Loading...
HomeMy WebLinkAboutPermit D97-0170 - SKYWAY LUGGAGE - STORAGE RACKSCity of Tukwila r Community Development / Public Works • 6300 Southcenter Boulevard, Suite 100 • Tukwila, Washington 98188 DEVELOPMENT PERMIT Parcel No: 420008 -0924 Address: 17450 WEST VALLEY HY Suite No: Location: Category: ACOM Type: DEVPERM Zoning: Const Type: RACKS Gas /Elec.: Units: 001 Setbacks: North: Water: UNKNOWN Wetlands: Contractor License No:." 'CONESSS.131NU OCCUPANT SKYWAY 17450: ` WEST VALLEY HY, TUKWILA'WA CONTACT FRANK'PALMER Phoner.206 762 -5969 7745' FIRST AVENUE SOUTH, SEATTLE, WA '981'08 OWNER ALASKAN COPPER COMPANIES INC.' PO BOX 3546, SEATTLE:WA 98124 CONTRACTOR 'CONESCO STORAGE SYSTEMS. INC. Phone: 206 762-5969 .7745 FIRST AVENUE SOUTH, SEATTLE, WA 98108 ************************.'*******•**.******************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * *** Permit Description: INSTALL:PALLET RACKS IN WAREHOUSE. *********** Ii****************************************** * * * * * * *. * * * * * ** * * * * * * * * * * * * * * ** Construction Valuation: $ .00 ' PUBLIC WORKS PERMITS: *(Water Meter Permits Listed Separate) •Eng..'Appr: Curb Cut /Access /S.idewalk /CSS: Fire Loop Hydrant:. No: Size(in): .00 • Flo Zone: Hauling: Start Time:. End Time LandAltering: Cut: Fill: Landscape Irrigation: Moving'Oversized Load: Start Time: End Timer Sanitary Side Sewer: No: Sewer'Main Extension: Private: Public: Storm Drainage: Street Use: Water Main Extension: Private: Public: ***********************************************.****** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** TOTAL DEVELOPMENT PERMIT FEES: $ 1,097.21 ***************************************************** * * ** * * * * * * * * * * * * * * * * * * * * * ** * * ** Permit Center Authorized Signature: I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provision of any other state or local laws regulating construction or the performance of work. I am authorized to sign for and obtain this development perm.t. WARNING: IF CONSTRUCTION BEGINS BEFORE APPEAL PERIOD EXPIRES, APPLICANT IS PROCEEDING AT THEIR OWN RISK. South: Sewer: Slopes: Occupancy: WAREHOUSE UBC: 1994 Fire Protection: SPRINKLERS East: .0 West: .0 A k!h2_ Date JL/ L fr This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. Permit No: Status: Issued: Expires: Streams: (206) 431-3670 D97 -0170 ISSUED 06/04/1997 12/01/1997 :CITY OF ,TUKWILA .Address . °174,5 No: 0 WEST VALLEY- Permit No D97- 0170.;. Su.i,te Tenant Status ISSUED Type 'DEVPERPi - Applied : 05127/ 1997 Par.ce;l # 4`20 Is :..•06 /04/'1997 *:* AAA' k; k*** A ** * *** �k.*******. kkA**A Ak**** AA** kk*; k*' AAA Ak ** *AA:A*****A *k * *k`•k*k * *•k* Rer t Conditions . o changes will l b e made to' the . plans unless ° approved `by ..the.: -< rchitec or Engineer and the T.ukw7la Bui ld:ing DTI/ isi.on 11 p"ermi,ts, i nspect ion. -rrecorids;` , ap}proved p lans sha11. be . ava i 1, ab l e et::, the ob,s to pri to tire start o any c.on str These .do61:ini nt;s ; are to,' maintained and`:avai 1 able 'u ntil final i' nspe ction ap is granted +., All cons.truc .ion t`o ;be °iri Y'conf marices width approved p lans. and ,evo m ireme of the Unifo Building Coder ' Ed iti`,on a en de,d Uniform Tl ral..,,0ode (1994 ,Ed and :Was State Energy, Code, (1994 .Edition),. Val1di v� /of Permit A i The s a 'r3,6e;; o ,f a. p ermit or, ; ap pr.ova;l o f plansi an `r�omputations shall not be.,con - str uedif�to be a per or an approval of, anv violation, 'a ari ' of the pr ovisions of the ybu i l d ing code • or of ,and ...... ; other:rord`'ijnance,..of: the:.lur.is,d- i:ctio No permit pr t ire, ;' ty to violate ot711,6ancel =the provi of this cod e 1 i4 ,:: , , .. " '''' ..,i . <--' , Project Name/Tenant: Existing use: ❑ Retail ❑ Restaurant ❑ Multi- family Warehouse ❑ Hospital ❑ Church ❑ Manufacturing ❑ Motel /Hotel Office ❑ School /College /University ❑ Other Proposed use: ❑ Retail ❑ Restaurant ❑ Multi- family ❑ Church ❑ Manufacturing ❑ MotelHotel ❑ School /College /University ❑ Other Value Construction: Site Address:: t 1 1 , -r .) o LO. v 0._11c,- ��k.J If yes, extent of change: (Attach additional sheet if necessary) City State /Zip: "-S C W 1 l -A Tax Parcel Number: I 1 �-1 C. l� O t;')% l� `1 7. -�'( -9 1 Property Ownpr: n 1 - -)0 0 [.-, Lo. ") 2-0 `ycli NJ Area of Construction: (sq. ft.) Will there be storage of flammable /combustible hazardous material in the building? yes ❑ no Attach list of materials and storage location on separate 8 1/2 X 11 paper indicating quantities & Material Safety Data Sheets Phone: 1. L. - L. 2 1- 5T Street Address: L - 1 ? 