Loading...
HomeMy WebLinkAboutUtilities 2007-06-05 COMPLETE AGENDA PACKET City of Tukwila Utilities Committee Joan Hernandez, Chair Joe Duffle Jim Haggerton AGENDA Tuesday, June 5, 2007 Time: 5:00 p.m. Place: Conference Room No. 1 1 ACTION TO BE TAKEN I. Current Agenda Review I. H. Presentation(s) II. III. Business Agenda III. A. 2007 Small Drainage Program A. Move to Committee of the Whole for Bid Award Page 1 discussion then to Regular Council for approval. B. Municipal Water Law Page 5 B. Information. IV. Old Business Next Meeting: Tuesday, June 19, 2007 Future Agendas: 1. The City of Tukwila strives to accommodate people with disabilities. S Please contact the Public Works Department at 206 433 -0179 for assistance. To: Mayor Mullet From: Public Works Directo Date: May 30, 2007 Subject: 2007 Small Drainage Program Project No. 07 -DRO1 BID AWARD ISSUE Award the 2007 Small Drainage Program to Road Construction Northwest, Inc., of Renton, Washington. BACKGROUND The Annual Neighborhood Drainage Program budgeted $320,000 and the Private Storm System Adoption and Rehabilitation Program budgeted $300,000 for a total of $620,000 available for construction of projects in 2007. The 2007 Small Drainage Program will construct the following projects: Site No. 1 65 Ave. South Site No. 2 South 116 Street Site No. 3 South 126 Street Site No. 4 South 135 Street *Denotes three sites for the Private Storm System Adoption and Rehabilitation Program projects. ANALYSIS This project was advertised on May 15 and May 22, 2007. Four bids were received and opened on May 30. The bids were checked and tabulated. One error was found and corrected but it did not affect the low bid amount. Road Construction Northwest is the low bidder with a bid of $517,281.00. The engineer's estimate was $515,960. All submitted references were checked and all indicated that Road Construction Northwest has performed this type of work and that they met the industry standard for quality. BUDGET AND BID SUMMARY (All amounts include sales tax.) Bid Results Bid Amount 517,281.00 Contingency (10 51,728.10 Total 569,009.10 RECOMMENDATION Award the construction bid for the 2007 Small Drainage Program to Road Construction Northwest, Inc., in the amount of $517,281.00. attachments: Project Location Map Bid Tabulation Consultant Recommendation (P:ProjxcsU- DR ProjectsW7DROIUdo Memo Bid Award 2077 SDP) INFORMATION MEMO Site No. 5 47` Ave. South Site No. 6 South 142n Place Site No. 7 South 162n Street Site No. 8 South 146 Street Engineer's Estimate Budget 515,960.00 620,000.00 51,596.00 567,556.00 620,000.00 Attachment III.A. ei hb °Ch °d 200 7 Annum N gram Drainage PCOg 2 Site 5 Site 1 CITY OF TUKWILA DEPARTMENT OF PUBLIC WORKS 2007 Smell Drainage Program Project No. 07 -DR01 Certified Bld Tabulation No. Item Quantity Unit 'ROADWAY 1 Mobilization 1 LS 1 46,000.00 48,000.0011 2 Temporary Water Pollution 1 Erosion Control 1 FA 1 10,000.00 10.000.001 3 Resolution of Utility Conflicts 1 FA 1 10,000.00 5 10,000.0011 5 4 Protect Temoorary Traffic Control 1 LS 1$ 48,000.00 48,000.0011 5 Clearing and Gnlbbino 1 LS 1 12,500.00 5 12.500.0011 5 6 Pavement Removal 445 SY 1 15.00 6,675.0011 7 Unsuitable Foundation Excavation Incl. Haul 85 CY 1 22.00 1.870.0011 5 8 Gravel Borrow Including Haul 455 TN 1 20.00 9100.0011 9 Crushed Surfacing Top Course 810 TN 1 30.00 24.300.0011$ 10 HMA 1/2 PG 64 -22 345 TN 1$ 120,00 41.400.0011 11 HMA Thickened Edge 925 LF 1 3.00 5 2.775.0011 12 Cement Concrete Curb and Gutter 50 LF 1 50.00 2.500.0011 1 13 Cement Concrete Sidewalk 25 SY 1 50.00 1.250.0011 1 II 14 Replace Existing Channelization 1 LS 11 3.500.00 3.500.0011 15 Thermoplastic Catch Basin Marking 31 EA I1 75.00 2.325.0011$ 1 II 16 Topsoil 160 CY 11 40.00 6.400.0011 5 17 Hvdroseed 3.370 SY 11 2.00 6.740.0011 5 18 Erosion