Loading...
HomeMy WebLinkAboutFS 2007-09-04 COMPLETE AGENDA PACKET �J'FW ZY City of Tukwila G men tion. K. T. Kinlow Matej Q •y M. Miotke y Finance &Safety Commiftee J. Hern erton Morrow �X D. Robertson C. OFlaherty N Jim Ha erton Chair Mayor Mullet G. Labanara N.Olivas 99 INS Joan Hernandez R.Can u D Pace D. Speck Dennis Robertson B. Fletcher R, Still K. Fuhrer D. Tomaso D. Haynes Judge Walden V. Jessop CC File (cover) S. Kerslake AGENDA TUESDAY, SEPTEMBER 4, 2007; 5:00 PM Conference Room #3 Item Action to be Taken Page 1. PRESENTATIONS 2. BUSINESS AGENDA a. Expenditure of funds for Regional Fire Authority; a. Forward to 9/10 C.O.W. Pg. 1 Nick Oiivas, Fire Chief, and 9/17 Regular Mtg. b. Expenditure of funds for South County Jail Study; b. Forward to 9/10 C.O.W. P9.21 Dave Haynes, Po /ice Chief, and 9/17 Regular Mtg. c. Use of Police Department seizure funds for vehicle c. Information only. Pg.33 purchase; Dave Haynes, Po /ice Chief. 3. ANNOUNCEMENTS 4. MISCELLANEOUS Next Scheduled Meeting: Monday, September 18, 2007 The City of Tukwila strives to accommodate individuals with disabilities. Please contact the City Clerk's Office at 206 433 -1800 for assistance. City of Tukwila 6200 Southcenter Boulevard Tukwila, Washington 98188 Steven M. Mullet, Mayor MEMORANDUM TO: Finance and Safety Committee FROM: Mayor's Office Fire Department DATE: August 28, 2007 SUBJECT: Joint Fire Services Study As committee members are aware, the cities of SeaTac and Tukwila have had a series of meetings to discuss the possibility of providing fire services jointly. We have met with representatives of Emergency Services Consulting, inc., the company that worked with Auburn, Algona and Pacific to form their Regional Fire Authority. Attached for your review and recommendation are three documents: 1) A SeaTac /Tukwila Master plan and Pay tnership Study Estimated Cost of Work, 2) an Interlocal Agreement between the cities of SeaTac and Tukwila for a Cooperative Fire Services Study, and 3) a Master Plan and Cooperative Fire Services Study Consultant Contract. It is estimated that our share of the study costs will be approximately 530,000. Staff recommends that the Mayor be authorized to sign the Interlocal and Consultant Services agreements, at a cost not to exceed 540,000, in anticipation of unforeseen costs arising. Funding for this effort will be taken from 2007 salary savings. With committee approval, these items will be forwarded to the COW for consideration on September 10, and to the Regular Council meeting of September 17. Phone: 206 433 -1800 City Hall Fax: 206- 433 -1833 e www.ci.tukwila.wa.us Rhonda Berry cost estimate full scope.xls 1 SeaTac/ Tukwila Master Plan and Partnership Study Estimated Cost of Work Objective Estimated costs Consulting Services Phase 1 Master Planning Process 1 &2 Work Plan and Review of Materials 1,015 3 Stakeholder Input 4,640 4 Current Service Delivery Analysis 20,760 5 Future System Demands 2,900 6 Future Delivery System Models 2,900 7 Fiscal Analysis 7,395 Subtotal 39,610 Phase 2 Partnership Opportunities Analysis 6,960 Phase 3 Findings and Action Steps 2,175 Draft and Final Reports and Presentations 4,495 Total Consulting Services 53,240 Expenses Phase 1 Master Planning Process 1 &2 Work Plan and Review of Materials 239 3 Stakeholder Input 1,379 4 Current Service Delivery Analysis 1,509 5 Future System Demands 272 6 Future Delivery System Models 7 Fiscal Analysis 787 Subtotal 4,186 Phase 2 Partnership Opportunities Analysis 851 Phase 3 Findings and Action Steps Draft and Final Reports and Presentations 1,120 Total Expenses 6,157 Grand Total 59,397 DRAFT 08/20/07 Rhonda Berry ILA fire study 2.doc 1 DRAFT INTERLOCAL AGREEMENT BETWEEN THE CITIES OF SEATAC AND TUKWILA FOR COOPERATIVE FIRE SERVICES STUDY THIS INTERLOCAL AGREEMENT "ILA is entered into pursuant to Chapter 39.34 RCW by the Cities of SeaTac and Tukwila Washington hereinafter referred to as "Cities to provide for the joint funding of Cooperative Fire Services Study. WHEREAS, the Cities desire to develop and promote equitable solutions to meet local, regional, and federal requirements. WHEREAS, the Cities desire to participate in efforts to plan effectively to share the use of common resources. WHEREAS, the Cities have agreed on the use of Emergency Services Consulting, Inc. a well qualified consultant available to perform the study and have agreed upon the scope of work and contract terms for the study, WHEREAS, through the Interlocal Cooperation Act, the parties have the authority to engage in cooperative efforts which result in more efficient use of Government resources; and NOW THEREFORE, and in consideration of the terms, conditions and performances made herein, it is agreed as follows: 1. Purpose of Interlocal Agreement: The purpose of the Interlocal Agreement is to set up a cooperative arrangement between the Cities to jointly fund an Cooperative Fire Services Study. 2. Lead City. The City of SeaTac will act as the Lead City, serving as the fiscal and administrative agent for the cities and SeaTac's Assistant City Manager as project manager for the study. 