Loading...
HomeMy WebLinkAboutRes 1552 - 2005-2010 Transportation Improvement ProgramSection 1. Filing of Program. The City Clerk is hereby authorized and directed to file a copy of this resolution, together with the exhibit attached hereto, with the Secretary of Transportation and the Transportation Improvement Board of the State of Washington. PASSED BY THE CITY COUNCIL. OF THE CITY OF TUKWILA, WASHINGTON, at a Regular Meeting thereof this 21st day of June 2004. o Pm Ha ..y n, Council President A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, ADOPTING A SIX -YEAR TRANSPORTATION IMPROVEMENT PROGRAM, AND DIRECTING THE SAME TO BE FILED WITH THE STATE SECRETARY OF TRANSPORTATION AND THE TRANSPORTATION IMPROVEMENT BOARD. WHEREAS, pursuant to the requirements of RCW Chapters 35.77 and 47.26 as amended, the City Council of the City of Tukwila has previously adopted a Transportation Improvement Program and thereafter periodically modified said Transportation Improvement Program by resolution; and WHEREAS, the City Council has reviewed the work accomplished under said program, determined current and future City street and arterial needs, and based upon these findings has prepared a Six -Year Transportation Improvement Program for the ensuing six (6) calendar years (2005- 2010); and WHEREAS, a public hearing was held on the said Six -Year Transportation Improvement Program on June 14, 2004; NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, HEREBY RESOLVES AS FOLLOWS: ATTEST/ AUTHENTICATED: J ne E. Cantu, CMG, City Clerk APPROVED AS FORM BY: Office of the Ci At{atiey- TIP 2005 -10 6/17/04 City of Tukwila Washington Resolution No. 1552 Filed with the City Clerk: Passed by the City Council: T A Washington State Department of Transportation WI Tukwila Co. No.: 17 Co. Name: King Co. City No.: 1320 MPO /RTPO: PSRC 16 2 19 3 14 6 Project i ecTnt A. Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or road Ending MP or road F. Describe Work to be Done 3 Overlay and Repair Program Various City Streets from: to: Repair, rehabilitate, and overlay City streets as needed in an annual program. CBD Transit Center Central Business District from: Construct transit center. from: Airport Way Reconstruct bridge. to: Pedestrian Safety Program Various City Streets from: to: Boeing Access Rd Bridge Replacement p 0 to: 1 -5 Green River Valley Signal Coordination c d 0. la t mm m U n F- co c E 1 S N m t a U d 4 5 6 7 8 07 S C G 0 P S T 21 P T W P S 12 S Phase Start (mm/dd/yyyy) 9 AL 1/1/2005 Totals PE 1 1/1/2005 Totals AL 1 1/1/2005 L Pave and /or stripe shoulder for walkway and other pedestrian safety improvements. Totals 14 4 11 S AL 1 1/1/2005 L Page 1 Six Year Transportation Improvement Program From 2005 to 2010 Project Costs in thousands of Dotrars Federally Funded Fund Source Information Expenditure Schedule Projects Only (Local Agency) Federal Funding RAN Federal Federal State 4th Required Fund Cost by Fund State Local Total 1st 2nd 3rd Thru Envir. Date Code Phase Code Funds Funds Funds 6th Type (MM/YY) 10 1 11 1 12 13 14 1 15 16 1 17 1 18 1 19 20 21 79501 7950 12501 12501 12501 4200 I I Hearing Date: 6/14/2004 Amend Date: Adoption Date: Resolution No.: 7950 7950 1250 1250 1250 4200 1 101 101 101 10 10 10 4201 4201 701 701 701 210 420 420 70 70 70 210 6001 6001 1001 1001 1001 300 Bridge Program Various City Streets from: to: Perform load ratings and bi- annual inspections as well as construct necessary repairs and maintenance. Totals 600 600 