Loading...
HomeMy WebLinkAboutUtilities 2007-10-16 COMPLETE AGENDA PACKET Distribution: J ��r!I! A w,, City of Tukwila J. Duffie S. Nor e B. Swat ll 99 Utilities Committee J. Ha erton J. Morrow K. Fuhrer O;' iy• 1 V. Griffin F. Iriarte S. Kerslake W p P. Linder B. Giberson J. Pace X01 1 Joan Hernandez, Chair D. Robertson G. Labanara C. Parrish �R`' P. Carter B. Shelton B. Arthur 1908 Joe Duff ie K. Matej R. Larson M. Miotke Jim Ha erton Mayor Mullet M. Cusick File Copy 99 R. Berry P. Brodin 3 Extra Copies D. Speck S. Anderson single side to Dana J Cantu e -mail to B.Saxton AGENDA TUESDAY OC TOBER 16 2007; 5:00 PM Conference Room #1 Item Action to be Taken Page I. Current Agenda Review II. Presentation(s) III. Business Agenda A. Contract for Grant Appropriation —Fort Dent A. Move to C.O.W. 10/22/07 Pg. 1 Park /Interurban Avenue Sewer Extension Project B. NPDES Phase II Stormwater Management Plan B. Move to C.O.W. 10/22/07 Pg. 21 Consultant Selection and Contract Agreement C. Proposed 2008 Budget and CIP (Please bring your C. Review Pg. 41 budget books) D. Utility Rates 2008 D. Move to C.O.W. 10/22/07 Pg. 43 IV. Old Business Next Scheduled Meeting: Tuesday, November 6, 2007 The City of Tukwila strives to accommodate individuals with disabilities. Please contact the Public Works Department at 206 433 -0179 for assistance. INFORMATION MEMO To: From: Date: Subject: Mayor Mullet Pt:blic W orks Directo~ October 8, 2007 State Grant for Fort Dent/Interurban Avenue South Sewer Extension City Project No. 04-SW02 State Capital Contract Number 08-96105-052 ISSUE Authorize the Mayor to sign a contract accepting appropriated state grant funds for the subject project. BACKGROUND The Governor approved the 2007-2009 Capital Budget that includes 167 direct appropriations for "Local and Community Projects" totaling over $165 million, that will be administered by the Washington State Department of Trade and Economic Development (CTED). After the budget law took effect in July, CTED notified the City of Tukwila of the appropriation of $450,000 for this project. ACTION TAKEN CTED drafted the attached grant contract, in the form of State Capital Contract Number 08- 96105-052. This contract shows that Tukwila's appropriation is actually $444,375.00 after CTED retains $5,625.00 for costs directly associated with managing this contract. RECOMMENDATION Approve the attached grant contract with CTED in order to received $444,375.00 in appropriated state grant funds. Attachment \11uk2\vol1\pubworksIPROJECfSIA- SW Project.s\04sw02 Ft Dent ill Sewer Ext\Info Memo CTED grant Fort Dent Park ill Sewer.doc STATE OF WASHINGTON DEPARTMENT OF COMMUNITY, TRADE AND ECONOMIC DEVELOPMENT 128 - 10th Avenue SW 0 PO Box 42525 ~ Olympia, Washington 98504-2525 0 (360) 725-4000 September 24, 2007 ;0 ~ P F-:;' ~ ":\ Ii f:: ~',; ~ ~_~~~-:"~51 'iff b~g 'SEP 2 8 Z007 Mr. Bob Giberson Acting City Engineer City ofTukwila 6300 Southcenter Blvd, Suite 100 Tukwila, W A 98188 TUI{WiLA PUBLIC WORI<S Dear Mr. Giberson: Enclosed for your review and signature are three originals of proposed Contract Number 08-96105-052 between the Department of Community, Trade and Economic Development and the City of Tukwila The purpose of the contract is to provide your organization with funds appropriated under the Local and Community Projects program solely and specifically for the Fort Dent Sewer project. Please review the contract carefully. Ifit meets with your approval, please sign and date all three originals where indicated (the Contract Face Sheet and pages 11 through 15) and return all three to me at your earliest convenience. We will sign them and return a fully executed original to you for your records. If you have any questions or need additional information, please call me at (360) 725-3021. I can also be reached by email at emilyh@cted.wa.gov. Sincerely, 94' . - - J f(..-li.//.. o<--..IJ'( G.vilC-[T uU Emily Hafford, Grants Specialist Capital Programs Enclosures cc: Daniel Aarthun, Capital Programs Manager ~~'! o Washington State Department of Community, Trade, and Economic Development Local Government Division Community Development Programs Unit Capital Programs CONTRACT FACE SHEET 1. GRANTEE NAME /ADDRESS: 2. CONTRACT NUMBER: 3. CONTRACT AMOUNT: City of Tukwila 6300 Southcenter Blvd, Suite 100 08 -96105 -052 $444,375.00 Tukwila, WA 98188 4. GRANTEE CONTACT PERSON, NAME/TITLE, PHONE: 5. CDBG STAFF CONTACT, NAME: Bob Giberson Emily Hafford (206) 431 -2457 6. DATE APPLICATION SUBMITTED: 7. CONTRACT START DATE: N/A 9. FUNDING AUTHORITY: Washington State Department of Community, Trade and Economic Development (hereinafter known as the "DEPARTMENT 10. STATE AND FEDERAL "BARS" CODE: 11. CATALOG OF FEDERAL DOMESTIC ASSISTANCE (CFDA): N/A N/A 12. SERVICE AREA: 13. COUNTIES: 14. NUMBER OF PAGES IN (BY LEGISLATIVE DISTRICT): 11 CONTRACT DOCUMENT: King 16 15: TIN: 16. SUBRECIPIENT OR PARTICIPATING ENTITIES: 91- 6001519 17. PURPOSE FOR AWARDED FUNDS: Funds will be used for capital infrastructure improvements related to the Fort Dent Sewer project, located from 14900 Maule Avenue South, to the intersection of Fort Dent Way and Interurban Avenue South. Work will include infrastructure improvements related to the construction of 2,150 linear feet of 8 -inch PVC sanitary sewer main. This will also include construction of 645 linear feet of 6 -inch ductile iron pipe force main from the Fort Dent Way and Interurban Avenue South intersection to Lift Station #5, with associated pavement restoration and related work. Construction began in February 1, 2007 and is expected to be completed by September 30, 2007. The DEPARTMENT and CONTRACTOR acknowledge and accept the terms of this CONTRACT and attachments and have executed this CONTRACT on the date below to start as of the date and year referenced above. The rights and obligations of both parties to this CONTRACT are govemed by this CONTRACT and the following other documents incorporated by reference, where applicable: CONTRACT Terms and Conditions including Attachment "A" Project Budget, Attachment "B" Certification of the Availability of Funds to Complete the Project, Attachment "C" Project Scope of Work, Attachment "D" Certification of the Payment and Reporting of Prevailing Wages, Attachment "E" Certification of Intent to Enter the Leadership in Energy and Environmental Design (LEED) Certification Process. FOR THE DEPARTMENT: FOR THE GRANTEE: Marijo Olson, Acting Assistant Director Local Government Division DATE: APPROVED AS TO FORM: Assistant Attorney General DATE: /�4 7 Steve Mullet City of Tukwila DATE: Mayor 8. CONTRACT END DATE: 6/30/2011 STATE OF "V ASHINGTON DEPARTMENT OF COMMUNITY, TRADE Al\TJ) ECONOMIC DEVELOPl\1ENT LOCAL AND COMMUNITY PROJECTS PROGRAlVI CAPITAL CONTRACT NUMBER 08-96105-052 THIS CONTRACT, entered into by and between the City of Tukwila (a unit oflocal government hereinafter referred to as the CONTRACTOR), and the Washington State Department of Community, Trade and Economic Development (hereinafter referred to as the DEPARTMENT), WITNESSES THAT: WHEREAS, the DEPARTMENT has the statutory authority under RCW 43.330.050 (5) to cooperate with and provide assistance to local governments, businesses, and community-based organizations; and WHEREAS, the DEPARTMENT is also given the responsibility to administer state funds and programs which are assigned to the DEPARTMENT by the Governor or the Washington State Legislature; and WHEREAS, the Washington State Legislature has, in Laws of2007, Chapter 520, Section 1041, made an appropriation to support the Local and Community Projects Program, and directed the DEPARTMENT to administer those funds; and - ---- WHEREAS, the enabling legislation also stipulates that the CONTRACTOR is eligible to receive funding for acquisition, construction, or rehabilitation (a venture hereinafter referred to as the "Project"). NOW, THEREFORE, in consideration of covenants, conditions, performances, and promises hereinafter contained, the parties hereto agree as follows: 1. FUNDING The funds awarded to the CONTRACTOR hereunder shall be a sum up to, but not to exceed $444,375.00. The DEPARTMENT has retained the amount of$5,625.00 for costs directly associated with managing the completion of this contract. 1 2. SERVICE PROVISIONS a) Funds awarded under this contract shall be used solely and specifically for capital construction costs associated with the Fort Dent Sewer, as contemplated in Laws of2007, Chapter 520, Section 1041. b) The CONTRACTOR shall perform in accordance with the terms and conditions of this contract and the following attachments which, by this reference, are made a part of this contract: ATTACHMENT A (Project Budget) ATTACHMENT B (Certification of the Availability of Funds to Complete the Project) ATTACHMENT C (Project Scope of Work) ATTACHMENT D (Certification of the Payment and Reporting of Prevailing Wages) ATTACHMENT E (Certification ofIntent to Enter the Leadership in Energy and Environmental Design Certification Process) 3. SPECIAL CONDITION(S) None. 4. CONTRACT PERIOD a) The effective date of this contract shall be the date of the last signature ofthe contracting parties. b) Unless terminated earlier pursuant to Section 9, 12, or 28, hereof, the termination date shall be June 30, 2011. ~ 5. CERTIFICATION OF FUNDS a) The release of state funds under this contract is contingent upon the CONTRACTOR certifying that it has expended or has access to funds from non- state sources as set forth in ATTACHMENT B (CERTIFICATION OF THE AVAILABILITY OF FUNDS rO COMPLETE THE PROJECT), hereof. Such non-state sources may consist of a combination of any of the following: i) Eligible Proiect expenditures prior to the execution of this contract. ii) Cash dedicated to the Project. iii) Funds available through a letter of credit or other binding loan commitment( s ).. iv) Pledges from foundations or corporations. 2 v) Pledges from individual donors. vi) The value of real property when acquired solely for the purposes of this Project, as established and evidenced by a current market value appraisal performed by a licensed, pr:Jfessional real estate appraiser, or a current property tax statement. The DEPARTMENT will not consider appraisals for prospective values of such property for the purposes of calculating the amount of non-state matching fund credit. vii) In-kind contributions, subject to the DEPARTMENT'S approval. b) The CONTRACTOR shall maintain records sufficient to evidence that it has access to or has expended funds from such non-state sources, and shall make such records available for the DEPARTMENT'S review upon reasonable request. 6. EXPENDITURES ELIGIBLE FOR REIMBURSEMENT The CONTRACTOR may be reimbursed, at the rate set forth elsewhere in this contract, for Project expenditures in the following cost categories: a) Real property, and costs directly associated with such purchase, when purchased or acquired solely for the purposes of the Project; b) Design, engineering, architectural, and planning; c) Construction management and observation (from external sources only); d) Construction costs including, but not limited to, the following: Site preparation and improvements; Permits and fees; Labor and materials; Taxes on Project goods and services; Capitalized equipment; Information technology infrastructure; and Landscaping. 7. REIMBURSEMENT PROVISIONS a) Payments to the CONTRACTOR shall be made on a reimbursement basis only. For the purposes of this contract, reimbursement shall be construed to mean costs incurred and paid, or costs incurred and payable within thirty (30) days. 3 b) The DEPARTMENT shall reimburse the CONTRACTOR for one-hundred percent (100%) of eligible Project expenditures, up to the maximum payable under this contract. When requesting reimbursement for costs incurred or expenditures made, the CONTRACTOR shall submit to the DEPARTIvIENT a . signed and completed Invoice Voucher (Form A-I9), referencing the Project activity performed, and any appropriate documentation. The voucher must be certified by an official of the CONTRACTOR with authority to bind the CONTRACTOR. The final voucher shall be submitted to the DEPARTMENT within fifteen (15) days following the completion of work or other termination of this contract. c) Each request for payment must be accompanied by a Project Status Report, which describes, in narrative form, the progress made on the Project since the last invoice was submitted, as well as a report of Project status to date. The DEPARTMENT will not release payment for any reimbursement request received unless and until the Project Status Report is received. d) After approving the Invoice Voucher and Project Status Report, the DEPARTMENT shall promptly remit a warrant to the CONTRACTOR. e) The CONTRACTOR shall not submit invoices more than once monthly. 8. EVALUATION AND MONITORING a) The CONTRACTOR shall cooperate with and freely participate in any monitoring or evaluation activities conducted by the DEPARTMENT that are pertinent to the intent of this contract, including periodic site inspections. b) The CONTRACTOR shall provide the DEPARTMENT with photographs, either hard copy or electronically, which depict visually the progress made on the Project. Such photographs shall be submitted to the DEPARTMENT at the inception of the Project, upon 50 percent of completion, and upon completion, as applicable. c) The DEPARTMENT or the State Auditor and any of their representatives shall have full access to and the right to examine during normal business hours and as often as the DEPARTMENT or the State Auditor may deem necessary, all the CONTRACTOR'S records with respect to all matters covered in this contract. Such representatives shall be permitted to audit, examine, and make excerpts or transcripts from such records and to make audits of all contracts, invoices, materials, payrolls, and records of matters covered by this contract. Such rights last for six (6) years from the date final payment is made hereunder. 