3. Governance Structure A. Steering Committee a) A Steering Committee comprised of city fire chiefs, City Manager or Administrator will lead the efforts of the study with SeaTac Assistant City Manager providing support. b) The Steering Committee will select the Consultant to perform the study and approve the schedule, payments, interim products and give direction to the consultant. c) The Steering Committee will develop performance expectations for the Consultant. d) The Steering Committee will manage this Agreement. B. Policy Committee a) A Policy Committee shall be formed and made up of the City Manager or Administrator or designee, the Fire Chief, A firefighters' union representative and two electeds from each city. The Policy Committee will meet at least monthly to get updates and guide policy direction on the Rhonda Berry ILA fire study 2.doc 2 8. Notices. Notices to the Cities shall be sent to the following persons: City Contact Tukwila SeaTac 9. Indemnification. G:\ group \CITYMAN \FIRESTUDY1ILAfire study2.docpage 2 of 3 Interlocal Agreement Cooperative Fires Services Study study.. b) The Policy Committee will be briefed on draft documents and presentations and have the opportunity to comment on the products and give input on the recommendations prior to release to the public or presentation in a public meeting to the City Councils. c) The Policy Committee will make recommendations to move forward on each Phase of the study. d) The Policy Committee will make a recommendation on the results of the study to the City Councils for consideration of future actions. 4. Fundine Arrangement. Each city shall contribute 50% of the cost of the study. The Lead City will invoice the other City upon approval by the steering committee of each invoice from the Consultant and invoices are due within 30 days of receipt. 5. Duration. This Interlocal Agreement shall become effective and shall remain in effect through the completion of the study.. 7. Termination. Any party may terminate its participation in the Interlocal Agreement without cause by giving the other Cities a ninety -day written notice. The terminating party shall remain fully responsible for meeting its funding responsibilities and other obligations established by this Interlocal Agreement through the end of the calendar year in which such notice is given. Each City agrees to indemnify the other Cities from any claims, damages, losses, and costs, including, but not limited to, attorney's fees and litigation costs, arising out of claims by third parties for property damage and bodily injury, including death, caused solely by the negligence or willful misconduct of such City, the City's employees, affiliated corporations, officers, and lower tier subcontractors in connection with this Interlocal Agreement. Each City hereby waives its immunity under Title 51 of the Revised Code of Washington for claims of any type brought by any City agent or employee against the other Cities. This waiver is draft 6/28/07 Rhonda Berry ILA fire study 2.doc 3 CITY OF TUKWILA By: Title: Date: CITY OF SEATAC By: Title: Date: G: \group \CITYMAN \FIRE STUDY\ILA fire study 2.docpage 3 of 3 Interlocal Agreement Cooperative Fires Services Study specifically negotiated by the parties and a portion of the City's payment hereunder is expressly made the consideration for this waiver. 10. Applicable Law: Venue: Attorney's Fees. This Agreement shall be governed by and construed in accordance with the laws of the State of Washington. In the event any suit, arbitration, or other proceeding is instituted to enforce any term of this Agreement, the parties specifically understand and agree that venue shall be exclusively in King County, Washington. The prevailing party in any such action shall be entitled to its attorney's fees and costs of suit. 11. Counterparts. This document may be executed in any number of counterparts, each one which shall be considered an original. IN WITNESS WHEREOF, the undersigned have entered into this Interlocal Agreement as of this day of 2007. Approved As To Form: City Attorney Approved As To Form: City Attorney draft 6/28/07 Rhonda Berry ESCi contract.doc 1 master plan and cooperative fire services study seatac /tukwila CONSULTANT CONTRACT DRAFT Project Description: Prepare Master Plans for the City of SeaTac Fire Department and the City of Tukwila Fire Department documenting current practices, making projections for future demand and recommendations for strategies to improve ability to deliver services in the future. Explore opportunities for partnership efforts between the two departments and make findings and recommendations on the financial and service delivery feasibility of the various partnership options identified. THIS CONTRACT is made and entered into effective on the date upon which the last party to sign this Contract so signs the Contract, by and between the City of SeaTac, a municipal corporation of the State of Washington, hereinafter referred to as the "City and Management Partners, Inc., hereinafter referred to as the "Consultant on the following terms and conditions in conjunction with the project indicated above. 1. EMPLOYMENT. The City hereby agrees to retain and employ the Consultant, as an independent contractor, and the Consultant hereby agrees to serve the City pursuant to this Contract. 2. INTERLOCAL AGREEMENT. The City of SeaTac and the City of Tukwila have entered into an Interlocal Agreement to jointly pursue and fund this study. The Interlocal Agreement is attached to this contract and the Consultant is aware of the terms of this Interlocal Agreement that will affect the governance structure of the study and the approval of the Consultant work. The Consultant agrees that the terms of this Interlocal Agreement are acceptable to the Consultant and compatible with the approach for this study and the Consultant's work. 3. SCOPE OF SERVICES. The Consultant shall be responsible for completion of the scope of services detailed in the attached Scope of Work. 4. TIME FOR BEGINNING AND COMPLETION. The consultant shall begin work on the attached Scope of Work within 10 days of signing of the contract. All work shall be completed by 2008. The established completion date may be extended at the discretion of the City, subject to a prior supplemental written agreement executed by the City to extend the established completion date. 5. PROFESSIONAL STANDARDS. The Consultant shall be responsible, to the level of competency presently maintained by other practicing professionals in the same type of work in this community, for the professional and technical soundness, accuracy, and adequacy of all designs, drawings, specifications, plans, programs and other work and materials furnished under this Contract. 