Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Permit D97-0039 - TAPIO RESIDENCE - LOT B - NEW SINGLE FAMILY RESIDENCE
City of Tukwila ?. Community Development / Public Works • 6300 Southcenter Boulevard, Suite 100 • Tukwila, Washington 98188 WARNING: IF CONSTRUCTION BEGINS BEFORE APPEAL PERIOD EXPIRES, APPLICANT IS PROCEEDING AT THEIR OWN RISK. Parcel No: 152304 -9304 Address: 3231 S 133 ST Suite No: Location: LOT B Category: NSFR Type: DEVPERM Zoning: Const Type: V -N Gas /Elec.: GAS Units: 001 Setbacks: North: Water: UNKNOWN Wetlands: Contractor License Nov OCCUPANT TAPIO DARYL - LOT B 3231 S 133 ST,.TUKWILA, WA OWNER FERNAU DARYL 3215 S 133RD, SEATTLE WA 98168 CONTACT DARYL TAPIO Phone: 206- 529 -9925 15642,42 AV S, TUKWILA'WA 98188 CONTRACTOR. OLYMPIC DEVELOPMENT Phone: 206 246-0055 15642 42 AV S, TUKWILA, WA 98188 ***************************************************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Permit Description: CONSTRUCT NEW SINGLE FAMILY RESIDENCE (2,140 S.F.) AND A1400 S.F. GARAGE. **************************************************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Construction Valuation: $ 159,286.20 ' ' PUBLIC WORKS PERMITS: *(Water Meter Permits Listed Separate) Eng. Appr: jjs Curb Cut/Access/Sidewalk/CSS: Y Fire Loop Hydrant: N No:, Size(in) .00 Flood Control Zone: N ' Hauling: N Start Time: End Time: Land Altering: N Cut: Fill: Landscape Irrigation: N Moving Oversized Load: N Start Time:. End Time: Sanitary Side Sewer: N No: Sewer Main Extension: N Private: Public: Storm Drainage: Y Street Use: N . Water Main Extension: N Private: Public: ***************************************************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** TOTAL DEVELOPMENT PERMIT FEES: $ 2,013.46 ***************************************************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Permit Center Authorized Signature: Signature: Print Name:_ DEVELOPMENT PERMIT .0 South: Sewer: Slopes:` OLYMPD *041C3. Occupancy: DWELLING UBC: 1994 Fire Protection: East: .0 West: .0 Permit No: Status: Issued: Expires: Streams: (206) 431 -3670 D97 -0039 ISSUED 05/16/1997 11/12/1997 )1 2644L I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provision of any other state or local laws regulating construction or the performance of work. I am authorized to sign for and obtain this development •e Lit. Date14 /27 This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. Address: 3231'S 133 ST ;Suite: Tenant Type: DEVPERM . Parcel #: 152304-9304 CITY OF TUKWILA • Permit No: D97-0039 Status: ISSUED Applied: 02/10/1997 Issued: 05/16/1997 Permit Conditions: 1 . Temporary erosion control measures shall be implemented as the first order of businestopreventsedimentation off- site or into existing sp:irrainagelaOltties. The site shall havefOerManint erosion control in . - place as soon as.'- possible , after final grading•has,been completed andpOtir to',..theFlnal Inspection. 3. SPRINKLERM:13,0E'THE , NEt4:,:coNstRuciroN:is REQUIRED 8Y.:,THE FIRE, Inspector prior to the a Ffnal. Inspection. 5. Driveways shall complyWith:City residential stapdardi., • Driveway Width shall be a 10 minimum and 20' maximum.' Slope' shaWbeie'maximum of".15%. :Turning radii shall be, a,minimdm\ of ,!fifVe ; B. For-residential driveways, a minimum 12" -concrete or ADS. N12' pipe shall be installed Unde'r the driveway at the ex-iting drafnaie-dttCh' ::, ', -, ',,f ,.; 7. Ito,ls strcngly'recommended-that storm'Orainage designs be ceeified(by'ea licensed eri0 , neer• otherwise, the owner , ., assumes liabilityl,for the design and any ,,.„ ,, . , damages ,, .. A114 drain pipe shall be,elther reinforced ADS pipe. Treated corrugated metal pipe may be , . used.for'detention facilities. ,,' 9. The' p owner shall sign aWater System A Agreement fbr future upgrade of the-existingeficient system prior to the Final Inspection. 10. PER TUKWILA UNDERGROUNDING ORDINANCE ALL UTILITIES.SHALLBE PLACED UNDERGROUND OR PROPERTY OWNER SHALL APPLY FOR WAIVER TO UNDERGRQUNDING ORDINANCE/OBLIGATION FOR FUTURE UNDER"- GROUNDING. 11. I t i t***k******k***** 4 **k********k**k*****kkkk****1*k****k**114A 12. No changes will be made to the plans unless approved by the Tukwila Building DiVision. 13. Plumbing permits shall be obtained through the Seattle-King County Department of Public Health. Plumbing will be inspected by that agency, including all gas piping (296-4722). 14. Electrical permits shall be obtained through the Washington State Division of Labor and Industries and all electrical work will be inspected by that agency (248-6630). 15. All mechanical work shall be under separate pe'rmit issued by the City of Tukwila. 16. All permits, inspection records, and approved plans shall be available at the job site prior to the start of any con- struction. These documents are to be maintained and avail- able until final inspection approval is granted. 17. Engineered truss drawings and calculations shall be on site and available to the building inspector for inspection purposes. Documents shall bear the seal and signature of a ashington:Sta e Pr essio n.al Engineer nv exposed. insula ns backing material shall ve a F lame;. pread ;Rati:ng .of ,2 r las and :materi.al,-sha:l ear i :dent c ation . showi`ng' the ;fire.,per.formance rat : the,reof .. l construction t:o., be, done. in::conformance with ;approved •'laps ;and .requiremen of ; the Uniform Building ,Code. (1994 :dit.io:n),.,as "amended, ,Uniform Mechani Code (1 .94 E.dition)? and Washi State Energy Code (19 Edition) 1 wood .to rema ; in„ placed: concrete shal i' be. treated: wood,. here : sha;ll, be" no : occupancy: of 'th;e..bu.ilding(s)'. until.. the inai .inspe'c.tion has been :.completed by .tfe Tukwila Bri.lding: Inspe 0114.0 d;i'ty of; Permit.:"' The i ssrance of : a permit .or approval' tans, sp`ec'if:ications? and computat :sans shat not be.,.•con trued : to be a p e r mit for, or. approval ; of t <any violation ; any 'of ,the provisions of.the„ build ng code or of any her ordinance: of tfi°er; `ur`isci,ic -t:ion °No'.'.`permwit presuming. to five authoritv v,io'late or cancel the proviskions .o.f this ::` code shall • :, X, Tukwila Building Division General Code Requirements for R -3, Residential Buildings The following code requirements are applicable to this permit and are intended to reference requirements that arc not specifically indicated on the construction drawings but in any case will be requirements for final inspection approval. The applicable comments are herein numbered and also keyed to the plans. 1. Walls and ceiling which separate the garage from the dwelling must be protected on e garage side by materials approved for one hour fire resistive construction. UBC 302.4 (5/8" Type "X" gypsum wallboard is an approved material.) Door opening between the garage and the dwelling shall be protected by a self closing tight fitting solid wood door 1 -3/8 inches in thickness. UBC 302.4 3�. Fire dampers are not required for air ducts that pass through the garage wall or ceiling separation provided that such ducts are constructed of steel having a thickness of not less than No. 26 galvanized sheet gage and have no openings into the garage area. UBC 302.4 Qa Appliances installed in a garage where they may be subjected to mechanical damage ll be suitably guarded against such damage by being installed behind protective barriers or by being elevated or located out of the normal path of vehicles. UMC 308.1 ()Heating appliances located in a garage and which generate a glow, spark or flame capable of igniting flammable vapors shall be installed with source of ignition at least 18- inches above the floor level. UMC 308.2 Plo In seismic zone 3, (Tukwila) water heaters shall be anchored or strapped to resist rizontal displacement due to earthquake motion. UPC 1310 (e). 0 Provide at least one handrail at stairs. Top of handrail shall be placed not less than 34 inches or more than 38 inches above the nosing of treads and landings. The handgrip portion of handrails shall not be less than 1 -1/4 inches nor more than 2 inches in cross - sectional dimension or the shape shall provide an equivalent gripping surface. Handrails projecting from a wall shall have a space of not less than 1 -1/2 inches between the wall and the handrail. UBC 1006.9 Factory built fireplaces are required to be certified and labeled in accordance with procedures and criteria specified in the UBC Standard 31 -2. This applies to both new and used factory -built fireplaces obtaining permits for installation starting January 1', 1997. WAC 51 -30 -3102 Page 2 of 3 In dwelling units, a detector shall be installed in each sleeping room and at a point entrally located in the corridor or area giving access to each separate sleeping area. In new construction required smoke detectors shall receive their primary power from the building wiring when such wiring is served from a commercial source and shall be equipped with a battery backup. UBC 310.9.1.3 & 310.9.1.4. () Under floor area shall be accessible. Accessible under -floor area shall be provided with a minimum 18 -inch by 24 -inch opening unobstructed by pipes, ducts and similar construction. All under floor access opening shall be effectively screened or covered. UBC 2317.3 Foundations for stud bearing walls shall be founded at a depth below undisturbed ground, per UBC Table 18 -I -D, with the exception that the floor under the floor may be ' excavated to the elevation of the top of the footing. 12. Under floor areas shall be ventilated by an approved mechanical means or by openings into the under floor area walls. Such openings shall have a net area of not less than 1 square foot for each 150 square feet of under floor area. Openings shall be located • as close to corners as practical and shall provide cross ventilation. The required area of such openings shall be approximately equally distributed along the length of at least two opposite sides. They shall be covered with corrosion resistant wire mesh with mesh openings of 1/4 inch in dimension. UBC 2317.7 ground cover of six mil black polyethylene or approved. equal shall be laid over the ground within crawl spaces. The ground cover shall be overlapped 12 inches minimum at the joints and shall extend to the foundation wall. WSEC 502.1.6.7 Floor insulation shall be installed in a permanent manner in substantial contact with surface being insulated. Insulation supports shall be installed so spacing is no more than 24 inches on center. The insulation shall not block the airflow through foundation vents when installed. When foundation vents are not placed so that the top of the vent is below the lower surface of the floor insulation, a permanently attached baffle shall be installed at an angle of 30 degrees from horizontal, to divert air flow below the lower surface of the floor insulation. WSEC 502.1.4.7. Air handling duct systems located within attic, garage, crawl space or other unconditioned spaces shall be insulated with 3.5 inch mineral or glass fiber blanket, 2.5 inch duct liner, mineral or glass fiber board or equivalent to provide an installed total thermal resistance of at least R -8. Page 3 of 3 Domestic Range Vents. Ducts used for domestic kitchen range ventilation (except wndraft grill ranges) shall be of metal and shall have smooth interior surfaces. Domestic Dryer Vent. Domestic clothes dryer moisture exhaust ducts shall be of metal and shall have smooth interior surfaces. (Approved flexible duct connectors may be used provided that they do not exceed 6 -feet in length and are not concealed within construction. UMC 504.3 Round or rectangular posts, poles and sawn timber columns supporting permanent s ructures which are embedded in concrete or masonry in direct contact with earth or embedded in concrete or masonry exposed to the weather shall be treated wood. The wood shall be treated for ground contact. UBC 2317.2 19. All foundation plates or sills and sleepers on a concrete or masonry slab, which is in direct contact with earth, and sills which rest on concrete or masonry foundations, shall be treated wood or foundation redwood, all marked or branded by an approved agency. UBC 2317.4 Columns and posts located on concrete or masonry floors or decks exposed to the eather or to water splash or in basements and which support permanent structures shall be supported by concrete piers or metal pedestals projecting above floors unless approved wood of natural resistance to decay or treated wood is used. The pedestals shall project at. least 6 inches above exposed earth and at least 1 inch above such floors. Project Name/Tenant: , _ - .�. __: O. Existing Square Footage for Structure: sq. ft. Dwelling sq. ft. Covered Deck(s) sq. ft. Garage /Carport Value CionstrunIinn : q � a Site Address: ?j i City State /Zip: S. /33 -S . 7 i 4,✓, /4 ci4 99/6 P. Proposed New Square Footage: / .2 / Vv sq. ft. Dwelling sq. ft. Covered Deck(s) / Y(JD sq. ft. Garage /Carport Tax Parcel Dumber: 3a /_"2 30 'x ) Property Owner: r ____— Floor Area Ratio: (total floor area of all structures divided by the area of the lot) .? Phone: Street Address: Cigy State /Zip: 2.2. "7 Z 5 c'/ S 1— a�tici7 S # /3d z. il ,g 96 3 / Fax #: o — .,?z5 Phone: Contact Person: l Street Address: City State /Zip: Fax #: Contractor: Phone: Street Address: Ci tate /Zip: Fax #: Architect: Phone: Street Address: f City State /Zip: Fax #: Engineer. DT 6 j ki lt-� k /31 Phone: � c ( "- 8t9/0 Street Address: City State /Zip: Z 91113 5:5 3 . .Q,44-. -y /_ J4 0? 