATE SUBTITLE — ��3 C�Y LAST REVISION SYMBOL DATE A GENERAL REVISION GM GC 03.28.91 0 BELLEVUE,WA.98007 THIS DESIGN AND /OR CHECKED I- SHEET SPECIFICATION IS APPROVED B.BERLIEN OE B RECORD DRAWING GM JW WH MB 03.13.92 .® ❑ EVERETT , WA . 98201 EC M TITLE APPROVED BY DEPT . DATE G. MILLER MW FACILITIES DEPARTMENT ❑ KENT, WA . 98031 ECKED �+ C SUPPORT BLUER I LLS PROGRAM ( #J00007) LIM LF 03.30.95 B . L °y I EN / — V ®® JOB NO. CI RENTON, WAA. , 98055 G. ❑ PORTLAND, 97220 CHAPPBERROVED CULTUM OFFICE REMODEL 91025 ' 'A SEATTLE, WA. 98124 APPROVED DWGNO. BLDG 7 -600 COL A -H /1 -5 TUKWILA. 7.600 -G01 a . L M.T.BURLEY 03 01.91 125A001N GMM/03,13,92 ISSUE LEGEND NOT YET ISSUED INDEX OF DRAWINGS O PREVIOUSLY ISSUED, INCLUDED 1 1 NOT IN THIS ISSUE IN SET IN THIS ISSUE DRAWING NO. SHEET NO. DRAWING TITLE REV DATE GENERAL e 7.600 - -G01 G01 COVER SHEET C 03.30.95 O 7.600 -G02 G02 INDEX OF DRAWINGS E 03.30.95 ARCHITECTURAL O 87.600 -1A10- 03/01/91 1A1OR FIRST FLOOR PLAN - REMOVAL A 03.28.91 O R7.600- 2A10- 03/01/91 2A1OR SECOND FLOOR PLAN - REMOVAL A 03.28.91 O 7.600 -1A10 1A10 FIRST FLOOR PLAN B 03.13.92 O 7.600 -2A10 2A10 SECOND FLOOR PLAN D 03.30.95 0 7.600 -A200 A200 1 DETAILS & SECTIONS D 03.30.95 O 7.600 -A201 A201 SECTIONS & WALL TYPES C 03.30.95 O 7.600 -IA280 1A280 FIRST FLOOR PLAN - REFLECTED CEILING PLAN 8 03.13.92 O 7.600 -2A280 2A280 SECOND FLOOR PLAN - REFLECTED CEILING PLAN D 03.30.95 O 7.600 -A350 A350 ROOM FINISH SCHEDULE D 03.30.95 O 7.600 -A355 A355 DOOR SCHEDULE C 03.13.92 MECHANICAL O R7.600 -1M10- 03/08/91 1M10R FIRST FLOOR PLAN - HVAC - REMOVAL A 03.28.91 O R7.600- 2M10- 03/08/91 2M10R SECOND FLOOR PLAN - HVAC - REMOVAL A 03.28.91 O 7.600 -M1 M1 FOUNDATION PLAN - PLUMBING B 03.13.92 O 7.600 -1M10 1M10 FIRST FLOOR PLAN - HVAC 1 B 03.13.92 0 7.600 -2M10 0 7.600-1M110 2M10 SECOND FLOOR PLAN - HVAC D 03.30.95 1M110 FIRST FLOOR PLAN - PLUMBING B 03.13.92 O 7.600 2M110 2M110 SECOND FLOOR PLAN - PLUMBING B 03.13.92 OI 7.600 1M360 1M360 FIRST FLOOR PLAN - SPRINKLER HEAD RELOCATIONS B 03.13.92 O 7.600 -2M360 2M360 SECOND FLOOR PLAN - SPRINKLER HEAD RELOCATIONS B 03.13.92 O - 1M361 FIRST FLOOR PLAN - 'AUTOMATIC SPRINKLER" DRAWING (REF DWG) -- - O - 2M361 SECOND FLOOR PLAN - 'AUTOMATIC SPRINKLER' DRAWING (REF DWG) -- -- O 7.600 -M500 M500 PLUMBING DETAILS & DIAGRAMS B 03.13.92 I ELECTRICAL O R7.600 -1E10- 03/08/91 1EIOR FIRST FLOOR PLAN - LIGHTING - REMOVAL A 03.28.91 O R7.600 -2E10- 03/08/91 2E1OR a SECOND FLOOR PLAN - LIGHTING - REMOVAL A 03.28.91 O R7.600 -1E60- 03/08/91 1E6OR I FIRST FLOOR PLAN - 120/208 VOLT POWER - REMOVAL A 03.28.91 O R7.600 -2E60- 03/08/91 2E60R 1 SECOND FLOOR PLAN - 120/208 VOLT POWER - REMOVAL A 03.28.91 O R7.600- 1E360- 03/08/91 1E3609 FIRST FLOOR PLAN - TELEPHONE & DATA - REMOVAL A 03.28.91 O 87.600- 2E360- 03/08/91 2E360R SECOND FLOOR PLAN - TELEPHONE & DATA - REMOVAL A 03.28.91 O 7.600 -1E3 1E3 120/208 VOLT POWER - MAIN FEEDERS, BUSWAYS AND PANELS B 03.13.92 O 7.600 -1E10 1E10 FIRST FLOOR PLAN - LIGHTING B 03.13.92 O 7.600 -2E10 2E10 SECOND FLOOR PLAN - LIGHTING E 03.30.95 O 7.600 -1E60 1E60 FIRST FLOOR PLAN - 120/208 VOLT POWER C 03.13.92 O 