Control Blanket 1,400 SY 11 6.00 5 8.400.0011 5 19 Property Restoration 1 FA 11$ 15,000.00 15.000.0011 5 20 Mailbox and Support 4 EA 11 500.00 2.000.0011 5 (TRAFFIC CONTROL DEVICES ROADSIDE DEVELOPMENT STORM DRAINAGE 21 Franchise Utility Coordination 1 FA 22 Ditch Excavation 60 LF 23 Shoring or Extra Excavation Class B 1 LS 24 Underdroin, 6" PVC 35 LF 25 Storm Drain Pipe, 6" PVC 210 LF 26 Storm Drain Pipe, 8" DI 85 LF 27 Storm Drain Pipe. 12" CPE 815 LF 28 Storm Drain Pipe, 12" PVC 20 LF 29 Storm Drain Pipe. 12" DI 1.035 LF 30 Storm Drain Pipe. 12" HDPE 105 LF 31 Storm Drain Pipe, 18" DI 85 LF 32 Storm Drain Pipe, 18" PVC 20 LF 33 60 "x48" CMP Arch Pipe 60 LF 34 Remove /Abandon Existing Storm Drain Pipe 270 LF 35 Remove /Abandon Drainage Structure 7 EA 36 Connect to Existing Drainage Structure 9 EA 37 Field Tap 3 EA 38 Catch Basin, Tvoo 1 28 EA 39 Catch Basin, Type 1L 6 EA 40 Catch Basin, Type 2, 48 -Inch 5 EA 41 Temporary Water Bypass System 1 LS KPG Road Construction R.L. Alla Dennis R ):nolnoor's Estimate Northwest. In company Construction. Inc Unit Total Unit Total Unit Total Unit Total Price Cost Price Cost Price Cost Price Cost 10.000.00 5 5 50.00 3.000.00 10,000.00 10,000.00 65.00 2,275.00 30.00 8,300.00 45.00 3,825.00 5 45.00 36,675.00 60.00 1.200.00 55.00 56,925.00 75.00 7,875.00 80.00 6,800.00 5 80.00 1,600.00 500.00 30,000.00 5 25.00 6,750.00 600.00 4.200.00 5 600.00 5,400.00 800.00 2.400.00 1.000.00 5 28.000.00 1.500.00 9,000.00 3.000.00 5 15,000.00 10,000.00 10,000.00 10,000.0011 5 5 5 5 Bid Total 515,960.00 37,000.00 37.000,00 10,000.00 10.000.001 10.000.00 5 10.000.00 N 40.000.00 5 40.000.0011 18.000.00 5 16.000.0011 10.00 4.450.0015 34.00 2.890.0011 21.00 9,555.001 21.00 17.010.0011 5 165.00 56.925.0015 6.00 5.550.0015 80.00 4.000.001 5 80.00 2.000.0011 11 2.050.00 2.050.001 75.00 2.325.00 N 39.00 6,240.001 0.30 1,011.0015 2.70 3,780.001 15,000.00 15.000.001 700.00 2.800.001 5 II 10,000.00 10,000.001 80.00 4.800.001 3,000.00 3,000.00 44.00 1.540.00 11 34.00 7,140.0015 44.00 3,740.001 53,00 43.195.0015 64.00 5 1,280.0011$ 82.00 64.170.0011 90.00 9,450.001 90.00 7.650.0015 110.00 2.200.001 310.00 18,600.00115 9,00 2,430.00115 500.00 3,500.0011$ 1,200.00 10,800.00 1,200.00 3.600.00115 1,200.00 33,600.001 1,500.00 9,000.001 5,000.00 25,000,0011 4,000.00 4,000.00 n Bld Total 517,281.00 11 Page 1 of 1 52,000.00 52.000.0011 5 10.000.00 10,000.0011 10.000.00 10,000.0011 6,000.00 5 6.000.0011 1.000.00 1.000.0011$ 5.00 2.225.0011 20.00 1.700.0011 20.00 9.100.0011 20.00 16,200.00115 220,00 75.900.0011 5.00 4,625.0011$ 30.00 1,500.0011 60.00 1,500.0011 2,000.00 2.000.0011 160.00 4.960.0011$ II 15.00 2.400.0011 1,50 5,055.0011$ 4.00 5.600.0011 15.000.00 15.000.0011 50.00 200.0011 10,000.00 10,000.001 5.00 300.001 1,000.00 1,000.001 20.00 5 700.001 97.00 20,370,001 106.00 9.010.001 116.00 94.540.001 113.00 2,260.001 118.00 122,130.001 145.00 15,225.001 155.00 13,175.001 128.00 2,560.001 368.00 22,080.001 1.00 270.001 100.00 700.001 500.00 4,500.001 1.000.00 3.000.001 1,000.00 28,000.001 1,200.00 7.200.001 2,000.00 10.000.001 1,000.00 1,000.001 Bid Total 594,985.001 II II KPG- By: M. Thomas Dato: May 30, 2007 Unit Total Price Cost 47.848.00 47,848.00 70.000.00 5 70.000.001 10,000.00 10,000.00 10.000.00 10,000.001 10.000.00 10.000.00 10.000.00 10.000.001 45.670.00 45.670.001 5.500.00 5,500.001 27,945.00 27,945.00 31.50000 31,500.00 53.50 23,807.50 25.00 11.125.00 123.65 10.510.251 20.00 1,700.00 52.45 23,864.75 15.00 6,825.00 55.60 45,198.00 20.00 16,200.00 181.50 62,617.50 172.00 59,340.00 2.90 2.682.50 3.00 2.775.00 70.00 3.500.00 45.00 2.250.00 140.00 3.500.001 3 53.00 1,325.00 2.296.00 2.296.00 1 5.000.00 5,000.001 84.00 2.604.0011 100.00 3,100.00 78.70 12,592.0011 100.00 16,000.00 2.25 7,582.5015 1.50 5,055.00 6.25 8.750.00 1$ 3.00 