Loading...
HomeMy WebLinkAboutPermit B95-0142 - SACCO ROBERT AND DIANE . . . . . .. . ... ...... ... ...... ...,.,...:. .. . ..._.,.. .. _.... ..__...... ..,.. ,<.. .> .. ., r ..•..<.. �,...,... .r.mw .mn k,x >...,5<�.,awv.m. :uu .,5. •.. ,.r .,>. h)._ ......3_v..tx+. Hausa. a.. ..r,.,.1.Fe.........._.,.,•.„_" 5\CCD O • 1 I 1 • . .. City of Tukwila (_ L (206) 431-3670 Community Development / Public Works • 6300 Southcenter Boulevard, Suite 100 • Tukwila, Washington 98188 BUILDING PERMIT Permit No: B95-0142 Type: B-BUILD Category: ASFR Address: 16415 53 PL S Location: Parcel #: 779640-0040 Zoning: Type Const: VN Gas/Elec: Wetlands: Water: Contractor License TENANT OWNER CONTRACTOR CONTACT TUKWILA No.: RMILLCI190L5 Status: ISSUED Issued: 05/26/1995 Expires: 11/22/1995 Suite: Type of Occupancy: DECK Slopes: Y Sewer: TUKWILA SACCO ROBERT & DIANE 16415 53RD PL'S, TUKWILA WA 98188 SACCO ROBERT & DIANE 16415 53RD PL S, TUKWILA WA 98188 R. MILLER CONSTRUCTION 146 THIRD AVENUE SOUTH, EDMONDS, WA 98020 SCOTT HALL 146 THIRD AV S, EDMONDS WA 98020 Phone: 206 583-0238 Phone: 206 583-0238 ************************************************************************** Permit Description: ENCLOSING EXISTING DECK TO.SINGLE FAMILY RESIDENCE Units: 001 Buildings: 001 Fire Protection: UBC Edition: 1991 SETBACKS Front: .0 Back: .0 Left: .0 Right: .0 Valuation: 1,950.00 Total Permit Fee: 78.75 *****************************************************************•********* / . Pic 5— -q5 Permit Cenr Authorized Signature Date I.hereby certify that I have read and examined this permit and know the same to be true and_ correct, All provisions of law and ordinances governing this work will be complied with,. whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign for and obtain this building permit. Signature:_ Print Name:___ __ Date: 5 • Title: This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. All PERMITS ISSUED FOR NEW CONSTRUCTION, REMODELING, OR DEMOLITION PROJECTS REQUIRE CONSTRUCTION, DEMOLITION AND LANDCLEARING WASTE MATERIAL FROM THESE PROJECTS TO BE RECYCLED AT A KING COUNTY LICENSED OR APPROVED FACILITY, OR TAKEN TO REGIONAL DISPOSAL FACILITIES. .0 _ CITY OF TUKWIL {' •4'` g Department of Corr ►i nunity Development— Permit Cent `: ,':► 2 ." 6300 Southcenter Boulevard - #100, Tukwila, WA 98188 ''. "` , �`' (206) 431 -3670 Building Permit Application Tracking PLAN CHECK PROJEQT NAME pp ,�, UPJ . NUMBER ,3c1 I I✓ • „he & DiiJ FJ SITE ADDRESS SUITE NO. 1396 - 01 1 1 '4 I. 53 • PL 3 INSTRUCTIONS TO STAFF • Contacts with applicants or requests for information should be summarized in writing by staff so that the status of the project may be ascertained at any time. • Plan corrections shall be completed and approved prior to sending to the next department. • Any conditions or requirements for the permit shall be noted in the Sierra system or summarized concisely in the form of a formal letter or memo, which will be attached to the permit. • Please fill out your section of the tracking chart completely. Where information requested is not applicable, so note by using "N /A ", date and initial. DEPARTMENTAL REVIEW "X" in box indicates which departments need to review the project. DEPARTMENT ` DATE IN DATE :;: REQUIREMENTS / COMMENTS ot BUILDING - 18 15 F, CONSULTANT: Date Sent - Date Approved - al review ������ initi (ROUTED) FIRE j FIRE PROTECTION: O Sprinklers Detectors N/A j �0 FIRE DEPT. LETTER DATED: INSPECTOR: INIT: l ' ll .. , 'PLANNING fr 5`1(g(5; ZONING: '-` ' JBAR/LAND USE CONDITIONS? ( Yes LJ 9_ h ,q(8 REFERENCE FILE NOS.: INIT. - MINIMUM SETBACKS: N- S - E- W- PUBLIC jc lc sumo UTILITY PERMITS REQUIRED? No PUBLIC WORKS LETTER DATED: 5 ®y a WORKS INIT: 01111 * Phi t f L,t76 • -. • . b 5.$.1 ka ,: 0 OTHER INIT: c' TYPE OF CONSTRUCTION: CERT. OF OCCUPANCY? UBC EDITION (year): v BUILDING - . . I final review INIT. / � = � i- v Q Yes � No � BUILDING 5 Ai OFFICIAL INIT: ,I . REVIEW COMPLETED AMOUNT CONTACTED f� e OWING: — �� /V1U� 7 DATE NOTIFIED V BY: �,-(� 5-a3-q5 (init.) J1 2nd NOTIFICATION BY: (init.) 3RD NOTIFICATION BY: (init.) 01/08/03 BUILDINJ PERMIT ?r.;.: . APPLICATION CITY OF TUKWILA Department of Community Development - Building Division 6300 Southcenter Boulevard, Tukwila WA 98188 (206) 431-3670 DESCRIPTION A i U T RCPT ; >' DATE BUILDING PERMIT FEE : •�.�ii'$ ' l 611= . PLAN CHECK PLAN CHECK FEE � �+�'' 595- /- N UM B ER � BUILDING SURCHARGE A PLJCA7"lON ,M'UST. BE . OTHER FILL�D:...L7U7"..+GO :4ETE4;Y :TOTAL - ...:7c{: 7 ,r S JS' SITE ADDRESS SUITE # VALUE OF CONSTRUCTION - $ /9/C S3 ` P/ PROJECT NAME/TENANT ASSESSOR ACCOUNT # �ifGGO geSiG?ehe 77q0 4lO - do e ¢ o TYPE OF 7] New Building • Addition • Tenant Improvement (commercial) • Demolition (building) WORK: 0 Rack Storage 0 Reroof 0 Remodel (residential) 0 Other: DESCRIBE WORK TO BE DONE: enc /Ole z iA� Qiec BUILDING USE (office, warehouse, etc.) Kr5 NATURE OF BUSINESS: WILL THERE BE A CHANGE IN USE? 0 No 0 Yes If Yes, new building requirements may need to be met. Please explain: SQUARE FOOTAGE - Building: 16 Tenant Space: Area of Construction: WILL THERE BE STORAGE OR USE OF FLAMMABLE, COMBUSTIBLE OR HAZARDOUS MATERIALS IN THE BUILDING? No Cl Yes IF YES, EXPLAIN: FIRE PROTECTION FEATURES: 0 Sprinklers 0 Automatic Fire Alarm S stem PROPERTY OWNER x e , s ma c, c PHONE G; 3 _ 3,r ADDRESS /6 y /' S3 °�`� / o /. �; Tp,ewi / , 9e' /cFe ZIP CONTRACTOR �� G oaSi F - m 6 � z PHONE 5 - � 3, 5) ADDRESS 7 � G 3''`1 /�6'e S, t0 '1 / GU /� ZIP 9 020 WA. ST. CONTRACTOR'S LICENSE # 7 9d L - EXP. DATE 9 9� ARCHITECT PHONE ADDRESS ZIP I HEREBY CERTIFY THAT.I „ HAVE READ: AND .:;EXAMINED ..AND. KNOW;THE SAME TO ;: BE TRUE AND:CORRECT, AND i:AM AUTHORIZED TO APPLY FOR ;THIS:'PERMIT. BUILDING OWNER SIGNATURE DATE s `9 5� OR PRINT NAME PHONE AUTHORIZED � a /� S83 - 23g AGENT ADDRESS /SSG 3,-4( 4 S CITY/Z IP4)/01on ,/s 7.2024, CONTACT PERSON G JG, . r/a // PHONE Sy 3 APPLICATION SUBMITTAL In order to ensure that your application is accepted for plan review, please make sure to fill out the application completely and follow the plan submittal checklist on the reverse side of this form. Handouts are available at the Building counter which provide more detailed information on application and plan submittal requirements. Application and plans must be complete in order to be accepted for plan review. VALUATION OF CONSTRUCTION Valuation for new construction and additions are calculated by the Department of Community Development prior to application submittal. Contact the Permit Coordinator at 431 -3670 prior to submitting application. In all cases, a valuation amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Building Division to comply with current fee schedules. BUILDING OWNER / AUTHORIZED AGENT If the applicant is other than the owner, registered architect/engineer, or contractor licensed by the State of Washington, a notarized letter from the property owner authorizing the agent to submit this permit application and obtain the permit will be required as part of this submittal. EXPIRATION OF PLAN REVIEW Applications for which no permit is issued within 180 days following the date of application shall expire by limitations. The building official may extend the time for action by the applicant for a period not exceeding 180 days upon written request by the applicant as defined in Section 304(d) of the Uniform Building Code (current edition). No application shall be extended more than once. If you have any questions about our process or plan submittal requirements, please contact the Departmfgek&mmunity Development Building Division at 431 -3670. DATE APPLICATION ACCEPTED L� OP TUKWILA DATE APPLICATION EXPIRES 5 � MAY 0 5 1995 I - 5 - q 1(u22ea' PERMIT CENTER (. SUBMITTAL CHECKLIST COMMERCIAL ,,,,,,.....:-..-.., . NEW COMM ERCIAL J3UILDINGS/ADDITIONS ...... COMM ERCIAL TENANT IMPROVEMENTS I I Completed building permit application (one for each structure) [] ......,........ . • ,••••••••'• .' 1 noloeopi(•01)131!POPP?9# I — [ Assessor Account Number ............. ..-•••:•••••••••••:•• : ••••••:.:••••::'•••::'::';':::::•••••••••''''•::::'::••"•••••••''••••••••••": • '••{1::1 AssessorAccount. urn ........ ..........,.... H..... ......... „: ,........ „:„...„:„....................,......„....:...........,.,..,.......,...,„,...,. ,. • •:: Two sets (2) of the following:::' „... ..„„ * ; '''"• :••••••••••••••••: •::••:•••::••"• :: (2) sots of constru otiort ••••• •••• .•-• -...• • -........,......,,,.....„,......:„.„...............„.:„.........,,,...,...,......,,,,...: . .. ........ „.. _.• ••. ....-.... „ ... . • ...•..•.•.._ •••...••••••••..-..-___ • ...•.............„......•„..„„„....................„....•_„.... „....„....„.•......•.....• -.• ......... ... . ..... . .......... ........ .. ... .................„ _ ...... „...„.,................ „........................... ...............................„. Specifications • :••:•.:••••••:••:::.:„;:.:..-.:....: •••.• •:- :•:•,... ,•:. ;...., ...............:-....„.....:,...::::::::".::::.:::: ::. oftenan ,,,,, ,, P .... :•,..„...:...........„,::::::......??..i„...;,...:.„.„..,..„,;.....,.....,...,,,,:.:,i,....„0„.......„,.......,....„.........„..........„.:.:„............„„.......„....., . • - - - - - • - • -.....- •-• - ••• . .-.....-- ..- . ....• -.... • .....„. -...„......... ......... „.... ..._. ....................„.... .............................„.....„.............„...„....„.,.......„...... • ri :struct•urel palpuletionSitaM a stiii.,..teIi -- ..':i•:.:::: ... .,p . opo ............. . 1 • • . ..engineer--.•.•... ...,„.......,. .....,...,... .. ..:... ,., . „. ...... . „.,..... .... ........••......,•„...„,..................,...., .........„.,..... .. ..... . . ,,,..........,....„..,........, „........ •••„........................ . .. ••••••,..,.:•„..„.•....„„•......•...:„:„.,....„.,..,......••••.„:.„....•„:„.„.....-.......•„:„..•.•.•.„ i;•Lai i diO Pki 318i - 1 !Of':'OPP I I 9 P b !°•••! :• • • '•': 1 !"0• : * : :! .. ' ' ' 0 : ) ootr . ... : : . p! :, ...P : .s... 9 .... ) Soils repOrt stamped by a Wes ng • • hi • r:.:.:...,,,. ,:oyeta11:.by.....mgp... ...,.....,.....,..??,„..„„„„„...,,,....,,.,:.,...,........................,....„.,........f................:„..:„....„....,...........:‘,.,,, •• „ W a s hington .. State licensed engine .......... , ...... . . • ,..,.....i..:,;:,.....:::::•••:::-...f.:.:::::•zo::::',,..::::::".:::::"•:.".•::"•'',.::::::::::::,',:::::::::::::;:.:::::::::::•:;:,::: " - - • • :•-".. ',:••• •:'-: ""••:',•:.-"•:••••••••:••••••.::•:,•••••:-•••..:..,,::.•••:::"•-•...•••:..:.,:..,::•:":::::. ::::::::::::::.::::::::::::::". locatton ....„.:„:„„.„.„....,......„,...._ Topographical survey • Tenant :::•'....„.......„ .,...........„......,„ . . , . . ,, ,. . , .. .... • ' ' • ••••••• ••••-•'•••••••:•:'• ''•••••'' : adjacent (Common : wall) ..,...........„.....:•::::::••:,:•••:-..,::-•f::•,..:;.;:p.,:••:::::„::,:::.:•,:::::::::.;:;,..::;:::....:::. — Use Energy. cal culations: stamped by Wash ng • ••••• • • ," • - : •.,:::::::.••••••:•••••:•:::••:.••'•••••••••:.: :....... 11:dinic4risi:616ii:Plbt!!°°°?'r91?9'97...",:-.•:.,':1:'::::...1.:.:::':':''.!':.:::::: :. • engineer or architect .. .... ......,. . . Floo plarrof:• proposed •teriant:speco•:::::::::::::::::::::::::::::::::".‘,,,,,,,,,..,...... • Legal description . :::•:•."....:: ••.::•::.::: :- . ..-: .••• • •••••:••••••••:..,... ••••::.••••••••,•,,.....,,,;.j........•-•.•, ceiling ,„..,.,•••..,.,,,,•:„,,,„.,,•.,:: ....... .100M: labelled ,...,..:,:,•••••.•....•••••• •,...... , licensod....: ,.....;.:........., in Working b .y Washington state .' ...........- - •• .., : ---- •• • 1 architect, which. include • :::.::•. .: .. ... ..„.......... .....,., . ,... ..-...- ..... .. . • walls, " existing : in: alli•e nd be .. ."de ni ,..,..., •9 Iis Site plan .......:,!.:.,:::::!..1:!:1•;.::::•,.:.! 1 .-- : ConStitictien•detaild:!• A rchitectural ,.:...i.,::.....::::::::::,:::::::::::•.;,..i...:..:::•.:::::.......?:•:.::::.!.....,....,.,,,....,.:::::...::,:,:.:,„...,.:„„...,..,......:......„,........;f::. Structural ,.... ,.. . ' . . .. •••...... ::::.....:..,:•:•..• • -.....-,........ ',..-„,„........- ... .., •••••• ,. . - ' • • •• :•.: .:•:r drawings ..H. .. ... .. ...........„.,....,,..... .....:.. ....„:„.,,:,,,.,„. ,,,;•,,:, ••••••„",......„. :•,•,:,..,:„„„:•,.,,,:••:i..,-•,:,•i:•„••,•.•••:,.:.?artotascsmee•Ctnito for or:"floor 1,•*.1...... . ,:, .... „ ,. :.,. .. ,.:,. ...... :.......,... . :... ........9: :...:. . , ..... :..,;:„: . , .... ,,: :::9 .-..•.:......,....:.•:::.tiC;yral drawings :::::::•••:.:.••:: •••,.....„;•:-.::......::.... ...„............ .., .. . . • • • '••••••••••• , • • • ':arici..;.::::.:,..,....:.„....:„.:::::.....:...........:.•.,,,..::::::::::....,::,,,....„,,,,...,,:.:„.......„:„.,, : .••• ,...- ... Mechanical drawings Elevations ...:::.:.::...„.•.......:::,.....:.,.,:..:-...,...,......„,..„...„....:...,.::......„......:..]..:m.;;; . " • • • • • • - . • ... ....„.. ........„-..... „..............:......,..:,....„...........,, ...,...E. ICilail license :'..:•:....• :•••••••••:•;•:::•••:'''''•:•: ::.•••••••::::•:•:'•••••::'':•:::::.••.:..'•::..:::;.::::":•..:.„.;:;:::•„.:::".•:•.::„.:,-::::::::::••••••••,:.: i;•••:; Ci d wings — . ' ' • . . :(); • .y tttity 1.W.-?, ,'.l..:....::t.:.:::h....e....:,lq1...e:.:...,:i.1....fr?...7!t..:,P11•,...r!!...:!!...:1...f1't)',..:!?...,..:.,..,..7....q Completed utoty ::::;,•.:‘,.,:i.'..:,:::..:::.::,: ' • ' p • .. orm . it a p p li c ation II F ' tien (one' for leniire:Projecty. ::::epplIcation arid an .. ..:::„ ,„,...........,,,.........‘..„.,.... : . .. , . ,, • •• • . . ,i. „....,:.„... . ......:: .• •.:: ... • . ..... .. . ..... ,..., . . .. ... . .. . .....,......„.„.,..„,..,.,...F.,•,.:,,,,,,.„.„...,,,::::„..:.„„......::::::.:,,,:::::-.n,,,.::.,..:.,..:p.....l.....,:.::: '..pis , r . ,..... , ......,:,,,........,...„. ..., • . .‘ .. . . , NOTE: .:'See •U utility .p 9t: and .c‘ . 466 . , 1clia ..: sp :op : '11lci,'■6 ... Ift) submittal requirements ./.. ll. .:.,. .. R (;ni(0 ,.. t. .. e4. .. , :: ,01.. .. iiiiI .... 6. ......,.. 0q ....,.....,... : 4 ...,.,0.....i), .. 0:,..;i,..4.10!). ,. :...i.:: .... (.. . "..,n......fi3....r.. , :,4.,.4...:ti,.................,cti j:.,e)..,...1,,,,,..,..,:,,..,,,,.........,.....,,:,,,...„....,,, : . :,...• .:.. ,....,...,....... • • • '• ••, • • •• ••• •••••• ••'•••••:••• •••••••:••• ••••• •-•••••• • • • •-• - • •• •••• •:.1•:.•:..• :. • . • • .••• • • • I I. Assessor Account Nurliber'',:',:,•;:::.."• •. • RACK:STORAGE::::.:i.'.:::...::: '., .,............1...;.,..:.,..:::;....::,.:1:...",...1.:::',...::1'ili:;:..:.::::::::',..::::'.::::::: : ' e x is tin g ' ,•• ':iiterial being cpmov '.• f3. ........„.. '..11'.',Na be'd4 16 s, ed:::.:... m ..:::::::..,......•••:.•,:',.•:::....:::::.:::.:....,....:::•,.......•••••••.,...::::......:.•::............. ‘.... . . . . — M1 ' I d.bUilding•Permit application •::••••••••••:',-•••••••';'••••:',•:•:•••••,..-.::::::::.::"...::::::::,...•::.:::::',:.-,:••." 9 - -. - .. ••••• - ' • - •••'• •••••• '' •• •••••• • '. '.: - ' No certification •••••••••••••:•••••••••'"•••••• ••••off• of the permit.'::::... ••::. :.•;•:.„,.:.:::••„•, •:•••••••,.•••••'. .. • •• • •., . ' . • . . . .. ... :....T4.',;: A; . letter is required . pile r „to. :' final .. . Inspection ; an d sign . . ....... .. • ... .. • ... .:...,...,...... • ..................,-..--...,........,....„..•:.. .: off ......... . : . . . . . ...„.......... „:.,..;.,„.......„... ....„. ........-, - ....... ,.........„.:...•••••.:...,....:•:..,.., ... „: .... . - - • . • .. .. . • ... .. .. .. ...... . . . . ...•...:...:.......... . .......„.. ...,..:....... : • ,.:.„ „.....„.. .:::.:•:„...:.