2 4 City State /Zip: ,,‘tZt. Fax #: Contractor: Phone: Street Address: _i / y s i A �--. -- S. �-Ft L City State /Zip: t.. IA I 0 a' Fax #: "1 1, L. • V c 3 s Architect: Phone: Street Address: City State/Zip: Fax #: Engineer: a} .._ #� s c u c, Phone: 8- t is - r 7- 00 '1 - 2_- Street Address: 11. 25 - t;'. N. 1 D iv_ ,S;.,, Ll( Gti" L.G. City State /Zip: C.a c l l20Z Fax #: Contact Person: __,-- k' k, PA ,..,y,,,,,, c-,,, • Phone: q 1L Street Address: City State /Zip: Fax #: Description of work to be done: n (n� n 4"'A 1, Lz- k• .A C . �C.M S t- c--- C-:-. , v \--•— Existing use: ❑ Retail ❑ Restaurant ❑ Multi- family Warehouse ❑ Hospital ❑ Church ❑ Manufacturing ❑ Motel /Hotel Office ❑ School /College /University ❑ Other Proposed use: ❑ Retail ❑ Restaurant ❑ Multi- family ❑ Church ❑ Manufacturing ❑ MotelHotel ❑ School /College /University ❑ Other Warehouse ❑ Hospital Office Will there be a change of use? ❑ yes ,tq no If yes, extent of change: (Attach additional sheet if necessary) Will there be rack storage? yes ❑ no Existing fire protection features: 'Sprinklers ❑ automatic fire alarm ❑ none ❑ other (specify) Building Square Feet: ( I 0 I U 0 existing Area of Construction: (sq. ft.) Will there be storage of flammable /combustible hazardous material in the building? yes ❑ no Attach list of materials and storage location on separate 8 1/2 X 11 paper indicating quantities & Material Safety Data Sheets Commercial / Multi - Family Tenant Improvement / Alteration Permit Application CITY OF TUVWILA Permit Center 6300 Southcenter Blvd., Suite 100, Tukwila, WA 98188 (206) 431 -3670 Protect Nuin bir:'° Permlt;Number: rr. — 0(70 Application and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or facsimile. APPLICANT REQUEST FOR PUBLIC WORKS SITE/CIVIL PLAN REVIEW OF THEFOLLOWING: (Additional reviews may be determined by the Public Works Department) ❑ Channelization /Striping ❑ Curb cut/Access /Sidewalk ❑ Fire Loop /Hydrant (main to vault) #: Size(s): ❑ Land Altering 0 Cut cubic yds. 0 Fill cubic yds. ❑ Sanitary Side Sewer #: ❑ Sewer Main Extension ❑ Storm Drainage ❑ Street Use ❑ Water Main Extension ❑ Water Meter /Exempt #' Size(s): 0 Deduct Cl Water Meter /Permanent # Size(s): ❑ Water Meter Temp # Size(s): Est. quantity: ❑ Miscellaneous Cl Flood Control Zone ❑ Hauling ❑ Landscape Irrigation O Private 0 Public O Private 0 Public 0 Water Only gal Schedule: Value of Construction - In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review - Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The building official may extend the time for action by the applicant for a period not exceeding 180 days upon written request by the applicant as defined in Section 107.4 of the Uniform Building Code (current edition). No application shall be extended more than once. Date application accepted: i Date application expires: Applic atiora take , (initials) PLEASE SIGN BACK OF APPLICATION FORM CUP LRMTT.DOG 1/29/97 BUILDING OWN R OR AUTHORIZED AG -NT: Signature: 7 / Dater 7 p Print nan }e: L.0.147_ 0_ y i' 1..4 i .a!(.- Pho e: U to 'll� 5 r (.� �( Fax 1l : .- 'j c. 2 L, 5�3 8 Address- () c j S 1 A,,,,.... S. City /State /Zip �•. iii.. 1 IS/ �� ALL COMMERCIAL/MULTI -FA Y TENANT IMPROVEMENT/ALreATION PERMIT APPLICATIONS MUSTBE SUBMITTED WITH THE FOLL ING: ALL DRAWINGS TO BE STAMPED BY WASHINGTON STATE LICENSED ARCHITECT, STRUCTURAL ENGINEER OR CIVIL ENGINEER ALL DRAWINGS SHALL BE AT A LEGIBLE SCALE AND NEATLY DRAWN ➢ BUILDING SITE PLANS AND UTILITY PLANS ARE TO BE COMBINED N/A SUBMITTED ❑ LJ Complete Legal Description tl ❑ Metro: Non - Residential Sewer Use Certification if there is a change in the amount of plumbing fixtures (Form H -13). Business Declaration required (Form H -10). Four (4) sets of working drawings (five(5) sets for structural work), which include : ❑ Er Site Plan (including existing fire hydrant location(s) 1. North arrow and scale 2. Property lines, dimensions, setbacks, names of adjacent roads, any proposed or existing easements 3. Parking Analysis of existing and proposed capacity; proposed stalls with dimensions 4. Location of driveways, parking, loading & service areas 5. Recycle collection location and area calculations (change of use only) 6. Location and screening of outdoor storage (change of use only) 7. Limits of clearing /grading with existing and proposed topography at 2' intervals extending 5' beyond property's boundaries 8. Identify location of sensitive area slopes 20% or greater, wetlands, watercourses and their buffers (change of use only) 9. Identify location and size of existing trees that are located in sensitive areas and buffer (TMC 18.45.040), of those, identify by size and species which are to be removed and saved 10. Landscape plan with irrigation and existing trees to be saved by size and species (exterior changes or change of use only) 11 Location and gross floor area of existing structure with dimensions and setback 12. Lowest finished floor elevation (if in flood control zone) 13. See Public Works Checklist for detailed civil /site plan information required for Public Works Review (Form H- 9). 