HomeMy WebLinkAboutRes 1638 - 2008-2013 Transportation Improvement Program �vIILA, /17'
19 08
C ity of Tukwila
Washington
Resolution No. I to 3 8
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUKWILA,
WASHINGTON, ADOPTING A SIX -YEAR TRANSPORTATION
IMPROVEMENT PROGRAM (2008- 2013), AND DIRECTING THE SAME
TO BE FILED WITH THE STATE SECRETARY OF TRANSPORTATION
AND THE TRANSPORTATION IMPROVEMENT BOARD.
WHEREAS, pursuant to the requirements of RCW Chapters 35.77 and 47.26 as
amended, the City Council of the City of Tukwila has previously adopted a
Transportation Improvement Program and thereafter periodically modified said
Transportation Improvement Program by resolution; and
WHEREAS, the City Council has reviewed the work accomplished under said
program, determined current and future City street and arterial needs and, based upon
these findings, has prepared a Six -Year Transportation Improvement Program for the
ensuing six calendar years (2008- 2013); and
WHEREAS, a public hearing was held regarding the City's Six -Year Transportation
Improvement Program on June 18, 2007;
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA,
WASHINGTON, HEREBY RESOLVES AS FOLLOWS:
Section 1. Program Adopted. A six -year Transportation Improvement Program
for the calendar years 2008 -2013 is hereby adopted.
Section 2. Filing of Program. The City Clerk is hereby authorized and directed to
file a copy of this resolution, together with the exhibit attached hereto, with the
Secretary of Transportation and the Transportation Improvement Board of the State of
Washington.
PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON,
at a Regular Meeting thereof this 1 g day of S� R 2007.
ATTEST/ AUTHENTICATED:
6 (-1./_./ z
V erns Griffin, Council President
Jan; Cantu, CMC, City Clerk
APPROVED AS TO FORM BY:
Filed with the City Clerk: �o ii 07
by City :6 -/k C2'
��,w- 7�_,����" Passed b the Cit Council•
Office of the City Attorney Resolution Number: (o g
Exhibit: City of Tukwila' s Six -Year Transportation
Improvement Program from 2008 to 2013
C: Documents and Settings \All Users\ Desktop \Kelly \MSDATA \Resolutions \TIP 2008 -2013 Adoption.doc
RT:GL:kn 6/14/2007 Page 1 of 1
/are City of Tukwi
a
����f: 6200 Southcenter Boulevard Tukwila, Washington 98188 Steven M. Mullet, Mayor
t 1906
July 10, 2007
Washington State Department of Transportation
P.O. Box 40901
Olympia, WA 98504 -7316
Attn: Jeanne Burbidge, Chair, Transportation Improvement Board
RE: 2008 -2013 Transportation Improvement Program City of Tukwila
Dear Ms. Burbidge:
On Monday, June 18, the Tukwila City Council approved Resolution #1638 adopting the
2008 -2013 Transportation Improvement Program.
A copy of the resolution along with the Transportation Improvement Program are
enclosed.
Please contact me at (206) 433 -1800 if you have questions.
Sincerely,
cZYLL.
J e E. Cantu, CMC
City Clerk
Enclosures
C: Verna Griffin, President, Tukwila City Council
James Morrow, Public Works Director, City of Tukwila
Phone: 206- 433 -1800 0 City Hall Fax: 206 433 -1833 0 www.ci.tukwila.wa.us
City of Tukwila
.t i--1r
(-0' 6 6200 Southcenter Boulevard Tukwila, Washington 98188 Steven M Mullet, Mayor
1908
July 10, 2007
Douglas D. MacDonald, Secretary
Washington State Department of Transportation
P.O. Box 47316
Olympia, WA 98504 -7316
RE: 2008 -2013 Transportation Improvement Program City of Tukwila
Dear Mr. MacDonald:
On Monday, June 18, the Tukwila City Council approved Resolution #1638 adopting the
2008 -2013 Transportation Improvement Program.
A copy of the resolution along with the Transportation Improvement Program are
enclosed.
Please contact me at (206) 433 -1800 if you have questions.
Sincerely,
Jr- E. Cantu, CMC
City Clerk
Enclosures
C: Verna Griffin, President, Tukwila City Council
James Morrow, Public Works Director, City of Tukwila
Phone: 206 433 -1800 City Hall Fax: 206 433 -1833 www.ci.tukwila.wa.us
Washington State Department of Transportation
Agency Tukwila
Co. No.. 17 Co. Name: King Co.