7.600 -2E60 2E60 SECOND FLOOR PLAN - 120/208 VOLT POWER G 03.30.95 O 7.600 -1E261 1E261 FIRST FLOOR PLAN - SMOKE DETECTOR B 03.13.92 0 7.600 -2E261 2E261 SECOND FLOOR PLAN - SMOKE DETECTOR B 03.13.92 O 7.600 -1E360 1E360 FIRST FLOOR PLAN - TELEPHONE & DATA B 03.13.92 O 7.600 -2E360 2E360 SECOND FLOOR PLAN - TELEPHONE & DATA D 03.13.92 O 7.600 -E500 E500 PANEL SCHEDULES D 03.13.92 1 0 7.600 -E501 E501 PANEL SCHEDULES & DETAIL B 03.13.92 O 7.600 -E515 E515 FIRE ALARM RISER DIAGRAM - 03.13.92 1 1 1 - \•k 6 0 - oPQQp `O,g Vs � RECEIVED 0(15 �� \5 CITY OF TUKWILA ® e o �N MAR 3 1 1995 PERMIT CENTER BE&C E 9 035 ENGINEERS VA DRAWN BY IDATE SUBTITLE LAST REVISION SYMBOL DATE SYM REVISION BY APPROVED DATE A REVISION BY APPROVED DATE ❑ AUBURN, WA . 98002 ACCEPTABILITY 'MILLER INDEX OF DRAWINGS A RELEASE FOR PERMI T (FULL SET) GM GC 03.08.91 ❑ BELLEVUE , WA • 98007 THIS DESIGN AND /OR CHECKED S HEET ��j®/ ❑ EVERETT , WA . 98201 SPECIFI IS APPROVED G . BELL I OE I B GENERAL REVISION GM GC 03.28.91 APPROVED BY DEPT. DATE G. MILLER LLER TITLE G FAC ILITIES DEPARTMENT ❑ KENT , WA . 98031 CED JOB NO. ? - ��� C PROJECTION ROOM T.I. (J #91012 -003) GM 06.21.91 ❑ PORTLAND, OR. 97220 CHEB.BKERLIEN APPRO v' V REMODEL D RECORD DRAWING GM JW WH MB 03.13.92 ❑ RENTON, WA. 98055 G.CUM OFFICE DWG NO. 91025 E SUPPORT BLUEBILLS PROGRAM ( #J00007)LMrV LE MW 03.30.95 o SEATTLE, WA. 98124 M T BURLEY 03.01.91 BLDG 7 -600 COL A -H /1 -5 TUKWILA 7.600 -G02 125A002N GMM/03,13.92 LEGEND 'III BUILDING AND WALL xx xx SECTIONS © DETAIL xx xx 0 © D © O ®® ® © REFERENCE TO DETAIL XX xx ; I PLAN 1 170' -0" 5' -0 32' -0" 1 32' -0" 32' - 0" 32' -0" 32' -0" 5' -0' XX 1 XX I ROOM NUMBER n I I 2A10 A200 I 1 1 I TYP ( I XX DOOR NUMBER �B O zAt o Aiot O © . WALL TYPE SEE SHEET A201 TY P (I - (' f � l i d , " !I, " _ , , „ O NEW PARTITION WALL ° I I 4 _, I 203B) - - - 1 - 0 GENERAL NOTES 38' -0'± - Q 1. NOTED ALIGN ALL DEMOUNTABLE PARTITIONS WITH CENTERLINE OF MULLION UNLESS OTHERWISE . I I I N © UNASSIGNED 2. ALIGN ALL DEMOUNTABLE PARTITIONS WITH CONFERENCE RM O 1 205 1 CHAMFER OF COLUMN AND /OR WALL UNLESS 203 I STAiR 08 2 OTHERWISE OTHERWISE NOTED. ©IIJ' "� 2 3. ALL DOORS ARE 6” FROM CORNER UNLESS NOTED - - - - �� �! _ - _ _ . ;� _ HALL + a1'∎ 4. ALL DIMENSIONS ARE TO FACE OF COLUMN/ � ) , 111: 201 1 ` I I I K208A) WALL /DEMOUNTABLE PARTITION UNLESS NOTED 11 --r----- i L OTHERWISE. 1 OD s'li 5. VERIFY ALL DIMENSIONS AND CONDITIONS PRIOR LOBBY r i 209A - TO PROCEEDING WITH THE WORK. N 7 200 I i WOMEN LOUNGE =o 2A70 A200 O � ® O !I® mi �t l-- ` I 209 I ' 6. PATCH AND PAINT ALL DAMAGED EXISTING SURFACES DAMAGED DURING REMOVAL AND - E LEV 1 1 1 h CONSTRUCTION (PAINT ENTIRE WALL). - o /� � o ' \® rill 2A 10 A2++ O 7. PRIOR TO INSTALLING FINISH FLOORING, I t_ �I) AV - _ = 4 INSPECT, PATCH AND REPAIR ALL SURFACES TO o 1 _ ® I�� ,11 I PROVIDE A SMOOTH, FLAT SURFACE THROUGHOUT. "' 111 2166 I 1 I I : : 1n"" \2,DA j ��.•� ■.,c`■ _ ��, F - 29-9± CONSTRUCTION NOTES M ECH RM PROVIDE NEW NON RATED DEMOUNTABLE - -- 1 210 I Q PARTITION WALL TO MATCH EXISTING. ALIGN STAIR 1 2A10 A200 DEMOUNTABLE PARTITION WITH CENTERLINE OF EXISTING WINDOW MULLION. 