00 / Fax #: Type of work: New Single - Family Residence ❑ Addition - Single - Family Residence Interior Remodel- Single - Family Residence ❑ Residential Accessory Structure* ❑ Remodel/Addition to Accessory Structure ❑ Garage(s) ❑ Deck(s) - Covered & Uncovered ❑ Residential Reroof Existing Square Footage for Structure: sq. ft. Dwelling sq. ft. Covered Deck(s) sq. ft. Garage /Carport sq. ft. Accessory Structure(s) sq. ft. Uncovered Deck Proposed New Square Footage: / .2 / Vv sq. ft. Dwelling sq. ft. Covered Deck(s) / Y(JD sq. ft. Garage /Carport sq. ft. Accessory Structure(s) sq. ft. Uncovered Deck Floor Area Ratio: (total floor area of all structures divided by the area of the lot) .? For an Accessory dwelling, provide the following: Lot area Floor area of principal dwelling Floor area of accessory dwelling ' Provide documentation that shows the principal owner lives in one of the dwellings as his or her primary residence. Single - Family Residential Permit Application Date application accepted: SFPERMIT.DOC 7/5/96 CITY OF 7' IKWILA Permit Center 6300 Southcenter Boulevard, Suite 100 Tukwila, WA 98188 (206) 431 -3670 Application and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or facsimile. APPLICANT REQUEST. FOR PUBLIC WORKS SITE/CIVIL PLAN REVIEW OF THE FOLLOWING: (Additional reviews shall be determined by the Public Works Department) ❑ Channelization /Striping Al Curb cut/Access /Sidewalk ❑ Fire Loop /Hydrant (main to vault) #: ❑ Flood Control Zone ❑ Hauling ❑ Land Altering: 0 Cut cubic yds. ❑ Moving an Oversized Load: Start Time: End Time: ❑ Sanitary Side Sewer #: ❑ Sewer Main Extension 0 Private 0 Public Storm Drainage ❑ Street Use ❑ Water Main Extension 0 Private 0 Public Water Meter /Permanent # Size(s): ❑ Water Meter Temp # Size(s): Est. quantity: gal Schedule: El Miscellaneous Size(s): 0 Fill cubic yds. Value of Construction - In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review - Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The building official may extend the time for action by the applicant for a period not exceeding 180 days upon written request by the applicant as defined In Section 107.4 of the Uniform Building Code (current edition). No application shall be extended more than once. Date application expires: Application to : (Initials) BUILDING- OWN AUTHORJZ ED AGENT: Signature: / y ) � Date: / Print name: ) a'k / Phone: �, ma Fax #y e,-9 5 Address ; �?< J Z 5 v S/ c /� (Ja,y , c. /� -, . UZ City /State /Zip: / ,, / 6J• 4 � / . '�o j/ ALL SINGLE - FAMILY RESIDENT! ' PERMIT APPLICATIONS MUST BE BMITTED WITH THE FOLLOWING: > DRAWINGS PREPARED BYE REGISTERED ARCHITECT OR PRO1 . ..SSIONAL ENGINEER MAY BE REQUIRED BY THE BUILDING OFFICIAL ➢ ALL DRAWINGS SHALL BE AT A LEGIBLE SCALE AND NEATLY DRAWN • BUILDING SITE PLANS AND UTILITY PLANS ARE TO BE COMBINED WA SUBMITTED ❑ Complete Legal Description ❑ Certificate of water /fire flow availability (Form H -11a). Contact the Public Works Department (206) 433 -0179 for servicing district. ❑ El Certificate of sewer availability (Form H -11). Contact the Public Works Department (206) 433- 0179 for servicing district. ❑ ❑ Metro: Residential Sewer Certification (if Tukwila Sewer District) (Form H -12) ❑ ® Four (4) sets of site plans to include: 1. Existing fire hydrant location(s). 2. Proposed access road. 3. Driveway location- driveway shall be 10' wide minimum and 20' wide maximum. If driveway is over 150' long, driveway shall be 20' wide and have an approved turnaround (City Ordinance 1741). 4. North arrow and scale. 5. Building setback from property lines. Any proposed or existing easements must be shown on plan. 6. Public Works review requires the following on site plan: driveway location (10' min., 20' max. width), show proposed and existing power, water and sewer lines, existing storm drainage system, downspouts and foundation drains, and where drains tie -in. 7. Parking plan. 8. Lowest building elevation (if in Flood Control Zone). 9. Estimated /proposed topography at 2' intervals and proposed elevation of lowest floor level. 10. Identify location of sensitive areas slopes 20% or greater, wetlands, watercourses and their buffers. 11. Identify location and size of significant trees that are located in sensitive areas and buffers or the shoreline zone. Of those, identify which are to be removed (Title 18, City of Tukwila Zoning Code). 12. Identify location of high water mark of the Green /Duwamish River if site is located within 200' of the high water mark. 13. See Public Works Checklist for detailed site plan information required for Public Works Review (Form H -9). Working Drawings ❑ ® Foundation plan and details ❑ Floor plan ❑ po Roof plan ❑ Building elevations (all views) El © Building height ❑ in Building cross - section ❑ ❑ Structural framing plans and details necessary to completely describe construction ❑ Washington State Energy Code Data (Gas /Electric /Oil /Propane /Heat Pump) Forms H -15 & H -16 available at Permit Center OR Prescriptive Heating System Sizing Chap 9 Form H -6. fl El Complete Land Use Applications if not previously submitted (i.e., Reasonable Use Exception, Variance, Shoreline or Tree Permit). Q ❑ Attach plans, reports or other documentation required to comply with Sensitive Area Ordinance and other land use or SEPA decisions. w ❑ If dwelling has a septic tank, and a bedroom or bathroom are added, provide written approval from the King County Health Department or the Tukwila Public Works Department prior to submittal of permit application. ❑ p Copy of Washington State Department of Labor and Industries Valid Contractor's License. If not available at the time of application, a copy of this license will be required before the permit is issued, unless the homeowner will be the builder OR submit Form H -4, "Affidavit in Lieu of Contractor Registration ". Building Owner /Authorized Agent If the applicant is other than the owner, registered architect/engineer, or contractor licensed by the State of Washington, a notarized letter from the property owner authorizing the agent to submit this permit application and obtain the permit will be required as part of this submittal. I HEREBY CERTIFY THAT / HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. SFPERMIT.DOC 7/5/96 ProJe9kj3 0 Type of inspec . : Address .?" _ 3 ) 5 13) Date called: 1, p Special instructions: y1/4.-491 • Date wanted: ft a. . . Requester: DotAivi 1 Phone No.: MI INSPECTION RECORD Retain a copy with permit INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 Approved per applicable codes. COMMENTS: Corrections required prior to approval. 20 31-3670 Inspector: s.„,/ Date: 0 , 1 I II ( $42.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Receipt No.: Date: Projecl Da ) Type of inspection: c a j j e Address:3 ) 15 < . - -, a . `%. Date called: Special instructions: t--- i3 , CC.P6 ' D - Date wanted: a.m. p.m. Requester: Phone No.: 'lal.kie,i • • : • o INSPECTION RECORD Retain a copy with permit INSPECTION NO. I CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 Approved per applicable codes. Inspector: I 1 Date: q PERMIT NO. (206) 431-3670 Corrections required prior to approval. COMMENTS: pi $42.00 REIN ECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Receipt No.: Date: COMMENTS) 1 itvI_AA vim-- • 2 I' v. IA-% c... or, Mta k 414_ . Type of inspection:, ,.., A 1 '"‘ 2. itil VSIStS 9 DZ 3 pt- .^ c A-4104\_ Sp - • Por0 Se 0 V Pt.PML- 6N.,-4..k V...____ Ov■c"IL-- AtA.-- E P6s eivt-IIA . . 0 eitk,v,oz eNht. 1 A- ikeNt--." (1-A-A - vrz-a---- w v.814... . cit.AN pi - I - Date wanted: ( PA-, brc eAc.re'it-Ac.:k (L.-5. Requester: \ Phone No.: N. e ---... Project;/- 0 Type of inspection:, ,.., A 1 '"‘ Address: 2- 2Z : 51 Si 1.> -,, Date called: Special instructions: __ , „..... - - Date wanted: p _o i ...., c. e a.m. Requester: \ Phone No.: ' • • •. ' '• 1INSPECTION RECORD Retain a copy with permit INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98 PERMIT NO. (206) 431-3670 Approved per applicable codes. ELCorrections required prior to approval. Date: Ti $42.00 REINSPECTION FEE REQUIRED. Prior to Inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Receipt No.: Date: a. .rainOr.11.:/knyla • • 0 - Project ( D Type of inspe ip a (( Ad e is, ) s i 3 � Date called: Special instructions: Date wanted: a.m. Requester: Phone No oi p I t Y1 • CITY OF,TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 II 10 NO. Approved per applicable codes. Receipt No.: INSPECTION - ;RECORD t z,;.c w ,hr Retain a copy with permit N I 1 (206) 431 -3670 Corrections required prior to approval. COMMENTS: a�— Date: qt $42.00 REINSPECTION FEE REQUIRE). Prior to inspection,'fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Date: Project: i 0 Type of ' p�t ��a e (ion: h j // 15t ( G� Dae ca ed: ,� , -1 � Add res ,, 5 , 33 � t I Date Special instructions: Date wanted:9 `9 c i t Requester: 4 l Phone No,:99) sb ' INSPECTION RECORD Retain a copy with permit INSPECT CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 Approved per applicable codes. PERMIT NO, (206) 431 -3670 Corrections required prior to approval. COMMENTS: {�- I Ns - t-L -- 9 P . ._ C D •• (1 -3T S P ks,ee7 D 1 ? (A-TA f !emu N+ 6-1 G1 s -' c R-- r m 6 C - At Inspector: r_ Date: [I $42.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Receipt No.: Date: Project:1 t Type of inspectionn Date called: o ,1- ,.-ci . Address ( 5 Special instructions: 5 .9.;:r.$.2..... TY. . , Date wanted: e7 or) a.m. V "'" : " ;7 Requester voadtit I 1 f Phone No.: INSPECTION RECORD Retain a copy with permit. INSPECTION NO. CITY OF BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 9818 Approved per applicable codes. COMMENTS: r•= •'; Inspectort .") ( Date: 9 iq 4 I I $42.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Receipt No.: Date: • „ . • ' . • • PERMIT NO. (206) 431-3670 Corrections required prior to approval. P roi act; - TAPI 0 Lo B Type_of inspection: P1-001a NSLAA-PiTx), Address: .2...I 5 153 Si Date called: — i -2 -91 Special instructions: Date wanted: a.m. - - 7 Requester: Phone No.: 2.46 0 LIAVALCAlattrAt,terttaaaPhe wooavosnwavesm5.11 / C INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 9818 17 Approved per applicable codes. COMMENTS: Inspector: ..tro /c07 INSPECTION RECORD Retain a copy with permit 6A- c_P-'756 k Corrections required prior to approval. Date: PERMIT NO. (206) 431-3670 • 1 01 fe.N: $42.00 REINSPECTIO FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Receipt No.: Date: .2A5..*-9ttiist La tee:4:441:0f aViy1)1,K,, 41thcil o&a1./ A.. Pro'e • APIO " LOT 5 . 1 Type of inspect(ofv INT V■00 ea0XAlf Date called: n eA: s 1 . Special instructions: Date wanted : _A. _ a.m. Requester Dimz\i L Phone No.: 7.2 _ oo I I INSPECTION RECORD • Retain a copy with permit INSPECTION NO. • CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 Approved per applicable codes. PERMIT NO. (206) 431-3670 Corrections required prior to approval. COMMENTS: • ;IA Inspector: Date: $42.00 EINSPECTIO FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Receipt No.: Date: Project: ` t Type of i ,-^ Address: } Date called: Special instructions: Date wanted: ; -4147 Requester: Phone No.: :�y�t t'1tlaw,� INSPECTION RECORD Retain a copy with permit INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 roc Approved per applicable codes. COMMENTS: Receipt No.: Corrections required prior to approval. J $42.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Date: (206) 431 -3670 alit17�79el.C. 4re @:!'.w9. ....ems .,►.4.er. �. .Jrwr..4.NL.,...,._: is _. Project: t? / Type of inspection: Date called: Address Special i tractions: Date wanted: . Requester: Phone No.: Approved per applicable, codes. COMMENTS: Inspector: INSPECTION RECORD Retain a copy with permit INSPECTION NO. CITY. OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 I •Illk (206) 431 -3670 Corrections required prior to approval. Date: /I... �►.�1 /1 $42,00 REINSPECT! of FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Receipt No.: Date: Pro'e Type of i pe do .` Li 11A5lki Lo s' Date called: S I ae Special instructions: Date wanted: i • •., . , a 13 , a:m: Requester: h A p i 7 r_ to - Phone No.: Z Oo G INSPECTION RECORD Retain a copy with permit. INSPE NO.' DIVISION CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 Approved per applicable codes. 1D-cocl PERMIT NO, (206) 431 -3670 V4 COMMENTS: i f -- 6e-2,a, Corrections required prior to approval. Date: 7 n $42.00 REINSPECTIOIf FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd,, Suite 100. Call to schedule reinspection. Receipt No.: Date: Prof q- Type of insct'I�oAM' NCI P) O 14�3; , es ? r : S Date called: Special instructions: Date wanted: _) O ~ 1 : a.m. Requester: �- t� . REEL Phone No.: 24(42— INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 Approved per applicable codes. Inspector: INSPECTION RECORD Retain a copy with permit 1 50 - Ooh PERMIT NO. (206) 431 -3670 ` k Corrections required prior to approval. COMMENTS: /, eeAJ / .r", 6 64 64/ee s 6-, 5 61 1 4;Lr,/ s L13/ -6) G76 Date: I $42.00 REINSPE ION FEE REQUIRED, Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Receipt No.: Date: . ,c Alt* Lz /att.l: valor.. Y .thel.5t1 ....Aso: • _to 'R.v. e. f' COMMENTS: ( wR.. wtSG Z32.10. . It, . Ft to ).1OA- CAePur w At..S 4. I ` E 1 4 STuQ 14ct( -ri +T bACK wAU> SHALL- 5 A'' St,1A9 61- kc4C — D, I. . 5 hi A D QwC3 311w0 S ' 1 0 . C. . AT D w ,. 6''z. `L bW C k.- I --tN4 EDGE o\ 1'- (-r A-FP L " Z ' `leek 5 A-0 v 0A-IL- P (-4-T-c bot7 ap TAD ( P.) (L-..J . ti-W% ok" Srw+ -P 0 C ? A-S R-A+rJ ( =t.41 Dv,cn'' opi JE tjS. 'rt 1 ,ASv "`E . Date wanted: b, 9.16 n Projec_ Q , 1 _ 01 - 5 Type of inspectionF der s' 1 . 5 s . r . Date called: 16-q7 Special instructions: Date wanted: b, 9.16 Requester: b p, giza i Phone No.: 90 ! l t- ' �o rJ t INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 Approved per applicable codes. [Receipt No.: INSPECTION RECORD Retain a copy with permit PERMIT NO. (206) 431 -3670 Corrections required prior to approval. $42.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Date: ■PrOjetA p 0 ... LOT m O _Typ_e_of inspecti, Mi 5VIEKVHIN&I AUPIE1 Address:. 5 13 5 _ r . , Date called: Special instructions: Date wanted: - P.m. 0 1 40 2-5- 0 1 - 7 Requester: Phone No.: 2A-ip- INSPECTION RECORD Retain a copy with permit INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 Approved per applicable codes. COMMENTS: I I Corrections required prior to approval. Receipt No.: $42.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Date: . • ' • , • • ' , • , • „ . • ,;" • /11441C.,1. • • Pro lay\ F 10 - Lo _ 5 TEW inse .. 6 .04,3 s 133 5 Date called: t . 2 I A ....9 - Special instructions: • Date wanted: 1 _ 2,.. , 1 —7 f f : rn. Requester: Phone No.: 2 _4 19 Dos6 •1 I Receipt No.: • :..-trAll*GMbInatitio2enalistrotscarawstafratattbacetineemusonsoramsamvastrai INSPECTION RECORD '44.4 Retain a copy with permit INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 Approved per applicable codes. I I Corrections required prior to approval. COMMENTS: 4 Inspector: Date: ( i sci? $42.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. 