„................ .... Assessor ACcount.Numbe ..,...:„ .........,.:-..:•„..:„..-.„...........-..- :H.:.,:,..........„.,,:„.„..:,.....:::::..:.::s:..,:,.. ................... . . . .. .. .. ... .. . .. .,,., ... . . , . , . :...:..., . .... . ,..:.. . ......:.::::„.„:,:,.,„.....,:,. . .„ . :„.„. . „...„................. , ,.., . . , ....................... ,.......„...,:. . „. . . . ....., .... •••••••••-•,...,•::: . . . . . : . : . ....::,,,,,,...,,,::::,....:•:;•;:.:.....,..:•:::::: . ,... . .•:::: . • --•:. :.:-...,.....„.„',..„,..-..,....„.„,...........,,,,,,,,•,-,...:„.„...:,-..:,;.::::.,..„..::::::,....i.:::i:.•::,„....:::., sets of plans, which include:•:.:::.:::::"::::•,..:.:'::•.•:•:::::••;•••••••••••:;:i>„••••:::::::::•:....:•"•:•:•,:•:::::•:•:',.',.:.,:•.:: •:•.:•ANTENNAISAT DISHES . ... .. • .. . . . , .. , . . Building floor plan showing: -...:....,....: ..:....,.•:..,..„.:::...:.•:..,:•1:::::',..:: ,....-.......,„.,....,...:,:.„.....„•:.....,:.:.,. : Completed building perm tt applice ton ' • • • : • Entire space where racks will be located •;,........,.....,...:...,..„ . . ri Assessor . . .. . .. , . :,......;.::':. . I . . .. ' .. : . ' . .. .. ' . . . ...,.....,...,:..,...:„. .. .1 . 1,',.. . . . . . ..;.„..,........,............: ........ '...... : .• ••••• Exit doors . :.:: -.. . ,.-.•.• „.. . • ••••• - ::• ••: :.• Dimensions of all aisles .................,,.,.......,..... ... „.....,...... .:... - • .. • . . .. • •• ••••• •••••:•••• • • ..., - - ...- .. - . ••••• .. ••:••••••••••••••:::""•::: . ' . :::•••••••:',:••••• . •••••• . • . l .•-•,:::-.•••:::•:.:••::•••••::::, . •,• . ••. . '........,:,:". ..• .. Tenant space floor plan TWd•(2).sets of...plani,':w*h include e • •:::,:-. , .:."..:•. , "..1 : , .. , .' , .:•:••:-::: . " , :',..::„ . .....,..:-:::.:". , ::• . :•.••...... i. •:•• • :•.•;..."....: :: :...,......-. : :::,.!..: .., :• • ::,....... , , , , , , ,i . , ..„ . ...: . . ,....„..„..... ,• showing rack storage layout,' aisles and . ..., .......... .... ... .. ,, • .. . xits;.::.::•:••': - - ' ..... . . . . [ ite (showing . . hpy■inij. . NOTE: Include dimensionS'el s(height,...widthandlengthkaisles...• .• : and exit . ways on.plan.. .:..,... ... : ...., „., ' • Details : antenna/.. setellite..dish,a„oi..meylocpf ::.:.::...- .,:....•...:,:.:.::......:.....,.,... • Structural • • • St licensed ..:•:::::.,•:. I calculations stamped by a Washington . ,,...: „...„.. ....,, ..,.,,, Feey.be eq.., .:,•:....:.:......„:.„.„,„,.....,.....,,„:„:„......,..,..,,...„:„........:...., ... ,.... .....,D,, S tr : tiotO rq l• cOcU 's'tarriped by a a ••• • r (rack storage•8!: and over). . ............... :,..:•-•,...::;:::•.;.,:.:.;.:.„,:....•.:.:•:.;..' : . ....... ... ... ,..„,,.........:.......,.:!...::..".......,,,::: .. : ... . : .:::....„ . : . ...-:....., . ,........::..,......„..,:„ . :. . •:::-.....:::::,-.....,.,.:,.... ,.. ........ . . . ...... • engineer a , -. • • - . . • • ..„ ...•••:. ....... . .. . ;:„.... ....... ..... .... : .. „... -..,.....-..... ......... .. . .. ........ _. —, ,. RESIDENTIAL _ ........,..:..„ ..• ...•............,..:..:_. ....-..... .::.,••••,...,....:....„..........-........,:...,... . ...•• • . • ... . . ........ NEW SINGLE FAMILY DWELLINGS/ADDITIONS RESIDENTiAL:.liEMGDELS:':: . ' . ...":'.:, -DWELLINGS/ADDITIONS ... : . .:, ... ... • ' . . ' ' . ' - ' '-' ' • • . • ....•••••......... ..•-• .. ....::. .... . ''''' ''' • • - - '• • • • • ..';::.- ':'",:•::::,•:••••''?,:::.,...:..-...:•.,......:•;:,:• ...1 , Coinpleetiibuildi .;.....;:..:.:.:.;::::::.:!.......,!: I Completed building permit application (one tor each sin,' ...cture): ::: ....: ,••,...........„..„............... . ... ... ....,... ............ „ ,. .,... ,......„.......,......,.......,...: ,.., ••••••••••••••,,,,c,..,,,•,,,.. ... . •• . • - ...... ... . .... . . ... .... ,, .,..... . ,...,....,.,,.,•,,,......•:„..•••,•,,.•..:••••.,:•.:: :. .1 --- 1 Asadsso, AccpyotNuob,,.....:::::::....,... ,............ _. :._ ....••". „....... • ••••••••••• ..".• •••••...•,.....,....• :• ••.• .• .• ..• •....„ ..•••• ,,,.............. ....•............ ...„.............•.•.• .... .. „ . . . .. . .. ... .................. ........ .... . ..............,.......„......„ :,..,....,:.., . •.. •• .." ... • .. . • ••••••••....• ... • •.• .... • . .. """...• ......•...•.....,.........:• I I Legal daserletlan. :: :::•••••:: • '::..::•• :':•••.- '...-- :. •'''''''''''••••• • . •••••' ••••••••••''''''''''::: ... • Assessor Account Number' ..„..:• ••.::...::.•:..„„.„:„.......,,::„].:::..:.„...,,..:„...:.-....,,,,..,.:,...i....-;::.„-,..•....„::..:„:;.,....„?..,. , .......::::„ . .... ; ......,,,,.. i. ,..: : .. . . ........... „.: . . , ‘ , . ,, ...;,...‘ ...„,...„.,.., „ ., ,.:, ,‘,.... . ••-• •-•••• • - • --- •• • • .• - • ,..---,•-•••••••••—•-• ..,.:...,:„.:,..:.:..:.:::,..,:..,::...:.:.........„.„:„....,......„,.:::.,....:.,..:.::,...:::.:.:,.....:.::..............,.,....,...........,„.„,.....,. • — Two sets (2) of working raw 6 •• Si pla •:........,;:.:::::::::„..:'.......,,,,,::::::.-.:•.:::::::;.:•..]:;;;::-....:,-,-.,,,.„:„:„..: ..,......:.,,,;•,;..:::::::::;;;•::,..i.......fePt".p.......,.:i:•:;:•.:::::',•:•,..".....,.•:,:...":...:i,:•.,..:„.•:::::.:,•;•::::•;:i..::::::::::',.:•••..::::::::::::.,-":::::::::::::::::::::::"::::...::::•••:::::::::::.:a:::::::::::.*:::.:'•:ii.::::::::::::::::::::::::::::•::::::: Foundation plan • • •• :•••---. plon ,. sltow close ttlY .. . .... : • ...,.,......,. : ' . .. • : :. • : : S Fo ie un p Ian clatl . pi :•:•:,":::: . •:',•:'-:!::::••4 rebtqc//np,•showing .:,.:.,....:.....i........,:.;,.i...1.:13. 4 ..,....,...... . 'an ' ......- '' ' ' --- widtt j ah g:!POP.q.9.!.••• a .... c .. ce ..,....,: e ,":. , . ) ;: • "•:':::::•-•••;'..::::••••••,.: i.::•:'.•:•:•.: uildin crossec..on.......„.......,............,:„,.... , . ., .... . .. . .. .. .‘ ....:.::::::::: :•..■...:Str0etiir0•:frary.qng:p Building•cross-sectiOnu ...,...,,,......,:i: ....... , • • . .. ::.:•••• :. BRuoioldripnlgar.le.:i'r,:VC;c:<''.a.•'::lial:.:•..l:',',''•:::•,::.i.:•'•?'•-•:!..•••!..••••.:•••:..•,•:•,..::•:,..,•'••...,:•••,•.,.:,.!:::::••••••••••••.:1,...„.'",...:"...".".•••••:•,:.,.:,:•„•.",:„.••.1:,!••;,"1:::,:':::::::::::i:::::::•:•si :i.•••'::•::'::••',•"•'''';':'•.:••••••••,'..:'....••••••': •••••..........., wor ..... :. k Structural „...,,,..„...,..,,.:i. • •• ' ••••-• ••:::7.7,..:,......„ .......: ...,,. ll•any : . .„ .................. .... .........„,„ ...,, ....,,... , : • . : . • ... „ ruc f ram i og plans a . • . ,.... : :::";:::,• i •„ ,. .::: ; , ,.- „:::•-...••:::••••••,.:-...::::•,:•:•:.....;•::•....::•••••............-,:: ..,„ nd PlartS'i nul.oe .. su . . ........: .. : .. ... .. •.:..: .. ...—,..,••••.....::::,:......::::,..............,,....:::. ,........: .,:.......„ .: .: ... ............. .....,... „.............. .. .. ............... .... . ...........„....,....„......: tE RER$D 9Fs..:.:::::,:::::::...::::::::::::::::.,:,:::::::::::::.:::,,...,:.:::,.::.::::::::::::::,.:::::::::::::::::::::::::::,::::::::::::::::::,::::::::::,,%,.'.:,,,,,,,:*,:::::::‘,.::::,::: .. — ■iiahi6atc:,. Code da ••• -- CoMpleted utility permit applicatio ,......: ,.....,,::-,,,:;„....„::..:.:.:...„...,.................... .... _ -••••:.,•••••• •• t ne19. ., *: S ... trti .... et ... 1.i ., ..) ................................... • • Six (6) Set sof site• utilities . :: :,c .,. . ...„...,.....,....,,,.:.......... . ; . .,,,,,,,,:,„.,.:..........., ,, : , .. r. f. , „. NOTE Building site plan and utility site 0 lan.May be:coniblned :'•:••• ..r..Neriative.deSCribing,exiSting.roef,..materiaf:being..ire :.• utility permit 'aP and ChecklIstiofopectt■o subroin Egiticii!frem0ii...„ : , •777.7.: material b...eiri,',)ristiPeci ............................................................... . ...: ....„.:_,., .. . ,,. ‘ , .... .