Loading...
HomeMy WebLinkAboutOrd 0793 - 1974-1979 Comprehensive Urban Arterial Street Plan 4 .f CITY 5 OF TUK WASHINGTON ORDINANCE NO. AN ORDINANCE ADOPTING A REVISED AND EXTENDED COMPREHENSIVE STREET PROGRAM IN ACCORDANCE WITH RCW 35.77 AND ADOPTING NO CHANGES RE- GARDING THE SIX -YEAR COMPREHENSIVE URBAN ARTERIAL STREET PLAN. WHEREAS, The City of Tukwila has previously adopted a comprehensive street program pursuant to RCW 35.77, and is further required to adopt a six -year comprehensive urban arterial street plan, also pursuant to RCW 35.77, and WHEREAS, THE City is required annually to review the work accomplished under both of said plans and to determine current city street need and WHEREAS, A public hearing was held on the comprehensive street program and on the extended six -year comprehensive urban arterial street plan on Monday, August 6, 1973, at 8:00 P.M. Pacific Daylight Time, in the Tukwila City Hall before the Tukwila City Council, NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, DO ORDAIN AS FOLLOWS: Section 1. Pursuant to RCW 35.77 and the public hearing on August 6, 1973, the attached documents, marked "Exhibit li" and incorporated herein by reference, are declared and adopted as the revised six -year comprehensive street program for the City of Tukwila. Section 2. Pursuant to RCW 35.77 and the public hearing on August 6, 1973, during which the extended six -year comprehensive urban arterial street plan was duly considered, there shall be no changes at this time in that plan. Section-3. This Ordinance and exhibits shall be filed with the Director 'of Highways of the State of Washington within -1- 411 thirty days after its adoption, as required by RCW 35.77. Section 4. This Ordinance and exhibits shall be sub- mitted to the Urban Arterial Board as required by RCW 35.77. PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, And approved by the Mayor at a regular meeting thereof this (aih day of August, 1973. Mayor Attest: °rA i i City Cler Approved as to Form: City Attorney Published: cU g /-4/1 /x/76 /ernes -2- 7.02 b/73 SIX YEAR CONSTRUCTION PROGRAM 1974 1979 HEARING DATE Au. 6, 1973ADOPTION DATE Auz. 6, 1973 RESOLUTION NO. (CITY) OF TUKWILA (T ROAD F C U R LOCAL NAME OR U L R U LENGTH COST ESTIMATE ITEM_ OF S T R E E T N A B R IN NO. ROAD OR STREET NO. C S A A TYPE OF WORK MILES 197 1975 1976 1977 79 TOTAL T S N L 1. Southcanter Blvd. 90Q5 S X Gr., Dr., Pave, Curb, Swk,'Illum, 1.2 502,200 502,200. R /W, Pedestrian Bridge and Traffic Signals. 2. Andover Park West 9002 C X Gr., Dr., Pave, Curb, Swk, Iilu, 1.0 325,000 325,000 and R /W. 3. 53rd Avenue South 9003 C X Gr., Dr., Pave, Curb, Swk, Illum, .50 460,000 460,000 (138th to Macadam Road) and R /W. 4. Macadam Road South 9003 C X Gr., Dr., Pave, Curb, Swk, and .53 165,300 335,000 500,300 Illum. 5. 57th Avenue South 9009 A X Gr., Dr., Pave Curb, Swk, Illum, .43 200,000 100,000 300,000 and R /W. 6. Tukwila Parkway 9024 S X Pave, Lift and Curb. .60 55,200 55,200 7. 56th Avenue South and 9014 C S Gr., Dr., Pave, Curb, Swk, Iilua, .50 250,000 250,000 South 1!7th Street and R /W.- 8. 57th Avenue South 9024 X Gr., Dr., Pave, Curb, SWk, Illum, 2.30 2,265,000 2,265,000 (South 180th to So. 212th) and R /W. 9. 53rd Avenue South 9013 A X Gr., Dr., Pave, Curb, Sark, Illum, .33 340,000 340,000 (So. 166th to Slade ray) and R /W. .F 7.02 6/73 Page 2 of 2 SIX YEAR CONSTRUCTION PROGRAM 1974 1979 HEARING DATE Aug. 6, 1973 ADOPTION DATE Aug. 6, 1973 RESOLUTION NO. (CITY) OF TUKWILA O ROAD F C U R LOCAL NAME OR U L R U LENGTH COST ESTIMATE ITEM OF S T R E E T N A B R IN NO. ROAD OR STREET NO. C S A A TYPE OF WORK MILES 197 1975 1976 1977-79 TOTAL T S N L 10. 62nd Avenue South 9008 C X Gr., Dr., Pave, Curb, Swk, Ilium, 1.00 430,000 430,000 R /W, Realign and Traffic Signal. 11. South 152nd 9007 S X Gr., Dr., Pave, Curb Swk Illum, .17 161,300 161,300 (Macadam Rd. to 57th Ave. 3.) and R /W. 12. South 152nd 9007 S X Gr., Dr., Pave, Curb, Swk, Illum, .28 259,200 259,200 (57th Ave. So. to 62nd So.) and R /W. 13. So. 160th 53rd Ave. So.) 9012 S X Gr., Dr., Pave, Curb, Swk, Ilium. .49 359,700 359,700 14. Interurban Ave. South 9016 S X Gr., Dr., Pave, Curb and Illum. .35 69,000 69,000 (42nd Ave. So. to Foster Interchange) 15. Minkler Boulevard C X Gr., Dr., Pav, Illum, Curb, and .37 200,000 200,000 (Andover West to South- R /W. center Parkway) '16. South 153rd Street; 9026 A X Gr., Dr., Pave, Curb, Swk, Illum, .20 100,000 100,000 (65th Ave. to 62nd Ave.) and R /W. 17. 55th Avenue South 9017 A X Gr., Dr., Pave, Curb, Swk, Illum, .33 200,000 200,000 Total 1,957,700 3,399,700 919,500 500,000 6,776,900