Loading...
HomeMy WebLinkAboutUtilities 2013-07-15 Item 2B - Bid Award - 2013 Annual Sewer Repair to King Construction Company for $49,056TO: City of Tukwila Jim Haggerton, Mayor INFORMATIONAL MEMORANDUM Mayor Haggerton Utilities Committee FROM: Bob Giberson, Public Works Director BY: Mike Cusick, P.E., Program Manager DATE: July 12, 2013 SUBJECT: 2013 Annual Sewer Repair Program Project No. 91340201 Bid Award ISSUE Award bid to King Construction Co., Inc. for the installation of side sewers to the Desimone residence at 6532 Southcenter Blvd (S 154th St) and Duong residence at 6542 Southcenter Blvd, Tukwila Washington. BACKGROUND It was discovered in December 2012 that sanitary sewer charges for the Desimone residence at 6532 Southcenter Blvd had been being paid to the City of Tukwila without being connected to the public sewer system. During the investigation of the Desimone residence, it was determined that sewer service for neighboring residence at 6542 Southcenter Blvd was also being paid, with no connection to sanitary sewer. In addition to the installation of the two side sewers, a 10 -foot section of existing sewer main is being replaced due to a tree root blocking a portion of the sewer line. This project must be completed as soon as possible as septic tank systems to both houses are failing. DISCUSSION Four firms from the MRSC Small Works Roster submitted bids for the side sewer installation project. King Construction, Co., Inc. of Pacific, Washington, submitted a bid of $49,056.00, including sales tax, bonding, and insurance. King Construction has successfully completed work in the past for Valley View Sewer District. Engineer's Bid 2013 Annual Sewer FINANCIAL IMPACT Estimate Results Repair Budget Construction (includes tax) $43,252.50 $49,056.00 $75,000.00 Contingency 10% 4,325.25 4,905.60 0.00 Total $47,577.75 $53,961.60 $75,000.00 The Annual Sewer Repair Program has $75,000 budgeted for 2013, although $32,000 was used for the 5 180th St Sewer Sliplining Project. The balance of $11,000.00 will be met from the remaining $35,000 for the 55th Ave S Sewer Line Repair project which came in under budget. RECOMMENDATION Council is being asked to approve the contract with King Construction Co., Inc. in the amount of $49,056.00 for the side sewer installation project and consider this item at the July 22, 2013 Committee of the Whole meeting and subsequent August 5, 2013 Regular meeting. attachments: Pages 116 & 118, 2013 CIP Vicinity Map Bid Results and King Construction's Proposal W: \PW Eng \PROJECTS\A- SW Projects \2013 Annual Sewer Repair (91340204) \Desimone Side Sewer Installation \Info Memo Bid Award.doc 13 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2013 to 2018 PROJECT: Annual Sewer Repair Program Project No. Varies Reduce sewer line infiltration and inflow (I & I) through groundwater intrusion or storm events as a DESCRIPTION: result of damaged deteriorating systems or unopposed connections. Include small repairs and capital maintenance. JUSTIFICATION: Decrease treatment, discharge, and pumping costs. STATUS: Annual program is determined after pipeline TV inspection reports are completed. MAINT. IMPACT: Less maintenance costs through rehabilitation of aging system. COMMENT: Ongoing project, only one year actuals shown in first column. 