Loading...
HomeMy WebLinkAboutRes 1638 - 2008-2013 Transportation Improvement Program �vIILA, /17' 19 08 C ity of Tukwila Washington Resolution No. I to 3 8 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, ADOPTING A SIX -YEAR TRANSPORTATION IMPROVEMENT PROGRAM (2008- 2013), AND DIRECTING THE SAME TO BE FILED WITH THE STATE SECRETARY OF TRANSPORTATION AND THE TRANSPORTATION IMPROVEMENT BOARD. WHEREAS, pursuant to the requirements of RCW Chapters 35.77 and 47.26 as amended, the City Council of the City of Tukwila has previously adopted a Transportation Improvement Program and thereafter periodically modified said Transportation Improvement Program by resolution; and WHEREAS, the City Council has reviewed the work accomplished under said program, determined current and future City street and arterial needs and, based upon these findings, has prepared a Six -Year Transportation Improvement Program for the ensuing six calendar years (2008- 2013); and WHEREAS, a public hearing was held regarding the City's Six -Year Transportation Improvement Program on June 18, 2007; NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, HEREBY RESOLVES AS FOLLOWS: Section 1. Program Adopted. A six -year Transportation Improvement Program for the calendar years 2008 -2013 is hereby adopted. Section 2. Filing of Program. The City Clerk is hereby authorized and directed to file a copy of this resolution, together with the exhibit attached hereto, with the Secretary of Transportation and the Transportation Improvement Board of the State of Washington. PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, at a Regular Meeting thereof this 1 g day of S� R 2007. ATTEST/ AUTHENTICATED: 6 (-1./_./ z V erns Griffin, Council President Jan; Cantu, CMC, City Clerk APPROVED AS TO FORM BY: Filed with the City Clerk: �o ii 07 by City :6 -/k C2' ��,w- 7�_,����" Passed b the Cit Council• Office of the City Attorney Resolution Number: (o g Exhibit: City of Tukwila' s Six -Year Transportation Improvement Program from 2008 to 2013 C: Documents and Settings \All Users\ Desktop \Kelly \MSDATA \Resolutions \TIP 2008 -2013 Adoption.doc RT:GL:kn 6/14/2007 Page 1 of 1 /are City of Tukwi a ����f: 6200 Southcenter Boulevard Tukwila, Washington 98188 Steven M. Mullet, Mayor t 1906 July 10, 2007 Washington State Department of Transportation P.O. Box 40901 Olympia, WA 98504 -7316 Attn: Jeanne Burbidge, Chair, Transportation Improvement Board RE: 2008 -2013 Transportation Improvement Program City of Tukwila Dear Ms. Burbidge: On Monday, June 18, the Tukwila City Council approved Resolution #1638 adopting the 2008 -2013 Transportation Improvement Program. A copy of the resolution along with the Transportation Improvement Program are enclosed. Please contact me at (206) 433 -1800 if you have questions. Sincerely, cZYLL. J e E. Cantu, CMC City Clerk Enclosures C: Verna Griffin, President, Tukwila City Council James Morrow, Public Works Director, City of Tukwila Phone: 206- 433 -1800 0 City Hall Fax: 206 433 -1833 0 www.ci.tukwila.wa.us City of Tukwila .t i--1r (-0' 6 6200 Southcenter Boulevard Tukwila, Washington 98188 Steven M Mullet, Mayor 1908 July 10, 2007 Douglas D. MacDonald, Secretary Washington State Department of Transportation P.O. Box 47316 Olympia, WA 98504 -7316 RE: 2008 -2013 Transportation Improvement Program City of Tukwila Dear Mr. MacDonald: On Monday, June 18, the Tukwila City Council approved Resolution #1638 adopting the 2008 -2013 Transportation Improvement Program. A