100 100 100 300 14 5 08002500 09 P 1,000 Ft T PE 1 1/1/2005 1 I 1 1 1 1001 1001 100 Totals 100 100 100 12 S AL 1 1/1/2005 1 1001 1 1 161 1161 1161 CE L from: West Valley Corridor to: S 180 St Corridor Design and construct signal coordination improvements, monitoring equipment, and control upgrages. Totals 100 16 116 116 Supersedes previous editions No No No No No No Washington State Department of Transportation Ag'cy: Tukwila Co. No.: 17 Co. Name: King Co City No.: 1320 MPO /RTPO: PSRC Project Identification A. Federal Aid No. B. Bridge No. C L d r A o o_ a C. P roject Title a a J 0 73 o E D. Street/Road Name or Number 9 r .8 Z' ca a U 0- z a.1 E. Beginning MP or road Ending MP or road E o F. Describe Work to be Done 1 2 3 4 5 6 7 14 7 03 P G Tukwila Intl Blvd (Phase 2) p P from: S 116 St to: S 132 St Construct overlay, curb gutter, sidewalks, illumination, T drainage, landscaping, and utility undergrounding. W 17 8 03 S 1,650 Ft W S 144 St (Phase 1) T S from: Tukwila Intl Blvd to: Military Road p Design and construct paving, curb gutter, sidewalks, drainage, G illumination, and utility undergrounding. C 16 9 12 P W CBD Traffic Signal Interconnect T CBD Streets G from: to: C Design and install hard wire interconnect system between traffic p signals in the CBD. S 16 10 01 .P 3,000 Ft W Southcenter Parkway T S from: S 180 St to: S City Limits p Design and construct widening to 4 lanes and center turn lane G including curb gutter, sidewalks, drainage, landscaping, and utility undergreundir 14 11 03 P 4,500 Ft W Interurban Ave T S from: S 143 St to: Ft Dent Way p Construct paving, curb gutter, drainage, illumination, sidewalk, G and landscaping. C 16 12 12 P 1,000 Ft W S 133 St SR 599 Ramps Intersection T S from: 500 Ft on each leg to: 500 Ft on each leg G Design and construct intersection improvements including a new C traffic signal. p Project Costs in Thousands of Dollars Fund Source Information Expenditure Schedule N 0 L I Federal Funding (Local Agency) a. Phase Federal Federal State 4th Ti d Start Fund Cost by Fund State Local Total 1st 2nd 3rd Thru (mm/dd /yyyy) Code Phase Code Funds Funds Funds 6th 8 9 I 10 11 12 13 14 15 16 17 18 19 CN 1/1/2005 1 I 36861 42001 14001 9286 43861 49001 Totals 3686 4200 1400 9286 4386 4900 CN 1 1/1/2005 I 1 10161 9391 19551 19551 Totals PE 1/1/2005 CN 1/1/2006 Totals CN 1 1/1/2010 Totals CN 1 1/1/2010 Totals PE 1/1/2009 CN 1/1/2010 Totals Page 2 180 1177 1357 374 1731 260 1471 57221 1 1 13741 70961 1 5722 50101 5010 26 274 300 Six Year Transportation Improvement Program From 2005 to 2010 1016 939 1955 1955 801 260 2601 1 2941 14711 1 1471 I I I 1 1 Hearing Date: 6/14/2004 Adoption Date: Amend Date: Resolution No.: 1374 7096 7821 57921 782 5792 4 30 461 3201 50 350 1 1 1 7096 7096 1 5792 5792 30 320 350 Federally Funded Projects Only RNV Required Envir. Date Type (MM/YY) 20 21 CE Supersedes previous editions No No No No No No Washington State Department of Transportation WA/ Agency: Tukwila Co. No.: 17 Co. Name: King Co City No.: 1320 MPO /RTPO: PSRC 1 2 14 13 16 16 14 17 Project Identification A. Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or road Ending MP or road F. Describe Work to be Done 3 Tukwila Intl Blvd S 116 St from: SR99 Bridge to: SR599 Design and construct widening on Tukwila Intl Blvd and intersection improvements at T.I.B. /S 116 St. Totals 16 14 03 P PE 1/1/2008 CN 1/1/2010 East Marginal Way from: Boeing Access Rd to: S 112 St Design and construct widening to 3 lanes including curb gutter, sidewalks, drainage, landscaping, and utility undergrounding. Totals 16 15 12 P 1,000 Ft AL 1 1/1/2007 1 L Andover Park E Minkler Blvd. from: 500 Ft each leg to: 500 Ft each leg Design and construct intersection and traffic signal improvements and widening for left turn lanes. S 168 St from: Southcenter Pkwy to: Andover Park W Construct new roadway including curb gutter, sidewalk, drainage, illumination, and landscaping. West Valley Hwy S 156 St Project Costs in 1 housands of bohars E 1 Fund Source Information Expenditure Schedule 17 q .I" 13 (Local Agency) m m al m 1 Federal Funding E~ i n 9 0- Phase Federal Federal State 4th E a Start Fund Cost by Fund State Local Total .o y Funds Funds Funds 1st 2nd 3rd Thru o (mm/dd/yyyy) Code Phase Code 6th 4 5 6 7 8 9 1 10 1 11 1 12 1 13 1 14 15 16 1 17 1 18 1 19 P PE 1/1/2010 I 100 100 100 04 1,500 Ft P S T W 01 P 2,000 Ft P T W S 12 P 1,500 Ft T P Totals AL L 1/1/2007 Totals AL 1 1/1/2009 L from: Southcenter Blvd to: S 158 St Construct additional northbound left tum lane at S 156 St for northbound HOV to northbound 1 -405. Totals 14 18 03 P 2,100 Ft G CN 1 1/1/2005 1 Tukwila Intl Blvd (Phase 3) C S from: S 132 St to: S 138 St p Reconstruct roadway including paving, curb gutter, sidewalks, T illumination, drainage, and utility undergrounding. W Totals Page3 Six Year Transportation Improvement Program From 2005 to 2010 1690 1690 6001 600 39451 I I Hearing Date: 6/14/2004 Adoption Date: Amend Date: Resolution No.: 100 100 351 35 2301 1920 265 1955 2001 2001 200 200 7751 775 775 775 1251 7251 35 1 1 I I 125 725 30001 4481 73931 35331 38601 3945 3000 448 7393 3533 3860 2001 100 1920 35 1920 200 4251 350 425 350 725 725 Federally Funded Projects Only R/W Required Envir. Date Type (MM/YY) 20 21 Supersedes previous editions No No No No No No Washington State Department of Transportation A Tukwila Co. No.: 17 Co. Name: King Co. City No.: 1320 MPO /RTPO: PSRC U li c Project identification A. Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or road Ending MP or road F. Describe Work to be Done 1 1 2 3 `oE 0 14 19 from: 1 -405 to: Strander Blvd Design and construct widening to 7 lanes including curb gutter, sidewalks, illumination, and drainage. Totals 16 20 04 P 2,000 Ft W AL I 1/1/2009 I Minkler Blvd T S from: Southcenter Pkwy to: Andover Park W p Consruct widening for 3 lanes inlcuding curb gutter, sidewalk, drainage, and landscaping. 14 21 16 22 17 23 00 24 West Valley Highway Tukwila Int'I Blvd. (Phase 4) from: Boeing Access Rd to: S 116 St Design and construct widening including paving, curb gutter, sidewalk, drainage, illumination, landscaping, and utility Totals undergreundin`. AL 1 1/1/2009 12 P 1,000 Ft W L Andover Pk E Industry Signal T S from: 500 Ft on each leg to: 500 Ft on each leg p Design and construct a traffic signal and intersection G improvements. Totals Nelson Place CBD Interurban Trail Connector from: Interurban Trail to: CBD Design and construct trail from Interurban Trail to CBD. C -‘1 e m, d o m U n l— co 76 z' Phase g m Start (mm/dd/yyyy) 4 5 6 7 8 9 05 P 0.5 Mi W AL 1/1/2010 03 P T S P G 3,500 Ft P S W Totals PEI 1/1/2010 03 P 600 Ft AL I 1/1/2009 I L Totals Page 4 Project Costs in rhousands of Dollars Fund Source Information Federal Funding Federal Fund Code 10 Federal State State Local Total 4th Envir. Cost by Fund Funds Funds Funds 1st 2nd 3rd Thru Type Phase Code 6th 11 12 13 I 14 1 15 16 I 17 18 1 19 20 21 5301 501 580 1 580 530 1901 190 Six Year