Loading...
HomeMy WebLinkAboutRes 1663 - 2009-2014 Transportation Improvement Program ILA, r �s :Or 2 (P a 08 C ity Washington Resolution No. 1 663 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, ADOPTING A SIX -YEAR TRANSPORTATION IMPROVEMENT PROGRAM (2009- 2014), AND DIRECTING THE SAME TO BE FILED WITH THE STATE SECRETARY OF TRANSPORTATION AND THE TRANSPORTATION IMPROVEMENT BOARD. WHEREAS, pursuant to the requirements of RCW Chapters 35.77 and 47.26 as amended, the City Council of the City of Tukwila has previously adopted a Transportation Improvement Program and thereafter periodically modified said Transportation Improvement Program by resolution; and WHEREAS, the City Council has reviewed the work accomplished under said program, determined current and future City street and arterial needs and, based upon these findings, has prepared a Six -Year Transportation Improvement Program for the ensuing six calendar years (2009- 2014); and WHEREAS, on June 9, 2008 a public hearing was held regarding the City's Six -Year Transportation Improvement Program; NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, HEREBY RESOLVES AS FOLLOWS: Section 1. Program Adopted. A six -year Transportation Improvement Program for the calendar years 2009 -2014 is hereby adopted. Section 2. Filing of Program. The City Clerk is hereby authorized and directed to file a copy of this resolution, together with the exhibit attached hereto, with the Secretary of Transportation and the Transportation Improvement Board of the State of Washington. PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, at a Council Meeting thereof this 6-7W day of Unl 2008. ATTEST/ AUTHENTICATED: I fie, un resident Christy O'Flaherty, CMC, City clerk APPROVED AS TO FORM BY: b o o(? �o� Filed with the City Clerk: Passed by the City Council: 6 -I6 -CP Office of the City Attorney Resolution Number: i b Exhibit: City of Tukwila's Six -Year Transportation Improvement Program from 2009 to 2014 CADocuments and Settings \All Users\ Desktop \Kelly \MSDATA \Resolutions \TIP 2009- 2014.doc GL:ksn 6/6/2008 Page 1 of 1 AIM T Washington State Department of Transportation Agge en ncy: Tukwila Co. No.: 17 Co. Name: King City No.: 1320 MPO /RTPO: PSRC 16 6 16 7 Project Identification A. PIN /Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or Road Ending MP or Road F. Describe Work to be Done 3 Neighborhobd Traffic Calming Program Various City Streets from: to: Program to address neighborhood traffic concems using striping, signage, roadway improvements, traffic calming, and education to reduce speeding and improve safety. 00 2 32 P Greenbelt Trails from: to: Provide sate connections to public trails to promote pedestrian and bicycle modes of transportation in lieu of motorized vehicles. 14 3 11 S Annual Bridge Inspections and Repairs Various City Streets from: to: Perform load ratings and bi- annual inspections as well as construct necessary repairs and maintenance. 00 4 32 P 1,000 Ft Tukwila Urban Center- Ped/Bike Bridge from: Baker Blvd. to: West Valley Hwy Pedestrian bridge over the Green River connecting the CBD and rail station. from: Airport Way to: 1 5 Reconstruct bridge. 