4 9. NONDISCRIMINATION PROVISION a) During the performance of this contract, the CONTRACTOR shall abide by all applicable federal and state nondiscrimination laws and regulations, including, but not limited to Chapter 49.60 RCW (Washington's Law Against Discrimination) and 42 U.S.C. 12101 et. seq. (the Americans With Disabilities Act [ADA]). b) In the event of the CONTRACTOR'S noncompliance or refusal to comply with any nondiscrimination law, regulation, or policy, this contract may be rescinded, canceled, or terminated in whole or in part, and the CONTRACTOR may be declared ineligible for further contracts with the DEPARTMENT. The CONTRACTOR shall, however, be given a reasonable time in which to remedy any such noncompliance. Any dispute may be resolved in accordance with the "Disputes" procedure set forth in Section 23 of this contract. 10. CONTRACT MODIFICATIONS The DEPARTMENT and the CONTRACTOR may, from time to time, desire to make changes to this contract. Any such changes that are mutually agreed upon by the DEPARTMENT and the CONTRACTOR shall be incorporated herein by written amendment. It is mutually agreed and understood that, except for the budget modifications described in Section 11 of this contract, no alteration or variation of the terms of this contract shall be valid unless made in writing and signed by the parties hereto, and that any oral understanding or agreements not incorporated herein shall not be binding. 11. MODIFICATIONS TO THE PROJECT BUDGET a) Notwithstanding any other provision ofthis contract, the CONTRACTOR may, at its discretion, make modifications not to exceed fifteen percent (15%) of each line item in the Project Budget (Attachment A), hereof. b) The CONTRACTOR shall notify the DEPARTMENT in writing when making any budget modification or modifications that would exceed fifteen percent (15%) of any budget line item. Any such request shall require the written approval of the DEPARTMENT, and any such modifications shall be made in writing and signed by both parties, and attached to the Project Budget (Attachment A), hereof. c) Nothing in this section shall be construed to permit an increase in the amount of funds available for the Project, as set forth in Section 1 of this contract. 12. TERMINATION OF CONTRACT a) If, through any cause, the CONTRACTOR shall fail to fulfill in a timely and proper manner its obligations under this contract or if the CONTRACTOR shall violate any of its covenants, agreements or stipulations of this contract, the 5 DEPARTMENT shall thereupon have the right to terminate this contract and withhold the remaining allocation if such default or violation is not corrected within twenty (20) days after the DEPARTMENT'S submitting written notice to the CONTRl\CTOR describing such default or violation; Provided, that if more than twenty (20) days are required to correct any such default or violation and the CONTRACTOR has initiated appropriate corrective measures as reasonably determined by the DEPARTMENT, the DEPARTMENT will not terminate this CONTRACT for such default or violation. b) Notwithstanding any provisions of this contract, either party may terminate this contract by providing the other party with written notice of such termination, specifying the effective date thereof, at least thirty (30) days prior to such date. c) In the event this contract is terminated, the CONTRACTOR shall be reimbursed for eligible expenses incurred prior to the effective date of such termination and not otherwise paid for by the DEpARTMENT, as the DEPARTMENT reasonably determines. d) In the event funds are not reappropriated for this Project in the 2009 - 2011 biennial budget, this contract shall terminate on June 30, 2009. 13. SPECIAL PROVISION The DEPARTMENT'S failure to insist upon the strict performance of any provision of this contract or to exercise any right based upon a breach thereof or the acceptance of any performance during such breach, shall not constitute a waiver of any right under this contract. 14. HOLD HARMLESS a) It is understood and agreed that this contract is solely for the benefit of the parties hereto and gives no right to any other party. No joint venture or partnership is formed as a result of this contract. Each party hereto agrees to be responsible and assume liability for its own negligent acts or omissions, or those of its officers, agents, or employees to the fullest extent required by law, and agrees to save, indemnify, defend, and hold the other party harmless from any such liability. In the case of negligence of more than one party, any damages allowed shall be levied in proportion to the percentage of negligence attributable to each party, and each party shall have the right to seek contribution from the other party in proportion to the percentage of negligence attributable to the other party. 6 b) This indemnification clause shall also apply to any and all causes of action arising out of the performance of work activities under this contract. Each contract for services or activities utilizing funds provided in whole or in part by this contract shall include a provision that the DEPARTMENT and the state of \Vashington are not liable for damages or claims from damages arising from any subcontractor's performance or activities under the terms of the contracts. c) The CONTRACTOR shall defend, indemnifY and save the DEPARTMENT, its officers, and employees harmless, from and against any and all claims, including reasonable attorney fees, made by the CONTRACTOR, its subcontractors, their . employees and subcontractors, and any other persons, relating to the payment or reporting of prevailing wages under RCW 39.04 or RCW 39.12. 15. RECAPTURE PROVISION In the event that the CONTRACTOR fails to expend state funds in accordance with state law and/or the provisions of this contract, the DEPARTMENT reserves the right to recapture state funds in an amount equivalent to the extent of noncompliance. Repayment by the CONTRACTOR of state funds under this recapture provision shall occur within thirty (30) days of demand. In the event that the DEPARTMENT is required to institute proceedings to enforcf.:: this recapture provision, the DEPARTMENT shall be entitled to its cost thereof, including reasonable attorney's fees. 16. OWNERSHIP OF PROJECT/CAPITAL FACILITIES The DEPARTMENT makes no claim to any real property improved or constructed with funds awarded under this contract and does not assert andwill not acquire any ownership interest in or title to the capital facilities and/or equipment' constructed or purchased with state funds under this contract. This provision does not extend to claims that the DEPARTMENT may bring against the CONTRACTOR in recapturing funds expended . in violation of this contract. 17. RELATIONSHIP BETWEEN THE PARTIES The CONTRACTOR and its employees or agents performing under this contract are not deemed to be employees of the DEPARTMENT nor agents of the DEPARTMENT in any manner whatsoever, nor will they hold themselves out as nor claim to be officers or employees of the DEPARTMENT or of the state of Washington hereof and will not make any claim, demand, or application to or for any right or privilege applicable to an officer or employee of the DEPARTMENT or of the state of Washington. 18. GOVERl\TJNG LAW AND VENUE This contract shall be construed and enforced in accordance with, and the validity and performance hereof shall be governed by, the laws of the state of Washington. Venue of any action at law between the parties arising out of this contract shall be the superior court of Thurston County, Washington. 7 19. SEVERABILITY In the event any term or condition of this contract or application thereof to any person or circumstances is held invalid, such invalidity shall not affect other terms, conditions, or applications of this contract that can be given effect without the invalid term, condition, or application. To this end the terms and conditions of this contract are declared severable. 20. REDUCTION IN FU1\TDS In the event state funds appropriated for th.e work contemplated under this contract are withdrawn, reduced, or limited in any way by the Governor or the Washington State Legislature during the contract period, the parties hereto shall be bound by any such revised funding limitations as implemented at the discretion of the DEPARTMENT, and shall meet and renegotiate the contract accordingly. 21. ENTIRE AGREEMENT This contract and all attachments hereto contain all the terms and conditions agreed upon by the parties. No other understandings, oral or otherwise, regarding the subject matter of this contract and attachments shall be deemed to exist or to bind any of the parties hereto. 22. SIGNAGE. MARKERS AND PUBLICATIONS If, during the period covered by this contract, the CONTRACTOR displays or circulates any communication, publication, or donor recognition identifying the financial participants in the Project, any such communication or publication must identify "The Taxpayers of Washington State" as a participant. 23. DISPUTES Except as otherwise provided in this contract, when a !Jona fide dispute arises between the parties and it cannot be resolved through discussion and negotiation, either party may request a dispute hearing. The parties shall select a dispute resolution team to resolve the dispute. The dispute resolution team shall consist of a representative appointed by the DEPARTMENT, a representative appointed by the CONTRACTOR, and a third party mutually agreed upon by both parties. The dispute resolution team shall attempt, by majority vote, to resolve the dispute. The parties agree that this dispute process shall precede any action in a judicial or quasi-judicial setting. 24. PREVAILING WAGE LAW The Project funded under this contract may be subject to state prevailing wage law (Chapter 39.12 RCW). The CONTRACTOR is advised to consult the Industrial Statistician at the Washington Department of Labor and Industries to determine whether prevailing wages must be paid. The DEPARTMENT is not responsible for determining whether prevailing wage applies to this Project or for any prevailing wage payments that may be required by law. 8 25. CHA1'l"GE OF OW}.j'ERSHIP OR USE FOR CONTRACTOR-O\VNED PROPERTY a) The CONTRACTOR understands and agrees that any and all real property or facilities owned by the CONTRACTOR that are acquired, constructed, or otherwise improved by the CONTRACTOR using state funds under this contract shall be held and used by the CONTRACTOR for the purpose or purposes stated elsewhere in this contract for a period of at least ten (l0) years from the date the final payment is made hereunder. b) This provision shall not be construed to prohibit the CONTRACTOR from selling any property or properties described in this section; Provided, that any such sale shall be subject to prior review and approval by the DEPARTMENT, and that all proceeds from such sale shall be applied to the purchase price of a different facility or facilities of equal or greater value than the original facility and that any such new facility or facilities will be used for the purpose or purposes stated elsewhere in this contract. c) In the event the CONTRACTOR is found to be out of compliance with this section, the CONTRACTOR shall repay to the state general fund the principal amount of the grant as stated in Section 1, hereof, plus interest calculated at the rate of interest on state of Washington general obligation bonds issued most closely to the effective date of the legislation in which the subject facility was authorized. Repayment shall be made pursuant to Section 15 (Recapture provision). 26. CHANGE OF USE FOR LEASED PROPERTY a) The CONTRACTOR understands and agrees that any facility leased by the CONTRACTOR that is constructed, renovated, or otherwise. improved using state funds urider this contraCt shall be used by the CONTRACTOR for the purpose or purposes stated elsewhere in this contract for a period of at least ten (10) years from the date the final payment is made hereunder. b) In the event the CONTRACTOR is found to be out of compliance with this section, the CONTRACTOR shall repay to the state general fund the principal amount of the grant as stated in Section 1, hereof, plus interest calculated at the rate of interest on state of Washington general obligation bonds issued most closely to the effective date of the legislation in which the subject facility was authorized. Repayment shall be made pursuant to Section 15 (Recapture Provision). 9 27. HISTORICAL At'll) CULTURAL ARTIFACTS In the event that historical or cultural artifacts are discovered at the Project site during construction, the CONTRACTOR shall immediately stop construction and notify the local historical preservation officer and the state historical preservation officer at the Washington State Department of ArchaeoIogy and Historic Preservation. 28. REAPPROPRIATION a) The parties hereto understand and agree that any state funds not expended by June 30,2009, will lapse on that date unless specifically reappropriated by the Washington State Legislature. Iffunds are so reappropriated, the state's obligation under the terms of this contract shall be contingent upon the terms of such reappropriation. b) In the event any funds awarded under this contract are reappropriated for use in a future biennium, the DEPARTMENT reserves the right to assign a reasonable share of any such reappropriation for administrative costs. 