Transportation Improvement Program From 2005 to 2010 Hearing Date: 6/14/2004 Adoption Date: Amend Date: Resolution No.: 50 580 4251 4251 Expenditure Schedule (Local Agency) 425 425 425 1001 1001 100 100 301 2201 30 220 2001 2001 580 425 100 100 220 220 200 from: S 156 St to: S 158 st Design and construct paving, curb gutter, sidewalks, drainage, and illumination. Totals 200 200 200 32 P PE 1 1/1/2009 1 1 1 1 1 301 301 1 1 30 30 30 30 Federally Funded Projects Only Supersedes previous editions R/W Required Date (M)WYY) No No No No No No Washington State Department of Transportation Ag'cy: Tukwila Co. No.: 17 Co. Name: King Co. City No.: 1320 MPO /RTPO: PSRC 1 2 16 25 17 26 03 P 1000 P S 144 St (Phase 2) Feet T W from: 42nd Ave S to: Tukwila Intl Blvd g Design and construct paving, curb gutter, sidewalks, drainage, G illumination, and utility undergrounding. C 16 27 03 P 1.1 W Southcenter Blvd. Miles S T from: 1 to: Tukwila Intl Blvd. C Improve roadway to a three -lane urban arterial with medians, turn G lanes, curbs, gutters, sidewalks, street lighting, and drainage. 16 28 14 29 17 30 Project Identirication A. Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or road Ending MP or road F. Describe Work to be Done 3 Klickitat SC Pkwy /1-5 Access Revision from: 1 -5 Off Ramp to: S 168 St Design and construct safety and capacity improvements. Andover Park West from: Tukwila Parkway to: Strander Blvd. Complete widening for center left turn lane. SC Blvd. 61st Ave S Bridge Widening from: 1 -5 to: 62nd Ave S Widen Southcenter Blvd. and the 61st Ave S Bridge to add a lane for future traffic growth. S 144th St Bridge Sidewalks from: 51st Ave S to: 53rd Ave S Widen existing sidewalks on bridge over 1 -5 between 51st Ave S and 53rd Ave S. N m 0 N h h C mm m 0 c 0 n1 h Ii Z a Phase E 1- w Start 2 (mm/dd/yyyy) 4 5 6 7 8 05 P 1,500 Ft W PE 1/1/2005 T S P G Totals PE 1/1/2006 CN 1/1/2007 Totals PE 1/1/2007 CN 1/1/2008 9 Totals 05 P C PE 1/1/2006 1 G P S T W Totals 04 P 0.5 C PE 1 1/1/2007 1 Miles G P S T W Totals 05 P 0.25 C PEI 1/1/2005 Miles G P S T W Totals Grand Totals fo Project hosts in 1 housands of boliars Fund Source Information Federal Funding Federal Federal State Fund Cost by Fund Code Phase Code 10 11 12 Page5 Six Year Transportation Improvement Program From 2005 to 2010 State Local Total Funds Funds Funds 13 Hearing Date: 6/14/2004 Amend Date: Expenditure Schedule (Local Agency) 4th 1st 2nd 3rd Thru 6th 14 1 15 16 1 17 1 18 5001 500 3001 2001 500 500 300 200 1 1501 1001 250 1 2501 1 8401 5601 14001 1 1 1400 990 660 1650 250 1400 1 1501 150 1 1 150 1 16001 16001 1 1 1750 1750 1 1001 1001 1 1001 100 100 1001 100 100 100 100 251 251 251 25 25 25 100 Adoption Date: Resolution No.: 1 1 1001 150 1600 1600 Federally Funded Projects Only Envir. Type 19 20 21 Supersedes previous editions R/W Required Date (MM/YY) No No No No No No AFFIDAVIT OF MAILING I laws of the State of Washington that on JAlP�QI stamped and addressed envelope directed to certify under penalty of perjury under the 2004, I deposited in the mail of the United States of America a properly Douglas MacDonald, WSDOT Secretary Omar Mehyar, W S T I P Region Manager PSRC Information Center "Doris" dzii- &L Said addressed envelope, mailed from 6200 Southcenter Boulevard, Tukwila, Washington, contained Resolution 1552 attachments relative to the annual Six -Year Transportation Improvement Program, from the City of Tukwila DATED this 23 day of UDC) 2004 Bob Baker, CMC, Deputy City Clerk