1 215 1 TYP A 2A10 A2o1 PROVIDE NEW COVE BASE TO MATCH EXISTING. TYP REPLACE DAMAGED WALL PANEL AND TRIM TO I I I I I I I I MATCH EXISTING. ® ALIGN DEMOUNTABLE WALL WITH CENTERLINE OF WINDOW MULLION. SEE DETAIL 6 SHEET A200. 1 i SECOND FLOOR PLAN T C DD E QF i SCALE: 1 8 =1 -0 % r H r R p 5995 KEY PLAN ' °, • RP N O SCALE Yy ` J ' RECEIVED �`' V CITY OF TUKWILA . B u t V1$101`� I MAR 3 1 1995 pING01 PERMtT CENTER BE&C 03.30 ENGINEERS .95 DRAWtJ BY SYIA REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE ❑ AUBURN, WA . 98002 ACCEPTABILITY G.M1 LL DATE SUBTITLE ER LAST REVISION SYMBOL DATE A GENERAL REVISION GM GC 03.28.91 ❑ BELLEVUE, WA. 98007 THIS DESIGN AND /OR CHECKED SECOND :LOOK PLAN SHEET B PROJECTION ROOM T.I . (J #91012 003) GM 06.21.91 ®A IV ❑ EVERETT, WA. 98201 SPECIF ICATION IS APPROVED B.BERLIEN � � QF ELI .M ILLER APPROVED BY DEPT. DATE G .M TITLE C RECORD DRAWING GM JW 1M-1 MB 03.13.92 FAC I L 1 T 1 ES DEPARTMENT ❑ KENT , WA . 98031 CHECKED ❑ PORTLAND, OR. 97220 B.BERLIEN 7 -600 JOB N0. D SUPPORT BLUEBILLS PROGRAM ( #J00007)LMN LF MW 03.30.95 ❑ RENTON, WA . 98055 G CULTUM OFFICE REMODEL 91025 y APPROVED BLDG 7 -600 COL A-H/1-5 TUKWI LA DwB NO. SEATTLE, WA. 98124 M. T. BURLEY 03.01.91 / 7.600 -2A10 __ 125A0102 GMM/03.13.92 1 1 LEGEND 1 ■■■- 2'- 0 "x2 " -0 " SUSPENDED I MEMM CEILING GRID 2'- 0 "x4 " -0 " SUSPENDED 1 O ® r ® C /� ® CEILING GRID L IL 4'- 0 " "x2 " -0 FLUORESCENT 11 11 LIGHT FIXTURE 0 © Q 4' 0'x1 -0" "FLUORESCENT 2 A280 A200 I I 1 2A280 A200 I 2A280 A200 2A280 A200 I I LIG F TYP TYP I TYP TYP 2'-0"x2"-0" FLUORESCENT LIGHT FIXTURE o INCANDESCENT LIGHT FIXTURE (FLOODLIGHT) 1 I _ l ` 1 , ��, lIb` , -Y (WA _ CK LIGHTING SYSTEM WASHER) ■ LL =l1M MIWINIT M _I ® ILLUMINATED EXIT SIGN M I LIIIMG_I1110101-■AIMIII ■f11N1RIIIK■,:) 1 1 1 M—E gi■-mo_ ®� �� FIRE SPRINKLER HEAD ii -. = - _ M�(♦I.�5M1= = = = = == I■ NIN��►: � ��a'01 ►�MI. - { l ) ® DIFFUSER p 1[__i►/_/ ■■/1- 31 1— I =I_—lo■__ICI r - _I - �� 1I -■ - ■IME �-M�M■NI��;— ■11 - ��� - - --1 I 2] RETURN AIR DIFFUSER IIMINIMIUMMINIMMIIME11.0 ■f_ =MI .... X111:■- 1■__ ■- ■C�.._.II�- .- 1__ ::::: - E: ® �� -1 I It!- ■ -0 -ME= MIME .;I- - ICI- - - -LJ� ■I� - TR ANSFER GRILLE 11_■ -- ■I_O- E__E■_ -!.■_ ■NIUM111 111111M.10.11111MOCEI O SPEAKER n 1∎Q/o ■I1— ■I_— _I_I_____r :i_ ■- — "1111 _I_ 4- - - CEILING HEIGHT - 9"-0" It`s® 011— ■I —I/_ :I•— :, ■ ■ III•IILIL .. ? ®/ ®IIEIIIIIII—M_ ■_ GENERAL NOTES 11 —■ __ ■1•�_i =l_____r, ® ■im ® ®ICI ® ®el 11_■ -- ►7I11•11S— - I =I,11—I =IL1 ■r M1110111 0- OS10 -I 1. SEE MECHANICAL/ELECTRICAL DRAWINGS FOR t:_ ■- -- ■1_l � WM MII MMIIMIK1 � INIIIMINI ® ®ICI ® ® -I REMOVALS /RELOCATIONS /NEW LOCATIONS OF 1I 0. 1 =1111111 OICIMINIMI�� ►��r_ IT IM o ::::: ® .111111=M -IMMIEMMu _ 3 FIXTURES /EQUIPMENT /ETC. 11 =���_ 11_ ! I � I1�J -u0 I 1 � 00000■f 1 ``r 1101 1 1 ?? w•� ®;11 EM �0■ ■■ 2 . EXISTING CEILING GRID (RUNNERS, TEES) TO ■►:_- _ :a V��'_■_■■IIrQ■ ■ -■■■ LICI - 0❑ ® `+ =-pompom REMAIN. REPLACE, R ( RUH EXISTING, , 1I_■ M0_- .11.0WM��NIIRIBUNI♦���I♦IM�rkllll�1 1_I ®- P�� CEILING GRID (RUNNERS, TEES) DAMAGED 1I® IENI_INI14; ' IIp _ Ii1® =11111 ; _MIOS1 ■I 11_��_�■ 1hIIIJ[ DURING REMOVAL AND /OR CONSTRUCTION. 