Loading...
HomeMy WebLinkAboutUtilities 2008-01-22 COMPLETE AGENDA PACKET City of Tukwila Distribution: C. rty K. W V. Griffin S. Norris Norris S. Kerslake J. Hernandez J. Morrow J. Pace Utilities Committee K. Hougardy F. Iriarte C. Parrish J. Haggerton B. Giberson B. Arthur Q; j0 P. Linder G. Labanara M. Miotke Verna Griffin, Chair D. Robertson B. Shelton File Copy J P. Carter R. Larson 3 Extra Copies 1908 Joan Hernandez K. Matej M. Cusick Single side to Dana Mayor Ha 99 erton P. Brodin e-mail to B.Saxton Kathy Hougardy R. Berry S. Anderson C. o'Flaherty and D. Speck J. Howat K. Narog J. Cantu B. Still AGENDA TUESDAY, JANUARY 22 2008 Time; 5.-00 PM Place; Conference Room #1 Item Action to be Taken Page I. Current Agenda Review I. II. Presentation(s) II. III. Business Agenda III. A. Water Disatrict 125 Infrastructure Transfer A. Information only Pg. 1 Information Letter to Residents B. 2007 Small Drainage Program Acceptance and B. Forward to Consent 2/4/08 Pg. 3 Contract Closure C. 2008 Utility Engineering Issues C. Discussion Pg. 7 IV. Old Business IV. Future Agendas: Next Scheduled Meeting: Monday, February 4, 2008 I& The City of Tukwila strives to accommodate individuals with disabilities. Please contact the Public Works Department at 206- 433 -0179 for assistance. INFORl\rIATION j\iIEMO To: From: Date: Subject: Mayor Haggerton Public Works Directo&n January 14,2008 Water District 125 Infrastructure Transfer ISSUE Completion of customer transfer of Water District 125 infrastructure in the Foster/Interurban and Foster Point areas. BACKGROUND This issue was brought to the Utilities Committee and Council in 2007. In summary, the City completed the AllentownIFoster Point water and sewer infrastructure improvements two years ago. This included the purchase of Water District 125 system assets in these areas with the eventual transfer of about 94 customers. In 2007, the City and District signed an interlocal agreement (AG07-045) for the transfer, pending appropriate approvals from the Cascade Water Alliance and Seattle. Cascade Water Alliance approved the transfer but Seattle did not take formal action given the consumptive volume did not affect supply amount in the wholesale block contract. Alternatively, the manager of Cascade Water Alliance will seek to include this transfer in a Seattle management agreement with other supply issues. It is now timely to complete this transfer and for the City and District to coordinate turning valves once the fmal meter read is accomplished in March. The notices regarding the transfer are anticipated to be sent in conjunction with the next billing cycle. RECOMMENDATION Information only - an update prior to sending notice to the customers. PB:sb Attachment: Letter to Customer - WD 125 Transfer P:\PROJECTS\A- WT Projects\92WT04 WD 125 Transfer\Info Memo - UC 012208 WD125 Transfer.DOC January 17, 2008 Dear Foster Area Water Customer: The City of Tukwila purchased the water system in your neighborhood as part of the Allentown/Foster Point water and sewer improvement project. Connection to the Tukwila water system will provide consistent service, improved fire flow, and the continued quality of safe drinking water to your home. Your water service account will be transferred from Water District 125 to the City of Tukwila on March 20, 2008. Shortly thereafter, a final meter reading and ending bill will be mailed to you from Water District 125. Tukwila's first water bill will be mailed on April 30, 2008. Water District 125 and the City of Tukwila have very comparable water rates. The City of Tukwila mails monthly water bills whereas Water District 125 bills bimonthly. The City ofTukwila also bills in 100 cubic foot increments or 1 ccf (1,000 cubic feet equals 10 ccf, which is the average residential monthly bill). The City of Tukwila's 2008 winter water rate (October - May) is $2.43, for a monthly water consumption charge of $24.30 plus a minimum of $6.00 for a total of $30.30. The City of Tukwila's summer water rate (June - Sept) is $3.38 per ccf and for 10 ccf, the monthly bill would be $39.80. The City of Tukwila's water and sewer rates are attached. Water customers in the upper Foster neighborhood (near 1-5) will now get a monthly water and sewer bill from the City of Tukwila. Customers in the Foster Point neighborhood will receive just a water only bill until they hook up to the new sewer system. Upon connection to the new sewer system, a combined water and sewer bill will then be mailed. If you have any questions concerning this transfer, please contact our Operations Manager, PatBrodin at(206) 433-1860, or our Senior Water/Sewer Engineer, Mike Cusick at (206) 431-2441. Thank you and we look forward to serving you. Sincerely, Jim Morrow Public Works Director Attachment P:\PROJECTSIA- WT Projects\92WT04 WD 125 Transfer\92WT04 Letter to Customer 125 Transfer.DOC Il'lFORiVLJ\.TION l\1El\tIO To: From: Date: Subject: Mayor Haggerton Public W orks Directo~ January 16, 2008 2007 Small Drainage Program Project No. 07-DROl, Contract No. 07-113 Project Completion and Acceptance ISSUE Accept construction contract as complete and authorize release of retainage in the amount of $28,973.90. BACKGROUND The