Loading...
HomeMy WebLinkAboutUtilities 2008-03-17 COMPLETE AGENDA PACKET Distribution: N. Olivas J. Pace tv, City of Tukwila V. Griffin J. Morrow S. Kerslake y J. Hernandez F. Iriarte M. Miotke O: l 3 Utilities Committee K. Hougardy B. Giberson C. Parrish P. Linder G. Labanara B. Arthur D. Robertson R. Larson File Copy A Verna Griffin, Chair Mayor Haggerton M. Cusick Single side to Dana 1908 Joan Hernandez R. Berry P. Ande 3 Extra Copies K. Matej S. Anderson Kathy Hougardy D. Speck J. Howat e -mail Agenda to J. Cantu B. Still B.Saxton C. O'Flaherty R. Still C. O'Flaherty, K. S. Norris K. Fuhrer Narog, S. Norris and S. Kirby AGENDA MONDAY, MARCH 17, 2008 Time; 5:00 PM Place: Conference Room #1 Item Action to be Taken Page I. Current Agenda Review I. II. Presentation(s) II. III. Business Agenda III. A. Solid Waste Rate Update A. Information Pg. 1 B. 2007 4 Quarter Reports B. Information Pg. 2 IV. Old Business IV. Future Agendas: Next Scheduled Meeting: Monday, Apri/7, 2008 S The City of Tukwila strives to accommodate individuals with disabilities. Please contact the Public Works Department at 206 433 -0179 for assistance. INFORMATION MEMO To: From: Date: Subject: Mayor Haggerton Public Works Directo~ March 10, 2008 Solid Waste Rates ISSUE Solid waste and recycling fees for commercial, multi-family and residential subscribers will increase effective April 1, 2008. BACKGROUND The City currently has an Agreement with Allied Waste of Kent to provide solid waste collection, disposal and recycling services to commercial, multi-family and residential customers. The Agreement is scheduled to expire on March 30,2012. DISCUSSION Under the terms of the Agreement, Allied Waste is authorized to adjust the rates on an annual basis by an amount equal to 80% change in the Consumer Price Index (CPl). Specifically, the Bureau of Labor Statistics Index for Urban Wage Earners and Clerical Workers was used to adjust rates. The adjustment is authorized only on the service portion of rates (transfer fee costs are excluded). For 2008, the service portion of rates will increase by 2.90 % . The following examples depict the impact of the 2008 rate increase: . Commercial: Description Current Rate New Rate 10-Gal Mini Can 7.20 7.37 20-Gal Mini Can 8.55 8.70 90-Gal Toter 24.13 24.42 DescriPtion Current Rate New Rate 1- Yard Container 13.11 13.32 6-Yard Container 62.07 62.84 10- Yard Container 100.00 102.90 Description Current Rate New Rate 1-Yard Container 12.01 12.18 6-Yard Container 56.22 56.77 10-Yard Container 100.00 102.90 . Residential: . Multi-family: Allied waste has notified residential, multi-family and commercial customers of the upcoming rate increase. RECOMMENDATION Present to Utilities Committee for information. FOURTH QUARTER REPORT TO COUNCIL October 1 - December 31, 2007 Prepared for Utilities Committee PUBLIC WORKS DEPARTMENT 2007 YEAR END SUMMARY First major storm of the winter created local flooding that required the closing of Southcenter Blvd. from 42nd Avenue South to 1-5. Public Works responded to 27 requests for help but there was no reported damage. Of the 27 flooding spots, 26 were on private property. The cost of materials and labor has increased at the rate of 1 % each month for 2007. Public Works is unable to provide the same level of service as a year ago. Asphalt has gone from approximately $30 a ton to $85 a ton. The increase is expected to continue for at least the next 6 months. 4th QUARTER SIGNIFICANT ISSUES . Traffic Signal Interconnect Project is completed and the Urban Center is being adjusted for actual field conditions. Preliminary reports are extremely favorable. . Preliminary seismic evaluation of all City facilities indicated that further evaluation is needed. . The removal of graffiti has become an expensive and burdensome maintenance function. Public Works is spending approximately $4,000 to $ 5,000 a month to remove graffiti from signs, walls, fences, bridges, etc. EMERGENCY MANAGEMENT . Hired Emergency Management Coordinator, Hillman Mitchell, who comes to us from the Red Cross. . Tukwila TV Channel 21 is operational. Tukwila TV 21 has proven to valuable asset in the City's ability to keep the public informed during the recent storm. . Tukwila Radio Station 1640 AM is operational. BUDGET PROGRAM GOALS Public Works Administration 1. Evaluate a Local Improvement District to potentiallY fund a portion of the Tukwila Urban Access Proiect at Klickitat and Southcenter Parkway: The analysis for determining the Urban Center's property owner's proportionate fair-share is nearing completion. Expected to be presented to Council during the first quarter of 2008. 2. Evaluate future qrant fundina options available and propose a course of action to fund transportation proiects: Ongoing. 