Loading...
HomeMy WebLinkAboutRes 1579 - 2006-2011 Transportation Improvement Program G I� Q o F 1908 C ity Washington Resolution No. 1 �5 7 9 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, ADOPTING A SIX -YEAR TRANSPORTATION IMPROVEMENT PROGRAM, AND DIRECTING THE SAME TO BE FILED WITH THE STATE SECRETARY OF TRANSPORTATION AND THE TRANSPORTATION IMPROVEMENT BOARD WHEREAS, pursuant to the requirements of RCW Chapters 35 77 and 47.26 as amended, the City Council of the City of Tukwila has previously adopted a Transportation Improvement Program. and thereafter periodically modified said Transportation Improvement Program by resolution, and WHEREAS, the City Council has reviewed the work accomplished under said program, determined current and future City street and arterial needs and, based upon these findings, has prepared a Six -Year Transportation Improvement Program for the ensuing six calendar years (2006 2011), and WHEREAS, a public hearing was held on the said Six -Year Transportation Improvement Program on June 13, 2005, NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, HEREBY RESOLVES AS FOLLOWS: Filing of Program. The City Clerk is hereby authorized and directed to file a copy of this resolution, together with the exhibit attached hereto, with the Secretary of Transportation and the Transportation Improvement Board of the State of Washington. PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, at a Regular Meeting thereof this 2C day of da nc_" 2005 ATTEST/ AUTHENTICATED f P LIMAL A Oak A_, Pamela Linder, Council President V ,Uane E Cantu, CMC, City Clerk APPROVED AS TO FORM BY Filed with the City Clerk. 15 m. Passed by the City Council. 2D Office of the City Attorney Resolution Number 157 TIP 2006 -2011 6/16/2005 Page 1 of 1 2005 -2010 TIP PROJECTS REVISED 6 1Del 'Green Rvr Vly Signal Coordination 8 'Del 'S 144 St (Tuk Int 1 Blvd Military Rd) 10 1Rev 1Southcenter Pkwy (S 180 St SCL) New 1 6 S 178 St Realignment New 24 S 180 St /Andover Park West Intersection New 31 ,East Marginal Way /BAR Intersection 2006 -201 1 L F2AFT T_ 1 P_ 'DRAFT 2006 2011 TIP SUMMARY 1 (Project Costs in Thousands of Dollars 5/25/05 1 Priority CIP 1 I FUNDING SOURCES 05 10 06 11 PROJECT TITLE (Page No 1 2006 2007 2008 1 2009 2010 2011 TOTAL federal state /tib' developer' unsecured City TIP TIP 1 1 3 L 1 Neighborhood Traffic Calming Program 3 3501. 350 350 50 3501 375 2 125 ---4- _3"171:'_ 24 2 .Greenbelt Trails 16 30 30, 30 4 3 Bridge Program 36 300, 1001 100 100 120; 120, 840' 1 840 5 4 Boeing Access Rd Bridge Replace 3 1 000, 1 9001 2 900 2 320 580 0 10 5 Southcenter Pkwy (S 180 St S 200 St) 40 10 000 5 500'1 15 500 1 000 6 000 7 500 1 000 6 S 178 St Realignment 41 7 675 1 7 6751 7 675 25 7 1Klickitat /SC Pkwy I 5 Access Revision) 42 1 2 0001 500' 500 500' 1 3501 650 0 7 8 Tukwila Int 1 Blvd (S 116 S 132) Ph 2 1 44 5 000! 