1t•_■ __ iii • 1#1,1 - L �� ___. _0_•■ i :116 11_I►��1�■ ►1_ ■I ■_ + ,i1 u 4 U 1 ■/1 �1 — ®_ - -__ ■■ 11'IMI 111111131- =MIN 1 11111111111 .t.' 1-1 = t 1t: �� Imi1— im Eon _ — --f11 ■� IC AI) ell i1 -® — ::1® ,. - -- -11:11■ I: ■16!'' CI I. ..�: -- is =a.� - I 11_— —■ -- . mat � .�I �1►1.►�•iu►5u N ono Fp � ii I I_► . � 1 11�_ ��1� I ••I -m-g ■.■._ - _ 1® ■I■I�I■ �d� r9 11711M111111111111•411- - - ∎— ∎1Q_/IE �I ( � CONSTRUCTION NOTES 1 ■ = i 1f■_ ■K`■Q■■{■ .I�I111111101, a 1 — ® ®� 2•1 =1® ®MII 1 . PROVIDE SEISMIC BRACING IN EXISTING CEILING G �,� ER ENUM � a I !171 �i =, � G J \ 5 SPACE THROUGHOUT AREA OF WORK. COMPLETE 0 =1 � - 1"1Wili i iii f Q � BRACING SO THAT ALL WORK IN THE CEILING �ii1111��'� AREAS EXPOSED BY THE SCOPE OF THIS CONTRACT 11 _ j __ _ 1'__ E COMPLY WITH DETAILS 1, 2, 3, 4 AND 5 ON 1 1 SHEET A200. 4 rf' . i • I I I I I I TTTTTEP SECOND FLOOR PLAN � �� ���� B G SCALE: 1 8 =1 -0 j IT I I ( Q 2 ------0 I - 5 ,ot 0 70 P Q Q �g9 1% K P / E, ... _1 5 cii5 ' * ° . \ /\S \� N NO SCALE arm. - \\-L CITY OF 14F14 3 1 19 °S BE &C 03.30 PERMIT CENTER ENGINEERS U . SYM REV BY APPROVED DATE SYM REVISION BY APPROVED DATE ❑ AUBURN, WA . 98002 ACCEPTABILITY GAMILL DATE SUBTI SECOND FLOOR PLAN LAST REVISION SYMBOL DATE A GENERAL REVISION GM GC 03.28.91 ❑ BELLEVUE,WA, 98007 THIS DESIGN AND /OR CHECKED S HEET B PROJECTION ROOM T.I. (J #91012 -003) GM 06.21.91 EZAOW CI EVERETT, WA. 98201 SPECIFICATION IS APPROVED B.BERLIEN REFLECTED CEILING PLAN �y G � Q CF EN TITLE FACILITIES DEPARTMENT ❑ KENT , WA . 98031 APPROVED BY DEPT. DATE G. LL ER GG C RECORD DRAWING GM JW WH MB 03.13.92 ❑ PORTLAND OR 97220 , . CHECKED B. BERL I EN T -6©0 JOB NO. D SUPPORT BLUEB I LLS PROGRAM ( #J00007) LMW LF MR 03.30.95 APPROVED ❑ RENTON, WA. 98055 G.CULTUM OFFICE REMODEL DWG NO 91025 U SEATTLE, WA. 98124 APPROVED BLDG 7 -600 COL A -H /1 -5 TUKWILA 7.600 -2A280 M.T.BURLEY 03.01.91 125A2802 GMM/03,13,92 . . - . �� y . d --*-*. - VERTICAL MEMBER REQUIRED AT PROVIDE SPLAY WIRES 11111.111 SEISMIC PODS TO EXISTING CEILING VERTICAL STRUTS @ 12' -0" - #12 WIRE PERIMETER GRID (8" FROM WALL. O.C., BOTH DIRECTIONS. O O O o O • HANGERS, 8" MAX. 4' -0" O.C.) W (STRUT: USG DONN COMPRESSION 1111 p fi FROM WALLS AND PER POST, VSA 24/47) CODE UE:G (88) 47.1812.b I 8' MAX. 1 I 8" MAX. 45' #12 GA SPLAY WIRE BRACING S ACK WI ^ES \\<\. �\ IN PLANE OF EACH TEE. o 0 0 • 21 VERTICAL ANGLE, 45 °. i/4' 5 MINIMUM 3 TURNS @ EACH END. , 12GA. HANGER WIRES TYP. CLEAR _ = / N w o O • • O • SI' ; , / 1 ) 1 45 �\ 45' o w #12 WIRE HANGERS @ 4' -0" O.C. 4 \ E - o EACHWAY SUSPENDED Alma ., „ \ o o • • o o FROM STRUCTURE ABOVE. - I • '' ?' � ` I �' / CEILING BRACING AT 12' -0 "X12' -0" (MAX.) O 0 ,. o TO MATCH STRUCTURAL 2 X 4' LIGHT 1 / �_ e% SYSTEM AND ON CENTER, , FIXTURE ATTACHED TO SUSPENDED 1.