Loading...
HomeMy WebLinkAboutPermit D97-0208 - BOEING #21-04 - STORAGE RACKSCity of Tukwila Community Development / Public Works • 6300 Southcenter Boulevard, Suite 100 • Tukwila, Washington 98188 WARNING: IF CONSTRUCTION BEGINS BEFORE APPEAL PERIOD EXPIRES, APPLICANT IS PROCEEDING AT THEIR OWN RISK. Parcel No: 102304 -9069 Address: 3417 S 120 PL Suite No: Location: Category: ACOM Type: DEVPERM Zoning: MIC /L Const Type: RACKS Gas /Elec.: Units: 001 Setbacks: North: Water: 125 Wetlands: Contractor License No :BOEINC *294ML Signature: Print Name: DEVELOPMENT PERMIT Permit No: Status: Issued: Expires: .0 South: .0 East: .0 West: .0 Sewer: VAL; VUE Slopes: Y Streams: Date: End Time: Fill: End Time (206) 431-3670 D97 -0208 ISSUED 07/08/1997 01/04/1998 Occupancy: WAREHOUSE UBC: 1994 Fire Protection: SPRINKLERS OCCUPANT BOEING #21 -04 3417= 5° 120 PL, SEATTLE, WA 98124 OWNER SABEY CORPORATION 201 ELLIOTT AVE. WEST, SUITE 400, SEATTLE WA 98119 CONTRACTOR BOEING COMPANY P.O. BOX 3707, M /S. IF -09, SEATTLE, WA 98124 CONTACT GARY TALLER Phone: 206.5 -2975 P.O. BOX 3707, M/S 46 -87, SEATTLE, WA 98124 ***** * * * * * * * * * * * * * * ** * * ** * * * * *** * ** ***** k***** **** * * ** * ** * ** *** * * * *** *** * * * * ** * * *** Permit Description: EARRANGE EXISTING PALLET RACK SHELF HEIGHTS. ***************************************************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Construction Valuation: $ .00 PUBLIC WORKS PERMITS: *(Water Meter Permits Listed Separate) Eng. Curb Cut /Access /Sidewalk /CSS: N Fire Loop Hydrant: N No: Size(in): .00 Flood Control Zone: N Hauling: N Start Time: Land Altering: N Cut: Landscape Irrigation: N Moving Oversized Load: N Start Time: Sanitary Side Sewer: N . No: Sewer Main Extension: N Private: N Public: N Storm Drainage: N Street Use: N Water Main Extension: N Private: N Public: N ****************************************************** * * * * * * * * * * * * * * * * * * * * * * * ** * * * *k TOTAL DEVELOPMENT PERMIT FEES: $ . 148.46 k***************************************************** * * * * * * * * * * * * * * * * * * * * * * * * * * *** Permit Center Authorized Signature :____ d,_< Date :''Q� 7 I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provision of any other -state or local laws regulating construction or the performance of work. am authorized to sign for and obtain this development permi This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. ht�uM:d:. CITY OF TUKW.tLA Address: _ 3417 S 120: FL' Fermi t No: D97 -0208 •Sui.te tenant :Status: ISSUED Tupe: DEVPEFM Applied: 06/26/1997 Parcel #: 102304 9/169 Issued:" 07/08/1997 *•k * *"R' *. * * *:k* **4,4,4, k•k ** ** k k * * ** *'•k *'* *** k• k* k• k*****•*• k.• k• k*• k• k** * **•k *: ** *•k *•k'k* *•#•k**•k•k* F ermit Conditions: T No changes :: 11 be made to the plans unless :appr,oved by the Architect .:or Engineer and the TukwilaBui1ding Division. 2 • Al : l per mit,s in,spection� arec�rdsl and appl Dyed: plans;shal1 be avai:.lable, ~ the ap. doc . 