29. SURVIVAL a) The terms and conditions contained in this contract that by theiJ;' sense and context are intended to survive the termination of this contract, including Sections 14 (Hold Harmless), 15 (Recapture Provision), 18 (Governing Law and Venue), 22 (Signage, Markers and Publications), 23 (Disputes), 25 (Change of Ownership or Use for Contractor-Owned Property) and 26 (Change of Use for Leased Property), shall so survive. {Rest afpage left blank intentionally} 10 30. ADMINISTRATION a) The CONTR..A..CTOR'S representative shall be Gail Labanara. b) The DEPARTMENT'S representative shall be Daniel Aarthun. IN WITNESS WHEREOF, the DEPARTMENT and the CONTRACTOR have executed this contract as of the date and year written below. Marijo Olson, Acting Assistant Director Local Government Division Department of Community, Trade, and Economic Development Steve Mullet, Mayor City of Tukwila Federal Tax ID #: 91-6001519 Date: Date: APPROVED AS TO FORM: c::2u~6f7~ Assistant Attorney General Date: - 9/Z0/Cl? / / 11 ATTACHlVIENT A PROJECT BUDGET Line Item Amount Site Acquisition $0.00 Architecture & Engineering $66,000.00 Construction $690,000.00 Capitalized Equipment $0.00 Construction Management $107,000.00 Other $0.00 Total Contracted Amount: $863,000.00 The CONTRACTOR, by its signature, certifies that the Project Budget set forth above has been reviewed and approved by the CONTRACTOR'S governing body or board of directors, as applicable, as of the date and year written below. CONTRACTOR TITLE DATE 12 ATTACHMENT B CERTIFICATION OF THE AVAILABILITY OF FU!'il)S TO COlVIPLETE THE PROJECT Non-State Funds Amount Total King County $250,000.00 City of Tukwila $168,625.00 Total Non-State Funds $418,625.00 $418,625.00 State Funds 2007 State Capital Budget $444,375.00 $444,375.00 Total Non-State and State Sources $863,000.00 CERTIFICATION The CONTRACTOR, by its signature, certifies that project funding from sources other than those provided by this contract and identified above has been reviewed and approved by the CONTRACTOR'S governing body or board of directors, as applicable, and has either been expended for eligible Project expenses, or is committed in writing and available and will remain committed and available solely and specifically for carrying out the purposes of this Project as described in elsewhere in this contract, as of the date and year written below. The CONTRACTOR shall maintain records sufficient to evidence that it has expended or has access to the funds needed to complete the Project, and shall make such records available for the DEPARTMENT'S review upon reasonable request. CONTRACTOR TITLE DATE 13 ATTACHiVIENT C PROJECT SCOPE OF'VORK PROJECT SUMMARY Funds will be used for capital infrastructure improvements related to the Fort Dent Sewer project, located from 14900 Maule Avenue South, to the intersection of Fort Dent vVay and Interurban Avenue South. Work will include infastructure improvements related to the construction of 2,150 linear feet of 8-inch PVC sanitary sewer main. This will also include construction of 645 linear feet of 6-inch ductile iron pipe force main from the Fort Dent Way and Interurban Avenue South intersection to Lift Station #5, with associated pavement restoration and related work. Construction began in February 1,2007 and is expected to be completed by September 30,2007. The CONTRACTOR, by its signature, certifies that the declaration set forth above has been reviewed and approved by the CONTRACTOR' Sgoveming body as of the date and year written below. CONTRACTOR TITLE DATE 14 ATTACHMENTD CERTIFICATION OF THE P A YlVIENT AND REPORTING OF PREVAILING \V AGES CERTIFICATION The CONTRACTOR, by its signature, certifies that all contractors and subcontractors performing work on the Project shall comply with prevailing wage laws set forth in Chapter 39.12 RCW, as applicable to the Project funded by this contract, including but not limited to the filing of the "Statement of Intent to Pay Prevailing Wages" and "Affidavit of Wages Paid" as required by RCW 39.12.040. The CONTRACTOR shall maintain records sufficient to evidence compliance with Chapter 39.12 RCW, and shall make such records available.for the DEPARTMENT'S review upon request. The CONTRACTOR, by its signature, certifies that the declaration set forth above has been reviewed and approved by the CONTRACTOR'S governing body as of the date and year written below. CONTRACTOR TITLE DATE 15 ATTACHMENT E CERTIFICATION OF INTENT TO ENTER THE LEADERSHIP IN ENERGY Al'<l"TI E~'VIRONIVIENTAL DESIGN (LEED) CERTIFICATION PROCESS CERTIFICATION The CONTRACTOR, by its signature, certifies that it will enter into the Leadership in Energy and Environmental Design certification process, as stipulated in RCW 39.35D, as applicable to the Project funded by this contract. The CONTRACTOR shall, upon receipt of LEED certification by the United States Green Building Council, provide documentation of such certification to the DEPARTMENT. The CONTRACTOR, by its signature, certifies that the declaration set forth above has been reviewed and approved by the CONTRACTOR'S governing body or board of directors, as applicable, as ofthe date and year written below. CONTRACTOR ~~ ,(I ~\~v. g<lV : rCv f; \;\ TITLE ~ [.]./~ '0.(' . ^~ 'Y~---.<, . .'" <'~ Urf' Y 16 INFORMATION :MEMO To: From: Date: Subject: Mayor Mullet Public W orIes Director~ October 11, 2007 U-' l NPDES Phase II Stormwater Management Plan Consultant Selection and Contract Agreement Project No. 93-DRIO ISSUE Approve Paramentrix, Inc., to develop the City's Master Drainage Program. BACKGROUND The National Pollutant Elimination System (NPDES) requires the City to develop a Master Drainage Program and other requirements outlined in the City's General Permit that became effective February 16,2007. The first annual report and the Cities Master Drainage Program are due to the Department of Ecology (DOE) on March 31,2008. To assist cities with this and other permit requirements, the Washington State Legislature approved grants of $75,000 to each of the effected jurisdictions. Staff discussions with the cities of Newcastle and SeaTac revealed their interest in partnering on a Master Drainage Plan. This partnership would reduce the overall cost in developing the plan by avoiding duplications. A consultant advertisement was published and five firms responded with proposals to conduct the work. ANALYSIS The five firms that responded were: 1. Parametrix, Inc. 2. Otak, Inc. 3. RoseWater Engineering, Inc. 4. Herrera Environmental Consultants 5. Gray & Osborn City staff from each of the cities reviewed and evaluated the proposals. Parametrix had the highest overall score and scored significantly better than the other firms. Staff from all three cities agreed that given previous discussions with Parametrix and the results of the ranking, that Parametrix should be selected to develop the Master Drainage Program for each of the cities. BUDGET SUMMARY Contract *Budget Stormwater Master Plan $75,000 $ 75,000 *This budget amount is a DOE grant for $75,000 and should be received in 2008. RECOMMENDATION Approve the consultant agreement with Parametrix, Inc., for professional services to complete the NPDES Phase II Stormwater Management Plan for $75,000. RL:sb Attachments: Consultant Agreement (P:Projects\A- DR Projects\93DR10\Info Memo Master Drainage Plan) CONSULTANT AGREEMENT FOR PROFESSIONAL SERVICES TillS AGREEI\tIENT is entered into between the City of Tukwila, Washington, hereinafter referred to as "the City", and Parametrix, hereinafter referred to as "the Consultant," in consideration of the mutual benefits, terms and conditions hereinafter specified. 1. Project Designation. The Consultant is retained by the City to perform consultant services in connection with the project designated - NPDES Phase IT Stormwater Management Plan. 2. Scope of Services. The Consultant agrees to perform the services, identified on Exhibit "A" attached hereto, including the provision of all labor, materials, equipment and supplies. 3. Time for Performance. Work under this contract shall commence upon the giving of written notice by the City to the Consultant to proceed. The Consultant shall perform all services and provide all work product required pursuant to this Agreement within 240 calendar days from the date written notice is given to proceed, unless an extension of such time is granted in writing by the City.. 4. Payment. The Consultant shall be paid by the City for completed work and for services rendered under this Agreement as follows: A. Payment for the work provided by the Consultant shall be made as provided on Exhibit "B" attached hereto, provided that the total amount of payment to the Consultant shall not exceed $ $75,000 without express written modification of the Agreement signed by the City. . B. The-ConsultantniaysuooofvoucfierstoiheTity once .p-ermoritll-dunng1he- __ progress of the work for partial payment for that portion of the project completed to date. Such vouchers will be checked by the City and, upon approval thereof, payment shall be made to the Consultant in the amount approved. . C. Final payment of any balance due the Consultant of the total contract price earned will be made promptly upon its ascertainment and verification by the City after the completion of the work under this Agreement and its acceptance by the City. D. Payment provided in this section shall be full compensation ror work performed, services rendered, and for all materials, supplies, equipment and incidentals necessary to complete the work. E. The Consultant's records and accounts pertaining to this Agreement are to be kept available for inspection by representatives of the City and state for a period of three (3) years after final payments. Copies shall be made available upon request. 5. Ownership and Use of Documents. All documents, drawings, specifications and other materials produced by the Consultant in connection with the services rendered under this Agreement shall be the property of the City whether the project for which they are made is executed or not. The Consultant shall be permitted to retain copies, including reproducible copies, of drawings and specifications for information, reference and use in connection with the Consultant's endeavors. The Consultant shall not be responsible for any use of the said documents, drawings, specifications or other materials by the City on any project other than the project specified in this Agreement. 6...:. Compliance with Laws. The Consultant shall, in performing the services contemplated by this Agreement, faithfully observe and comply with all federal, state, and local laws, ordinances and regulations, applicable to the services to be rendered under this Agreement. 7. Indemnification. The Consultant shall indemnify, defend and hold harmless the City, its officers, agents and employees, from and against any and all claims, losses or liability, including attorney's fees, arising from injury or death to persons or damage to property occasioned by any act, omission or failure of the Consultant, its officers, agents and employees, in performing the work required by this Agreement. With respect to the performance of this Agreement and as to claims against the City, its officers, agents and employees, the Consultant expressly waives its immunity under Title 51 of the Revised Code of Washington, the Industrial Insurance Act, for injuries to its employees, and agrees that the obligation to indemnify, defend and hold harmless provided for in this paragraph extends to any claim brought by or on behalf of any employee of the Consultant. This waiver is mutually negotiated by the parties. This paragraph shall not apply to any damage resulting from the sole negligence of the City, its agents and employees. To the extent any of the damages referenced by this paragraph were caused -byoi' restinea-frani tne-'concurrenfnegligenceoftneCity,-irs-agentn>r'employees', this - obligation to indemnify, defend and hold harmless is valid and enforceable only to the extent of the negligence of the Consultant, its officers, agents and employees. 8. Insurance. The Consultant shall secure and maintain in force throughout the duration of this contract comprehensive general liability insurance, with a minimum coverage of $500,000 per occurrence and $1,000,000 aggregate for personal injury; and $500,000 per occurrence/aggregate for property damage, and professional liability insurance in the amount of $1,000,000. Said general liability policy shall name the City of Tukwila as an additional named insured and shall include a provision prohibiting cancellation of said policy except upon thirty (30) days prior written notice to the City. Certificates of coverage as required by 2 this section shall be delivered to the City within fifteen (15) days of execution of this Agreement. 9. Independent Contractor. The Consultant and the City agree that the Consultant is an independent contractor with respect to the services provided pursuant to this Agreement. Nothing in this Agreement shall be considered to create the relationship of employer and employee between the parties hereto. Neither the Consultant nor any employee of the Consultant shall be entitled to any benefits accorded City employees by virtue of the services provided under this Agreement. The City shall not be responsible for withholding or otherwise deducting federal income tax or social security or for contributing to the state industrial insurance program, otherwise assuming the duties of an employer with respect to the Consultant, or any employee of the Consultant. 