4 1861 9 186 3 686'1 4 200 1 300 18 9 Tukwila Int 1 Blvd (S 132 S 138) Ph 45 3 600' 3 085 6 685 2 950 2 900, 835 26 10 1S 144 St (Tuk Int 1 Blvd 42 Ave S) 47 2201 1 1381 1 1 1 3581 753 605 1 11 'Overlay Repair Program 48 1 1 250, 1 2501 1 4001 1 400 1 400 1 4001 8 100 8 100 9 12 Traffic Signal Interconnect Program 49 1 000', 1 4001 1 I 2 400 1 200 1 1 200 11 13 Interurban Ave (S 143 St Ft Dent) 50 1 1 5 7921 5 792 1 1 000' 4,792 2 14 (Tukwila Urban Center Transit Center 54 3001 1 0001 1 000 2001 1 2 500 1 0001 5001 900, 100 28 15 1Andover Pk W (Tuk Pkwy Strander) 55 1 1001 1 1 7001 8001 1 400 400 30 16 S 144th St Bridge Sidwalks (Over I 5) 56 j 251 25 1 I 1 1 25 27 17 Southcenter Blvd (T I B I 5) 57 1 6001 7 0001 I 1 1 7 600 7,6001 1 0 15 1 18 Andover Pk E /Minkler Blvd 58 1 2001 1 1 1 200' I 200 1 14 19 ,E Marginal Way (BAR S 112 St) 59 1 351 1 1 920 1 955 9901 700 265 17 20 W Valley Hwy /S 156 St 1 60 725 7251 1 3001 3001 125 12 21 1S 133 St /SR 599 off ramp signal 1 61 301 320, 350' 3001 50 20 22 IMinkler Blvd (APW SC Pkwy) 62 j 4251 425, 0 0 30 1 425 ,90,i 22 1 23 Andover Pk E /Industry Signal 63 220, 24 I S 180 St /Andover Park West Intersection 64 1 1 2101 210 301 1001 80 1 16 25 S 168 St (SC Pkwy APE) 65 1 1 1 000 1 000 11 1,000 29 26 '1SC Blvd 61st Ave S Bridge Widening 66 2301 1 2301'i 1 1 1 230 13 27 1Tukwila Int 1 Blvd /S 116 St 67 i 1 250 1 2501 1 080 170 19 21 28 Tukwila Int 1 Blvd (BAR S 116) Pb 4 68 1 1 4001 400 320' 80 29 W Valley Hwy (T_405 Strander) 69 580 580' 1 5301 50 23 30 Nelsen P1 (S 156 S 158) 71 2001 2001 j 200 31 1East Marginal Way /BAR Intersection N/A 1161 1 1 1161 1001 16 1 1 1 1 1 1 1 T0TAL 31 836] 20 4091 11 7851 2 8051 4 965 13 0771 84 877' 12 756 13 100' 11 595 14 903 32 523 1 I 1 i 1 1 1 1 1 I 1 1 1 1 I 1 1 1 1 1 1 15 'I W Washington State Department of Transportation Agge Tukwila Co. No.. 17 Co. Name: King Co. City No.. 1320 MPO /RTPO: PSRC Project Identification I Project Costs in thousands of Dollars A. Federal Aid No. B. Bridge No. m Fund Source Information C. Project Title d d d m I Federal Funding D. StreetlRoad Name or Number a� N 3 A• Phase Federal Federal State n- Z E. Beginning MP or road Ending MP or road E 1- m a Start Fund Cost by Fund F Describe Work to be Done (mm/dd/yyyy) Code Phase Code 1 2 3 4 5 6 7 8 9 I 10 11 I 12 14 31 07 S 1000 ALL 1/1/2006 I NHS 1001 East Marginal Way Boeing Access Rd. from: 500 Ft. each leg to: 500 Ft. each leg Overlay and repair pavement in the vicinity of the intersection. Feet Totals Grand Totals for Tukwila Report Date: July 25, 2001 Page 6 Six Year Transportation Improvement Program From 2006 to 2011 Hearing Date: 6/13/2005 Amend Date: 16 116 116 100 16 116 116 Expenditure Schedule (Local Agency) Adoption Date: 6/20/2005 Resolution No.. 1579 Federally Funded Projects Only R/W State Local Total 4th Envir Required Funds Funds Funds 1st 2nd 3rd 6th Type Date 13 14 15 16 17 I 18 I 19 20 21 CE 13056 13853 57968 84877 31836 20409 11785 20847 No Supersedes previous editions Washington State Department of Transportation A'gency Tukwila Co. No.. 17 Co. Name: King Co. City No.. 1320 MPO /RTPO: PSRC Project Identification A. Federal Aid No. B. Bridge No. m .F. u d a To 2 C. P Title 8 a 5 3 r o E D. Stre Name or Number o w 9 Cl Phase i 0 z E. Beginning MP or road Ending MP or road E it p (D Start F Describe Work to be Done c a (mm/dd/yyyy) 1 2 3 4 5 6 7 8 9 16 25 01 P 2000 p PE 1/1/2011 S 168 St Feet T S 168 St W from: Southcenter Pkwy to: Andover Park W Construct new roadway including curb gutter, sidewalk, drainage, illumination, and landscaping. 