Loading...
HomeMy WebLinkAboutPermit D02-082 - CITY OF TUKWILA - CITY HALLCITY OF TUKWILA CITY HALL 6200 SC BL D02-082 Value of Construction: Type of Fire Protection: Type of Construction: Public Works Activities: Storm Drainage: Street Use: Water Main Extension: Water Meter: Channelization / Striping: doc: Devperm City of Tukwila Parcel No.: 3597000282 Address: 6200 SOUTHCENTER BL TUKW Suite No: Tenant: Name: TUKWILA CITY HALL Address: 6200 SOUTHCENTER BL, TUKWILA, WA Owner: Name: CITY OF TUKWILA Address: 6200 SOUTHCENTER BLVD, TUKWILA WA Contact Person: Name: TOM PULFORD Address: 6300 SOUTHCENTER BL, #100, TUKWILA, WA Contractor: Name: WAKEFIELD GLASS INC Address: 11014 1ST AVENUE SOUTH, SEATTLE, WA Contractor License No: WAKEFG1090JR $4,000.00 SPRINKLERS /AFA DEVELOPMENT PERMIT ** Continued Next Page ** D02 -082 Department of Community Development / 6300 Southcenter BL, Suite 100 / Tukwila, WA 98188 / (206) 431 -3670 Permit Number: D02 -082 Issue Date: 01/27/2003 Permit Expires On: 07/26/2003 Phone: Phone: 206 433 -0179 Phone: 206 241 -7359 Expiration Date: 04/08/2003 DESCRIPTION OF WORK: TI IMPROVEMENTS TO INCREASE OFFICE SIZE BY RELOCATION OF GLASS/WOOD WALL AND INSTALLATION OF TWO NEW DOORS. Fees Collected: Uniform Building Code Edition: Occupancy per UBC: Curb Cut/Access /Sidewalk/CSS: Fire Loop Hydrant: Number: 0 Size (Inches): 0 Flood Control Zone: Hauling: Start Time: End Time: Land Altering: Volumes: Cut 0 c.y. Fill 0 c.y. Landscape Irrigation: Moving Oversize Load: Start Time: End Time: Sanitary Side Sewer: Sewer Main Extension: Private: Public: Private: Public: $164.96 1997 0016 Printed: 01 -27 -2003 z w QQ • � J U U 0 CO J F- • LL w 0 2 LQ = • d I- al Z = F- 0 Z F- LU te '. O 92 0E-- w W O w U= 0 f... z Permit Center Authorized Signature: Signature: Print Name: doc: Devperm City of Tukwila Department of Community Development / 6300 Southcenter BL, Suite 100 / Tukwila, WA 98188 / (206) 431 -3670 I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating constr th erformance of work. I am authorized to sign and obtain this development permit. This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. D02 -082 Printed: 01 -27 -2003 doc: Conditions City of Tukwila Department of Community Development / 6300 Southcenter BL, Suite 100 / Tukwila, WA 98188 / (206) 431 -3670 Parcel No.: 3597000282 Address: 6200 SOUTHCENTER BL TUKW Suite No: Tenant: TUKWILA CITY HALL 1: ** *BUILDING DEPARTMENT CONDITIONS * ** 2: No changes will be made to the plans unless approved by the Engineer and the Tukwila Building Division. 3: Electrical permits shall be obtained through the Washington State Division of Labor and Industries and all electrical work will be inspected by that agency (206- 835 - 1111). 4: All permits, inspection records, and approved plans shall be available at the job site prior to the start of any construction. These documents are to be maintained and available until final inspection approval is granted. 5: Partition walls attached to ceiling grid must be laterally braced if over eight (8) feet in length. 6: All construction to be done in conformance with approved plans and requirements of the Uniform Building Code (1997 Edition) as amended, Uniform Mechanical Code (1997 Edition), and Washington State Energy Code (1997 Edition). 7: Validity of Permit. The issuance of a permit or approval of plans, specifications, and computations shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinance of the jurisdiction. No permit presuming to give authority to violate or cancel the provisions of this code shall be valid. 8: ** *FIRE DEPARTMENT CONDITIONS * ** 9: The attached set of plans have been reviewed by The Fire Prevention Bureau and are acceptable with the following concerns: 10: Maintain fire extinguisher coverage throughout. 11: Clear access to fire extinguishers is required at all times. They may not be hidden or obstructed. (NFPA 10, 1 -6.5) 12: Exit doors shall be openable from the inside without the use of a key or any special knowledge or effort. Exit doors shall not be locked, chained, bolted, barred, latched or otherwise rendered unusable. All locking devices shall be of an approved type. (UFC 1207.3) 13: Dead bolts are not allowed on auxiliary exit doors unless the dead bolt is automatically retracted when the door handle is engaged from inside the tenant space. (UFC 1207.3) 14: Exit hardware and marking shall meet the requirements of the Uniform Fire Code. (UFC 1207 -1212) 15: When two or more exits from a story are required, exit signs shall be installed at the required exits and where otherwise necessary to clearly indicate the direction of egress. (UBC 1003.2.8.2) 16: Aisles leading to required exits shall be provided from all portions of buildings. Aisles located within an accessible route of travel shall also comply with the Building Code requirements for accessibility. (UFC 1204.1) 17: Exits shall be illuminated any time the building is occupied with light having an intensity of not less than 1 foot candle at floor level. Fixtures required for exit illumination shall be supplied from separate sources of power for Group I, Division 1.1 and 1.2 occupancies and for all other occupancies where the exiting system serves an occupant load of 100 or more. (UBC 1003.2.9, 1003.2.9.2) 18: Maintian sprinkler coverage per N.F.P.A. 13. Addition /relocation of walls, closets or partitions may require relocating and /or adding sprinkler heads. 19: All new sprinkler systems and all modifications to existing sprinkler systems shall have fire department review and approval of drawings prior to installation or modification. New sprinkler systems and all modifications to sprinkler systems involving more than 50 heads shall have the written approval of the W.S.R.B., Factory Mutual, Industrial Risk Insurers, Kemper or any other representative designated and /or recorgnized by the City of Tukwila, prior to submittal to the Tukwila Fire Prevention Bureau. No sprinkler work shall commence without approved drawings. (City Ordinance #1901) 20: Contact the Tukwila Fire Prevention Bureau to witness all required inspections and tests. (UFC 10.503) (City Ordinance #1900 and #1901) 21: Maintain automatic fire detector coverage per N.F.P.A. 72. Addition /relocation of walls, closets or partitions may require relocating and /or adding automatic fire detectors. 