10. Covenant Against Contingent Fees. The Consultant warrants that he has not employed or retained any company or person, other than a bonafide employee working solely for the Consultant, to solicit or secure this contract, and that he has not paid or agreed to pay any company or person, other than a bonafide employee working solely for the Consultant, any fee, commission, percentage, brokerage fee, gifts, or any other consideration contingent upon or resulting from the award or making of this contract. For breach or violation of this warrant, the City shall have the right to annul this contract without liability, or in its discretion to deduct from the contract price or consideration, or otherwise recover, the full amount of such fee, commission, percentage, brokerage fee, gift or contingent fee. 11. Discrimination Prohibited. The Consultant, with regard to the work performed by it under this Agreement, will not discriminate on the grounds of race, color, national origin, religion, creed, age, sex or the presence of any physical or sensory handicap in the selection and retention of employees or procurement of materials or supplies. 12. Assignment. The Consultant shall not sublet or assign any of the services covered by _ ___ ______ __ 13. Non-Waiver. Waiver by the City of any provision of this Agreement or any time limitation provided for in this Agreement shall not constitute a waiver of any other provision. 14. Termination. A. The City reserves the right to terminate this Agreement at any time by giving ten (10) days written notice to the Consultant. B. In the event of the death of a member, partner or officer of the Consultant, or any of its supervisory personnel assigned to the project, the surviving members of the Consultant hereby agree to complete the work under the terms of this Agreement, 3 if requested to do so by the City. This section shall not be a bar to renegotiations of this Agreement between surviving members of the Consultant and the City, if the City so chooses. 15. Attorneys Fees and Costs. In the event either party shall bring suit against the other to enforce any provision of this Agreement, the prevailing party in such suit shall be entitled to recover its costs, including reasonable attorney's fees, incurred in such suit from the losing party. 16. Notices. Notices to the City of Tukwila shall be sent to the following address: City of Tukwila 6200 Southcenter Blvd. Tukwila, WA 98188 Notices to Consultant shall be sent to the following address: Parametrix 411 10 8th Avenue NE, Suite 1800 Bellevue, W A 98004-5571 17. Integrated Agreement. This Agreement, together with attachments or addenda, represents the entire and integrated Agreement between the City and the Consultant and supersedes all prior negotiations, representations, or agreements written or oral. This Agreement may be amended only by written instrument signed by both the City and the Consultant. DATED this day of CITY OF TUKWILA CONSULTANT By: ~~ Steven M. Mullet, Mayor f?-,',--;c.-i'.~J Title Attest! Authenticated: Approved as to Form: Jane E. Cantu, City Clerk Office of the City Attorney 4 {}"~ .,',:', ..' ,.... SCOPE OF WORK . City of Tukwila . NPDES Phase II Stormwater Management Plan INTRODUCTION The efforts described in this Scope of Work will enhance the City of Tukwila's existing stormwater management program (SW},1P) to meet the Department of Ecology I\TPDES Phase IT permit requirements. The SWMP update effort will include review of existing stormwater program elements and gap analysis of those, elements as they pertain to the known Phase II requirements; evaluation of the existing stormwater technical manual currently in use; identification of staffmg needs to sustain your SWMP; evaluation of future funding needs for program sustainability; and assistance in presenting your respective SVi'MPs to City Council. In addition, since the Phase II requirements are not yet fully defined by Ecology, effort will be made to keep abreast of evolving Ecology requirements. The work described in this scope is expected to be performed during the period October 2007 through May 2008. PROJECT PURPOSE AI\'D OVERVIEW The purpose of this project is to assist the City of Tukwila in developing a stormwater management program that is supported by your city council and can be implemented by your staff. Since your SWMP update. is being done in collaboration with SWMP updates for the municipalities of Newcastle and SeaTac, elements that are common to all three cities will be identified and developed, and elements of the SW1\1P that are unique to the City of Tukwila will also be identified and developed. These elements will ' be identified in an initial scoping.meeting with City staff and developed over the course ofthe project and included in the SWMP. Specific tasks include: Task 1: Stormwater Program Evaluation Task 2: Develop Compliance Schedule Task 3: Stormwater Manual Technical Evaluation Task 4: Develop SWMP Documents -.-Task-5:.Staffing-Analysis.--,--- ._._.__ . Task 6: Council Presentations Task 7: Public Involvement Program Task 8: Funding Analysis Task 9: Project Management Task 10: Develop Program Tools (optional depending on availability of funding) . . . . . . . . . The individual tasks are described in detail below. City ofTukwila NPDES Phase II SlOnnwarer Management Plan Scope of Work 1 558-2067-XXX Oerober 2007 ~~_~_L__~;____L-_~--'_____ SCOP--E-OF WORK (CONTINUED)--- - - - --- -- - ----- -- ---- 1. STORMWATER PROGRAM EVALUATION Measurable Objectives The consultant shall prepare a Memorandum containing two (2) tables: (1) Existing Stormwater Program Elements and, (2) Ecology required Program Elements. It is intended that the Ecology required Program Elements table be shared with all three Cities (Tukwila, Newcastle and SeaTac) to establish concurrence for all shared elements. Approach Parametrix will compare the l\TPDES Phase II permit requirements with stormwater program elements currently in place or planned for the City. The foundation for this will be the draft l\TPDES Phase II Stormwater Management Program Evaluation matrix that we have already started. Feedback from the City will be required to identify any additional data sources such as facility inspection reports, operation and maintenance programs, in-house database information, or recorded complaints. At this time we will also identify any unique local needs and site-specific water quality issues, including impending TMDLs or ESA items, or the use of regional detention/water quality facilities. In addition to the program evaluation described above, Parametrix will assist Tukwila with developing basin-specific flow control guidelines (exemptions) for up to five (5) flowlf1ow exemption scenarios. The guidelines will focus on pre-development flow match targets (e.g., 2008 existing condition, 1982 condition, pre-forested conditions, or drainage to built systems) that are specific to protecting each receiving system or receiving water. The guidelines would be developed by first selecting the drainage basins for basin-specific standards, typically for unique in-place collection or discharge systems. For discharges to natural systems, a qualitative review of each of the receiving systems will be made to place each drainage area in a flow control guideline scenario. For natural systems, Parametrix will propose a pre-developed flow condition recommendation (described as a pre-development condition) for use in a Stormwater Management Manual. There will be two workshops with staff to (1) define the approach and applicable basins and (2) confirm the proposed standards and area applications. No public meetings or Ecology meetings are proposed on ._this topic._ Asummary.technicaLme.mpmndJlTILWiU J?_~.-I?Jepw~!Lt9_SI,!PP-Ql1 !h~J1Q.w _$c:~n~o jlH~D}l!tj.Y~s '--.- Assumptions . Up to five (5) scenarios will be developed with basin-specific flow control guidelines. . Appropriate information about the built systems is provided; we will not prepare any maps, inventory, or calculations of the existing system performance. Tukwila will provide the information. . It is anticipated that following an initial evaluation the project team, this analysis will be completed in one working session with representatives from each City. Tukwila will provide Parametrix with current copies of the following in both hard copy and electronic format if available by the dates indicated in the project schedule: ~ 'Stormwater Comprehensive Plan City ofTuJ.:wila NPDES Phase II Stormwater Management Plan Scope of Work 2 558-2067-XXX October 2007 L ~~~;'-~:~'-~~~-~~-f---~~-- ,-_~~SCOPE_OE WORK (CONIINUEI)) -~~- ,. Long-term Capital Improvement Project schedule, including anticipated annual budget requirements. ,. illicit discharge, detection, and elimination program and supporting documentation ,. Maintenance manuals and record keeping documents and procedures.. }> Facility inspection and reporting documents and procedures. }> All available drainage system mapping including both pipe and structures with existing identification method documentation. ,. Identification of critical area concerns. }> Assessment of water quality concerns ,. Existing basin plans and identification of any future basin plans. ~ Draft and [mal maps for the flow exemption areas will be prepared by Tukwila. Deliverables . Draft Existing Stormwater Program Table summarizing: ~ The existing stormwater manageIUent programs currently in place. ~ Deficiencies in the existing stormwater management programs. ~ Recommended approaches/programs and prioritization to ensure permit compliance. ,. Development of a retrofit flow control standard for the City. . Draft Program Element Table summarizing all three Cities, . Common program elements to all three Cities will be identified. . Basin Specific Flow Control Technical memorandum (2-3 pages) describing the approach and recommendation. Final Existing Program Element Table for the City. Final Program Element Table for all three (3) Cities. 2. DEVELOP COMPLIANCE SCHEDULE Measurable Objectives A detailed compliance schedule is needed to ensure Tul'Wila remains m compliance with all the requirements of tbe NPDES Phase II permit. Approach The Parametrix will work with the City to develop a detailed compliance schedule that is specific to the City's needs. This schedule will assist the team in identification of time critical elements that if not addressed, might lead to permit deadlines being missed. Although the primary target of this scope's effort is to create a S\VMP document to be submitted with the City's first Annual Report on March 31,2008, if CiI)' ofTuklVila NPDES Phase II Srormwaler Management Plan Scope ofVlork 3 558-2067-XXX OClober 2007 budget allows, other deadlines need to be considered. The three (3) secondary deadlines are listed as follows: Public Participation in the SWMP development - February 2008 Initiation of cost-tracking mechanisms - January 1,2009 - this work is not included in the current scope and budget. Development of an education and outreach program and the listing of a hotline - February 16, 2009 _ the hotline work is not included in the current scope and budget. Support Tukwila in its required Ecology Annual Report - this work is not included in the current scope and budget beyond 2008. Assumptions If Tukwila wishes to include any or all of the secondary work, additional scope and budget can be added at any time over the course of this project. A revised project schedule would be needed to assess how this additional work would impact the compliance schedule. . Any delay in the City's providing the Parametrix with the needed deliverables as per the project schedule could impact the success of meeting the timeline in the City's compliance schedule. Deliverables MS Project Gantt chart of permit deadlines and supporting tasks (hard copy and pdf electronic copy) 3. STORMWATER TECHNICAL MANUAL EVALUATION Measurable Objectives The City has indicated the need to evaluate the storrnwater technical manuals available for adoption. There are two primary manuals used in this region: Ecology's 2005 Storrnwater Management Manual for Western Washington (SMMWW) and King County's 2005 Surface Water Management Manual (SWDM). Although there are similarities between the two manuals, the following issues need to be __ --eva-Iuated-prior-to-adoption-:--- _____________ ____. . Retrofit requirements for redevelopment. Flow control standards. . Water quality treatment standards. Current thresholds for storrnwater requirements. . Hydrologic modeling tools required (W\v"HM3 or KCRTS). \\'hether the King County manual has been deemed equivalent by Ecology to Ecology's manual. General ease of use of the adopted manual. . City-specific issues identified during the scoping process that may require modifications in standards prior to adoption of either manual. City ofTuk.vila NPDES Phase 11 SromlWaier MaJlagement Plall Scope of Work 4 558-2067-XXX Ocrober 2007 ~-_~~~i_o-'-~~__=r.,~~-.:____,-__~_SCOP-E_OEWORK1CONTJNUED} - - - -- We are aware that the King County manu"al is currently under review by Ecology and will be revised to meet the permit requirements for equivalency. Per a conversation on October 4, 2007, a draft of the KCSWDM is due out in November with finalization of the Manual anticipated by early 2008. It is Parametrix's understanding that evaluation of the two manuals will be performed specifically for the City of Tukwila and the City of Newcastle. The City of SeaTac does not anticipate the need to change its current stormwater management manual. Approach Evaluate retrofit requirements for redevelopment: Review the Tukwila's current standards and code to determine current thresholds for