41 • A, • e oj gk ) 1 O '" L0 ( 5 Type of insinkK s r, p,c, Addres : 3231 S 133 S% Date called: is - (lo ' 9/ Special instructions: Date wanted: //�� 11 l,� C'a. to 1 t 7 p.m. Requester: b A R'I L Phone No.: 2 LA( 0 " occ ss INSPE CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 COMMENTS: vU,.� UG�L.( Approved per applicable codes. 'Lira $42.00 REINSPECTIO FEE REQUIRED. ,Prior to inspection, fee must Inspector: be paid at 6300 Southcenter Blvd„ Suite 100. Call to schedule reinspection, Receipt No.: Date: INSPECTION RECORD Retain a copy with permit 1) 0051 Date: PERMIT NO. (206) 431 -3670 Corrections required prior to approval. Ct Proje ctivIO Typmitystiloo vecas Date called: 1 —97 tcy rjssci 5 . s, J 1 Special instructions: . � Date wanted: („ _ -3 � J . � ' , i _ ii RequesterI-b r r� 14 0a61/47 -- Phone No.: X735 — 32-0 yrry.�a�rt INSPECTION RECORD Retain a copy with. permit INSPECTION NO: CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 9818 Receipt No.: Date: Approved per applicable codes. $42.00 REINSPECTIO ' EE REQUIRED. Priorrto• inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. 1 40 DCI1'0031 PERMIT NO. (206) 431 -3670 Corrections required prior to approval. _ i....... tea.=x _t - - 6 .... ProlAnt- Li 5r- 13 Type of inspectiO g1 rixyl6 I S 0 515 1 6 5 ,, r Date called: Special instructions: .. Date wanted:, .-.-• -11. - Requester: v4Dovr Phone No.: 1 F7 2- 1 0 ' . • Approved per applicable codes. INSPECTION RECORD Retain a copy with permit INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 9818 (206) 431-3670 Corrections required prior to approval. COMMENTS: .• • AMP A Ai. Inspector: Date: 1 $42.r0 REINSPECTION F REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Receipt No.: Date: Special Instructions: Permit No.: 3D co _ 0 039 Site Address: 1 (.0(` 9-) 1) ltw.c, Q )s k„ ( PO) S t P... ti" -N■10 i s Ati 2 ' (a (p et0 R IAA (fib- of rt,D p,let 1 sT,L.. e(Ic.6t) Requester: Dory y "TCt �i o ')t'u lt.. Sp6‘,1 (4 ftD PE VA:uA.. 4„ 'ite,I q7 1)0. -,K-M . C 2 . 1 (i) L Ih In{A sk Q4 d ` i,,...x ,,,,,i1A0 c.,11-r ldv, 1 ) C- A,.. 4i‘ cat (.( D G14,12Z • Project: 1 Permit No.: 3D co _ 0 039 Site Address: 1 S 13 3 rd L.. Q ' Date Called: ( _ q _ q 7 ect rl Type of Inspection: - 6 hrw► d ra i t c& 2 - Lot Date Wanted: (� - 5 - q 7 • a.m. [ . 'p Requester: Dory y "TCt �i o Phone No.: Q.46- 0o5.5 City of T&,:wita W Inspection Request Department of Public Works — Engineering Division Phone: (206) 433 -0179 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Special Instructions: - cAn r • Permit No.: lY l _ 60?? Site Address: 3 23 1 12 , 1cP7 "MrAA1 'r� 9 I- `-p-.1- + r 6 olk{ .Gf /6 S 7 k 4 tf im /G knr%s.,7Xi'l /,1fµaa�JA/ I or gfi, /(r-V/ f1'7 /y!f <,J3J . 6,4% (/, TU dn ,t -i fy (/4 I7 /3'(i/ i f( /iz4 /WJt / a Lk 9X dip IN AOF u.4 (*Li- C:X0 . 1144'7 IA4- Date Wanted: �. (4 riaa O p.m. Requester: ,v / - / (4 11"0 _' , i 3 Viii 'f "r co 61.4.4- •z.L. `r S/` 1/ C4. �,.Yrti(� T •- /2 /4ANLA' 1 G" Aos ? l c'ttpsiL/ 4, / .e:,..,• r ,dee.0,. iUrLr v c Project: -1-" Sc42_ - cAn r • Permit No.: lY l _ 60?? Site Address: 3 23 ( $ /33 ''' S1- Date Called: !?,, / _ ^ Type of Inspection: Date Wanted: �. (4 riaa O p.m. Requester: ,v / Phone No.: r? yZ - 67// City of TuL'i Inspection Requ Department of Public Works - Engineering Division Phone: (206) 433 -0179 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 ©.v 5 & N-• C4 ,,ca.0 Project:. -- i t o I_ - p Permit No.: n -- 0 4 3 c� Site Address: 31. 3 i 5, (3.7,. 4 , T Date Called: e h / 2 Type of Inspection: 57) Date Wanted: / 2/ 97 9 • p.m. .. nR Phone Phone No.: 7,, Lim, IV Special Instructions: 4/1147, - / : .e( .- - / 4" A JOS Rio Piettg4 aic.5 4 , /fir b zee 13r it o- ur -o1 . J_- } t t ? c - G 1R Pg. A a ,c 4 'i X / of kg, t 4 &J cot - 9 Q 7 - i ,' t (. / 3 J , (, / 1.. ,t , ' C - //.-/Q7 ti City of Tibuwi'la Department of Public Works — Engineering Division Phone: (206) 433 -0179 Inspection Request 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Project: 1 P p Permit No.: D c _ o ,,- Site Address: 3 2 , 3 i Date Called: cif / a ht..? Type of Inspection: c. -� �� Date Wanted: j -a.m. • p.m. q/ 5 / S-2 Requester: Phone No.: Special Instructions: L^,0_249:2____622. f .4) P)-3/``) Com- • \ lb `1 1 P(A c • City of Tu�cwila Department of Public Works — Engineering Division Phone: (206) 433 -0179 Inspection Request 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Sprinklers: Fire Alarm: Hood & Duct: Halon: Monitor: Pre -Fire: Permits: • Authorized Signa ure FINALAPP.FRM ' City of Tukwila Fire Department .TURWILA.FIRE DEPARTMENT FINAL APPROVAL FORM Retain current inspection schedule Needs shift inspection Approved without correction notice Approved with correction notice issued /- /2 )L L) 575/cmk T.F.D. Form F.P. 85 John W. Rants, Mayor Thomas P. Keefe, File Chief Project Name . .. 4"? C._ 7T »' 0 3 ./ `''> /3.3 (_ ''9 7 Suite # cW Headquarters Station: 444 Andover Park East • Tukwila, Washington 98188 • Phone: (206) 575.4404 • Fax (206) 5754439 4 *A.4i4," * * *4 “4 * * * * 16c* * ;% ** * **. *. * ** *4,` * 444.4v.k* * * * * * * *: 4. * * *.k �x fY or �TUKWILA l�H� TRANSMIT * � * * *. * * * * * * *# * * * * * *` *k�r' **� *' * * *'y * *' * ** • �t *** * ** * * ** * * * **A* *,* TRAN8MIT. :R970082 Amount;. 1,241'7..05:/16 /97 1423 Payment Method :' CHECK •No.tat i an.a OLYMPIC DEVELOP 'nit: SLB Permit. No: 097 -0039 Type: DEVPERM DEVELOPMENT PERMIT Parcel No 152304-9304 Site Address: 3231 S 133 ST Location: LOT B Total Feee: 2.013.46 Payment 1,241.75 Total ALL Pmts: . 2.013.4E Balance:. .00 **** A************* r1******** s1 *** *** * * * * ** * * * * *k **** * * * * * * * *k * * * ** Account Code . Description BUILDING 7 RES • 000/345.830 PLAN CHECK - UTILITY 000/384.904 STATE DUILDING•SURCHARGE 000/342.400 INSP FEE - UTILITY 412/342..400 'INSP FEE - STORM DRAIN 000/322400 Amount 1,187.25 20.00 4.50 15.00 15.00 0555 05/19 9717 TOTAL 2483.50 • • •., " 1)61 (2) , , .:•Ii.*******.***.*********** ; * * * * * * ***** •: TRANS1111 mount: 77171 02/10/9? :CHECK OLYMP1C :DEVELOP . SLB: ----- --- , . . Type.: DEYPE :• DEVELOPMENT : rdnOe1 NO 2. 15230 . 4,79304 LOtatiOni,... 32 AV:S & .S 133 ST.i..LCIT .Tpta 1 Fees: :.1 This ' . .-771.71 Total ALL Pmisz'. ..• .• - Balance: ..1.191.:75 Account :Code 'Desor:iptiOn . Amount 000/345.830 : P.-AN• CHECK RES ' 4. 7464 02/1i 1705 TOTAL 77171 Project Name: J2xX Lb S r3� f Address: 3eXx S 41,3 S Residential Building Permit Number: 1. Prescriptive Option W.S.E.C. Chapter 6, (check building permit option used): El I. El II ❑III. 21 Iv. 71 v. ❑VI. 71 vii. ❑ VIII. 2. House Square Footage (HSqFt) 2/ 3. Heating System installed, (check system type below): ❑ a. Electric Resistance /21 BTU /h per sq. ft. in b. Electric (forced air) /24 BTU /h per sq. ft. RI c. Other Fuels (gas, heat pump) /27 BTU /h per sq. ft. 4. Equipment: a. Make Rla.e.s..., b. Model C rc i'cuT 2L 6 ,.r Aem -ria 4c. c. Size in BTU's A 6.0,- 5. Calculation /(HSqFt) „ 71/4) (see line 2 above) a, b, or c above) Maximum Size BTU /h X o'7 (see line 3 ..57 780 BTU Equipment Applicar<t's Signatu e: 7/9/96 CITY : ' TUKWILA Permit Center 6300 Southcenter Boulevard, Suite 100, Tukwila, WA 98188 Telephone: (206) 431 -3670 Prescriptive Heating System Sizing for Single Family Homes - New Construction Washington State Energy Code Chapter 9, Climate Zone 1 PERMIT APPLICATION #: 1:1g1e.0039 Date: of H -6 RECEIVED CITY OF TUKWILA FEB 1 01997 PERMIT CENTER NO MANUFACTURER FRAME MATERIAL MODEL # SIZE U-VALUE AREA S.F. / -Znfa /44 v. i1 i .c 1° , se • 6 ec _ ff- 15 / / , "3 4 /76 / 2— 2 a x5° 2D i / S' 9 :2--- 1 /W a 37_ / .6"°x.I ° ./. / f) ° ) 6 a g 5 1 ;• Orox 1. HEAT SOURCE: 2. WINDOW SCHEDULE: Fill in the window schedule based upon the proposed residential design and calculate the glazing area as % of the conditioned floor area. 3. CHECK PRESCRIPTIVE OPTION: Glazing percentage will determine which option to choose. Mark option at top of column. (See back of this sheet) WINDOW SCHEDULE GLAZING/SKYLIGHTS BY TYPE TOTAL GLAZING AREA 2,510 ENRCYCOD.DOC 2/13/97 CITY O( TUKWILA Permit Center 6300 Southcenter Boulevard, Suite 100, Tukwila, WA 98188 Telephone: (206) 431-3670 WASHINGTON STATE ENERGY CODE RESIDENTIAL COMPLIANCE FORM PRESCRIPTIVE APPROACH S.F. ÷ TOTAL CONDITIONED FLOOR AREA ACTIVITY #: 0( - 00349 (gas, oil, propane, heat pump, electric) TOTAL GLAZING AREA 99 (add entire column) S.F. x 100 = PROPOSED GLAZING PERCENTAGE H-15 The proposed glazing percentage must be less than or equal to the glazing percentage listed under the prescriptive option that is selected. Vtr NOTE: Carefully review the requirements of each of the options in the charts below. From the table that refers to your heat source, choose the option that best suits your dwelling design. Glazing percentage determines which option to choose. Your building design must match the selected option requirements without exceptions or substitution. Design drawings must indicate all applicable requirements from table. HVAC AF.UE :: Glaiingrriax U -value Door:U- value (kyalue) ... Ceilings;: A ': with attics r vaulted! Walls: r\; ';'.• :.':: 1 above `gra below. grade .interior. ;:exterior; . Floor Slab on grade. HEAT SOURCE: OTHER (gas, oil, propane, heat pumps) OPT I O OPT II O OPT III OPT c` OPT V o o R -19 R -10 > .78 21% 0.65 :0.40 (R -2.5) R -30 : R -30 R -19 R -19 R -10 R -19 R -10 >.74. 21% 0.60 0.40 (R -2.5) R -30 R- 30: R - R -19 R -10 R -19 R -10 OPT VI* OPT VII* 0 0 > :78 . . '25% 0.50 0.40 (R -2.5) R -25 R -10 > ;7 .: 30% 0.45 0:40 (R -2.5) two stories ' The " >" symbol means more than or equal to; " <" means Tess than or equal to. 2 Glazing trade -offs may be made if the Option U -value requirement is not exceeded. PLAN REVIEW (for official use only) Selected Option is appropriate for this dwelling design. ❑ YES ❑ NO Option may be a better choice. Notes: Approved by: Date: ENRGYCOD.DOC 2/13/97 .n.,,x•�x..raaw - e...e.eitke.wa..:e,We w_,.ctw. ee uel.e.e n:..r..m•cmr.e..vawavena -mt rtemo<.v.•xreuvei. a 4aNewree ,001 '41 cteNIZIE) ... CILPTER 6, PRESCRIPTIVE ONIONS FOR ALL "R" OCCUPANCIES, CLIMATE ZONE I X Exhaust ventilation sha I be provided for each dwelling unit as follows (S. 302): LOCATION MINIMUM AT .25 W.G. MFR. /MODEL FAN LABEL CFM (.1 W.G.) KITCHEN FAN 100 CFM _yn 0 /O6 BATHROOM FAN 50 CFM ,`N) T ajde,„ iva `i 50 BATHROOM FAN 50 CFM 6104.5_444 � hi) 50 CFM „z,q ii _ii BATHROOM FAN LAUNDRY FAN 50 CFM g6 - v a» 0 Xi WHOLE HOUSE FAN* 0 50 CFM (1 -2 BEDROOMS) (CHOOSE OOSE ONE) O 80 CFM (3 BEDROOMS) kid £ ( 'f ) 100 CFM (4 BEDROOMS) g ezv h ! em i n *Whole house fan also serves as a kitchen or bath spot fan: ,'YES 0 NO If a spot fan is designated as a whole house fan, the capacity shall be the larger CFM requirement. ❑ Whole house fan: Location attic fan is closer than 4' to O Whole house fan is listed O Whole house fan wiring O Whole house fan shall UpJv -F 044 c rt Sone rating (< 1.5 if ceiling) /labeled "for Continuous use.” for control routed to central location. run continuously: Kitchen rate 25CFM, bath & laundry rate 20CFM. ❑ Integrated forced -air furnace ventilation (IAC Code S. 303.1.2(b)) shall be used instead of a whole house fan and fresh air inlets in the bedrooms: 0 YES 0 NO O If yes, a 6" outside air inlet duct with damper limiting the ventilation rate to .35 -.5 ACH, shall run from the building exterior to the furnace return plenum. ❑ Mechanical ventilation fan ducts shall be > 4" and properly sized using IAQC, Table 3 -3. ❑ Fresh air shall be provided for each unit as follows: (IAQ Code, S. 302.6.1): O Each bedroom: Tested, screened, controllable, through -wall port (> 4 sq. in.) to the exterior. O Overall living area: One wall port as specified for bedrooms. O •• P2 Central forced air furnace which delivers outside makeup air through the ducting system. CITY of TUKWILA Permit Center 6300 Southcenter Boulevard, Suite 100, Tukwila, WA 98188 Telephone: (206) 431 -3670 H -15 ACTIVITY #: `�� _ 003 MINIMUM VENTILATION REQUIREMENTS FOR RESIDENTIAL OCCUPANCIES FOUR STORIES AND LESS Chapter 51 -13 W.A.C. Source specific and whole house ventilation systems are required for residential occupancies. In addition, exhaust ventilation fans must provide specific performance ratings and (in the case of the whole house fan) specific "Sone" ratings. Fill in the exhaust fan schedule below with the fan manufacturer's name, model number and performance rating. Secondly, check the criteria that applies to your design. ENRGYCOD.DOC 2/13/97 1S 9 33' V r�- S. 133ERSt- Il'.srf!,t. MA 1w/1 C SAWe4 MALI 11 Loy C Rr -1= lies rid /1O US (3z /5) ARA. C 4c. I I Lor 'FASEN+G'/T CA.ccE5.5/ E:><I S n..16 /Ywr"uSF.. q L= L'AAtI 3r1$ S ., • •x/sr/N4 2 7 7 SS 98' FE AT. 3)' IEtt r1T I . I ; I DowdsPD4r D'41A1s, '/ "N YC. I � 1 � i•onrNr4 JR4uJ1� �1 1 -, I. . _. _0/ wA.E'ED ft 44„;40,,c fit 1(41.::71! cII • , r,,I1 '1 ! I Exist I 1 tz sac ��•- Cr 7100 WA'1fR. LINE, I'MKntnS INsr•ALIRo LY wnto ; C ►o Ail,/ sap. 6rW,d W 17t AND SwIL) -20' Sion srwe( SM.s PR it VALVtB GAS, Poo E ti Co cs S PL. IN• APPROVED PER PUBLIC WORKS I.'i TER DATED /5 /997 70 F.N. (sr RI!/KLa Rs. RgG eat: F.L) SITE PLAN SC Lfr / 1 = ZO' O LDRAV/A6E : L 0 ® _A4of' / 12.4,4 Th wi_ AKF4 77)7A L. /i•`E* Snotw, pRA +4 IJSL /•WIt fl M R I At. »a 3tiuo( VV+D I. AS (c e Tv( GR. �-- L7RwiwAy g" /7 /I'PAVtA�L'Af ✓NAuiroN OZ,4 U.r 4R41/24 SNaw &DE. , 6., co .1,04 Pt- �J' 9aikEIVED CITY OF TUKWILA APR 3 01997 PERMIT CENTER /zooid , /&oa /,7844 1,9844' .2, 984 z, $yog 1 D, A1,/ y' ADS DETAI WASMMC wcl` PVC rot icier foortlt4 DRA1d CM NRcifrM)9 EASEmEdr °GyBs A CCESr 4IIKWIIA APPROVED MAY 1 6 1997 \ AS NOTED / Sr c Tor: v r — :•� —' BUILDI U DIVISION DS N .r /D/.. Y .. d: • A :..L LIor lb� s a rt ct< cA,✓ OLYMPIC DEVELOPMENT 22725 9151 Way S. 11F302 Kent, WA 09031 L. nql -0031 1.. r r These plans have been reviewed by the Public Works Department for conformance with current City stn Acceptance is subject to errors and c-1 . which do not author& viol k:71 of adop` ...+dards or ordinances. for ii.o ;....iequacy of the design ren•<.: ';► vith the designer. Additions, deletions or r6•1; to these drawings after this date will vc.