•:• ••••• Additional. toPograpt■ical and soils info' mation.'nfay. be required if uniq , . .. NOTE:•A!ceillli60094 1(?tter: 1S: required prior t ,...,..., ' an tL : ............... :::::..:.: , ,%,?::::: : : : ::::,:::::: : ': :: :::: : :: : :... : :,: :: : : : : ,: : : :: : : ).,:, 1 ,.... ::::.: ::„.„, ::: „ . .,.,„...........„ ...„..,,,........,... . ...... ... ........ . . . ... . . site COnditions..•. • ::..•.. • . :. • : • ... ..„ ... off of the ipettnIt . . : eqs- 0 I 6 4:2. .. ‘‘.„ City of Tul( Appilr # op -30 •44/4) :of Central Permit System — Engineering Division - 1 6300 Southcenter Blvd., Suite #100, Tukwila, WA 98188 Phone: (206) 433-0179 ; UTILITY PERMIT APPLICATION Site Address: /‘Wa 3.5" INF OFW ATIC* Name of Project: .0e'.4o. - Pro. ert Owner: , t 9ber - e o Phone No.: 6 3 - Street Address: V/5 ,'/ City/State/Zip: .b44.-,/ek ?cc pg Engineer: Phone No.: Street Address: City/State/Zip: Contractor: Phone No.: Street Address: City/State/Zip: King Cty Assessor Acct #: ggyo- Do Contractors License #: pj/Z.G.G // G - 6 - Exp. Date: 6 7 PERMITS 0 Channelization/Striping/Signing 0 Sewer Main Extension El Private E3 Public REQUESTED 0 Curb CuUAccess/Sidewalk 0 Storm Drainage 0 Fire Loop/Hydr. (main to vault) - No.: Sizes: 0 Street Use 0 Flood Zone Control 0 Water Main Extension EPrivate 1:1 Public O Hauling 0 Water Meter / Exempt: - No.: Sizes: O Land Altering cubic yards Deduct E] Water Only 0 O Landscape Irrigation 0 Water Meter/ Permanent - No.: O Moving an Oversized Load 0 Water Meter/ Temporary:- No.: Sizes:_ Est. start/end times: Estimated quantity: Date: Schedule: O Sanitary Side Sewer - No.: 0 Other: WATERMETR::,: Name: Phone No.: DEPOSIT! REFUND/BILLING.:::: Street Address: City/State/Zip: MONTH Phone No.: SERVICE : Name: BILLINGS •:' Street Address: Cit /State/Zi : El Water 0 Sewer 0 Metro El Standby DEscR,p.TioFIpRo,JECT El Single-Family Residential 0 Multiple-Family Dwelling 0 Hotel 0 Duplex 1:1 Apartments 0 Other: No. of Units: ID Motel 0 Triplex 0 Condominiums •,\ CI Commercial/Industrial CI Office 0 Warehouse El Church 0 School/College/University El Retail ED Manufacturing CI Hospital 0 Other: MISCELLANEOu... El New Building J Remodel/ Square footage of original building space: 9c4g3 • INFORMATION Square Addition Square footage of additional building space: W-C/95 5 King County Assessor's valuation of existing structures: $ Valuation of work to be done: $ "ea I HEREBY .CERTIFY THAT! HAVE.REAp.*THIS:AppLICATIqN.;ANDI:KNOWTHES4146.:t0..BE::TRUe'40.:CORFikCT::.:. Applicant/Authorized / Contact Person Agent Signature: (print name): We' e // Print Name: 4 6.0 6—e /-7/P/ Address:/Y6 3 4 riEcovE9 Phone: • Date: 5 ,1y...zy y Ttsivit.A 5". ( 94 .e/$4.1011/ fe,g.D. Phone: 513 2-3 Date Application Accepted: 0 Date Application Expires: 'IL< • V T CENTER 04/22/92 z ';, ' • " "" ""'; 77 rn...r"" ^'n711"sr :77. > •,".v 7 . 7 T ■ r -r7•± "'" ''�, '� " T't^' "—' 7 ' ; ^++! "q ^„^^...+►"!'7- P' "* 7•r" "." . . 7”,7? ,t, i 9 . • t ae... . x 0 i FA k* * * *•k * * *k•A * *'h * * *k•h•4 k•*A**•.A•A *** *kk *•A•* fie * *k *•k* * *•k * *•k :k * * **A **k *•A ** GENERA 78.75 C 3: 1 v Or T U IC W I L. A . WA 1' R A N "M I1 TOTAL 78.75 k1•- F*: F*** 7t* k*• A**+ tA• k*• k*• A*: 4k• k:1 k• 4kk***• k•.1 �o** kA* *.kk *k * *•k•k*h•kAk *{t•h * *•.1 *.F CHECK( 78.75 1 RON€MIT Number: 94002231 Amount;: 7f1.75 05/05/r ` 901 CHANGE 0 00 Payment Method: CHECK Notation: R.MILLER CON3TRU In : A 'O 252A004 ]tiCHECK Permit No: 095•-0142 Type: II- 13UILD BUILDING PERMIT Parce•I No: 779640 -00.40 S ite Address: 16415 . 53 PL S Total Fees: 70.75 This Payment 7E1.75 Total ALL Pmts: 78.75 ; 0 .00 ,..,'A * * ** *** * * * *A•k* *A * * * *A.A k* *•AA A** * * *k *k* * * *** *71 * * ***A * ** *71 *** * * * *** 4 Account Code Description Amount , :a 000 /322.100 BUILDING "- RES 45.(10 000/3.45.030. PLAN CHECK - RES 29.2,E 000 /306.904 STATE BUILDING SURCHARGE 4.50 4. C , INSPECTION RECORD C Retain a copy with perms 0 r ()/4-1 CITY OF TUKWILA BUILDING DIVISION , j 6300 Southcenter Blvd., #100, Tukwila, WA 9818; . 1 • 431 -3670 ProJecf- Type ot1ns :.' Address: I ( 04... ( ).."? ' . �. p1 I DateDafled: • Special fnstructiois: n � � IA'''N- Date Wanted: l� q + ..+ iIL�• =�...,..m. . t vs ‘ -- . 5e, Requester: �"' K Approved per a doable code ■ Corrections required prior to approval. ' COMMENT ' ;a • nor: Dat C r ,,,L. spect .. O $30.00 REINSPECTION FEE REQUIRED. Prior to reinspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. =------- t Dace: i fTh INSPECTION RECORD k ect Retain a copy with Permit 01 ` "� •. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 4 (206) 431 -3670 Project : Type of Inspection t�` S `. ( 0 1d enc� • U3 i tom; r r� Address: , l_4, S — s 3 r t I Dade Called: -7 I 1 C(5 Spacial Instructions; Date Wanted: _ / / `) /c(3- �.m. Requesters tj Phone ' Approved per applicable codes. ❑ Corrections required prior to approval. COM' ENTS: • !Inspector: �. Dale I ❑ $30.00 REINSPECTION FEE REQUIRED. Prior to reinspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. .�.���i`,::�:�.'��•;•t�r., .�s: ., �:; ?��` - "n: .{ �`^+`+ �Y;+ ' ��' �', �?+ 4���� '3foTi"��iiY.lu;Stw.:.�,�i.u��` P '7 INSPECTION RECORD 0 TZ`t3 7 Retain a copy with permit 0/ Q./ CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206) 431-3670 11:1 : ype o ns " cc.° h is\ Address: / l Date Called: -- ( e 4 1/ 4 i 53 Special Instructions: Date Wanted: - 7/2Y/ 1 ( (aTn) p m Requester: Phone No.: lq Approved per applicable codes. 0 Corrections required prior to approval. COMMENTS: • .• • • Inspector: '141 411....1d16(-1 Date zy 0 $30.00 REINSPECTION FEE REQUIRED. Prior to reinspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. • .fiAz --A -1 , • tit . .446t, &Iv A• INSPECTION RECORD 943 Retain a copy with permit 0 INSP N O. PER NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 tir wok. (206) 431-3670 roe : c co Si, 'Type pi InspectiorT /a te m Address: 16/4/5 53 Date Called: Special Instructions: Dale Wanted: 7 _ 7 amC Request d' er: y w Or — Approved per applicable codes. 0 Corrections required prior to approval. • COMMENTS' ' ' -1& 47T • ; t 4.4 _ Ae nspectorm ..,/ .40 0 $30.00 REINSPECTIO FEE REQUIRED. Prior to reinspection, fee must be paid at • 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. ) INSPECTION RECORD 695 Retain a copy with permit c71 L{,. 1 INS ECTION Nd. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 ,1,,, .J r �� (206) 431 -3670 ' 'roe : — i ., ��� yPe o nspect .n: 't fl. .. cress: ` i ) r ) . iiiii Sp: «aI nstruct ons: Date anted:,..' .3 am. on. Requester: r Phone •.: H 19 - LI s t--(. � Approved per applicable codes. ❑ Corrections required prior to a . PP Pe PP Q P approval. COMMENTS: /�l2 _. ,u.`d A-js - . ]off 4` `` "` v- /*- — / 1 ii- 5 L. 4 A i 4 7i, 11 Cl CVO 4.44 j 2 7 1, -- ed/ /.,r, r ir e .,, 4 A e /p h -' ' /'S 'dd j1 1 rr /)t./.1 /.A. / fir - �` - - � �1I `' Inspector; Date; .. r • � �» ❑ $30.00 REINSPECTION FEE REQUIRED. Prior to reinspection, fee must be paid at ' 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. ' 1 FecetNo .: Date: I 7 W: �_..�.J...�.iG.:'4.`:J.:..IY,ix �..!.iiJ.� +�r..n :t..Lw�SS:ll �lJ.'1 �: :.s.kC'..tlr�.t�..i.r,:�:.1.., _t��i R.4. M...lu.� <... xy ..a. ... !'S r1t: ±! ^�".t M.. •2�.t'.n". (.7) MI INSPECTION RECORD 6 5 — Retain a copy with permit V 01 • , 0. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION •1 \at. 6300 Southcenter Blvd., #100, Tukwila, WA 98188 l• (206) 431 Projects a al d ene Type ot Inspection: cut,y1 , cs. • ress: ( 15 - G .- 3 r a 5 I e ": 0 ) Speclal Instructions: Date Wanted;_ / 7/ rcis am. Requester: ott i4 Phone No.: (r) H O Approved per applicable codes. Corrections required prior to approval. COMMENTS: C /7 — C-AJ kriAGT ni-ro 5 L-6.4 " 5 .*:"74 AK UGIA 114 DONCY , p nspector: El $30.00 REINSPECTION FEE REQUIRED. Prior to reinspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule relnspection. I Date: 1 ;' ' 4.3 .". !r■ .. .........,..,. __ . ...... .:....:n..,..,, - :...:.x+i,.:.