6. COMPENSATION. The City shall pay to the Consultant as provided in the attached Scope of Work. Time and expenses will not exceed $59,397. The City will pay only Page 1 of 4 Rhonda Berry ESCi contract.doc 2 for actual services rendered. Payments for time and expenses will not exceed the total amount shown for each activity Progress billings shall show the percent completion of each activity and final payment for each activity will not be made until the deliverable for the individual activity has been completed satisfactorily. 7. RECORDS INSPECTION AND AUDIT. All compensation payments shall be subject to adjustments for any amounts found upon audit or otherwise to have been improperly invoiced, and all records and books of account pertaining to any work performed under this Contract shall be subject to inspection and audit by the City for a period of up to three (3) years from final payment of work performed under this contract. 8. OWNERSHIP OF DOCUMENTS. All plans, programs, specifications, designs, reports, records and other documents produced during or as a result of services rendered pursuant to this Contract shall be the property of the City of SeaTac and City of Tukwila and shall not be property of the Consultant. Any reuse of such documents on or for any project other than that covered under this contract shall be without liability or legal exposure to the Consultant. 9. EQUAL EMPLOYMENT OPPORTUNITY. The Consultant shall strictly abide by all local, state and federal equal employment opportunity laws and policies relating to the establishment of non discrimination in hiring and employment practices, and assuring the service of all clients, customers or involved members of the public without discrimination. 10. INDEMNIFICATION. The Consultant shall indemnify and hold harmless the City and its officers, agents and employees or any of them from any and all claims, actions, suits, liability, loss, costs, expenses and damages of any nature whatsoever, by any reason of or arising out of any negligent act or omission of the Consultant, its officers, agents and employees, or any of them relating to or arising out of the perfot mance of this Contract; and if final judgment be rendered against the City and its officers, agents and employees or any of them, or jointly against the City and the Consultant and their respective officers, agents and employees, or any of them, the Consultant shall satisfy the same to the extent that such judgment was due to the Consultant's negligent acts or omissions. The City shall indemnify and hold harmless the Consultant and its officers, agents and employees, or any of them from any and all claims, actions, suits, liability, loss, costs, expenses and damages of any nature whatsoever, by any reason of or arising out of any negligent act or omission of the City, its officers, agents or employees, or any of them relating to or arising out of the performance of this Contract; and if final judgment be rendered against the City and its officers, agents and employees, or any of them, or jointly against the Consultant and the City and their respective officers, agents and employees, or any of them, the City shall satisfy the same to the extent that such judgment was due to the City's negligent acts or omissions. 11. RESTRICTION AGAINST ASSIGNMENT. The Consultant shall not assign this Contract or any interest herein, subcontract any part of the consulting services to be performed here, nor assign any money due or to become due hereunder, without first obtaining the written consent of the City. Page 2 of 4 Rhonda Berry ESCi contract.doc 12. CONTINUATION OF PERFORMANCE. In the event that any dispute or conflict arises between the parties while this Contract is in effect, the Consultant agrees that, notwithstanding such dispute or conflict, the Consultant shall continue to make a good faith effort to cooperate and continue work toward successful completion of assigned duties and responsibilities. 13. TERMINATION OF CONTRACT. Performance of the consulting services under this Contract may be terminated for any cause deemed sufficient by either the City or the Consultant, in whole or in part, at any time, by either party giving the other written notice of such termination, specifying the extent and effective date thereof, by not sooner than thirty (30) days from date of such notice, providing that the Consultant shall complete and be compensated for any projects or duties previously assigned and accepted, and shall be compensated for all expenses incurred or committed to, that cannot be canceled. 14. CONTRACT ADMINISTRATION. This Contract shall be administered by the Principal on behalf of the Consultant and by the Assistant City Manager on behalf of the City. Any written notices required by terms of this contract shall be served or mailed as follows: If to the City: If to the Consultant: Attn: Tina Rogers Assistant City Manager City of SeaTac 4800 S. 188` St. SeaTac, WA 98188 Attn: Bruce Caldwell Emergency Services Consulting, Inc. 25200 SW Parkway Ave. Suite 3 Wilsonville, OR 97070 15. CONSTRUCTION AND VENUE. This Contract shall be construed in accordance with laws of this State of Washington. In the event of any litigation regarding the construction or effect of this Contract, or the rights of the parties pursuant to this Contract, it is agreed that venue shall be King County, Washington. 