+rl this acceptance and will require a resubrni;tal of revised drawings for subsequent approval. Final or is subject to field inspection by the Works utilities iDspector. Date: KM. t X By' ,� 'lam- ca./ M7-0O51 ti MDT Engineering Lateral Analysis Wind Loads: 0 - 15' 15 - 30' V=ZICW Rw Basic Wind Speed = 80 MPH Exposure "B" Ce = 0.62 Ce = 0.76 Cq = 1.3 Qs = 16.4 PSF I = 1.0 WL=CeCqQs1 0 - 15' WL = 0.62 x 1.3 x 16.4 x 1.0 = 13.2 PSF 15 - 30' WL= 0.76 x 1.3 x 16.4x 1.0 = 16.2 PSF Vri /kJ r7 /O. 4 /5. -C V"9/ Seismic Loads: Seismic Zone 3 Z=0.30 I= 1.0 C = 2.75 Rw = 6 V = 0.30 x 1.0 x 2.75W = 0.1375W 6 1L: 12.6/9P 14AcLe ()C.C. rtta- 60) 1 ,4kao, -L4t- vv,) /// 00APTP-045 Consulting Structural Engineers 29413 55th Ave. S. Auburn, WA 98001 (206) 946-8810 RECEIVED CITY OF TUKWILA FEB 1 0 1997 PERMIT CENTER ; -ri n m R1 a CO 0 m ow.. - np CO LS 0 SW # TRIB. AREA TOTAL SHEAR LENGTH OF WALL SHEAR PER FOOT SW TYPE (I) C, 4i,')(/ , ' ' �Co � 7 # x� 1 ;2'2'P[C 1!A (Z )1 ' / 1 r't - F /A CV IA (4 .i., ?(l (p �-) l `7(i 2# , I -7 -t- / l , 2S" -► /c2, 9l 4- 4 , (7 - ' 6 /A L .44.4 + 1,gZ+Pi, 4 ',J ( ) 9. a) y214 - - 'Z' ' gCa f lA ( I l , (q)Z1 '2)+ 0Y- - ,52 /W ' / 79 r = :t. / 80 (I 1.5 -+-/0) (y 1 „ 9� /2. . . . ,24,61- S T l (q pZ., to 4-1 # '2.7 +6o = ' /4 I 1 (y)(I-+- 7 6 ) e, (4)(I; rv» 1702 '2- / 2 ,03- 44.6)-I-- ,a: *' 4.4-,65-1- = 0 2S ' Mi r'L>✓ IA ‘,4 I ''')) �� ,r,- i - /o - D6 , -� x'2' 1to , ' l'?j7PC lP l0 /O )/e) -# , 24-4-, 44,607 + +7 lS' .a lam log nCcCivCD CITY OF TUK VILA L MDT Engineering Description: Consulting Structural Engineers 29413 55th Ave. S. Auburn, WA 98001 (206) 946-8810 B 1 01997 PERMIT CENTER • : • . s . 31 7. \) Ov 1= 410 17 pLr 4/0 .OF ,t ic 1/1-1 eoie: RECEIVED CITY OF TUKWILA FEB 1 0 1997 PERMIT CENTER 4.60 071 444 Gv RECEIVED CITY OF TUKWILA FEB 1 0 1997 PERMIT CENTER STRUCTURAL NOTES CODES AND SPECIFICATIONS 1. Uniform Building Code - 1994 Edition 2. ACI 318 -83 Building Code Requirements for Reinforced Concrete 3. HILTI Fastening Technical Guide 4. Western Products Use Book 5. Simpson Strong Tie Connectors Catalog - 1995 DESIGN CRITERIA 1. Wind Load - per Uniform Building Code Exposure B, Method 2, Basic Wind Speed = 80 MPH 2. Seismic - per Uniform Building Code Zone 3, I= 1.0 3. Roof Load - DL = 15 PSF LL = 25 PSF 4. Floor Load - DL = 10 PSF LL = 40 PSF 5. Deck Load - DL = 10 PSF LL = 40 PSF 6. Soils - Assumed 2000 PSF Allowable Soil Bearing - Assumed 30 PCF Equivalent Fluid Pressure for Retaining Wall Design 7. Concrete - 2500 PSI @ 28 days - Grade 40 reinforcement - minimum 3" cover for all reinforcement except as noted at.... retaining walls or other details 8. Mortar - Type S TIMBER CONSTRUCTION NOTES 1. Lumber grades and allowable stresses shall be as follows unless noted otherwise on plan: Glulam beams 24F -V4 Fb =2400 psi 1 3/4" Micro =lams E =1800 ksi Fb =2600 psi 2 11/16" Parallams E =2100 ksi Fb =3100 psi 3 1/2, 51/4 & 7" Parallams E =2000 ksi Fb =2900 psi 2. When top plate is interrupted by header, header shall have strap connectors to the top plate each end. Use 2 - Simpson MSTA24 connectors, UNO. 3. All shear wall sheathing nails and anchors shall be as detailed on the drawings and as noted in the shear wall schedule. All exterior walls shall be considered shear walls. Use 7/16" min. APA Rated Sheathing - blocked - with minimum nailing 8d common @ 6" oc, UNO. 8d common nails shall be 0.131" 0 x 2 1/4" minimum. 4. Floor and roof diaphragm nailing shall be 8d common @ 6 "oc at all supported panel edges and 8d @ 12 "oc at intermediate supports. SOIL CONSTRUCTION NOTES 1. All footings and slabs shall bear on undisturbed soil or fill compacted to 95% Modified Proctor. 2. Assumed allowable soil bearing pressure = 2000 psf. GENERAL CONSTRUCTION NOTES 1. Contractor shall verify all dimensions in the field. Any variations from the drawings shall be brought to the attention of the Designer or Engineer. 2. Adequate shoring and bracing of all structural members during construction sII gEIVED be provided. Any proposed field changes to have the prior approval of Engine. TUKWILA FEB 101997 PERMIT CENTER T.. MARK L SHEATHING FASTENER SPACING ALL EDGES BOTTOM PLATE NAILING OR ANCHOR BOLTS FRAMING ANCHORS (NOTES: 7j) ALLOWABLE SHEAR NOTES /), 7/16" MIN APA RATED SHEATHING OR APA RATED SIDING 303 8d @ 6" oc OR 15 GA. © 5" oc 18d © 8 "oc OR 1/2" 0 A.B. c 8' -0 "oc A34 t 2' -4 "oc 130 PLF J 5, 2 7/16" MIN APA RATED SHEATHING OR APA RATED SIDING 303 8d @ 6" oc OR 15 GA. t 5" oc 16d @ 6 "oc or 1/2" 6 AB © 3' -4 "oc or 5/8" 0 AB © 5 =0 "oc A34 t16 "oc or A35 © 18 "oc 230 PLF 5, 2 2 7/16" MIN APA RATED SHEATHING OR APA RATED SIDING 303 8d @ 4" oc OR 15 GA. © 3" oc 2 -led @ 8 "oc or 1/2" 0 AB @ 2' -2 "oc or 5/8" 0 AB © 3' -4 "oc A34 © 10 "oc or A35 c 12 "oc 353 PLF 2 3 7/16" MIN APA RATED SHEATHING OR APA RATED SIDING 303 8d @ 3" oc OR 15 GA. @ 2 1/2" oc 2 -16d c 6 "oc or 1/2" 0 AB © 1' -9 "oc or 5/8" o3 AB Q 2' -8 "oc A34 © 8 "oc or A35 t 10 "oc 451 PLF 4, 2 4 7/16" MIN APA RATED SHEATHING OR APA RATED SIDING 303 10d LID 3" oc OR 15 GA. (2 oc 5d COOLER OR GWB © 4" oc 2 -16d 0 5 "oc or 1/2" fb AB ( � 1' -4 "oc o 5/8" 0.AB a 2' -2 "oc 2 -18d @ 6 "oc or 1/2" 0 AB c 3' -0 "oc or 5/8" 0 AB © 4' -10 "oc A34 © 6 "oc or A35 @ 8 "oc A34 @ 14 "oc or A35 c 18 "oc 545 PLF 250 PLF ' 2, 9 3 1/2" GWB BOTH SIDES I88 1/2" GWB ON INSIDE FACE ONLY 5d COOLER OR GWB © 4" oc 16d © 8 "oc or 1/2" 0 AB © 6' -0 "oc A34 © 2' -4 "oc 125 PLF 3 7 7/16" MIN APA RATED SHEATHING BOTH SIDES 8d © 3" oc . OR 15 GA. a 2 1/2" oc 2 -16d @ 3 "oc or 5/8" 0 AB (ID 1' -4 "oc A35 @ 6 "oc 902 PLF 6, 2 88 1/2" GWB BOTH SIDES 5d COOLER OR GWB © 4" oc 2 -led © 8 "oc or 1/2" 0 AB @ 2' -8 "oc or 5/6" 0 AB © 4' -0 "oc A34 © 12 "oc or A35 © 14 "oc 300 PLF 3 NOTES: 1. ALL FASTENERS SHALL MEET THE FOLLOWING CRITERIA: 8D COMMON = 0.131" 0 X 2 1/4" MIN. . 10D COMMON = 0.148" $ X 2 1/2" MIN. 16D COMMON = 0.167" 45 X 3 1/2" MIN. 5D COOLER = 0.086" 0 5(1 MIN. 5D GWB = 0.092" 0 X 1 3/4" MIN. 15 GA. STAPLE= 0.072" 0 X 1 1/2" MIN. 2. ALL APA RATED SHEATHING AND SIDING PANEL EDGES SHALL BE BACKED WITH 2 INCH NOMINAL OR WIDER FRAMING AND FASTENED PER THE SCHEDULE ABOVE. PANELS MAY BE INSTALLED EITHER HORIZONTALLY OR VERTICALLY. SPACE NAILS AT 12 "OC OR STAPLES AT 10 "OC ALONG INTERMEDIATE FRAMING MEMBERS. 3. ALL GWB SHEATHING ON DESIGNATED SHEARWALLS SHALL BE BACKED WITH 2 INCH NOMINAL OR WIDER FRAMING AND F TENED P THE SCHEDULE ABOVE AT ALL STUDS, TOP AND BOTTOM PLATES AND BLOCKING. AT SHEARWALL TYPE 5 AND 6 ,THE BLOCKING AT THE HORIZONTAL PANEL EDGES AT THE INTERIOR PORTION OF THE SHEA ALL IS N REQUIRED. NOTE THAT THE FASTENING AT ALL STUDS AND TOP AND BOTTOM PLATES IS STILL REQUIRED. 4. WHEN SHEARWALL IS LESS THAN 28" IN LENGTH, REFER TO LATERAL RESTRAINT PANEL DETAIL 5. PROVIDE 7/16" MIN. APA RATED SHEATHING (PLYWOOD OR O ) OR APA RATED SIDING 303 OR I R SEAL OSB RATED PANEL SIDING ON ALL EXTERIOR WALLS AND NAIL PER 1 U.N.O. 6. WHERE PANELS ARE APPLIED ON BOTH FACES OF A WALL A NAIL SPACING IS LESS THAN 6 INCHES ON CENTER ON EITHER SIDE, PANEL JOINTS SHALL BE OFFSET TO FALL ON DIFFERENT FRAMING MEMBERS OR FRAMING SHALL BE 3 -INCH NOMINAL OR THICKER AND NAILS ON EACH SIDE SHALL BE STAGGERED. 7. REFER TO TYPICAL SHEARWALL DETAILS FOR LOCATION OF FRAMING ANCHORS. FRAMING ANCHORS ARE NOT REQUIRED AT EXTERIOR SHEAR WALLS AT ROOF. 8. AT INTERIOR SHEARWALLS AT ROOF, REFER TO DTL. 11/ AND 2/S FOR CONSTRUCTION DETAILS. 9. FRAMING AT ADJOINING PANEL EDGES SHALL BE 3" N AL 0 IDER AND NAILS SHALL BE STAGGERED WHERE 10d NAILS ARE SPACED 3" OR LESS ON CENTER. S "EARWALL SCHEDULF RECEIVED CITY OF TUKWILA FEB 1 0 1997 PERMIT CENTER , ' 2 1 • . BOTTOM PL NAILING PER SW SCHEDULE 2-2x STUDS SIMPSON HPAHD22 HOLDDOWN. FILL ALL NAILHOLES W/ I6d NAILS. SHEET NO. EDGE NAILING 9 BOT. PL 4 SILL PL. 10 .■ii -HI FOOTING DIMENSIONS OTHER FDN. SECTIONS Tr©ICAL S1 EARWALL DETAIL FOUNDATION WALL MDT Engineering Cuuaulling Structural Enginu"ra 2041:1 15M I Ave. S. Auburn, WA UDUDI 1111'111:1.1.5 D. TIIOAII'SON, 1'.k). 1200) 0411- 1111111 Kugialul•od I'rafoaaiu"ul Engineer • ANCHOR EOLTS PER SHEAR WALL SCHEDULE. z RECEIVED CITY OF TUKWILA FEB 1 01997 PERMIT CENTER FACE OF CONCRETE ' CORNER • •I• I 1/2" - MIN. • COPT RIGHT 1995 MDT Engineering J"II NO. DRAWN Dc:c:Ucc ;M SHEET NO. USE TOP PL NAILING PER SW SCHEDULE EDGE NAILING PER SW SCHEDULE. SHEATHING PER PLAN 4 SW SCHEDULE. . . „ B , • • MDT Engineering Consulting Structural Engineers 29113 65th Ave. S. Auburn. WA 00001 MICHELLE IL THOMPSON, P.E. (208) 040-8810 Registered Professional Engineer SIMPSON FRAMING ANCHOR PER SW SCHEDULE. RECEIVED CITY OF TUKWILA FEB 1 0 1997 PERMIT CENTER rrFICAL INTERIOR 51-1E412WALL DETAIL W/ NO SHEA1RWALL AE3OVE COPYRIGHT 1995 MDT Engineering JOU NO. DATE ClIFCERO M.P.T. SCAI I: I": DRAWN IJN:ATION DocUcoM 2x STUDS. BOTTOM PL NAILING PER SW SCHEDULE SHEATHING . PER PLAN - 4 SW SCHEDULE. GWB PER PLAN EDGE NAILING a BOT. FL, RIM JOIST 4 TOP PL. SIMPSON STRAP' PER PLAN. CENTER ON RIM JOIST. AT INTERIOR WALL SLOT PLYWOOD. TYPICAL S1-4EARUJALL DETAIL LU/ WALL BELOW SIIEET NO. • MDT Engineering Consulting Strut:11'nd Essg ne seti 20.11 :1 551 Ave. S. Auburn, WA 90001 IIIC1IEI1E D. '11I0NI'SON, P.E. (201t) tl•itt— itltIt) Hugh tuned I'rufoodouul Eurhlout• SIMPSON FRAMING ANCHOR PER SW SCHEDULE. RECEIVED CITY OF TUKWILA FEB 1 01997 PERMIT CENTER COPY RIGHT 1995 MDT Engineering DID No. SCALE I :I DRAWN LOCATION DocUcoM DATE 1'IICt3431 M.D.T. 3 2 NIIEET ND. NAIL SHEATHING TO HEADER 0 3 " O.G. E.W. APA RATED SHEATHING --� 3/8" MIN. 24/0 EXP. I (2) 2x STUDS. NAIL r SHEATHINGTO EACH STUD 2x4 TOP PLATE HEADER cl DETAIL l I' MDT Engineering ►IICIIgLI.E P. TIIAAIPSUN, P.E. Registered Professional Engineer 4 •-1 L._ -- !.—I SIMPSON HPAHD22 1.)./l/.(7 7/ J RAU'S till II I c -411 IIII — E =_tI_ =x"41 - 1 1 1 1 sN It If CL{2, 11 ' 1 I I 11 a +lI • I U • . v + U • • 4 LATE1 AL RESTRAINT FANEL Consulting Structural Engineers 20413 55th Ave. S. Auburn. WA 9111111 (2011) U10 -8010 24" MIN. OR 16" MIN. (2) 2x PLATE NAIL SHEATHING TO EACH PLATE (3) 2x PLATE e Iro' WIDE PANELS. 0 GAUGE STAPLES OR 8 PENNEY NAILS a 3" O.C. ALL PLATES, HEADERS AND STUDS. (2) 2x4 BLOCKING a ANY PLYWOOD JOINTS. I /2 "dia. ANCHOR BOLTS 1" MIN. EMBEDMENT RECEIVED CITY OF TUKWILA FEB 1 01997 PERMIT CENTER COPYRIGHT 1995 MDT Engineering JON NO. C111Y Af.D M.D.T. PArr SCALE NTS 1)1140'• - ^ LOCATION DocUc 11 r- PART A: (TO BE COMPLETED BY APPLICANT) 1. Owner Name /Address /Phone: i)AR y L 1 AP (0 ) 1?N?• c i Agent or Contact Person /Name /Phone: cSa) /33 C 3 Al" 2. This certificate is submitted as part of an application for: 1'1) Owner /Agent's Signature: 3 X >c40 PROJECT# D—17 - 003 / CERTIFICATE OF WATER AVAILABILITY, sgeS -184' £AJ A y S 0- 02_ Site Address (Attach map and legal description showing hydrant location & size of main): -1 3 5 3 kc> i f'c W,q Residential Building Permit Cl Preliminary Plat ❑ Short Subdivision ❑ Commercial /Industrial Building Permit . ❑ Rezone Cl. Other: 3.•• • Estimated number'ofshrvice'connections and meter size(s): ( � x C� 4. Vehicular distance from nearest hydrant to therear of the furthest structure: ft. 5. Minimum needs of development for fire flows: gpm at a residual pressure of 20 psi. Source of minimum flow requirement: ❑ Fire Marshal ❑ Developer's Engineer ❑ City ❑ Insurance Underwriter El Utility ❑ Other 6. Area is served by: (utility) Date: RE EIVED (Reverse side to be completed by water utility and governing jurisdictiMY OF TUKWILA FEB 1 0 199 / 06/94 PERMIT CENTER i t'.4Pda. . SVIO MI'a'O,:J' \' f,' ri: 4:[ t. GSU'f= fl:.1'L`Rii'n ^w"44{itl.4tt: C.aC W w1 4 , i4m7 h C ;ART i3: (TO BE COMPLETED BY WATER UTILITY) . 1: This_proposed is located within .f t4474 4, k Abr ow n ,,, "*No.axt N."WV3'�,91:Att'� ^S. (City /Coun LA. 1 I4 2. Improvements required to upgrade the water system to bring it into compliance with the utilities' comprehensive plan or to meet the minimum flow requirementsloc_,he •:project before .connection: 3. Based upon the improvements listed above, water can be provided and will be available at the site with a residual pressure of -20 psi at gpm for a duration of Z hours at a velocity of fps as documented by the attached calculations. I hereby certify that the above. information is true and correct. / l 61. -k`/ `,�,1 feCR'..K .n (Si / l (v_.� -( .l KZ l 2 - 7 ".77 y /P ho ne•f '•.. : : 6,67 B Date PART C: (TO BE COMPLETED BY•GOVERNING JURISDICTION) 1. Water Availability - Check one: D Acceptable service can be provided to this project. X) Acceptable service cannot be provided to this project unless the improvements listed in Item #C2 are met. D System is not capable of providing service to this project. 2. Minimum water system improvements: (At least equal to B2 above) . — *S'er v, .;4G T �'✓ Gtr. ,,c..77c✓ .' Itaviowl Van, . em u J2' )4 7 //-%47. AgencyyPhone ' By Date Strand Associates PHONE NO : 206 +725 5490 Jan. 17 1997 10:28AM P02 Order No. '/' 74 O;i_,_ Plat: Vol Page Page 2of2 uar0 17. 1997 10:44:25 ': LEEDAR ENTERPRISES THWESTERN ITL �� A MinMpp Nt• Componp 1201 Third Ave., Suite 1410 Semis: Washington Se101 9095 2081025.1952 sw o ►�w� ,.; d>� SEA; 1— i 4 flimwwrinw. 