�_..:::cr . : sw�u.t:: *.m:.:::.v.�'d':.as .�....... i:x G:;...:aL"fLa•u'•:; ......::.',.'i- 'ra?:G ..._.. ,dit^.F.:J�: _f! `;fS� .r.....2f :::1:....,........... cc.. 1 3 0 INSPECTION RECORD Retain a copy with permit Nil - --., , o. • �'- CITY OF TUKWILA BUILDING DIVISION < \\ . 6300 Southcenter Blvd., #100, Tukwila, WA 98188 * (206) 431 -3670 project: Type of ins • : • n: a� • , 12� r+ Y >m I h Address : 14cm is- 53 r a ` pi . S • Date Called: .7 /6P 9� Special Instructions: Date Wanted: .7 I 7 1 l ant .m. ) Requesterab 1 t f. H t Phone No.: 9 T I � 11 (, 1 ❑ Approved per applicable codes. - Corrections required prior to approval. • COMMENTS:. ; I (i�o (,, 4-4.) rib x.„ c /-or 1-0-t* . . 6G .. ` - (740-- . t, I kg..1t.. L.-l.e.,,. C.c" - y 5 a -ek , �!. .6 i fey n 5 . 04/0 i 1 Inspector: Date: pact . ( —� 7 1 `a 1 ❑ $30.00 REINSPECTION FEE REQUIRED. Prior to reinspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. ''` ece o.: e: Ir.- :..L.. ,....1.... t;;:: 3:: a .eit` .,4.1. .r ' .::i.:::at:.4...'-',:aa:�`�'' r ,7!.' O.t'... �:t . x' , • • • •■• • • N' •..."••••••... ”•••••• •••••••••••• •-•••••••• •••••••,••••• • •••••••••••••••••••••.•• ••••■••••• ••••••••••• k • 1 INSPECTION RECORD 0 • di 4 CO20. Retain a copy with permit TI • FoArr CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 b (206) 431-3670 ' Project: Type of Inspect rot& i-Vm • Address: / (it .-- 53 s Date Called: S Special Instructions: Date Wanted: a _ 5 ; am xer r-ou Isvivrto,-3 Requester: i t i arr.,00■ 4— S " Phone No,: fLn) , Approved per applicable codes. 0 Corrections required prior to approval. COMMENTS: ' .• • •, Inspector: _ 6 L Date: f , u $30.00 REINSPECTION FEE REQUIRED. Prior to reinspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. I Receipt No.: -- bate; _ - •••-• • •'701 Air C) INSPECTION RECORD 'IF Retain a copy with permit it' - I SP CT O. • R •. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 14,IA (206) 431-3670 ro ect:a Y.: 4,11 ; t4 r1: .12, 1MM klfr Ilte a a.: Address: / , Sp al Vstruct ens: Date Wanted: u/ y 4,7) 12AC1511Q)0500 Requester: P r . Approved per applicable codes. 0 Corrections required prior to approval. COMMENTS: ' M71)( A as/19 0‘ Ofril-oK\ „• • 1111 nspeoior: o 00.00 REINSPECTION FEE REQUIRED. Prior to reinspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. p receot No.: Data: 0 (1) CITY OF TUKWILA Address: 16415 53 PL S Permit No: B95-0142 Suite: Tenant: SACCO ROBERT & DIANE Status: ISSUED Type: B-BUILD . Applied: 05/05/1995 Parcel #: 779640-0040 Issued: 05/26/1995 *414(4**********************************44****1t********************k******AkAk Permit Conditions: _. ,...„.„.... . i: 1 No changes will be made .to ;:tfie'010Tiless approved by the . Architect or Engineer 2. Plumbing permitshalT: obtained through thi4ea,ttle-King County DepartmenicifPubllealth will be • inspected byfriatagelicY, g0,01p,in4 .., , _ .. _ . (296-4722) 3. ElectricW0e*rmitshall bp,obtainedthroughthe'NashingOn -,. .„.,-. State Diy2 Indust 1e rd 11 Oect0e...41 work wiTreAnpeCted'by that' (248-6(,30). 4. All permits, inOection reAords, and approved plariShall ti available at the job site2\pribr to the start of anyi''cO'n %.4., . struc are to be maintained and avail- . , , able approval is granted 5. All structural welding :hall be done py W.A.B.O. certified, '':.: • welde an.pecialjnspepieOUBC Sec.-7306(a)5). 6. When special inspection, iS owner architect or enclAne4r-sha,lpot4fY:AhejUkwila Building engineer Div10on,,ot!ap0intMent',;(5fHth'e inipOtiOn agencies pr lortd the first building Ins CoOlesof all special insOCtton report s,• shall be s(4 the Building: Division in a timely manner Report „contain aAdreit project nam permit number and type of Inspection being •;:: :!',11 , performed , . 7. The SD0cial(,:insp'ector shall subm1t afin0s19hid report statinwbether the work requiring speci Was, to the6*est of the inspector's knOwledge, ijiCOnformance J W with approved plan. and specifio$tions' workmanship prtiyislon's the UEIC. 8. All construction to be done in conformance With $0proved , 1 -..:: plans andTequireMents of the Uniform Building Code(1941./ . Edition) as amended, Uniform Mechanical Code (1991 Edition), 1 and Washingtan5tate Energy-00e 9. All wood to remain in placed,'ICanCre4'Spall be .treated wood. i 10. Validity of Permi issuance of 1 $-'0ermi,,teOproval of plans, speciticat a computations 'lafl not be con- ! strued to be a permit feievOriii3kOvilf, any violation I _ .... _ of any of the provisions of the building code or of any other ordinance of the jurisdiction. No permit presuming to I give authority to violate or cancel the provisions of this code shall be valid. 1 i . ! 1 1 . f 1 s • • 1 , A iA � EPAHATE PERMIT REQUIRED FOR: j ❑ MECHANICAL VELEC RICAL ❑ PLUMBING ❑ GAS PIPING CITY OF TUKWILA Sacco Residence Remodel BUILDING DIVISION FILE COPY General Contractor. I understand that the Plan Chec': .:.-o ['R. Miller Construction, Inc. sub crt to c.- ore cnd omissions and ppir.,vJ of 0140 3rd Avenue South pi r..; c rot authorize the violation of any ['Edmonds, WA 98020 adop cd code or ordnance. Receipt of contractor's ['Contact: Scott Hall 0.583-0-9a copy of approved pi • • . • By MIME At. Engineer: Date Z 5 - ' 5 • Maw and Associates ['810 3rd Avenue Penult lt ��5 01 R.3 ['Lobby 120 ['Seattle, WA 98104 REVISIONS ['Gonac - t Joe Maw NO CHANGES SHALL BE MADE TO 0024 -714s THE SCOPE OF WORK WITHOUT PRIOR APPROVAL OF TUKWILA BUILDING DIVISION. NOTE: REVISIONS WILL REQUIRE A NEW PLAN SUBMITTAL AND MAY INCLUDE ADDTRONAL PLAN REVIEW FEES_ Owner: ['Robert Sacco CITY OF TUKWILA 01E415 53rd Place South APPROVED RECEIVED ['Tukwila, WA 98188 CITY OF TUKWILA MAY 19 1995 MAY 0 51995 AS NOTED iesM , PERMIT CENTER BUILDING DIVISION i• • 30'-0" j l e 126.29' I 280' 20' -0" 275' 61.26 : / I up i. 3• -0•. 30' -0" r EXISTING HOUSE { 62' -O" x 36' -6" } . 0 F . " _ 93.32' W_ M_ 24._0.. widc concrete drivc ,,.,,..,. . ............. .. 0 -° -- 18.49' 270' Cm' OF TUKWILA 'a. APPROVED A 34' -0" - < 7, MAY 19 1995 F AS NOTED (.'�. 67.1' 26 - BUILDING DIVISION . I 73-75' concretc sidewalk 4.) .\\ planting strip 0 F.H. K— 6•• our RECEIVED � IIIiI � catcF� basin - CI OF TUKWILA NORTH MAYO 51995 0 Site Plan - 104-15 53rd PI. S., Tukwila, WA. PERMIT CENTER N ( V O in ( ) I ` ' _ CCTV OF TUKWIIA APPROVED MAY 19 1995 AS NOTED BUILDING DIVISION % / ,I i 71 • .,- . 1,..-,,,,,,.„.--<z -.•:, :‘,3,/.:,..„:.‘„ - i • ,,•:..x.„. „..,..., , 0,,,, .,<,./..,,..,„, , _,,,,,:<./,<",-,c -,,,zs, • ..,_„.,,,, 0. ,,,,,..):::,,,,:,,.: 6 km ,.•,...„(///. .x.„„. s ,-;,,,,y' 4 ... /..,..:::. rr.. r■1 ■■�_ � i s /, i/ I i 1 9 iii /i j ' . / r. / ,// ' %, J / ii „ I a�a +�ri4' • •+i. ♦ ♦ • •i'i R ►•• �i♦ •♦i•�♦•• ♦ ♦• y h ♦y i �Oi ♦i O � '• �. REG IVED r %%• • •k , • • ♦ ,,, • , ♦ •i i • ♦ ♦ iS •♦• i t .: 4 : , ,, J♦ •' litsiti,::: ♦ ♦ �,+4. ♦ ♦ ••••• h . N ��� CITY OF KWILA a • �i♦ • ♦i i Q Oi0• ♦• ♦i♦ •'♦ ♦ t:44:•:::i • • • ♦iri i i '♦• ♦ • ♦i v ■�� ■ •:.:s.W». +i +i • ••♦. . �i i0♦•♦ ♦ !�i�• ♦ ♦ •i ♦� 00 ♦•• •♦ ♦♦•�♦ I ;4: = �aaa �•�• •♦♦.: �• �•♦•-1 O ♦♦• ♦ •♦ ♦ ♦♦♦♦•♦� ii• ♦♦ • ♦• ♦ ♦i ♦ • era �� M �/ s. • ■ 21:,te.�a_ eAUM y:::.:A t#4141_� .•i♦.O♦.•i . ♦ att:.•.♦.•J {� i♦:♦ Itta � 10:61.44.4, A ❖.♦.•.w *A* .•a40.• ...maw MAY O J i;i:D 7 g i••♦ . + 4• • � i� • ♦ O % • • • oil • M4M-i •J 1;9:9P;9:9 i•. • i rm.., i i i ii i • •♦ 3 . i i i• , •iii• i i ii i ♦ ♦ � ♦ i! i�i .•.:. ♦•i� - PERMIT .ENTER aw •i • iii► ♦ ♦♦♦• ♦O ••� . •.• ♦ ♦v♦• g • • ♦ • ♦ • • ♦ ♦ • •.; .+ • •• ••• ••♦••• 1L•,♦••••♦•♦♦•J • •. '11** *1 i +i i i ?e♦i yi i i i •i i i�•i ♦�•%fir i•�♦�♦� :44 • � •4•••i ♦i ♦i i ♦i ♦i :.4. t:0 '7 i ♦.••i! v -•tiv.