16. MERGER AND AMENDMENT. This Contract contains the entire understanding of the parties with respect to the matters set forth herein and any prior or contemporaneous understandings are merged herein. This Contract shall not be modified except by written instrument executed by all parties hereto. IN WITNESS WHEREOF, the parties hereto have executed this contract. CONSULTANT: By: Principal Date: CITY OF SEATAC: Page 3 of 4 3 Rhonda Berry ESCi contract.doc By: City Manager Date: Approved as to Form: By: City Attorney Date: Page 4 of4 4 Rhonda Berry Scope of Work 082507.doc 1 "Ci Scope of Work The following objectives and tasks will be completed to produce the final report and recommendations. This methodology has been developed specifically for the Sea Tac and Tukwila Fire Departments based on our understanding of your expectations. ESCi will utilize approaches, tools, and techniques proven through experience to provide the kind and quality of information needed to make objective, informed decisions. The evaluation and analysis of data and other information will be based on local standards, International City Managers Association (ICMA), National Fire Protection Association (NFPA) standards, Washington State Rating Bureau schedules, Commission on Fire Accreditation International (CFAI) self- assessment criteria, health and safety requirements, federal and state mandates relative to emergency services, and generally accepted best practices within emergency services. Objective 1: Develooment of Proiect Work Plan Activity: Meet with and refine the proposed work plan with each City's management team to gain a comprehensive understanding of the project's background, goals, and expectations. This action plan shall be developed identifying: Primary tasks to be performed Person(s) responsible for each task Time table for each objective to be complete Method of evaluating results Resources to be utilized Possible obstacles or problem areas associated with the accomplishment of each task This meeting will also help to establish working relationships, make logistical arrangements, determine line of communications, and finalize contractual arrangements. Objective 2: Review of Background Information Activity: Review /evaluate documents and information relevant to this project including: General plan of the municipality and surrounding community Existing community growth management plans Current and proposed and use plans Zoning maps and zoning code Current comprehensive planning documents including proposed new Potential Annexation Areas Scope of Work Cities of Sea Tac and Tukwila, Washington 08/25/07 1 Rhonda Berry Scope of Work 082507.doc 2 "Ci Municipal building codes and ordinances Local census statistics Physical facilities Incident data to include CAD and NFIRS data Service practices, current service delivery objectives and targets, MOU's for mutual aid, and other relevant information ESCi will provide agencies with a comprehensive list of all data and information needed to conduct the study. A "start date" for calculation of due dates for all deliverables will be established upon ESCi's receipt of all materials from an agency. Obiective 3: Stakeholders Inout Activity: Conduct interviews with and gather information from key personnel including: City Manager or City Administrator and Mayor Governing body of the City (as appropriate) Fire department managers and other staff Union leadership City's community planning staff City's finance function manager Others as they may contribute to this project The project team will interview key stakeholders of organizations associated with this study. At a minimum, members of the project team will interview fire agency officials, community planning officials, labor representatives, and others that the project team or agency deems necessary. From these interviews, ESCi will obtain additional perspective on operational, economics, and policy issues facing the agency. In addition, the project team will learn more about availability of data necessary to meet projected goals. Obiective 4: Current Service Delivery Analysis Activity: Conduct a limited organizational review and perform detailed analysis of the agency's current resources and service delivery levels based on the elements included in the following objectives. Task 1: Organization Overview An overview of the organization shall be conducted evaluating: Responsibilities and line of authority History, formation, and general description of the fire department today Chain of command Organizational structure Operating budget, funding, fees, taxation, and financial resources Scope of Work Cities of Sea Tac and Tukwila, Washington 08/25/07 2 Rhonda Berry Scope of Work 082507.doc 3 4ci figgiGENCY SERVICES CONSULTING sne Current description of the fire suppression infrastructure Task 2: Management Components Areas to be evaluated include: Mission, vision, strategic planning, goals, and objectives Adequacy of standard operating guidelines, rules and regulations, and policies Financial controls Internal evaluation of critical issues Internal evaluation of future challenges Internal and external communications Decision making processes Document control Security Reporting and records Task 3: Planning for Fire Protection, Rescue, and EMS The planning processes within the agency shall be reviewed Including these key components: Review and evaluate the adequacy of the current planning process Identifying critical issues and analyzing current and future services Review elements of tactical planning within the organization Review elements of operational planning within the organization Review