01i ' pr• *ior to. -tl a �st:ai t.; of 'a:any con - s Th ese uments $,are' to- be maintained and avai 1- ab'1 until ;fin l inspection 1 p j p r oval is .granted a ▪ A .l:l constr`u :on `tc: fie done l r co`nforman w1:th approved • plans h i r emerrts.; of the Un i f orm Bu i'I dLi ode (1994 Edition) °as�,'amended. R .i 4 . Va d i tv. of Permit: The issuance :of 'a permit approval of p 1'ans, s�p`e.ciffc:ations, 'and cpmputations shal1, not 4b e :con strued o : be. a , per mi t f `, = an approval of , anv',viol,ati on . of an of� the - prov s i and: of .,the building :.code . or of any A.Y other tordinance:`sof the s-jur i s`diction No permit presuming give autsfir,i o?ty Ito :violate or ,cancel the provisions of this c: o d� e s h all ".be , 1 i d. Project Name/Tenant: ,� BOEiNG BLDG. u ;24 ��-014 Value of Construction: l / � � `]' eta Site Address: City State /Zip: T � 3i-0 s, /Ao 1 Tax Parcel Number: /0a3o 9069 Will there be rack storage? 71 yes ❑ no Property Owner: THE BOEING COMPANY Phone: • Street Address: cf/ P.q. 90X 3707 M/S 46 -87 SEATTLE, ly e �W124 Fax #: Contact Person: GARY TALLER /544 P e: - 2975/ Street Address: City State /Zip: P.O. BOX 3707 MIS 46 -87 SEATTLE, WA 9812 Fax #: 206- 544 -2854 Contractor: , 6OQ Phone: Street Address: City State /Zip: Fax #: Architect: Phone: Street Address: City State /Zip: Fax #: Engineer. U0 �• 1 �► ^ I�s Phone: 65`vl --- -S,�32 Street Address: City State /Zip: Fax #: Description of work to done: N l � n Gc S J n , I , ar` )2.e_ �. eX i T K (L / r l / / e Existing use: ❑ Retail ❑ r estaurant ❑ Multi-family klai Warehouse ❑Hospital ❑ Church Manufacturing ❑ Motel /Hotel ❑ Office ❑ School /College /University ❑ Other Proposed use: ❑ Retail ❑ Restaurant ❑ Multi- family gl Warehouse Hospital ❑ Church ® Manufacturing ❑ Motel /Hotel ❑ Office ❑ School /College /University ❑ Other Will there be a change of use? ❑ yes % no If yes, extent of change: (Attach additional sheet if necessary) Will there be rack storage? 71 yes ❑ no Existing fire protection features: ❑ automatic fire alarm C3 none ❑ other (specify) , • / sprinklers Building Square Feet: ) / 7-2 , existing 1 Area of Construction: (sq. ft.) 604 Will there be storage of flammable /combustible hazardous material Attach list.of materials and storage location on separate 8 1/2 In the building? ❑ yes 71 no X 11 paper Indicating quantities & Material Safety Data Sheets CITY UP= r''KWILA Permit Center 6300 Southcenter Boulevard, Suite 100 Tukwila, WA 98188 (206) 431 -3670 JOB # I(9024 / Commercial / Multi- Family Tenant Improvement / Alteration Permit Application Application and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mall or facsimile. 1 ugt Pt APPLICANT: REQUEST FOR PUBLIC. WORKS; SITE/ C, IVILAPIAN!REVIEWOF:THE+FOLLOWING: (Additional reviews maybe .determined•by'the'Publlc•Works Department) ? `' ❑ Channelization /Striping ❑ Land Altering 0 Cut cubic yds. ❑ Sanitary Side Sewer #• ❑ Storm Drainage ❑ Street Use ❑ Water Meter /Exempt #: Size(sy ❑ Water Meter /Permanent # Size(s)* ❑ Water Meter Temp # Size(s): Est. quantity: ❑ Miscellaneous ❑ Curb cut/Access /Sidewalk ❑ Flood Control Zone ❑ Hauling 0 Fill cubic yds. ❑ Landscape irrigation ❑ Sewer Main Extension 0 Private 0 Public ❑ Water Main Extension 0 Private 0 Public 0 Deduct 0 Water Only gal Schedule: Value of Construction - In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review - Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The building official may extend the time for action by the applicant for a period not exceeding 180 days upon written request by the applicant as defined in Section 107.4 of the Uniform Building Code (current edition). No application shall be extended more than once. Data application accepted: ( /1 Dale application expires: IQ @b ad Application t y: (initials) Ci PERMIT.DOC 7/9/96 /: '' ... .... BUILDING OWN ,, OR AU 0 . 0 AGENT: Signature: t / Date: Print name: GARY f ALLER Phone: -544 -2975 Fax A: 206- 544 -2854 Address P.tt, BOX 3707 M/S 116 -87 City /State /Zip SEATTLE, WA 9812 ALL COMMERCIAL/MULTI -FAh Y TENANT IMPROVEMENT /AL ATION PERMIT APPLICATIONS MUST BE SUBMITTED WITH THE FOLLOWING: ALL DRAWINGS TO BE STAMPED BY WASHINGTON STATE LICENSED ARCHITECT, STRUCTURAL ENGINEER OR CIVIL ENGINEER ➢ ALL DRAWINGS SHALL BE AT A LEGIBLE SCALE AND NEATLY DRAWN ➢ BUILDING SITE PLANS AND UTILITY PLANS ARE TO BE COMBINED N/A SUBMITTED ❑ ❑ Complete Legal Description ❑ ❑ Metro: Non - Residential Sewer Use Certification if there is a change in the amount of plumbing fixtures (Form H -13). Business Declaration required (Form H -10). Five (5) sets of working drawings, which include : ❑ ❑ Site Plan (including existing fire hydrant location(s) 1. North arrow and scale 2. Property lines, dimensions, setbacks, names of adjacent roads, any proposed or existing easements 3. Parking Analysis of existing and proposed capacity; proposed stalls with dimensions 4. Location of driveways, parking, loading & service areas 5. Recycle collection location and area calculations (change of use only) 6. Location and screening of outdoor storage (change of use only) 7. Limits of clearing /grading with existing and proposed topography at 2' intervals extending 5' beyond property's boundaries 8. Identify location of sensitive area slopes 20% or greater, wetlands, watercourses and their buffers (change of use only) 9. Identify location and size of existing trees that are located in sensitive areas and buffer (TMC 18.45.040), of those, identify by size and species which are to be removed and saved 10. Landscape plan with irrigation and existing trees to be saved by size and species (exterior changes or change of use only) 11. Location and gross floor area of existing structure with dimensions and setback 12. Lowest finished floor elevation (if in flood control zone) 13. See Public Works Checklist for detailed civil /site plan information required for Public Works Review (Form H- 9). ❑ ❑ Floor plan: show location of tenant space with proposed use of each room labeled ❑ ❑ Overall building floor plan with adjacent tenant use; identify tenant space use and location of storage of any hazardous materials; dimensions of proposed tenant space. ❑ ❑ Vicinity Map showing location of site ❑ ❑ Rack Storage: If adding new racks or altering existing rack storage, provide a floor plan identifying rack layout and all exit doors. Show dimensions of aisles, include dimensions of height, length, and width of rack. Structural calculations are required for rack storage eight feet and