71 Q Floor plan: show location of tenant space with proposed use of each room labeled ❑ Er Overall building floor plan with adjacent tenant use; identify tenant space use and location of storage of any hazardous materials; dimensions of proposed tenant space. 0 ❑ Vicinity Map showing location of site ❑ Rack Storage: If adding new racks or altering existing rack storage, provide a floor plan identifying rack layout and all exit doors. Show dimensions of aisles, include dimensions of height, length, and width of rack. Structural calculations are required for rack storage eight feet and over. El' ❑ Indicate proposed construction of tenant space or addition and walls being demolished El ❑ Construction details 0 0 Sprinkler details - details of sprinkler hangers, specifically penetrations in structure, i.e., roof; size of water supply to sprinkler vault with documentation from contractor stating supply line will meet or exceed sprinkler system design criteria as identified by the Fire Department. 0 ❑ Washington State Non - Residential Energy Code Data shall be noted on the construction drawings. El ❑ SEPA Checklist - if intensification of use (check with Planning Department for thresholds). d a Attach plans, reports or other documentation required to comply with Sensitive Area Ordinance or other land use or SEPA decisions. 0 El Food service establishments require two (2) sets of stamped approved plans by the Seattle -King County Department of Public Health prior to submitting for building permit application. The Department of Public Health is located at 201 Smith Tower, Seattle, WA or call (206) 296 -4787. (Form I1 -5) ❑ ❑ Copy of Washington State Department of Labor and Industries Valid Contractor's License. If no ■R-Q contractor has been selected at time of application a copy of this license will be required before the s - � ' ¢ permit is issued OR submit Form H -4, "Affidavit in Lieu of Contractor Registration ". Building Owner /Authorized Agent If the applicant is other than the owner, registered architect/engineer, or contractor licensed by the State of Washington, a notarized letter from the property owner authorizing the agent to submit this permit application and obtain the permit will be required as part of this submittal I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. C7•I'I:IIMIT.1)0C 1/29/97 ACTIVITY NUMBER PROJECT NAME DEPARTMENT: COMPLETE (z COMMENTS • BUILDING DIVISION Aq2,r\ 5 PUBLIC WORKS r) 5-3 DETERMINATION OF COMPLETENESS: (T,Th) TUES/THURS ROUTING: PLEASE ROUTE 0 NO FURTHER REVIEW REQUIRED El ROUTED BY STAFF (If routed by staff, make copy to master file & enter Sierra.) REVIEWERS INITIAL REVIEWERS INITIAL REVIEWERS INITIAL C:ROUTE-F • Perms+ Ccuml. CoPy PLAN REVIEW / ROUTING SLIP 091 0 I - 70 DA1E 6•77 FIRE PREVENTION El awe. -50c I 19 t STRUCTURAL ik) • NOT COMPLETE Ei DATE APPROVALS OR CORRECTIONS: (ten days) APPROVED El APPROVED W/ CONDITIONS El DATE CORRECTION DETERMINATION: APPROVED fl APPROVED W/ CONDITIONS fl DATE a PLANNING DIVISION 0 Vg IQ) PERMIT COO FiTuR DUE DATE NOT APPROVED (attach comments) 0 (Certification of occupancy required. DUE DATE So q . 9 NOT APPLICABLE 1 1 DUE DATE 6 - NOT APPROVED (attach comments) [1 t .„) *rk' *fi .-l.'* . * ** * *i4 * *. * * * * * * * * *,%. * * *** * * ** * *. * *k * * * *k. * * * * *1A * * * * * ** o TRANSMIT it* �F *fi *u. * *,5* * * * ** **)*1t **k ** *,* *15*71* * ** CITY,,.OF; TUKWILA. NA ** * * * * *R * * * *A.* * * * ** ** TRANSMIT Number 89700592 Amount: 1.097.21 06/041.97 16:04 Payment 'Method: CHECK. Notation: CONESCO STORAGE Init: SLB Permit No: D97-0170 Type: DEVPERM DEVELOPMENT PERMIT Parcel N "5 « 420008-0924 Site Address: 17450 WEST VALLEY HY Total Fees: 1.097.21 This Payment 1,097.21 Total ALL Pmts: 1.0977.21 Balance: .00 **fi * * * ***,k % ************* d, * * * * * * * *d. * * **ItI.ItIt **I ** ** A A *71o1 *** * * * *I * Account Code 000/322.100 000/345.830 000/386.904 Deer ^iption BUILDING - NONRES PLAN CHECK - NONRES STATE BUILDING SURCHARGE Amount • 662.25 430.46 4•50 .. 