15 PERMIT CONDITIONS D02 -082 Permit Number: D02 -082 Status: ISSUED Applied Date: 04/03/2002 Issue Date: 01/27/2003 Printed: 01 -27 -2003 z w Q om Q? JU U 0 co o CO 11J J • a. F— Ili 0 u_¢ CO I I_ Ui Z = t-0 Z I— w O 22 • I- w W 2 H - L' O w z O~ z City of Tukwila Department of Community Development 1 6300 Southcenter BL, Suite 100 / Tukwila, WA 98188 / (206) 431 -3670 22: All new fire alarm systems or modifications to existing systems shall have the written approval of the Tukwila Fire Prevention Bureau. No work shall commence until a fire department permit has been obtained. (City Ordinance #1900) (UFC 1001.3) 23: Call the Tukwila Fire Department at 575 -4407 for approval of any system shut down. Have job site address, name and Tukwila Fire Department Job Number available to confirm shut down approval. (City Ordinance #1900) 24: All electrical work and equipment shall conform strictly to the standards of The National Electrical Code. (NFPA 70) 25: Required fire resistive construction, including occupancy separations, area separation walls, exterior walls due to location on property, fire resistive requirements based on type of construction, draft stop partitions and roof coverings shall be maintained as specified in the Building Code and Fire Code and shall be properly repaired, restored or replaced when damaged, altered, breached, penetrated, removed or improperly installed. (UFC 1111.1) 26: This review limited to speculative tenant space only - special fire permits may be necessary depending on detailed description of intended use. 27: Any overlooked hazardous condition and /or violation of the adopted Fire or Building Codes does not imply approval of such condition or violation. 28: These plans were reviewed by Inspector 512. If you have any questions, please call Tukwila Fire Prevention Bureau at (206)575 -4407. I hereby certify that I have read these conditions and will comply with them as outlined. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provision of any other work or local laws regulating constr ction or he peyformance of work. doc: Conditions D02 -082 Printed: 01 -27 -2003 Value of Constr ction: Building Square Feet: 4- ie ovU existing No. of Stories: 2 Area of construction (sq ft): A `t Will there be storage of flammable /combustible hazardous material in the building? ❑ yes ❑ no Attach list of materials and storage location on separate 8 1/2 X 11 paper indicating quantities & Material Safety Data Sheets Fax #: Architect: Phone: Street Address: City State /Zip: Fax #: Engineer: Phone: Street Address: City State/Zip: Fax #: Contact Person: Description of work to be done (please be specific): �: �� S Joao , ,� Existing use: ❑ Retail ❑ Restaurant ❑ Multi- family ❑ Warehouse ❑ Hospital ❑ Church ❑ Manufacturing ❑ Motel /Hotel 'O ffice ❑ School /College /University ❑ Other Proposed use: ❑ Retail ❑ Restaurant ❑ Multi- family ❑ Warehouse ❑Hospital ❑ Church ❑ Manufacturing ❑ Motel /Hotel.ffice ❑ School /College /University ❑ Other Building Square Feet: 4- ie ovU existing No. of Stories: 2 Area of construction (sq ft): A `t Will there be a change of use? ❑ yes rli no I If yes, extent of change: (Attach additional sheet if necessary) Will there be rack storage? ❑ yes 171 no Existing fire protection features: 7 sprinklers ® automatic fire alarm ❑ none ❑ other (specify) Will there be storage of flammable /combustible hazardous material in the building? ❑ yes ❑ no Attach list of materials and storage location on separate 8 1/2 X 11 paper indicating quantities & Material Safety Data Sheets CITY OF TUI VILA Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 (206) 431-3670 00, ( 4" .�Gd�Cv� Project Number: Permit Numbe 02 Commercial / Multi - Family Tenant Improvement / Alteration Permit Application Application and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or facsimile. APPLICANT REQUEST FOR PUBLIC WORKS SITE /CIVIL PLAN REVIEW OF THE FOLLOWING: (Additional reviews may be determined by the Public Works Department) ❑ Flood Control Zone ❑ Hauling ❑ Channelization /Striping ❑ Curb cut/Access /Sidewalk ❑ Fire Loop /Hydrant (main to vault) #: Size(s): ❑ Land Altering 0 Cut cubic yds. 0 Fill cubic yds. ❑ Sanitary Side Sewer #: ❑ Sewer Main Extension ❑ Storm Drainage ❑ Street Use ❑ Water Main Extension ❑ Water Meter /Exempt #: Size(s): 0 Deduct El Water Meter /Permanent # Size(s): ❑ Water Meter Temp # Size(s): Est. quantity: gal Schedule: ❑ Miscellaneous ❑ Landscape Irrigation 0 Public 0 Public 0 Private 0 Private 0 Water Only Value of Construction - In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review - Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The building official may extend the time for action by the applicant for a period not exceeding 180 days upon written request by the applicant as defined in Section 107.4 of the Uniform Building Code (current edition). No application shall be extended more than once. Date application expires: 10-3 —DA Date application acce ted: Application taken by: (initials) �-s PLEASE SIGN BACK OF APPLICATION FORM BUILDING R OR AUTHORIZED AGENT: APPLICAT S MUST BE SUBMITTEb WITH T OLLOWING: • ALL DRAWINGS TO BE STAMPED BY WASHINGTON STATE LICENSED ARCHITECT, STRUCTURAL ENGI EER OR CIVIL GINEER ALL AIVINt'S I BE AT A LEGIBLE SCALE AND NEATLY DRAWN • BUILDING SITE PLANS AND UTILITY PLANS ARE TO BE COMBINED N/A SUBMITTED ❑ El Complete Legal Description ❑ ❑ Metro: Non - Residential Sewer Use Certification if there is a change in the amount of plumbing fixtures (Form H -13). Business Declaration required (Form H -10). Four (4) sets of working drawings (five(5) sets for structural work), which include : ❑ ❑ Site Plan (including existing fire hydrant location(s) 1. North arrow and scale 2. Property lines, dimensions, setbacks, names of adjacent roads, any proposed or existing easements 3. Parking Analysis of existing and proposed capacity; proposed stalls with dimensions 4. Location of driveways, parking, loading & service areas 5. Recycle collection location and area calculations (change of use only) 6. Location and screening of outdoor storage (change of use only) 7. Limits of clearing/grading with existing and proposed topography at 2' intervals extending 5' beyond property's boundaries 8. Identify location of sensitive area slopes 20% or greater, wetlands, watercourses and their buffers (change of use only) 9. Identify location and size of existing trees that are located in sensitive areas and buffer (TMC 18.45.040), of those, identify by size and species which are to be removed and saved 10. Landscape plan with irrigation and existing trees to be saved by size and species (exterior changes or change of use only) 11. Location and gross floor area of existing structure with dimensions and setback 12. Lowest finished floor elevation (if in flood control zone) 13. See Public Works Checklist for detailed civil /site plan information required for Public Works Review (Form H -9). ❑ ❑ Floor plan: show location of tenant space with proposed use of each room labeled LLI i U) u_ ❑ ❑ Overall building floor plan with adjacent tenant use; identify tenant space use and location of storage of W 0 any hazardous materials; dimensions of proposed tenant space. _ ❑ ❑ Vicinity Map showing location of site