City No.. 1320 MPO /RTPO: PSRC
14 3
14 4
16 5
16 6
Project Identification
A. Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or road Ending MP or road
F Describe Work to be Done
3
from: to:
Provide safe connections to public trails to promote pedestrian
and bicycle modes of transportation In lieu of motorized vehicles.
Annual Bridge Inspections and Repairs
Various City Streets
from: to:
Perform load ratings and bi- annual inspections as well as
construct necessary repairs and maintenance.
08002500
from: Airport Way to: 1 -5
Reconstruct bridge.
11 S
09 P 1,000 Ft T
Boeing Access Rd Bridge Replacement p
Boeing Access Road 0
01 S 7 400 Ft W
Southcenter Parkway Extension T
Southcenter Parkway S
from: S 180 St to: S 200 St P
Construct widening to 4 lanes with center turn pockets including G
curb gutter, sidewalks, drainage, landscaping, and utility
05 P 1,500 Ft W
Tukwila Urban Center Access (Klickitat) 08 T
S
from: 1 -5 Off Ramp to: S 168 St P
Design and construct safety and capacity improvements. G
Totals
AL 1 1/1/2008 1
Totals
PE 1/1/2008
AL 1/1/2013
Totals
BR
Totals 7444
CN 1 1/1/2008 1 Discretionary I 94761
Page 1 Six Year Transportation Improvement Program
From 2008 to 2013
Neighborhood Traffic Calming Program No
Various City Streets
from: to:
Program to address neighborhood traffic concerns using striping,
signage, roadway improvements, traffic calming, and education to Totals 60 60 10 10 10 30
00 2 32 P PE 1 1/1/2013 1 I I 1 1 301 301 1 1 I 30 CE
Greenbelt Trails No
Project Costs in Thousands of Dollars Federally Funded
o I Fund Source Information Expenditure Schedule Projects Only
E w c o a (Local Agency)
a t I Federal Funding I R/W
a� y c a Phase Federal Federal State 4th Required
E r- d Start Fund Cost by Fund State Local Total 1st 2nd 3rd Thru Envir Date
o-
(mm/dd/yyyy) Code Phase Code Funds Funds Funds 6th Type (mmjyy)
4 5 6 7 8 9 1 10 1 11 I 12 13 14 15 16 I 17 I 18 1 19 20 21
i i
12 S AL 1/1/2008 I I I 60 60 101 101 101 30 CE
7444
Hearing Date: 6/18/2007 Adoption Date: 6/18/2007
Amend Date: Resolution No.. 1638
30 30
800 800
1 1 501 501
1 69311 14375
6981 14425
TPP1 50001 165261 310021
3436 5000 8168 16604 16604
30
8001 8001 1001 1001 1201 480 CE
101751 208271
Totals 9476 5000 16526 31002 10175 20827
CN 1 1/1/2008 I Discretionary I 34361 TPP 1 50001 81681 166041 166041 1
100 100 120 480
50 1
50 14375
14375 CE
CE
I CE
Supersedes previous editions
No
No
Yes
7/1/08
Yes
1/1/09
Washington State Department of Transportation
WAY
Aggency Tukwila
Co. No.. 17 Co. Name: King Co.