14 26 04 P 0.5 17 30 SC Blvd. 61 Ave S Bridge Widening from: 1 -5 to: 62 Ave S Widen Southcenter Blvd. and the 61 Ave S bridge to add a lane for future traffic growth. 14 27 04 P Tukwila Int'I Blvd. S 116 St from: SR 599 Bridge to: SR 599 Design and construct widening on Tukwila Int'I Blvd. and intersection improvements at T.I.B. S 116 St. 14 28 03 P Tukwila Int'I Blvd. (Phase 4) Tukwila Int'I Blvd. from: Boeing Access Rd. to: S 116 St Design and construct widening including paving, curb gutter, sidewalk, drainage, illumination, landscaping and utility undergrounding. 14 29 05 P West Valley Hwy West Valley Hwy from: 1-405 to: Strander Blvd. Design and construct widening to 7 -lanes including curb gutter, sidewalks, illumination, and drainage. Nelsen Place Nelsen Place from: S 156 St to: S 158 St Design and construct paving, curb gutter sidewalks, drainage, and illumination. Totals 1000 1000 C PEI 1/1/2011 1 1 1 12301 12301 G P S T W Totals 1230 1230 1230 1000 p PEI 1/1/2011 I 1 1 12501 12501 1 1 1250 CE Feet No Miles 3500 Feet 03 p 600 Feet Miles Totals p PEI 1/1/2011 S W 0 Totals 0.5 W ALL1 1/1/2011 T S G P Totals ALL 1/1/2011 Totals Report Date: July 25, 2001 Page 5 Project Costs in thousands of Dollars Fund Source Information Federally Funded Expenditure Schedule Projects Only Federal Funding (Local Agency) R/VV Federal Federal State 4th Required Fund Cost by Fund State Local Total Envir Date y Funds Funds Funds 1st 2nd 3rd Thru Type (MM/YY) Code Phase Code 6th 10 1 11 1 12 13 14 15 16 1 17 18 I 19 20 21 1 1 I 1000 1000 1000 GE Six Year Transportation Improvement Program From 2006 to 2011 Hearing Date: 6/13/2005 Adoption Date: 6/20/2005 Amend Date: Resolution No.. 1579 1250 1250 4001 400 400 400 5801 580 580 580 2001 200 1 1 I I I 1000 1230 GE 1250 200 200 200 400 GE 400 580 GE 580 200 GE No No No No No Supersedes previous editions Washington State Department of Transportation A'g'ency Tukwila Co. No.. 17 Co. Name: King Co. City No.. 1320 MPO /RTPO• PSRC Project Identification Project Costs in ThousancTs ohollars Federally Funded L y Expenditure Schedule Pro ects Onl A. Federal Aid No. B. Bridge No. d Fund Source Information 1 Y F a (Local Agency) `o C. Project Title a J r Federal Funding R/W o E D Street/Road Name or Number 2 y 3 n. Phase Federal Federal State 4th Required li E. Beginning MP or road Ending MP or road E m State Local Tota Envir Date LL z 9 9 9 Start Fund Cost by Fund 1st 2nd 3rd Thru F Describe Work to be Done a (m Start Code Phase Code Funds Funds Funds 6th Type (MAY) Y) 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 I 17 I 18 19 20 21 16 19 03 P 1500 P PE 1/1/2008 35 35 1 1 35 CE East Marginal Way Feet S CN 1/1/2010 1 1920 1920 1 1 1920 No East Marginal Way T from: Boeing Access Rd. to: S 112 St W Design and construct widening to 3 -lanes including curb