a ❑ ❑ Rack Storage: If adding new racks or altering existing rack storage, provide a floor plan identifying rack F— _ layout and all exit doors. Show dimensions of aisles, include dimensions of height, length, and width of Z '— rack. Structural calculations are required for rack storage eight feet and over. w S w O ❑ ❑ Indicate proposed construction of tenant space or addition and walls being demolished Li D ❑ ❑ Construction details O 0 I— CI 11 w Sprinkler details - details of sprinkler hangers, specifically penetrations in structure, i.e., roof; size of water = v supply to sprinkler vault with documentation from contractor stating supply line will meet or exceed L I P sprinkler system design criteria as identified by the Fire Department. w Z ❑ ❑ Washington State Non - Residential Energy Code Data shall be noted on the construction drawings. U 0 I— ❑ ❑ SEPA Checklist - if intensification of use (check with Planning Department for thresholds). Z ❑ ❑ Attach plans, reports or other documentation required to comply with Sensitive Area Ordinance or other land use or SEPA decisions. ❑ ❑ Food service establishments require two (2) sets of stamped approved plans by the Seattle -King County Department of Public Health prior to submitting for building permit application. The Department of Public Health is located at 999 Third Avenue, Suite 700, Seattle, WA or call (206) 296 -4787. (Form H -5) ❑ " ❑ Copy of Washington State Department of Labor and Industries Valid Contractor's License. If no contractor has been selected at time of application a copy of this license will be required before the permit is issued OR submit Form H - "Affidavit in Lieu of Contractor Registration ". Building Owner /Authorized Agent If the applicant is other than the owner, registered architect/engineer, or contractor licensed by the State of Washington, a notarized letter from the property owner authorizing the agent to submit this permit application and obtain the permit will be required as part of this submittal I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJUIjY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. Parcel No.: 3597000282 Permit Number: D02 -082 o O Address: 6200 SOUTHCENTER BL TUKW Status: PENDING N 0 Suite No: Applied Date: 04/03/2002 Lii H Applicant: TUKWILA CITY HALL Issue Date: co ti. u.l 0 Receipt No.: R020000467 Payment Amount: 101.75 g Q cn D Initials: SKS Payment Date: 04/10/2002 12:17 PM F W '. User ID: 1165 Balance: $0.00 Z TRANSACTION LIST: 0 H Type Method Description = it U W ACCOUNT ITEM LIST: doc: Receipt City of Tukwila 6300 Southcenter BL, Suite 100 / Tukwila, WA 98188 / (206) 431 -3670 ACCT #303.00.594.190.62 Current Pmts Amount BUILDING - NONRES STATE BUILDING SURCHARGE Description Account Code 000/322.100 97.25 000/386.904 4.50 Total: 101.75 . 75 :)4/11 7716 TOTAL Printed: 04 -10 -2002 TRANSACTION LIST: ACCOUNT ITEM LIST: Current Pmts 6300 Southcenter BL, Suite 100 / Tukwila, WA 98188 / (206) 431 -3670 z RECEIPT Parcel No.: 3597000282 Permit Number: D02 -082 U O Address: 6200 SOUTHCENTER BL TUKW Status: PENDING N 0 Suite No: Applied Date: 04/03/2002 w H Applicant: TUKWILA CITY HALL Issue Date: 0 Receipt No.: R020000441 Payment Amount: 63.21 g Q Nm Initials: SKS Payment Date: 04/03/2002 09:19 AM = a . User ID: 1165 Balance: $101.75 H t Payee: ACCT #303.00.594.190.62 W W Type Method Description = U uj Payment Other 63.21 LL.Z Amount PLAN CHECK - NONRES Description Account Code 000/345.830 63.21 Total: 63.21 7,469 04/03 97.1.6 TOTAL O.00 Printed: 04 -03 -2002 Type of Inipection: Special Instructions: Date Wanted: INSPECTION RECORD Retain a copy with permit INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 applicable codes. COMMENTS: PERM 6)431-3670 El Corrections required prior to approval. $47.00 REINSPECTION E REQUIRED. Prior to inspection, fee mus .e paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. •Fire Alarm: Hood & Duct: Halon: Monitor: Pre-Fire: Permits: - lithorized Signature City of Tukwila Fire Department Thomas R Keefe, Fire Chief Retain current_inspection schedule. Needs shift inspection /Approved without correction notice 0 Approved with correction notice issued FINALAPP.FRM Rev. 2/19/98 TUKWILA FIRE DEPARTMENT FINAL APPROVAL-$FORM Steven M. Mullet, Mayor Permit No. Project Name Headquarters Station: 444 Andover Park East • Tukwila, Washington 98188 • Phone: 206-575-4404 • Fax: 206-575-4439 t. FILE COPY incidental work elements required to complete the contract. J 1. Mobilization and demobilization: Deliver, store, and remove all equipment, material and personnel necessary for 0 H construction. 2. Demolition: L I - Prepare reuse of exisiting system components with careful removal of existing iii N plate glass panels, door hardware and aluminum extrusion, if applicable to the r- : new configuration. in existing counter. PART 1- GENERAL 1.01 SUMMARY OF WORK SECTION 01010 PAGE 1 SUMMARY OF WORK A. The Project Work is summarized and may not include specific reference to all B. Accomplish all work described in the Contract Documents(Plans and specifications) for the General Construction Contract for the 2002 City Hall Interior Window Wall and Door Modifications.The Project Work includes, but is not limited to the installation of, all work associated with the following tasks. However, the Contractor shall fully satisfy himself /herself in regards to the estimated quantities shown: 1.02 CONTRACTS 3. Carpentry Provide all components required to install door systems to match existing. 4. Door and window systems Provide all aluminum frame and glass glazing systems components to match existing. RECEIVED CITY OF TUKWILA 5. Work by others: Carpet pathching and painting. APR 0 3 2002 PERMIT CENTER A. There will be one contract for the Project, which includes the Work described in the project manual and drawings. B. The Contractor shall provide all items, articles, materials, operations or methods listed, noted or scheduled on the drawings and /or herein, including all 01010 -1 2-8Z labor, equipment and incidentals necessary and required for proper and timely completion of the Work. Contractor shall use new materials unless specifically noted or directed. 1.03 CONTRACTOR PERSONNEL The Contractor shall employ only fit and skilled persons and maintain proper order at the place of work and shall maintain the project site as a safe and secure work place conforming to all applicable codes and regulations. 1.04 USE OF DOCUMENTS Technical Specifications are enumerated in the table of contents of the project manual. Numbering of sections is for identification only and may not be consecutive. Contractor shall check his /her copies of the specifications with table of contents to verify that they are complete. Notify the Engineer of incomplete copies. 