elements of master planning within the organization Make recommendations relative to future planning process needs Task 4: Personnel Management Personnel management programs shall be reviewed, focusing on: Policies, rules, regulations, manuals, and handbooks Reports and records Compensation Labor management relationship and issues Certifications and licensing Disciplinary process Counseling services The application and recruitment process Testing, measuring, and promotion processes Health and wellness programs Task 5: Incident Staffing Review staffing levels of the fire department. Areas to be considered include: Review and evaluate operational staffing levels and deployment Analyze any existing standard of response coverage for personnel deployment Scope of Work Cities of Sea Tac and Tukwila, Washington 08/25/07 3 Rhonda Berry Scope of Work 082507.doc 4 Ci and compare to critical tasking for incidents Review firefighter emergency medical services (EMS) staff distribution Task 6: Training Program Review training program including: General training competencies Training administration, schedule, and facilities Training procedures, manuals, and protocols Record keeping and clerical support Task 7: Capital Assets Review status of current major capital assets (facilities and apparatus) and analyze future needs relative to the purchase of necessary capital improvement items including: Facilities Tour and make observations in areas critical to current station condition and efficiency, with particular focus on each facility's viability for continued use in an effective future deployment strategy. Items to be contained in the report include: o Design o Code Compliance o Construction o Staff Facilities o Safety o Efficiency o Environmental Impacts Apparatus Vehicles Review and make observations regarding inventory of apparatus and equipment. Items to be reviewed include: o Apparatus type, age, maintenance and replacement funding program o Distribution and deployment o Analyze current standard of response coverage for apparatus deployment and compare to needed fire flows and critical tasking Fire flow- Review and make observations regarding availability of fire flow. Items to be reviewed include: o Availability of fire flow relative to need o Identification of areas of deficiency and ownership of o Reliability of water district's systems, information, testing, communication with fire department Task 8: Fire Prevention /Public Education/ Development Review Programs Review the department's efforts toward fire prevention, public education, and development review programs. Elements to be evaluated include: Code enforcement activities New construction plan review and inspection General inspection program Fire and injury public education programs Fire investigations Pre incident planning Statistical collection and analysis Scope of Work Cities of Sea Tac and Tukwila, Washington 08/25/07 4 Rhonda Berry Scope of Work 082507.doc 5 "Ci EMERGENCY SERVICES CONSULTING Ina Task 9: Current Deployment Strategies and Performance Review and make observations in areas specifically involved in, or affecting, service levels and performance. Areas to be reviewed shall include: Demand Study o Analysis and geographic display of current service demand by incident type o Analysis and geographic display of current service demand by temporal variation. Distribution Study o Overview of current facility deployment strategy, analyzed through geographical information systems (GIS) software as appropriate, with identification of service gaps and redundancies. o Overview of current apparatus deployment strategy, analyzed through GIS software as appropriate, with identification of service gaps and redundancies. Concentration Study o Analysis of response time to achieve full effective response force o Analysis of company and staff distribution as related to effective response force assembly Reliability Study o Analysis of current workload, including unit hour utilization of individual companies (to the extent data is complete) o Review of actual or estimated failure rates of individual companies (to the extent data is complete) o Analysis of call concurrency and impact on effective response force assembly Performance Summary o Analysis of actual system reflex time performance, analyzed by individual components (to the extent data is available). o Analysis of current first -due unit response time performance levels and capabilities, including both temporal and geographic discussions Review the deployment of technical rescue, emergency medical services, hazardous materials, and other specialized programs Review effectiveness of systems for mutual aid and /or automatic aid Deliverable: Draft Master Plans for each agency covering Phase I Objectives 1 4 shall be delivered to Steering Committee within weeks of start date. Upon Steering Committee approval of sufficiency of draft Master Plans, presentation of findings to the Steering and Policy Committees and City Councils will be made. Steering Committee will compile comments and give direction to ESCi for changes needed within 3 weeks of presentations. Obiective 5: Future System Demand Proiections Scope of Work Cities of Sea Tac and Tukwila, Washington 08/25/07 5 Rhonda Berry Scope of Work 082507.doc 6 4Ci Activity: Conduct an analysis of community growth projections and interpret their impact on emergency service planning and delivery for a planning horizon of 2020. Task 1: Population Growth Projections An interpretation of available census and community development data will be provided indicating: Population and employment history and demographics Census -based population and employment growth projections Community planning -based