1,1 nu1t,hM nrnmmnr mint � aw nra 1. �a A fu1 ligot A g a , 4 40 e 1 16 0 1 ' FROM : LEEDAR ENTERPRISES • • January 17, 1997 10:44:25C1 Strand Associates PHONE NO. 206 +725 5490 Jan. 17 1997 10:26AM P01 , EXHIBIT "A" PARCEL A: That portion of the Southwest quarter of the Northwest quarter of Section 15, Township 23 North, Range 4 East, W.M., in King County, Washington, described as follows: BEGINNING at the West quarter section corner of said Section 15; thence North 0 01' 04" East along the West line of said Section 15, a distance of 673.57 feet; thence North 89° 59' East 112.00 feet to the true point of beginning; thence continuing North 89 59' East 98.00 feet; thence North 0° 01' 04 ",East 75.00 feet; thence South 89° 59' West 98.00 feet; thence South(0 01' 04" West 75.00 feet to the true point of beginning, \S, C ti r•itir PARCEL E: That portion of the Southwest quarter of the Northwest quarter of Section 15, Township 23 North, Range 4 East, W.M., in King County, Washington, described as follows: BEGINNING at the West quarter section corner of'said Section 15; thence North n° 01' 04" East along the West line of said Section 15, a distance of 673.57 feet; thence 89° 59' East 210.00 feet to the true point of beginning; thence continuing North 89° 59' East 98,30 feet; thence NiemIll 6 18' 45" West 75,00 feet; thence South 89 59' West 50.00 feet; thence Jor.th 21 35' West 32.26 feet; thence South 89° S9' VIII 35.99 feet; thence South 0° 01' 04' West 105.00 feet to the true point ET Beginning. PARCEL C: That portion of the Southwest quarter of the Northwest quarter Sectio 15, Township 23 North, Range 4 East, W.M., and vacated South 132nd described as follows: BEGINNING at the West quarter of Section corner of said Section 15; thence North 0° 01' 04" East along West line of said Section 15; a distance of 748.57 feet; thence 89° 59' East 312 feet to the true point of beginning; thence N.or.th 0 91' 04" East._19.6.0 feet to the North line of vacated portion of South 132nd Street; thence along sa: North line North 88° 15' 04" East 6 at; thence South 41° 58' feet East L1,.44 feet; thence SWith' 21° '3 East 171.6 fee't; thence South 89° 50' Itest 5�J9 feet; hence South 0° 01' 04" iY/5S.,10 feet; thence South 89° 59' West 98 feet to the true point of beginning, END OF EXHIBIT "A" NORTHWESTERN TITLE A M'iwe.a Tub ComA n' Page 1 of 2 ❑ .:CERTIFICATE OF SEWER AVAILABILITY ❑ CERTIFICATE OF SEWER NON- AVAILABILITY O Building Permit ❑ Preliminary Plat or PUD ❑ Short Subdivision ❑ Rezone or Other Proposed Use: O Residential S.F. ❑ MulitFamily ❑ Commercial ❑ Other APPLICANTS NAME _L )ARYL.. PROPERTY ADDRESS OR APPROXIMATE LOCATION Sig 1} I V'b LEGAL DESCRIPTION (rii) 3z xk LDT.g Dcn -0039 3z& S. /4 6 (Z c, $) x.31 S 133s4 (Attach map & legal description if necessary) ++++++++++++++++++++++++++++++++++ + + + + + + + + + + + + + + + + + + + + + + + + + + + + + ++ SEWER ��AAGENCY INFORMATION 1. a.L S ewer service will be provided by side sewer connection only to an existing 69 size sewer I'7 O feet from the site and the sewer system has the capacity to serve the proposed use. OR — b.1_ 1 S wer service will require an improvement to the sewer system of: �� (1) feet of sewer trunk or lateral to reach the site; and /or 0 (2) the construction of a collection system on the -- 11 site; and /or III (3) other (describe) 2. (Must be completed if 1.b above is checked) a.l I The sewer system improvement is in conformance with a County approved sewer comprehensive plan. OR b. I . The sewer system improvement will require a sewer comprehensive plan amendment. 3. a.1 The proposed project is within the corporate limits of the district, or has been granted Boundary Review Board approval for extension of service outside the district or city. OR b. Annexation or BRB approval will be necessary to provide service. 4. Service is subject to the following: a. District Connection Charges due prior to connection: GFC . LFC: /5 UNIT TOTAL )950• - (Subject to change on January 1st) METRO Capacity Charge $750 billed by METRO after connection to sewer system. b. Easement(s): 1 / //'' Required ^ Maybe Required c. Other: GR4Vi77ry S6a206,67 I1�4YRE2 A PRosi_e7,0 I hereby certify that the above sewer agency information is true. This certification shall be valid for one year from date f signature. RECE CITY OF TUKWILA VAL VUE SEWER DIST ICT FEB 1 0 1997 / — 2/-- 97 Manager, T. J. Matelich or Date PERMIT CENTS ) DECLARATION OF EASEMENT KNOW ALL MEN BY THESE PRESENTS that we, the undersgned, owners in fee simple of the lands herein described as Parcel A and Parcel B and Parcel C, do desire to create an easement for the purpose of ingress and egress and utility installation and maintenance for Parcels A and B and any other parcel which may be created therefrom. Description of Parcel 4. That portion of the Southwest quarter of the Northwest quarter of Section 15, Township 23 North, Range 4 East, W.M., in King County,. Washington, desctived as follows: Beginning at the West Quarter section corner of said Section 15; than North 0 degrees 01 minutes 04 seconds East along the West line of said Section 15, a distance of 673.57 feet; thence North 89 degrees 59 minutes East 112.00 feet to the true point of beginning; thence continuing North 89 degrees 59 minutes East 98 feet.; thcrse north 0 degrees 01 minutes 04 seconds east 75.00 feet; thense South 89 degrees 59 munites West 98.00 feet; thence South 0 degrees 01 minutes 04 seconds West 75.00 feet to the true point of beginning. Illustration per Exhibit t A. PmSr -'i p t i np o' That portion of the Southwest quarter of the Northwest quarter of' Section 15, Township 23 North, Range 4 East, W.M., in King County, Washington, described as follows: Beginning at the West quarter section corner of said Section 15; thence North 0 degrees 01 minutes 04 seconds East along the West line of said Section 15, a distance of 673.57 feet; thence North 89 degrees 59 minutes East 210.00 feet to the true point of beginning; then continuing North 89 degrees 59 minutes Est 98.30 feet; thence north 0 degrees 18 minutes 45 seconds West 75.00 feet; • thence South 89 degrees 59 minutes -West 50.00 feet; thence North 21 degrees 35 minutes West 32.26 feet; thence South 89 degrees 59 minutes West 35.99 feet.; thence South 0 degrees 01 minutes 04 seconds West 105.00 feet to the true point of beginning. Illustration per Exhibit A. i • 0 • • • • • C._Lt 44.- I.oeccGt sr / . - -' 0t E.asment. Page 1 of 3 Post-It Fax Note 7671 on" z- • 9 71141$ 4 From Bum/ bpiht9 L. -roc.° Co/Dept.. CLI an/ r AhX5 PPIDne1- CaP - .5 t i 11 Phone N Fax • /3 j _..• 4 6 7 ,- Fax 41 Cf tr) IL • o I- 111 RPCI 152304930406 FERNAU DARYI_ 3215 S 133RD SEATTLE WA LOTI15-2304 BLOCKI9304 RY OY ST Sc NC LEVY OM-LV 98 T 2413 97 T 2413 TH N 0-18-45 W 75 FT TH N 21-35-00 W 32,26 FT TH S 0-01-04 W 105 FT RF'CI 152304930406 DOC:I-000232 02/08/97 SEGREGATION/ME ST:CURNT ACTIVE 719800 PORTION OF SW 1/4 OF NW 1/4 - 02/10/97 BEGIN SW CORNER 1. 98168 TH N 0-01-04 E 673.57 FT TH N 89-59-00 E 210 FT LAST LEGAL TO POINT OF BEGINNING IS 12 TH N. 89-59-00 E 98.30 FT LAND IMPS BILLED PAID P A 22r100 .00 .00 22,100 337.25 .00 F TOTAL DUE: TH S 89-59-00 W 50 FT TH S 89-59-00 W 35.99 FT TO FOB JUMP CODE1 -------- A987 337.25 T• �. ?„ J1.87 io 4 5 131.28 C - 0 `, a) < 'V 1.° � o i0 7.9 1'1 it 1 n A N r." 01 OZO� o 90,17 � ' ci v '' ti v `0,0 bp,P 18 eG p O �� 2 ., 0�0 „ ? • JO 4 •. 02/10/1997 16:25 2062960106 a e 100 m 100 DEPT OF ASSESSMENT. 11•••• 13.x.' .. 665; 1 `41360 �I 889• d•!W 98 0 h 98 278.20 70 to 70 l) /79.74 70 98.30 KCSP 11 8003180801 Z N W m l 0 CO el 69 •54 - 3OW 60.05 PAGE 04 /24 th ca � rs I e 60 \/.114.t< f� /94,04 I i t 4 Its /09.04. 121.07 1 1 7 0 CITY OF. TUKWILA Id: ASSR100M Keyword: UACT. User: 1671 02/10/97 Parcel General Information Maintenance 6888888888888888888888888 888888888888888888888888888888888888888888888888888888£ a General Parcel Data Maint - Action: Update Record a iiaaaadaadadagagagadadaaadaaaaaaaaaaaaaaaaaaaaaaaaaaaaagaaaaaaaaaaaaaaaaaaaaaaaag BOOK/PG/LT: 324W a Parcel No: 152304 a a Status: A Active Retired(Y/N): N Street Address: Dir: St: Situs Location: 32 AV S & S 133 ST, TAX LOT 74 CI Legal Desc 152304 74 a Acres: .00 a X - COORD: a Y-COORD: a Tax Rate Area a Assr Use Code : 9000 Assessed/Exempt: a Pub Owned(Y/N) : N a Primary Owner: FERNAU DARYL Phone: (206)000-0000 a a Mailing Addr: 3215 S 133RD a SEATTLE WA a Zip: 98168 a a Contract Owner: Percent/Ownership: .00 a A <F7>Write Record, <F2>Allow Fractions, <ESC>Cancel a a a 'City: a a. a a . £.��..:;?:.,, r,. *1"' ., :'[r;;ir• ,. : Xr; +i: ^,n=' ^v t` aT.. ^i ^, .irxr+ar :K . N'Y. 't. d , ix•:; 3 `vf;„. '"N e� ,. F . , ?ii:.' {:YtxC �is+� ?� . .... y, ._€i` '.: , w ='r� ,•,. .�,r . . ,�! , c. 4 tie DECLARATION OF EASEMENT KNOW ALL MEN BY TUESE PRESENTS that we, the undersgned, owners in fee simple of the•lands herein described as Parcel A and Parcel B and - Parcel C, do desire to create an easement= for the purpose of ingres and egress and utility installation and maintenance for Parcels A and B and any other parcel which may be created therefrom. PFserintion of Parcel A� That portion of the Southwest quarter of the Northwest quarter of Section 15, Township 23 North, Range 4 East, W.H., in King County. Washington, desc:t.ived as follows: Beginning at the West Quarter section corner of said Section 15; then North 0 degrees 01 minutes 04 seconds East along the West line of said Section 15, a distance of 673.57 feet; thence North 89 degrees 59 minutes East 112.00 feet .t.o the true point, of beginning; thence continuing North 89 degrees 59 minutes East 98 feet; thence north 0 degrees 01 minutes 04 seconds east 75.00 feet; t South 89 degrees 59 munitcs West 98.(X) feet.; thence Sout.ti 0 degrees 01 minutes 04 seconds West 75.00 feet to the true point of beginning. Desrrintinn of Parrrl T3_ That portion of the Southwest quarter of the Northwest quarter of Section 15. Township 23 North, Range 4 East, W.H., in King County, Washington, described as follows: Beginning at t.lrc: West quarter section corner of said Section 15; thence North O degrees 01 minutes 04 seconds last, along the West line of said Sectipn 15. a distance of 673.57 feet; thence North 89 degrees 59 minutes East 210.00 feet to the true point of beginning; t hen continuing North 89 degrees 5'; minutes East e8.30 feet; thence north 0 degrees 13 minutes 45 seconds West 75.00 feet; thence South •89 degrees 59 minutes West 50.00 feet: thence North 21 degrees 35 minutes West 32.26 feet ; thence South 89 degrees 59 m i rtu les W '.' t 3 5 .'x') Evil!: thence :; t h l) degrees 01 minutes 04 seconds West. 105.(X) feet to the true poina . of heginoing. Decrription of Parrpl C • • That portion of the Southwest :quarter of the Northwest QAuarter of Section 15, Township 23 North, Range 4 East, X.H., in King County, Washinton and vacated South 132nd descrived as follows: Beginning at the West quarter of section corner of said Section 15; thence North 0 degrees 01 minutes 04 seconds East along the West line of said Section 15; a distance of 748.57 feet; thence 89 degrees 59 minutes East 112 feet to the true point of beginning; Thence North 0 degrees 91 minutes 04 seconds Ease 196.17 feet to the North line of cavated portion of South 132nd Stree; thence along said North line North 88 degrees 15 minutes 04 seconds East 65.18 Feet; thence South 41 degrees 58 minutes feet East 11.44 Cm t: thence South 21 degrees 35 minutes East 171.65 feet; thence South 89 degrees 59 minutes feet West 35.99 feet; thence South 0 degrees 01 minutes 04 seconds West. 30 feet; thence South 89 degrees 59 minutes feet West 98 feet to true point of beginning. RECEIVED CITY OF TUKWILA APR 3 0 1997 PERMIT CENTER E:J i'agc; 1 of 3 ;...' 5.) 2..8 8CEROETER LARD SURVEYING P. 0. Box 813 Seahurst, WA 98062 (206) 242 -6621 FAX (206) 243 -9679 New Easement Description: That portion of the Southwest Quarter of the Northwest Quarter of Section 15, Township 23 North, Range 4 East N.M., in King County, Washington, and vacated S. 132nd Street described as follows: Beginning at the West Quarter Section corner of said Section 15; Thence N 0 01' 04" E along the West line of said Section 15; a distance 748.51 feet; Thence N 89 59' E 112.00 feet; Thence N 0 01' 04" E 196.17 feet to the North line of vacated portion of S. 132nd Street; Thence along said North line N 88 15' 04" E 43.18 feet to the True Point of Beginning; Thence continuing N 88 15' 04" E 20.00 feet; Thence S 41 58' E 11.44 feet; Thence S 21 35' E 186.65 feet; Thence S 57 53' 02" W 49.02 feet; Thence N 0° 01' 04" E 10.00 feet; Thence S 89 59' W 20.00 feet; • Thence N 33 41' 56" E 36.07 feet; Thence N 0° 01' 04" E 6.31 feet to a point of curvature; Thence on a curve to the left with a radius of 20.00 feet an arc of 31.43 feet; Thence S 89 59' W 43.37 feet; Thence N 0 01' W 20.00 feet; Thence N 89 59' E 27.12 feet to a point of curvature; Thence on a curve to the left with a radius of 20.00 feet an arc of 38.94 feet; Thence N 21 35' W 100.93 feet to the True Point of Beginning. 41•55 NI Seri i o4"E. t1.44 q�vj om • oft oA Nei31_£ / �j =' 4 S9'hT � L.4 R :fie! �3 J 4.11 -- f cy o jso:oo 8.00 .5 59•S9'v4 10 e 1; r G1 .00 • >`1 e9'S9' - l '18.3 0 So.00 8 r 7 S69•Si'of , g 0 7 I:aswt;nt Pa* 2 of 3 This easmcnt is established for•the purpose: of ingress and egress • with responsibilities for the maintenance and repair thereof. . • I t►. i he. Pvent. of repair and /or maintenance work on the said above . dcsc•r i find easement, the owners of Parcel A and Parcel B and any other parcel created /subdivided from Parcel A and /or Parcel B and /or Parcel C sle:ilI have joint mutual and sole responsibiIi?y for the cost of said r•epair and /or maintenance. The basement created shall lx, for the use and benefit of the owners of Parc :el A and Parcel Baud Parcel C plus any other Parcel created/subdivided from any of these existing Parcels. This easement shall be a covement. running with the Iand and shall be binding upon and i mire to he benefit of a I I parties beret o, their heirs, successors and /or assigns. DATK: Owner i 1 and I) and C th:nl:r Parcels A ana B ana•C C F a T t F I' A T I o ,e STATE rlF Washington COUNTY OF King • Daryl A. Fernau and Leonides S. Fernau On this day before me, the undersigned, .. Notary Public: in and for the State of Washington, duly c and sworn, persesrn:elly appeared, to or 1;nown to be the i n d i v i d u a l s described here! n , and who executed • :lie within and foregoing Inn; ruci ::•1 . :c•4oe,wledged the said inst ruae•nt to be t he free and voluntary act and deed of instrument t o he the I rye and voluntary art and deed of them, for thy a '' : and purposes therein n killed, and on Bath state• that THEY are• ant !►m ixed 1') e•x.'•ute t !:e s:: id i . Witness my kind and official seal hep• a :effixe•d the day and yt•:►r :rl,eWe Wr i t leer►. My commission Expires: No ry t!ehl is in and /for the s . Ae r' Wash i ngt on F:►sae'n: I' ir/. 3 cF 3 oT/3 CHICAGO TITLE INSURANCE COMPANY CHICAGO TITLE INSURANCE COMPANY A.L.TA. COMMITMENT SCHEDULE A (Continued) BEGINNING AT THE WEST QUARTER SECTION CORNER OF SAID SECTION 15; THENCE NORTH 00 °01'04" EAST ALONG THE WEST LINE OF SAID SECTION 15, A DISTANCE OF 673.57 FEET; THENCE NORTH 89 °59' EAST 210.00 FEET TO THE TRUE PQINT OF BEGINNING; THENCE CONTINUING NORTH 89 °59' EAST 98.30 FEET; THENCE NORTH 06 °18'45" WEST 75.00 FEET; THENCE SOUTH 89 °59' WEST 50.00 FEET; THENCE NORTH 21 °35' WEST 32.26 FEET; THENCE SOUTH 89 °59' WEST 35.99 FEET; THENCE SOUTH 00 °01'04" WEST 105.00 FEET TO THE TRUE POINT OF BEGINNING; .z�x 457 Order No.: 473860 Your No.: OLYMPIC DEVELOPMENT /FERNAU LEGAL DESCRIPTION EXHIBIT (Paragraph 4 of Schedule A continuation) THAT PORTION OF THE SOUTHWEST QUARTER OF THE NORTHWEST QUARTER OF SECTION 15, TOWNSHIP 23 NORTH, RANGE 4 EAST, WILLAMETTE MERIDIAN, IN KING COUNTY, WASHINGTON, DESCRIBED AS FOLLOWS: TOGETHER WITH AN EASEMENT FOR INGRESS, EGRESS AND UTILITIES AS ESTABLISHED . BY INSTRUMENT RECORDED UNDER RECORDING NUMBER 9701160638; 'EXCEPT PORTION THEREOF. LYING WITHIN THE ABOVE DESCRIBED. MAIN TRACT. • RECEIVED , • CITY OF TUKWILA diesm.6 /1•15. 