HomeMy WebLinkAboutRes 1663 - 2009-2014 Transportation Improvement Program ILA,
r
�s :Or
2 (P
a 08
C ity
Washington
Resolution No. 1 663
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUKWILA,
WASHINGTON, ADOPTING A SIX -YEAR TRANSPORTATION
IMPROVEMENT PROGRAM (2009- 2014), AND DIRECTING THE SAME
TO BE FILED WITH THE STATE SECRETARY OF TRANSPORTATION
AND THE TRANSPORTATION IMPROVEMENT BOARD.
WHEREAS, pursuant to the requirements of RCW Chapters 35.77 and 47.26 as
amended, the City Council of the City of Tukwila has previously adopted a
Transportation Improvement Program and thereafter periodically modified said
Transportation Improvement Program by resolution; and
WHEREAS, the City Council has reviewed the work accomplished under said
program, determined current and future City street and arterial needs and, based upon
these findings, has prepared a Six -Year Transportation Improvement Program for the
ensuing six calendar years (2009- 2014); and
WHEREAS, on June 9, 2008 a public hearing was held regarding the City's Six -Year
Transportation Improvement Program;
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA,
WASHINGTON, HEREBY RESOLVES AS FOLLOWS:
Section 1. Program Adopted. A six -year Transportation Improvement Program
for the calendar years 2009 -2014 is hereby adopted.
Section 2. Filing of Program. The City Clerk is hereby authorized and directed to
file a copy of this resolution, together with the exhibit attached hereto, with the
Secretary of Transportation and the Transportation Improvement Board of the State of
Washington.
PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON,
at a Council Meeting thereof this 6-7W day of Unl 2008.
ATTEST/ AUTHENTICATED:
I fie, un resident
Christy O'Flaherty, CMC, City clerk
APPROVED AS TO FORM BY: b o o(?
�o�
Filed with the City Clerk:
Passed by the City Council: 6 -I6 -CP
Office of the City Attorney Resolution Number: i b
Exhibit: City of Tukwila's Six -Year Transportation
Improvement Program from 2009 to 2014
CADocuments and Settings \All Users\ Desktop \Kelly \MSDATA \Resolutions \TIP 2009- 2014.doc
GL:ksn 6/6/2008 Page 1 of 1
AIM
T Washington State Department of Transportation
Agge en ncy: Tukwila
Co. No.: 17 Co. Name: King
City No.: 1320 MPO /RTPO: PSRC
16 6
16 7
Project Identification
A. PIN /Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road Ending MP or Road
F. Describe Work to be Done
3
Neighborhobd Traffic Calming Program
Various City Streets
from: to:
Program to address neighborhood traffic concems using striping, signage,
roadway improvements, traffic calming, and education to reduce speeding
and improve safety.
00 2 32 P
Greenbelt Trails
from: to:
Provide sate connections to public trails to promote pedestrian and bicycle
modes of transportation in lieu of motorized vehicles.
14 3 11 S
Annual Bridge Inspections and Repairs
Various City Streets
from: to:
Perform load ratings and bi- annual inspections as well as construct
necessary repairs and maintenance.
00 4 32 P 1,000 Ft
Tukwila Urban Center- Ped/Bike Bridge
from: Baker Blvd. to: West Valley Hwy
Pedestrian bridge over the Green River connecting the CBD and rail station.
from: Airport Way to: 1 5
Reconstruct bridge.
08002500
Southcenter Parkway (S 180 St S 200 St)
Southcenter Parkway
from: S 180 St to: S 200 St
Construct widening to 4 lanes with center tum pockets including curb B.
gutter, sidewalks, drainage, landscaping, and utility undergrounding.
Tukwila Urban Center Access (Klickitat)
Southcenter Parkway
from: 1 -5 Off Ramp to: S 168 St
Design and construct safety and capacity improvements.