population and employment growth projections Population and employment growth projections in Potential Annexation Areas Task 2: Service Demand Projections Population and employment growth projections, along with historical and forecast incident rates, will be utilized to develop projections for future service demand including impact of Potential Annexation Areas: Total community service demand projections by type Geographic service demand projections (using GIS methodology) Task 3: Community Risk Analysis Future land use and zoning classifications will be used, along with historical incident data and demographics, to analyze and classify community fire protection risk by geography. When possible, additional target hazard information will be mapped and displayed for use in deployment strategy planning. The resulting community risk analysis will include geographic display of information such as: Population density Housing building density Target age fire risk populations Property use risk classifications Specific hazards (life safety, chemical, etc.) where information is available Needed fire flow requirements from existing data Obiective 6: Future Delivery System Models) Activity: Develop and analyze various resource deployment strategies for providing emergency services with the specific intent of identifying the option that can deliver the optimum levels of service to the community in the future, based on the previous projections of service demand and community risk. Recommendations will be provided identifying the best Tong -range strategy for service delivery and the impact of initiating such a strategy: Task 1: Review /Revise Standards of Response Coverage Using the previous analysis of community risk, ESCi will facilitate discussions with the City's fire service managers to develop consensus on any necessary revisions of the department's standards of response coverage and key performance objectives and will ensure that the standards are reasonable and consistent with industry practices and benchmarks: Scope of Work Cities of Sea Tac and Tukwila, Washington 08/25/07 6 Rhonda Berry Scope of Work 082507.doc 7 EMIRGENCr SERVICES' CONSULTING sn Classification of incident risk types for deployment planning Critical tasking analysis for identified incident risk types Needed fire flows for identified incident risk types Special equipment/apparatus needs for incident risk types First -due unit arrival response time objectives for incident risk types Effective force arrival response time objectives for incident risk types Dispatch call processing time objectives Company turnout time objectives Task 2: Recommended Long -Term Strategy Develop one or more recommended long -range options for resource deployment that will improve the department's level of service towards the identified performance objectives and targets. This may include, but is not necessarily limited to, the following options: Specific recommendations regarding any relocation of existing facilities Specific recommendations regarding general locations of future fire stations Specific recommendations regarding the deployment or distribution of on -duty personnel Implementation plan and timetables Task 3: Projected Performance Evaluate and present the following in graphical and descriptive format for the deployment option(s): Degree of benefit to be gained through its implementation Extent to which it achieves established performance targets Potential negative consequences Obiective 7: Fiscal Analysis Activity: Fiscal analysis and planning is an important component of the emergency services evaluation. Long -term survival of an emergency services system requires that the system be adequately funded. ESCi will determine the fiscal state of the agency, determine future revenue forecast, and develop recommendations on improving the financial resources available for fire and EMS services. All recommendations will be consistent with the community's current and future financial ability and capability to provide adequate, cost effective services to its citizenry. Also, budgeting practices will be thoroughly examined, and alternate methodologies may be suggested provided existing budgeting laws and ordinances would permit them. Findings and recommendations will be made, where appropriate, on: Projected capital and operating costs of recommended strategy Options and recommendations for financing capital improvements (fees) Options for long -term funding strategies considering the full range of revenue options available to City Fire Departments Options for cost avoidance Options for cost recovery Scope of Work Cities of Sea Tac and Tukwila, Washington 08/25/07 7 Rhonda Berry Scope of Work 082507.doc 8 ,ci Deliverable: Draft Master Plans for each agency covering Phase I Objectives 5 7 shall be delivered to Steering Committee within weeks of start date. Upon Steering Committee approval of sufficiency of draft Master Plans, presentation of findings to the Steering and Policy Committees and City Councils will be made. Steering Committee will compile comments and give direction to ESCi for changes needed within 3 weeks of presentations. ESCi shall identify areas of duplication that can be reduced through partnership efforts, as well as potential service improvements that can be accomplished as an outcome of the master planning process described in Phase 1 of this scope of work. Experience has shown that this process frequently becomes the overriding influence for fire protection partnership efforts between agencies. Items in this section of the report include but are not limited to the areas listed below. The detailed information shall provide department heads and elected officials with the information