7 /rlm FEB 101997 PERMIT CENTER £0021 NO.LM:3H 09VOIHD 6T68LL3903 %V. V3:60 Illd L6 /LO /30 ,:, �.,� •, �YiMi� ",_TS`s�'��;tr �SSi. SFr' ij';' �' S�' 33ZY•: JNfrYt 6EtY��L".' e�."• 3'A.a^tt�tL?Na:.:..�= .:1't1� %fti PROJECT NAME COMPLETE COMMENTS • REVIEWERS INITIAL REVIEWERS INITIAL ri eermik can*or C PLAN o � REVIEW /ROUTING LIP ACTIVITY NUMBER DEPARTMENT: UILDING DIVISION ❑ P IC WORKS 21E 5�� 5 - 11 N D97 -0039 4 DETERMINATION OF COMPLETENESS: (T,Th) TUES /THURS ROUTING: PLEASE ROUTE l l NO FURTHER REVIEW REQUIRED ❑ ROUTED BY STAFF I I (If routed by staff, make copy to master file & enter Sierra.) I APPROVALS OR CORRECTIONS: (ten days) APPROVED I I APPROVED W/ CONDITIONS ❑. NOT APPROVED (attach comments) ❑ CORRECTION DETERMINATION: APPROVED ❑ REVIEWERS INITIAL C :ROUTE -F NOT COMPLETE ❑ 14.1:111 APAMV,*.ittlAtiSVP&ViikrAMVATIMTArgiiiViitkit7A TAPIO DARYL — CORRECTION #2 FIRE PREVENTION Dens a J i Q7iQ7 STRUCTURAL ❑ DATE DATE DATE DATE 4/30/97 PLANNING DIIVIISION PERMIT COORDINATOR DUE DATE 5/01/97 NOT APPLICABLE ❑ DUE DATE 5/15/97 DUE DATE APPROVED W/ CONDITIONS ❑ NOT APPROVED (attach comments) ❑ (Ccrtificadon of occupancy required. . 1'. �if7�'.6i:�A•ii�F^i�Ari:'F''Xw� �ui::is,.��y. ACTIVITY NUMBER D97 -0039 PROJECT NAME TAPIO DARYL — CORRECTION #2 DEPARTMENT: BUILDING DIVISION r FIRE PREVENTION E PLANNING DIVISION U PUBLIC WORKS El STRUCTURAL Ej PERMIT COORDINATOR ❑ I DETERMINATION OF COMPLETENESS: (T,Th) COMMENTS • TUES /THURS ROUTING: PLEASE ROUTE fl NO FURTHER REVIEW REQUIRE ROUTED BY STAFF 11 (If routed by staff, make copy to master file & enter Sierra.) REVIEWERS INITIAL APPROVALS OR CORRECTIONS: (ten days) APPROVED n APPROVED WI CONDITIONS E. NOT APPROVED (attach comments) ri REVIEWERS INITIAL CORRECTION DETERMINATION: APPROVED 17 APPROVED W/ CONDITIONS REVIEWERS INITIAL C :ROUTE -F 2S1'+t's %:Y,:CS ,?i'Kt K'stiYki5h iF1 „i ^!7,1 .n s.p i1,t°r 7koo441NuraN x,v r.mrd ol?fm PLAN REVIEW / ROUTING SLIP DATE DATE DATE Vi DATE 4/30/97 DUE DATE 5/01/97 NOT COMPLETE El NOT APPLICAB DUE DATE 5/15/97 DUE DATE NOT APPROVED (attach comments) Q (Cettiftcadoa of occupancy required. ) • • • • • • :'.+ ACTIVITY NUMBER D97 -0039 PROJECT NAME TAPIO DARYL CORRECTION #2 DEPARTMENT: BUILDING DIVISION ❑ FIRE PREVENTION II �❑ STRUCTURAL ❑ PUBLIC WORKS MAY 0 8 1997 COMMUNITY PLAN REVIEW / ROUTING SLIP DEVELOPMENT 4 DETERMINATION OF COMPLETENESS: (T,Th) COMPLETE ❑ COMMENTS TUES /TJJJ RS ROUTING: PLEASE ROUTE - NO FURTHER REVIEW REQUIRED ❑ ROUTED BY STAFF ❑ (If routed by staff, make copy to master file & enter Sierra.) REVIEWERS INITIAL 4)90 t APPROVALS OR CORRECTIONS: (ten days) Q�(����1 DUE DATE 5/15/97 APPROVED -1 APPROVED W/ CONDITIONS 1?3 NOT APPROVED (attach comments) REVIEWERS INITIAL )4i CORRECTION DETERMINATION: APPROVED ❑ APPROVED W/ CONDITIONS DATE NOT COMPLETE ❑ • NOT APPLICABLE ❑ DATE S /j97 5h/c/--7 REVIEWERS INITIAL DATE C:ROUTE -F DATE 4/30/97 PLANNING DIVISION PERMIT COORDINATOR ❑ DUE DATE 5/01/97 DUE DATE NOT APPROVED (attach comments) ❑ (Certification of occupancy rcquircd. ) RECEIVED PROJECT NAME DEPARTMENT: BUILDING DIVISION El PUBLIC WORKS DETERMINATION OF COMPLETENESS: (T,Th) COMPLETE COMMENTS • REVIEWERS INITIAL /U t � APPROVALS OR CORRECTIONS: (ten days) REVIEWERS INITIAL CORRECTION DETERMINATION: REVIEWERS INITIAL C:ROUTE -F N. TAPIO DARYL — CORRECTION #2 NOT COMPLETE FIRE PREVENTION STRUCTURAL Ti DATE DATE PLAN REVIEW / ROUTING SLIP DATE ,.// /4 -7 PLANNING DIVISION PERMIT COORDINATOR Q $ J DUE DATE 5/01/97 NOT APPLICABLE El TUES /THURS ROUTING: PLEASE ROUTE fl NO FURTHER REVIEW REQUIRED k ROUTED BY STAFF El (If routed by staff, make copy to master file & enter Sierra.) I DUE DATE 5/15/97 APPROVED n APPROVED W/ CONDITIONS C NOT APPROVED (attach comments) DUE DATE APPROVED I I APPROVED W/ CONDITIONS p NOT APPROVED (attach comments) 0 (Certification of occupancy required. ) %Y :H:GJS:: 4;:4:61::44 . 4114.4tU auuxrrlscwo PROJECT NAME RED INITIAL REVIEWERS INITIAL C :ROUTE -F :??5bt v ItoN4 $' Aw?a'3:`0 ;tiV.Y W10 tre ff1 3411 (.11•V V ACTIVITY NUMBER D97 -0039 DEPARTMENT: BUILDING DIVISION ❑) FIRE PREVENTION ❑ PUBLIC WORKS STRUCTURAL • ❑ APPROVALS OR CORRECTIONS: (ten days) APPROVED ❑ APPROVED WI CONDITIONS CORRECTION DETERMINATION: TAPIO DARYL — CORRECTION #2 :LY1SOYzrtr cx..d!YZC!Yi� PLAN REVIEW / ROUTING SLIP ROUTED BY STAFF n (If routed by staff, make copy to master file & enter Sierra.) DATE S/ 97 REVIEWERS INITIAL DATE DATE 4/30/97 PLANNING DIVISION PERMIT COORDINATOR 1 J DETERMINATION OF COMPLETENESS: (T,Th) DUE DATE 5/01/97 COMPLETE n • NOT COMPLETE ❑ NOT APPLICABLE ❑ COMMENTS TUES /THIJRS ROUTING: PLEASE ROUTE NO FURTHER REVIEW REQUIRED ❑ /51 t i NOT APPROVED (attach comments) Et DUE DATE 5/15/97 DATE / / 7 E DUE DATE APPROVED ❑ APPROVED WI CONDITIONS E NOT APPROVED (attach comments) 0 (Certification of occupancy rsquired. _ ) PUBLIC WORKS PLAN REVIEW / ROUTING SLIP ACTIVITY NUMBER \ _ t / — 0 39 DATE PROJECT NAME - T P P I O SF P- DEPARTMENT: BUILDING DIVISION El I DETERMINATION OF COMPLETENESS: (T,Th) COMPLETE n NOT COMPLETE El COMMENTS TUES /THURS ROUTING: PLEASE ROUTE [1 NO FURTHER REVIEW REQUIRED El ROUTED BY STAFF El (If routed by staff, make copy to master file & enter Sierra.) REVIEWERS INITIAL APPROVALS OR CORRECTIONS: (ten days) APPROVED ❑ APPROVED W/ CONDITIONS ❑ NOT APPROVED (attach comments)(g REVIEWERS INITIAL CORRECTION DETERMINATION: C:ROUTE -F FIRE PREVENTION ❑ STRUCTURAL ❑ DATE DATE PLANNING DIVISION DUE DATE NOT APPLICABLE ❑ DUE DATE REVIEWERS INITIAL DATE a PERMIT COORDINATOR ❑ DUE DATE APPROVED Cl APPROVED W/ CONDITIONS ❑ NOT APPROVED (attach comments) ❑❑ (Certification of occupancy requited. ) ,iS, �..F:y"1_:i:`.v:, ✓;.7 + ".`7Y'�a: �{'.� er'�+:u�.' BUILDING DIVISION Dem-0 3. PUBLIC WORKS 1 REVIEWERS INITIAL REVIEWERS INITIAL REVIEWERS INITIAL C:ROUTE -F FA ACTIVITY NUMBER D97 -0039 PROJECT NAME TAPIO DARYL LOT B DEPARTMENT: COMPLETE 171 NOT COMPLETE El COMMENTS DATE DATE ry DATE t4',�yr"xk4ii r iFtnir; aWa!603'RO"v ti'pv,.C:it'MM;?; , 9€sw C.�v6tM*y C.opj PLAN REVIEW / ROUTING S DATE 2/20/97 FIRE PREVENTION P G DIVISION a1a�l�i N�a /a5// S TR p(. U PERMIT COORDIN ■ ►Q DETERMINATION OF COMPLETENESS: (T,Th) DUE DATE 2/25/97 NOT APPLICABLE 0 4 TUES /THURS ROUTING: PLEASE ROUTE 11 NO FURTHER REVIEW REQUIRED 0 ROUTED BY STAFF n (If routed by staff, make copy to master file & enter Sierra.) APPROVALS OR CORRECTIONS: (ten days) DUE DATE 3/11/97 5 APPROVED fl APPROVED W/ CONDTTIOr1S . N T APPROVED (attach comments) NI Q Coffee+ l n L&P€( i I For ors 3.121:2- CORRECTION DETERMINATION: DUE DATE APPROVED I I APPROVED W/ CONDITIONS p NOT APPROVED (attach comments) 0 (Cetti lcadon of occupancy requited. ) .Mb +}k.'.:a izMiNk ✓�".,`s?6 ^r "'.i�- 1 "'':5''i J:�;+rZ'vt b^�:^..�,•e Ati,, °t L1s Yal siteiY —Miem6 PROJECT NAME COMPLETE COMMENTS • REVIEWERS INITIAL REVIEWERS INITIAL REVIEWERS INITIAL C:ROUTE -F PLAN REVIEW / ROUTING SLIP P77 ACTIVITY NUMBER D97 -0039 TAPIO DARYL LOT B DEPARTMENT: BUILDING DIVISION r FIRE PREVENTION [J PLANNING DIVISION 0 PUBLIC WORKS STRUCTURAL El PERMIT COORDINATOR El DETERMINATION OF COMPLETENESS: (T,Th) CORRECTION DETERMINATION: NOT COMPLETE • TUES /THURS ROUTING: PLEASE ROUTE ROUTED BY STAFF El (If routed by staff, make copy to master file & enter Sierra.) DATE Z Z DATE DATE 2/20/97 DUE DATE 2/25/97 NOT APPLICABLE Ei NO FURTHER REVIEW REQUIRED El I APPROVALS OR CORRECTIONS: (ten days) APPROVED APPROVED W/ CONDITIONS El. NOT APPROVED (attach comments) DATE 3 0 DUEDATE 3/11/97 DUE DATE APPROVED pi APPROVED W/ CONDITIONS p NOT APPROVED (attach comments) 0 (Certification of occupancy required. f bt�i.• rk ! .`MMW.tal'lJ+'/•tcrviMv W' M + '„KT�s.:i�.�it�:>x ACTIVITY NUMBER D97 - 0039 PROJECT NAME TAPIO DARYL LOT B 30 ( 3 s4— DEPARTMENT: BUILDING DIVISION El FIRE PREVENTION PLANNING DIVISION STRUCTURAL PERMIT COORDINATOR Q PUBLIC WORKS 4 DETERMINATION OF COMPLETENESS: (T,Th) DUE DATE 2/25/97 COMPLETE NOT COMPLETE NOT APPLICABLE El COMMENTS TUES /THURS ROUTING: PLEASE ROUTE [f NO FURTHER REVIEW REQUIRED E ROUTED BY STAFF El (If routed by staff, make copy to master file & enter Sierra.) REVIEWERS INITIAL A S / / DATE 2 /" 2- ) -7 7 • APPROVALS OR CORRECTIONS: (ten days) APPROVED n APPROVED WI CONDITIONS NOT APPROVED (attach comments) Q REVIEWERS INITIAL 4 :5 // DATE a/1 )!Q CORRECTION DETERMINATION: APPROVED n APPROVED W/ CONDITIONS REVIEWERS INITIAL C:ROUTE -F DATE PLAN REVIEW / ROUTING SLIP DATE 2/20/97 DUE DATE 3/11/97' DUE DATE NOT APPROVED (attach comments) 0 (Cerdfcatioa of occupancy requited, ) r "r�,w t 'x''*•.' r s ' fe,.,,..n '#.r g6P,hxi• e• PLAN REVIEW / ROUTING SLIP ACTIVITY NUMBER D97 -0039 PROJECT NAME TAPIO DARYL LOT B DETERMINATION OF COMPLETENESS: (T,Th) COMPLETE E COMMENTS • REVIEWERS INITIAL NI C-] APPROVALS OR CORRECTIONS: (ten days) REVIEWERS INITIAL CORRECTION DETERMINATION: REVIEWERS INITIAL C:ROUTE -F NOT COMPLETE DATE DATE DATE o2/, DATE 2/20/97 DEPARTMENT: BUILDING DIVISION El FIRE PREVENTION PLANNING DIVISION II 1 PUBLIC WORKS ► STRUCTURAL PERMIT COORDINATOR 0 7 DUE DATE 2/25/97 NOT APPLICABLE 0 TUES /THURS ROUTING: PLEASE ROUTE n NO FURTHER REVIEW REQUIRED ROUTED BY STAFF U (If routed by staff, make copy to master file & enter Sierra.) DUE DATE 3/11/97 APPROVED El APPROVED W/ CONDITIONS El. NOT APPROVED (attach comments) Q I DUE DATE APPROVED D APPROVED W/ CONDITIONS p NOT APPROVED (attach comments) Q (Certification of occupancy required. }f� ACTIVITY NUMBER D97 -0039 PROJECT NAME DEPARTMENT: BUILDING DIVISION L-1 FIRE PREVENTION p PLANNING DIVISION p PUBLIC WORKS ■ STRUCTURAL p PERMIT COORDINATOR p J I DETERMINATION OF COMPLETENESS: (T,Th) COMPLETE p COMMENTS ' REVIEWERS INITIAL APPROVED p REVIEWERS INITIAL CORRECTION DETERMINATION: REVIEWERS INITIAL C:ROUTE -F is k'r A�Y1nYf'P�6:Maitaec4AA155•2s. ", zkVfi744 slYLMd P!SS;R7,31 PLAN REVIEW / ROUTING SLIP p q-i -oo l D TAPIO DARYL LOT B NOT COMPLETE p DATE DATE • DATE 2/20/97 DUE DATE 2/25/97 NOT APPLICABLE El TUES /THURS ROUTING: PLEASE ROUTE N NO FURTHER REVIEW REQUIRED El ROUTED BY STAFF ri (If routed by staff, make copy to master file & enter Sierra.) DATE 2 1 2h/ `l APPROVALS OR CORRECTIONS: (ten days) DUE DATE 3/11/97 APPROVED WI CONDITIONS E. NOT APPROVED (attach comments) 3 -II - DUE DATE APPROVED El APPROVED W/ CONDITIONS p NOT APPROVED (attach comments) 0 (Certification of occupancy required. ) • . 47.nt •,r..;.s : 4: »d 1;! 4 /4s .=.esAi at„V ZYr+i7: b \" : Tt,r iqit ACTIVITY NUMBER PROJECT NAME DEPARTMENT: BUILDING DIVISION ❑ PUBLIC WORKS ❑ D97 -0039 REVIEWERS INITIAL APPROVALS OR CORRECTIONS: (ten days) REVIEWERS INITIAL CORRECTION DETERMINATION: irm f%ejwt • CtdInMov 01:19,9 PLAN REVIEW / ROUTING SLIP TAP TO DARYL — LOT B FIRE PREVENTION ❑ PLANNING DIVISION ❑ STRUCTURAL ❑ PERMIT COORDINATOR' I DETERMINATION OF COMPLETENESS: (T,Th) DUE DATE 2/13/97 COMPLETE ❑ NOT COMPLETE N iI K �IG1 NOT APPLICABLE ❑ oMMENTs L 1 r)r(r 1.2 ��'Cr i 0 fl ?t_ TUES /THURS ROUTING: PLEASE ROUTE ❑ NO FURTHER REVIEW REQUIRED ❑ ROUTED BY STAFF ❑ (If routed by staff, make copy to master file & enter Sierra.) DATE APPROVED ❑ APPROVED W/ CONDITIONS ❑ NOT APPROVED (attach comments) ❑ DATE APPROVED 17 APPROVED W/ CONDITIONS ❑ NOT APPROVED (attach comments) ❑ REVIEWERS INITIAL DATE C :ROUTE -F DATE 2/10/97 DUE DATE 2/27/97 DUE DATE (Certification of occupancy required. tr raiU .t&; �ih- sv '?:;.1 44641 i •r� na t� r iXt3"}+�1AV , ,tr ? t cY :I 't,"t�: fits z,�% : {�,ta <d � s�c�t ?�t:�, '(�'�ci?'��.�.s tr +ta i. v a:,�.i�'' c�,i£?�'.t• .M ACTIVITY NUMBER PROJECT NAME DEPARTMENT: BUILDING DIVISION PUBLIC WORKS TUES /THURS ROUTING: REVIEWERS INITIAL REVIEWERS INITIAL C:ROUTE -F PLAN REVIEW / ROUTING SLIP D97 -0039 TAPIO DARYL — LOT B FIRE PREVENTION PLANNING DIVISION STRUCTURAL El PERMIT COORDINATOR Cl 4 DETERMINATION OF COMPLETENESS: (T,Th) COMPLETE NOT COMPLETE NOT APPLICABLE El COMMENTS E"e C e U.) Oc O) cr ( ) 4z I e h / f k i�orthc,t f � f,,, � ��a 6111's' 14c4) r4... PLEASE ROUTE El NO FURTHER REVIEW REQUIRED El ROUTED BY STAFF n (If routed by staff, make copy to master file & enter Sierra.) DATE 7// 3 / 7 I 2 APPROVALS OR CORRECTIONS: (ten days) APPROVED APPROVED W/ CONDITIONS E NOT APPROVED (attach comments) fl { REVIEWERS INITIAL DATE I CORRECTION DETERMINATION: APPROVED D DUE DATE APPROVED W/ CONDITIONS El NOT APPROVED (attach comments) 0 DATE DATE 2/10/97 DUEDATE 2/13/97 DUEDATE 2/27/97• (Certification of occupancy required. S:4144t#PxlSxtir.4: DEPARTMENT: BUILDING DIVISION El PUBLIC WORKS ❑ on rtgigti' d1 s'SY+f�h�'�}'r .K4�.: 1V FEB 1< 9 1997 PLAN REVIEW / ROUTING St -ITT ACTIVITY NUMBER D97 -0039 DATE 2/10/97 PROJECT NAME TAPIO DARYL — LOT B DETERMINATION OF COMPLETENESS: (T,Th) COMPLETE L 1 NOT COMPLETE Lam.! FIRE PREVENTION 111 PLANNING DIVISION ❑ STRUCTURAL El PERMIT COORDINATOR ❑ 1 COMMENTS • /d - 6/42,, gN azedtdir /i4 AL dB DUE DATE 2/13/97 NOT APPLICABLE ❑ TUES /THURS ROUTING: PLEASE ROUTE NO FURTHER REVIEW REQUIRED ❑ ROUTED BY STAFF ❑ (If routed by staff, make copy to master file & enter Sierra.) REVIEWERS INITIAL cpscr I 1 APPROVALS OR CORRECTIONS: (ten days) DATE `/3 DUEDATE 2/27/97 APPROVED ❑ APPROVED W/ CONDITIONS NOT NOT APPROVED (attach comments) ❑ REVIEWERS INITIAL DATE CORRECTION DETERMINATION: DUE DATE APPROVED ❑ APPROVED WI CONDITIONS ❑ NOT APPROVED (attach comments) 0 REVIEWERS INITIAL DATE C:ROUTE -F (Certification of occupancy required. rs ,'t7,Qa a vii,.'..'y A:7 1( i rr.r• M. , �"•.iir. a y a n+' q n " ,vid�•�v�vz i�,l;. fiSN� ,t'.l�ir;tlf!a:,z+:si��'�k�.� s.�,'�.':s�..i "f » v�-'- i�f��li� ,�...�.tai�Kxl�..