1076 06/06 9719 TOTAL 1097.21 Project: K- w P�\ L ..PA x G aG�' Type of inspection: t rte-- - ° Gr>+► Address: rL'S' : v` • Date called: Special instructions: Date wanted: Co 12 Cr (D. p.m. Requester: Phone No.: INSPECTION NO.., CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 Approved per applicable codes. INSPECTION RECORT Retain a copy with pe .t 0110 PERMIT PERMIT NO. (206) 431 -3670 Corrections required prior to approval. COMMENTS:. C,s► c.�' i� c.a q4s r N 414 9 ail' Inspector: Date: r $42.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection, Receipt No.: Date: Pro� LU 6A�e- Type of inspection �,1 � ,p►c ire D t' , J V T r 1 Date called: ^ 30 --7 Special instructions: .erY ' Date wanted: 1 �j �] �a rr — 1 ` 1 p.m. Requester IA AAC,A - 1 Phone No.: 444' ^ �3'Jc7 ' : aarZt t. !.andnu *m.q«• a an .x *Xmvi c i..riy,;V }�m7nl.nogeen+wammanws wraara - . INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd:, #100; Tukwila, WA 981 Approved per applicable codes. COMMENTS: • Inspector: INSPECTION RECD" Retain a copy with p t Corrections required prior to approval. < 5 Ls 44 � 1 4/ WA,/ k , r,6Z4 e4 -.AJAr PERMIT NO. Date: 7- - / $42.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Receipt No.: Date: 206) 431 -3670 {; December 6, 1999 Frank Palmer 7745 First Avenue S Seattle, WA 98108 RE: Permit Status D97 -0170 17450 West Valley Hy Dear Mr. Palmer: In reviewing our current permit files, it appears that your permit for the installation of pallet racks issued on June 4, 1997 has not received a final inspection as of the date of this letter by the City of Tukwila Building Division. Per the Uniform Building Code and/or Uniform Mechanical Code, every permit issued by the building official under the provision of this code shall expire by limitation and become null and void if the building or work authorized by such permit is not commenced within 180 days from the date of such permit, or if the building or work authorized by such permit is suspended or abandoned at any time after the work is commenced for a period of 180 days. Based on the above, if a final inspection is not called for within ten (10) business days from the date of this letter, the Permit Center will close your file and the work completed to date will be considered non - complying and not in conformance with the Uniform Building Code and/or Mechanical Code. Please contact the Permit Center at (206)431 -3670 if you wish to schedule a final inspection. Thank you for your cooperation in this matter. Sincerely, Brenda Holt Permit Coordinator City of Tukwila Department of Community Development Xc: Permit File No. D97 -0170 Duane Griffin, Building Official John W. Rants, Mayor Steve Lancaster, Director 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • (206) 431\7670 • Fax (206) 43133665 Peter S. Higgins, S.E. Prepared For Conesco Storage Systems, Seattle, WA Prepared By: Peter S. Higgins And Associates Consulting Structural Engineers 1225-F North Pacific Glendale, CA (818) 549-0072 This Document and the design contain • and Associates. It is proviced as an be reproduced in any fashi,dn witho wr Notice/to B If this calculation is submit contain all sheets of call the next page(s), shal Section 1. All documents s7al ink of a contrasting calculation shall be sighted ac s copyright Peter S. Higgins rument of servic and shall not tten permission. Departmen s i val, it shall ste ilding permit app he tabl of contents on pan d b opri 11 d ngs listed in and nature in am Jo •er Reference. The s 1 k. OVIi1310 APPROVE 30 2 1997 1,, BOLDING DNIS100 ExPliss. 111AR 1 1998 RECEIVED CITY OF TUKWILA MAY 2 7 1997 PERMIT CENTER o 11 Project:.'.Skyway Luggage May. 8,',1997 VI) PELt S. HIGGINS AND ASSOCIATL) CONSULTING STRUCTURAL ENGINEERS ' 1.2.2.2 Short Formulation Table of Contents 1''Reference Data 1.1 Documents 1.1.1 Drawings 1.1.1.1 By, Peter S. Higgins and Associates ...... 1.1.1.2 By Others 1.2 Loads 1.2.1 Vertical (Dead plus Live) 1.2.2 Seismic 1.2.2.1 General (199 UBC UBC Chapter 22, Division Job No. 2604 Sheet ii 2 Basic 2 2.1 Components and Geometry 2 2.2 Check Beams 2 2.2.1 Design Forces ,'.. 2 2.2.2' Beam Properties 3 2.3 Check Posts (Dead plus Live Loads) 3. 2.3.1 Load to Post 3 2.3.2 Post Properties (net section) 3 2.4 Longitudinal Seismic 4 2.4.1 Base Shear 4 2.4.2 Design Forces 4 2.4.3 Post - Combined Stresses 4 2.4.4 Beam Connections 5 2.4.4.1 Design Forces 5 2.4.4.2 Connection Capacity 5 2.5 Transverse Seismic 5 2.5.1 Base Shear 5 2.5.2 Design Forces 5 2.5.2.1 Stability 5 2.5.2.2 Brace 6 2.5.2.2.1 Design Force 6 2.5.2.2.2 Brace Capacity 6 PEA. ;:c S. HIGGINS AND ASSOCIATIC, CONSULTING STRUCTURAL ENGINEERS Project: Skyway Luggage Job No. 2604 Sheet 1 May 8, 1997 1 Reference Data This calculation reviews the installation of storage racks for structural adequacy. The sealing of drawings is for the struc- tural review of the storage racks only. Other information is not reviewed, nor approved. 