over. ❑ ❑ Indicate proposed construction of tenant space or addition and walls being demolished ❑ ❑ Construction details ❑ ❑ Sprinkler details - details of sprinkler hangers, specifically penetrations in structure, i.e., roof; size of water supply to sprinkler vault with documentation from contractor stating supply line will meet or exceed sprinkler system design criteria as identified by the Fire Department. ❑ ❑ Washington State Non- Residential Energy Code Date shall be noted on the construction drawings. ❑ ❑ SEPA Checklist - if intensification of use (check with Planning Department for thresholds). ❑ El Attach plans, reports or other documentation required to comply with Sensitive Area Ordinance or other land use or SEPA decisions. Cl ❑ Food service establishments require two (2) sets of stamped approved plans by the Seattle -King County Department of Public Health prior to submitting for building permit application. The Department of Public Health is located at 201 Smith Tower, Seattle, WA or call (206) 296 -4787. (Form H -5) ❑ ❑ Copy of Washington State Department of Labor and Industries Valid Contractor's License. If no contractor has been selected at time of application a copy of this license will be required before the permit is issued OR submit Form H -4, "Affidavit in Lieu of Certificate of Contractor ". Building Owner /Authorized Agent If the applicant is other than the owner, registered architect/engineer, or contractor licensed by the State of Washington, a notarized letter from the property owner authorizing the agent to submit this permit application and obtain the permit will be required as part of this submittal I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND 1 AM AUTHORIZED TO APPLY FOR THIS PERMIT. CTPLRMIT.DOC 7/9/96 r k** ** * **A*kkkk ** * * ** *k ** {************ *A** *** * *** *kk* *h *kkk * * * * ** 1RANSMIT * * * *k * * * * * * *k * * * * * *kk * * *•k* 148.46 06/26/97 11 :03 Init: SLB TT:Y .OF . TUKWILA. WA ..r ** ** * * ** * *k * *A * *k ** * *• . *lk*1k ** TRANSMIT Number; R9700605 Amount: Payment Method: CASH Notation: BOEING Permit No D97.0208 Type: DEVPERM DEVELOPMEWt PCRMIP Parcel 102.304 -9069 Site Address: 34y7 S 120 PL Total Fees: ,148.46 This : Payment 148..46 Total ALL Pats: 148.46 Balance: .00 **** * * * * * * *A * * *fA*,* * *•A * * *4 * * ** **** * * * * * ** * *4* * * * *k * * * * ** * * * * ** Account Code 000/322.100 000/345.. 830 000/388.904, Description HUILDING NOHRES PLAN_ CHECK - NONRES STATE E;UIL0 NG SURCHARGE Amount • 87.25 - 56.71 4.;0 ;:•7 66/26 9711 TOTAL. Project: / t Type of ins ctior Address: Date calle . --- Special instructions: _ Date wanted: V � a.m. Requester: Phone No.: INSPECTION RECORD Retain a copy with permit INSPEC •N NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 Approved per applicable codes. $42.00 REINSPECTION , ' EE REGI !RED. Prior to inspection, fee must be paid at 6300 Southcent -r Blvd., Suite 100. Call to schedule reinspection. Receipt No.: Date: PERMIT NO. (206) 431 -3670 Corrections required prior to approval. is Project: n _ r..