necessary to make important decisions regarding emergency services partnership. Included are: Objective 1: General Partnering Strategies Activity: The various partnering strategies are described, beginning with a do- nothing approach and ending with complete consolidation of the fire agencies into a new emergency service provider. Objective 2: Projected performance of consolidated fire agency Activity: Evaluate and present the following in graphical and descriptive format for a consolidated fire agency with combined resources: Degree of benefit to be gained through its implementation Extent to which it achieves established performance targets Potential negative consequences Obiective 3: Critical Issues Objective 4: Fiscal Analysis Scope of Work Cities of Sea Tac and Tukwila, Washington 08/25/07 Activity: The study takes into account the many shared critical issues that face each agency and how such matters affect the effort to construct a regional model for efficient service. These issues are identified and analyzed. Specific recommendations are offered. Activity: ESCi uses computer- driven model budgets for each agency to allow a comparative examination of the actual public costs for each organization and as a tool 8 Rhonda Berry Scope of Work 082507.doc 9 for analyzing the financial effects of any type of partnership. Budget modeling is also used to measure the effects of the proposed change(s). Funding mechanisms are identified and comprehensive financial outcomes are provided for each partnership strategy offered. Review and analyze department budgets and revenues. 1. Review separate budgets. 2. Develop projected consolidated budget. 3. Identify financial issues of partnership. 4. Identify areas of short and long -term savings and costs if any. Objective 4: Financial Outcomes of Identified Ootions Activity: Predicted costs and /or savings of each partnership option shall be presented for evaluation. Deliverable: Draft report covering Phase 11 shall be delivered to Steering Committee within weeks of start date. Upon Steering Committee approval of sufficiency of draft report, presentation of findings to the Steering and Policy Committees and City Councils will be made. Steering Committee will compile comments and give direction to ESC1 for changes needed within 3 weeks of presentations. Any cooperative venture among the agencies presents organizational and community leaders with a series of challenges. Successful implementation of this proposal requires that significant matters be addressed, regardless of which form of partnership option is chosen. Those issues are identified as: Obiective 1: Findinas Activity: Feasibility of each partnership option is presented. Obiective 2: Preferred Option Activity: The preferred option or options is presented and discussed. Obiective 3: Policy Action Activity: Necessary policy action by the elected bodies is described. Objective 4: Timelines Activity: The recommendations outlined in this section provide general completion timelines offered to guide the agencies in developing a more detailed Scope of Work Cities of Sea Tac and Tukwila, Washington 08/25/07 9 Rhonda Berry Scope of Work 082507.doc 10 4 Ci EMERGENCY SERVICES CONSULTING inc.: listing during the formal planning process. Obiective 5: Process Issues Activity: Strategic planning, legal considerations, management and governance, funding and other issues are discussed. Deliverable: Draft report covering Phase III shall be delivered to Steering Committee within weeks of start date. Upon Steering Committee approval of sufficiency of draft report, presentation of findings to the Steering and Policy Committees and City Councils will be made. Steering Committee will compile comments and give direction to ESCi for revisions needed within 3 weeks of presentations. Final Project Report Activity: ESCi will complete any necessary revisions of the draft Master Plans and reports and produce the specified quantity of publication quality, bound, final versions of the written reports. Deliverable: Final publication- quality, bound individual agency Master Plans and Final Reports of Phase II and III shall be delivered to Steering Committee within 3 weeks of receipt of Phase III revisions from Steering Committee. Scope of Work Cities of Sea Tac and Tukwila, Washington 08/25/07 10 City of Tukwila 6200 Southcenter Boulevard Tukwila, Washington 98188 Steven M Mullet, Mayor MEMORANDUM TO: Finance and Safety Committee FROM: Mayor's Office Tukwila Police Depart e t DATE: August 29, 2007 SUBJECT: South County Regional Jail Feasibility Study Staffs from cities in suburban King County have held a series of meetings to discuss solutions to the problem of decreasing availability of inmate beds in the King County jail. South County cities recognized early on that our needs were somewhat different than those of eastside and north end cities, and formed a separate group to evaluate our needs. The work group has dubbed itself South Corrections Entity (SCORE), and includes representatives from Des Moines, Federal Way, Renton and Tukwila. Primary staff support has been provided by the City of Renton. SCORE is based on the Valley Communications (Valley Com) model, with four owner agencies being those listed above. SeaTac has been identified as a potential contract agency, and it's likely that other cities in the area would contract for services on an as- needed basis. An RFQ was published in June; the responses received from four consultants were reviewed and evaluated, and DLR Group was chosen as the superior response. The SCORE work group looked long and hard at DLR's proposal and was able to shave the initial S351,000 proposed cost down to $161,000 to study a 500 bed