\i - • c EACH WAY. SEE TYPICAL CEILING SYSTEM -y ‘1 EXISTING CEILING GRID ,� ' 2 ,fr � O o O o BRACING THIS SHEET. WITH CLIP (2) OR E / 1- 1/2" SELF TAPPING CROSS TEE MAIN TEE LOCATE FIRST POINT OF METAL SCREW (2) riTTACH AT NORTH WALL NOTE: HANGER WIRES 'E' AND 'W' ARE IN THE SAME ACIWITHIN 4' -0" AND ONE ADJACENT WALL. VERTICAL PLANE AS THE MAIN TEE, 4' 0" 12' 0 OF WALLS. HANGER WIRES 'N' AND 'S' ARE IN VERTICAL PLANES MAX ON CENTER PERPENDICULAR TO THE MAIN TEE. LIGHT FIXTURE BRACING (TYP) rli's\ CEILING GRID AT WALLS (TYP) CEILING BRACE (TYP) ("i CEILING HANGER LAYOUT (TYP) n NO SCALE 1A280,2A280 A200 NO SCALE 1A280,2A280 A200 NO SCALE 1A280,2A280 A200 NO SCALE (SEISMIC POD LOCATIONS) 1A280,2A280 A200 ' ; E az o�\ � oo i COM t CAL •UTS EXISTING STRUCTURE ABOVE SINK PLASTIC LAMINATE FACE �� GLASS _ WIRE PULLS (TYP) WINDOW MULLION ' 1 14" III i::: : IIHHII H IIII SILL (WOOD, METAL) azoo azoo PLASTIC LAMINATE ON COUNTER EDGES, SIDES o e e e n 2 / BACKSPLASH - - - -'` `' o o I J �� BLOCKING (AS REQUIRED, TYP) m�umuunnn �� 1i i � ��� �`` e o DRAWER WITH 1/4" HARDBOARD ��li�n ....nun PARTITION 3''' ���- \� ��_ , ��■I_ > m <,‘ I ADJUSTABLE SHELF III i # WIRE, PARTITION CEILING RUNNER OR END CONDITION j N -'irl I 1/4" HARDBOARD SEISMIC BRACE, ONE , TRIM TO MATCH PARTITION o SUSPENDED THREE -WIRE SPLAY BRACE EXPANDABLE FOAM (ODORLESS AND o o N ADJUSTABLE STANDARDS (TYP) CEILING AT EVERY 8 L.F. SUNLIGHT RESISTANT) MINIMUM 3 TIGHT TURNS • PLASTIC LAMINATE INTERIOR AND DEMOUNTABLE AT EACH END. NO BENDS .A SHELF PARTITION OR KINKS ON WIRES. NOTE: HOLD NEW PARTITION WALL TIGHT 2'-8" 2' -8 2 -8 �� TO EXISTING EXTERIOR WALL, NOTCH PARTITION AT 51 LL AND 8'_0" BLOCKING (AS REQUIRED) 3 TRIM OUT AS DESCRIBED ABOVE, 1 FILL VOID AT MULLION WITH FOAM 4" RUBBER BASE DEMOUNTABLE PARTITION BRACE (TYP) PARTITION AT MULLION (TYP) CABINET ELEVATION TYP d CABINET SECTION Ink NO SCALE 1A10,2AtOL 00 SCALE: 3 " =1' -0' 1A10,2A10 A200 SCALE: 3/4 " =1' -0' 1A10,2A10 A200 SCALE: 3/4 " =1' -0" A200 A200 • EXISTING WIN)I'S NEW DOOR NEW PARTITION WINDOW (1/4' GLAZING) NEW PARTITION WALL �= \`\ + ct M — o w O i 1 = _ j °i / o _ _ CC\Z � o E PQ P 10 1 995 1 .... Q R 7' -2 "± 3 ° �i "C O`V\S�Oc (TYPICAL) a\���p�N ' RECEIVED PROJECTION ROOM 216 (EXTERIOR) OITYOPT NAR 3 1 1999 SCALE: 1/4 " =1' -0" 2A10 A200 �_� PERMIT CENTER BE&C 03.30 ENGINEERS D .95 m REVISION BY APPROVED DATE SY6f REVISION BY APPROVED DATE DRAWN BY DATE SUBTITLE LAST REVISION SYMBOL DATE ❑ AUBURN, WA. 9 ❑ 8002 ACCEPTABILITY G.MILLER DETAILS & SECTIONS A GENERAL REVISION GM GC 03.28.91 ❑ BELLE , WA. 95007 TNIS DESIGN AND /OR CHECKED SHEET L- i PROJ ECTION ROOM T.I. (J #91012 003) GM 06.21.91 ❑ EVERETT, WA. 98201 SPECIFICATION IS APPROVED BG LEN TILE A200 1,� OF APPROVED BY DEPT. DATE G.MLLER FACILITIES DEPARTMENT ❑ KENT , WA . 98031 ry � RECORD DRAWING GM JW WH MB 03.13.92 B. BERL I EN ! - V V ® JOB NO. ❑ PORTLAND , OR , 97220 g SUPPORT BLUEB I LLS PROGRAM ) APPROVED O 1025 ( #J00007 LMN LF MW 03.30.95 El RENTON, WA . 98055 G.CULTUM OFFICE REMODEL ND SEATTLE, WA . 