City No.. 1320 MPO/RTPO: PSRC
Project Identification Protect Costs In Thousands of Dollars
A. Federal Aid No. B. Bridge No. m m v y I Fund Source Information
C. Project Title ro d v m I Federal Funding
D. StreetlRoad Name or Number 'al- i c E
B t Phase Federal Federal State
Li 0 Z E. Beginning MP or road Ending MP or road E t w Start Fund Cost by Fund
F Describe Work to be Done (mm/dd/yyyy) Code Phase Code
a
1 2 3 4 5 6 7 8 9 I 10 I 11 12 I 13
1
14 7 03 S 5,000 Ft G CN 1/1/2008 I STP(U) 1
Tukwila Intl Blvd (Phase 2) 0
Tukwila Intl Blvd p
from: S 116 St to: S 132 St S
Construct overlay, curb gutter, sidewalks, illumination, drainage, T
landscaping, and utility undergrounding. W Totals 3691 4200 1422 9313 4645 4668
CN 1 1/1/2008 STP(U) 34261 WSDOTI 28511 6241 69011 32451 36561
14 8 03 S 2,100 Ft G
Tukwila Intl Blvd (Phase 3) C
Tukwila Intl Blvd S
from: S 132 St to: S 138 St P
Reconstruct roadway Including paving, curb gutter, sidewalks, T
illumination, drainage, and utility undergrounding. W
17 9 03 P 1000 P
S 144 St (Phase 2) T
S 144 St W
from: 42nd Ave S to: Tukwila Intl Blvd S
Design and construct paving, curb gutter, sidewalks, drainage, G
illumination, and utility undergrounding. C
16 10 07 S C
Overlay and Repair Program G
Various City Streets 0
from: to: P
Repair, rehabilitate, and overlay City streets as needed in an S
annual program. T
16 11 12 S W
Traffic Signal Interconnect Program T
Various City Streets G
from: to: C
Design and install hard wire interconnect system between traffic P
signals and the Traffic Operations Center S
14 12 03 P 4,500 Ft W
Interurban Ave S T
Interurban Ave S S
from: S 143 St to: Ft Dent Way P
Reconstruct street including paving, curb gutter drainage, G
illumination, sidewalk, and landscaping. C
Totals
PE 1/1/2010
RW 1/1/2010
CN 1/1/2011
Totals
AL 1 1/1/2008
Totals
AL I 1/1/2013
Totals
RW 1/1/2013
CN 1/1/2013
Totals
Page2 Six Year Transportation Improvement Program
From 2008 to 2013
Hearing Date: 6/18/2007
Amend Date:
State Local Total
Funds Funds Funds
Expenditure Schedule
(Local Agency)
1st 2nd 3rd
14 15 16 17 I 18
3691 TPPI 42001 1422 9313 4645 46681
3426 2851 624 6901 3245 3656
200 200 1 200
1 35 35 1 1 35
1 1138 1138 1
Adoption Date: 6/18/2007
Resolution No.. 1638
4th
Thru
6th
19
1138
CE
1373 1373 235 1138
7500 7500 1250 1250 1250 3750
CE
No
CE
1 1 75001 75001 12501 12501 12501 3750 CE
1 1 30001 30001 1 1 1 3000 CE
3000 3000 3000
1 1501 1501
1 74751 7475
150 CE
7475
7625 7625 7625
Federally Funded
Projects Only
R/W
Required
Envir Date
Type (MMNY)
20 21
Supersedes previous editions
Yes
1/1/08
No
No
No
Yes
1/1/12
IOW
Washington State Department of Transportation
Agency* Tukwila
Co. No.. 17 Co. Name: King Co.
City No.. 1320 MPO /RTPO: PSRC
15
c m
O y�
c
LL
oE
Project Identification
A. Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or road Ending MP or road
F Describe Work to be Done
Project Costs In Thousands of Dollars
Fund Source Information
a m
m d v r Federal Funding
Phase Federal Federal State
E r d Start Fund Cost by Fund State Local Total
a (mm/dd/yyyy) Code Phase Code Funds
1 2 3 4 5 6 7 8 9 10 1 11
16 13 21 P T RW 1/1/2009
Tukwila Urban Center Transit Center W CN 1/1/2010 CMAQ
Central Business District P
from: to: S
Design and construct a transit center.
16 14
17 15
16 16
16 17
05 P 2000 C
Andover Park West C,
Andover Park West P
from: Tukwila Parkway to: Strander Blvd. S
Complete widening for center left turn lane. T
W
05 P 0.25 C
S 144 St Bridge Sidewalks C,
S 144 St p
from: 51st Ave S to: 53rd Ave S S
Widen existing sidewalks on bridge over 1 -5 between 51st Ave S T
and 53rd Ave S. W
03 S 11 W
Southcenter Blvd. S
Southcenter Blvd. T
from: 1 to: Tukwila Intl Blvd. C
Improve roadway to a three -lane urban arterial with medians, turn G
lanes, curbs, gutters, sidewalks, street lighting, and drainage. P
Andover Park E Minkler Blvd.