gutter, sidewalks, drainage, landscaping, and utility undergrounding. Totals 1955 1955 35 1920 14 20 12 P 1500 T ALL 1/1/2009 I 1 1 1 7251 7251 1 I 1 725 CE Feet P No West Valley Hwy S 156 St from: Southcenter Blvd. to: S 158 St Construct additional northbound left tum lane at S 156 St for northbound HOV to northbound 1-405. Totals 16 21 12 P 1000 C ALL 1/1/2009 I S 133 St SR 599 Ramps Intersection Feet G P from: 500 Ft. on each leg to: 500 Ft. on each leg S Design and construct intersection improvements including a new traffic T signal. W Totals 16 22 04 P 2000 W ALL 1/1/2010 1 Minkler Blvd. Feet T Minkler Blvd. S from: Southcenter Pkwy to: Andover Park W P Construct widening for 3 -lanes including curb gutter, sidewalk, drainage, and landscaping. Totals 16 23 12 P 1000 W ALL 1 1/1/2010 Andover Park E Industry Dr. Signal Feet T S from: 500 Ft. on each leg to: 500 Ft. on each leg P Design and construct a traffic signal and intersection improvements. G Totals 16 24 12 P 1000 W ALL 1 1/1/2010 S 180 St Andover Park W Intersection Feet T from: 500 Ft. on each leg to: 500 Ft. on each leg Widen for north south tum lanes. P Totals Report Date: July 25, 2001 Page 4 3001 300 I I I I I Six Year Transportation Improvement Program From 2006 to 2011 Hearing Date: 6/13/2005 Amend Date: 725 725 501 3501 50 350 4251 4251 425 425 2201 220 220 220 2101 2101 Adoption Date: 6/20/2005 Resolution No.. 1579 725 1 1 1 350 CE I I I I I I I 350 425 CE 425 210 210 210 220 CE 220 210 Cr: No No No No Supersedes previous editions Washington State Department of Transportation A ge'ncy Tukwila Co. No.. 17 Co. Name: King Co. City No.. 1320 MPO /RTPO: PSRC Project Identification A. Federal Aid No. B. Bridge No. c 2 r Tz 0 o N C. Project Title d a w 0 03 3 .o E D. Street/Road Name or Number 2 s a h 3 Phase u z E. Beginning MP or road Ending MP or road E w Start F Describe Work to be Done (mm/dd/yyyy) 1 2 3 4 5 6 7 8 9 14 13 03 P 4500 W CN 1/1/2011 Interurban Ave S Feet T Interurban Ave S S from: S 143 St to: Fort Dent Way P Reconstruct street including paving, curb gutter, drainage, illumination, G sidewalk, and landscaping. C Totals 16 14 21 P T ALL 1/1/2006 Tukwila Urban Center Transit Center W Central Business District P from: to: S Design and construct a transit center. 16 15 05 P 2000 C Andover Park West Feet G Andover Park West from: Tukwila Parkway to: Strander Blvd S Complete widening for center left tum lane. T W 17 16 05 P 0.25 C S 144 St Bridge Sidewalks Miles G S 144 St P from: 51 Ave S to: 53 Ave S S Widen existing sidewalks on bridge over 1 5 between 51 Ave S and 53 Ave T s. W 16 17 03 S 11 C Southcenter Blvd. Miles G Southcenter Blvd. 0 from: International Blvd. to: 1 -5 P Improve roadway to a 3 -lane urban arterial with medians, tum lanes, curb S gutter, sidewalks, illumination, and drainage. T 16 18 12 S 1000 Andover Park E Minkler Blvd. from: 500 Ft. each leg to: 500 Ft. each leg Design and construct intersection and traffic signal improvements and widening for left tum lanes. Totals PE 1/1/2007 CN 1/1/2011 Totals PEI 1/1/2006 Totals PE 1/1/2007 CN 1/1/2008 Totals