copy of the resolution along with the Transportation Improvement Program are enclosed. Please contact me at (206) 433 -1800 if you have questions. Sincerely, Jr- E. Cantu, CMC City Clerk Enclosures C: Verna Griffin, President, Tukwila City Council James Morrow, Public Works Director, City of Tukwila Phone: 206 433 -1800 City Hall Fax: 206 433 -1833 www.ci.tukwila.wa.us Washington State Department of Transportation Agency Tukwila Co. No.. 17 Co. Name: King Co. City No.. 1320 MPO /RTPO: PSRC 14 3 14 4 16 5 16 6 Project Identification A. Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or road Ending MP or road F Describe Work to be Done 3 from: to: Provide safe connections to public trails to promote pedestrian and bicycle modes of transportation In lieu of motorized vehicles. Annual Bridge Inspections and Repairs Various City Streets from: to: Perform load ratings and bi- annual inspections as well as construct necessary repairs and maintenance. 08002500 from: Airport Way to: 1 -5 Reconstruct bridge. 11 S 09 P 1,000 Ft T Boeing Access Rd Bridge Replacement p Boeing Access Road 0 01 S 7 400 Ft W Southcenter Parkway Extension T Southcenter Parkway S from: S 180 St to: S 200 St P Construct widening to 4 lanes with center turn pockets including G curb gutter, sidewalks, drainage, landscaping, and utility 05 P 1,500 Ft W Tukwila Urban Center Access (Klickitat) 08 T S from: 1 -5 Off Ramp to: S 168 St P Design and construct safety and capacity improvements. G Totals AL 1 1/1/2008 1 Totals PE 1/1/2008 AL 1/1/2013 Totals BR Totals 7444 CN 1 1/1/2008 1 Discretionary I 94761 Page 1 Six Year Transportation Improvement Program From 2008 to 2013 Neighborhood Traffic Calming Program No Various City Streets from: to: Program to address neighborhood traffic concerns using striping, signage, roadway improvements, traffic calming, and education to Totals 60 60 10 10 10 30 00 2 32 P PE 1 1/1/2013 1 I I 1 1 301 301 1 1 I 30 CE Greenbelt Trails No Project Costs in Thousands of Dollars Federally Funded o I Fund Source Information Expenditure Schedule Projects Only E w c o a (Local Agency) a t I Federal Funding I R/W a� y c a Phase Federal Federal State 4th Required E r- d Start Fund Cost by Fund State Local Total 1st 2nd 3rd Thru Envir Date o- (mm/dd/yyyy) Code Phase Code Funds Funds Funds 6th Type (mmjyy) 4 5 6 7 8 9 1 10 1 11 I 12 13 14 15 16 I 17 I 18 1 19 20 21 i i 12 S AL 1/1/2008 I I I 60 60 101 101 101 30 CE 7444 Hearing Date: 6/18/2007 Adoption Date: 6/18/2007 Amend Date: Resolution No.. 1638 30 30 800 800 1 1 501 501 1 69311 14375 6981 14425 TPP1 50001 165261 310021 3436 5000 8168 16604 16604 30 8001 8001 1001 1001 1201 480 CE 101751 208271 Totals 9476 5000 16526 31002 10175 20827 CN 1 1/1/2008 I Discretionary I 34361 TPP 1 50001 81681 166041 166041 1 100 100 120 480 50 1 50 14375 14375 CE CE I CE Supersedes previous editions No No Yes 7/1/08 Yes 1/1/09 Washington State Department of Transportation WAY Aggency Tukwila Co. No.. 17 Co. Name: King Co. City No.. 1320 MPO/RTPO: PSRC Project Identification Protect Costs In Thousands of Dollars A. Federal Aid No. B. Bridge No. m m v y I Fund Source Information C. Project Title ro d v m I Federal Funding D. StreetlRoad Name or Number 'al- i c E B t Phase Federal Federal State Li 0 Z E. Beginning MP or road Ending MP or road E t w Start Fund Cost by Fund F Describe Work to be Done (mm/dd/yyyy) Code Phase Code a 1 2 3 4 5 6 7 8 9 I 10 I 11 12 I 13 1 14 7 03 S 5,000 Ft G CN 1/1/2008 I STP(U) 1 Tukwila Intl Blvd (Phase 2) 