East Marginal Way
East Marginal Way
from: Boeing Access Rd
12 S 1,000 Ft
S
T
to: S 112 St W
Totals
RW 1/1/2010
CN 1/1/2010
Totals
PEI 1/1/2013
Totals
PE 1/1/2008
CN 1/1/2009
Totals
AL 1 1/1/2010
from: 500 Ft each leg to: 500 Ft each leg
Design and construct intersection and traffic signal improvements
and widening for left turn lanes. Totals
16 18 03 P 1,500 Ft P AL I 1/1/2009 I
Page 3 Six Year Transportation Improvement Program
From 2008 to 2013
200
200
I
12
I I 1
Hearing Date: 6/18/2007 Adoption Date: 6/18/2007
Amend Date: Resolution No.. 1638
Funds Funds 1st 2nd 3rd
13 14 1 15 16 1 17 I 18
1 6001 600 1 6001
1 31201 3320 1 1 3320
3720 3920
1 1 6561 656 1 1 8051 8051
1461 1461
1 251 251
600 3320
7600 7600
1 1 4701 4701
Expenditure Schedule
(Local Agency)
1 1
1 1 805
25 25
1 1 6001 600 6001 1
1 1 70001 70001 1 70001
470 470
1 6601 6601 1 351
656
1461
1 1 1 25 CE
25
600 7000
1 1 651 405 CE
65 405
Design and construct widening to 3 lanes including curb gutter,
sidewalks, drainage, landscaping, and utility undergrounding. Totals 660 660 35 625
625 CE
Federally Funded
Projects Only
RAN
4th Required
Thru Envir Date
6th Type (MM/yy)
19 20 21
CE
Yes
CE
CE
Supersedes previous editions
Yes
No
No
No
No
Transportation fiprovemG"
2008 to 2013
Page 4 Six Year
From
Adoption Date: 611812007
Hearing Date:
611812007 Resolution No.. 163
of Transportation Funded
Amend Date: Federates Only
twt5tate Departmen Pro
Vi washing E xpenditure Sched tz1W
city Tuk Thousands of Dollars (Coca! A0 'Required
g wila
Name: King G0 p ro)ect costs In l nfor+aat 1On 4th Envir Date
Co. Na Fund Source I Thru Type (MMN
17 MPOiR PSRC 3d
r
G o No TPO: Federal Funding Local Total 1st 2nd 7 6th 20 21
A
G No.. 1320m c N State tate Fun F n 17 18 1 19
Federal S ds u ds I
m N a c rJ t _F Fund Funds
Protect Identification B. Bridge No. a phase Fund Cost by Code 15 16 4 l 725 CE
No
Phase 14 1
roa 9 U
1 Aid N Start Code 13 A Federal r rn o 'n 'o tm tart Y{ 11 12 I 766 766
ectlltle a 9 10
m C Prot Ending MP °r road 8 I I
Road Name or Number
1 0 a Z E. Beginning MP to be Done 5—T 6 r AL 11112010 I I
u. F Describe work 41 72
3 '12 P 1,500 Fl Q
2 766 g00� I 50 4501 CE No
1 I 5001
14 19 West ValleYH`'dytS156St I
Io: S 158 St Totals I
156 St for 5 Al_ I 11112009 I
from: SOUthCenter stud 1,000 Ft W 450
bound left S 1 lane at S P 50
Construct rthbo additional north '12 T I I 425 GE No
northbound NOV to northbound 1405 S 500 500 1
G 425\ 4251 16 20 s Intersection C 1
S 133 St i SR 599 Ramp I
to: 500 Ft on each leg P Totals I
500 Ft on each leg ents including a new AL I 1112011
from: improvements 425
construct intersection imp 04 P 2 000 Ft W
Design and co L 41 I 316 CE 140
signal. 42
traffic srg SS 425
P 3571 3571 I
16 21
MinMer Blvd
Minkler Blvd to: Andover Parkw rdewatk,
from: Southcenter Pkwy
cure Putter,
Consrucf widening for 3 lanes intcuding
drainage and landscaping.
16 22 Industry Dr Si
Andover Pk E to: 500 Ft on each leg
from.. 500 Ft on each leg
Design and construct a traffic signal and intersection
improvem
16 23
S180 St Andover Park W Intersection
to: 500 Ft, on each leg
from: 500 Ft. on each leg
Widen for north 1 south turn lanes.
16 24
S168St
S 168 St roadway nter Pkwy to'. Andover Park E
trom'• a Construct new including curb gutter sidewalk,
drainage, il rainage• illumination, and landscaping.
12 P
Totals
AL 11112010 I
1,000 Ft W
S
P
Totals
AL I 11112013
1 2 p 1000 W
01 P
Totals
AL 11112013
4,000 Ft T
W
S
Totals
I
I I
357 357
I I
I 2101 2101
13750 13750
41 316
210 GE
210
210 I 1
210 1 3750 GE
137541 137501
1375
N0
No
Supersedes previous editions
Washington State Department of Transportation
Agency' Tukwila
Co. No.. 17 Co. Name: King Co.