retrofit requirements. . Compare the City's current retrofit thresholds to the retrofit thresholds in the NPDES Phase II Permit. . Coordinate with City staff and other relevant downstream agencies to determine if there are current hydraulic capacity problems or natural resources that could benefit from stormwater retrofit"through redevelopment requirements. . Perform conceptuai hydrologic analyses to determine how peak flow rates and durations could potentially be reduced with retrofit requirements. Evaluate applicable hydrologic modeling tools: . Identify the types of stormwater design elements typically requiring hydrologic modeling, such as conveyance, water quality treatment, flow control, and Low Impact Development (LID) Best Management Practices (BMPs). . Prepare a matrix that identifies: ~ stormwater design elements for which hydrologic analysis is required, }> typically acceptable methodologies, }> readily available resources that present the methods, -v--advantages-and-disadvantages,of.the-methods,"--- --- _ -- --------- --- - ---- - ~ agencies that may potentially review projects, and . recommended allowable methodologies. Evaluate King County SWDM equivalency to Ecology's SMM\.VW: . Coordinate with Ecology regarding review and approval status of King County's SWDM. Coordinate with King County to discuss potential major differences. General ease in using the adopted manual: . King County's S\VDM was prepared specifically for areas for which stormwater management is specifically within the jurisdiction of King County. Consequently, there are terms and sections within the S"\VDM that are not applicable to the City. Depending on the number of differences, it Ciry ofTukwila NPDES Phase II S;onnwater Management Plan Scope of Work 5 558-2067-XXX October 2007 p1fs---;o- ~:-:-- --:-~~-~~--_:-------SCOPE OF WORK (CONTJNUEDl- - --- - - - - ---- may be simpler to prepare an entirely new manual, replace specific sections, or adopt Ecology's SMMWW with amendments. . Parametrix will identify specific questions typically encountered in stormwater management design and determine how readily the answers may be found in the two different manuals. Other City-specific issues: Review other issues identified by the City during the scoping process that may require modifications in standards prior to adoption of either manual. Assumptions . The only two manuals Parametrix will include in this evaluation are the Ecology 2005 . Stormwater Management Manual for Western Washington (SMMWW) and King County 2005 Surface Water Design Manual (SWDM). . It is Parametrix's understanding that the King County manual has been submitted to Ecology for review but that a fmal determination has not yet been made. Parametrix will coordinate with Ecology to determine the review status. Parametrix will proceed with evaluating the two manuals and will incorporate information from Ecology if such information is available as the evaluation occurs. . Additional manuals can be included in this evaluation subject to scope and budget modifications approved by the City. The results of the approaches will be summarized in a Draft and Final Stonnwater Manual Evaluation and Recommendations Technical Memorandum. There will not be a separate memorandum for each task. Deliverables . Matrix identifying hydrologic and retrofit analysis methodologies. . Draft Stormwater Manual Evaluation and Recommendations Technical Memorandum - . . Final Stonnwater Manual Evaluation and Recommendations Technical Memorandum. 4. DEVELOP SWMP DOCUMENTS Measu.rable Objectives The Parametrix will support Tukwila in the development of an Ecology approved SyVMP that addresses the minimum requirements for Ecology's Phase II permit. However, the requirements are still evolving at Ecology and the development of Tukwila' s manual may need modification as ne\v information becomes available throughout the course of this project. The SWMP will include elements common to all three Cities in addition to elements unique to Tukwila. Approach Reach consensus on the SVl1vlP elements that are committed to by Tukwila. The draft SWMP and supporting implementation plan will need to be presented to City council. Attend the 1\l}>DES Ciry ofTl<kwila NPDES Phase II Sronnwater Mallagemellt Plan Scope of'llork 6 558-2067-XXX October 2007 ~_=-h~'+"'~~- ~---:'-~- -:-,~~----,-~ -SCOPE-Oa; WORK-(CONt"JNUED)- - -- -- - -- - - ----- - ~----- ___u coordinators meeting with Ecology on October 25-26 to obtain up-to-date information on Ecology's Phase II permit requirements. Assumptions . A summary of all Phase II permit minimum required elements will be prepared by the Parametrix. This will include elements that: . Have been accomplished by Tukwila . Have been agreed to by City Council . We will address the content of the Phase II permit requirements. If new issues arise from Ecology there will need to be modifications to scope and budget. Deliverables . Draft SWMP document. . Final SWMP document. 5. STAFFING ANALYSIS Measurable Objectives Using a staff matrix, the Parametrix will work with the City to determine the number and type of staff it will take to support the implementation of the stormwater management program. Approach Using a staffing matrix, the stormwater program elements that need to be implemented will be _defmed by staff position and paired with the different staffing skills and/or responsibilities required to sustain those positions. The existing staff availability and skills will be evaluated and included in the matrix. The matrix will be completed by indicating whether a particular skill/responsibility is required and the estimating the anticipated level of effort in hours. Hours available from existing staff will be included as negative values. Summing the hours will provide an estimate of the full-time equivalents (FTEs) required as-well anhe-skilHype:---- .. +---------- u__ ___u_ u____ -------- -- --- - -- --- ----- -- -- _UB_ -- Assumptions . No draft of the Technical Memorandum will be provided since consensus will be reached during the development of the staffmg matrix. The Staffing Recommendation Technical Memorandum will be presented to City council. Deliverables Completed draft staffmg matrix . Final staffing matrix Final Staffmg Recommendation Technical Memorandum. Cil)' ofTuh;ila NPDES Phase II Stonnwater Management Plan Scope of Work 7 558-2067-XXX October 2007 :;; :,,~;;,~': ,_;d-:-_--"-<~;'C-'"~-_SCOP-E-OF-WORK.(CONTINUED n __m__ _~<___ - --__ <-. - __ _~. 6. COUNCIL PRESENTATIONS Measurable Objectives Assist the City in its efforts to codify the SWMP and support staffmg requirements needed for its implementation. Approach Presentation of the draft SWMP at a City council meeting. Presentation of the Staffing Recommendation Technical Memorandum to City council could potentially necessitate attendance at a second city council meeting. Assumptions . Parametrix will attend two (2) City council meetings. Any further attendance will require expanded scope and budget that will include preparation, travel and meeting time. City council meetings will include presentation of the Staffmg Recommendation Technical Memorandum and to present the draft S\VMP. Deliverables Two (2) preparation meetings with City staff, each prior to the respective City council meeting. Two (2) meetings with City council. 7. PUBLIC INVOLVEMENT PROGRAM Measurable Objectives To update the existing Tukwila stormwater website, enabling it to meet the minimum Ecology Phase II requirements for a public involvement program. Approach To.workwith Tukwilastaff-supportingtheir in-house IT- staff; Assumptions It is likely that public involvement strategies/tools will be discussed at a forum/subcommittee meeting with relevant information posted on the "Share Point" currently under development by King County. Deliverables Technical SUPPOlt to the Tukwila IT staff. City ofTukwila NPDES Phase II StOnllwater Management Plan Scope afWork 8 558-2067.XXX October 2007 L;~_~,~~___-'.'~~~'~-,-,-__SCORE-ORWOBK_(CONIJNUED)__ __n ~ ____ _ ____ ___- __ ___ 8. FUNDING ANALYSIS Measurable Objectives Parametrix project team will assist. Tukwila in conducting a funding analysis to ensure that funding is available to sustain the City's SWMP. Approach The funding analysis will involve a review of the City's known and anticipated revenue needs (including the anticipated costs of the NPDES Phase II elements),' an evaluation of existing revenue sources, a review of the utility rate structure, and consideration of the use of other funding sources such as system development charges for new construction. This work will be completed by the FCS Group. FCS Group will meet once with the City to identify up to two key funding policy questions for analysis. FCS Group will develop a technical memorandum defining each of the up to two issues, proposing alternative solutions, analyzing the pros and cons of each alternative, and providing a preliminary recommended course of action for each issue. FCS will perform a technical financial analysis, modeling rates for up to two levels of service, as defmed by the City and Pararnetrix. Resulting rate projections will be provided to the City for operational service levels, taking into consideration capital improvement costs as well as the required changes due to compliance with the Phase II permit. The analysis will include the incorporation of depreciation funding as a way of meeting ongoing system replacement needs. The level-of-service approach will allow the City to consider alternatives and quickly rule out fmancially infeasible options. Assumptions . Rate projections will be calculated assuming continuation of the City's existing rate structure. Deliverables Funding Analysis Technical Memorandum. . A recommended funding plan for the City. The funding plan will include rate projections for up to two levels of service. Two (2) review meetings with City staff, one to identify key policy issues, and one to discuss technical memoranda and the financial analysis. 9. PROJECT MANAGEMENT 9.1. Managing the Project Measurable Objectives Constant and thorough project management and communications shall be maintained between the Pararnetrix team and Tukwila staff to maximize teamwork and productivity while minimizing rework. eif} ofTllkwila NPDES Phase II Srormwater Management Plan Scope of Work 9 558-2067-XXX October 2007 Approach Parametrix shall manage the project in collaboration .with Tukwila to accomplish the project objectives. The work shall be in compliance with the project's scope, within the defined schedule and budget, while actively projecting/monitoring risk factors. Project Management Plan The PMP shall be prepared by the Parametrix and meet the requirements of Parametrix's project management plan guidelines. The P11P shall include a communication plan, work breakdown structure, scope of work, schedule, and deliverables matrix. Parametrix shall prepare a PMP within 30 days of receipt of written Notice to Proceed. Scope, Schedule, and Budget Parametrix shall monitor and manage the project scope for the purpose of developing a SWMP for submittal to Ecology as part of the required NPDES Phase II permitting process. Changes in scope shall be reported to the City for approval and as agreed to and documented prior to work proceeding. This is intended to help all parties monitor the scope and to propose corrective actions when necessary. The Parametrix shall create, update, monitor and manage the project schedules. Two separate schedules will be needed; the project schedule and Ecology's permit schedule. The schedules shall meet the Ecology permit and project timelines. Projections shall be provided to the City. Current status to complete work within schedule shall be developed. This is intended to help monitor the project schedule and to propose corrective actions if necessary. The Parametrix shall provide monthly progress reports on the project scope, schedule, cost to complete, earned value, and budget status. Parametrix shall prepare and submit monthly invoices for work performed and report on the invoice tracking, cost to complete, and earned value status. Assumptions Project meetings will be held a maximum of twice monthly; one at the City's office in Tukwila and the other at Parametrix's office in Bellevue. Every attempt will be made to manage the project without the meetings, but should they be required, agendas shall be prepared by the Parametrix prior to each meeting. Meeting-summaries ,.including-aGtion .items,-shall-be.produced . by.the_Parametrix-and...distributed .to_the. team and City within two working days of the meeting. Eight (8) meetings are included; two in each month of November 2007 through March 2008 except October, December and March which have one meeting each scheduled. Monthly invoices and progress reports shall be prepared in a standard Parametrix format. Progress reports shall describe the work accomplished during the billing period, including the status of individual work elements, schedule, budget, and action or information needed from the City. Earned value reporting shall be included. Progress reports shall be submitted to the City with the monthly invoice. The duration of this phase of the contract is estimated to be six (6) months. Deliverables . Project Management Plan Monthly invoices, progress and earned value reports. City ofTukwila NPDES Pilase II Stonnwater Management Plan Scope of Work 10 558.2067-XXX October 2007 C:-1~-;~:--'i--;--c--::---'----._---- --uSC-oPE OF WORK (CONT-INUED}------u--- ------- - -- ___m -- 9.2. Managing Subconsultants The Parametlix shall coordinate and manage all work and manage the effOlts of subconsultants. 