08002500 Southcenter Parkway (S 180 St S 200 St) Southcenter Parkway from: S 180 St to: S 200 St Construct widening to 4 lanes with center tum pockets including curb B. gutter, sidewalks, drainage, landscaping, and utility undergrounding. Tukwila Urban Center Access (Klickitat) Southcenter Parkway from: 1 -5 Off Ramp to: S 168 St Design and construct safety and capacity improvements. Project Costs in Thousands of Dollars Federally Funded ro Fund Source Information Expenditure Schedule Projects Only m N o m V v s Federal Funding (Local Agency) n RM/ a. o.t.- 51 o P t Phase Federal Federal State State Local Total 4th Require Date d E r Start Fund Cost by Fund 1st 2nd 3rd Thru Envir. s Funds Funds Funds Type (Mwyy) a (mm/ddryyyy) Code Phase Code 6th 4 5 6 12 S 08 14 5 09 p 1,000 Ft T Boeing Access Rd Bridge Replacement P Boeing Access Road O 01 S 7,400 Ft W T S P G 05 p 1,500 Ft W 08 7 8 9 ALL 1/1/2009 Totals PE 1/1/2009 Totals ALL 1/1/2009 Totals PE 1/1/2010 CN 1/1/2012 Totals ALL 1/1/2014 Totals CN 1/1/2009 Totals CN 1/1/2009 Totals Report Date: June 27, 2005 Page 1 10 11 12 I 13 14 15 16 17 18 19 20 21 BR Discretionary Discretionary 7444 3401 9476 Six Year Transportation Improvement Program From 2009 to 2014 7,444 6931 TPP TPP 5000 5250 Hearing Date: 6/9/2008 Adoption Date: 6/16/2008 Amend Date: Resolution No.: 1663 215 9,476 5000 16526 215 1 215 215 43 43 43 86 1015 1015 1015 500 500 1600 1600 2100 2100 6931 143751 16526 21209 43 10151 120 14375 310021 10175 31002 10175 298601 29860 3,401 5250 21209 29860 29860 43 140 120 140 140 615 400 100 400 100 20827 20827 43 140 86 615 1600 CE 1600 14375 CE 14375 CE CE Yes 12/31/12 No Yes 7/1/09 Yes 12/31/09 v. 5.7 Supersedes previous editions Agency: Tukwila Co. No.: 17 City No.: 1320. 14 9 17 10 16 11 14 14 Washington State Department of Transportation Co. Name: King MPO /RTPO: PSRC Project Identification A. PIN/Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or Road Ending MP or Road F. Describe Work to be Done 3 Tukwila Intl Blvd (Phase 2) Tukwila Intl Blvd from: S 116 St to: S 132 St Construct overlay, curb gutter, sidewalks, illumination, drainage, landscaping, and utility undergrounding. Tukwila Intl Blvd (Phase 3) Tukwila Intl Blvd from: S 132 St to: S 138 St Reconstruct roadway including paving, curb gutter, sidewalks, illumination, drainage, and utility undergrounding. S 144 St (Phase 2) S 144 St from: 42 Ave S to: Tukwila Int'I Blvd Design and construct paving, curb gutter, sidewalks, drainage, illumination, and utility undergrounding. Annual Overlay and Repair Program Various City Streets from: to: Repair, rehabilitate, and overlay City streets as needed in an annual program. 16 12 Tukwila Urban Center Transit Center Central Business District from: to: Design and construct a transit center. 