1.05 CONTRACTOR'S USE OF PREMISES A. Contractor shall limit his /her use of the premises for work and for storage related to the project and in a manner which allows for Owner's use and access. B. Coordinate use of the premises under the direction of the Engineer. All work will be done after 5:30 PM Tuesday through Friday and during the day on Saturday by permission only. C. Move any stored products, under the Contractor's control, which interferes with operations of the Engineer at the Engineer's request. 1.06 SALVAGED MATERIALS SECTION 01010 PAGE 2 SUMMARY OF WORK Salvage only items that are noted in the Contract Documents. The Engineer retains first "Right of Refusal" to salvage all artifacts, materials, equipment, and products not identified in documents but uncovered or disturbed during the course of the Work. 1.08 NUMBER OF SPECIFIED ITEMS REQUIRED SECTION 01010 PAGE 3 SUMMARY OF WORK Wherever in these specifications an article, devise or piece of equipment is referred to in the singular number, such reference applies to all and as many articles as are indicated or required to complete the installation. 1.14 ORGANIZATION AND FORMAT OF SPECIFICATIONS A. Organization: Division Section and paragraph numbers, as listed in the table of contents of the project manual and the items of work included under the headings generally conform with "Masterformat" of the Construction Specifications Institute. Numbering of paragraphs and sections is merely for convenience and identification and may not be consecutive; the Contractor shall check his /her copies of the contract documents with the project manual table of contents and the page numbering as well as the list of drawings to be sure that they are complete. Trade headings are used in the specifications for convenience only. The Engineer is not bound to define the limits of any subcontractors. B. Format: These specifications are of the abbreviated or "stream- lined" type and frequently include incomplete sentences. Word such as "shall," "shall be, " "the Contractor shall" and similar mandatory phrases shall be supplied by inference in the same manner as they are in a note on the drawings. Phrases following a heading for material or item of equipment and listing required features or characteristics of the item shall be construed as meaning, "The item shall be...," or "The item shall include...," and the Contractor shall provide all items, articles, materials and operations listed, including all labor, materials, equipment and incidentals required for satisfactory installation and completion of the Work. 1.15 ADDITIONAL DEFINITIONS The following additional terms are used in the contract documents and are defined as follows: A. The terms "approved and "for approval" mean "approved by the Engineer" and "for the Engineer's approval." B. Where the terms "or approved" or "or approved equal" are used, the Engineer is the sole judge of the quality and suitability of the proposed substitution. C. The term "coordinate" means "satisfactorily combine the work of all trades for a complete and operating installation." 01010 -3 v,.ys: Ms; is k z • w ce 6 J0 O 0 J N LL w 2 u. N � I w z = I— O z �- ww 3 . O • I-- w • w LL z ui O z D. The term "directed" means "as directed by the Engineer." E. The term "indicated" means "indicated or noted on the drawings." F The term "provide" means "furnish and install." The term "requested" means "as requested by the Engineer." SECTION 01010 PAGE 4 SUMMARY OF WORK H. The term "selected" means "selected by the Engineer" and is not necessarily limited to a manufacturer's standard line of colors, finishes or details. I. The term "submit" means "submit to the Engineer." J. The term "FOIC: means "furnished by the Owner, but installed by the Contractor." K. The term "FOIO" means "furnished by the Owner and installed by the Owner." L. The term "NIC" means "not in this contract." PART 2 - PRODUCTS (Not Used) PART 3 - EXECUTION (Not Used) END OF SECTION 01010 01010 -4 1 K• • PART 1 - GENERAL 1.01 DISCRIPTION A. This section generally includes administrative and procedural requirements for submittals required for performance of the Work, including: 1. Project progress schedule with submittal duration shown. 2. Shop drawings. 3. Product data. 4. Samples. 1.02 SUBMITTAL PROCEDURES SECTION 01300 PAGE 1 SUBMITTALS A. Coordination: Coordinate preparations and processing of submittals with performance of construction activities. Transmit each submittal sufficiently in advance of performance of related construction activities to avoid delay. 1. Coordinate each submittal with other submittals and related activities that require sequential activity. 2. Coordinate transmittal of submittals for related elements of Work so processing will not be delayed by the need to review submittals concurrently for coordination. a. Engineer reserves the right to withhold action on a submittal requiring coordination with other submittals until related submittals are received. b. For product substitution see section Material, Equipment and Product Substitutions. B. Processing: Allow sufficient time for that Work will not be delayed by the time required to process submittals, including resubmittals. 1. Allow one (1) week turnaround for each submittal, from time of receipt at the Engineer's office. Complex submittals or a concentration of submittals within a short time frame will necessitate a longer turnaround time. Provide a "priority list" when submitting several submittals to the Engineer 01300 -1 z w ct 00 0 . J i N O w g s �- z I- o z �- w Lij a O w uj H U ' O w z 0 - O z SECTION 01300 PAGE 2 SUBMITTALS z in a short time frame. Submittal sequencing should coincide with the ;= submittal schedule; see section Construction Schedule. Allow additional w time to permit coordination with subsequent submittals. v o 2. If there is a delay in the submittal process due to coordination, the Engineer co 0 will advise the Contractor. w = CO W C. Submittal Preparation: Place a permanent label or title block on each submittal for w o identification. Name the entity that prepared each submittal on the label or title g block. w co a 1. Include the following information on the label for processing and recording Z i action taken. ; 0 zi-- a. Project name and date, 5. 3 b. Name and address of Engineer, ;O p- c. Name and address of Contractor and Subcontractor, 0 I — : d. Name and address of supplier and name of manufacturer, w v e. Number and title of appropriate specification section, and f. Drawing number and detail references, as appropriate. z co 2. Provide a space approximately 4" x 5" to record the Contractor's review v and approval markings and the action taken. p 1 ' z D. Submittal Transmittal: Package each submittal appropriately in manageable quantities and transmit from Contractor to Engineer using a transmittal form. Submittals received from sources other than the contractor will be returned without action. 