3. Evaluate the City's Emerqency Manaaement Plan usinq the National Emerqency Manaqement Accreditation Proqram Standard as the quideline: Emergency Management Coordinator and CERT positions were both advertised and interviews held. Coordinator position started December 6, 2007. CERT position will be finalized in first quarter of 2008. 4. Provide quarterlY reports on emerqency manaqement issues: Goal met and ongoing. 5. Hold quarterly community workshops: Goal met and ongoing. Business Services 1. Create a more effective. cost-efficient department - proiectina and monitorinq department costs: seekinq more cost-effective purchasinq aqreements with vendors: preparinq the departmenfs operation. maintenance and capital facilities budaet usina a "needs-basis" approach: Ongoing. Fleet Services has the ability, by specific vehicle, to identify total costs - fuel, repair, and maintenance. Project Management submitted to WSDOT a change in the manner that construction projects are managed through the use of Primavera. To date, the use of Primavera has saved the City tens of thousands of dollars in averted construction claims. 2007 Fourth QuarterNear End Report Page 2 2. Evaluate a proqram that effective Iv and efficientlv administers Council-approved Local Improvement Districts: Goal Met. First LID since 1989 brought before the Council for consideration. LID for the construction of a new residential road between 53fd Ave. S and 55th Ave S at 142"d Street. 3. Review "rate model" for establishinq appropriate rates for water. sewer and surface water enterprise funds: Goal met and ongoing. Water Utility/Maintenance Operations General 1. Track backflow prevention compliance for the annual Department of Health report usinq the City's cross-connection data proqram: Annual goal met. 2. Continue the remaininq phase of the automatic meter read proqram in the residential areas: Completed. 3. Implement a proqram to test the accuracy of water meters 2-inches and larqer into standard preventative maintenance procedures: Ongoing. Performance 1. Install new water meters within 48 hours of the hook-up request: Goal met. 2. Respond to water quality concerns within 24 hours: Goal met. 3. Test chlorine residual level bi-monthlv: Goal met. 4. Test coliform levels bi-monthlv: Goal met. 5. Reduce the percentaqe of water loss bv an additional 10 percent as required bv the State: Goal met. 6. Reqular testinq of fire hydrants: Goal met. Sewer Maintenance Operations General 1. Evaluate system-wide conditions for possible replacement and/or upqrade: Ongoing. 2. Review results of video 10QS to identify areas of damaqe or infiltration/inflow: Ongoing. Performance 1. TV inspect 20.000 LF of pipe annuallv: Completed. 2. Clean 183.000 LF of pipe annuallv: Completed. 3. Clean and maintain 730 manholes annuallv: Completed. 4. Weeklv monitorinq of 10 sewer lift stations for pump hours. start counts. and qenerator operation: Ongoing, being implemented on a recurring basis. . General Engineering Services - Water 1. Complete construction of Allentown Phase II/Foster Point water. sewer. surface water and street improvements: Completed. 2. Complete construction of the Southcenter Blvd. Water Main Replacement Proiect: Completed. 3. Complete construction of Interurban Ave. S. Waterline Proiect: Project construction delayed to 2008. General Engineering Services - Sewer 1. Complete construction of Allentown Phase II/Foster Point water. sewer. surface water and street improvements: Completed. 2. Commence construction of the Gravity Sewer under 1-405 Proiect: Geotechnical investigation and analysis underWay. Construction delayed to 2008 due to budget restraints. Surface Water Maintenance General: 1. Participate in development of a multi-vear small drainaqe proiect list: Completed. 2. Provide field support to Enqineerinq for GIS inventory: Completed. 3. Investiqate throuqh usaqe of TV,GIS and fIushinq tasks to find unmapped systems: Completed. Performance: 1. TV inspect 15.000 LF of pipe: Completed. 2. Maintain/clean 3.500 LF of ditches and four larqe water quality ponds: Completed. 3. Clean 1.400 catch basins. manholes and stormceptors: Completed. 4. Maintain/clean 15.000 LF of storm lines: Completed. 2007 Fourth QuarterlYear End Report Page 3 5. Conduct weekly monitorinq of five storm lift stations for pump hours. start counts. and Qenerator operation: Ongoing, being implemented on a recurring basis: Surface Water General Engineering Services 1. Complete small drainaQe proiects identified on the approved FY2007 list: Construction completed, closeout in first quarter 2008. 2. Obtain fundinQ for acquisition of Duwamish Gardens: Goal met, project moved to 301 Parks fund for 2008. 3. BeQin adoption and repair of the private storm systems that have been identified: Construction of three projects was completed with this year's Small Drainage Project construction contract. 4. Continue development of the GIS as-builts of City infrastructure that complies with NPDES Phase II: Goal met, Area 4 inventory is underway.