16 13 Andover Park West Andover Park West from: Tukwila Parkway Complete widening for center left tum lane. to Strander Blvd. Interurban Ave S Interurban Ave S front: S 143 St to: Fort Dent Way Reconstruct street including paving, curb gutter, drainage, illumination, sidewalk, and landscaping. L N r. T, m c E 7 m V a W o a E z 4 5 6 7 03 S 5,000 Ft G 0 P S T W C 03 S 2,100 Ft G C S P T W 03 P 1000 P T w S G C 07 S C G 0 P S T w 21 P T w P S 05 P 2000 C G P S T W 03 p 4,500 Ft W T S P G C m L D u Phase o Start (mm/ddyyyy) 8 9 CN 1/1/2009 Totals CN 1/1/2009 Totals ALL 1/1/2014 Totals ALL 1/1/2009 Totals ALL 1/1/2009 Totals ALL 1/1/2009 Totals CN 1/1/2014 Totals Project Costs in Thousands of Dollars Fund Source Information Federal Funding Federal Fund Code 10 STP(U) STP(U) STP(U) Report Date: June 27, 2005 Page 2 Six Year Transportation Improvement Program From 2009 to 2014 Hearing Date: 6/9/2008 Adoption Date: 6/16/2008 Amend Date: Resolution No.: 1663 Federal State State Local Total Cost by Fund Phase Code Funds Funds Funds 11 12 I 13 14 15 16 1715 TPP 2000 1296 5011 5011 1,715 3104 3,104 800 800 2000 1296 5011 668 I 3772 1 668 3772 1750 7500 4600 1461 17501 1750 1750 75001 7500 7500 5400 1 4600 5400 1461 1461 1461 7625 7625 1 7625 7625 Expenditure Schedule (Local Agency) 1st 2nd 5011 3772 3772 1250 17 18 19 1250 3rd 1250 1250 1250 1250 3100 4th Thru 6th 1750 1750 3750 3100 2300 1461 1461 3750 2300 CE 7625 7625 Federally Funded Projects Only RAN Required Envir. Date Type (mm/y 20 21 CE No CE Yes 7/1/08 CE Yes 12/31/14 Yes 1/1/12 v. 5.7 Supersedes previous editions T Washington State Department of Transportation Agge en ncy: Tukwila Co. No.: 17 Co. Name: King City No.: 1320 MPO /RTPO: PSRC 16 16 17 17 16 18 14 19 16 20 14 21 Project Identification A. PI WFederal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or Road Ending MP or Road F. Describe Work to be Done 3 TUC/TOD Pedestrian Improvements from: Tukwila Urban Center to: Rail Station Construct bike/pedestrian connection between Tukwila Urban Center and Commuter Rail Station/TOD area. S 133 St /SR 599 Ramps Intersection from: 500 Ft. on each leg to: 500 Ft. on each leg Design and construct intersection improvements including a new traffic signal. Macadam Rd S 144 St Intersection Macadam Road from: S 144 St to: 1,000 Ft on south leg Widen Macadam Road to add a northbound left tum lane. Andover Park E /Minkler Blvd. Intersection from: 500 Ft. on each leg to: 500 Ft. on each leg Design and construct intersection and traffic signal improvements and widening for left tum lanes. West Valley Hwy /S 156 St from: Southcenter Blvd. to: S 158 St Construct additional northbound left tum Zane at S 166 St for northbound HOV to northbound 1 -405. Andover Pk E Industry Dr. Signal from: 500 Ft. on each leg to: 500 Ft. on each leg Design and construct a traffic signal and intersecbon improvements. Tukwila Int'I Blvd. (Phase 4) Tukwila Intl Blvd from: Boeing Access Rd to: S 116 St Design and construct widening including paving, curb gutter, sidewalk, drainage, illumination, landscaping, and utility undergrounding. Project Costs in Thousands of Dollars m m Fund Source Information m m t a I Federal Funding 5 0 o Start Federal I Cost by Fund State (mm/dd/yyyy) Code Phase Code Funds 4 5 6 32 S 0.75 06 12 P 05 P 1000 1,000 Ft W T S G C P 12 S 1,000 Ft 12 p 1,500 Ft T P 12 p 1,000 Ft W T S P G 03 P 3,500 Ft P S W O 7 8 9 CN 1/1/2009 Totals ALL 1/1/2009 Totals ALL 1/1/2010 Totals ALL 1/1/2010 Totals ALL 1/1/2010 Totals ALL 1/1/2010 Totals ALL 1/1/2014 Totals Report Date: June 27, 2005 Page 3 10 11 I 12 I 13 Six Year Transportation Improvement Program From 2009 to 2014 Hearing Date: 6/9/2008 Adoption Date: 6/16/2008 