98124 APPROVED BLDG 7 600 COL A H/1 5 7UKWILA 7.600 -A200 M.T.BURLEY D3.01.91 125A200N MM 0 G / 3,13,92 _ 3 1/4 " �3 1/4" 1 • r 1 22 GA. METAL STUD FOR A 3 1/4" WIDE WALL AT 16" O.C. 5/8" TYPE 'X' G.W.B. (EACH SIDE) BUILT -UP ROOFING 22 GA. METAL STUD FOR A WITH PAINTED (EACH SIDE) METAL FLASHING , 3 1/4" WIDE WALL AT 16" O.C. PLYWOOD DECK TF. ,SES c 22 GA. METAL RUNNER (TOP AND c BOTTOM) FOR A 3 1/4" WIDE WALL 5/8' TYPE 'X' W. EACH SIDE) t WITH VINYL COVERING (EACH SIDE) 22 GA. = A ri BOTTOM )M /4 "(WIIDEAWALL __ -_ i EXISTING CONCRETE WALL OR r1 G.W.B. COVERED STEEL COLUMN - ( 1 5/ " 0 0 I I2 1/4� I I , ��� A = USG - DONN HIGH PERFORMANCE PARTITION WALL AS SHOWN B = USG DOWN HIGH PERFORMANCE PARTITION WALL AS SHOWN li (,� B' = USG - DONN HIGH PERFORMANCE PARTITION WALL AS SHOWN 1 (ONE -HOUR PARTITION WALL SYSTEM) CONCRETE FIN WALL BEYOND CONCRETE ROOF SPANDREL G.W.B. SOFFIT PARTITION DETAIL (PLAN PARTITION DETAIL PLAN I WOOD BLOCKING RIGID INSULATION SCALE: 3' =1' -O" SCALE 3"= BATT INSULATION 2 5/8" WOOD FRAMING TO TRUSSES r T SUSPENDED ACOUSTICAL CEILI °' REPEAT NOTES FROM BELOW / 22 GA. METAL STUD FOR A 2 5/8" WIDE WALL AT 16" O.C. CARPET, PAD AND RESILIENT BASE - " ° © E--1 1 1/2" CONCRETE TOPPING t ato,2A10 A200 �.`- 3/4 PLYWOOD (2 LAYERS) 5/8" TYPE 'X' G.W.B. (ONE SIDE) _ _ TRU ° ° ? N WITH VINYL COVERING I 1 � � I 'a, 1 1 1 wRatYNtom ®Br a' T\ 22 GA. METAL RUNNER (TOP AND N . ' / ' -- • BOTTOM) FOR A 2 5/8" WIDE WALL _ SUSPENDED ACOUSTICAL / TILE CEILING AND GRID ! CONCRETE SPANDREL C = USG - DONN HIGH PERFORMANCE PARTITION WALL AS SHOWN 1 RIGID INSULATION WOOD BLOCKING 22 GA. METAL STUD FOR :..F1 1Ii *' D I BATT INSULATION A 3 1/4" WIDE WALL AT ' SUSPENDED ACOUSTICAL CEILING 16" O.C. I DEMOUNTABLE PARTITION PARTITION DETAIL ( PLAN ) PANEL (5/8" G.W.B. RIGID INSULATION WITH VARIOUS FINISHES) SCALE: 3 " =1' -0" WOOD FURRING 1 o G 18.8 WITH WOOD TRIM = 0" D ANSULATEDWGLASS FRAME ' 3 1/4" � LDT 1 P 0\ 0) CONCRETE WALL C I P 0 05 R P • J METAL STUD RUNNER NC ��� \S� 1 ' f \ 1 FASTEN RUNNER TO SLAB 22 GA. METAL STUD FOR A ' °' AT 24" O.C. WITH POWDER ACTUATED :/ CARPT, PAD AND RESILI ENT BASE 1 1/4" LONG PINS • 4 --` 4° CNCRETE SLAB d IDE) "' AA � ' ) 4 GRAVEL W.P. MEMBRANE / WITH VINYL COVERING (ONE SIDE), - 2* 1 4" SAND BASE PER FINISH SCHEDULE `' , AND PAINTED (ONE SIDE . ,�s % \I 1 PERIMETER SLAB INSULATION / FINISH FLOORING PER ( ) FINISH SCHEDULE ° CONCRETE SLAB /TOPPING -- - - - - -- 4 � � i I 22 GA. METAL RUNNER (TOP AND `, . a pr,,,,____, , L ; I A BOTTOM) FOR A 3 1/4" WIDE WALL J)) 111 le i LANDSCAPED BERM 4 ' ° W 3 SIDEWALK ' ° • FOOTINGS /FOUNDATIONS (CONCRETE) D = USG - DONN HIGH PERFORMANCE PARTITION WALL AS SHOWN EXISTING EXTERIOR WALL CONDITION D' = USG - DONN HIGH PERFORMANCE PARTITION WALL AS SHOWN USG - DONN HIGH PERFORMANCE PARTITION WALL (ONE -HOUR PARTITION WALL SYSTEM) FOR INFORMATION ONLY DEMOUNTABLE PARTITION PARTITION DETAIL (PLAN) WALL SECTION (TYP) SECTION (TYP) (---E SCALE: 3 " =1' -O" RECEIV CITV OR TUK WILA SCALE: 1/2 " =1' -0" 1A10,2A10 A201 SCALE: 1 1/2 " =1' -0" 1A10,2A10 A201 ;:,142 3 1 1053 BE&C 03.30 ,- �� ENGINEERS C . 95 _ PERMIT CENTER _ SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE r AUB . ' N , WA . 98002 ACCEPTABILITY DRAWN BY LLER DATE SUBTI LAST REVISION SYMBOL DATE G.MI A GENERAL REVISION GM GC 03.28.91 • : L , ' a 8007 THIS DESIGN AND /OR CHECKED SECTIONS & WALL TYPES SHEET - - SPECIFICATION IS APPROVED B.BERL IEN A201 B RECORD DRAWING GM JW WH MB 03.13.92 "- ❑ EVERETT, WA. 9. 