Loading...
HomeMy WebLinkAboutReg 2013-08-05 Item 5H - Bid Award - Surface Water Lift Station with Gary Harper Construction for $318,568.35 COUNCIL AGENDA SYNOPSIS MICA ti, k i l.' Initials ITEM NO. lV ' L Meetim Date Pre eared b ;1 Ma w's review Council review 1 y 08/05/13 BG alm a a ' O 2 908 5 H ITEM INFORMATION CAS NUMBER: STAFF SPONSOR: BOB GIBERSON ORIGINAL AGENDA DATE: 8/05/13 AGENDA ITEM TITLE Surface Water Lift Station No. 15 Bid Award to Gary Harper Construction, Inc. CATEGORY ❑ Discussion ®Motion ❑ Resolution ❑ Ordinance ❑ Bid Award ❑Public Hearing ❑ Other Mtg Date Mtg Date 08/05/13 Mtg Date Mtg Date Mtg Date Mtg Date Mtg Date SPONSOR ❑ Council ❑Mayor ❑ HR ❑ DCD ❑Finance ❑ Fire ❑ IT ❑P&R ❑Police ®PIV SPONSOR'S The Surface Water Lift Station No. 15 Project will install electrical upgrades, construct a SUMMARY modular concrete wall enclosure and then install a City purchased 600KW backup generator. The project was advertised for bid on July 2 and 9, 2013 and four bids were opened July 16, 2013. The low bid of$318,568.35 was from Gary Harper Construction, Inc., who has successfully worked for the City in the past. Council is being asked to award the bid to Gary Harper Construction in the amount of$318,568.35. REVIEWED BY ❑ COW Mtg. ❑ CA&P Cmte ❑ F&S Cmte ®Transportation Cmte ❑ Utilities Cmte ❑Arts Comm. ❑ Parks Comm. ❑Planning Comm. DA'Z'E: 07/23/13 COM VlhfIEE CHAIR: KATE KRULLER RECOMMENDATIONS: SPONSOR/ADMIN. Public Works COMMIT TEE Unanimous Approval; Forward to Regular Consent Agenda COST IMPACT / FUND SOURCE EXPENDITURE REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED $318,568.35 $515,000.00 $0.00 Fund Source: 412 SURFACE WATER FUND(PAGE 140&136,2013 CIP) Comments: MTG. DATE RECORD OF COUNCIL ACTION 08/05/13 MTG. DATE ATTACHMENTS 08/05/13 Informational Memorandum dated 07/19/13 Bid Tabulation Minutes from the Transportation Committee meeting of 07/23/13 71 72 J�.1J ILA 1.I,, s� City of Tukwila \ : o Jim Haggerton, Mayor 19oa INFORMATIONAL MEMORANDUM ...,) TO: Mayor Haggerton Transportation Committee FROM: Bob Giberson, Public Works Director By: . Ryan Larson, Senior Program Manager . DATE: July 19,2013 (revised after 7/23 TC) SUBJECT: Surface Water Lift Station No. 15 Project No.91041203 Bid Award ISSUE Award the bid for construction of the Surface Water Lift Station No. 15 improvements. BACKGROUND This project will provide a back-up power generator for the Surface Water Lift Station No. 15,which drains approximately 200 acres of the northern portion of the Tukwila South Development. The station was built in 1977, has four pumps and a total capacity of 43.7 cfs. The electrical controls and pumps are located below ground and the surface water lift station currently does not have generator backup power. ANALYSIS The Surface Water Lift Station No. 15 project was advertised for bids on July 2 and 9, 2013. Four bids were received and opened on July 16, 2013. The bids were checked and tabulated and Gary Harper Construction, Inc. is the apparent low bidder with a bid of$318,568.35. Gary Harper Construction has successfully completed a similar project for the City in the past. A review of the bid tabs showed that the lowest three bidders were within 10%of each other and that the individual bid amounts were similar. The engineer's estimate was$266,194.50. The engineer's estimate was lower by approximately $50,000 due to the electrical upgrade component of the project. This bid award