Loading...
HomeMy WebLinkAboutTrans 2013-07-23 Item 2A - Bid Award - Surface Water Lift Station #15 Improvements to Gary Harper ConstructionTO: Cit of Tukwila Jim Haggerton, Mayor INFORMATIONAL MEMORANDUM Mayor Haggerton Transportation Committee FROM: Bob Giberson, Public Works Director By: Ryan Larson, Senior Program Manager DATE: July 19, 2013 SUBJECT: Surface Water Lift Station No, 15 Project No, 91041203 Bid Award ISSUE Award the bid for construction of the Surface Water Lift Station No. 15 improvements. BACKGROUND This project will provide a back-up power generator for the Surface Water Lift Station No. 15, which drains approximately 200 acres of the northern portion of the Tukwila South Development. The station was built in 1977, has four pumps and a total capacity of 43.7 cfs. The electrical controls and pumps are located below ground and the surface water lift station currently does not have generator backup power. ANALYSIS The Surface Water Lift Station No. 15 project was advertised for bids on July 2 and 9, 2013. Four bids were received and opened on July 16, 2013. The bids were checked and tabulated and Gary Harper Construction, Inc. is the apparent low bidder with a bid of $318,568.35. Gary Harper Construction has successfully completed similar project for the City in the past. A review of the bid tabs showed that the lowest three bidders were within 10% of each other and that the individual bid amounts were similar. The engineer's estimate was $266,194.50. The engineer's estimate was lower by approximately $50,000 due to the electrical upgrade component of the project. This bid award is only for the installation of the backup generator. A second memo will propose the $200,000 purchase for the actual generator. The total construction budget is $515,000 and with the generator purchase of $200,000, this leaves only $315,000 for this award. Additional funding is available from the 2013 Small Drainage Program and it is recommended that $36,000 be transferred to allow for construction of the Surface Water Lift Station No. 15 project. BUDGET AND BID SUMMARY (All amounts include sales tax) Bid Results Estimate 2013 Budget Bid Amount $318,568.35 $266,194.50 Project Budget (CIP pg. 140) $515,000.00 Generator Purchase (see separate memo) (200,000.00) 2013 Small Drainage Project (pg. 136) 36,000.00 Contingency (10%) 31,856.83 26,619,45 0.00 Total $30,425.18 $292,813.35 $351,0.04 all RECOMMENDATION The Council is being asked to award the construction of the Surface Water Lift Station No. 15 project to Gary Harper Construction, Inc. in the amount of $318,568.35 and consider this item at the August 5, 2013 Regular Consent Agenda. attachments: Bid Tabulation EngsPROJECTS1A- DR Pro*cps1,Morm Lift Staton No 15 Improvemerrls (91041203pesogrAMo Mem F3 I Award .doc 2 BID TABULATION Owner: City of Tukwila Project; Storm Lift Station No. 15 Improvements Engineers: PACE Engineers, Inc, Bid Date: Bid Time: Job No, July 16, 2013 10:00 AM! 11372.001 Engineer's Esti TEM NO. ITEM OR TASK DESCRIPTION QUANTITY NO, UNIT UNITS UNIT PRICE COST 1 2" HMA 1/2" with 4" CSTC CSTC 3 Traffic Control Devices 4 1Plantings 5 Mobilization 2 6 7 8 9 Ternporry Water Pollution/Erosion Control Resolution of Utility Conflicts Traffic Control labor (Min. $35/hr) CMU Shelter Including Awning 10 80 SY 20 TN LS 11 EA Bollards 11 Generator Concrete Pad 12 1Generator installation 13 112" DI Pipe Supports 14 [Electrical ' 15 !Cement Concrete Sidewalk 40 2 1 16 !Reduced Pressure Backflow Assembly with Hot Box II 1 1 EA LS LS I LS Subtotal 9.5% STATE SALES TAX TOTAL BID $55.00 530,00 $1,000.00 $181.82 $25,000.00 $1,000.00 $5,000.00 $35.00 $90,000.00 5150.00 53,000.00 $15,000.00 5300.00 $90,000.00 $500.00 $3,000,00 54,400.00 $600.00 $1,000,00 , 52,000.024 525,000.00 IF $1,000.00 55,000.00 51,400.00 $90,000.00 $300.00 53,000.00 515,000.001 5900.00 590,000.00 $500.00 53,000.00 $243,100.02 $23,094.50 $266,194.52 Gary Harper Construction UNIT PRICE 549.00, $55.00, $500.00 5150.00 $30,600.00 51,700.00 55,000.00 548.00 574,600.00 5720.001 $6,800.00 59,500.00 5900.00 5143,200.00 51,400.00, 54,900.00 COST $3,920.00_ 51,100,00 5500.00 51,650.00 $30,600.00 51,700.00 McClure and Sons Inc. UNIT PRICE $50.00 5.00 $500.00 $120.00 $5,000.00 $1,920.00 ' 574,600.00 51,440.00 56,800.00 59,500.00 $2,700.00 $143,200.00 $1,400.00 $4,900.00 5290,930.00 527,638.35 $318,568.35 0,000,00 $2,500.00 $5,000.00 $55,00 88,128.00 $1,000.00 $6,000.00 COST 4,000.00 700.0 $500.00 $1,320.00 0,000.00 $2.500.00 $5,000.00 $2,200.00 Nordic Construciton, Inc. UNIT PRICE 538.00 $40.00 52,400.00 5250.00. 57,600.00 51,800.00 $5,000.00 544.00 28.00'. 595,000.00 $2,000.00 $6,000.00 $30,000.00 $1,000.00 $30,000.00 $3,000.00 $128,000.00 $128,000.00 ,000.00 $1,000.00 5,000.00' $15,000.0 9,34800 $30,338.06 $349,686.06 $1,000.00 511,000.00 55,000,00, $500,00 5170,000.00 $3,300.00 57,000.00 COST 53,040.00 5800.00 52,400.00 52,750.00 $7,600.00 $1,800.00 $5,000.00 $1,760.00, 595,000,00 52,000,00 511,000.001 $5,000.00 51,500.00 $170.000.00 $3,300.00 57,000.00 R. L. Alia Company UNIT PRICE 5188,00 $100.00 $500.00_ 8300.00 535,000.00 51,000.00 $5,000.00 535.00 COST 515,040.00 $2,000.00 I $500.00 53,300.00 $35,000.00 51,000.00 55,000,00 51,400.00 $75,000.00( 575,000.00 $3,000.00( $6,000.00 520,000.00 850,000.00 $5,000,00 $20,000.00 $50,000,00 $15,000.00 $164,000.001 5164,000.00 $1,500.00 $2,500.00 51,500.00 52,500,00 $319,950.00 $30,395.25 1 $350,345.25 $397,240.00 $37,737.80 5434,977.80 W:\PW Eng\PROJECTS‘A- DR Projects\Storm Lift Station No 15 Improvements (91041203)\Desigrffinal PDF Plans and Specs\Copy of 11372 615 Tab 20130716.xls 7/1712013 3