City No.. 1320 MPOIRTPO: PSRC
Project Identification Project Costs in Thousands of Dollars
s Expenditure Schedule
A. Federal Aid No. B. Bridge No. m v y Fund Source Information
1 a c a C. Project Title f o 0
Federal Funding (Local Agency)
D. Street/Road Name or Number o `a~ y o a Phase Federal Federal State 4th
u. a Z E. Be inning MP or road Endin MP or road E m Start Fund Cost b Fund State Local Total Thru
9 g g y Funds Funds Funds 1st 2nd 3rd
F Describe Work to be Done a. (mm/dd/yyyy) Code Phase Code 6th
1 2 3 4 5 6 7 8 9 I 10 I 11 12 1 13 14 15 16 I 17 I 18 I 19
14 25 04 P 0.5 C AL 1/1/2013 I I 11200 11200 1
SC Blvd. Widening G
Southcenter Blvd P
from: 1 -5 to: 61st Ave S Bridge S
Widen Southcenter Blvd. and the 61st Ave S Bridge to add a lane T
for future traffic growth. W Totals 11200 11200 11200
14 26 04 P 2000 P AL I 1/1/2013 I I 1 I I 46751 46751 1 1 I 4675 CE
Tukwila Int'I Blvd S 116 St
Tukwila Intl Blvd
from: 1,000 Ft. on each leg to: 1,000 Ft. on each leg
Design and construct widening on Tukwila Intl Blvd and
intersection improvements at T.I.B. /S 116 St. Totals
14 27 03 AL I 1/1/2011
14 28
17 29
00 30
Tukwila Int'I Blvd. (Phase 4)
Tukwila Intl Blvd
from: Boeing Access Rd to: S 116 St
Design and construct widening including paving, curb gutter,
sidewalk, drainage, illumination, landscaping, and utility
West Valley Highway
West Valley Hwy
from: 1-405 to: Strander Blvd
Design and construct widening to 7 lanes including curb gutter,
sidewalks, illumination, and drainage.
Nelson Place
Nelson Place
from: S 156 St
to: S 158 st
05
P 3,500 Ft P
S
W
0
P 0.5 Mi W
T
S
P
G
03 P 600 Ft
Totals
AL I 1/1/2013
Totals
AL I 1/1/2013
Design and construct paving, curb gutter sidewalks, drainage,
and illumination. Totals
32 P 1,000 Fl PE 1/1/2008
Tukwila Urban Center Ped /Bike Bridge 08 AL 1/1/2013
I
STP(E)
Page 5 Six Year Transportation Improvement Program
From 2008 to 2013
I
1 6301 6301 1 1 I 630 CE
200
Hearing Date: 6/18/2007
Amend Date:
4675 4675
30001 30001
630 630
2001 2001
200 200
I 1
1 21001 2 001 2001 I
Adoption Date: 6/18/2007
Resolution No.. 1638
3000 3000 3000
I 1 I
11200
4675
I 3000 CE
from: Baker Blvd to: West Valley Hwy
Pedestrian bridge over the Green River connecting the CBD and
rail station. Totals 200 2100 2300 200 2100
630
200 CE
200
2100 CE
Federally Funded
Projects Only
RAN
Required
Envir Date
Type (MM/yy)
20 21
CE
No
Supersedes previous editions
No
No
No
No
No
Washington State Department of Transportation Page 6 Six Year Transportation Improvement Program
Agency* Tukwila From 2008 to 2013
Co. No.. 17 Co. Name: King Co. Hearing Date: 6/18/2007 Adoption Date: 6/18/2007
City No.. 1320 MPO /RTPO: PSRC Amend Date: Resolution No.. 1638
i az
1 2
17 31
Project Identification
A. Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or road Ending MP or road
F Describe Work to be Done
3
Macadam Rd S 144 St Left Turn Pocket
Macadam Road
from: S 144 St to: 1,000 Ft. on south leg
Widen Macadam Road to add a northbound left turn lane.
Project Costs in Thousands of Dollars Federally Funded
a D v d I Fund Source Information Expenditure Schedule Projects Only
m 0 0 u t I Federal Funding I (Local Agency) R/W
V a� y o k Phase Federal Federal State 4th Required
E 1- d Start Fund Cost by Fund State Local Total 1st 2nd 3rd Thru Envir Date
2 (mm/ddryyyy) Code Phase Code
a Funds Funds Funds 6th Type (MM/YY)
4 5 6 7 8 9 I 10 11 I 12 I 13 14 15 16 I 17 I 18 I 19 20 21
1 1 1
05 P 1000 AL 1/1/2010 I 1 1 444 444 1 I 1521 292 CE
Totals
Grand Totals for
444 444 152 292
Supersedes previous editions
No