* 0(-) 24- 0 - Type of inspection: (2,'3. Address: (1 i Iti if L. Date called: sAl Date wanted: Special instructions: 'x''' ': Requester: 4 Phone No.: ',1 rode CITY OF TUKWILA BUILDING DIVISION '-' 6300 Southcenter Blvd., #100, Tukwila, WA 98188 INSPEefi51■1 NO. Approved per applicable codes. [Receipt No.: INSPECTION RECORD 0 Retain a copy with permit (206) 431-3670 Corrections required prior to approval. -Qpmm E NTS: f a tiv e (4' / 2-0 co he 5. If 4 414Aliblill r. Ff $42.00 REINSPECTIO EE R QUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Date: Project: Z EI a oZ( t, Type of inspection:p AClid F— Address 34-I 1 S I '� 1 called: Dt � J� Special instructions: Date wanted: $f 21 I c j '. a.m... Requester: itIttti Phone No.: INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 101 Approved per applicable codes. COMMENTS: Inspector: I r eceipt No.: INSPECTION RECORD Retain a copy with permit II LAN- ck-S `- Corrections required prior to. approval. $42.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. C - i 0 Zocc PERMIT NO. Date: z1 7,:ti \ 91 (206) 431 -3670 Date: Project: _ J 2 / / Type of inspection 6 4 7 Address: Date called: Special instructions: .. � Date wanted: 12 7 a.m. Requester: Phone No7 346;2 eaii 11 INSPECTION . RECORD„ Retain a cdpy with permit INSPEC •N NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 9818 PERMIT NO (206) 431 -3670 Approved per applicable codes. MMENTS: Th Inspector: I Corrections required prior to approval. S $42.00 REINSPECTIO ! FEE R QUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Receipt No.: Date: City of Tukwila Fire Department TUKWILA FIRE DEPARTMENT FINAL APPROVAL FORM Project Name PQ t�hac Z_( —04 Address 4t� 121, QL Retain current inspection schedule Needs shift inspection Approved without correction notice Approved with correction notice issued Sprinklers: Fire Alarm: Hood & Duct: Halon: Monitor: Pre -Fire: Permits: Authorized Signature FINALAPP.FRM T.F.D. Form F.P. 85 John W. Rants, Mayor Thomas P. Keefe, Fire Chief Permit No \ Qf ' Lc) Suite # 5. Date Headquarters Station: 444 Andover Park East • Tukwila, Washington 98188 • Phone: (206) 5754404 • Fax (206) 5754439 February 10, 1997 1- 9604- DBW97024 To: Subject: 1997 Washington State Contractor's License for The Boeing Company Enclosed is a copy of the Washington State Contractor's License for 1997. This license expires on January 1, 1998. Please contact me if you have any questions. ,4 D. B. Weigelt 1 -9604, 1F-09 (206) 655 -4535 Enclosure Larry Allen 19 -35 Leonard Astemborski OH -13 Terry Beals 63 -04 Rick Ford 2R -71 Len Knecht 63 -04 N. Konwent 5H -26 John Murdoch 89 -14 N. Pestisme 63 -04 Lori Pitzer 2R -71 Mike Sullivan 3U -EH Gary Taller 46 -87 Rex Turner 7R -35 ROE [ NC::294ML STATE OF WASHINGTON F625-052-00313-821 BLDG 21 -04 B/5 -H /8 8 SUMMARY BOEING FACILITIES P.O. Box 3707 Seattle, Washington 981242207 Mail Stop: 46-87 awl BUILDING: 21 -04 LOCATION: B/5 -H /8 SUMMARY: FILENAME: PR160241.XLS PROJECT RELOC. PROPERTY FINANCE MN JOB NO. 160241 -00 FIG. BY JBURKS CHECKED BY &. jfl DATE 6/9/97 SHEET METHODOLOGY: , THE FOLLOWING CALCULATIONS REVIEW PALLET RACKS FOR GRAVITY AND LATERAL LOADS. THE MAXIMUM CAPACITY OF THE RACKS, GIVEN THE CONFIGURATION AND LOCATION, WAS DETERMINED. _ POSTED LOAD LIMIT: 1000 LBS