4,200.00 15.000,00 15.000.0011 15,000.00 15,000,00 875.00 3,500.0011 600.00 2,400.00 10,000.00 10,000.001 10,000.00 10,000.00 45.60 2,738.001 20.00 1,200.00 1,000.00 1,000.001 35.000.00 35,000.00 209.20 7,322.001 200.00 7,000.00 24.65 5,176.50 60.00 12,600.00 43.25 3,676.25 90.00 7.650.00 28.80 23.472.001 90.00 73.350.00 44.40 888.001 150.00 3,000.00 54.00 55,890.001 110.00 113,850.00 75.10 7,885.501 100.00 10,500.00 98,10 8,338.501 140,00 11,900.00 64.95 1,299.001 150.00 3,000.00 428.30 25,698.001 440.00 26,400.00 14.50 3,915.001 25.00 6,750.00 635.00 4,445.00 5 1,000.00 7,000.00 490.00 4,410.00 1,000.00 9,000.00 995.00 2,985.001 1,000.00 3,000.00 1,231.75 34,489.00 2,000.00 56,000.001 1.610.95 9,665.701 2,200.00 13,200.001 3.203.00 16,015.001 5,500.00 27,500.001 12,655.00 12,655.001 10,000.00 10,000.00 "BidlTotul.,'' 611 ;429.451 Bid Total 'Corrected Math Error. Written amount was $611,439.45 727,195.00 ....,p~ !7539thAvenueNOrth ~ '-JI" Seattle, WA 98109 SEATILE . TACOMA Fax I 206.286.1639 Phone I 206.286.1640 ENGINEERS ARCHITECTS lk'lDSCAPE ARCHITECTS SURVEYORS May 30, 2007 Mr. Ryan Larson, P.E. Senior Surface Water Management Engineer City of Tukwila Public Works Tukwila, WA 98188 RECEIVED t1AY 30 2007 TU!{WILP, PUBLIC WORKS Re: 2007 Small Drainage Program Project No. 07-DR01 Recommendation for Contract Award Dear Ryan: KPG, Inc has reviewed the projects and references submitted by Road Construction Northwest, Inc for the referenced project. All references checked indicated that Road Construction Northwest has performed the type of work detailed in the project referenced and have met the industry standard for quality. . We are therefore recommending that the City award Project No 07-DR01 entitled 2007 Small Drainage Program to Road Construction Northwest, Inc. Please call me at (206) 267-1063 if you should have any questions or require further information. ;n:t::~ 1 T~as, PE Project Engineer Lf Attachment III.B. INFORMATION MEMO To: From: Date: Subject: Mayor Mullet Public Works Directo~ May 31, 2007 Municipal Water Law ISSUE Proposed new rules under the Municipal Water Law require public water systems to look more closely at water use efficiency and how municipal water rights are utilized. BACKGROUND The Department of Health, Office of Drinking Water, was directed by the Washington State Legislature to adopt a Water Use Efficiency Rule. This was a requirement of the Municipal Water Supply - Efficiency Requirements Act. Proposed language to the Group A Public Water Systems Rule, Chapter 246-290 WAC, was drafted and packets sent out in June of 2005. Requirements of the new law include issues such as: Public Hearing Notices Distribution Leakage Standards Conservation Goal Setting and Performance Reporting Requirements Metering Requirements Water Use Efficiency Rule Implementation Water Rights and Place of Use Certificates The Distribution Leakage Standard Fact Sheet that DOH provided to all water supply agencies shows a 10% loss standard. Tukwila has been applying this loss standard in the City's water fund budget as a performance goal. Through the Cascade Water Alliance, the City is also involved in a number of conservation efforts including the new showerhead program and the washer rebate program. The City of Tukwila does not have water rights to supply drinking water; however, a water right and water certificate has been granted to the City for irrigation use at Foster Golf Links. There may be some issues that require the City's golf course to monitor how much water is being pumped and how it's being used. Any water rights that the City has which are based on a pumps and pipes policy must be included in the Tukwila Water System plan approved by both DOH and DOE. RECOMMENDATION Information only. PB:ad (p:aJice\UC 060S07 Municipal Wa= Law) 5