01 APPROVED BY DEPT. DATE GR ILLER LE of FACILITIES DEPARTMENT ID KENT, WA . 9811 ( #000007) LMW LF MW 03.30.95 CHECKED C SUPPORT BLUEB I LLS PROGRAM — ❑ PORTLAND, OR 97220 B 7-600 JOB NO 91025 I 1=1 RENTON, WA. 98055 G CULTUM — -- SEATTLE , WA . 981 24 APPROVED BLDG 7-600 COL A H 1 5 TUKWILA '' ND. M.BURLEY D3.01.91 / 7.600 -A201 125A201N GMM/03.13.92 FINISH MATERIALS ROOM FINISH SCHEDULE KEY MATERIAL FINISH NOTES ROOM ROOM FLOOR NORTH EAST SOUTH WEST CEILING REMARKS - - -- FLOORING - -- N O . BASE WALLS BASE WALLS BASE WALLS BASE WALLS MAT'L HEIGHT F -1 CARPET FACTORY FINISH BENTLEY: COVENT GARDEN, "WATERFORD ", #CG32B -1353 100 LOBBY -- B -2 W -3/4 -- W -1/3 -- W -1/3 B -2 W -1/3/4 C -1/3 9' -0" SEE NOTE 1 F -2 SHEET VINYL FACTORY FINISH ARMSTRONG: POSSIBILITIES, QUILTED DOTS, "SANDSTONE", #86153 101 HALL -- -- -- W-1/3 B -2 W -4 -- W -1/3 -- -- C -1/3 9' -0" SEE NOTE 1 1 102 OPEN OFFICE F -1 B-1 W-2/3 B-2- W-1/2/3 B-1 W -2 B-1 W -2 C-2 9'-0" SEE NOTE 1 -- 103 HALL F -1 B -1 W -2 -- B -1 W -2 B -1 W -2 C -2 9'-0" 104 OPEN OFFICE F -1 B -1 W -1/3 B -1 W -2 B -1 W- 1/2/3 B -1 W -2 C -2 9' -0" SEE NOTE 1 105 HALL F -1 B -1 W -2 B -1 W -I/2/3 B -1 W -2 B -1/2 W -1/2/3 C -2 9' -0 SEE NOTE 1 -- BASE -- 106 OFFICE F -1 B -1 W -1/2/3 B -1 W -1/3 B -1 W -1/3 B -1 W -2 C -2 9' -0" SEE NOTE 1 ' B -1 RUBBER BASE FACTORY FINISH JOHNSONITE: 4 ", 'GRAY", #DC-48 107 OFFICE F -1 B -1 W -2 B -1 W -2 B -1 W -1/3 8 -1 W -2 C -2 9' -0" B -2 WOOD STAIN AND SEAL MATCH EXISTING (4 "X3/4") 108 OFFICE F -1 B -1 W -2 B -1 W -2 B -1 W -1/3 B -1 W -2 C -2 9"-0" 109 OFFICE F -1 8-1 W -2 B -1 W -2 B -1 W -1/3 B -1 W -2 C -2 9' -0" 110 OFFICE F -1 B -1 W -2 B -1 _W -2 B -1 W -1/3 B -1 W -2 C -2 9' -0" — 111 BREAK ROOM F -2 B =1 W -2 W-2 W = 2 B -1 B-1 -- W -1/3 C -2 9'_0 SEE NOTE 1 ` J -- WALLS — 112 MECHANICAL ROOM W -1 CONCRETE (EXISTING) PAINT PARKER P "INT: 'POLAR BEAR ", #5420W 113 MENS. RESTROOM — -- -- -- -- -- -- -- __ - __ `, W -2 DEMOUNTABLE PARTITIONS FACTORY FINISH (VINYL) USG: DOV WALL (5/8" G.W.B. - "PRESIDIO ISLAND - LR 78" VINYL, "DAWN GRAY" TRIM) 114 WOMENS RESTROOM W -3 G.W. (EXISTING) PAINT PARKER I:`INT: `:OLAR BEAR ", #542GW 115 ELECTRICAL ROOM -- -- -- -- -- -- -- -- -- -- — !,„ 4 DEMO UNTABLE PART ITIONS PAINT USG: DONN WALL (5/8' G.W.B. - PAINTED - PARKER PAINT: "POLAR BEAR ", #5420W) 116 ELEVATOR - -- -- 117 TELEPHONE ROOM -- -- -- -- -- . 118 OFFICE F -1 B -1 W -2 B -2 W -1/3/4 B -1 W -1/3 8-1 W -2 C -2 9' -0" SEE NOTE 1 119 OFFICE F -1 B -1 W -2 B -1 W -2 B -1 W -1/3 B -1 W -2 C -2 9' -0" 120 OFFICE F-1 B-1 W-2 B-1 W-2 B-1 W-1/3 B-1 W-1/3 C-2 9' -0" 121 OFFICE F -1 8 -1 W -2 B -1 W -2 B -1 W -2 B -1 W -1/3 C -2 9' -0" — CEILING -- r 12Z OFFICE F -1 B-1 W-2 B-1 W-2 8-1 W-2 8-1 W-1/3 C-2 9' -0 C 1 SUSPENDED ACOUSTICAL TILE FACTORY FINISH ARMSTRONG: SANSERRA TRAVERTONE 2'- 0 "X2' -0" (SQUARE CUT TEGULAR LAY -IN EDGES) 123 OFFICE F -1 B -1 W -1/3 B -1 W -2 B -1 W -2 B -1 W -1/3 C -2 9'-0" C C 2 SUSPENDED ACOUSTICAL TILE FACTORY FINISH ARMSTRONG: C ORTEGA INABOARD 2'- 0"X4' -O" (SQUARE LAY IN EDGES) 124 OFFICE F -1 B-1 W-1/3 8-1 W-2 B-1 W-2 B-1 W-2 C-2 9'-0" ■ 3 G.W.B. (EXISTING) PAINT PARKER