10. DEVELOP PROGRAM TOOLS [OPTIONAL] Measurable Objectives The Parametrix- would work with City staff to develop tools to use in routine implementation of the SWMP. These -efforts will include the creation of decision flow charts, checklist reporting forms and other materials needed by City staff to implement the new SWMP. Approach This work would be completed after the fIrst Annual Report and completion of the fIrst SWMP document. A meeting with City staff could be required to determine remaining budget available and to prioritize tasks. An amendment to the scope and budget will be required -to defme the agreed upon course of action. This work could include use of the Parametlix to assist the City in new program implementation as required by the SWMP. The programs that are not part of this scope and budge are: Public Involvement and Participation; illicit Discharge Detection and lllumination; Controlling Runoff from New Development, Redevelopment and Construction Sites; Pollution Prevention and Operation and Maintenance for Municipal Operations; Pollution Source Control; and Monitoring. Assumptions This work is not part of this scope and budget. Deliverables . A draft amendment to the scope and budget if required. GENERAL ASSUMPTIONS . It is assumed that all documentation provided by Tukwila will be clearly marked and well --organized-to-facilltate--Parametrix- review: Any organizationalefforts-requiredby-the-Parametlix - -- - - to complete the program evaluation will require additional scope and budget. Any electronic fIles provided by Tukwila will be in a useable format. Tukwila shall provide the Parametlix with one compiled set of comments for each draft submittal. Any additional comments that require an additional draft review will result in an increase to scope and budget. . All deliverables will include an electronic copy and 2 hard copies, unless otherwise stated . The Scope of Work does not include environmental fIeld investigation, fIeld surveying, base map production or utilities documentation. It is assumed that any needed documentation of the City's existing infrastructure will be provided by the City of Tukwila. City ofTlIhvila NPDES Phase II Starmwacer Managemem Plan Scope afWork 11 558-2067-XXX October 2007 ~,~.:~;':~~ -~-,l~j:;_'i'~-:----SCQPE-OF-WORK-(CONTtNUED}--------_~--_---n__n- - - - ----- PROJECT DELlVERABLES The deliverables shall meet the following requirements: This project shall communicate in English units Hard copy submittals to the City of Tukwila shall include two (2) copies unless otherwise noted. . Electronic fIles shall be provided for all documents, and shall be sent to the City using a File Transfer Protocol (FTP) site, CDIDVD, or email attachment, as appropriate. . Electronic files shall be in an IBM-compatible format using the following software: ~ MS Office 2000 :> MS Project Professional 2003 :> Adobe PDF format )> Internet access with TCP/FTP capabilities and email address. )> AutoCAD 2006 :> WVlH:NI Version 3 )> KCRTS Version 6.0. Updated: 08/29/07 FURNISHED MATERIALS The following items are to be obtained by the Parametrix from the City: . Existing Stormwater Management Manual in both hardcopy and electronic format . Existing Storm and Surface Water Comprehensive Plan in both hardcopy and electronic format City of Tukwila GIS base map including: )> Available information on stormwater structures and pipes l> Basin Delineations Ciiy ofTuk:>\!ila NPDES Phase II.Stormwater Management Plan Scope of Work 12 558-2067-XXX October 2007 Truk I Task 2 I I Took 3 Tusk 4 1 I Took 5 Bill_n8 Pruicct Scunme __Pmjxr Mu rwBrmcm I �rng Pnm, Evalunu llnnc SSW nn Comne Schedule I_ Te ch Mnnunl Gvvl Rule Iluws Cost IIOU,s Co. Hours I Cost Noun Coo I /lours Cost I P51_In l in Clinton Iionn l: 1 270 i4 01 FO o0 I oI 10:00 �I of 10.00 0 10.00 II r,oirct Mnnnver sberl iolt 5110,94 1 1,')00,76 ,371.20 34 14,358.24 8 5554.80 I I Sr. r olcrl ScicnOsl 1_n4n Dorm ttl_$.9.22.....1 41 0 50.00 I 22 03,927.66 4 $714.12 1 I SI_Cmuullnrn Paul insult 020422 04 10.00 $0.00 I 0 50.00 70 $6.126.60 35 0 50.001 LngineerhV Juliellrm,it 5117.34 01 _I 0 10.00 L 0 00.0o 0 SO W Sr. Gn 1r.IJCoup $140.77 0 $0.01 I 0 00.00 I 0 $0.00 0 SO.W� I englncerID SeeWu Dubu 0100.67 0 10.00 I 0 $OPS I_ 0 SOPS 0 Sr. Planner 'ibacsa ]u $123.20 0 $0. 0 5000 0 $O 1 0 50.00 Sr. Scientlst Hob Sullivan $141.79 0 1 0 FO.S 0 000)01 0 00.00 Sr, S Ct,sdio Wi::u0r11 0)7fl 0 10 .00 I 0 SO.W I 0 10.60 I 0 50.05 I _.1. 6 Sr.DnSlncer Iirin N<I.mn 5126,46 0 50.1%7 I 0 50 0 50.00 0 00.00 1_ GIS Annlvst R_ck Rosnrin 100.43 I 00 I I O._W_ 0 50.00 I_ 0 $0.00 SI�G75 Annlvsl Jlm GII_I<y, 714_040i_ 3)04 09 O TU, U $0.IX S I I 0 0 00 00 I_ Sr.E jnur JcnnlJer Dvamk 5127.71 I of moo U (1 50.60 0 50.05 0 EO.OU EnBineerl CmiB,Duivago___ _$81.56 00__ 50. _I 0 00.00 IG $1,703.02 A $65231 Sr. oJrcl Ciuordinnlor Sluulmt 13 ,1, $03.60 I 41 $334.72 321 17.677.76 I_ $669 I 103.68 Conancls A4rninisvamr Jean JUhnwn SM. 21 117 01 SO.W 0 moo 0 EOW cchu Tlcnl Editor Sybil GooOjoo $9 _2.32 01 52.00 01 oo.00 1 G 1553.92 1 S9' W df oc so ICcbl rtlrroto 573,76 $09504 I' 8 0590.08 II $1.327.68 3 Cirunhic Artist _LI to )1,000n $94_24 01 80 W 0 50.00 I G $565.44 S 1oIor Sukrotal 'rook 11 Subconsllllnnt rt5 cram Direct Cast I Labor Mimic Repmduotian___ Miscellaneous Direct Cola S'o)trntii1 Total 2077. m rut 35.54017.5,, 4„ 06)0)5 I Units Coot 1 SU.485Aui 60 $29.10 105.01) $0.00 Units 18.639.04 Cost $0.00 $0.00 $0.00 1 I $N fi39.04 I Units 140 80 $18.534.00 Cost 10.00 538.80 810000 10.00 $138.80_5_ fir_ E18,672.801 I Units 25 30 Cost $39.57 O 10.00 I 0 3 3350.08 32 O $0.00 16 O 10.00 I 4 O $0.00 1_ 0 35 _$4.92.6.951_1 4 01 50.00 I_I 0 O $0.001_1 0 O $0.00 I 0 O 10.00 I 0 80.0 0 0 L 5 0 10.00 I 0 0 $0.00 0 O $0.001 0 O 10.00 I_ 26 2 $167.36 8 01 00.00 ____0369.28 5 5368 80 $321.28 00.W I 01 547120 -1- $2,715.79 54 $6.661.67 $0.00 _514.55 125.00 $0.00 s z 5_, H 34�_I Units Coo 00.00 $64.35 I $6,720.22 II 1 I Task 0 Took 7 I I SWMP13ocumenls SI0f6n4 Analysis 1_ I (tours I Coos Hours Cost I_ U 1 30 314.55 L $50.00 $0.00 I Umu 0 SOPS 0369.28 8 2 109 30 LOW) L 13,819.52 $2.856.48 1 5810.80 I_ 10.00 I $563.08 $0.00 $0.00_ 10.00 I $0,00,1' $0.00 10.00 50.00 I 33,120.66 I $609 44 I 1188481_ 012626.20 I I I 10.00 _I_ Cast I 012,715.75 I I $74.00 $75.00 $0.00 1_ i'_ $89.55 Units 0 10 18 0 0 0 0 0 0 0 0 0 4 0 38 00.00 51,193.60 03,213.54 8816.88 50.00 I_ 00.00 I 0 10.00 $0.00_ 0 00.00 10.00 of 1080 10.00 I OI 10.00 SO_00�1 0 .30.011 0.00 I 00.00 1 00.00 I $0.0 1_ $0.00 $184 04 1 $295.04 1 $0.00 1 1 15.703.70 I_ Cast 50.00 1 525.00 1_ $0.00 1 $73.00 i $0,728.70 1_I Task S Task 9 Tusk 10 Council Prtsentatin a Public Involvement I Pun61nr. Arwlynis Toul Hours Cost hour. I__ Cost I_I hours Coot $tours I Cost I I 101E2,263._40 01 00.00 0____10,(10 101 12.263.40 14 1 671 .0 5 5396 80 0 50 00 1071 519033.12 14 $2,499.4 0 $0.00 0 10.170 74 013,211.22 0:_ 0 5 $0.00 I 0 $0.00 3 8 17.760.36 O $0.00 01 SO_00 01 10.(10 0 50.00 01 0.00 ql 1 0.00 39 55.490.07 01 $0.00 0 1 0.5 0 10.00 I 01 30.001 0 10.00 0 50.001 0I $0.00 i 0 ___,3000 0 00.00 I_ 0 $000 1 0 0.00 0 00.00 1 0 30.00 I_ 01 $0. 0 $0.10 1 5 $632.30 I_ 0 50.00 01 $0.0 II 0 30.00 I 0 $0.00 I O 50.00 0 OI Eo.00 00 0 10.00 I 0 00.00 0 $0.00 -10. C 50.)10 0 $0.00 O 50.00 0 $0.00 0 $0.00 5 54 078.10 0 00.00 I_I II $0.00 o _SOPS I_ 55 $4.602.40 O 80.001_ 0 50 0 00.00 2 $175.301_ 2 8184.641 0 $000 0 50.110 19 31.756,08 1_ 4 5290.041 0 50.0 01 30)0)1 1 54 03,983.04 I,. 5 $471.201_ 0 $O.S� IN 01.696.321_ 10 51.008.00 0 8000 531 165.581.77 I_ $0.00 58,66000 18,660.00 I 44 36,913541 _10.00 1 Units Cost 120 Bill $250.00 1_ 00.00 I_ 1300.20 1 t_ $7,221.74 1_ Units Cost Unit Cart 50.00 25 $12.13 $0.00 $25.00 $0.S I 10.00 $0.00 I I II 1 11,060.001 1 $�69L1_ 11 Cost 1 5181.88 1 I 1575.00 I m.0o $756.88 I $74,998.65 I ),tt,st07 WOES Stormwater Management Program Key Personnel Knowledge and Experience with NPDESlMaster Drainage Plan Development Firm Experience and Knowledge with 14PDES1Master Drainage Plan Development Approach to Project TOTALS Ability to keep project on schedule and within Budget pro Team Availability Other (Review Defined +l- Points with Reason) 7 ON 7 5 0 4 Rank 1- 5, Lowest Best) 5 Firm Ran 1p: U0 RANGE FROM a TO SCORING TOTAL SCORE 1S BEST HIGHES 23 5.5 5.5 7 5 5 6 4 5 5 26 7.3 7 9 5 6.5 34.8 5 5 7 5 6.5 28.5 28 2 1 4 3 O INFORM r DATE; S) N AO) OUTSTANDING; 5) AVERAGE/ADEQUATE; City of T:1Jk'loila MEMORANDUM Utilities Committee Kimberly Matej, Council Legislative Analyst Mayor Mullet Rhonda Berry, City Administrator Kevin Fuhrer, Finance Director DATE: October 11,2007 SUBJECT: Review of the Mayor's 2008 Proposed Budget and CIP TO: FROM: CC: Below you will find a list of budget and CIP pages expected to be reviewed at the October 16 Utilities Committee. Please remember to bring your copy of the 2008 Proposed Budget and CIP to all meetings. Utilities..Committee OCtober 16; 2007 Public Works General Land Ac uisitions & Park Oevelo . 301 Attachment F - SWM Surface Water 412 E ui ment Rental 501 Ca italltems Summa Public Works General BUDGET PAGES 117 -136 149 168-172 173-175 179-180 117 -136 If time permits, we may want to review the final three items below. Utilities Committee -- '. - - - . -- -.- October 16;2007> ~ Attachment A Attachment B Attachment C CIP PAGES CIP PAGES VII-IX X XI-XIV INFORMATION MEMO To: From: Date: Subject: Mayor Mullet Public W orks Director~ October 11, 2007 IT - I Water, Sewer, and Surface Water Rates for 2008 ISSUE Adopt 2008 water, sewer and surface water rate increases. WATER Public Works has analyzed the needs of the water enterprise fund. There was a small rate increase in 2007 yet wholesale water rates from Cascade Water Alliance have increased 9 % for 2008. A rate increase (see Table 1) is being proposed to maintain the current level of service and lessen the impact of future cost increases for purchased water. A portion of this increase will provide the funds necessary for continuing operational and capital needs. Exhibit A is an overview of all of the Proposed Utility Rate Increases for residential customers. Exhibit B is the Ordinance needed to incorporate the water rates into the Public Works Fee Schedule Resolution. SEWER For sewer rates, King County Ordinance No. 15805 shows no increase of the King County sewage disposal fees for 2008 and the rates will remain $27.95 per residential customer equivalent per month. The King County sewage capacity charge (for any new sewer connections) will increase from the current $42.00 per month for fifteen years to $46.25 per month for fifteen years for any sewer connection occurring between January 1, 2008, and December 31, 2008. Exhibit C is the King County Ordinance No. 15805. Tukwila's sewer base rate is scheduled for an increase, see Table 2, in accordance with the rate model which analyzes the City's operational and capital needs. The City's sewer rate will increase from $8.80 to $10.12 per residential connection and from $15.40 to $17.71 for up to 750 cubic feet or fraction thereof for commercial/industrial customers. Exhibit D-l shows a comparison of adjoining cities and their water and sewer rates. Exhibit F is the Resolution that updates the Public Works Fee Schedule. SURFACE WATER The Tukwila's surface water base rate is also scheduled for an increase (see Table 3) in accordance with the rate model. The City's surface water rate will increase from $62.00 to $71.00 per parcel, per year and will range from $8.85 to $73.96 per 4,356 sq. ft. Exhibit D-2 is a comparison of other cities and their surface water rates. Exhibit F is the Resolution that updates the Public Works fee schedule for the City's semi-annual surface water fees. Page 2 October 11, 2007 TABLE 1 - WATER RATES PROPOSED FOR 2008 CATEGORY Current 2007 Rates Proposed for 2008 Single and Multi-Family (October - May) $2.21 $2.43 Single and Multi-Family (June - September) $3.07 $3.38 Commercial/Industrial (October - May) $2.86 $3.15 Commercial/Industrial (June - September) $3.94 $4.33 TABLE 2 - SEWER RATES PROPOSED FOR 2008 e) Current 2007 Rates Flat rate of $8.80 er month Flat rate of $8.80 per month for each dwellin unit Flat rate of $15.40 per month, and in addition, any usage over 750 cubic feet of water per month shall be at the rate of $15.40 er 750 cf Proposed for 2008 Flat rate of $10.12 er month Flat rate of $10.12 per Month for each dwellin unit Flat rate of $17.71 per month, and in addition, any usage over 750 cubic feet of water per month shall be at the rate of $17.71 er 750 cf CATEGORY CommerciallIndustrial Sewer Service TABLE 3 - SURFACE WATER RATES PROPOSED FOR 2008 CATEGORY Current 2007 Rates Proposed for 2008 1. Natural $77.00/ $7.70 $88.55/ $8.85 2.0-20% Developed Surface $167.30/ $16.73 $192.40/ $19.24 3. 21-50% Developed Surface $306.70/ $30.67 $352.71/ $35.27 4. 51-70% Developed Surface $457.70/ $45.77 $526.36/ $52.63 5.71-85% Developed Surface $551.30/ $55.13 $634.00/ $63.40 6. 86-100% Developed Surface $643.20/ $64.32 $739.68/ $73.96 7. Single-Family Residential Parcels $62.00 per parcel $71.00 per parcel RECOMMENDATION Adopt the City's water, sewer, and surface water proposed rate increases in accordance with the Public Works Fee Schedule Resolution and the Water Ordinance. Attachments: Exhibit A Rate Matrix Exhibit B Water Ordinance Exhibit C King County Ordinance No. 15805 Exhibit D Comparison of Rates with adjoining cities Exhibit F Public Works Fee Schedule Resolution (p:gail\Warer Sewer Rate Info Memo 10-11-07 Exhibit A Proposed Utility Rate Increases Monthly Fees for Residential Customers WATER chase Water Pass-through as erage monthly rate with 10 ccf) s through pur (pv __.r ter Fire Lines _it of Tukwila Wa Charg Ci Monthly (Minimum SEWER King County Sewer te) Treatment 1 (Monthly Flat R City Monthly e C fo Resider M 00 6 +9°!0 60 $23. $2 $25. 