1.1 Documents 1.1.1 Drawings 1.2 Loads 1.1.1.1 By Peter S. Higgins and Associates AR - 1, LM - 3 1.1.1.2 By Others Conesco SKY -1 1.2.1 Vertical (Dead plus Live) Loads per level = 0.5 kips Design beams for 25% impact 1.2.2 Seismic 1.2.2.1 General (199 UBC UBC Chapter 22, Division VI) Where: IJ_ R 1 Thus: R =8 Longitudinal 6 Transverse v < 0.5631✓ R /s within the range: 0.031 ✓ <_I /5. 0.13711/ Z =0.3 I =1.00 1.25S T 2/3 S <1.5 (unless lower value per- mitted by soils report) W =Total Load (Dead Load of rack is usually negligible) T may be determined by any rational method, or the default C /R of 0.46 may be used. Project: Skyway Luggage May 8, 1997 2 Basic 2.1 Components and Geometry w • W=99" • a=60" b=60" c=60" Beam Type LBC25 2.2 Check Beams 2.2.1 Design Forces PWCA S. HIGGINS AND ASSOCIATk_f_ CONSULTING STRUCTURAL ENGINEERS 1.2.2.2 Short Formulation If racks are interconnected such that 4 posts in each direction resist lateral load, then •(using code defaults for C/R V = 0.137 DL+ _LL 0.07514/ 2 (since DL « LL) This condition is usually satisfied by interconnecting back to back rows of rack, or by tieing single rows across the aisles Ail 5_ (2)(8) =3.9 inch kips D H=240" D=44" l,=44 ld=56" Upright Type 150 s < m min =0.13 in Job No. 2604 . Sheet' 2 CONSULTING STRUCTURAL ENGINEERS Project: Skyway Luggage May 8, 1997 2.2.2 Beam Properties The drawing is a bit ambiguous. All three beams are possible and OK. 2.75" 0.88" F L, s 0.75" t 2.75" 0.88" - I_ I 1.5" t LB035 t=0.075in S in IX=L.19. if LBC35 t=0.075in S in I in LBF354 t=0.075in S in I in 2.75" 2.3 Check Posts (Dead plus Live Loads) 2.3.1 Load to Post p<(# of levels)(L) 2 =0.8 kips Job No.. 2604:: Sheet O.K. 2.3.2 Post Properties (net section) Again, the drawing is ambiguous. The 14 ga post is assumed (smallest post manufactured). O.K. _:R S. HIGGINS AND ASSOCIAt.L. CONSULTING STRUCTURAL ENGINEERS Project:. Skyway Luggage Job No. 2604 •May .8, 1997 Sheet 4 1 8 150 X 2.4 Longitudinal Seismic 2.4.1 Base Shear Determine Period - Rayleigh Method - UBC Method B. Deriva- tion supplied upon request. 3 T > 1 i�L ( 2n 2 +2n+ 1 2300N 1 Substituting yields T >0.9 sec Thus: V <0.073W 2.4.2 Design Forces P <0.8k; V <0.06k t =0.075 in As =0.39 in S =0.38 in r =1.21 in S =0.18 in r =0.66 in M <Va- (1.3) P < (0.06) (60) - (1.3) (0.8) = 2.3 inch kips 2.4.3 Post - Combined Stresses P M — +T P M = 0.32 <1.33 O•K• 1 /r =67 a /rx =50 F =18.2 ksi P =7.lk 24 k Units: kips, inches, seconds Where: W = Load per level L = Spacing between levels I = Moment of inertia of post n = Number of levels (fixity due to width of base plate) S. HIGGINS AND' ASSOCIAZ ' CONSULTING STRUCTURAL ENGINEERS ' Project': Skyway Luggage Job No.. 2604. May 1997 Sheet 5 2.4.4 Beam Connections 2.4.4.1 Design Forces Mconn_ 2.4.4.2 Connection Capacity 2 „ °YP) 7/1 6" diam. Rivet Va = 2.5 kips 2.5 Transverse Seismic 2.5.1 Base Shear Use Code Default Values for CS } V= 0.14W =0.21k 2.5.2 Design Forces D t V h' _P EQ 2.5.2.1 Stability Standard Connection M (1.33) (2.5) (4) =13.3 in k O.K. Vh' Peg = .D h' =120 inches P =0.6 kips Note: Bracing shown is schematic - see this section, subsection .2 for actual geometry. Peq$PD +L - Stable -No Uplift. Anchors provide added Factor of Safety. Use min. 3/8" diam. ICBO approved expan- sion anchors. Minimum embedment 2" into slab. O.K. PER S. HIGGINS . • CONSULTING STRUCTURAL ENGINEERi:y Project: Skyway Luggage May 8, 1997 • 2.5.2.2 Brace 2.5.2.2.1 Design Force 2.5.2.2.2 Brace Capacity Pbr1 • (in) 56 115. • 0.071" Anet= rrai in 4=0.76 City of Tukwila (fl -') a9, Fire Department Review Control # 01q7 -01 io Fire Department Thomas P. Keefe, Fire Chief Re: Rack at 5t,ock.1 Luce , ritAso W VCS i( iy Dear. Sir: The attached set of building plans have been reviewed by The Fire Prevention Bureau and are acceptable with the following concerns: 1. Storage may not be closer than 36 inches in all directions to ceiling -hung "Space or Unit" heaters. (UFC 1109.2) Storage may not be closer than 18 inches below sprinkler heads. (NFPA 13, 4 -2.5 and.NFPA 231.5 -1) 2. In double row racks with heights of storage up to and including 25', an average nominal 6" transverse flue space between loads or at rack uprights shall be maintained. (NFPA 231C 4 -3.1) Maintain minimum 6" longitudinal flue space between back to back racks. (NFPA 231C) 3. Where storage height exceeds 15 feet and ceiling sprinklers only are