2011 funds were used for Interurban Gravity Sewer. FINANCIAL Through Estimated (in $000's) 2011 2012 2013 2014 2015 2016 2017 2018 BEYOND TOTAL EXPENSES Design 0 Land (R/W) 0 Const. Mgmt. 0 Construction 75 75 75 75 75 75 75 75 600 TOTAL EXPENSES 0 75 75 75 75 75 75 1 75 75 600 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Mitigation Expected 0 Utility Revenue 0 75 75 75 75 75 75 75 75 600 TOTAL SOURCES 0 75 75 75 75 75 75 75 75 600 Project Location: Entire System 2013 - 2018 Capital Improvement Program 116 14 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2013 to 2018 PROJECT: 55th Ave S Sanitary Sewer Line Repair Project No. 90640203 DESCRIPTION: Repair existing 8" sanitary sewer line that has collapsing pipe in 55th Ave South. JUSTIFICATION: The repair is needed to prevent the line from complete failure. STATUS: MAINT. IMPACT: If line collapses, sewer will be plugged and back up, causing property damage. COMMENT: Sewer line is down 15+ feet in paved street. FINANCIAL Through Estimated (in $000's) 2011 2012 2013 2014 2015 2016 2017 2018 BEYOND TOTAL EXPENSES Project Location :.i nnrci 0 309th lr� �� '- ♦ N Design ' ' `�, N♦; 1 l.1�� � 11•1 J � '` 0 Land (RNV) � f�, O''' j lir �y /. I GV /��t tires .��� � �s150 PM 9 744 se st' 9[ � �r.� Ills$ S1a3 Sr N. ♦ 8 11@6 0 Const. Mgmt. 5 166 S[ 5 S 160 St l�mtAil __ _ (� i.,r..,�a 5 Construction 65 65 TOTAL EXPENSES 0 0 70 0 0 0 0 0 0 70 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Mitigation Expected 0 Utility Revenue 0 0 70 0 0 0 0 0 0 70 TOTAL SOURCES 0 0 70 0 0 0 0 0 0 70 2013 - 2018 Capital Improvement Program 118 15 Project Location :.i nnrci 0 309th lr� �� '- ♦ N ' ' `�, N♦; 1 l.1�� � 11•1 J � '` .� 739 � f�, O''' j lir �y /. I GV /��t tires .��� � �s150 PM 9 744 se st' 9[ � �r.� Ills$ S1a3 Sr N. ♦ 8 11@6 s\ mil ► ) 5 166 S[ \ \�\�i ` ! + =� e S 160 St l�mtAil __ _ (� i.,r..,�a 2013 - 2018 Capital Improvement Program 118 15 PROJECT SITE CALL 48 HOURS BEFORE YOU DIG 1- 800 - 424 -5555 NOT TO SCALE City of Tukwila DESIMONE SIDE SEWER 6532 SOUTHCENTER BLVD. SHEET: VICINITY MAP REVISION #1: JULY 9, 2013 LAST REVISION: APPROVAL: M.CUSICk 16 M CUSICK, July 1, 2013 QUOTE TAB FOR THE SIDE SEWER INSTALLATION AT 6532 AND SOUTHCENTER BLVD. THE SCOPE WORK INCLUDES A SEWER LINE REPAIR NORTH OF THE POINT OF CONNECTION ENGINEERS OPINION KING GREEN RIVER GREEN EARTH WORKS ARCHER COST CONSTRUCTION CONSTRUCTION CONSTRUCTION CONSTRUCTION ALL WORK $ 39,500.00 $ 44,500.00 $ 52,149.00 $ 83,877.00 $ 98,700.00 TRENCH SAFTEY SYSTEM $ 300.00 $ 1,500.00 $ 4,000.00 $ 4,000.00 SALES TAX $ 3,752.50 $ 4,256.00 $ 5,096.66 $ 8,348.32 $ 9,756.50 TOTAL $ 43,252.50 $ 49,056.00 $ 58,745.66 $ 96,225.32 $ 112,456.50 PROPOSAL June 13, 2013 Side Sewer Installation at 6532 and 6542 Southcenter Boulevard THIS IS A PREVAILING WAGE JOB Installation of Side Sewer Description Unit Cost Perform all work associated with this project including bonding and insurance. Lump Sum $ ;/ ;7/ Y270,6)0 Trench Safety System Lump Sum $ 3 00-00 Tax (9.5 %) $ 1 { 2 5 . . . u 0 Total $ /7' p 56,00 Company Name: Contact Name: Address: Ury -r Ike,; L/4-- 7 ?v zi 9 Telephone: Please retum to: Mike Cusick, P.E. City of Tukwila Public Works Department 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 Pease return to the City of Tukwila by 5:00 PM Friday June 28, 2013. (W:PW EnglProjects /A -SW 791240204/Proposal 6532 & 6542 Southcenter BI) 18