� L•••O ♦ ♦•♦•♦'' •O :444.0 ••..O♦••♦♦•♦: • ♦••♦••• •O ♦:J :►•••••• ♦••♦•Di ft:S ►•i i i•♦A . :4• t C ♦• ♦••♦•iii 1 i ♦i i i i i ♦i • ii iA :;.:*.x.:.... c i i i i 4.:441 ,. ♦ •i .x.:0, �`��di i•+•♦i•♦Oi♦••i Q '_�•2•♦•:44•i ni i i i•i i i : i♦i••�i•1i i•i � *:::::::$4 'ii i i i•••:$ U +s4 •'♦• ♦ivi��•• i'i�•�• �•. iiiii • ii ' i i� ♦�••�♦ �I �i o East Elevation •�`- • •• ♦'tai•+ %' � � f ' : i••••i• • : i: yi ♦1 i i i i♦i - ----■."- -. I - .-_, r -____ -, 2 _ _ . , 1 ! \ - i . = CITY OF TUKWILA APPROVED MAY 19 1995 s� AS NOTED 8.0 I. _ = l - % ®5 _ BUILDING DIVISION // :, � ,,.- � .�,, — /� �� ••fi x �:� ::::;y. +,:., w F ' : at r DTI I°•b •t ' I li / . ,_.,„ ,.. , ,,_ I - _____ _1, ........__ ________ RECEIVED CITY. OF TUKWILA MAY Q 5 1995 North EIevotion PERMIT CENTER D 1 . wale: 1/8• = 1•• - O 0 z 0 0 0 0 . I • CITY OF TUKWILA APPROVED MAY 19 1995 AS NOTED j BUILDING DIVISION ' UU RECEIVED CITY OF TUKWILA West Elevation - Unchanged MAY 0 5 1995 scale: 1/8" = r - a• PERMIT CENTER 0 4 0 i ED, 0 0 non s ■i CITY OF TUKWILA APPROVED MI "' MAY 19 1995 i AS NOTED _. / 1, �� _ / BUILDING DIVISION - - .. __/ - '. En 'It limmi • iiiiiiii•••••i I i isiiiiiiiii = - I KIM _ • • : I MIN I •••• 11•111 INES 11 ` 1 ~ ' W •••I .. _ .. EMI BIM Or NUM Sail MINA • RECEIVED CITY OF TUKWILA • 0 South Elevation - Unchanged " MAY 0 5 1995 o PERMIT CENTER li ID 0 . 5 a t 0 I r -II CITY OpFDpnTUKWILA cx1 - t r1g 6" conc_ wail w/12" footing 1 ' APPROVED 1 t typ• 1 1 ' i 1 ' MAY 19 1995 1 1 r 1 J 1 AS NOTED i i BUILDING DIVISION 1 r L 1 exlsting slab on grade 11 1 ' r . 1 1 1 1 1 , ' 12' - O .. 1 I 1 4 -ea.. 6" x 12 ". r f vents , I In new - anatrucLlOn. 1 1 \ t i 5tep conc_ wall to j match alopc I I I JI ' 1 1 r , t existing Slab on grade 1 r Ft I N 0 r,, 1 14' - e ., i i O F c 1 X I G, - � , 11 a r ii i K �!_ _ J. J , ^ r l • 1 ix X14'. :. ! 3 - 2" new canc. foundation to support new structure above y,_,.-4 i \ f / 4 RECEIVED V I s' - 6" 1 CITY OF TUKWIW , NORTH MAY g 5 1995 o Foundation Plan PERMIT CENTER scale 1/8" = 1' - 0" U 6 0 0 0 0 0 0 . . L -1 CITY OF TUKWILA r _, APPROVED MAY 19 1995 . L, AS NOTED 1 , . BUILDING DIVISION i I t I I r I I a . e• ercucll wall with L 1- 4. 1 sc 6 Ea.evel siding over ?f i 1 t ■ 7 COX plywood i ; i : • 1 A 0 ■ i /-- -4- sc -4 A\ i ■ , I 1 I i .4- x 12 •-- 1 cling 2 sc 10 (CD 16 O.C. to rer n nsai kv : IV I : i 1 4 a v rolooatie existing 6*-0''' sc 6*- i 63" - .-. . aluminur, liding door .1 X 1 1_, ■ ' ---- i t I _. 1 ■ , 3 , „! • i I tIrte d to remain \,././ ) 1 .,* RECEIVED CITY OF TUKWILA Nom First Floor Framing MAY a 5 1995 soallet 1/e = 1' - 0" PERMIT CENTER 4 CI < 0 7 ...._ 111=111 . . . . II H CITY OF TUKWILA I APPROVED • i I MAY i 9 1995 • ,, li AS NOTED 1 • BUILDING DIVISION I 1 I I 1 ! J i ; repl.acc '1.4.1e. 17c.t.arrs !! ""l ( sce otructurai notce. )1 f : Nj, E1.0 • i I , 2 x. e otuci ay le" O.C. 1. LI" • T ' ' ' -19 frle+uldatiart , i 1 ,' ;,. i .. ,._ - 1/2** CI7X ply up iii !" beycl eilciln.0 i ; .....,..GE i L., I i i 1 e . ! I 9 .... , f 1 1 . 1/2" cwe» aver- II; elerric exlt.Ing cx-t.7.cric>r• w.alle. .4 rril I. vlesc.tt Ili I - • if .4 .. .7_ ii I. r-e-...:,,,....t. e•-o• x .*.--.f5" 0.1_ door —.• :i I : . -....._ II . h . 7 . t li: ---...,:- 7 ::x 5 single hung — z :/ /1C4-.- C Y• x .'""(:)" e•Ingle hung • \---- .4*-6" >c. 5*--0" picture wInciaw RECEIVED '7. NOR..TH CITY OF TUKWILA MAY 0 5 1995 - First Floor Plan 0 lie." ..-.= 1. - cr. PERMIT CENTER U . o 8 .• . o o . / .............................. .. .... . _ii-_-_ - - - . - - . - -- ---,-,- . - ..... . i . I i { UTILITY BATH i C[IY OF TUKWILA F - APPROVED F (----- J 1 exleting bearr1 replaced eee structural MAY i 9 1995 2 s ' AS NOTED T t r „ , - - - -- BUILDING DIVISION U P , ) move wet bar I I . I i 3 °'x50• 9 ' i I .. .. demo exleting walla >1 i , i FAMILY ROOM a I 3'-0").c-5•0" i i i i elev., bar and caeework F i ' II relocate sliding door �� /i j 3'0"x5'0" 3 ne wct bar location 5 exleting 3'0" x5'0" windowe \ } + 0 0 . new walla and glazing � 0, O` j 0 4- '5 "x,0„ RECEIVED CITY OF TUKWILA nIOIZTH 0 MAY 0 First Floor Plan - Area of Construction PERMIT CENTER a o 0 0 ll . . . 8 „A I - 1 • roof overhang �� 1 � I \1,1 , t — J CITY OF TUKWILA ` i i ( I APPROVED r 1 _ - �J I I MAY 19 1995 I% 1 ----{{{ AS NOTED i J I BEDROOM 1 BEPROOM 1 1-- I BUILDING DIVISION t-- i 1 1 1 1 I :Lb 'I 1 note: I MASTER BEPROOM j new cont. gutter I - 3 ; connected to [ { I { ! ` 1 exfeting do 1 LIVING ROOM I! I DOWN{ d m ow an storcer ? at edge of I j existing deck 1 • U U , I NOOK L' PINING I F. 1 new elaetomerlc roof Ing { 1 • on cxleting deck i KITCHEN I f / existing downspout �� _ L J� exiating guard -rail to stay ` ` N i RECEIVED CITY OF TUKWILA 1 Second Floor Plan MAY 0 5 1995 scale: 1!8" = ,• - CP• D PERMIT CENTER N D 0 U li D c --- r•icigc notes: t • 1. Roof live load -25 psf ( totai =40 pesf) C 2. Floor five: load =40 psf ( total .--65 psf ) .. Wind load 20 pof ' 4. Assurrred eoil earing =2000 psf i i 1 1I virdcr truss I it i , , existin cedar OMakes over 7x4 skip- shcwthing ! l L I I I i ! CITY OF T F� IlKV'�!A I ( 1 ; r APPROVED ' i II I __[..._ ____I____ I- • 3. t MAY 19 1995 � I 1 AS NOTED I r I BUILDING DIVISION ! 1 I r` i 1 , I f ! j I rl gal J 1 i I i I I. 1 I II f 11 I I 1 F j I 1 1' I , 1 • i I I 1 s , !I i I; } I i Ii I I I ► i ; i C I I I 1 I , 6 x 12 b v rri I • ' i i t I i -� j - , : J'6 \— 6x6 post I I I I � I �"\-..d I �, �. / '. I : I hip master 2 x 6 manufactured truss 2J 6/12 pitch RECEIVED CITY OF TUKWILA n. Roof Framing plan - Existing ae =-- MAY Q 5 1995 / scl 1/8' - �" PERMIT CENTER n v / < U NORTH 6 0 10 0 6 0 no work In cxlating roof 6t ructur• e r / 1/2" CtX pl / 2 x 6 stud \ \s \ / \ C APPROVED / cxlating Al_ 61_ door _ � now olsa m tocrtc coat ing / / 6" bevel aiding over 3c T Ea ,j G plywood /� MAY i ^ 1 solid blocking g 2a a il oints y y \ ex isting guard rail and structure \j, 11C- AS NOTED - -- \ o t u ` , continuous gutter t storm s o torewer BUILDING DIVISION I I ' S ; 1 I t A A ; i�1 \ t r 6x10 header \ ! F>.-r. 2 x 6 sill' exiattng floor,Jotots ' now GLB per structural _ • • _!f _ I A - � ' OA OA re -bar as a Flown / f 6.. min_ new IZ -30 In wit perimeter vent 1 now 2 x 6 wall A rid glazing / DETAIL 2 -12 ! 1/2" x 10" A.B. 1/2" underfayment over m 6' -0" 0_C_ ax. I I) 1 � /8" T 8. G COX plywood DETAIL 1 -12 li))) j u II F U � 11 U r , • � U J! II : U ; t new 2 x 10 Joists \ .• 1 i , I conc. Footing / n , a �` % ICI ( _ - y . II l�)�� n R -30 Insulation �•)� 2. . III 1i - • • : 1111 ` l A existing - new 2 x 6 wall ■ vap or barrie __ _ "'' crawl apace new crawl space ♦. • • ‘43.. -4- mil. vlectueen I I \ a i + � vapor barrier — t t / 1 - )) — li` •fif =)4ii -— )1) ))— I — .) �1 i i r t, . r — t s concrete footing 1 I 6.. ) 6 • X 6 .. t CIT R ECEIVED OF TUKWIr s. LA o>=TAIL 2 -11 MAY Q 51995 ('\ Sect A. — - Deta l l – - PERMIT CENTER 0 eoete: 3/16 • 1' 0" 2 scle: 3/4" _ 1" O•• • U 0 0 0 ri 11 • • • - 2 x 6 framed wall with t. -19 insulation flit! OF !U/11iIL11 1/2" GWB over 4- mil. vapor barrier \ APPROVED MAY 19 1995 6 • bevel siding eiastomcrlc coating AS NOTED " 1/2" underlaymcnt < \\\\ 5/8" T ec G. COX plywood BUILDING DIVISION < 1/2" COX plywood 3/4•' B -C Te.G plywood new high denoity IZ -30 insulation ' 1 \.■ metal drip flashing i ' 1 r r < f tt 4'• aluminum g utter i ^ r - i � t 1 1 5 / I cedar trim / metal drip flaohing 1 1/2" screened vents new 2 x 10 Joist w/ R -30 insulation \_ \ / a r ced 1 x 6 trim \� cxloting 2 x 70.joista ` 6" bevcl aiding 2 x 6 wall framing \ c 1/2" COX plywood 1/2" GWB over 4- mil: vapor barrier. \ , < 6x10 header typ. 2 -19 insulation > r . 1 WI I 11P RECEIVED .,- CITY OF TUKWIlA MAY 0 5 1995 . 01 Detail Detail scale: 3/4" = 1 - 0" scale: 3/4 = 1. - o PERMIT CENTER Q D 0 12 u 0 • 4.L''I'l)RAL NOTES y5 I I . nOVERN1NC :T CODE •. 199 UUC 2 l )F STUN LOADS kilot'l.ive Load - 25 pit' Wind - 80 rnpf E:xp. B 1 lour Load - 40 psi Seismic - Zone 3 3 FOUNDATION - 2000 p f. To 1bc verified in field. 