1. Address no more than one topic or related topics on a single transmittal (i.e., mechanical items will not be submitted under same transmittal with electrical items or miscellaneous specialties; not shoring with foundation, etc.,). 2. Record relevant information, deviations, and requests for data, including minor variations and limitations from the Contract Documents. 3. Shop drawings, product data, samples and mock -up as required for submission by the technical specification sections are to be submitted to the Engineer for review /approval, and concurrently to the City project manager for review in the numbers and content as follow: 01300 -2 * * 1.03 SHOP DRAWINGS SECTION 01300 PAGE 3 SUBMITTALS Shop drawings: Engineer: (2) prints Owner: (1) print Product date: Engineer: (2) copies Owner: (2) copy Samples Engineer: (2) samples Owner: (1) sample Mock -ups Engineer: As required by any technical specification section. Demonstrations: As required to facilitate installation and inspection. Note: Reference applicable mechanical and electrical technical specifications sections for submittal requirements. * Where required, submit 2 additional (VERIFY) prints /copies for maintenance manuals. 4. Material and color submittal: Submit samples of actual colors of materials. 5. Numbering of submittals shall be as follows: Numerical Order Spec. Section Revision Letter 1- 09500 -A 6. In the event of the need to "revise and resubmit" a submittal, resubmit same in acceptable form /content, clearly identifying deviations from previous submittal content. A. General: Submit drawings drawn to accurate scale. Do not reproduce Contract Documents or copy standard information for use as shop drawings. Standard information prepared without specific references to the Project is not considered a shop drawing. B. Drawings include: Shop drawings include fabrication and installation drawings, setting diagrams, schedules, patterns, templates, and similar drawings. Include the following information: 1. Dimensions, 01300 -3 ..,.- ..,.,......„- ., v.nF. vn V5 A+114 i f Mk� N z � w aa 6 i 0 O O N o: w= J H, CO u- w 0 . 2 gal u_ I _. Z �. � Z i- ww N : o w w z 0 0 z 1.05 SAMPLES SECTION 01300 PAGE 4 SUBMITTALS z 2. Identification of products and materials included, :z w 3. Compliance with specified standards, ct 4. Notation of coordination requirements, o 5. Notation of dimensions established by field measurements, o o 6. Date when review has to be finalized to meet schedule. w = J F— U) LL C. Sheet size: Except for templates, patterns, and similar full -size drawings, submit w 0 shop drawings on sheets at least 8 -1/2" x 11 ", but no larger than 36" x 48 ". g 5 J • IL Q 1.04 PRODUCT DATA = d I- w z A . General: Product data includes manufacturer's printed installation instructions, 1- o . catalog cuts, standard color charts, roughing -in diagrams and templates, standard w I- wiring diagrams and performance curves. s a ' ,b N 1. Where product data must be specially prepared because standard printed (31-- data are not suitable, submit as "shop drawings." = v B. Requirements: Mark each copy to show applicable choices and options, and z indicate the applicable information on selected products. Include the following H i. information. p f z 1. Manufacturer's printed recommendations, 2. Compliance with recognized trade association standards, 3. Compliance with recognized testing agency standards, 4. Application of testing agency labels and seals, 5. Notation of dimensions verified by field measurement, 6. Notation of coordination requirements, 7. Date when review has to be finalized to meet schedule. A. General: Submit samples that are identical with the material or product proposed. Samples include partial sections of components, cuts or containers of materials, color range sets, and swatches showing color, texture and pattern. 01300 -4 s Q4F+'tyc+vsivmux w+ SECTION 01300 PAGE 5 SUBMITTALS z 1. Package samples to facilitate review. Prepare samples to match the 1 z: Engineer's sample. Include the following: re LL .J U 0 a. Generic description of the sample, co 0 b. Sample source, cn w = c . Product name or name of manufacturer, co LL d. Compliance with recognized standards, W 0 e. Availability and delivery time, and f. Specification section. u. j g2 B. Requirements: Submit samples for review of kind, color, pattern, and texture, for I . _ a comparison of these characteristics between the final submittal and the actual z F- . 1--O component as installed. w F- w . 3 1. Where variation in color, patter, texture or other characteristics are '0 N inherent in the material, submit not less than four (4) units to show 0 F-- approximate limits of the variations. z v L iz C. Submittals: Where samples are for selection of appearance characteristics from a w z range of standard choices, submit a full set of choices for the material or products. co Off" 1.06 ENGINEER'S ACTION A. Review: Except for submittals for record, information, or similar purposes, the Engineer will review each submittal, mark to indicate action taken, and return promptly. B. Compliance with specified characteristics is the Contractor's responsibility. Approval of submittals does not release the Contractor from a proper installation, compliance with applicable codes, or coordination of the work. END OF SECTION 01300 01300 -5 z PART I - GENERAL 1.01 RELATED DOCUMENTS Drawings and general provision of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 1.02 SUMMARY A. This section includes the following: Demolition and removal of buildings components. B. Related Sections: The following Sections contain requirements that relate to this Section. environmental protection measures for demolition operations. 1.03 DEFINITIONS CUTTING AND PATCHING Section 02060 A. Remove: Remove and legally dispose of items except those indicated to be reinstalled, salvaged, or to remain the Owner's property. B. Remove and Salvage: Items indicated to be removed and salvaged remain the Owner's property. Remove, clean, and pack or crate items to protect against damage. Identify contents of containers and deliver to Owner's designated storage area. C. Existing to Remain: Protect construction indicated to remain against damage and soiling during demolition. When permitted by the Engineer, items may be removed to a suitable, protected storage location during demolition and then cleaned and reinstalled in their original locations. 