20 +15 °I° $7 t0 $7 $1.0 0.00 2010 2.0 +5% 20 0 8 5 °l0 1 to 2007 +10 $3.72 to $3.91 $3.9$2.00 1to 38 $3.38 to 3,72 $1.90 +3% $3.07 to $3.40 $2.98 to $3.07 $3.10 JN +20 $45 to $5 $9.00 +9.17% g5 $25.60 to $2.3 +10% $8to$ $0.80 1 +10 °(0 $33.83 to 21t $13.8 +10 $3 p 75 to 33 83 $2.80 $3.08 +15°(0 0 !0 $27.95 t0 $30.75 5 °(0 1 17,71 to $20.3 $13.3 $2.80 +15% 40 $15 40 to $1 $2,66 2 to 1 o /$13.39 0115 $2.31 +15°/0 12 $10.12 to $11.64 $1.1.64 $175 57 58 $8.80 to $1.52 $51.54 $1.32 201 20 1 +5 +5 °l0 $k.32 $4.5 15.60 $4.11 to $2. $2.10 $38.07 5 ila Sew $367 City of Tuk Flat Rate? $33.60 Monthly $32,60 11t "�$g6,25 Sevier f3• (Residential) I nthty $42.00 $5374.0(1____, -$34.05' _--•r $3k.0 $5,195.65 1 +1 75 $85 to a.� Capacity Charge +20 !0 7. e Metro GaP $71 to $85 $1.07 King Gount ation +15 °!0 $5.9 t0 $7.0 $1.16 +20 l° $$62 to $5. o 65 48 to $0 75 y WATER $52 17 $7.0 W $4.33 to $5 SURFACE Surface Water July) 0 84 $4.81 Tukwila Jan 7 City of Charge divided monthly 1 Charge $7.72 Mnnu Increase for chart $5.1'7 Monthly $4.05 $2.2 pet Month Total p TOtat i $3.82 10,•112007 EXHIBIT B AN ORDINAL~CE OF THE CITY COIJNCIL OF THE CITY OF TUKWILA, WASHINGTON, AMENDING ORDINANCE NO. 2137, RELATING TO METERED WATER RATES; REPEALING ORDINANCE NO. 2001 s2; PROVIDING FOR SEVERABILITY; AND ESTABLISHING AN EFFECTIVE DATE. WHEREAS, the City Council desires to have in place an equitable and adequate rate structure to fInance the operation and maintenance, debt service requirements, as well as the Capital Improvement Program of the water utility; and WHEREAS, the City Council desires to continue the pass-through rate increases received from the city's water supplier; and NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, DO ORDAIN AS FOLLOWS: Section 1. Ordinance 2137, as codifIed at Section 14.04.240 of the Tukwila Municipal Code is hereby amended to read as follows: 14.04.240 Rates for metered water. A. The rates for metered water supplied within the City for commerciaVindustrial customers, in one month increments or any fractional part thereof, shall be in accordance with the fee schedule to be adopted by motion or resolution of the Tukvvila City Council the follov.ing schedule: COMPlfERCLUIINDUSTRLU CUSTOPlffiRS Size of Base Size of Base Sen'iee -- Sen"iee 3/1 inch $12.00 4-ifleh $100.00 -l--iE:efl 25.00 6-ffieh 150.00 1 1/2 inch 35.00 S-ffieh 200.00 ~ 50.00 10 inch 250.00 ~ 75.00 12 inch 300.00 In addition, for each 100 cubic feet of water used, the rate for the monthly billing shall be as follo'.1;s: January May ............................$~per 100 cubic feet Jooe September .......................$~ per 100 cubic feet October Deccmber...................$~ per 100 cubic feet B. Single-family customers (one dwelling unit): The base '.vater charge will be $6.00 for each account. Each single-family residence shall be charged in accordance with the fee schedule to be adopted by motion or resolution of the Tukvvila City Council. In addition, for each 100 cubic feet ofv;ater used, the rate shall be as follows: January May ............................$m..per 100 cubic fcet June September .......................$.1Q1 per 100 cubic feet October December...................$W per 100 cubic fcct Water Rate Ord 1O-11-07.doc C. Multi-family customers (more than one dwelling unit): The base '.'luter charge \\111 be $6.00 for each d'Nelling unit. Each dwelling unit shall be charged in accordance with the fee schedule to be adopted by motion or resolution of the Tukwila City Council. In addition, for each 100 cubic feet of ';/ater used, the rate shall be as follo','/s: January May ............................RZl per 100 cubic feet June September .......................ll:QZ per 100 cubic feet October December...................~per 100 cubic feet D. Every person 62 years of age or older (if married, then either spouse) and every person totally and permanently disabled residing in a separately metered dwelling and who is paying directly for such separately billed service either as owner, purchaser or renter and whose individual disposable income if a single person, or whose combined disposable income, if a married couple, from all sources is less than $32,000.00 per year, shall pay a rate equal to 50% of all water service charges. Every such person shall file with the Finance Department their affidavit that he or she is qualified to be charged the special rate. Such affidavits are to contain information as required by the Finance Director in order to establish eligibility. Each affidavit will also include an unqualified promise to inform the City of any changes in financial condition that would disqualify the person for the special rates. The Finance Director may require affidavits on an annual basis if deemed necessary. E. These rates will remain in effect for the corresponding periods thereafter, unless there is an increase in the cost of purchased water to Tukwila. At such time, the City will amend its rates charged to customers per cubic feet by a mark-up percentage in order to recover these direct costs. Section 2. Ordinance 1766, as codified at Section 14.04.250 of the Tukwila Municipal Code is hereby amended to read as follows: 14.04.250 Fire Protection. A. Any service connection to the main for a fire sprinkler system shall be approved in advance by the City, and shall be installed at the expense of the owner, and fitted only with such fixtures as are needed for fire protection and must be entirely disconnected from those used for other purposes. B. Any service connection other than fire sprinkler installed on private property for fire protection, and fitted with fire hydrants, stand pipes or other outlets for fire protection shall be approved in advance by the City. C. It is unlawful for any person to fail, neglect or refuse to give the supervisor or his duly authorized representative free access at all reasonable hours to all parts of premises supplied with water from the City mains, for the purpose of inspecting the condition of pipes, and fixtures, and noting the amount of water being used and the manner in which it is used. D. The rate for water supplied for fire protection purposes exclusively, shall be deemed service charges and shall be, for anyone month or fractional part thereof, shall be charged in accordance with the fee schedule to be adopted by motion or resolution of the Tuk\.vila City Council. as follows: Water Rate Ord IO-II-07.doc Size of Service Base Charge Size of Service Base Charge ~ $-&00 S-ffieh $ 96.00 ~ ~ $13.50 10 inch $150.00 4-ineft $21.00 12 inch $216.00 6-ffieh $51.00 Water used for any purpose other than for fIre protection service shall be deemed as Theft III. Section 3. Repealer.Ordinance No. 2137, as codifIed at 14.04.240 of the Tukwila Municipal Code, is hereby repealed. Section 4. Severability. If any section, subsection, paragraph, sentence, clause or phrase of this ordinance or its application to any person or situation should be held to be invalid or unconstitutional for any reason by a court of competent jurisdiction, such invalidity or unconstitutionality shall not affect the validity or constitutionality of the remaining portions of this ordinance or its application to any other person or situation. Section 5. Effective Date. This ordinance or a summary thereof shall be published in the official newspaper of the City, and shall take effect and be in full force fIve days after passage and publication as provided by law. PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, at a Regular Meeting thereof this day of , 2007. Steven M. Mullet, Mayor ATTEST/ AUTHENTICATED: Jane E. Cantu, CMC, City Clerk APPROVED AS TO FORM: Office of the City Attorney Filed with the City Clerk: Passed by the City Council: Published: Effective Date: Ordinance Number: Water Rate Ord JO-II-07.doc EXHIBIT--- G UI King County KING COUNTY 1200 King County Courthouse 516 Third Avenue Seattle, \VA 98104 Signature Report May 29, 2007 Ordinance 15805 Proposed No. 2007-0272.2 Sponsors Ferguson and Phillips 1 AN ORDINANCE determining the monetary requirements 2 for the disposal of sewage for the fiscal year beginning 3 January 1, 2008, and ending December 31, 2008, setting 4 the sewer rate for the fiscal year beginning January 1, 2008, 5 and ending December 31, 2008, and approving the amount 6 of the sewage treatment capacity charge for 2008, in 7 accordance with RCW 35.58.570; and amending Ordinance 8 12353, Section 2, as amended, and K.C.C. 4.90.010, and 9 Ordinance 11398, Section 1, as amended, and K.C.C. 10 28.84.055. 11 12 BE IT ORDAINED BY THE COUNCIL OF KING COUNTY: 13 SECTION 1. Ordinance 12353, Section 2, as amended, and K.C.C. 4.90.010 are 14 each hereby amended to read as follows: 15 A. Having determined the monetary requirements for the disposal of sewage, the 16 V council hereby adopts a ((~)) 2008 sewer rate of twenty-seven dollars and ninety-five 1 7 ~ cents per residential customer equivalent per month. Once a sewer rate ordinance becomes I Ordinance 15805 18 effective, the clerk of the council is directed to deliver a copy of that ordinance to each 19 agency having an agreement for sewage disposal with King County. 20 B.. The King County council approves the applicati~n of Statement of Financial 21 Accounting Standards No. 71 (FAS 71) to treat pollution remediation obligations as 22 regulatory assets and establish a rate stabilization reserve for the purposeofleveling rates 23 between years. 24 C. As required for FAS 71 application amounts are to be placed in the rate 25 stabilization reserve from 2007 operating revenues and removed from the calculation of 26 debt service coverage for 2007. The reserve balance shall be an amount at least sufficient 27 to maintain a level sewer rate between 2007 and 2008, and shall be used solely for the 28 purposes of: maintaining the level sewer rate in 2008; and if additional reserve balance is - 29 available, moderating future rate increases beyond the 2007-2008 periods. Ifthe 30 estimated amount ofthe reserve, as shown in the financial forecast, Attachment A to _ 31 ((Ordinance 15522)) this ordinance, needs to be ((adjusted)) reduced to meet debt.service 32 coverage requirements for 2007 or 2008, the county executive shall notify the council of 33 the change by providing an updated financial forecast. 34 D. The executive shall provide monthly cost reports to the council on Brightwater 35 as outlined in K.C.C. 28.86.165. 36 SECTION 2. Monetary requirements for the disposal of sewage as defined by 37 contract with the component sewer agencies for the fiscal year begiIll1ing January 1, 38 2008, and ending December 31,2008. The council hereby determines the monetary 39 requirements for the disposal of sewage as follows: 2 Ordinance 15805 40 Administration, operating, maintenance repair and replace (net of other income): 41 $65,245,854. 42 Establishment and maintenance of necessary working capital reserves: 43 -$18,676,016. 44 Requirements of revenue bond resolutions (not included in above items and net of 45 interest income): $185,963,318. 46 TOTAL: $232,533,155. 47 SECTION 3. Ordinance 11398, Section 1, as amended, and K.c.c. 28.84.055 are 48 each hereby amended as follows: 49 A. The amount of the 1994 metropolitan sewage facility capacity charge adopted 50 by K.C.C. 28.84.050.0. shall be seven dollars per month per residential customer or 51 residential customer equivalent for fifteen years. 52 B. The amount of the 1995 metropolitan sewage facility capacity charge adopted 53 by K.C.C. 28.84.050.0. shall be seven dollars per month per residential customer or 54 residential customer equivalent for fifteen years. 55 C. The sewage treatment capacity charge shall be seven dollars per month per 56 residential customer or equivalent for fifteen years for sewer connections occurring 57 between and including January 1, 1996, and December 31, 1996. 58 D. The amount of the sewage treatment capacity charge adopted by K.C.C. 59 28.84.050.0. shall be seven dollars per month per residential customer or equivalent for 60 fifteen years for sewer connections occurring between and including January 1, 1997, and 61 December 31, 1997. 3 Ordinance 15805. 62 E. Th~ amount of the sewage treatment capacity charge adopted by K.C.C. 63 28.84.050.0. shall be ten dollars fifty cents pe~ month per residential customer or 64 equivalent for fifteen years for sewer connections occurring between and including 65 January 1, 1998, and December 31, 1998. 66 F. The amount ofthe sewage treatment capacity charge adopted by K.C.C. 67 28.84.050.0. shall be ten dollars fifty cents per month per residential customer or 68 equivalent for fifteen years for sewer connections occurring between and including 69 January 1, 1999, and December 31, 1999. 70 G. The amount of the sewage treatment capacity charge adopted by K.C.C. 71 . 28.84.050.0. shallbe ten dollars fifty cents per month per residential customer or 72 equivalent for fifteen years for sewer connections occurring between and including 73 January 1, 2000, and December 31,2000. 74 H. The amount of the sewage treatment capacity charge adopted by K.C.C. 75 28.84.050.0. shall be ten dollars fifty cents per month per residential customer or 76 equivalent for fifteen years for sewer connections occurring between and including 77 January 1,2001, and December 31,2001. 78 I. The amount of the sewage treatment capacity charge adopted by K.C.C. 79 28.84.050.0. shall be seventeen dollars and twenty cents per month per residential 80 customer or equivaient for fifteen years for sewer connections occurring between and 81 including January 1,2002, and December 31,2002. 