0 Tukwila Intl Blvd p from: S 116 St to: S 132 St S Construct overlay, curb gutter, sidewalks, illumination, drainage, T landscaping, and utility undergrounding. W Totals 3691 4200 1422 9313 4645 4668 CN 1 1/1/2008 STP(U) 34261 WSDOTI 28511 6241 69011 32451 36561 14 8 03 S 2,100 Ft G Tukwila Intl Blvd (Phase 3) C Tukwila Intl Blvd S from: S 132 St to: S 138 St P Reconstruct roadway Including paving, curb gutter, sidewalks, T illumination, drainage, and utility undergrounding. W 17 9 03 P 1000 P S 144 St (Phase 2) T S 144 St W from: 42nd Ave S to: Tukwila Intl Blvd S Design and construct paving, curb gutter, sidewalks, drainage, G illumination, and utility undergrounding. C 16 10 07 S C Overlay and Repair Program G Various City Streets 0 from: to: P Repair, rehabilitate, and overlay City streets as needed in an S annual program. T 16 11 12 S W Traffic Signal Interconnect Program T Various City Streets G from: to: C Design and install hard wire interconnect system between traffic P signals and the Traffic Operations Center S 14 12 03 P 4,500 Ft W Interurban Ave S T Interurban Ave S S from: S 143 St to: Ft Dent Way P Reconstruct street including paving, curb gutter drainage, G illumination, sidewalk, and landscaping. C Totals PE 1/1/2010 RW 1/1/2010 CN 1/1/2011 Totals AL 1 1/1/2008 Totals AL I 1/1/2013 Totals RW 1/1/2013 CN 1/1/2013 Totals Page2 Six Year Transportation Improvement Program From 2008 to 2013 Hearing Date: 6/18/2007 Amend Date: State Local Total Funds Funds Funds Expenditure Schedule (Local Agency) 1st 2nd 3rd 14 15 16 17 I 18 3691 TPPI 42001 1422 9313 4645 46681 3426 2851 624 6901 3245 3656 200 200 1 200 1 35 35 1 1 35 1 1138 1138 1 Adoption Date: 6/18/2007 Resolution No.. 1638 4th Thru 6th 19 1138 CE 1373 1373 235 1138 7500 7500 1250 1250 1250 3750 CE No CE 1 1 75001 75001 12501 12501 12501 3750 CE 1 1 30001 30001 1 1 1 3000 CE 3000 3000 3000 1 1501 1501 1 74751 7475 150 CE 7475 7625 7625 7625 Federally Funded Projects Only R/W Required Envir Date Type (MMNY) 20 21 Supersedes previous editions Yes 1/1/08 No No No Yes 1/1/12 IOW Washington State Department of Transportation Agency* Tukwila Co. No.. 17 Co. Name: King Co. City No.. 1320 MPO /RTPO: PSRC 15 c m O y� c LL oE Project Identification A. Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or road Ending MP or road F Describe Work to be Done Project Costs In Thousands of Dollars Fund Source Information a m m d v r Federal Funding Phase Federal Federal State E r d Start Fund Cost by Fund State Local Total a (mm/dd/yyyy) Code Phase Code Funds 1 2 3 4 5 6 7 8 9 10 1 11 16 13 21 P T RW 1/1/2009 Tukwila Urban Center Transit Center W CN 1/1/2010 CMAQ Central Business District P from: to: S Design and construct a transit center. 16 14 17 15 16 16 16 17 05 P 2000 C Andover Park West C, Andover Park West P from: Tukwila Parkway to: Strander Blvd. S Complete widening for center left turn lane. T W 05 P 0.25 C S 144 St Bridge Sidewalks C, S 144 St p from: 51st Ave S to: 53rd Ave S S Widen existing sidewalks on bridge over 1 -5 between 51st Ave S T and 53rd Ave S. W 03 S 11 W Southcenter Blvd. S Southcenter Blvd. T from: 1 to: Tukwila Intl Blvd. C Improve roadway to a three -lane urban arterial with medians, turn G lanes, curbs, gutters, sidewalks, street lighting, and drainage. P Andover Park E Minkler Blvd. East Marginal Way East Marginal Way from: Boeing Access Rd 12 S 1,000 Ft S T to: S 112 St W Totals RW 1/1/2010 CN 1/1/2010 Totals PEI 1/1/2013 Totals PE 1/1/2008 CN 1/1/2009 Totals