ALLI 1/1/2007 Totals CMAQ Report Date: July 25, 2001 Page 3 10001 1000 I I I Six Year Transportation Improvement Program From 2006 to 2011 Hearing Date: 6/13/2005 Adoption Date: 6/20/2005 Amend Date: Resolution No.. 1579 Project Costs in thousands of Dollars Federally Funded Expenditure Schedule Federal Funding I (Local Agency) R/W Federal Federal State 4th Required Fund Cost by Fund State Local Total 1st 2nd 3rd Thru Envir Date Code Phase Code Funds Funds Funds 6th Type MM/YY) 10 11 I 12 13 14 15 16 17 18 19 20 21 5792 5792 5792 CE Fund Source Information I I 5792 5792 5792 15001 2500 1 3001 10001 10001 200 CE 1500 2500 300 1000 1000 1001 1001 1 1001 7001 7001 I I 800 800 251 251 251 200 200 200 200 700 100 700 25 25 25 6001 6001 1 6001 70001 70001 1 7000 7600 7600 600 7000 2001 2001 1 2001 Projects Only CE CE CE No No No No No CE Feet No Supersedes previous editions Washington State Department of Transportation A'g'ency Tukwila Co. No.. 17 Co. Name: King Co. City No.. 1320 MPO /RTPO: PSRC Project Identification Project Costs in thousands of Dollars Six Year Transportation Improvement Program From 2006 to 2011 Hearing Date: 6/13/2005 Amend Date: Expenditure Schedule (Local Agency) A. Federal Aid No. B. Bridge No. t III d F und Source Information C. Project Title m m m d r m I Federal Funding v. o E D. Street/Road Name or Number 2 J o State Local Total sti e a� rn Phase Federal Federal State a a Z E. Beginning MP or road Ending MP or road E s Start Fund Cost by Fund 1st 2nd 3rd F Describe Work to be Done l (mm/dd/yyyy) Code Phase Code Funds Funds Funds 1 2 3 4 5 6 7 8 9 1 10 11 12 13 14 15 16 1 17 1 18 1 16 7 05 P 1500 W PE 1/1/2006 Discretionary 500 2000 2500 20001 5001 Klickitat SC Pkwy 1 -5 Access Revision 085 Feet T S from: 1 -5 Off Ramp to: S 168 St P Design and construct safety and capacity improvements. G Totals 500 2000 2500 2000 500 14 8 03 S 5000 G CN 1 1/1/2006 1 STP(U) 1 36861 TPPI 42001 13001 91861 50001 41861 Tukwila Int'I Blvd (Phase 2) Feet O Tukwila Int'l Blvd P from: S 116 St to: S 132 St S Construct overlay curb gutter, sidewalks, illumination, drainage, T landscaping, and utility undergrounding. W Totals 3686 4200 1300 9186 5000 4186 14 9 03 S 2100 G CN 1 1/1/2006 1 STP(U) 1 29501 OTHER 29001 8351 66851 36001 30851 Tukwila Int'I Blvd (Phase 3) Feet C Tukwila Int'I Blvd S from: S 132 St to: S 138 St T Reconstruct roadway including paving, curb gutter, sidewalks, P illumination, drainage, and utility undergrounding. W Totals 2950 2900 835 6685 3600 3085 17 10 03 P 100 W PE 1/1/2006 I 1 2001 200 2001 I S 144 St (Phase 2) Fe et T RW I 1 201 20 201 I S 144 St S CN AIPI 7531 3851 1138 1 11381 from: 42 Ave S to: Tukwila Int'l Blvd P Design and construct paving, curb gutter, sidewalks, drainage, G illumination, and utility undergrounding. Totals 16 11 07 S c ALL 1 1/1 /2006 1 1 1 I Overlay and Repair Program G Various City Streets 0 from: to: P Repair, rehabilitate, and overlay City streets as needed in an annual S program. T Totals 16 12 12 S W ALL 1 1/1/2006 1 CMAQ 1 12001 I 1 12001 24001 10001 14001 Traffic Signal Interconnect