1.04 MATERIALS OWNERSHIP A. Except for items or materials indicated to be reused, salvaged, or otherwise indicated to remain the Owner's property, demolished materials shall become the contractor's property and shall be removed from the site with further disposition at the Contractor's option. B. Historical items, relics, and similar objects including, but not limited to, cornerstones and their contents, commemorative plaques and tablets, antiques, and other items of interest or value to the Owner, which may be encountered during demolition, remain the Owner's property. Carefully remove and salvage each item or object in a manner to prevent damage and deliver promptly to the Owner. 1.5 SUBMITTALS A. General: Submit each item in this Article according to the Conditions of the contract and Division 1 specification Sections. Review and approval by Engineer and Owner will be required for each submittal. B. Proposed dust - control measures. C. Proposed noise - control measures. D. Schedule of demolition activities indicating the following: 1. Detailed sequence of demolition and removal work, with starting and ending dates for each activity. 02060 -1 wm:MNL•'JR lM:lNnW:4d11� Y ?i+y' 2. Detailed proposal for contractors vehicular site access and traffic control measures for trucks and vehicles entering and leaving the site. Detailed proposal for control and security of site perimeter and work areas. 3. Dates for shutoff, capping, and continuation of utility services. E. Inventory of items to be removed and salvaged. F. Inventory of items to be removed by Owner. G. Photographs, sufficiently detailed, of existing conditions of adjoining construction and site improvements that might be misconstrued as damage caused by demolition operations. H. Record drawings at Project closeout according to Division 1 Section "Contract Closeout." 1. Identify and accurately locate capped utilities and other subsurface structural, electrical, or mechanical conditions. 1.6 QUALITY ASSURANCE A. Demolition Firm Qualifications: Engage an experienced firm that has successfully completed demolition work similar to that indicated for this Project. B. Regulatory Requirements: comply with governing EPA notification regulations before starting demolition. Comply with hauling and disposal regulations of authorities having jurisdiction. Comply with Seattle City Light requirements for demolition adjacent to Power and Communication lines (see site plan). C. Pre - demolition Conference: conduct conference at Project site to comply with pre- installation conference requirements of Division 1 Section "Project Meetings." 1.7 PROJECT CONDITIONS A. The Tukwila City Hall is a fully occupied facility, which will require full public access from 8:30 am until 5:30 pm week days. The immediate area subject to this work will be available to the contractor from 5:00pm to 10:00pm weekdays. Portions of the building house the Tukwila Police Department, which is operational 24 hours a day seven days a week. B. On -site storage or sale of removed items is prohibited. 1.8 SCHEDULING A. Arrange demolition schedule so as not to interfere with Owner's on -site operations. B. The Contractor shall cooperate with other crews on the site and schedule activities. PART 2 - PRODUCTS (This section not used) PART 3 - EXECUTION 3.1 EXAMINATION 02060 -2 .TUTTING AND PATCHING Section 02060 .TUTTING AND PATCHING Section 02060 A. Verify that utilities have been disconnected and capped. B. Verify existing conditions to determine extent of demolition required. C. Inventory and record the condition of items to be removed and salvaged. D. Evaluate the condition of the building to determine whether removing any element might result in a structural deficiency or unplanned collapse of any portion of the structure or adjacent structures during demolition. E. Perform regular walk - throughs of the buildings to be demolished and the site as the Work progresses to detect hazards resulting from demolition activities. 3.2 DEMOLITION SCHEDULE A. Remove the following: 1. All items necessary for the installation of two new doors assemblies, removal of two existing doors assemblies, relocation of a window wall and additional window wall section as indicated on the drawings. END OF SECTION 02060 V` PART 1 GENERAL 1.01 Included Work A. Finish hardware B. Glazing � J u� U C. Doors and window system frames. ' w J F-. w 0 . 1.02 Reference Standards 2 u. Conform with requirements of the following Reference Standards, as supplemented and D. d modified hereinafter. _ z I -. 1. National Association of Architectural Metal Manufacturers (NAAMM) 0 z g Architectural Metal Finishes Manual. 2. The Aluminum Association Designation System for Aluminum Finishes. 3. Architectural Aluminum Manufacturers Association (AAMA). o 52 _' 4. American Society for Testing and Materials (ASTM). w w 5. Flat Glass Marketing Association (FGMA) ~ tL 0 Ili 0 A . Fabricator / Installer: Must be experienced in the fabrication and working of z.. Architectural metalwork of the highest quality; must have plant, facilities, and personnel adequate for the satisfactory production of required components. 1.03 Quality Assurance B. Warranty: Aluminum door, window and frame fabrication, installation and glazing shall be warranted for 1 years. 1.04 Submittals specs \08410 A. Shop Drawings: Submit for approval; show full -size detail of sections, complete details of fabrication. Show clearances with other items of work. Indicate the following: 1. Elevation of each door and frame type. 2. Condition at openings with various wall and counter connections and materials. 3. Location and installation requirements for hardware. 4. Connections and trim. SECTION 08410 PAGE 1 ALUMINUM DOORS, FRAMES AND GLAZING SYSTEMS 05/18/1999 { PART 2 PRODUCTS 2.01 Materials SECTION 08410 PAGE 2 ALUMINUM DOORS, FRAMES AND GLAZING SYSTEMS B. Samples: Submit samples of metal members for aluminum doors and frame sections; full size by 24" length showing profiles and finishes. Include one set of color chips represented specified color and finishes. C. Product Data: Submit manufacturers' published literature for specified products and accessories as applicable, including manufacturers' specifications, physical characteristics and performance data. Submit as a supplement, manufacturers' instructions and directions for application if not included in manufacturers' published literature. A. Aluminum: Extruded shapes shall be 6063 -T5 or T5 alloy and temper; sizes and shapes as indicated; 1/8" minimum wall thickness. Trim, beads and stops shall be .050 minimum. Cut corners square and fasten with extruded corners brackets and stainless steel screws. Black anodic coating; AA- M12C22A34 Class II mechanical finish, non - specular as fabricated, with medium -matte etch and minimum thickness 0.4 mil. B. Fasteners: All exposed fasteners shall be stainless steel. C. Glazing: Clear 1/4" tempered or laminated safety glass meeting UBC Standard 54 -2 with manufacturer's name and glass quality permanently etched at corner. 