PAIN "POLA M R BEAR ", #5420W 125 OFFICE F -1 B -1 W -1/3 B -1 W -2 B -1 W -2 B -1 W -2 C -2 9' -0" A. 126 OFFICE F -1 B -1 W -1/3 B -1 W -2 B -1 W -2 B -1 W -2 C -2 9' -0" NO S: 127 SUPPLIES F -1 B -1 W -2 B -1 W -2 B -1 W -2 B -1 W -2 C -2 9' -0 128 COMPUTER ROOM F -1 B -1 W -2 B -1 W -2 B -1 W -1/2/3 8 -1 W -2 C -2 9' -0" 1. EXISTING CEILING GRID (RUNNERS /TEES) SHALL BE USED 129 CONFERENCE ROOM F -1 B -1 W -1/3 B -1 W -2 B -1 W -2 B-1 W -2 C -2 9' -0" 0 13 SUPPLIES F -1 B -1 W -1/3 B -1 W -2 , B -1 W -2 B -1 W -2 C -2 9' -0" SEE NOTE 3 131 OFFICE F -1 B -1 W -1/3 B -1 W -1/3 • B -1 W -2 B -1 W -2 C -2 9' -0" 132 OFFICE F -1 B -1 W -2 B -1 W -1/3 B -1 W -1/2/3 B -1 W -2 C -2 9' -0" SEE NOTE 1 133 MAIL ROOM F -1 B -1 W -1/2/3 W -1/3 B -1 W -2 B -1 W -2 C -2 9 " -0 SEE NOTE 1 134 STAIR 2 F -1 -- W -1/3 -- W -1/3 -- W -1/3 -- W -1/3 C -3 9' -0" SEE NOTE 1 135 STAIR 1 F -1 -- W -1/3 — W -1/3 -- W -1/3 -- -- C -3 -- SEE NOTE 1 ■ 200 LOBBY -- B -2 W -3/4 • -- W -1/3 -- W -1/3 B -2 W -1/3/4 C -1/3 9' -0" SEE NOTE 1 • 201 HALL — — W -1/3 B -2 W - -4 -- W -1/3 -- — C -1/3 9' -0" SEE NOTE 1 203 ' CONFERENCE ROOM F -1 B -1 W -1/3/4 B -2 W -1/3/4 , B -1 W -1/3/4 B -1 W -1/3 C -2 9' -0 SEE NOTE 1 204 CABLE ENCLOSURE F -1 -- W -2 - V7=73 -- W -2 -- W -2 C -2 9' -0" SEE NOTE 1 205 UNASSIGNED F -1 B -1 W -1/3 B -1 W -1/3 B -1 W -1/2/3 B -1 W -1/2/3 C -2 9' -0" SEE NOTE 1 206 TELEPHONE ROOM -- -- — -- -- — -- -- -- -- -- 208 STAIR 2 F -1 — W -1/3 -- W -1/3 -- W -1/3 -- W -1/3 C -1 9' -0" SEE NOTE 1 209 BREAK ROOM F -2 B -1 W -2 B -1 W -2 I B -1 W -1/3 -- W -1/3 C -2 9' -0" SEE NOTE 1 210 MECHANICAL ROOM — -- — -- -- -- -- -- -- -- -- 211 MENS RESTROOM -- -- — — -- — -- -- -- -- -- 212 WOMENS RESTROOM -- — -- -- -- -- -- -- -- -- -- 213 ELECTRICAL ROOM — -- -- -- -- -- -- -- -- 214 ELEVATOR — -- — — -- -- -- -- -- -- -- 215 STAIR 1 F -1 -- W -1/3 -- W -1/3 -- W -1/3 -- -- C -1 9' -0" SEE NOTE 1 216 PROJECTION ROOM F -1 8 -1 W -4 8 -1 - '9 -4 B -1 W -1/3 B -1 W -1/3 C -2 9' -0" NOTES: 1. THE EXISTING WOOD BASE SHALL BE RETAINED IN THE AREA AND ADDITIONAL BASE SHALL BE ADDED AS INDICATED (IF APPLICABLE) 2. THE " - -" DESIGNATES THE EXISTING MATERIAL REQUIRES NO WORK 3. PAINT OUT EXISTING COLUMN (W -3) p,Qe 1 1995 ,,. GO\JS °' RECE 'cIVD if CITY OF TllKWiLA 311d95 BE&C 03.30 PERMIT CENTER ENGINEERS U , 95 SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE ❑ AUBURN , WA . 98002 ACCEPTABILITY G MILLER DATE SUBTITLE LAST REVISION SYMBOL DATE A GENERAL REVISION GM GC 03.28.91 CI BELLEVUE , WA . 98007 THIS DESIGN AND /OR CHECKED ROOM FINISH SCHEDULE SHEET , � AEAr�/ EN . ❑ EVERETT WA 98201 SPECIFICATION IS APPROVED BERLIEN A! 5® DF B PROJECTION ROOM T . I . (491012-003) GM 06.21.91 APPROVED BY DEPT. DATE G .MILLER TITLE `/ FACILITIES DEPARTMENT ID KENT, WA . 98031 CHECKED C RECORD DRAWING GM JW WN MB 03.13.92 ❑ PORTLAND, OR . 97220 B.BERL IEN 7 °600 JOB ND. ° D SUPPORT BLUEBILLS PROGRAM ( #J00007)LMW LE MW 03.30.95 APPROVED 91025 ❑ RENTON, WA , 98055 G.CUL TUM OFFICE REMODEL SEATTLE, WA. 98124 APPROVED BLDG 7 600 COL A -H/1 -5 TUKWILA I '' '. 7,600 -A350 M.T.BURLEY 03.01.91 125A350 GMM/03.13.92