Project Costs in Thousands of Dollars Federally Funded
ro Fund Source Information Expenditure Schedule Projects Only
m N
o m V
v s Federal Funding (Local Agency)
n
RM/ a.
o.t.- 51 o P t Phase Federal Federal State State Local Total 4th Require Date d
E r Start Fund Cost by Fund 1st 2nd 3rd Thru Envir.
s Funds Funds Funds Type (Mwyy)
a (mm/ddryyyy) Code Phase Code 6th
4 5 6
12 S
08
14 5 09 p 1,000 Ft T
Boeing Access Rd Bridge Replacement P
Boeing Access Road O
01 S 7,400 Ft W
T
S
P
G
05 p 1,500 Ft W
08
7 8 9
ALL 1/1/2009
Totals
PE 1/1/2009
Totals
ALL 1/1/2009
Totals
PE 1/1/2010
CN 1/1/2012
Totals
ALL 1/1/2014
Totals
CN 1/1/2009
Totals
CN 1/1/2009
Totals
Report Date: June 27, 2005 Page 1
10 11 12 I 13 14 15 16 17 18 19 20 21
BR
Discretionary
Discretionary
7444
3401
9476
Six Year Transportation Improvement Program
From 2009 to 2014
7,444 6931
TPP
TPP
5000
5250
Hearing Date: 6/9/2008 Adoption Date: 6/16/2008
Amend Date: Resolution No.: 1663
215
9,476 5000 16526
215 1
215 215 43 43 43 86
1015
1015 1015
500 500
1600 1600
2100 2100
6931 143751
16526
21209
43
10151 120
14375
310021 10175
31002 10175
298601 29860
3,401 5250 21209 29860 29860
43
140
120 140 140 615
400 100
400 100
20827
20827
43
140
86
615
1600 CE
1600
14375 CE
14375
CE
CE
Yes
12/31/12
No
Yes
7/1/09
Yes
12/31/09
v. 5.7 Supersedes previous editions
Agency: Tukwila
Co. No.: 17
City No.: 1320.
14 9
17 10
16 11
14 14
Washington State Department of Transportation
Co. Name: King
MPO /RTPO: PSRC
Project Identification
A. PIN/Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road Ending MP or Road
F. Describe Work to be Done
3
Tukwila Intl Blvd (Phase 2)
Tukwila Intl Blvd
from: S 116 St to: S 132 St
Construct overlay, curb gutter, sidewalks, illumination, drainage,
landscaping, and utility undergrounding.
Tukwila Intl Blvd (Phase 3)
Tukwila Intl Blvd
from: S 132 St to: S 138 St
Reconstruct roadway including paving, curb gutter, sidewalks,
illumination, drainage, and utility undergrounding.
S 144 St (Phase 2)
S 144 St
from: 42 Ave S to: Tukwila Int'I Blvd
Design and construct paving, curb gutter, sidewalks, drainage,
illumination, and utility undergrounding.
Annual Overlay and Repair Program
Various City Streets
from: to:
Repair, rehabilitate, and overlay City streets as needed in an annual
program.
16 12
Tukwila Urban Center Transit Center
Central Business District
from: to:
Design and construct a transit center.
16 13
Andover Park West
Andover Park West
from: Tukwila Parkway
Complete widening for center left tum lane.
to Strander Blvd.
Interurban Ave S
Interurban Ave S
front: S 143 St to: Fort Dent Way
Reconstruct street including paving, curb gutter, drainage, illumination,
sidewalk, and landscaping.