82 J. The amount ofthe sewage treatment capacity charge adopted by K.C.C. 83 28.84.050.0. shall be seventeen -dollars and sixty cents per month per residential 4 Ordinance 15805 84 customer or equivalent for fifteen years for sewer connections occurring between and 85 including January 1,2003, and December 31,2003. 86 K. The amount of the sewage treatment capacity charge adopted by K.C.C. 87 28.84.050.0. shall be eighteen dollars per month per residential customer or equivalent 88 for fifteen years for sewer connections occurring between and including January 1,2004, 89 and December 31,2004. 90 L. The amount of the sewage treatment capacity charge adopted by K.c.c. 91 28.84.050.0. shall be thirty-four dollars and five cents per month per residential customer 92 or equivalent for fifteen years for sewer connections occurring between and including 93 January 1,2005, and December 31,2005. 94 M. The amount of the sewage treatment capacity charge adopted by K.C.C. 95 28.84.050.0. shall be thirty-four dollars and five cents per month per residential customer 96 or equivalent for fifteen years for sewer connections occurring between and including 97 January 1, 2006, and December 31, 2006. 98 N. The amount of the sewage treatment capacity charge adopted by K.C.C. 99 28.84.050.0. shall be forty-two dollars per month per residential customer or equivalent 100 for fifteen years for sewer connections occurring benveen and including January 1, 2007, 101 and December 31,2007. ((For connections occurring between January 1, 2008, and 102 December 31,2008, said amount shall be fifty dollars per month per residential customer 103 or equivalent for fifteen years, to be reviewed, approved or changed during 2007)). 104 >1 O. The amount of the sewage treatment capacity charge adopted by K.C.C. 105 ~28.84.050.0. shall be forty-six dollars and twenty-five cents per month per residential 5 Ordinance 15805 1 06 ~ customer or equivaleut for fifteen years for sewer connectious occurring between and 107 v \ including January 1. 2008. and December 31, 2008. 108 In accordance with adopted policy FP-( (R)) li.3 .d. in the Regional Wastewater 109 Services Plan, K.C.C. 28.86.1.60.C., it is the council's intent to base the capacity charge 110 upon the costs, customer growth and related financial assumptions used in the Regional 111 Wastewater Services Plan. 112 In accordance with adopted policy FP-((~)) Q in the Regional Wastewater 113 Services Plan, K.c.c. 28.86.160.C, the council hereby approves the cash balance and 114 reserves as contained in the attached financial plan for ((~)) 2008. 115 In accordance :with adopted policy FP-((R)) li.3.c., King County shall pursue 116 changes in state legislation to enable the county to require payment of the capacity charge 117 in a single payment, while preserving the option for new ratepayers to finance the 118 capacity charge. 119 SECTION 4. A. The county executive shall semiannually update the council on 120 the progress of contract negotiations with the sewer service providers. The update shall 121 be accomplished through a status report that shall, at a minimum, include the following: 122 1. An update of the status of negotiations with each component agency; 123 2. An identification of issues in contention with each component agency; 124 3. An identification of agencies with which the executive branch feels the 125 county is at an impasse; and 126 4. For those agencies at an impasse, a detailed summary of the issue causing the 127 Impasse. 6 Ordinance 15805 128 B. The report shall be filed in the form of thirteen copies with the clerk of the 129 council who will keep a copy and forward a copy to each councilmember as well as the 130 lead staff to the operating budget, fiscal management and mental health committee, or its 131 successor, the lead staff to the growth management and natural resources committee, or 132 its successor, and the lead staff to the regional water quality committee, or its successor. 133 C. The report shall be transmitted by March 31 and September 30 of each year 134 until such time as all the component agency contracts have been extended. The executive 135 shall notify the council when all the component agency contracts have been extended by 136 filing thirteen copies ofthe notice with the clerk of the council who will keep a copy and 137 forward a copy to each councilmember as well as the lead staff to the operating budget, 138 fiscal management and mental health committee, or its successor, the lead staff to the 7 Ordinance 15805 139 growth management and natural resources committee, or its successor, and the lead staff 140 to the regional water quality committee, or its successor. 141 Ordinance 15805 was introduced on 4/23/2007 and passed by the Metropolitan King County Council on 5/29/2007, by the following vote: Yes: 8 - Mr. Gossett, Ms. Patterson, Ms. Lambert, Mr. von Reichbauer, Mr. Dunn, Mr. Ferguson, Mr. Phillips and Mr. Constantine No: 0 Excused: 1 - Ms. Hague KING COUNTY COUNCIL KING COUNTY, WAS INGTON A TrEST: ~~ Anne Noris, Clerk of the Council APPROVED !hi, ~ day ~ l...-....L- ,2007. Ron Sims, County Executive Attachments A. Wastewater Treatment Enterprise 2008 Proposed Financial Plan .~x.: .% .j.-) '"" ~ ......, ~ ~ :JiJ fl1 o rn ~.') -:;:, C':.q ::ZZ:r- -'-',"'"'1 '""'I'J"~ ..",~ Q;;) ~ t"") -.;. ~ - - ~ --.;.. ..r:- " '" 1'7] ~-" --,.~ --'~. c 0) 8 SINGLE FAMILY WATER RATES AS of OCTOBER 2007 (SUMMER) CITY BASE CITY RATE PER CCF HIGHLINE $7.00 1 3.80 SOO CREEK $8.85 3.56 SEATTLE $9.78 j 3.24 SKYWAY I $10.74 j 3.02 TUKWILA $6.0o 33 RENTON I $11.93 I 2.01 KING COUNTY #125 $10.50 I 2.60 COVINTON $12.50 I 2.20 TACOMA $14.73 I 1.35 AUBURN $7.80 I 1.90 LAKEHAVEN (FEDERAL WAY) j $7.46 j 0.55 ASSUME 5/8 OR 3/4 METER SIZE NON METRO SINGLE FAMILY SEWER WASTE WATER RATES AS OF OCTOBER 2007 CITY BASE Assume CITY RATE 10 ccf SOUTHWEST SUBURBAN $19.50 SEATTLE (Bill includes Metro) 0.00 I $77.48 SKYWAY 22.70 SOO CREEK 14.80 RENTON 14.67 TACOMA 14.52 $26.50 TUKWILA 2008 1012 AUBURN 9.81 VALLEY VUE 7.00 LAKEHAVEN (FEDERAL WAY) 10.38 $16.10 p: \gait \Utility Rate Comparison OCT 2007water.xls EXHIBIT User Charge on water consumption Assume 10 ccf TOTAL $38.00 $45.00 $35.60 $44.45 $32.40 $42.18 Jan -08 $30.20 $40.94 $33.80 $39.80 Jan -08 $25.60 $37.53 $26.00 $36.50 $22.00 $34.50 $13.50 $28.23 Jan -08 $19.00 $26.80 $5.50 $12.96 KING COUNTY METRO TOTAL $0.00 $19.50 0.00 77.48 Jan -08 27.95 50.65 27.95 42.75 27.95 42.62 0.00 41.02 27.95 38.07 Jan -08 27.95 37.76 27.95 34.95 0.00 26.48 EXHIBIT P - 2-- SINGLE FAMILY SURFACE WATER RATES AS OF OCTOBER 2007 CITY Monthly Rate Yearly Rate Redmond $16.56 $198.72 Bellevue $13.33 $159.96 Seattle $13.74 $164.88 Sammamish $12.50 $150.00 Issaquah $12.34 $148.08 Auburn $11.50 $138.00 Des Moines $9.83 $117.96 Jan-08 King County $9.25 $111.00 Renton $7.41 $88.92 Jan-08 Federal Way $6.98 $83.76 $6.90 $82.80 Jan-08 p:\gail\Utility Rate Comparison SSWM OCT 2007.xls ..,- EXHIBIT , r A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, ADOPTING A PUBLIC WORKS FEE SCHEDULE WHEREAS, each year the City analyzes the rate model for the three utility water, sewer and surface water enterprise funds and updates the traffic model and analyzes the transportation network to ensure continued compliance with the Growth Management Act and the adopted Comprehensive Plan; and WHEREAS, the City needs to recoup a greater percentage of the cost of operating and maintaining its infrastructure for water, sewer and surface water utilities; and WHEREAS, adopting the fees in a separate document will allow them to be more easily updated in the future; NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, HEREBY RESOL YES AS FOLLOWS: Section 1. Public Works fees will be charged according to the following schedule: Public Works Fee Schedule Permit Description Cost Type A (Short-Term Nonprofit) $50.00 Type B (Short-Term Profit) $100.00 $250.00 Application Base Fee, plus four components based on construction value Type C 1) Plan Review (Disturbance of City Right-of-Way) 2) Construction Inspection 3) Pavement Mitigation 4) A Grading Plan Review Type D (Long-Term) $100.00 Type E $100.00 (Potential Disturbance of City Right -of-Way) $250.00 Processing Fee, plus $5,000.00 cash Type F (Blanket Permits) deposit, withdraw $1 OO/instance for inspection Additional Inspections $60.00 per inspection Franchise- Telecommunications $5,000.00 Administrative Fee Franchise - Cable $5,000.00 plus 5% of total revenue Street Vacation $1,200.00 $500.00 Processing Fee, plus 17% Administrative Latecomer's Agreements Fee, plus $500.00 Segregation Fee Flood Zone Control $50.00 Copy of City of Tukwila's Infrastructure Design and Construction Standards $50.00 \\tuk2\vol1\PUBWORKS\GAIL\Resolutions & Ordinances\Resolution PW Fees 2008 10-11-07.doc Public Works Fee Schedule (cont.) Water Rates Water Meter Installation .75" I" 1.5" 2" 3" 4" 6" Water Meter Deduct Water Base Charge Single Family (one dwelling unit) Multi-Family (more than one dwelling unit) CommerciallIndustrial Customers % inch Service 1 inch Service 1 ~ inch Service 2 inch Service 3 inch Service 4 inch Service 6 inch Service 8 inch Service 10 inch Service 12 inch Service Monthly Water Rates Single and Multi-Family (January - May) Single and Multi-Family (June - Sept.) Single and Multi-Family (October - Dec.) CommerciallIndustrial (January - May) CommerciallIndustrial (June - Sept.) CommerciallIndustrial (October - Dec.) Fire Protection Service Charges 2 inch Service 3 inch Service 4 inch Service 6 inch Service 8 inch Service 10 inch Service 12 inch Service Cost $ 600.00 $ 1,100.00 $ 2,400.00 $ 2,800.00 $ 4,400.00 $ 7,800.00 $12,500.00 $25.00 In addition, will be charged for each 100 cubic feet of water used as shown below in monthly water rates. $ 6.00 $ 6.00 for each dwelling unit $ 12.00 $ 25.00 $ 35.00 $ 50.00 $ 75.00 $100.00 $150.00 $200.00 $250.00 $300.00 In addition to the water base charge, will be charged for each 100 cubic feet of water. $2.43 $3.38 $2.43 $3.15 $4.33 $3.15 Per month based on size of service. $ 6.00 $ 13.50 $ 24.00 $ 54.00 $ 96.00 $150.00 $216.00 \\tuk2\vol1\PUBWORKS\GAIL\Resolutions & Ordinances\Resolution PW Fees 2008 10-1l-07.doc Sewer Rates Cost Residential Sewer Service Flat rate of$1O.12 per month. (single dwelling unit) (TMC 14.16.030 No.1) Residential Sewer Service Flat rate $10.12 per month for each dwelling unit. (multiple dwelling unit, permanent type) (TMC 14.16.030 No.2) Commercial and Industrial Flat rate of $17.71 per month and in addition any Sewer Service usage over 750 cubic feet of water per month shall be at the rate of $17.71 per 750 cubic feet. (TMC 14.16.030 No.4) Sewer Late Charge $5.00 per month on sewer accounts more than 30 days in arrears. (TMC 14.16.030 No.5) Public Works Fee Schedule (cont.) Surface Water Rates Cost Per Year Category Service Charge Service Charge per acre Per 4,356 sq. ft. 1. Natural $ 88.55 $ 8.85 2. o - 20% Developed Surface $192.40 $19.24 3. 21- 50 % Developed Surface $352.71 $35.27 4. 51 - 70% Developed Surface $526.36 $52.63 5. 71 - 85% Developed Surface $634.00 $63.40 6. 86 - 100% Developed Surface $739.68 $73.96 7. Single Family Residential Parcels $ 71.00 per parcel N/A Transportation Concurrency Test Fee Fees for Residential Use All Types of Unit Residential! Between 1 and 3 $300 Between 4 and 5 $600 Between 6 and 10 $1,200 Between 11 and 15 $2,000 Between 16 and 20 $3,500 Between 21 and 25 $5,000 Between 26 and 30 $6,500 Between 31 and 40 $8,000 Between 41 and 60 $10,000 Greater than 60 $12,000 \\tuk2\voll\PUBWORKS\GAIL\Resolutions & Ordinances\Resolution PW Fees 2008 1O-11-07.doc Public Works Fee Schedule (cont.) Fees for Non-Residential Use Institutional All Other Gross Floor Area Industrial2 Office3 Retail 4 Eatery 5 & Port 6 Uses Less than 5,000 $1,000 $1,800 $2,700 $5,400 $500 $1,500 Between 5,001 and 10,000 $1,500 $2,700 $4,050 $8,100 $1,000 $2,000 Between 10,001 and 20,000 $2,000 $3,600 $5,400 $10,800 $1,500 $2,500 Between 20,001 and 30,000 $3,000 $5,400 $8,100 $10,800 $2,000 $2,500 Between 30,001 and 40,000 $4,000 $7,200 $10,800 $10,800 $2,500 $2,500 Between 40,001 and 50,000 $5,000 $9,000 $13,500 $10,800 $3,000 $2,500 Between 50,001 and 70,000 $6,000 $10,800 $16,200 $10,800 $4,000 $2,500 Between 70,001 and 90,000 $7,000 $12,600 $18,900 $10,800 $5,000 $2,500 Between 90,001 and 150,000 $8,000 $14,400 $21,600 $10,800 $6,000 $2,500 Between 150,001 and 200,000 $9,000 $16,200 $24,300 $10,800 $7,000 $2,500 Greater than 200,000 $10,000 $18,000 $24,300 $10,800 $8,000 $2,500 I All residential uses defined by the ITE Trip Generation Manual Land Use Codes 200-299, including single family, multi-family, mobile home parks, and shared housing 2 All industrial/agricultural uses defmed by the ITE Trip Generation Manual Land Use Codes 100-199, including light and heavy industrial, manufacturing, and warehousing 3 All office, medical, and service related uses defined by the ITE Trip Generation Manual Land Use Codes 600-699, 700-799, and 900-999, including general office, medical facilities, and banks 4 All retail and recreation uses defined by the ITE Trip Generation Manual Land Use Codes 400-499, 800-830 and 837-899, including retail sales, rental sales, athletic clubs, and theaters 5 All food service uses defined by the ITE Trip Generation Manual Land Use Codes 831-836, excluding accessory (stand-alone) drive-through espresso stands (or similar) under 250 sf which are assessed $300 6 All institutional and transportation uses defined by the ITE Trip Generation Manual Land Use Codes 000-099 and 500-599, including schools, olaces of worship, day care, terminals, and transit \\tuk2\voll\PUBWORKS\GAIL\Resolutions & Ordinances\Resolution PW Fees 2008 1O-11-07.doc