installed, fire protection by one of the following methods is required for steel building columns located within racks: (a) one -hour fire proofing, (b) sidewall sprinkler at the 15 foot elevation of the column, (c). ceiling sprinkler density minimums as determined by the Tukwila Fire Prevention Bureau. (NFPA 231C, 3 -2.3) 4.' Aisles leading to required exits shall be provided from all portions of buildings. Aisles located within .an accessible route of travel shall also comply with the Building Code requirements for accessibility. (UFC 1204.1) John W Rants, Mayor Headquarters Station: 444 Andover Park East • Tukwila, Washington 98188 • Phone: (206) 575.4404 • Fax (206) 5754439 at; 5weft1?3 x:y ,, •riSfras a ra ;u ' tN3v rn:v v+w.. ,,.«» s.., m o..w ,... Page number L" City of Tukwila Fire Department Thomas P. Keefe, Fire Chief • • 5. Depending on the classification of the commodity being stored and the size of the storage area, smoke vents and curtain boards may be required by Table 81 -A of the Uniform Fire Code. Contact the Tukwila Fire Prevention Bureau for further information. 6. Depending on the classification of the commodity being stored and the storage height, in -rack sprinklers may be required per N.F.P.A. 231C. Contact the Tukwila Fire Prevention Bureau for further information. 7. Refrain from blocking sprinkler coverage with shelving. NFPA standard #13 states that any shelving or decks in excess of 4 feet in width will require installation of sprinklers thereunder. 8. High -piled combustible storage is combustible materials in closely packed piles more than 12 feet in height or combustible materials on pallets or in racks more than 12 feet in height. For certain special- hazard commodities such as rubber tires, plastics, some flammable liquids, idle pallets, etc., the critical pile height may be as low as 6 feet. (UFC article 2, sec. 209 -H) Contact The Tukwila Fire Prevention Bureau to witness all required inspections and tests. (UFC 10.503) (City Ordinance #1742) This review limited to speculative tenant space only - special fire permits may be necessary depending on detailed description of intended use. Any overlooked hazardous condition and /or violation of the adopted Fire or Building Codes does not imply approval of such condition or violation. John W Rants, Mayor Headquarters Station: 444 Andover Park East • Tukwila, Washington 98188 • Phone: (206) 5754404 • Fax (206) 5754439 Headquarters Station: 444 Andover Park East • Tukwila, Washington 98188 • Phone: (20) 5754404 • Fax (206) 5754439 L I CENSE NUMBER CONTRACTOR NAME PARENT ' COMPANY SEARCH NAME ADDRESS LINE 1 ADDRESS L INE 2 C/TY,STATE , ZIP TELEPHONE EFFECTIVE DATE EXPIRATION DATE sus 2NDED :DATE, BIRTH DATE, ' • . OPT ION : 1 206 248 6636 MAY 15 '97 09: 34AM DEP • OF L&I TUKWILA CROCS 1 DE PARZ„,,NT OF LABOR AND INDUSTRIEL SLCS S CONTRACTOR :INFORMATION INQUIRY: DENVER (303 ) 455-7080 08/3 09/19/97 00/00/00 00 /00/ 00 00 CONESCO STORAGE 4495 aAS ON ST CONES SS 131NU. STATUS ACTIVE CONTRACTOR, TYPE CONS T CONT. CONESCO STORAGE SYSTEMS INC CO 80211 0 - 02- -C22 le 2.1 06 ez 6(. , COUNTY • . BUSINESS TYPE GRANDFATHER CODE $ PE CIALTY CODE 1 SPECIALTY CODE 2 OUT STATE CORP NiA OTHER SPEC UNUSED Model Hot Roned Shape W 1 D ( t As S,, rx ry \ 150 - 3.00 1 1.63 1 0.075 0.39 0.38 1.21 0.66 300 - 3.00 1 3.00 1 0.075 0.59 0.67 1.30 1.12 302 - 3.00 3.00 1 0.105 0.82 0.91 1.29 1.10 341 C3x4.1 0.75 3514LD 3.50 2.75 10.75 0.075 0.58 \ 454 C4x5.4 3.00 2.75 1.63 0.075 10.88 J / Type shaped A B d t Sx Is 3041 C3x4.1 11.10 1.66 4054 C4x5.4 11.93 3.85 5067 C5x6.7 3.00 7.49 2514LD 2.50 2.75 1 0.75 0.075 10.34 0.47 3014LD 3.00 2.75 10.75 0.075 0.46 0.75 3514LD 3.50 2.75 10.75 0.075 0.58 1.12 3024 3.00 2.75 1.63 0.075 10.88 1.36 3524 3.50 2.75 1.63 0.075 1.02 1.90 4024 4.00 2.75 1.63 0.075 1.25 2.62 4524 4.50 2.75 1.63 0.075 1.48 3.48 5024 5.00 2.75 1.63 0.075 1.73 4.50 5524 5.50 2.75 1.63 0.075 2.00 5.68 6024 6.00 2.75 1.63 0.075 2.28 7.03 6022 6.00 2.75 1.63 0.105 3.04 9.37_, i Type All C 1.50 1.50 GENERAL NOTES CONN. 1 BRACE DIMENSIONS t= 0.075" 1 This drawing shows standard details of the rack product line only. See engineer approved installation drawings (same Job number) for components used, special details, arrangement, and site specific information. 2. The installation drawings govern over this drawing. 