Amend Date: Resolution No.: 1663 Local Total 4th Funds Funds 1st 2nd 3rd 6th 14 15 16 17 18 19 630 630 630 630 630 630 690 690 690 60 630 610 654 1080 500 4591 6901 60 610 654 I 1080 500 I 45911 Expenditure Schedule (Local Agency) 630 180 430 610 610 180 430 75 654 654 75 579 48 579 1032 1080 1080 48 1032 48 452 500 500 48 452 4591 4591 4591 4591 Federally Funded Projects Only R/W Required Envir. Date Type (MM' 20 21 CE No v. 5.7 Supersedes previous editions x VI Wash i n gton Sta;e Depar of Transportation Tukwila ,gencf. Co. Name K=n° D .lo, 17 MpOIRTpo: PS_�— No city N 132 Project Identification B. Bridge N A. P1NfFeddrat Aid No' C. Project Mp or Road E Beginning MPor R dumber oa Ending 4 E Beginning rit to be cone r F pescribe 3 05 11 29 S i44 St Bridge Sidewalks Ave S 5144 St Ave c over 15 51st Ave S and 53rd 1 I Widen Ave S. 1 30 Aver Park W Minkler Blvd drainag to: r e( WalK AConsr Soum�nte or a Andover curb gutter, I and landscaping. a &9 k5. 6 31 East M W y Siaewa to S 112 Si utter, East Marginal Wks Rd. including cu 3 andsi c from: e ns iructw 'de id Design landscaping, and Ls in Thousands of Dolla abon p d Source form la Federal funding State State F re al CAS by Fund Funds se Fund Cod Start Code phase 13 a. 10 12 9 111120 0.25 G P S T W Totals 111t20t2 2000 s 03 T otal p1 1 ALL I Ft T Grand Totals for Tukwila SI (u) ro vem ent Pr Transportation Imp 20Q9 to 20� 4 Six Year Vrom 61161 Adopti Date.. 1663 61912008 'Resolution NO" Funded Fleecing pa F projects Only Amend Date: Expenditure Schedule RNV Agency) Required (Local A9 Emir. Date TYPe tMMHY1 700' 700 TOtals 25,640 T Local otal Funds 15 16 25 I 25 1st 25 25� 425 2nd 3rd 18 I 4th Thru an 20 21 19 i 25 425 2q5 35 CE 425 425 1955 125 35 192C' 1955 3841 4,081 50,349i 1255 55, 34 1 12,2rp 95, 143 1 No v. 53 Supersedes previous editions City of Tukwila 6200 Southcenter Boulevard Tukwila, Washington 98188 Jim Haggerton, Mayor JEANNE BURBIDGE, CHAIR, TRANSPORTATION IMPROVEMENT BOARD Washington State Department of Transportation P[> BOX 4OSO1 Olympia, WA 98504-0901 RE: CITY OF T1JKWILA 2009-2014 TRANSPORTATION IMPROVEMENT PROGRAM Dear Ms. Burbidge: Enclosed is City of Tukwila Resolution #1663, passed June 16, 2008, adopting the Transportation Improvement Program for 2009-2014. Please contact me with any questions at 206 433-1855, Enclosures xc: Joe Duffle, Council President Jim Morrow, Public Works Director June 19, 2008 Sincerely yours, Christy O'Flaherty, CMC City Clerk Phone: 206-433'1800° City Hall Fax: 206'433-1833°��ci.tukwila'wa.us Enclosures City of Tukwila 6200 Southcenter Boulevard Tukwila, Washington 98188 Jim Haggerton, Mayor PAULA J. HAMMOND, SECRETARY Washington State Department of Transportation PO BOX 47316 Olympia, WA 98504 -7316 Please contact me with any questions at 206 433 -1855. xc: Joe Duffie, Council President Jim Morrow, Public Works Director June 19, 2008 RE: CITY OF TUKW1LA 2009 -2014 TRANSPORTATION IMPROVEMENT PROGRAM Dear Ms. Hammond: Enclosed is City of Tukwila Resolution #1663, passed June 16, 2008, adopting the Transportation Improvement Program for 2009 -2014. Sincerely yours, Christy O'Flaherty, CMC City Clerk Phone: 206 -433 -1800 0 City Hall Fax: 206 433 -1833 0 www.ci.tukwila.wa.as