SUBJECT: Duwamish Gardens
Project No. 90630102
30% Design Plan Update
ISSUE
Review the 30% Duwamish Gardens' project design.
BACKGROU ND
The City acquired the Duwamish Gardens site in 2008 for future restoration as a salmon habitat site with minor
park elements. The project is currently in the design phase and staff is in the process of obtaining all construction
permits to clear the site of existing structures and secure construction funding. Construction is anticipated to begin
in spring of 2014, provided that permitting is completed and all construction funding can be secured.
The design is being led by the City's design consultant, J.A. Brennan. Project plans were presented to the City in
June for 30% of the design and the consultant is preparing 60% drawings that will be available in early September.
ANALYSIS
The 30% project design is based on information received during the cultural resources investigation, site
characteristics, and meetings with stakeholder groups including city staff, Tukwila Parks Commission, Sound
Transit, permitting and granting agencies, interested citizens, the adjacent property owner, and tribal interests, The
various stakeholders recommended the following criteria:
• Maximize the availability of wetted habitat area
• Protect identified cultural resources
• Design the site to minimize future maintenance of habitat features
• Provide public access across the entire site and to the water
• Provide interesting interpretive elements throughout the site to draw the public in. These elements could
include a signature art piece at the far side of the site, interpretive art throughout the site, natural stone
benches with engravings, signs, or stamped concrete.
• Provide onsite parking
Minor layout revisions are anticipated for the 60% design to further increase habitat areas that will include:
• Removing one view point and moving a section of the trail further north
• Moving the trail end back approximately 30 feet
• Ending the trail at the river's edge to reduce environmental concerns
RECOMMENDATION
Information only.
attachment: Selected 30% project design plan sheets (5, 9, and 11 of 17)
WPW EngIPROJECTSIA- DR Projecls\Duwarnish Gardens 06 -DRO2 (90630102)1Designllnfo Memo 30 °/ Design Concept.docx
63
1
CONTAMINATED SOIL AREA
ARCHAEOLOGICAL SITE 45 —KI -703
20 0 20 40
SCALE //V FEET
CRUSHED ROCK
PEDESTRIAN TRAIL, TYP.
m
TRUCK DRIVEWAY SIZE AND
CONFIGURATION SUBJECT TO
CHANGE, IN NEGOTIATION
WITH ADJACENT PROPERTY
OWNER
REMOVABLE
BOLLARD,
TYP.
SOUND TRANSIT
ELEVATED GUIDEWAY
SOUND
TRANSIT
ACCESS
STREAM,
X COBBLE, _ --
5 PARKING STALLS,
LOCATION AND
CONFIGURATION SUBJECT
TO CHANGE
0
//
/NV
ENCH
GABION
RETAINING/
WALL
NTII
CULTURAL
RESOURCE
BOUNDARY
PARK-UPAOE
GASION
RETAINING
WALL --
POTENTIAL AR SI
ELEMENT
1j
'40440 121
• w,
4
DUWAMISH RIVER
N�3
TEPS
EXLSTING CONCRETE
CO�UMNS
30% DESIGN DEVELOPMENT,
NOT FOR CONSTRUC1\ION II
PUBLIC WORKS DEPT.
- ENGINEERING- STREETS - WATER - SEWER- PARKS - BUILDING-
j•a• br��
DUWAMISH GARDENS
LAYOUT PLAN
filene
.m. r=xrt
em
1
SS
RG
UR
PLANTING LEGEND
SEEDING/PLANTING BENEATH GUIDEWAY
STREETSGAPE PLANTING -TREES AND
LOW-GROWING PLANTS
RAIN GARDEN- MOSTLY LOW-GROWING PLANTS
LAWN
UPLAND RIPARIAN PLANTING (EL.13 *7
IIII
MR MOIST sT RPAR AN PLANTING (EL. 10131
I I `
HP
LM j
HIGH MARSH PLANTING (EL 7 5-10)
LOW MARSH PLANTING (EL. 5-7.5.)
�i� fl Ir,y
IAVS�i�� ■
lP I'm • i1 b.
"MIA�
r/ / .411
Al
Off
WO
22
20
) 1
eo�iiiGit= ��iiii iiii�llr. �•����1� ►�
oeek
.421/17,01,4
�— - -— Is
12
30% DESIGN DEVELOPMENT
NOT FOR CONSTRUCTION
N.
PUBLIC WORKS DEPT.
- ENGINEERING- STREETS - WATER - SEWER- PARKS - BUILDING-
P
OS
j•a• br��
DUWAMISH GARDENS
PLANTING PLAN
Nem
9
17,
revisions
.wl° r=zo' -o.
clain
1
Path
=lel. Ili,
Mmo
Mlo tr. LI, rnn.h SLOS
Mel %A
A
SECTION A SCALE: I' = 20'
0 I
20. 40.
MD11 ariol
74.1 Ilat low marth
MoM
PaliMmraM accom,-1
I.xlmamy bcoal
Dptand
Al[Larldr,
AAA moxe
Pah,
Dana
eIeMMAt
A'
B
Ouvramish Deo,
SECTION B
SC. E 1 = 10
2CE
Mud ELM
km11 and lovimarsh M5-10
Pralm M10-1.0
=01.110
AA,
Wk.
ymperly lfreoghtl
30% DESIGN DEVELOPMENT
NOT FOR CONSTRUCTION
PUBLIC WORKS DEPT.
-ENGINEERING-STREETS-WATER-SEWER-PARKS-BUILDING-
DS
j, a. brenian9
DUWAMISH GARDENS
SITE SECTIONS
Ell
Mane
data