- �,:'tf�.F'ia S�' PLAN REVIEW / ROUTING SLIP ACTIVITY NUMBER PROJECT NAME D97 -0039 TAPIO DARYL — LOT B DEPARTMENT: BUILDING DIVISION C1 FIRE PREVENTION ❑ PLANNING DIVISION PUBLIC WORKS ❑ STRUCTURAL ❑ PERMIT COORDINATOR 4 DETERMINATION OF COMPLETENESS: (T,Th) COMPLETE `"' � I NOT COMPLETE ❑ NOT APPLICABLE El COMMENTS TUES /THURS ROUTING: PLEASE ROUTE 11 NO FURTHER REVIEW REQUIRED ROUTED BY STAFF ❑ (If routed by staff, make copy to master file & enter Sierra.) REVIEWERS INITIAL /\ .I (51 APPROVALS OR CORRECTIONS: (ten days) DATE �/ 2101 DATE 2/10/97 DUEDATE 2/13/97 DUEDATE 2/27/97 APPROVED 1 APPROVED W/ CONDITIONS . NOT APPROVED (attach comments) 1 REVIEWERS INITIAL CORRECTION DETERMINATION: APPROVED REVIEWERS INITIAL C:ROUTE -F DATE DATE DUE DATE APPROVED W/ CONDITIONS ❑ NOT APPROVED (attach comments) ❑ (Cettiticadon of occupancy rcquirsd, `ink; `.70,4. § =a's`'' ACTIVITY NUMBER PROJECT NAME TAPIO DARYL — LOT B DEPARTMENT: BUILDING DIVISION E1 FIRE PREVENTION [ PLANNING DIVISION Q PUBLIC WORKS i STRUCTURAL El PERMIT COORDINATOR 0 4 DETERMINATION OF COMPLETENESS: (T,Th) DUE DATE 2/13/97 COMPLETE ED NOT COMPLETE El NOT APPLICABLE 0 COMMENTS TUES /THURS ROUTING: PLEASE ROUTE NO FURTHER REVIEW REQUIRED El ROUTED BY STAFF ri (If routed by staff, make copy to master file & enter Sierra.) REVIEWERS INITIAL REVIEWERS INITIAL REVIEWERS INITIAL C:ROUTE -F PLAN REVIEW / ROUTING SLIP D97 -0039 CORRECTION DETERMINATION: i'ok cAltrr." t � APPROVALS OR CORRECTIONS: (ten days) DATE DATE 2 — / 3 " °? DATE DATE 2/10/97 DUE DATE 2/27/97• APPROVED 0 APPROVED W/ CONDITIONS E. NOT APPROVED (attach comments) fl DUE DATE APPROVED ' I I APPROVED W/ CONDITIONS NOT APPROVED (attach comments) Q (Cerdficadoa of occupancy required. = -•• „., (•, `,!. , • Bayside Drywall and Paint •29918 321" Ave. SE Palmer, WA 980S1 Phone & Fax # 360486.2166 • • • * . • 01yrni)ic„Development.NW Inc, 156 42"`'Av'e South' Ttik‘,0116.. WA 9,8188 N1r. tai)1(). ertnagatird Sealer as instilled all per coLle 3.!-; ' a' it the e I. 01N1n2 • 322$ S. 133 St,. l'ttk■villa 2 3231 S. 1 3Y' St. . Tukkvilla This is astandard 11•10f V01 in, \ A JC c,ontinue the :application per code as ak,%a■, unlessotherwise instructed II' you have any questions, please.o.)ritact. me dire,etly, Sincerely. Terrry Tankersley Bayside Drywall & Paint City of Tukwila Department of Public Works TO: Permit Center t FROM: V Public Works Engineering ) DATE: I May 15, 1997 SUBJECT: Tapio New SFR - Lot B • 3231 South 133rd Street Permit No.: D97-0039 Contact Person: Daryl Tapio • Phone: (206) 246-0055 JJS/sal NOTIFICATION OF UTILITY PERMIT ACTION THE FOLLOWING PUBLIC WORKS PERMITS HAVE BEEN APPROVED FOR ISSUANCE IN ACCORDANCE WITH THE PLANS APPROVED ON MAY 15, 1997: PERMIT FEE Access $25.00 Storm Drainage $25.00 TOTAL: $50.00 Two copies of the confirmed Utility Permit Application and plans are attached for inclusion in the permit file. CF: Development File (with copy of application and plans) PW Utilities Inspector (with copy of application and plans) John W. Rants, Mayor • Ross A. Eamst, P. E., Director 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: (206) 433 • Fax (206) 431-3665 The Tukwila 'John W. Rants, Mayor Thomas P Keefe, Fire Chief Fire Department Review Control , #p97--oo39. Tap i o , Daryl - 3231 South 133rd Street ,T116-attached set of building plans have been revieWed hY. The Bureau and are acceptable - w ith following concerns :-, 1:.: Your f ire department . access road must he designed' to Meet- Or exceed T u k w i l a . Public Works standards, - . - . ' , •.., ,.)::,•‘:,,,:,:.:,. -. , : : . ,,, .. Yours , truly, :- :.';;;•.:,.... : , • C CITY OF TUKWILA Department of Community Development Building Division - Permit Center 6300 Southcenter Boulevard, Tukwila, WA 98188 Telephone: (206) 431 -3670 "ei'..tt.l i a 9 wraurranwmvivegttrZmi � 't +�n i •ti a k + A "; : RECEIVED CITY OF TUKWILA APR 3 0 1997 PERMIT CENTER REVISION SUBMITTAL DATE: PROJECT NAME: .12)6e 1 L o r PROJECT ADDRESS: .I xx 5. 131 '� f CONTACT PERSON: _)i'J At9/D PHONE: - 06 5-S REVISION SUMMARY: l . _ .1 ; Q Lill 4 S z � -r�- s T I� -��J► •Q k Le kit) .- -4/97 PLAN CHECK/PERMIT NUMBER: 397-0 -003p a_ s 4 2, 4-K4 , A .L1 c-tt. act s r / iI 4{ 1 41-frj1144.116 - 4 11-t - C ° v - ,Z.1 4 i a f< . SHEET NUMBER(S) "Cloud" or highlight all areas of revisions and date revisions. SUBMITTED TO: CITY USE ONLY 3/19/96 April 28, 1997 Dear Mr. Tapio: City of Tukwila Mr. Daryl Tapio 22725 - 91st Way South, #F -302 Kent, Washington 98031 a(, w";.. `ti rn ri T 3 ra � r'�rC;':�.Ytn"''t('-y v. �;rt;�,fn7'1 r 7m; �Cn�, c John W. Rants, Mayor Department of Community Development Steve Lancaster, Director SUBJECT: CORRECTION LETTER #2 Development Permit Application Number D97 -0039 Tapio, Daryl 3231 S 133 St This letter is to inform you of further corrections that must be addressed before your application for development permit can be approved. All correction requests from each department must be addressed at the same time and reflected on your drawings. I have enclosed review comments from the Public Works Department. At this time the Planning Division, Building Division and Fire Department have no comments regarding your application for permit. As of this date the Permit Center has documented that a complete package was not submitted for Correction Letter #1. As stated in this letter and Correction Letter #1 all corrections requests from each department must be addressed at the same time and reflected on your drawings. Comment number 3 stated in the Public Works Department comment letter was not completed and comment #1 from the Building Division comment letter was not completed, therefore your revision submittal was not considered to be a complete submittal for revision. Also, per your discussion with the City Administrator you will comply with Val Vue Sewer District standards. The City requires that four (4) complete sets of revised plans be resubmitted with the appropriate revision block. In order to better expedite your resubmittal a Revision Sheet must accompany every resubmittal. I have enclosed one for your convenience. Corrections /revisions must be made in person and will not be accepted through the mail or by a messenger service. 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • (206) 431-3670 • Fax (206) 4313665 f you have any questions please contact me at the City of Tukwila Permit Center a 206) 431-3672. tbi..,.. DATE: rrt+Y 1Wit ir.<; a4l l mce Ar ctArr85tnaJ},747COnt lag :ii..'.P:l7'*11%'Q+l'TAVIV7, WIliTIAM,X C City of Tukwila Department of Public Works April 1, 1997 1) Provide an easement for the fire department turn- around. 5) Comply with ValVue sewer district standards. PUBLIC WORKS DEPARTMENT COMMENTS PROJECT NAME: Tapio New SFR's - Lot A and Lot B PLAN CHECK NO.:D97 -0038, D97 -0039 PLAN REVIEWER: Contact Joanna Spencer at (206) 433 -0179, if you have any questions regarding the following comments. 3) Owner shall sign a water service Proportionate Fair Share Agreement (separate agreement for each lot). 2) Access easement and utility easement is required between lot A and lot B. All easement documents shall be submitted to Public Works for review prior to recording. 6) Storm drain catch basin shall be located at the pipe bend. Specify type of bedding and backfill material, and percent compaction for material. Show cross section of footing drain trench. 7) Maintenance agreements are required for the following items: all common utilities; fire department turn- around; and access to property. John W. Rants, Mayor Ross A. Earnst, P. E., Director 4) Two separate taps are required for your new water lines. Show proposed location of the new water meters. Your sprinkler system designer shall determine the size of your water services and water meters. Specify the following: type, size, and depth of pipe; size of meter and meter box; location and type of tap; type of pipe bedding and backfill materials (include compaction data expressed in a percentage). Ten feet (10') of separation is required between water lines and sanitary sewer lines. 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: (206) 433-0179 • Fax (206) 431-3665 P .: is tiX�J.•:fit'i:�pi? .r..;n +. re..,v`t �1.+;.... DATE: ..rr∎ ,:, ,: r :'it ';s- -itn.. i 2 .;"vv • ._ -5tr1 M n "" 'A :+ ;:++`a • ,r rx c..,y. , ,;:.s� °e.:c.' „ t".; x. 7' �"'• z_. �" �:' i.,».., �i" �Ff ch,. a.;. n, 4�' j" � r`... t�' ��f.",+: �u. �! at?r�` �`!" q:. r: fi:.,: �r, lrri....,n.,•.�e:�.. x.., ,.,..:,P;.;:;.;.i� i. r. .11, n`�cr. •r ...o."�..l�i,.�..e a 5�'-_F.�t.'.,.��. rS -r. ,tt ..., x .. o, ..r. ., >2 . 4'f` City of Tukwila Department of Public Works PUBLIC WORKS DEPARTMENT COMMENTS April 1, 1997 PROJECT NAME: Tapio New SFR's - Lot A and Lot B PLAN CHECK NO.: D97 -0038, D97 -0039 PLAN REVIEWER: Contact Joanna Spencer at (206) 433 -0179, if you have any questions regarding the following comments. 1) Provide an easement for the fire department turn - around. John W. Rants, Mayor Ross A. Earnst, P. E., Director 2) Access easement and utility easement is required between lot A and lot B. All easement documents shall be submitted to Public Works for review prior to recording. 3) Owner shall sign a water service Proportionate Fair Share Agreement (separate agreement for each lot). 4) Two separate taps are required for your new water lines. Show proposed location of the new water meters. Your sprinkler system designer shall determine the size of your water services and water meters. Specify the following: type, size, and depth of pipe; size of meter and meter box; location and type of tap; type of pipe bedding and backfill materials (include compaction data expressed in a percentage). Ten feet (10') of separation is required between water lines and sanitary sewer lines. 5) Six inch (6 ") private sewer main extension off the existing sanitary sewer manhole in South 133rd Street is required with a manhole at the end of the private sewer main extension. Six inch (6 ") pipe shall have a minimum 2% slope. Specify the following: type and size of pipe, location of pipe, percent slope on pipe, length of run, connection point to existing system, location of all cleanouts, location of manholes, invert elevation at the manholes, invert elevation at junctions, type of pipe bedding, and type of material to be utilized for backfill. Material compaction data for all sewer bedding and backfill shall also be specified. 6) Storm drain catch basin shall be located at the pipe bend. Specify type of bedding and backfill material, and percent compaction for material. Show cross section of footing drain trench. 7) Maintenance agreements are required for the following items: all common utilities; fire department turn - around; and access to property. 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: (206) 433-0179 • Fax (206) 431-3665 DATE: CONTACT PERSON: Siys�vr.;F 'z:. i�3r:iicl^ riW4Veli`Vi'{g d CITY OF TUKWILA Department of Community Development Building Division - Permit Center 6300 Southcenter Boulevard, Tukwila, WA 98188 Telephone: (206) 431 -3670 ti RECEIVED CITY OF TUKWILA MAR 2 0 1997 PERMIT CENTER REVISION SUBMITTAL c /f? PLAN CHECK/PERMIT NUMBER: pq / - 003 j9 603g PROJECT NAME: ' o A Li PROJECT ADDRESS: f22 3 5 L.o/- 4 � Lo-- /s'3 SI. PHONE: 2c/4. O U S REVISION SUMMARY: I o p--0 v i 8.a. pfr-oo ec 4{441" LA' A- a Act Z3 On-2. .4 104 . I o s a -1' is ' 4 Z +� ( -e-1-41-1 del),( 3 /�u2y7 o I o a�, r S p SHEET NUMBER(S) "Cloud" or highlight all areas of revisions and date revisions. SUBMITTED TO: ObanYl CITY USE ONLY Bldg.: • Planning Fire Public Works 3/19/96 March 17, 1997 Dear Mr. Tapio: v City of Tukwila Mr. Daryl Tapia 22725 - 91st Way South, #F -302 Kent, Washington 98031 SUBJECT: CORRECTION LETTER #1 Development Permit Application Number D97 -0039 Tapio, Daryl 3231 S 133 St Sincerely, Kelcie J. Peterson Permit Coordinator Enclosures Sent via fax on March 17, 1997 File: D97 -0039 P97 -0016 FILE COPY John W Rants, Mayor Department of Community Development Steve Lancaster, Director This letter is to inform you of corrections that must be addressed before your application for development permit can be approved. All correction requests from each department must be addressed at the same time and reflected on your drawings. I have enclosed review comments from the Public Works Department and the Building Division. At this time the Fire Department and Planning Division have no comments regarding your application for permit. The City requires that four (4) complete sets of revised plans be resubmitted with the appropriate revision block. In order to better expedite your resubmittal a Revision Sheet must accompany every resubmittal. I have enclosed one for your convenience. Corrections /revisions must be made in person and will not be accepted through the mail or by a messenger service. If you have any questions please contact me at the City of Tukwila Permit Center at (206) 431 -3672. 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • (206) 431-3670 • Fax (206) 431-3665 : Ph'ft ulR:vk a ? . £u 3uGr"?f 5: 1 33fi1ix ' "��a'�; vi nit} s�5 tvz,,coordoilm �r DATE: C City of Tukwila Department of Public Works PUBLIC WORKS DEPARTMENT COMMENTS March 10, 1997 PROJECT NAME: Tapio New Single Family Residence (SFR) - Lot A and Lot B PLAN CHECK NO.:D97 -0038 and D97 -0039 Plan Reviewer: Contact Joanna Spencer at (206) 433 -0179, if you have any questions regarding the following comments. J r:,.. Ross A. Earnst, P. E., Director 1.) At the present time, the King County Assessors office recognizes only one parcel at the proposed construction site (see attached). Public Works is aware that a title company is pursuing a lot separation process with the King County. However, a formal short plat application to divide the above parcel into two lots (lot A and lot B) must be submitted to the City of Tukwila Department of Community Development, along with all easement considerations. 2.) The owner must provide proof that the lot or lots are recognized as separate lots pursuant to the provisions of TMC Title 17 and RCW chapter 58.17. 3). It has been brought to the City's attention that the existing storm drainage ditch on the south side of South 133rd Street overflows during heavy rain. The City is also aware that there are a series of springs on the adjacent and downstream properties. As a result of this downstream drainage problem, the property owner must design and construct on -site detention in accordance with the King County Surface Water Manual. This design shall be prepared by a licensed civil engineer and is required in order to bring surface water flows to the pre - development conditions. Contact the Public Works Surface Water Engineer, Mr. Phil Fraser, at (206) 433 -0179 regarding any storm drainage questions. 