4. RF.INFORCED CONCRETE t'c -- 2000 psi ultimate strength ;ti 28 days mix o provide design mix. Reinforcing steel to be fy 40,000 psi, grade 40 WWF reinforcing to meet ASTM A 18', min lap 8 inches. All reinforcing shall be spliced 36 bar diameters minimum except where noted ( diem 0,e, and detailed ; ccordine t.n ACI manual of Standard Practice (latest edition). AU reinforcing shall be held firmly in place during, c. nerve pour by means of preca:;t concrete blocks for slab on Cmck and adequate wire ties. Thoroughly wet all reinforcing steel just prior to concrete pour C'h :unfer all exposed corners 3 /4" or per arch All concrete shall be cured by 1eeping ►t thoroughly wet and protected for at 7 days. Provide shop , irnwuigs of al! rtlr,tbrcin steel to Architect for approval prior in t'abrl:'atii,U , Minimum Concrete Coyer W all faces. Weather . - 1 1 /2" Footings 3" Earth • 2" Interior' ' - 3:4" Typical Wall Reinforcing r," wall: r;? at 12" o.c. each way, centerline of wall Min, lap of reinforcing; 36 bar diameter. Provide dowel to match wall vertical. Provide cornet bars fi4 - 2'- 0 "x2' -0" (it 12" o.c. Min slab reinlbreing: 6x6-10/10 WWF 5 WOOD FRAMING USE CATEGORY MINIMUM GRADE .foist (2" thick, 5" wide) Hf'tr l 1400 l b (repetitive) 1400 M -f-: 'lx or 6x Beams Dl+ -1. No. 1, 1500 Fb (single) 4x or 6x Post 825 Fe, 1400 M-F Stuck, Plates, Blocking No 3, Standard or "Stud ", 500F o� Any species allowed, unless otherwise noted. m v, —< m 1 1 � • • • All 01, finis to be 24FV4 or 2 -4FVK. Supplier U' pr shop drivyings and AfTC Ue tifl ate prior to fabrication. Lumber gradinz (and ,ties:s) in ac:coi.dance with WWPA Grading Rules, 198 t editic;i, All lumber 4" or less in thickness to be marked "S -Dry ". All lumber in contact with citncrete or masonry or exposed to the weather to be pressure treated (P. f3eam and Joist hangers and post caps arid bases to be Simpson unless shown otherwise (all references on the drawings are Simp on Catalog designations). All beams and post to have metal framing connectors at all partitions and (3) 2x4 nailed laminated posts und,;r beams, unless otherwise noted. All framing to be nailed per UBC Table 25Q. • All wood exposed to weather or contact with concrete are to he treated • .I ypic<tl header to be 4x12 - intenor wall 6x10 - exterior wall WOOD C()NNl?C'l (')RS All wood connectors shall h;' Srr?lps6n Strong Tic connectors Provide Simpson Cl' u,nd CC for all po. t base and pc.cst to tonne tions and Simpson I-i I at all truss to beam connection:,. Provide Simpson HD 3A at all wall connections. 6 PLYWOOD • Nailtnt; noted blow is minimum, see drawing for c1o'er spaced nailing: floor • 5/8" T&G, 40;20 exterior glue with 1Gd nails .Z4 4" o r. at all 'cdg s and 10" o.c at all sttppo!ts unless nosed otherwise. on plan • Walk - 1/2" plod with lOd naiis.at 4" o.c, at all edges and 10" o c: at all supports UtlieSS noted otherwise on plan. (See plar and ck'uii for special nailing) Floor 3/4 1'&G with exterior I.;tlue with l0d (1; 6 "o,c.. All edges 10 "o C Infield . • 7. Contractor to 'tieiif;y all dimensions and `crily all conditions assumed during design and valid. 8 STRUCTURAL Ri.1GTl1RAL STEEL All steel to be A 36. It All weld to be E-70. All bolts to he A 325. S Provide shop drawing to architect for approval before fabrication. I z 0 • m n. • m CD oci m c rt < C • m co w 33 L g 2 • • • • ____•. _..._.....� .. _ '. *._''''.. ....._ 1 I I' I A I I I I • ,/ I I I I I I I, I I • I 1 I • ...7 / .t (.... :: i :..f A \ C7 ,' A , t d --I IO -71C� ry � . "';t ' + � . � { v e t r 1 f.XP ; ti /, . . �.....,� I<114 MAW c C ASSOC p►za cr K �: � ►9 DESIGNED: d DRAWN: k.c: CONSULTING ENGINEERS CHECKED: t 810 3rd Lobby One Ave, • y rrr �. J0� NO: i .- I I i Seattle, WA 98104 ro if-i 7 l;�N f`1.�.l� �fr" i1lA4.} DATE: • V.7. 1 � 1 r.• • L ( 206 624 -714 i,� u I ,. �,n SIHEEf NO: 7,7' . I .. - _—_ - i _ NI / • . / . , . / , . ,., ...- ■,_ __.-- . — . t i in 1 c -..)...,, t uL 1 t..1 I t) %Jan rrin itv. LtJ1JJ•1. 10 I i LIU 1 1 ' : I. I i , . i j I , 9 C.1 • . — ■0 IL L qNS /— t .1E, ti • : N E V / 1 1 ..... / , .. sf. m . 1/41 1, .... I. .... :-.... . . • c„, i) kb x , ::* k 1 ■ 1 ID .. S . .,v V) - X ' • lkl e ei ) / ) 1 . \ tii X - - , *. r .■ 17' C . s . ..2" qs4 v Cl .. ■ • ' . ' V ,y .,::: ,, ...- '...//,-,..• No, a.? ,i; . • . y .-.......„ ‘t:, ,,.• , 0 •..4, -a X 2 6 ' \'•":'.. *(. , • . q t=o 710 ,* A L';`•%:.:". • /.4) • ' , F c...n ,. 0;. k ::::... - :::•=ek . '.? (-.::. to C) —I . IC" ' I..% . . r..••• I N . . M . i 33 LO r Eh 6C) . l Cal •P• .. .. .... ..,,,............---. r51" 0 .V _ ri Z C.71 ...pp] ....r.r...........................-.Ary ... . •,. KM MAW & ASSOC r '&415 r33 Pip i'icA.,rn..1 DESIGNED: Jri -- 1 DRAWN: Kc CONSULTING ENGINEERS CHECKED: ALIONarawon••••••■•••••• • • 810 3rd Aye, Lobby One irrix: JOB NO: Seattle, WA 98104 P" r PI A NI 1 t-1 6 1 PLAH DATE: 4.21. IF? _12061_824-7146 44 I f... o n SHEET NO: • • • • • • 1 • • • • _ Y 1 L . 6 • `11 4 o ca V ., O CCU G ft _ ..... __......... _..... _ ....'........_._._..d _._...._. —_... Y. f !V . f)? om Ik m � � `fir' kt%� �'� "•J` • w KM MAW & ASSOC 16 4-t.15 , 4oUrH DESIGNED: 4 .1N1 DRAWN k _ CONSULTING ENGINEERS CHECKED: , 810 3rd Aye, Lobby One Yme JOB NO: 15.31 Seattle, WA 98104 � l f � L 'r Ad L DATE: f27 -15 -_ r . 1., 206)_±23.-7146 � o:� SHEET NO: �)ti. �-'' • • / MY 'd L UE: lb I. hl li &H h AA NU, rUb . 64 :3VV IV h', U bA . EG ` \� +(` 1 1 . .�... 1i " r , x. y ' wIt /yr, `1 / ?a - V4 4) _._ __.._ _.. l P i 1. CI G !o.:) e,I✓0.�: `� :. Pl ( .7U er, f . D e ....,. _ (2. X wiz X Yi 0 ;4:1 ._ r "1 F ria \,/ALL ri, 6kki .,_____....„.....___,,....., , vi , i i 1 1 -0---------- Ter" i i . 2. x '01, x -` / N.• k 0 vJlc% \ 1 I r 1 ... 15 T FCN WALL . 1. l v a 3: c.' r =711! I _.._._.._. o a `� rn tal ,c \t, i , ::':•:t• • : ` Z V I m ,,,,,C:`,..!. r,: ;.1 O m d r -4 . : .i.• i m cr N)' s'4N,�t iTC 1 i ..JJ 1 I Hi KM MAW & ASSOC 1 i eum DESIGNED: ,_. DRAWN: K6 " CONSULTING EN0 t44EEF25 CHECKED: 810 3rd Ave, Lobby One Inv. JOB NO: 1 ra. 3i Seattle, WA 98104 1 ON e(19T WALL. DATE: 4. Z '1 (206) 624-7146 _._...... it. '11 ..._._..___..__._. ... SHEET NO: .{ .. / . ��, , ,! 11111 C.. CJJ IUL. 1u'08 Oun 1 n ItV, LVVJ"tJJ'1CJ 1,01 / - -' --- � X I `'T PL`fbiDUV // . • -. _,._- 2A t-1Piet) w/ 2 - /8' c' "fli u oL / 6 62."0.. C / / \,,,,05)( 15) `te i - 1 F ON N O 210 N ii l ' 5X191 2 x1 es^.V ". r• e 4 :v v".? :. 8 .: ..: 2 / „ i c.4 1 m 'I G 4' 'j • � ,� p ° t� Q g KM MAW ASSOC pao cp� P1 DESIGNED: t i . rei . �4 I .� c,uTH .._..�..._.... DRAWN: k. . CONSULTING ENGINEERS CHECKED 610 3rd Ave, l,obis Cane .. . _.. . ... .,..._ _. _ ,�...�...�. _ ; -vil Seattle, WA 9810 �t 1f� (..10 1'v we) we) 05 A DATE NO Z •1 (206 ) 624 7146 /‘ l 1 1_ 0 11 � SHEET NO: :.i.:5 • • • APR-27-95 THU 16:20 aft FAX NO. 2063433919 P. 07 - • — • Cx'I1 JO 15T Q v/i3 /.. 2 WLEY 4 - 5 4" .0.1hu e).saf,7 r• 0.3 Al (AL wi mee.45 / privvtoe. DocAwc.i \ ....„ WS 1S C ri:f000y • 0 DJ) - <I> 0 - 0 M CZ 71 2 A Et; 0 0 .0•■••••••••••10MI.M.I.MONW..4.0.1.4.4... KM MAW & DRAWN: CONSULTING ENGINEERS CHECKED: 810 3rd Ave, Lobby One Tr , JOB NO: 1`..>-4 Seattle, WA 98104 976 la \AM DATE: 4. (206) 624-.7146 I coo • . `t l'Wir~ c+v') Juc tu.JJ Wall ..... .... • I p .• *. -• • ..:...... - 7. r.,..t_i � ;,t /�I . I I a '\ -- l ie" Ft w, 4.. y 4' -r �,t,,! � �^Lt. f <2' 44 i 4 ..15.__..... T .W 1/2 %} 'N (1 0 ��• ;� Z SI '"'c ij 5 to 83 C .1 5 Z & ASSOC I, MAW � KM MA 7 L ourH DESIGNED: ��� bF�AWN: KG CONSULTING ENGINEERS CHECKED: 810 3rd Ave, Lobby One JOB NO: 5.3I Seaittle, WA 08104 tiN `' -TO '1'., DATA 4,2/.1 Ir, i. n\ nr. •h .. J r" ���f �Ir + 0It curF1 No! . :7 .7 .. ...•- ......rrrw.....n- . . :•,• «... _ ..0 ••••••`......."........"."•••••••••• • • . 1~:X1 r f _. . 5 :lt,D \r1, , 1P:x,.' 4 1.•1U(10 - fr; , P!EMC ve r ' 1 W T a LAP OF 1.1Ar-ICIE P / • , ,_rr. 0x / [-.,-_..„......,-_--=‘_....._. .....,_------..... v.