Notice to Proceed for Contract No. 07-113 with Road Construction Northwest, Inc., of Renton, Washington, was issued July 16, 2007, for construction of the 2007 Small Drainage Program, Project No. 07-DROl. This project completed eight drainage sites: Site No.1 - 65th Ave. South Site No.2 - South 116th Street Site No.3 - South 126th Street Site No.4 - South 13Sth Street Site No.5 - 47th Ave. South * Site No.6 - South 142nd Place * Site No.7 - South 162nd Street * Site No.8 - South 146th Street/42nd Ave. South *Denotes three sites for the Private Storm System Adoption and Rehabilitation Program projects. This contract was totally complete on December 31, 2007. Change Order Number 1 was issued in the amount of $23,242.56 for sliplining the existing 18" storm drain pipe at Site No. 2. The pipe was found to be in worse condition than expected and had to be repaired to remain useful. The unit price bid quantity overruns were primarily due to greater than expected utility conflicts, such as unmarked and mismarked franchise utilities on Site No.8. Contract Award Amount Change Order #1 Unit Bid Quantity Overruns Total Amount Paid (including tax and retainage) $ 517,281.00 23,242.56 38,954.25 $ 579.477.81 RECOMMENDATION It is recommended that this contract be forwarded to the Tukwila City Council on the consent agenda for formal acceptance and authorize the release of retainage, subject to the standard claim and lien release procedures. Attachments: Notice of Completion of Public Works Contract 2007 Annual Neighborhood Drainage Program Map P:\PROJECTS\A- DR Projects\07-DROl (2007 Sop)\Construction\Info Memo - Closeout RCNW - 2007 SOP.doc ~ State of Washington F/ Depart~ntofRevenue ~/... PO Box 47474 REVENUE Olympia WA 98504-7474 Contractor's Registration No. (UBI No.) 602286010 Date NOTICE OF COJ\'IPLETION OF PUBLIC ,YORKS CONTRACT From: ,- _>~.-.DepartIDent,U~~-QDly",cJ~;{\~"i~~J Assigned To .~~aIite'&~4-ddf~sso(:PubIicO:.\ge#fy-ct,,~?S,..-'~,~;::.::._';j~,.'1 r - I City of Tukwila Attn: Diane Jaber 6200 Southcenter Blvd Tukwila, \Va 98188 Date Assigned Notice is hereby given relative to the completion of contract or project described below Description of Contract Contract Number 2007 Small Drainage Program (project No. 07-DR01) 07-113 Contractor's Name Telephone Number Road Construction Northwest, Inc 425-254-999 Contractor's Address PO Box 188, Renton, Wa 98057 Date Work Commenced Date Work Completed Date Work Accepted 7/16/07 12/13/07 Surety or Bonding Company Employers Mutual Casualty Company, Bond No. S360562 Agent's Address Bratrud Middleton Insurance, 1201 Pacific Ave, Tacoma, Wa 98402-4321 Contract Amount Additions Reductions Sub-Total Amount of Sales Tax Paid at R 171 % (Ifvarious rates apply, please send a breakdown.) TOTAL Comments: Sales Tax included in various unit price bid items per rule 171 Finance Approval T)~\ . $ 517,281.00 $+ 62,196.81 $- $ 579,477.81 $ 0.00 Liquidated Damages $ Amount Disbursed Amount Retained $ 550,503.91 $ 28,973.90 $ 579,477.81 TOTAL $ 579,477.81 ITh1jr$i~~fr:~I;t;!~1f7j~~~f~~r'~~J';c:rjjfsbuf~bigt:Qffice't1Pr~~tfj}~i,~~~l~!~~;tf1 Signature Type or Print Name Diane Jaber Phone Number 206-433-1871 The Disbursing Officer must complete and mail THREE copies of this notice to the Department of Revenue, PO Box 47474, Olympia, W A 98504-7474, immediately after acceptance of the work done under this contract. NO PAYMENT SHALL BE MADE FROM RETAINED FUNDS until receipt of Department's certificate, and then only in accordance with said certificate. To inquire about the availability of this document in an alternate format for the visually impaired, please call (360) 753-3217. Teletype (TTY) users please call (800) 451-7985. You may also access tax information on our Internet home page at http://dor.wa.gov. REV 31 0020e (6-27-01) 2007 Annual Neighborhood Drainage Program Map INFORlVI...'\. TION l\tIElVIO From: Mayor Haggerton Public W orks Directo~ January 16, 2008 2008 Utility Engineering Issues To: Date: Subject: ISSUE Discuss Utility Engineering issues that will be top priorities for the 2008 Utilities Committee and select Council meetings. BACKGROUND The 2008-20 13 Financial Planning Model and Capital Improvement Program was adopted on December xx, 2007, and includes numerous projects that are slated for design and construction in 2008. Also, numerous development projects are in the works that have indirect impacts on our engineering program and projects. DISCUSSION The following issues are likely to be brought forward to Committee: Surface Water Items . NPDES Phase II update . Duwamish Gardens . GIS Inventory Area 4 . Annual Drainage Program and Private System Adoptions . Tukwila International Blvd High-Flow Bypass (included in Till Phase WIll) General . Standby Power Upgrades . Citywide Telephone System Upgrade . City Facility Seismic Analysis . TMC 14 update Sewer Items . GIS Inventory - Area 4 Update . Sewer Repair at 14438 59th Ave. S. . Sewer Infiltration and Inflow (1&1) . Gravity Sewer under 1-405 to Tukwila . Tukwila South development Water Items . Southcenter Blvd. Water Main Replacement . MLK Jr. Wy. Waterline RECOMMENDATION For discussion. P:\BOB\TC_UC\UC 2008 Utility Issues - Changes.doc