HomeMy WebLinkAboutUtilities 2013-07-15 Item 2C - Final Acceptance - 2012 Small Drainage Program by Green River Construction Company for $652,460.16TO: FROM: BY: DATE: SUBJECT: City of Tukwila Jim Haggerton, Mayor INFORMATIONAL MEMORANDUM Mayor Haggerton Utilities Committee Bob Giberson, Public Works Director- - Peter Lau, Senior Program Manager July 12, 2013 2012 Small Drainage Program Project No. 91241201, Contract No. 12 -092 Project Completion and Acceptance ISSUE Accept contract as complete and authorize release of retainage. BACKGROUND The Notice to Proceed for Contract No. 12 -092 with Green River Construction Company, Inc. of Tukwila, Washington was issued on August 6, 2012 for the 2012 Small Drainage Program. This project provided drainage improvements at nine locations in Tukwila. The improvements included storm pipe and structure replacements, slip line pipe liner rehabilitation of existing storm pipes, asphalt pavement and concrete curb replacements, and site restorations. ANALYSIS Construction was physically completed on December 28, 2012. Only one change order was executed for a contract time extension due to additional time needed for material procurement. The small amount of unit price over -runs was due to the final material quantities being slightly more than the bid quantities. The construction budget was $743,996.05 with a 15% contingency. Construction Contract Amount Change Order No. 1 Unit Price Over -runs Sales Tax Paid Total Amount Paid $646,858.19 0.00 552.88 5,049.09 $652,460.16 Retainage is being held by the City for this project in the amount of $32,370.55. RECOMMENDATION The Council is being asked to formally accept and authorize the release of retainage, subject to standard claim and lien release procedures, for the 2012 Small Drainage Program with Green River Construction Company, Inc. in the final amount of $652,460.16, and to consider this item on the Consent Agenda of the August 5, 2013 Regular Meeting. Attachment: Notice of Completion W: \PW Eng \ PROJECTS \A- DR Projects \2012 SDP (91241201) \Construction\After Con \Info Menlo - 2012 SDP Closeout, 7- 09- 13.docx 19 NOTICE OF COMPLETION OF PUBLIC WORKS CONTRACT Contractor's UBI Number: 600 - 582 -949 Name & Address of Public Agency of Tukwila 6200 Southcenter Blvd Tukwila, WA 98188 UBI Number: 179000208 Notice is hereby given relative to the completion o Date: June 25, 2013 epartment Use Only Assigned to: Date Assigned: contract or project described below Project Name 2012 Small Drainage Program Contract Number 12 -092 Job Order Contracting ❑ Yes X No Description of Work Done /Include Jobsite Address(es) Provided storm drainage improvements at 9 locations within City of Tukwila. The locations were: 1) the intersection of 47th Avenue South and South 109th Street; 2) 49th Avenue South between South 107th Street and South 109th Street; 3) the intersection of South 128th Street and 37th Avenue South; 4) the intersection of Tukwila Parkway and Southcenter Parkway; 5) Fort Dent Park; 6) South 107th Street between 49th Avenue South and Beacon Avenue South; 7) South 114th Street east of 49th Avenue South; 8) South 142nd Street between 52nd Avenue South and 53rd Avenue South; and 9) Gilliam Creek Inlet off South 154th Street between 42nd Avenue South and 51st Avenue South. The drainage improvements included storm pipe and structure replacements, sliplinelpipe liner rehabilitation of existing storm pipes, asphalt pavement and concrete curb replacements, and site restorations. Federally funded road transportation project? ❑ Yes V No Contractor's Name Green River Construction Company, Inc. Telephone Number 206 - 246 -9456 Contractor Address 6402 South 144th Street, Suite 1, Tukwila, WA 98168 If Retainage is Bonded, List Surety's Name (or attach a copy) N/A Surety Agent's Address N/A Date Contract Awarded July 2, 2012 Date Work Commenced August 9, 2012 Date Work Completed December 28, 2012 Date Work Accepted Contract Amount Additions (+ ) Reductions ( - ) Sub -Total Amount of Sales Tax Paid at 9.5% (If various rates apply, please send a breakdown) r 1r,anw Al, $ 646,858.19 $ 552.88 0.00 $ 647,411.07 $ 5,049.09 TOTAL $ 652,460.16 NOTE: These two totals must be equal Liquidated Damages $ Amount Disbursed $ Amount Retained $ Please List all Subcontractors Below: 0.00 620,089.61 32,370.55 TOTAL $ 652,460.16 Subcontractor's Name: UBI Number: Affidavit ID (if known) Lakeside Industries, Inc. 601 106 847 420463 Briar Group, Inc. 602 110 282 434000 Group Four, Inc. 600 061 180 Not known yet Pacific Concrete Services, LLC 602 126 314 Not known yet Rosso Gardens, LLC 602 326 543 Not known yet F215- 038 -000 08-2011 REV 31 0020e (08/25/11) Continued on page 2 20