PER SHELF STRUCTURAL CAPACITY: 700 81000 LBS PER SHELF EXPIRES 12/11/ q1 THE ABOVE NOTED PALLET RACK IS STRUCTURALLY ADEQUATE FOR A MAXIMUM SHELF LOAD OF 700 &1000 LBS PER SHELF, UNIFORMLY DISTRIBUTED. THIS LIMIT APPLIES TO THE CURRENT CONFIGURATION AND LOCATION ONLY. FIELD OBSERVATIONS: THE LIMITING CONDITION FOR THESE RACKS ARE THE WELDS IN THE BEAMS. THE 10' BEAMS ARE LI MITED TO 700 LB SHELF LOAD DUE TO THE TYPE 'A' WELD. THE 14' BEAMS ARE LIMITED TO 1000 LB SHELF LOAD DUE TO TYPE 'A' WELDS. RECOMMENDATIONS: THE EXISTING PALLET RACK IS ADEQUATE FOR THE NEW SHELF CONFIGURATION, WITH THE EXCEPTION OF DOWN LOADING THE 10' BEAM CAPACITY TO 700 LBS RATHER THAN 1000 LBS. BEAMS 10' LBF 404 14' LBC50 AND 377B COLUMNS LMT30 TYPE 'A' WELD (VERTICAL) 4 PIN CONNECTION BASEPLATE 1/2" X 8" X 8" WITH (2) 1/2" X 3 1/2" MIN. EMBED HILT! KWIK BOLT II ROW SPACER RS -6 6" ROW SPACER RECEIVED CITY OF TUKWILA JUN 2 6 1997 PERMIT CENTER 1 D C O EI W Ctf t 6/9/97 2:31 PM 05 rD9"7 7, (Albo :sd: 0.107 S S p 6Z 0-4/ 4d► deb �9� AI SK1�N77 Irvfr , 9b „ 9 „ �� „s gt oy ->gam 1 ,t S KLh/V* wb3S „Sh LMT so (APtc_71-FT coLu 76 09 /VA YO ED C....0. CONDITIONS 4ND mosy s HELVES. BLDG 21 -04 B /5 -H /8 PALLET RACK DESIGN BOEING FACILITIES P. O. Box 3707 Seattle, Washington 98124 -2207 Mall Stoo: 46-87 PROJECT RELOCATE FINANCE PROP. MNGMT. FIG. BY JBURKS CHECKED BY PALLET RACK GEOMETRY NUMBER OF SHELVES = 5 (MUST BE < 8) IF NUMBER IS LESS THAN EIGHT, SET LOWER SHELF HEIGHTS (BELOW LEFT) TO ZERO AS REQUIRED. SHELF SPACING = 27" SHELF SPACING = 37" SHELF SPACING = 37" SHELF SPACING = 39" SHELF SPACING = 39" SHELF SPACING = 0" SHELF SPACING = 0" SHELF SPACING = 0" BY: BAO / REV. C,/ 11.03.93 JOB NO. 160241 -00 DATE 6/5 /97 SHEET 4- OF REV'D 6/6 /97 BEAM SPAN = 168" SHELF BASE SET SHELF HEIGHTS BELOW TO ZERO BEAM SPAN = 168" 1/8 FILENAME: PR160241.XLS 6/6/97 2:01 PM LEVEL D hx (in) hx (in) wx (k) wxhx wxhx Fx (k) wxhx 27 179 CD CD CD CD CD 00000 107.4 0.318 0.057 37 152 91.2 0.270 0.049 37 115 69 0.204 0.037 39 78 46.8 0.139 0.025 39 39 23.4 0.069 0.013 0 0 0 0.000 0.000 0 0 0 0.000 0.000 0 0 0 0.000 0.000 TOTALS 3 337.8 _ 1.000 0.180 BLDG 21 -04 B /5 -H /8 PALLET RACK DESIGN BOEING FACILITIES P.O. Box 3707 Seattle, Washington 981242207 Mail Stop: 46-87 PROJECT RELOCATE FINANCE PROP. MNGMT. FIG. BY JBURKS CHECKED BY BEAM LOADS SHELF DL = SHELF LL = BY: BAO / REV. C / 11.03.93 200 LB /SHELF = 1000 LB /SHELF = 100 LB /BEAM 500 LB /BEAM MOMENT AT CENTER OF BEAMS: ASSUME 20% FIXITY AT ENDS FOR DETERMINING THE MOMENT AT THE CENTER OF BEAMS. MDL = WDLL * (80 %) = ( 80 %) * (0.100 * 168 / 8) k -in = MLL = W$LL * (80 %) _ ( 80 %) * (0.500 * 168 / 8) k -in = MOMENT AT END OF BEAMS: MDL = WgLL * (20%) _ ( 20 %) * (0.100 * 168 / 8) k -in = JOB NO. 160241 -00 DATE 6/5 /97 SHEET i OF REVD 6/6 /97 1.68 k -in 8.4 k -in 0.42 k -in Mu .