L N
r. T,
m c
E 7 m V
a W o a
E z
4 5 6 7
03 S 5,000 Ft G
0
P
S
T
W
C
03 S 2,100 Ft G
C
S
P
T
W
03 P 1000 P
T
w
S
G
C
07 S C
G
0
P
S
T
w
21 P T
w
P
S
05 P 2000 C
G
P
S
T
W
03 p 4,500 Ft W
T
S
P
G
C
m
L
D
u Phase
o Start
(mm/ddyyyy)
8 9
CN 1/1/2009
Totals
CN 1/1/2009
Totals
ALL 1/1/2014
Totals
ALL 1/1/2009
Totals
ALL 1/1/2009
Totals
ALL
1/1/2009
Totals
CN 1/1/2014
Totals
Project Costs in Thousands of Dollars
Fund Source Information
Federal Funding
Federal
Fund
Code
10
STP(U)
STP(U)
STP(U)
Report Date: June 27, 2005 Page 2
Six Year Transportation Improvement Program
From 2009 to 2014
Hearing Date: 6/9/2008 Adoption Date: 6/16/2008
Amend Date: Resolution No.: 1663
Federal State State Local Total
Cost by Fund
Phase Code Funds Funds Funds
11 12 I 13 14 15 16
1715 TPP 2000 1296 5011 5011
1,715
3104
3,104
800
800
2000 1296 5011
668 I 3772 1
668 3772
1750
7500
4600
1461
17501
1750 1750
75001
7500 7500
5400 1
4600 5400
1461
1461 1461
7625
7625 1
7625 7625
Expenditure Schedule
(Local Agency)
1st 2nd
5011
3772
3772
1250
17 18 19
1250
3rd
1250
1250 1250 1250
3100
4th
Thru
6th
1750
1750
3750
3100 2300
1461
1461
3750
2300 CE
7625
7625
Federally Funded
Projects Only
RAN
Required
Envir. Date
Type (mm/y
20 21
CE
No
CE
Yes
7/1/08
CE
Yes
12/31/14
Yes
1/1/12
v. 5.7 Supersedes previous editions
T Washington State Department of Transportation
Agge en ncy: Tukwila
Co. No.: 17 Co. Name: King
City No.: 1320 MPO /RTPO: PSRC
16 16
17 17
16 18
14 19
16 20
14 21
Project Identification
A. PI WFederal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road Ending MP or Road
F. Describe Work to be Done
3
TUC/TOD Pedestrian Improvements
from: Tukwila Urban Center to: Rail Station
Construct bike/pedestrian connection between Tukwila Urban Center and
Commuter Rail Station/TOD area.
S 133 St /SR 599 Ramps Intersection
from: 500 Ft. on each leg to: 500 Ft. on each leg
Design and construct intersection improvements including a new traffic
signal.
Macadam Rd S 144 St Intersection
Macadam Road
from: S 144 St to: 1,000 Ft on south leg
Widen Macadam Road to add a northbound left tum lane.
Andover Park E /Minkler Blvd. Intersection
from: 500 Ft. on each leg to: 500 Ft. on each leg
Design and construct intersection and traffic signal improvements and
widening for left tum lanes.
West Valley Hwy /S 156 St
from: Southcenter Blvd. to: S 158 St
Construct additional northbound left tum Zane at S 166 St for northbound
HOV to northbound 1 -405.
Andover Pk E Industry Dr. Signal
from: 500 Ft. on each leg to: 500 Ft. on each leg
Design and construct a traffic signal and intersecbon improvements.
Tukwila Int'I Blvd. (Phase 4)
Tukwila Intl Blvd
from: Boeing Access Rd to: S 116 St
Design and construct widening including paving, curb gutter, sidewalk,
drainage, illumination, landscaping, and utility undergrounding.
Project Costs in Thousands of Dollars
m m Fund Source Information
m m t a I Federal Funding
5 0
o Start Federal I Cost by Fund State
(mm/dd/yyyy) Code Phase Code Funds
4 5 6
32 S 0.75
06
12 P
05 P 1000
1,000 Ft W
T
S
G
C
P
12 S 1,000 Ft
12 p 1,500 Ft T
P
12 p 1,000 Ft W
T
S
P
G
03 P 3,500 Ft P
S
W
O
7 8 9
CN 1/1/2009
Totals
ALL 1/1/2009
Totals
ALL 1/1/2010
Totals
ALL 1/1/2010
Totals
ALL 1/1/2010
Totals
ALL 1/1/2010
Totals
ALL 1/1/2014
Totals
Report Date: June 27, 2005 Page 3
10 11 I 12 I 13
Six Year Transportation Improvement Program
From 2009 to 2014
Hearing Date: 6/9/2008 Adoption Date: 6/16/2008
Amend Date: Resolution No.: 1663
Local Total 4th
Funds Funds 1st 2nd 3rd 6th
14 15 16 17 18 19
630 630 630
630 630 630
690
690 690 60 630
610
654
1080
500
4591
6901 60
610
654 I
1080
500 I
45911
Expenditure Schedule
(Local Agency)
630
180
430
610 610 180 430
75
654 654 75 579
48
579
1032
1080 1080 48 1032
48
452
500 500 48 452
4591
4591 4591 4591
Federally Funded
Projects Only
R/W
Required
Envir. Date
Type (MM'
20 21
CE
No
v. 5.7 Supersedes previous editions
x
VI Wash i n gton Sta;e Depar of Transportation
Tukwila
,gencf. Co. Name K=n° D
.lo, 17 MpOIRTpo: PS_�—
No
city N 132
Project Identification
B. Bridge N
A. P1NfFeddrat Aid No'
C. Project Mp or Road
E Beginning MPor R dumber
oa Ending
4
E Beginning rit to be cone r
F pescribe 3 05
11 29 S i44 St Bridge Sidewalks Ave S
5144 St
Ave c over 15 51st Ave S and 53rd 1
I Widen
Ave S.