3. MATERIAL Steel - Cold Formed - ASTM A570 Grade 50 UNO Hot Rolled - ASTM A36 Welding Electrodes - AWS E70 -XX (all welds single pass fillet welds designed at 50% stress levels) 4. Expansion Anchors shall be ICBO approved types. e.g. Hilti Kwik Bolt (ICBO RR #2156, 4627) ITW Ramset/Red Head JS type (ICBO RR #1372) Gunnebo Taper -Bolt Sup -R -Stud (ICBO RR #3219) Embedment shall be minimum 5X Bolt Diameter. Other similar anchors may be used if ICBO approved. The anchor types, sizes, and embedments shown on the installation drawing govern over the sizes shown on this drawing. Special inspections are not required unless noted on the installation drawings. 3a TYPICAL 1' Returns B 0.88 \ '' UNO RIVET PATTERN 2 Rivet Clip Standard 3 Rivet Clip Optional 1/8 RIVET -typ 3/16" CONNECTOR PLATE ON BEAM BEAMS 5. Unless noted otherwise on the installation drawings, the allowable soil bearing value is 1.0 KSF. BEAM - COLUMN CONN. 7/16" (Nom.) ASTM A502 -3 Rivets DIMENSIONS AND PROPERTIES UNITS: INCHES UNO BEAM® BU MU N COLUMNS �� - t uIMENSIJNS AND rrturCR I IES NET SECTION - UNITS: INCHES UNO PETER -1(Hi anI AND ASSOCIA ES STRUCTURAL E GINEERS 1225 -F NO:TH ACIFIC ,G ' Co CO YI G AND D GBY WR GNED.. C - NG PE r BE St 18 -54 IG ARE CO 01T. EN PERMI O ONLY S ONLY ARE V •.40 FOR AP`LICATION. RAWING A OSS T IS BLOCK. 1 U t o 1997 6-4 -96 WN KED APPROVED P. H. STANDARD RECEIVED T =11 ga CITY OF TUKWILA PERMIT CENTER Min. 3 /8" Anchor (1 per post) FRONT TYPICAL ELEVATIONS SEE INSTALLATION DRAWINGS FOR SITE SPECIFIC INFORMATION 0 u-� BASE PLATES COMMON SIZES ONLY SEE INSTALLATION DRAWINGS FOR CUSTOM SIZES AND ANCHORAGE ANDERSEN RACK, INC. 3 INCH TEARDROP STYLE STORAGE RACKS STANDARD DETAILS Min. 1 /2" Anchor (2 per post) 7 SEISMIC (t= 318 ") SIDE Added 1/8 V \ Welds Job # 260 Drawing # Type A i B d! t 1 Sx lx LB020 2.00 2.75 0.75 0.0751 0.27 1 0.29 LB030 3.00 2.75 0.7510.07510.4710.76 L9035 3.50 2.75 10.75 ! 0.0751 0.63 1 1.19 LBC30 3.00 2.75 0.75 1 0.0751 0.88 1.37 LBC35 3.50 2.75 0.7510.075 1.05 11.95 LBC40 4.00 , 2.75 1.50 1 0.075 1.27 12.66 LBC45 4.50 2.75 1.50 1 0.075 1.50 13.51 LBC50 5.00 2.75 1.50 1 0.075 1.77 14.64 LBC50 5.00 2.75 1.50 1 0.075 1.77 1 4.64 LBC55 5.00 2.75 1.50 I 0.075 2.05 1 5.80 LBC55A 5.00 2.75 1.50 1 0.105 2.76 17 79 LBC60A 6.00 2.75 1.50 1 0.1051 3.14 19.59 LBF354 3.50 2.75 1.5010.075 0.77 1.47 LBF404 4.00 2.75 1.50 10.075 0.94 2.05 LBF454 4.50 2.75 1.5010.075 1.14 2.75 \ LBF453 4.50 2.75 1.50 1 0.089 1.30 3 14 DAT 7'26 -95 CHECKED APPROVED PETER' 0. NIGCINS AND ASSOCIATES STRUCTURAL ENGINEERS 122 - N TH PACIFIC ENDA - .( 02 818- 49- X0 6] D ING AND E N AR CO IGHT C P NG BY N PER N ONLY ET IGNED"G IE • ONLY ARE ALID FOR BUI�'CIpIG'PE� IT A• PLICATION, DRAWING MUST BE SI NED ' C ROSS , OHIS BLOCK GENERAL NOTES CONN. , 3a Type All C e 1.50 I 1.25 , T BRACE DIMENSIONS Min. 1 =0.060 1. This drawing shows standard details of the rack product line only. See engineer approved installation drawings (same Job number) for components used, special details, arrangement, and site specific information. 2. The installation drawings govern over this drawing. 3 MATERIAL Steel - ASTM A570 Grade 50 UNO Welding Electrodes - AWS E70 -XX (all welds single pass fillet welds designed at 50% stress levels) 4. Expansion Anchors shall be ICBO approved types. e.g. Hilti Kwik Bolt (ICBO RR #2156, 4627) ITW Ramset/Red Head JS type (ICBO RR #1372) Gunnebo Taper -Bolt Sup -R. Stud (ICBO RR #3219) Embedment shall be minimum 5X Bolt Diameter. Other similar anchors may be used if ICBO approved. The anchor types, sizes, and embedments shown on the installation drawing govern over the sizes shown on this drawing. Special inspections are not required unless noted on the installation drawings. 5 Unless noted otherwise on the installation drawings, the allowable soil bearing value is 1.0 KSF. 0.88 RIVET PATTERN 3 Rivet Clip Standard 4 Rivet Clip Optional O POST each vertical face 1/8 V RIVET -typ 3116" CONNECTOR PLATE ON BEAM DIMENSIONS AND PROPERTIES UNITS: INCHES UNO BEAMS BEAM- COLUMN CONN. 7/16" (Nom.) ASTM A502 -3 Rivets BEAM® �J Type W I D t l As Sx LM15 LM20 3.00 1 1.63 1 0.075 1 0.38 1 0.37 1 1.21 1 0.68 3.00 I, 3.00 1 0.075 1 0.58 1 0.67 I 1.31 1 1.12 LM30 3.00 i 3.00 0.105 1 0.80 1 0.89 1 1.29 1 1.10 LM40 3.00 1 3.00 0.135 1 1.00 1 1.10 1 1.28 I 1.08 MAY IT T D COLUMNS DIMENSIONS AND PROPERTIES NET SECTION - UNITS: INCHES UNO I E%PIRES. MAR 2 1 19a 118 V RECEIVED CITY OF TUKWILA PERMIT CENTER P17-0170 Min. 3/8" Anchor (1 per post) STANDARD T =11 ga FRONT TYPICAL ELEVATIONS SEE INSTALLATION DRAWINGS FOR SITE SPECIFIC INFORMATION BASE PLATES COMMON SIZES ONLY SEE INSTALLATION DRAWINGS FOR CUSTOM SIZES AND ANCHORAGE LODI METAL TECH STORAGE RACKS (Fy =50 ksi) STANDARD DETAILS Min. 12" Anchor (2 per post) ______' Added ve V We lds 7.00" SEISMIC ( =3181 Job # D 60 4 Drawing # LM -3 4 PLAN L 1l_ :o`r E ILI Nl� 7 L4N /I(/ PL= 924.4ot,' ? s <,, ft, J. 