2.02 Doors, Frames B. Glazing accessories 1. Glazing splines: Resilient silicone extruded to suit glazing retaining slots; black color. 2. Glazing clips: Manufacturer's standard type. 2.04 Hardware Hardware for Aluminum Entrances shall be furnished and installed by the door manufacturer and shall include match the existing system for form, materials and color. 1. Narrow Stile Entrance Aluminum Doors 1 3/4 ", by 4 1/2" or approved. Sizes as indicated. 2.03 Glazing system A. Safety glass (all glass) ASTM C 1048, Kind FT fully tempered, Condition A uncoated, type 1 transparent flat, Class 1 clear, Quality q3 glazing select; conforming to ANZI Z97.1; 1/4 inch thick minimum. specs \08410 >ni 05/18/1999 z 1 w re 6 00 CO CI ill H C U ,W w � _ F w 1— 0 z F-- w w. O oE- w w ti o W z • u 0 SECTION 08410 PAGE 3 ALUMINUM DOORS, FRAMES AND GLAZING SYSTEMS 2.05 Fabrication A. Fabricate doors and window frames systems with extruded section stiles and rails with corners rigidly joined and welded; make provisions for other hardware to template. B. Workmanship: Free from mars and buckles; angles clean, sharp and true with all joints precision fitted. Make connections with concealed fastenings wherever possible. Fabricate all work with allowance for expansion and contraction. C. Fit and assemble component parts in the shop insofar as practicable; fit, assemble, mark, and disassemble work that cannot be permanently assembled in the shop to assure proper fitting in the field; mark assembled components to correspond with shop drawings for placement location and erection on the site. D. Form all exposed exterior joints with concealed fastenings; miter exposed perimeter corner joints and butt other exposed exterior joints. Form all exterior joints to hairline machine accuracy; seal from back permanently water and weatherproof, unless otherwise approved; match adjoining surfaces for continuity of line, profile, and finish; all surfaces flush. E. Provide rigid reinforcement at all corners and joints on interior of frames; make connections to inside of frames with spot welding or concealed mechanical fastening. F. Fabricate frames for accurate fit. Fabricate framing members to allow no more than plus or minus 1/16" tolerance in variation from indicated width at sealed joints with building construction. G. Fabricate components to allow for thermal expansion and contraction and to maintain watertight integrity of system; design for noiseless movement that may be caused by 120 - degree ambient temperature and its resulting surface temperature; fabricate so as to prevent buckling, opening of joints, failure of seals, undue stress on fasteners and anchorages, or other detrimental effects. PART 3 EXECUTION 3.01 Installation A. After removal of existing glazing system, erect members where indicated with all members level, square, plumb, at proper elevations as indicated and in true alignment with other construction; rigidly attached to structural elements of the building; install hardware to template as indicated as required for satisfactory operation. B. Install glass per FMGA Manual, Chapters VIII and IX. specs \08410 05/18/1999 z • _ r z ~w wg . -I C.) 0 (n w = - I- wO ? = w I- _ z � I- 0 Z 1— ww O N O I w W u' O ..z 0 z specs \08‘1 r SECTION 08410 PAGE 4 ALUMINUM DOORS, FRAMES AND GLAZING SYSTEMS 3.02 Cleaning and protection. Upon completion, clean all surfaces free from dirt, stains, or other defacing marks and materials; leave all exposed surfaces free from scratches, dents, and other defects, free from soil, and polished. J C) END OF SECTION 08410 0 O 05/18/1999 DEPARTMENTS: u�din D► vis -11- iikkrinli 4-1 • DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Complete IA Kb 51') y -Ci' ' Fire Prevention Structural ❑ Incomplete PLAN REVIEW /ROUTING SUP ACTIVITY NUMBER: D02 -082 PROJECT NAME: TUKWILA CITY HALL SITE ADDRESS: 6200 SOUTHCENTER BOULEVARD XX Original Plan Submittal Response to Incomplete Letter # Response to Correction Letter # DATE: 04 -03 -02 Revision # After Permit Is Issued h la, DP- L-3 -- Planning Division Permit Coordinator DUE DATE: 4 -04 -02 Not Applicable ❑ Comments: Permit Center Use Only INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: TUES /THURS ROUTING: Please Route ❑ Structural Review Required ❑ No further Review Required ❑ REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: Approved ❑ Approved with Conditions ❑ Not Approved (attach comments) ❑ Notation: REVIEWER'S INITIALS: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: Documents/routing siip.doc 2.28 -02 DUE DATE: 5-02 -02 DATE: z w _1 U 00 WI WO 2 g Q cn I O W z= H 1- O Z 1— W uj a O - OH WW 2 H H . L I O . • Z' W O ~ Z DEPARTMENTS: Building Division Public Works DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Complete APPROVALS OR CORRECTIONS: Approved Notation: REVIEWER'S INITIALS: Documents/routing slip.doc 2-28-02 Incomplete ❑ Approved with Conditions PLAN REVIEW /ROUTING SUP ACTIVITY NUMBER: D02 -082 PROJECT NAME: TUKWILA CITY HALL SITE ADDRESS: 6200 SOUTHCENTER BOULEVARD XX Original Plan Submittal Response to Incomplete Letter # Response to Correction Letter # DATE: 04 -03 -02 Revision # After Permit Is Issued Fire Prevention ❑ Planning Division ❑ Structural ❑ Permit Coordinator ❑ TUES /THURS ROUTING: Please Route ❑ Structural Review Re ui ❑ No further Review Required REVIEWER'S INITIALS: <� DATE: DUE DATE: 4-04-02 Not Applicable ❑ Comments: Permit Center Use Only INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: L110--e. DUE DATE: 5-02-02 Not Approved (attach comments) ❑ DATE: 4 Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: rt" letsnamwrzOMPON z Z re w QQ � J O UO U CO W J = H O w � g a w = F- _ Z �. I O Z I— w O N O H w W H rz O LLI • to z PERMIT NO.: �•) Z -08Z BUILDING PERMITS INSPECTIONS 0 1 Progress Inspection Status 2 Pre- construction ❑ 3 Investigation ❑ 4 OK to Occupy ❑ 5 Remove Stop Work Order ❑ 6 Follow -up ❑ 7 Pre -Move Inspection ❑ 50 WSEC Residential ❑ 60 WA Ventilation/Indoor AQC ❑ 70 NLEA Inspection/Modular Struct ❑ 71 Mobile Home Tie Down Insp ❑ 72 Marriage Lines ❑ 90 Resteel O 95 Footing Drains O 100 Foundation Footings O 200 Foundation Walls ❑ 250 Foundation Insulation ❑ 300 Concrete Slab /Slab Insulation ❑ 350 Crawl Space ❑ 400 Shear Wall Nailing ❑ 450 Plywood Wall Sheathing ❑ 500 Roof Sheathing Nailing ❑ 525 Plywood Deck Nailing ❑ 550 Exterior Wall Sheathing ❑ 600 Masonry Chimney ❑ 610 Chimney Installation/All Types 700 Framing 750 Roof/Ceiling Insulation 0 800 Floor Insulation ❑ 801 Wall Insulation 802 Exterior Roof Insulation 03 Glazing Inspection ❑ 815 Lighting and Controls ❑ 900 Suspended Ceiling ❑ 1000 Interior Wallboard Fastening ❑ 1001 Exterior Wallboard Fastening ❑ 1110 Pre -Move Inspection ❑ 1115 Motor Inspection ❑ 1120 Pre -Demo ❑ 1140 Pre - reroof ❑ 1400 Final -Fire 1700 Final- Building ❑ 1 Final - Reroof 0 3100 Site Visit El 4000 Special - Concrete ❑ 4001 Special -Bolts in Concrete ❑ 4001 Special - Mom/Resist Conc Frame ❑ 4003 Special -Reinf Steel Prestress ❑ 4004 Special- Welding ❑ 4005 Special- High - Strength Bolting ❑ 4006 Special - Structural Masonry ❑ 4007 Special -Reinf Gypsum Concrete ❑ 4008 Special - Insulating Conc Fill ❑ 4009 Special -Spray Fireproofing ❑ 4010 Special- Piling, Piers, Caissons ❑ 4011 Special - Shotcrete ❑ 4012 Special- Grading, Excav/Fill ❑ 4013 Special- Retaining Wall ❑ 4014 Special -Panels ❑ 4015 Special -Smoke Control System it TENANT NAME: CONDITIONS C /hi( 10001 No changes will be made to the plans unless approved by the Engineer and the Tukwila Building Division 0 10002 Plumbing permits shall be obtained through King Co 10003 Electrical permits obtained through L & I ❑ 10004 All mechanical work shall be under separate permit 10005 All permits, insp records & approved plans available 10006 All structural concrete shall be special inspected ❑ 10007 All structural welding shall be done by WABO certified inspector ❑ 10008 All high - strength bolting shall be special inspected ❑ 10009 Bolts installed in concrete shall be special inspected ❑ 10010 When special inspection is required...notify Tukwila Building Division ❑ 10011 The special inspector shall submit a final signed report ❑ 10012 Any new ceiling grid and light fixture installation 10013 Partition walls attached to ceiling grid 10014 Readily accessible access to roof mounted equipment ❑ 10015 Engineered truss drawings & calcs shall be on site ❑ 10016 Any exposed insulation backing material shall have ❑ 10017 Subgrade preparation including drainage, excavation ❑ 10018 A statement from the roofing contractor verifying fire retardant class of roof 10019 All construction to be done in conformance w /approved plans ❑ 10020 Structural observation shall be provided for this project ❑ 10021 All food preparation establishments must have King Co ❑ 10022 Fire retardant treated wood shall have flame spread of ❑ 10023 Notify Building Division prior to placing any concrete ❑ 10024 All spray applied fireproofing shall be special inspected ❑ 10025 All wood to remain in placed concrete shall be treated ❑ 10026 All structural masonry shall be special inspected `10027 Validity of Permit ❑ 10028 Rack storage requires separate permit ❑ 10030 No occupancy of building until final insp by Bldg Div ❑ 10031 Comply with requirements of TMC 16.04 ❑ 10032 Remove all weeds, concrete, stone foundations, flat concrete ❑ 10034 Removal of septic tanks require approval and compliance with King Co Health Dept. ❑ 10035 Contact PW Div to obtain insp for water /sewer connect ❑ 10036 Manufacturers installation instructions required on site ❑ 10038 A C of O will be required for this permit ❑ 10039 Final approval for all TI w /in the limits of the SC Mall ❑ 10040 All construction noise to be in compliance with 8.2 TMC ❑ 10041 Ventilation is required for all new rooms & spaces ❑ 10042 Fuel burning appliances ❑ 10043 Appliances, which generate ❑ 10044 Water heater shall be anchored ❑ 10045 Reroof ❑ "Anchoring — All new construct and substantial improvement shall be anchored to prevent flotation" Plan Reviewer: Permit Tech: Date: Date: ° v / Z W ' tY .� U 00 N J F- M u„. WO 2 L Q w � = 1W Z = F- ZI- W uJ 3 O� O 1- W W H 0 O U= O 1- Z DEPARTMENTS: Complete 0 APPROVALS OR CORRECTIONS: REVIEWER'S INITIALS: Documents/routing slip.doc 2 -2802 PLAN REVIEW /ROUTING SUP ACTIVITY NUMBER: D02 -082 PROJECT NAME: TUKWILA CITY HALL SITE ADDRESS: 6200 SOUTHCENTER BOULEVARD DATE: 04 -03 -02 XX Original Plan Submittal Response to Incomplete Letter # Response to Correction Letter # Revision # After Permit Is Issued Building Division ❑ Fire Prevention Public Works ❑ Structural DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Incomplete ❑ 612- ),er Planning Division Permit Coordinator DUE DATE: 4 -04-02 Not Applicable ❑ Comments: Permit Center Use Only INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg Fire ❑ Ping ❑ PW ❑ Staff Initials: TUES /THURS ROUTING: Please Route ❑ Structural Review Required ❑ No further Review Required ❑ REVIEWER'S INITIALS: DATE: DUE DATE: 5-02-02 Approved ❑ Approved with Conditions (g( Not Approved (attach comments) ❑ Notation: i DATE: /C / Gr7/ Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: z H W fe J O 0 0 N J = t— w 0 2 g a = • d �.w ZF.- 1— 0 Z I— LL! S j o O I- W UJ • 0 O .• W = z PLAN REVIEW /ROUTING SLIP ACTIVITY NUMBER: D02 -082 PROJECT NAME: TUKWILA CITY HALL SITE ADDRESS: 6200 SOUTHCENTER BOULEVARD DATE: 04 -03 -02 XX Original Plan Submittal Response to Incomplete Letter # Response to Correction Letter # DEPARTMENTS: Building Division ❑ Fire Prevention ❑ Planning Division Public Works ❑ Structural ❑ Permit Coordinator DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Complete `. Incomplete Comments: Permit Center Use Only INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: TUES /THURS ROUTING: Please Route ❑ Structural Review Required REVIEWER'S INITIALS: APPROVALS OR CORRECTIONS: Approved ❑ Approved with Conditions ❑ Notation: REVIEWER'S INITIALS: Documents/routing slip.doc 2.28-02 ❑ No further Review Required Revision # After Permit Is Issued DUE DATE: 4 -04 -02 Not Applicable ❑ DATE: L[ DUE DATE: 5-02 -02 Not Approved (attach comments) ❑ DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: DEPARTMENTS: Building Division Public Works DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Complete ❑ Documents/routing slip.doc 2-28-02 APPROVALS OR CORRECTIONS: Incomplete REVIEWER'S INITIALS: PLAN REVIEW /ROUTING SLIP ACTIVITY NUMBER: D02 -082 PROJECT NAME: TUKWILA CITY HALL SITE ADDRESS: 6200 SOUTHCENTER BOULEVARD XX Original Plan Submittal Response to Incomplete Letter # Response to Correction Letter # DATE: 04 -03 -02 Revision # After Permit Is Issued Fire Prevention ❑ Planning Division ❑ Structural ❑ Permit Coordinator ❑ DUE DATE: 4 -04 -02 Not Applicable El Comments: Permit Center Use Only INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: TUES /THURS ROUTING: Please Route ❑ Structural Review Required ❑ No further Review Required Lr REVIEWER'S INITIALS: DATE: /1/(32— DUE DATE: 5 -02 -02 Approved ❑ Approved with Conditions ❑ Not Approved (attach comments) ❑ Notation: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: z I • w re 2 00 coo J H • w w g Q rn D = d W z F . 1- 0 ' Z I— w w O (22 O 1-- W u O .. Z W • = O ~ Z Current Contractor; Registration Card: t o Enter Contractor Information in Sierra: `. tom palford 1 understand that the Plan Check approvals are sub;ect to errors and or* +ssions and approval of plans does not a, �i;c .zE tree violation of any aCo:'.ed code or ordinance. Receipt of con- tractor's copy of approved plans acknowledged. 3 PIPING OF TUKWILA ,.DI DIVISION 166TH ST