1 30 Aver Park W
Minkler Blvd drainag
to: r e( WalK
AConsr Soum�nte or a Andover
curb gutter,
I and landscaping.
a &9 k5.
6 31 East M W y Siaewa
to S 112 Si utter,
East Marginal Wks Rd. including cu
3 andsi c
from: e ns iructw 'de
id Design landscaping, and
Ls in Thousands of Dolla abon
p d Source form
la Federal funding State
State
F re al CAS by Fund Funds
se Fund Cod
Start Code phase 13
a.
10 12
9
111120
0.25 G
P
S
T
W
Totals 111t20t2
2000
s
03
T otal p1 1
ALL I
Ft
T
Grand Totals for Tukwila
SI (u)
ro vem
ent Pr
Transportation Imp 20Q9 to 20� 4
Six Year Vrom
61161
Adopti Date.. 1663
61912008 'Resolution NO" Funded
Fleecing pa F
projects Only
Amend Date:
Expenditure Schedule RNV
Agency) Required
(Local A9 Emir. Date
TYPe tMMHY1
700'
700
TOtals 25,640
T
Local otal
Funds
15 16
25 I 25
1st
25
25�
425
2nd
3rd
18
I
4th
Thru
an 20 21
19
i 25
425
2q5
35 CE
425
425 1955
125
35 192C'
1955 3841 4,081 50,349i 1255 55,
34 1
12,2rp 95, 143 1
No
v.
53 Supersedes previous editions
City of Tukwila
6200 Southcenter Boulevard Tukwila, Washington 98188 Jim Haggerton, Mayor
JEANNE BURBIDGE, CHAIR, TRANSPORTATION IMPROVEMENT BOARD
Washington State Department of Transportation
P[> BOX 4OSO1
Olympia, WA 98504-0901
RE: CITY OF T1JKWILA 2009-2014 TRANSPORTATION IMPROVEMENT PROGRAM
Dear Ms. Burbidge:
Enclosed is City of Tukwila Resolution #1663, passed June 16, 2008, adopting the
Transportation Improvement Program for 2009-2014.
Please contact me with any questions at 206 433-1855,
Enclosures
xc: Joe Duffle, Council President
Jim Morrow, Public Works Director
June 19, 2008
Sincerely yours,
Christy O'Flaherty, CMC
City Clerk
Phone: 206-433'1800° City Hall Fax: 206'433-1833°��ci.tukwila'wa.us
Enclosures
City of Tukwila
6200 Southcenter Boulevard Tukwila, Washington 98188 Jim Haggerton, Mayor
PAULA J. HAMMOND, SECRETARY
Washington State Department of Transportation
PO BOX 47316
Olympia, WA 98504 -7316
Please contact me with any questions at 206 433 -1855.
xc: Joe Duffie, Council President
Jim Morrow, Public Works Director
June 19, 2008
RE: CITY OF TUKW1LA 2009 -2014 TRANSPORTATION IMPROVEMENT PROGRAM
Dear Ms. Hammond:
Enclosed is City of Tukwila Resolution #1663, passed June 16, 2008, adopting the
Transportation Improvement Program for 2009 -2014.
Sincerely yours,
Christy O'Flaherty, CMC
City Clerk
Phone: 206 -433 -1800 0 City Hall Fax: 206 433 -1833 0 www.ci.tukwila.wa.as