is only for the installation of the backup generator.A second memo will propose the$206,619 purchase for the actual generator.The total construction budget is$515,000 and with the generator purchase of$206,619,this leaves only $315,000 for this award.Additional funding is available from the 2013 Small Drainage Program and it is recommended that $43,000 be transferred to allow for construction of the Surface Water Lift Station No. 15 project. BUDGET AND BID SUMMARY(All amounts include sales tax) Bid Results Estimate 2013 Budget Bid Amount $318,568.35 $266,194.50 Project Budget(CIP pg. 140) $515,000.00 Generator Purchase(see separate memo) (207,000.00) 2013 Small Drainage Project(pg. 136) 43,000.00 Contingency(10%) 31,856.83 26,619.45 0.00 Total $350.425.18 $292.813.95 $351.000.00 RECOMMENDATION The Council is being asked to award the construction of the Surface Water Lift Station No. 15 project to Gary Harper Construction, Inc. in the amount of$318,568.35 and consider this item at the August 5, 2013 Regular Consent Agenda. attachments: Bid Tabulation W:\PW Eng\PROJECTS\A-DR Projects\Storm Lift Station No 15 Improvements(91041203)\Design\Info Memo Bid Award.doc 7 3 { • • 74 BID TABULATION Owner: City of Tukwila Project: Storm Lift Station No. 15 Improvements Engineers: PACE Engineers, Inc. Bid Date: Bid Time: Job No. July 16, 2013 10:00 AM 11372.00 Engineer's Estimate Gary Harper Construction McClure and Sons Inc. Nordic Construction, Inc. R. L. Alia Company ITEM NO. ITEM OR TASK DESCRIPTION QUANTITY NO. UNITS UNIT UNIT PRICE COST UNIT PRICE COST UNIT PRICE COST UNIT PRICE COST UNIT PRICE COST 1 2" HMA 1/2" with 4" CSTC 80 SY $55.00 $4,400.00 $49.00 $3,920.00 $50.00 $4,000.00 $38.00 $3,040.00 $188.00 $15,040.00 2 CSTC 20 TN $30.00 $600.00 $55.00 $1,100.00 $35.00 $700.00 $40.00 $800.00 $100.00 $2,000.00 3 Traffic Control Devices 1 LS $1,000.00 $1,000.00 $500.00 $500.00 $500.00 $500.00 $2,400.00 $2,400.00 $500.00 $500.00 4 Plantings 11 EA $181.82 $2,000.02 $150.00 $1,650.00 $120.00 $1,320.00 $250.00 $2,750.00 $300.00 $3,300.00 5 Mobilization 1 LS $25,000.00 $25,000.00 $30,600.00 $30,600.00 $30,000.00 $30,000.00 $7,600.00 $7,600.00 $35,000.00 $35,000.00 6 Temporary Water Pollution /Erosion Control 1 LS $1,000.00 $1,000.00 $1,700.00 $1,700.00 $2,500.00 $2,500.00 $1,800.00 $1,800.00 $1,000.00 $1,000.00 7 Resolution of Utility Conflicts 1 FA $5,000.00 $5,000.00 $5,000.00 $5,000.00 $5,000.00 $5,000.00 $5,000.00 $5,000.00 $5,000.00 $5,000.00 8 Traffic Control labor (Min. $35 /hr) 40 HR $35.00 $1,400.00 $48.00 $1,920.00 $55.00 $2,200.00 $44.00 $1,760.00 $35.00 $1,400.00 9 CMU Shelter Including Awning 1 LS $90,000.00 $90,000.00 $74,600.00 $74,600.00 $88,128.00 $88,128.00 $95,000.00 $95,000.00 $75,000.00 $75,000.00 10 Bollards 2 EA $150.00 $300.00 $720.00 $1,440.00 $1,000.00 $2,000.00 $1,000.00 $2,000.00 $3,000.00 $6,000.00 11 Generator Concrete Pad 1 LS $3,000.00 $3,000.00 $6,800.00 $6,800.00 $6,000.00 $6,000.00 $11,000.00 $11,000.00 $20,000.00 $20,000.00 12 Generator Installation 1 LS $15,000.00 $15,000.00 $9,500.00 $9,500.00 $30,000.00 $30,000.00 $5,000.00 $5,000.00 $50,000.00 $50,000.00 13 12" DI Pipe Supports 3 EA $300.00 $900.00 $900.00 $2,700.00 $1,000.00 $3,000.00 $500.00 $1,500.00 $5,000.00 $15,000.00 14 Electrical 1 LS $90,000.00 $90,000.00 $143,200.00 $143,200.00 $128,000.00 $128,000.00 $170,000.00 $170,000.00 $164,000.00 $164,000.00 15 Cement Concrete Sidewalk 1 LS $500.00 $500.00 $1,400.00 $1,400.00 $1,000.00 $1,000.00 $3,300.00 $3,300.00 $1,500.00 $1,500.00 16 Reduced Pressure Backflow Assembly with Hot Box 1 LS $3,000.00 $3,000.00 $4,900.00 $4,900.00 $15,000.00 $15,000.00 $7,000.00 $7,000.00 $2,500.00 $2,500.00 Subtotal 9.5% STATE SALES TAX TOTAL BID $243,100.02 $23,094.50 $266,194.52 $290,930.00 $27,638.35 $318,568.35 $319,348.00 $30,338.06 $349,686.06 $319,950.00 $30,395.25 $350,345.25 $397,240.00 $37,737.80 $434,977.80 • • • • • • . • 75 // 1` City of Tukwila friti �` of Transportation Committee ,390a - TRANSPORTATION COMMITTEE-Meeting Minutes July 23, 2013—5:15 p.m. —Conference Room #1 PRESENT Councilmembers: Kate Kruller, Chair; Dennis Robertson,Joe Duffle Staff: Bob Giberson,Frank Iriarte, Ryan Larson, Robin Tischmak, Pat Brodin, Jack Pace, Gail Labanara, Maggi Lubov, David Cline, Laurel Humphrey Guest: Roger Baker, resident CALL TO ORDER: Committee Chair Kruller called the meeting to order at 5:15 p.m. I. PRESENTATIONS No presentations. II. BUSINESS AGENDA A. Surface Water Lift Station No. 15 —Bid Award Staff is seeking Council approval to award a bid to Gary Harper Construction, Inc. in the amount of $318,568.35, for the construction of the Surface Water Lift Station No. 15 project. This project will provide a backup generator for this station, which drains approximately 200 acres of the northern portion of the Tukwila South Development. Gary Harper Construction is the low bidder and has successfully completed a similar project for the City. $36,000 unused dollars will be transferred from the 2013 Small Drainage Program to cover a project budget shortage. UNANIMOUS APPROVAL. FORWARD TO AUGUST 5 REGULAR CONSENT AGENDA. B. Surface Water Lift Station No. 15 —Purchase of Backup Generator Staff is seeking Council approval of the purchase of a 600KW generator in the amount of $206,619.93 from Cummins Northwest, LLC for the Surface Water Lift Station No. 15 project described in item A above. Cummins is the manufacturer of the majority of the City's standby generators and maintenance staff are satisfied with the reliability and serviceability of the units. UNANIMOUS APPROVAL.FORWARD TO AUGUST 5 REGULAR CONSENT AGENDA. C. 42nd Ave S/Allentown Roadside Barrier Warrant Analysis Staff presented and discussed the draft roadside barrier warrant analysis for 42nd Avenue South in Allentown that was prepared by KPG, Inc. Several areas of the river bank along 42nd Avenue South and South 115`h Street are being recommended for guardrail or barrier installation and/or upgrades and modifications. Most of the areas analyzed in the report would benefit from beam guardrail type 31. Existing concrete barriers are recommended to be removed and replaced due to being unrestrained, their proximity to the edge of pavement, and erosion under the base. The total project cost estimate for all recommendations is $366,480. The report also included short-term safety improvement recommendations, which are not figured into the total cost. Committee members asked clarifying questions about definitions and barrier types. The committee packet includes a draft CIP sheet that reflects staffs proposal to spread the cost and the construction over the next six years to minimize the impact to the Residential Street Fund (103 Fund). Committee members requested that staff prepare a proposal that would reflect a compressed schedule allowing construction to be completed sooner but having more immediate financial impact. 77