4). The proposed residence shall utilize sprinklers for fire protection due to inadequate water pressure in the surrounding area. A 3/4" water meter is not sufficient. Size of the water meter shall be determined by the sprinkler company and /or designer. John W. Rants, Mayor 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: (206) 433.0179 • Fax (206) 4313665 - xar.ma mnt93 :ui'^i.X: :r4 ; "•ffibi�IL1'e"ohiediT i'' Yf r i: 'w .11,7*.r ok,- U) Cx .66 y/PhoheT- -Z r' 47 By „taio AgencyrPhone ' By ;ART ;3: (TO BE COMPLETED BY WATER UTILITY) I 1: This _proposed project is located within ' u4) t I O (Cit) /Coun I hereby certify that the above. information is true and correct. 2. Improvements required to upgrade the water system to bring it into compliance with the utilities' comprehensive plan or to meet the minimum flow requir,ements •,project before .connection: 3. Based upon the improvements listed above, water can be provided and will be available at the site with a residual pressure of -20 psi at gpm for a duration of Z hours at a velocity of fps as documented by the attached calculations. PART C: (TO BE COMPLETED BY•GOVERNING JURISDICTION) 1. Water Availability - Check one: ❑ Acceptable service can be provided to this project. Xi Acceptable service cannot be provided to this project unless the improvements listed in Item #C2 are met. ❑ System is not capable of providing service to this project. 2. Minimum water system improvements: (At least equal to B2 above) Date Date lan Reviewer: . Contact Bob Benedicto at (206) 431-3670, if you have „ II any questions regarding the following comments. 1. l'ovide'd with prOpp§ed:ci*tIlingiciCated:On'Oite:by dimension :frOrn. at least two adjacent properly lines. „.,.... .• , . *t ?iA4V4' „?t:�.�5� DATE: City of Tukwila Department of Public Works Ross A. Earnst, P. E., Director PUBLIC WORKS DEPARTMENT COMMENTS March 10, 1997 PROJECT NAME: Tapio New Single Family Residence (SFR) - Lot A and Lot B PLAN CHECK NO.:D97 -0038 and D97 -0039 Plan Reviewer: Contact Joanna Spencer at (206) 433 -0179, if you have any questions regarding the following comments. John W. Rants, Mayor 1.) At the present time, the King County Assessors office recognizes only one parcel at the proposed construction site (see attached). Public Works is aware that a title company is pursuing a lot separation process with the King County. However, a formal short plat application to divide the above parcel into two lots (lot A and lot B) must be submitted to the City of Tukwila Department of Community Development, along with all easement considerations. 2.) The owner must provide proof that the lot or lots are recognized as separate lots pursuant to the provisions of TMC Title 17 and RCW chapter 58.17. 3). It has been brought to the City's attention that the existing storm drainage ditch on the south side of South 133rd Street overflows during heavy rain. The City is also aware that there are a series of springs on the adjacent and downstream properties. As a result of this downstream drainage problem, the property owner must design and construct on -site detention in accordance with the King County Surface Water Manual. This design shall be prepared by a licensed civil engineer and is required in order to bring surface water flows to the pre - development conditions. Contact the Public Works Surface Water Engineer, Mr. Phil Fraser, at (206) 433 -0179 regarding any storm drainage questions. 4). The proposed residence shall utilize sprinklers for fire protection due to inadequate water pressure in the surrounding area. A 3/4” water meter is not sufficient. Size of the water meter shall be determined by the sprinkler company and /or designer. 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: (206) 433.0179 • Fax (206) 4313665 DATE : 3/5/97 . PROJECT NAME Tapio Daryl Lot B PLAN CHECK NO D97 -0039 BUILDING DTVISION COMMENTS Contact Bob Benedicto at (206):.431 3670, if you have any ,questions regarding the following comments., rovide a site plan with proposed dwelling located on site by dimension from at least. two adjacent property lines Yrt`v; giti id.iiflfiA' %73",7'A:.IMagi*.m....1 City of Tukwila Fire Department Fire Department Review Control #D97 -0039 (511) Dear Sir: February 27, 1997 Re: Daryl Tapio 3231 South 133rd Street, Lot B John W. Rants, Mayor Thomas P. Keefe, Fire Chief The attached set of building plans have been reviewed by. The Fire Prevention Bureau and are acceptable with the following concerns: 1. Every building shall be accessible to Fire Department apparatus by way of access roadways with all- weather driving surface of not less than 20' wide and 13'6" vertical clearance. Access roads in excess of 150' shall be provided with an approved turn - around area. Access shall be within 150' of all portions of the buildings. (UFC 902.2.2.1, UFC 902.2.1) 2. For short plat development (four single family homes or less), hydrants shall be placed so that a hydrant is within 250 feet of a building. Distance from a hydrant to a building is measured along the path of vehicular travel. The hydrant must flow a minimum of 1000 GPM at 20 PSI residual pressure. 3. Fire hydrant's shall conform to American Water Works Association specifications C- 502 -54; it shall be compression type, equipped with two 2 1/2" N.S.T. hose ports and one 5" Storz pumper discharge port, and shall have a 1 1/4" Pentagon open -lift operating nut. 4. All required hydrants and surface access roads shall be installed and made serviceable prior to and during the time of construction. (UFC 901.3) 5. In lieu of a fire hydrant, an approved residential fire sprinkler system may be installed when vehicular Headquarters Station: 444,:x. d c :'c r DI! e Tci;i', W= shin :on n61 Ea • Phone: (206) 5754404 • Fax. (206) 575.4439 City of Tukwila John W Rants, Mayor Fire Department Thomas p Keefe, Fire chief travel distance from the nearest hydrant exceeds 250 feet. Acceptance of residential fire sprinkler systems shall include field verification of GPM and residual . pressures meeting or exceeding the listing for the sprinkler type. 6. Your street address must be conspicuously posted on the building and shall be plainly visible and legible from the street. Numbers shall contrast with their background. ( 901.4.4) Contact The Tukwila Fire Prevention Bureau to witness all required inspections and tests. (UFC 10.503) (City Ordinance #1742) Any overlooked hazardous condition and /or violation of the. adopted Fire or Building Codes does not imply approval of such condition or violation. Yours truly, The Tukwila Fire Prevention Bureau cc: TFD file ncd 4 sl 1 Headqua-te s Sri ticn: 444 Andover Park East a Tuh, nia, Washington 98188 a Phone: (206) 575.4404 • Fax (206) 575.4439 '02 ,i"'{i.C;. -tiro �Ei(i'� •∎ ";3'0lt'6F, I l�.k4!p'/11� February 26,1997 Mr. Daryl Tapio 22725 - 91st Way South, #F -302 Kent, Washington 98031 Dear Mr. Tapio: SUBJECT: Development Permit Application Number D97 -0039 Tapio, Daryl 3231 S 133 St - Lot B This letter is to inform you that your permit application received at the City of Tukwila Permit Center on February 10, 1997, was reviewed at the February 25, 1997, plan review meeting. Your application was determined to be complete. Your permit has begun the plan review process, you will be notified of any required corrections or when your plan is approved. If you have any concerns or questions please contact me at the City of Tukwila Permit Center at (206) 431 -3672. Sincerely, --- Wct-eg ‘ . Kelcie J. Peterson Permit Coordinator File: D97 -0039 City of Tukwila FILE COPY John W Rants, Mayor Department of Community Development Steve Lancaster, Director 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • (206) 4313670 • Fax (206) 4313665 ���tfi�•:.SR:,r ����:KT•r DATE: 2 / 7' PROJECT NAME: 4 r3:.�r.v•:u ?: PROJECT ADDRESS: SUBMITTED TO: ken CONTACT PERSON: 71 DLt, CITY OF TUKWILA Department of Community Development Building Division - Permit Center 6300 Southcenter Boulevard, Tukwila, WA 98188 Telephone: (206) 431 -3670 Planning Fire REVISION SUBMITTAL PLAN CHECK/PERMIT NUMBER: r TlfiD ) Da)-7 32 Au4 S. l3 3-s'1' — L f-, / ( ctirk3 PHONE: 8 -- 7 5 REVISION SUMMARY: G CA bLM'l t W k 1st k EMGwi7 (f [o G' `' r+1 43) I C (l ( tfitags to hdp coq d h I h-ko I f OF 1k Public .Works RECEIVED CITY OF TUKWILA FEB 2 0 1997 PERMIT CENTER SHEET NUMBER(S) "Cloud" or highlight all areas of revisions and date revisions. CITY USE ONLY 3/19/96 tV1'k7104, 'MIN,i S. ilk _.1ttA S4 February 18, 1997 Mr. Daryl Tapio 22725 - 91st Way South, #F -302 Kent, Washington 98031 Dear Mr. Tapio: Building Division: Fire Department: rC • 991 City of Tukwila c FILE COPY Department of Community Development Steve Lancaster, Director SUBJECT: Development Permit Application Number D97 -0039 NOTICE OF INCOMPLETE APPLICATION Tapio, Daryl 32 Av S & S 133 St - Lot B This letter is to inform you that your permit application received at the City of Tukwila Permit Center on February 6, 1997 was determined to be incomplete. Before your permit application can begin the plan review process the following requirements from the Building Division and Fire Department must be met. Contact Ken Nelsen, Plans Examiner, at 431 -3676 if you have any questions regarding the following comments. 1. Provide proposed window manufacturing and U- values for the windows. 3. What is the method for providing whole house ventilation? 2. Provide exhaust fan manufacturer's specifications and model number. Contact Nick Olivas, Assistant Chief at 575 -4404 if you have any questions regarding the following comments. 1. Site plan must show Fire Department access road with hammer -head turn- around for access to lots A & B. John W. Rants, Mayor 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • (206) 4313670 • Fax (206) 4,313665 Mr. Daryl Tapio February 18, 1997 Page 2 The City requires that four (4) complete sets of revised plans be resubmitted with th • • • appropriate revision block In order to better expedite your resubmittal a Revision Sheet must accompany every resubmittal. I have enclosed one for your convenience. Revisions must be made in person and will not be accepted through the mail or by a messenger service. If you have any questions please contact me at the City of Tukwila Permit Center at (206) 431-3672. • Sincerely, / Ca Kelcie J. Peterson Permit Coordinator • Enclosure File: D97-0039 ',.."V,:116`1:;!;;.1■4%;:.*::;*,;;;,' .;# ;r rt ;:;■ii: " . . I fR • . TA .- . ; - ,': . B . , .'.* .:.,:....1 i :'•'` ', 'VI' .'.'tt. .... . D EX P kATI O:... „,...”, .t... -,.•.t ...'..,.•..,..:,.:, E:::''. ......../,.`,,, ..',',•,t'''.'rq,.„., 1,..':et. so. ' • • ' ,• .• -, fo: 4 v' '') . . , . ... 1 rr ii::.: 'zi 3 In. q 3,4'. . r . • 4. .. ,... 7... Si ...t • . ..'4: 4 ;- , ....r. . '''''.. ' :., :.1...,..;:...,...,-,..... •••• ,..., . , .. .. . .. . .htt. . .4-.1 tr • • ■•■••• ••••■1, ••••■■■ ■%•.. ; I —r Zu ,I A g.ouNo 6 itAVE.L fL 33' C7 5ew0. MA,// S. / 3 3 5 f. . f 6V47f.0 MA,.✓( i8 SS ?8' - 3� Poi I I — 20' 7 O' L IIATER L 1,4 1 I ""clsRZS IN.sTA61.1F WrR._ sr. u ‘,..6- L J M t d s r: 0 (3 rw,✓ W to ,1 A0 SIDE sIEW: IZ SPECS �FPER, S TE PLAN • I ■ LS, �1d L ,ZS RFa., r_ ,-,0) GAS, IPo i 1�ow,JSPo ('L OVED PER PUBLIC WORKS e ER DATED /5 .'9 % 7 rI D1 ; E c J LE 1 � /- ZO/ O 1DRAv1AGE. ; L o T O Roo• A z EA 2oOi / Zoe) o 7?R IV/ A/_ Ar /, - 7 45 , 93G • ' TTAL 2,986 z,92 . Sturm USE. r/gTiV� MA,TERIA r+�2 3F_v'rtdG A.ND I Ac.c. I,.L AS R4i . y co / £.✓G12. 1�2,vEVJAy /1 T PAV6.1) 4" 4R4V,E, S Na UCUEAZ, CAG'i 3iUC. APR 3 0 1997 PERMIT CENTER SIONM D,LA1l 4' Acs I I 0 E q"PVC — 1� fo,>/Mw D #' '-✓ (ts Nrt ,oss r Attest CI-H IIKWI� ea �L APPROVED MAY 1 6 1997 ASN`i .)L BUILDING avtoroN i` it S r_" i c'9t•� G /n/r' 9 1ECEIVED CITY OF TUKWILA OLYMPIC DEVELOPMENT 22725 91st way S. Kerd. WA 9w31 D9"I-0039 14 18AL -16 -18 z 24 PIT-0 z5I g J al /A"ri&Ni diY/440 � I / sf-Ys i :ji r i n I - 1 1J lul L Plan Chock approvals are to errors and arrdadOns and approval of plans does not audio %) to violation of any adopted coda Oa. t of contractor's coPy of f'4 REVISIONS Permit No. /Q OcrA •1 SEPARATE PERMIT . RE9UIRED FOR: MECHANICAL LE�1 ELECTRICAL E: MBING Il GAS PIPING CITY OF TUKWILA BUILDING DIVISION ,�.... .CITY OF TUKWILA APPROVED MAY 1 6 1997 AS hOJED BUILDING DIM' NO CHANGES SHALL BE MADE TO THE SCOPE OF WORK WITHOUT PRIOR APPROVAL OF TUKWILA BUILDING DIVISION. NOTE: REVISIONS WILL REQUIRE A NEW PLAN SUBMITTAL AND MAY INCLUDE ADDITIONAL PLAN REVIEW FEES. RECEIVED CITY OF TUKWILA FEB 1 0 1997 PERMIT CENTER ICTELEME POST 18AL.16 — 18 24 /200 /102- P 0 3 V8 ot a L.5 4 waxca 4x/0 _4 a_ II 0 1., a 11 0 - - - - - - - - - _ VAL 160 c.FA1 FA,1 QC (6 tn Fg--A- 6 14— klGrA‹ es(lo t 7-4 • PIT M431 2<‘ 1. e Ata ealt 5 1 V 4' 1 XP/ Si *PAK/ u hocAriod S.) fi H 2-Z- gpA- 'i'x (*yp) /1\ /1NU AAe--A00* IL?) I 41_1 -1.A1/1 Ysx16 - • vax-lao.v, qx/ii E 16,-a , .11 GITY W ltWitA OVE MAYI 1 6 197 A:' NOTE BUILD1 IG DI MON RECEIVED CITY OF TUKWILA FEB 1 0 1997 PERMIT CENTER lle TELECATE POST 18AL-15 - 18 x 24 174 OOM . 462f,Or 5 r OE o il N4.1043 12fx 1" ")< 6 6 ft_ I 11 1 11 1-. L41 I I z-4- /--- 0 +. 1 1 iz*xic30 d syxo NI/4 1 11 IWO / L.. leox. to. 6 'it /1•1 // 1 4-41 x 4 ar< poi smot.a pKT w/c3A-T, BAcLuiP 6 41- FLA 12.d. Ducr CITY OF TOW APPROVED MAY 1 6 1997 AS NOTED BUILDNG DIVT3TN RECEIVED CITY OF TUKWILA FEB 1 0 1997 PERMIT CENTER • 14•TaILATEPOST 18111.46 - 18 x 24 t 1. Ala 0 4 H II 0 0 1— It'll-006M :4 tv.itiaLct (Tire) 047 6 .0 114za• 6 -.4›<&) mu- r6vbettea) 0 0 eok._, PA D'S 0 L 11 4- 4Ae2 r11,1; 0 0 d 1X/X 9,42>C le PA1/419 ++ 1. _ !Lod d e2c...*e. 1- man DING OF T DMA APPRO D M Y 1 6 1997 AS NOEL) RECEIVED CITY OF TUKWILA FEB 1 0 1997 PERMIT CENTER 1$ It 34 MINIM oM N0. 100011 C&U P 1a. 12 12q1-,o059 G' 17 F 11.. • I 1. • 1 \\ . 4 NAIL- r•Ar ate-1-4 6 id.' C.' t . VG- - PossrlYrc Go, ttiSc -T 104 6.-0.426.• sl- x (.0 c eM. - •J .4-x 6 ei It I -T N/esirtrie7d. v - ///b I g < a• I6 ea.. 1) <01 - e-- la y :24a V(1/ + c: I/Z - e -I9 IN JL- _z ,A - ML-11:3°A14./ - Nt2 v r ■1' f . ‘ i1•11 Y1 / &42x to 8 ICo - �� ot� a.4 •J Imo. ± 114V . 14 oc4 ar..11 y ' . CITY OF TUKWI1A APPROVED MAY 1 6 1997 AS NOTED BUILDING DIVISION 0 LAZi AR 6A. 2.4/7 s, 4.6A _` -. °/ t4&' /1. S®/o 2 VA PA) 14/ MALt_S /GF'iLiA4 O ] Al Si FS A S AID Tel) U4/ ,$ GIN Y OF TUKWILA FEB 1 0 1997 PERMIT CENTER REVISIONS I BY Of Dale Scale NG Drawn Job eoprer Sheet Sheeta 0 00 N 0 N N BM WEST 971I 98■99-. 11, Y26-2937) rac 13— 0 F- 0' C C F F F I I 23-0 ari-i-OOM K605030 I wsino6 F 0 N) F N F F N C C F C F 20 — 5— 5 N F F N) F N 0 F F F 10-0 0 F F 10-0 00 N 0 I 2P- FIRkaw46-, ' CITY OF TUMVILA APPROVED MAY 1 6 1997 AS NOTED BUILDING DIVISION RECEIVED CITY OF TUKWILA FEB 1 0 1997 PERMIT CENTER