Program T Various City Streets S from: to: P Design and install hard wire interconnect system between traffic signals and 0 the Traffic Operations Center. G Totals 1200 1200 2400 1000 1400 Report Date: July 25, 2001 Page 2 Adoption Date: 6/20/2005 Resolution No.. 1579 4th Thru 6th 19 753 605 1358 220 1138 1 81001 81001 12501 12501 14001 4200 CE 8100 8100 1250 1250 1400 4200 Federally Funded Projects Only Envir Type 20 CE CE CE CE CE R/W Required Date (MM/YY) 21 Yes 1/1/09 No No No No No Supersedes previous editions 171 Washington State Department of Transportation Agency Tukwila 1 g ency Tukwila Co. No.. 17 Co. Name: King Co. City No.. 1320 MPO /RTPO• PSRC Project Identification Project Costs in thousands of Dollars Federally Funded L y Expenditure Schedule Projects Onl A. Federal Aid No. B. Bridge No. d Fund Source Information 1 Y o 2 :_°0" C. Project Title g! m L Federal Funding (Local Agency) RNV .o D. StreetlRoad Name or Number al- a Phase Federal Federal State 4th Required a E. B ginning MP o r road Ending MP or road E o m State Local Total Envir Date Li. Z g 9 9 r- Start Fund Cost by Fund F Describe Work to be Done 2 1st 2nd 3rd Thru (mm/dd/yyyy) Code Phase Code Funds Funds Funds 6th Type (MM/YY) 1 2 3 4 5 6 7 8 9 10 11 1 12 13 14 15 16 17 I 18 19 20 21 1 1 19 1 12 S ALL 1/1/2006 I 2125 2125 350 350 350 1075 CE Neighborhood Traffic Calming Program No Various City Streets from: to: Program to address neighborhood traffic concerns using striping, signage, roadway improvements, traffic calming, and education to reduce speeding vo eofoW 00 2 32 P Totals PEI 1/1/2011 1 Greenbelt Trails No from: to: Provide safe connections to public trails to promote pedestrian and bicycle modes of transportation in lieu of motorized vehicles. Totals 30 30 30 14 3 11 S ALL 1/1/2006 1 8401 8401 3001 1001 1001 340 CE Bridge Program No Various City Streets from: to: Perform load ratings and bi- annual inspections as well as construct necessary repairs and maintenance. Totals 840 840 300 100 100 340 14 4 09 P 1,000 T PEI 1/1/2007 1 BR I 23201 1 1 5801 29001 1 10001 19001 CE Boeing =Ge Rd Bridge Replacement Feet P No Boeing Access Road 0 from: Airport Way to: 1 -5 Reconstruct bridge. Totals 2320 580 2900 1000 1900 16 5 01 P 1 4 W CN 1 1/1/2006 1 Discretionary I 10001 TPP 1 60001 85001 155001 100001 55001 CE Southcenter Parkway Extension Miles T Yes Southcenter Parkway S from: S 180 St to: S 200 St P 1/1/06 Construct widening to 4 lanes with center tum pockets including curb G gutter, sidewalks, drainage, landscaping, and utility undergrounding. Totals 1000 6000 8500 15500 10000 5500 16 6 01 S 2200 W CN I 1/1/2006 I 76751 76751 7675 I CE S 178 St Realignment Feet G Yes S 178 St P from: 1 -5 to: Southcenter Parkway T 1/1/06 Realign S 178th St to reduce steep grade and intersect Segale Drive C. S Report Date: July 25, 2001 Page 1 I I 301 301 30 CE Totals 7675 7675 7675 Six Year Transportation Improvement Program From 2006 to 2011 Hearing Date: 6/13/2005 Adoption Date: 6/20/2005 Amend Date: Resolution No.. 1579 2125 2125 350 350 350 1075 Supersedes previous editions