AL 1 1/1/2010 from: 500 Ft each leg to: 500 Ft each leg Design and construct intersection and traffic signal improvements and widening for left turn lanes. Totals 16 18 03 P 1,500 Ft P AL I 1/1/2009 I Page 3 Six Year Transportation Improvement Program From 2008 to 2013 200 200 I 12 I I 1 Hearing Date: 6/18/2007 Adoption Date: 6/18/2007 Amend Date: Resolution No.. 1638 Funds Funds 1st 2nd 3rd 13 14 1 15 16 1 17 I 18 1 6001 600 1 6001 1 31201 3320 1 1 3320 3720 3920 1 1 6561 656 1 1 8051 8051 1461 1461 1 251 251 600 3320 7600 7600 1 1 4701 4701 Expenditure Schedule (Local Agency) 1 1 1 1 805 25 25 1 1 6001 600 6001 1 1 1 70001 70001 1 70001 470 470 1 6601 6601 1 351 656 1461 1 1 1 25 CE 25 600 7000 1 1 651 405 CE 65 405 Design and construct widening to 3 lanes including curb gutter, sidewalks, drainage, landscaping, and utility undergrounding. Totals 660 660 35 625 625 CE Federally Funded Projects Only RAN 4th Required Thru Envir Date 6th Type (MM/yy) 19 20 21 CE Yes CE CE Supersedes previous editions Yes No No No No Transportation fiprovemG" 2008 to 2013 Page 4 Six Year From Adoption Date: 611812007 Hearing Date: 611812007 Resolution No.. 163 of Transportation Funded Amend Date: Federates Only twt5tate Departmen Pro Vi washing E xpenditure Sched tz1W city Tuk Thousands of Dollars (Coca! A0 'Required g wila Name: King G0 p ro)ect costs In l nfor+aat 1On 4th Envir Date Co. Na Fund Source I Thru Type (MMN 17 MPOiR PSRC 3d r G o No TPO: Federal Funding Local Total 1st 2nd 7 6th 20 21 A G No.. 1320m c N State tate Fun F n 17 18 1 19 Federal S ds u ds I m N a c rJ t _F Fund Funds Protect Identification B. Bridge No. a phase Fund Cost by Code 15 16 4 l 725 CE No Phase 14 1 roa 9 U 1 Aid N Start Code 13 A Federal r rn o 'n 'o tm tart Y{ 11 12 I 766 766 ectlltle a 9 10 m C Prot Ending MP °r road 8 I I Road Name or Number 1 0 a Z E. Beginning MP to be Done 5—T 6 r AL 11112010 I I u. F Describe work 41 72 3 '12 P 1,500 Fl Q 2 766 g00� I 50 4501 CE No 1 I 5001 14 19 West ValleYH`'dytS156St I Io: S 158 St Totals I 156 St for 5 Al_ I 11112009 I from: SOUthCenter stud 1,000 Ft W 450 bound left S 1 lane at S P 50 Construct rthbo additional north '12 T I I 425 GE No northbound NOV to northbound 1405 S 500 500 1 G 425\ 4251 16 20 s Intersection C 1 S 133 St i SR 599 Ramp I to: 500 Ft on each leg P Totals I 500 Ft on each leg ents including a new AL I 1112011 from: improvements 425 construct intersection imp 04 P 2 000 Ft W Design and co L 41 I 316 CE 140 signal. 42 traffic srg SS 425 P 3571 3571 I 16 21 MinMer Blvd Minkler Blvd to: Andover Parkw rdewatk, from: Southcenter Pkwy cure Putter, Consrucf widening for 3 lanes intcuding drainage and landscaping. 16 22 Industry Dr Si Andover Pk E to: 500 Ft on each leg from.. 500 Ft on each leg Design and construct a traffic signal and intersection improvem 16 23 S180 St Andover Park W Intersection to: 500 Ft, on each leg from: 500 Ft. on each leg Widen for north 1 south turn lanes. 16 24 S168St S 168 St roadway nter Pkwy to'. Andover Park E trom'• a Construct new including curb gutter sidewalk, drainage, il rainage• illumination, and landscaping. 