-_-:-....=-.„--7/.-;:,;:::-_-:-....1=---__._ i ., : .t., esl 1 • • ,L.; % t, 1 .. ' ' 2 ) I U tO D W , ,-)Ir'1f' ='rah HU 20 HA Ne M � � • .,e',..:' • CG S ` , x!III 14 /2e O Z CO r__ .._ K M MAW & ASSOC 1 e4 � : 3 ,v :�1u1`N �ESI NEa; T1ri! __r..._y DRAWN: K.-- CONSULTING ENGINEERS CHECKED: 810 3rd Ave. Lobby One :>,.,I , Seattle, WA �?8 y � , ' � ' /��> � 'o v� , � JOB N .1 . k A 104 DATE: 4.21. 1 Vi i ,, �, pi , ... (206) 624—'7146 SHEET NO: .:1.5 . ... ..r YY_Mr.wr.Jl4 y,. ... .Yh•M.� - - � _ . r ..•rrrwer+w4W.Mw.r.,w1�.....�rw + rYr�...�•r�.. _____________............ i . tImem•••■••“.■••••••■• • r ........ Mr. ••••••• ................i........41.11...olar.,•••■• woe. ....... . .1 , , . . .. . . ....... KM. (JOE) M,W. RE. STRUCTURAL OEF.'I' 3 SHEET !WATE JOB MO..... 1 S TR! ?CP.3M. W61 .1 1 pm- < / r-: c. r � ,Z ' 4"C . { j / c:::,. r • is: pi 1Lv )) .'• i ll. /r / ::,;.? 6 rte //iv- ...x? ^/° ,I ,l,,'/- 47,/fj7 • / /X5 X el ' /• r✓ x ',pc) , --4 4r. <.) ' - 2 > K 5Z7 >; /? , j,. • -, / � .^.-7 _ /7.. 3 %l7 - 6 : .5- • ' / 6 5 . r' ., r X ' C? • c T �`•.` 1 „ l fi O ` // t.T It' �. ? , •,1 ;, , r • i . m � � -? x•1 � s , ,. .y�;c` � - .�—� — :- c::) -Sig] --, 144-E ., ,,,, ...:.; ..., 6 . . . 4 , . cy Rr S. G X (a /// V . #2. ' (/ . i .14 2 / ' i/ �.1'' 1 • -• 9 a . 7. . . . 4 • • • . ...4 , • •• re. ■••••••• . •■■•••• •• •••■•••••••■•••■••••••••• • .0am...A 0.0•■••■• •Ro. 0000.0.00••■• ••••••••••••• .000m* • •••■•■••■••■••■••••■ ■■•••• • • • • I. KM. (JOE) e' IC,11. io Al JOB t40. I STRUCTURAL ENG!: tEr.1-1 '.$.'...r.3 1 CEIt41(141. BUILD; NO 1 SHEET Nt ) • tpEA1RE, ViAf:01,NO TON 98104 824.7146 LOCAMN CHECK --- Z. ( ::* ) 1 : 1 11 • .3 /0Y S -C60 e 6'el• "e • P . I, i s 2 5 , .4 .4. c '• 6 s /2 S 2C S .7 C. ' • 7 / ,/ • . .3 i2 . (/' ! 2 -3 , e „ .• il • ' • ••••;;- t' 0' "• *,, 4 • sl . •I/ , • , \.:..; • 0 c -< 33 • IR co C R F3 m . • m p • c CI rOPTgi, 1L ,• . . .. ...._. .... ... .. ..... *;4i.:.A �. :Fi: v.FZ.s; xrr,<, ,., .. .. . o-. _,+. ;a,..a s s. ♦. <.re...o ... ,... ......... ..... ..... ................ .......... ., w, �. anizfv; awCbry' n»:. N' Y• X�teF'!• +,•,r;rL3sYwn•: »«6r.+.wn.,...., r..e...........,........_... ' To: Permits From: Joanna Spencer, PW Assistant Development Engineer Date: May 15, 1995 Subject: Sacco Residence - Remodel 16415 53rd Place S Proiect No. P95 -0030 Plan Check No.B95 -0142 Review Comments The subject project was reviewed at the May 9th Public Works plan review meeting and the site was checked by Public Works staff on May 11th, 1995. It has been determined that no Public Works permits are requiered for enclosing the existing deck. If any questions, please let me know. JJS /jjs cf: PW Utilities Inspector Development File C Sacco Residence - Washington State Energy Calculation Comparison. Glazing area comparison before and after proposed remodeling project: before remodel after remodel 1st floor heated floor space 1933 s.f. 2128.5 s.f. 2nd floor heated floor space 2025 s.f. 2025 s.f. - no change 3958 s.f. 4153.5 s.f. 1st floor glazing area 141.7 s.f. 231.35 s.f. 2nd floor glazing area 366.7 s.f. 366.7 s.f. - no change 508.4 s.f. 598.05 s.f. Glazing as a % of floor area: 508.4 s.f. / 3958 s.f. = 13% 598.05s.f. / 4153 s.f. = 14.5% The proposed remodel will still keep the building under the recommended glazing area per floor area of 15 %. Building components compared in existing construction and in remodeled areas: existing remodeled area Slab on grade R -8 not applicable Floors R -19 R -30 Walls R -19 R -19 Ceilings R -30 R -30 Glazing 'U' value U =0.90 (default) U =0.65 Calculations of thermal transmittance of the gross exterior, floor, roof /ceiling assembly area: Calculation of tar. et Uat tar. et U values from 1991 WSEC : (U)(opaque above grade wall area) +(U)(opaque below grade wall area) +(U)(.15)(floor area of conditioned space) +(U)(floor area over unconditioned space) +(U)(roof /ceiling area) +(U)(opaque door area) +(U)(lin. ft. of concrete slab perimeter)= target 'U' value Existing: (.62)(2231.6 s.f.) +(.037)(508 s.f.) +(.65)(.15)(3958 s.f.) +(.041)(2455 s.f.) +(.036)(2025 s.f.)+ (.4)(40s.f.) +(.54)(94 I.f. )= 1938.608 After remodel (.62)(2147.95s.f.) +(.037)(508 s.f.) +(.65)(.15)(4153 s.f.) +(.041)(2608.5 s.f.)+ (.036)(2161.5 s.f.) +(.4)(40 s.f.) +(.54)(94 I.f.)= 2006.959 Calculations of proposed Uap ( proposed U values from 1991 WSEC 1: Existing: (.62)(2231.6 s.f.) +(.037)(508 s.f.) +(.9)(508.4 s.f.) +(.041)(2455 s.f.) +(.036)(2025 s.f.) +(.4)(40 s.f.) +(.54)(94 I.f. )= 2100.263 After remodel (.62)(2147.95 s.f.) +(.037)(508 s.f.) +(.86)(598.05 s.f.) +(.04)(2608.5 s.f.) +(.036)(2161.5 s.f.) +(.4)(40 s.f.) +(.54)(94 I.f)= 2113.762 RECEIVED CITY OF TUKWILA MAY 051995 PERMIT CENTER C • Calculation of 'U' value for glazing area for after remodel: 508.04 s.f. (.9) + 90.01 s.f. (.65) = .86 508.04 s.f. + 90.01 s.f. Calculation of 'U' value for floor over unconditioned space: 2025 s.f. (.041) + 153.5 s.f. (.029) = .04 2025 s.f. + 153.5 s.f. Comparison of existing thermal transmittance and proposed thermal transmittance: Existing: Uat = 1938,608 Uap = 2100.263 161.655 over per 1991 WSEC Proposed: Uat = 2006.959 Uap = 2089.84 82.881 over per 1991 WSEC Conclusion: Although the building still does not meet the 1991 Washington State Energy Code or the City of Tukwila standards, by doing the work in the manner proposed we will have increased the over all efficiency of the building envelope. RECEIVED CITY OF TUKWILP MAY 5 1995 PERMIT CENTER • Jmakd off. NAMMNw AMACV,MA V NNWANSAVONWW W \' w WOtiVAWAVV_M• — ' �Vwwrtiv.WWWAVVIN LV,ANNVO"A V,W.\ by the undersigned, fo Representative of R. Miller Inc. r DETACH TO DISPLAY CERTIFICATE —; DEPARTMENT OF LABOR AND INDUSTRIES • • . THIS CERTIFIES THAT THE PERSON NAMED HEREON IS REGISTERED AS PROVIDED BY LAW AS A 4'; j�J} "• ' • !' Y 'i`t � � w'i� �14iit�t�er�'' r ?o,� //t �,i_... t � ; �,... e `i �: • `i. �; `•�Y rF•iti ��.,�,, G�1.,,, ; 3.64.W AI b;�•a•,, ,� n.Y��•',.b�: t DETACH TO DISPLAY CERTIFICATE_! The above is a photocopy of the original Contractor's License, as sighted by STATE OF WASHINGTON F825.052.000(3.02) Constructi4 Co. Inc. On this t. State of Washington ) County of Snohomish ) SS day personally appeared before me this RECEIVED CITY OF TUKWILA MAY 051995 PERMIT CENTER 1 ,661 Ii Z AVW cnr� fo. J o 3 o, Wash ngton, I .., I . . 4 111111 4 - . .. ' . . . O [4 cif) 4 4 I I . 0 .. I 411I IIMIMMI4 > , ' . . ..' 1 H 41) U ., i 1 1 (1:14.4 0 r r i:ILI I ( ' 1 1 i ___A- . _ , . 1 Calculation of 'U' value for glazing area for after remodel: 508.04 s.f. (.9) + 90.01 s.f. (.65) = .86 508.04 s.f. + 90.01 s.f. Calculation of 'U' value for floor over unconditioned space: 2025 s.f. (.041) + 153.5 s.f. (.029) = .04 2025 s.f. + 153.5 s.f. Comparison of existing thermal transmittance and proposed thermal transmittance: Existing: Uat = 1938.608 Uap = 2100.263 161.655 over per 1991 WSEC Proposed: Uat = 2006.959 Uap = 2089.84 82.881 over per 1991 WSEC Conclusion: Although the building still does not meet the 1991 Washington State Energy Code or the City of Tukwila standards, by doing the work in the manner proposed we will have increased the over all efficiency of the building envelope. RECEIVED CITY OF TUKWILA MAY 0 5 1995 PERMIT CENTER I \_ ts r- DETACH TO DISPLAY CERTIFICATE I ♦ „u;i,:e7 u•,u. YWrMrN,. Y4V4 \M•.W\. \hWW\4Y. 1Y4YVYN'YVVWVW\\\\ \ h 11Mh\M'4 \\M1h4Nw.w., NMN.6.,v, •1W \ \\ 1VNh n ..w..AWW!\\.. „. ,..,..„ i ( e , . • DEPARTMENT OF LABOR AND INDUSTRIES , 1 ! THIS CERTIFIES THAT THE PERSON NAMED HEREON IS REGISTERED AS PROVIDED BY LAW AS A i_ DETACH TO DISPLAY CERTIFICATE ._f • The above is a photocopy of the original Contractor's License, as sighted by by the undersigned, fo =-' ' i - Constructidp Co. Inc. . ; On this day personally a • , igtoni Representative of R. Miller Inc. RECEIVED . CITY OF TUKWILA • ..?• MAY 0 5 1995 t PERMIT CENTER