facility. Cost allocation for each city has yet to be determined, but most likely we will pay a pro rata share based on average daily inmate population. Depending upon the cost sharing method chosen Tukwila's share of the study cost could range from approximately $34,000 to 41,000. Staff requests that the Mayor be authorized to expend an amount not to exceed $45,000 to cover any unforeseen expenses. Staff requests that this item be referred to the COW on 9/10 and Regular Meeting on 9/17 for approval. Phone: 206 -433 -1800 City Hall Fax: 206 433 -1833 www.ci.tukwila.wa.us Wor Group Des MoneS Jennefer Henson Tukw‘la Don Lincoln Federal H a 9 An y Mc• Call Jason Gregory Renton Penny Bartley i 0 Organizational Structure for SCORE Based upon Va ey Com Four Owner Agencies Tukwi a Federa Way Des Moines Renton Potentia Contract Agency SeaTac Feasibility Study Published RFQ on June 4th Received four responses Team reviewed responses and unanimously picked DLR GRoup as the Superior response DLR Proposal eam met with DR on u y 12t" nitia proposa for feasibi ity study was $351,000 Proposa has been modified and is now $161,000 ••r1 Proposal Highlights Early estimates for 500 bed facility Construction costs of $79,000 per bed (based upon 2011 costs) 35% indirect costs including design Total $54,000.000 Sc h e dule suggested that we ace erat nnd four D_R occupancy pae0r bUd'9 p aflSwt h °the proect cou d save 20 1p Acce.erating $3 Even without modification, the existing schedu e is achievab e. ••CD projected Bed Needs ovner C\tJ Usage 2026 Usage 83 70 Tukwila 61 71 Federa Way 23 DeSM0" nes 20 177 208 Renton 75 r 5 �5 FaGt 97 40 Extra Capacity i••0 Feasibility Assumptions Faci ity wi be designed with 500 beds, potentia for expansion at the site, up to a maximum of 750 beds The faci ity shou d be designed to meet ACA (American Corrections Association) standards he faci ity wi be based upon the Cow itz County Lai 0 it Assumptions (continued) he faci ity is designed to io d misdemeanor offenders and investigative fe ony arrests The faci ity wi be designed as a "fu service :ai "anticipating that we wi house A__ of our misdemeanor inmates Medica Menta Management Cowlitz County Facility Previous comparable for construction costs Team has seen and approved as comparable facility Approximately 200 square feet per bed Full-service facility On-site medical, laundry and kitchen facilities Potential Sites \J\Ie need to provide sites to t R to have begfl the cost estma t them one month after they we have approximate y start the study to provide the ocations n he reduced fee inc udes due dugeflce o n y one site. TO: FROM: DATE: SUBJECT: City of Tukwila Police Department An Accredited Agency Finance Safety Committee Acting Assistant Chief Mike Villa for Chief Dave Hayn August 17, 2007 BearCat Armored Vehicle MEMORANDUM Steven M Mullet, Mayor David W Haynes, Chief of Police I am requesting authorization to spend approximately $50, 000 from the seizure fund for a joint purchase with the Valley Special Response Team (VSRT) agencies (Tukwila, Renton, Auburn, Port of Seattle, Federal Way, and Kent) for a Lenco BearCat Armored Vehicle. Background The Valley Special Response Team uses armored vehicles to provide transportation and ballistic protection on barricaded subjects, warrant services, and hostage situations. The vehicles transport VSRT members and negotiators into the perimeter of the crisis site, are used for conducting evacuations, and can perform downed person rescues while affording ballistic protection. In 2006 we deployed armored vehicles 38 times. Thirty -two of those occasions where for high risk warrant services. The vast majority of those were for narcotic warrants. Currently VSRT owns two armored vehicles. Both of these are military surplus. One vehicle, the Peacekeeper, is about the size of an armored mini van. It is unreliable and becoming expensive to maintain due to its age, 1981 vehicle. During the past 12 months VSRT has spent about $20,000 on vehicle maintenance. Furthermore, the Peacekeeper is only rated to stop pistol and some rifle rounds. The other vehicle provides excellent ballistic capabilities, but it is very limited in its law enforcement applications due to its configuration. The team needs a reliable rifle rated armored vehicle that is designed for law enforcement. Nationally the SWAT industry standard is upgrading to vehicles with armor capable of stopping larger caliber rifle rounds, and capable of transporting more people. In our region, Seattle, Tacoma and King County (soon to be Bellevue) have acquired Lenco armored vehicles. These same vehicles are currently in use by other SWAT teams around the country. Funding During the past two years Valley SRT has made several inquiries into availability of grant funding to acquire a Lenco vehicle. Each time we've been informed that there is no such funding available; at least, not any more. 6200 Southcenter Blvd. Tukwila, WA 98188 Phone: 206 433 -1808 Pol. Dept. Fax 206 244 -6181; Admin. Fax 206 433 -7197; Invest. Fax 206 431 -3688 The cost for an outfitted vehicle will be about $300,000. Because the majority of tactical operations in which VSRT deploys are directly related to illegal drug enforcement, I propose funding the BearCat purchase from drug asset forfeiture accounts. Split six ways, each agency's share will be approximately $50,000. The Chief's of the VSRT participating agencies are of a consensus to approve this purchase with approval from their respective cities. This memorandum is to officially request approval to use seized monies to fund the City of Tukwila's portion of this joint purchase. Approval by Committee Members Joan Hemandez Jim Haggerton Dennis Robertson Armored vehicle Photo