12 P Totals AL 11112010 I 1,000 Ft W S P Totals AL I 11112013 1 2 p 1000 W 01 P Totals AL 11112013 4,000 Ft T W S Totals I I I 357 357 I I I 2101 2101 13750 13750 41 316 210 GE 210 210 I 1 210 1 3750 GE 137541 137501 1375 N0 No Supersedes previous editions Washington State Department of Transportation Agency' Tukwila Co. No.. 17 Co. Name: King Co. City No.. 1320 MPOIRTPO: PSRC Project Identification Project Costs in Thousands of Dollars s Expenditure Schedule A. Federal Aid No. B. Bridge No. m v y Fund Source Information 1 a c a C. Project Title f o 0 Federal Funding (Local Agency) D. Street/Road Name or Number o `a~ y o a Phase Federal Federal State 4th u. a Z E. Be inning MP or road Endin MP or road E m Start Fund Cost b Fund State Local Total Thru 9 g g y Funds Funds Funds 1st 2nd 3rd F Describe Work to be Done a. (mm/dd/yyyy) Code Phase Code 6th 1 2 3 4 5 6 7 8 9 I 10 I 11 12 1 13 14 15 16 I 17 I 18 I 19 14 25 04 P 0.5 C AL 1/1/2013 I I 11200 11200 1 SC Blvd. Widening G Southcenter Blvd P from: 1 -5 to: 61st Ave S Bridge S Widen Southcenter Blvd. and the 61st Ave S Bridge to add a lane T for future traffic growth. W Totals 11200 11200 11200 14 26 04 P 2000 P AL I 1/1/2013 I I 1 I I 46751 46751 1 1 I 4675 CE Tukwila Int'I Blvd S 116 St Tukwila Intl Blvd from: 1,000 Ft. on each leg to: 1,000 Ft. on each leg Design and construct widening on Tukwila Intl Blvd and intersection improvements at T.I.B. /S 116 St. Totals 14 27 03 AL I 1/1/2011 14 28 17 29 00 30 Tukwila Int'I Blvd. (Phase 4) Tukwila Intl Blvd from: Boeing Access Rd to: S 116 St Design and construct widening including paving, curb gutter, sidewalk, drainage, illumination, landscaping, and utility West Valley Highway West Valley Hwy from: 1-405 to: Strander Blvd Design and construct widening to 7 lanes including curb gutter, sidewalks, illumination, and drainage. Nelson Place Nelson Place from: S 156 St to: S 158 st 05 P 3,500 Ft P S W 0 P 0.5 Mi W T S P G 03 P 600 Ft Totals AL I 1/1/2013 Totals AL I 1/1/2013 Design and construct paving, curb gutter sidewalks, drainage, and illumination. Totals 32 P 1,000 Fl PE 1/1/2008 Tukwila Urban Center Ped /Bike Bridge 08 AL 1/1/2013 I STP(E) Page 5 Six Year Transportation Improvement Program From 2008 to 2013 I 1 6301 6301 1 1 I 630 CE 200 Hearing Date: 6/18/2007 Amend Date: 4675 4675 30001 30001 630 630 2001 2001 200 200 I 1 1 21001 2 001 2001 I Adoption Date: 6/18/2007 Resolution No.. 1638 3000 3000 3000 I 1 I 11200 4675 I 3000 CE from: Baker Blvd to: West Valley Hwy Pedestrian bridge over the Green River connecting the CBD and rail station. Totals 200 2100 2300 200 2100 630 200 CE 200 2100 CE Federally Funded Projects Only RAN Required Envir Date Type (MM/yy) 20 21 CE No Supersedes previous editions No No No No No Washington State Department of Transportation Page 6 Six Year Transportation Improvement Program Agency* Tukwila From 2008 to 2013 Co. No.. 17 Co. Name: King Co. Hearing Date: 6/18/2007 Adoption Date: 6/18/2007 City No.. 1320 MPO /RTPO: PSRC Amend Date: Resolution No.. 1638 i az 1 2 17 31 Project Identification A. Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or road Ending MP or road F Describe Work to be Done 3 Macadam Rd S 144 St Left Turn Pocket Macadam Road from: S 144 St to: 1,000 Ft. on south leg Widen Macadam Road to add a northbound left turn lane. Project Costs in Thousands of Dollars Federally Funded a D v d I Fund Source Information Expenditure Schedule Projects Only m 0 0 u t I Federal Funding I (Local Agency) R/W V a� y o k Phase Federal Federal State 4th Required E 1- d Start Fund Cost by Fund State Local Total 1st 2nd 3rd Thru Envir Date 2 (mm/ddryyyy) Code Phase Code a Funds Funds Funds 6th Type (MM/YY) 4 5 6 7 8 9 I 10 11 I 12 I 13 14 15 16 I 17 I 18 I 19 20 21 1 1 1 05 P 1000 AL 1/1/2010 I 1 1 444 444 1 I 1521 292 CE Totals Grand Totals for 444 444 152 292 Supersedes previous editions No