0o' -4 21 ; ' I5.2o eASaME^IT AP V I G I N 17- H E4 1 (,0 s1, fit, Ex - .'r P'oEt lu ; — E &4 r Ex.? T 13EAM5 2 aka' VENT E<' t (tarp y r zx�' f+— %kS SEAM NEw Jf2GTW5 FI%b jAF G _ • - Curb Mount Frame — S.S. or Alum. Nails (by others) Built up Rooting —_ (by others; TAX I.D. NUMBER 4200-08092447 165' F 21Z 213(7 36_0 _ 5(_ x 99 M O V ENI BUILDING OWNER AND ADDRESS Douglas Rosen ALCO Investment Co. 3223 Sixth Avenue South Seattle, Washington 98124 (206) 623 -5800 BUILDING ADDRESS 17450 West Valley Highway Tukwilia, Washington 98188 TENANT INFORMATION_ Skyway Luggage - Contact: Tom McMakin 1206) 441-5300 PROJECT ADMINISTRATOR AND CONTACT Keith F. Howell 4700 Colorado Avenue South Seattle, Washington 98134 (2061 763 -8156 ZQ+'IG Commercial- Light Industrial OCCUPANCY CLASS Group F Occupancy Division 1: No change Fusible 1 ink Rating: Maximum Allowable Exposure: LEGAL DESCRIPTION The North 321.90 feet of the South 923.00 feet of that portion of government Lot Section 25, Township 23 North, Range 4 East, W.k4., in King County, and east of the West Valley Road; Except that portion conveyed to the State of Washington for highway purposes recorded under Recording Soother 6409834. PROJECT DESCRIPTION Existing warehouse building to be used for luggage storage and distribution. Upgrade batik: :ng to a Class 3- Fire Commodity. This requires the installation of curtain boards and smoke vents. DRAWING INDEX A0.1: Site Flan, Vicinity Plan, Ceiling Plan, Smoke Vent Detail, Curtain Board Detail, General Description, SQUARE FOOTAGE Righting Arnn; Existing: 44.800.00 f f TOTAL 44,800.00 s.f. GENERAL NOTES Drawings indicated general and typical details of construction. Contractors shall verify all dintensiars and conditions for compatibility before proceeding. Drawings shall be used in conjunction with structural, electrical and mechanical drawings (when applicable) for bidding and construction. Contractor shall be responsible for all safety precautions and the methods, techniques, sequences or procedures required to perform the work. 100' F 150' 225 300' SMOKE VENT P1REDj Acrylic Domes UL Fusible Link Curb Opening { SPECIFICATIONS manufactured by Arct its tout be factory Inc. Each Marto sf all S se l m single or double acrylic domes. Acrylic domes to conform to AAMA )601.( -1976 tar a dealpn food of 40 pal. Curb mounted units shall be tanned with 6093 -19 Extruded Aluminum with a minimum wall It.icknesa of nit) inches. Deck mounted sea fly J with factory netund S efii^a) shall ), equipped shoe G onua Spr mounted eurb with 1 Insula0an (optton��al)), Operation by n dat lotion Oar Spdnma Waal standout, avodrddn. APPROVAL 518EET /12 ARCHITECTURAL SPECIALTIES INC. P.O. DOX 22325 PORTLAND OR 97222 Pli. (503) 232 -2966 FAX (503) 232 -9028 PROJECT _ ARCI•II'fECi CQNTRACI 011 APPROVED BY b DRAWN BY D .ray RECEIVED ),ITV OF ,iKv`F ary OF 8X09) A • n, PPROVFD 7 I 221 PERMIT CENTER r.l g oo Oo Qs, 7- kola o Q co) e-a T � V f-4 trl Z `t J bc'j -ono W A M Era I I I I �C OFFICES /SHOWROOM 280' -0" PLAN V I E WscALE: 1/16" =1' -0" C 160 -0" 20` -0" 12' --- END VIEW (DOUBLE ROW) 20' -0" THIS DRAWING AND THE INFORMATION CONTAINED HEREIN IS THE PROPERTY. OF EEC�' BE USS EN TORAGE SYSTEMSeINC. AND SHALL CON NO7 ED OR DISCLOSED WITHO THE EXPRESS WRITT. MI EF;CUNESCO DRAWING SUB;JDCT Tp'RETURN' DEMAN'I9t 44" 99" 500 LBS. PER LEVEL 500 LBS. PER LEVEL 500 LBS. PER LEVEL FRONT VIEW ELEVATION VIEW SCALE_: 1/4' =1' -0" CUSTOMER SCALE. 20` -0" NOTED 4/22/97 END VIEW (SINGLE ROW) 5' -0 " TYP, LMT LOAD BEAM M ❑D# LBL35 -099 3 1/2" X 99' W/1 5/8" STEP SKYWAY LUGGAGE - SEATTLE, WA. APPROVALS TITLE `rk vnut --44" -I150 240 44 UPRIGHT FRAME 20' H X 44' D W /3" X 1 5/8" X 13 -GA, COLUMN AND STANDARD POUT PLATE ANDERSEN RACK SYSTEMS, INC. � 2- 7,4D-cPl iJ04, /461/4x h" ve DisiraAce. '{'o GXI+ v►nal tua- viceaa Z0° fee+. (u'sC 1003.x) � l B G s 'oy c rand that the Plan Check approvals are. and am.ssion5 and approval pt Poe, urti authorize the violation of any cteri ie o- ota •nance Receipt of con- . col of approved plans aowledged: • gam Permit IN Dq1 - 0l10 DATE. REVISION �t ^ ....�.. N.C.. e C O u � I I IE S C O 1101 WILEY RD. 7745 1st AYE S. 4495 .JASRH ST. SHAUM9URE. IL 60173 SEATTLE WA 98108 DENVER, CIt 80211 (708) 882 - 0207. 5206) 762 5969 - (303) 455'7080 0 STORAGE 8YBTEMS 11MG. FAX (708)862=0811 FAX (206)762 -6538 FAX (303)455 -7006 ITs.H.�cm:sar 2 c 21 s��_ �rv�r,:�c'UH4: Ef;envEEa 2B04 MAY - 91997 JOB NUMBER U�.E DRAWN. F, Palmer - DRAWINC1iNp: Env OF TURWF n AP PRO JUN -219 SEPARATE. " - MIT REQUIRED FOR: 0 LEO ICAL 0 AL 0 PLUMBI G ; O GAS PIi1NG CITY Ott' KW ILA BUiLDINE. IYISION a