= WLLL * (2CP /o) = (20 %) * (0.500 * 168 / 8) k -in = 2.1 k -in SEISMIC LOADING - LONGITUDINAL DIRECTION V_ ZIC xW Rw Z = 0.3 I= 1 C = 2.75 Rw = 8 (FOR MOMENT FRAME, Rw = 8; FOR BRACED FRAME, Rw = 6) 2 <-- - -TYPE 1 FOR 100% LL; TYPE 2 FOR 50% REDUCTION IN LL (PER UBC SIDS) W = 5* (200 + 1000/2)/1000 = 3.5 k (FOR BOTH SIDES OF RACK) V= 0.1031 W= 0.361 k LATERAL FORCE DISTRIBUTION - LONGITUDINAL DIRECTION ONE SIDE OF RACK ONL 2/8 FILENAME: PR160241.XLS 6/6/97 2:01 PM • 0.387 k -in 0.016 k m = v = 0.057 k m = 0.775 k -in v = 1.369 k -in 0.027 k m = V = 0.106 k m = 1.963 k -in v= 2.304 k -in 0.035 k m = v = 0.143 k m = 2.645 k -in V = 2.96 k -in 0.061 k m = V = 0.168 k m = 3.275 k -in V = 5.157 k -in Ok m = v = 0.18 k m = 7.038 k -in v= 0 k -in Ok m= v= O m= 0k -in v= 0 k -in O k m= v = Ok m= 0 k -in v= 0 k -in m= v = Ok m= 0k -In .Y` 1 BLDG 21 -04 B /5 -H /8 PALLET RACK DESIGN BOEING FACILITIES P. O. Box 3707 Seattle, Washington 98124 -2207 Mail Stoo: 46-87 PROJECT RELOCATE FINANCE PROP. MNGMT. FIG. BY JBURKS CHECKED BY SEISMIC LOADING - LONGITUDINAL DIRECTION (cont) USING "PORTAL FRAME METHOD" DETERMINE FORCES AT INTERIOR SECTION DUE TO SEISMIC LOADING BASE FIXITY: TYPE "2" IF BASE IS FIXED; TYPE "1" IF BASE IS PINNED > 1 0.057 k 0.049 k 0.037 k 0.025 k 0.013 k Ok FLOOR SLAB Ok Ok BY: BAO / REV. C / 11.03.93 v = 0.005 k m= V= m = V= • m= V= m = V= m= v= m= v= m: V= m: JOB NO. 160241 -00 DATE 6/5 /97 SHEET h OF REVD 6/6 /97 Pd +I +s = 3 k v = 0.005 k 0.387 k -in 0.016 k 1.369 k -in 0.027 k 2.304 k -in 0.035 k 2.96 k -in 0.061 k 5.157 k -in Ok 0 k -in Ok 0 k -in Ok 0 k -in 3/8 FILENAME: PR160241.XLS 6/6/97 2:01 PM BLDG 21 -04 B /5 -H /8 PALLET RACK DESIGN BOEING FACILITIES P. O. Box 3707 Seattle, Washington 981242207 Mail Stoo: 46-87 a PROJECT RELOCATE FINANCE PROP. MNGMT. FIG. BY JBURKS CHECKED BY SEISMIC LOADING - LONGITUDINAL DIRECTION (cont) BEAM LOADS - VERTICAL LOAD = 600 lb /beam Md +I CENTER = 10.08 k -in Md +I END = 2.52 k -in Mseismic = 5.16 k -in Md +l +s END = 7.68 k -in L= TRY LBC5Q BEAM BY: BAO / REV, C / 11.03.93 168" Fy = 42 ksi Sx = 1.766 inA3 Ix = 4.644 inA4 Fb = 0.6 * Fy = 25.2 ksi JOB NO. 160241 - 00 DATE 6/5 /97 SHEET I OF REVD 6/6 /97 M all = Sx *Fb = 1.7655 * 25.2 = 44.49 k -in >= 10.08 OK CHECK SEISMIC - (4/3) * Mall = 59.32 k -in >= 7.68 OK CHECK DEFLECTION - Amax = 1/ 180 = 0.933 in 4 Ant = 384E1 0.28 in <= 0.933 OK CHECK END CONNECTION - WELD TYPE: A WELD CAPACITY: 10.01 "k > 7.68 OK ( -23% UNDERSTRESS CONDITION) PLATE TYPE: 4 PIN END PLATE; COLUMN THICKNESS: 0.105 " PLATE CAPACITY: 36.29 `k > 7.68 OK 4/8 FILENAME: PR160241.XLS 6/6/97 2 :01 PM LEVEL DIST BETW COG & SHELF TOP 1.15 *hx (in) wx (k) wxhx wxhx Fx (k) Mot (k -in) V wxhx 14 " 221.95 N N N N N O O O x-0000 266.34 0.751 0.155 34.38 0 " 174.80 34.96 0.099 0.020 3.55 0 " 132.25 26.45 0.075 0.015 2.03 0 " 89.70 17.94 0.051 0.010 0.94 0 " 44.85 8.97 0.025 0.005 0.23 0 " 0.00 0.00 0.000 0.000 0.00 0 " 0.00 0.00 0.000 0.000 0.00 0 " 0.00 0.00 0.000 0.000 0.00 TOTALS 6 2 354.66 1.000 0.206 41.14 LEVEL DIST BETW COG & SHELF TOP 1.15 *hx (in) wx (k) wxhx wxhx Fx (k) Mot (k -in) V wxhx 14 " 221.95 N N N N N O O O 266.34 0.295 0.142 31.47 19 " 196.65 235.98 0.261 0.126 24.71 19 " 154.10 184.92 0.205 0.098 15.17 20 " 112.70 135.24 0.150 0.072 8.11 20 " 67.85 81.42 0.090 0.043 2.94 0 " 0.00 0.00 0.000 0.000 0.00 0 " 0.00 0.00 0.000 0.000 0.00 0 " 0.00 0.00 0.000 0.000 0.00 TOTALS 6 903.9 1.000 0.481 82.41 BLDG 21 -04 B/5 -H /8 PALLET RACK DESIGN BOEING FACILITIES P. 0. Box 3707 Seattle, Washington 98124 -2207 Mail Stop: 46-87 4' PROJECT RELOCATE FINANCE PROP. MNGMT. FIG. BY JBURKS CHECKED BY SEISMIC LOADING - TRANSVERSE DIRECTION ASSUMPTION: PALLET RACK IS BRACED IN TRANSVERSE DIRECTION V _ ZIC x W RW Z = 0.3 I= 1 C = 2.75 Rw = 6 (FOR MOMENT FRAME, Rw = 8; FOR BRACED FRAME, Rw = 6) 2 <-- - -TYPE 1 FOR 100% LL; TYPE 2 FOR 50% REDUCTION IN LL (PER UBC STDS) W1 = 5* (200 + 1000/2)/1000 = V1 = 0.1375 W = 0.481 k W2 = [(5 * 200) + 1000/2]/1000 = V2 = 0.1375 W = 0.206 k LATERAL FORCE DISTRIBUTION - ALL SHELVES LOADED - TRANSVERSE DIRECTION ONE BENT OF RACK ONL LATERAL FORCE DISTRIBUTION - ONLY TOP SHELF LOADED - TRANSVERSE DIRECTION ONE BENT OF RACK ONL JOB NO. 160241 -00 DATE 6/5 /97 SHEET ' OF REV'D 6/6 /97 3.5 k (ALL SHELVES LOADED) (PER UPRIGHT FRAME) 1.5 k (ONLY TOP SHELF LOADED) (PER UPRIGHT FRAME) BY: BAO / REV. C / 11.03.93 5/8 FILENAME: PR160241.XLS 6/6/97 2:01 PM BLDG 21 -04 B/5 -H /8 PALLET RACK DESIGN BOEING FACILITIES P. O. Box 3707 Seattle, Washington 98124 -2207 Mail Stop: 46-87 PROJECT RELOCATE FINANCE PROP. MNGMT. FIG. BY JBURKS CHECKED BY SEISMIC LOADING - TRANSVERSE DIRECTION (CONT) ALL SHELVES LOADED 0.14 k SHELF DEPTH = 40 in 14" > IP 0.13 k 19" 0.10 k 19" "' 0.07 k 20" "' ' 0.04 k 20" I 0.00 k 0" SHELF BASE - SLA 0.00 k 0" 0.00 k 0 " Ps = 82.41 /40 = 2.06 k BY: BAO / REV. C / 11.03.93 P= 1200 lb P= 1200 lb P= 1200 lb P= 1200 lb P= 1200 lb B Ps = 82.41 /40 = 2.06 k Pd = 0.5 k Pd = 0.5 k PI= 2.5 k PI= 2.5 k 0.15 k 14" 0.02 k 0.02 k 0.01 k 0.01 k 0.00 k SHELF BASE - SL )A k 0.00 k Ps= 41.14/40 = 1.03 k JOB NO. 160241 -00 DATE 6/5 /97 SHEET 1 OF REV'D 6/6 /97 ONLY TOP SHELF LOADED SHELF DEPTH = 40 in P= 1200 lb P= 200 lb P= 200 lb P= 200 lb 1 P= 200 lb B a- a- Ps41.14/40 = 1.03 k Pd= 0.5k Pd= 0.5k PI = 0.5 k PI = 0.5 k 6/8 FILENAME: PR160241.XLS 6/6/97 2:01 PM BLDG 21 -04 B /5 -H /8 PALLET RACK DESIGN BOEING FACILITIES P. O. Box 3707 Seattle, Washington 98124-2207 ONLY TOP SHELF LOADED Mall Stoo: 46-87 PROJECT RELOCATE FINANCE PROP. MNGMT. FIG. BY JBURKS CHECKED BY SEISMIC LOADING - TRANSVERSE DIRECTION (CONT) COLUMN DESIGN - CASE 1: DL + LL + SEISMIC (LONGITUDINAL) P(DL)= 0.50 k P (LL) = 2.50 k P (SEISMIC) = 0.00 k (AT INTERIOR COLUMNS) P (TOTAL) = 3.00 k M (SEISMIC) = 7.04 k -in CASE 2: DL + LL + SEISMIC (TRANSVERSE) P (DL) = 0.50 k P (LL) = 2.50 k P (SEISMIC) = 2.06 k P (TOTAL) = 5.06 k M (SEISMIC) = 0.00 k -in (BRACED TRANSVERSELY) BY: BAO / REV. C / 11.03.93 wo �w iwc-r I- DATE 6/5 /97 SHEET ID OF REVD 6/6 /97 7/8 FILENAME: PR160241.XLS 6/6/97 2:01 PM ALL SHELVES LOADED ONLY TOP SHELF LOADED MAXIMUM DOWNWARD LOAD (k) = 2.06 + 0.5 + 2.5 = 5.06 1.03 + 0.5 + 0.5 = 2.03 FACTOR OF SAFETY AGAINST OVERTURNING = (0.5 + 2.5/2)/ 2.06 = 0.85 (0.5 + 0.5/2)/ 1.03 = 0.73 < 1.5 NG < 1.5 NG BASE UPLIFT LOAD TO BE RESISTED BY ANCHOR BOLTS (k) = (1.5 *2.06) -0.50- 2.50/2 = 1.34 (1.5 *1.03)- 0.50 - 0.50/2= 0.79 PROJECT RELOCATE FINANCE PROP. MNGMT. FIG. BY JBURKS CHECKED BY SEISMIC LOADING - TRANSVERSE DIRECTION (CONT) COLUMN DESIGN - CASE 1: DL + LL + SEISMIC (LONGITUDINAL) P(DL)= 0.50 k P (LL) = 2.50 k P (SEISMIC) = 0.00 k (AT INTERIOR COLUMNS) P (TOTAL) = 3.00 k M (SEISMIC) = 7.04 k -in CASE 2: DL + LL + SEISMIC (TRANSVERSE) P (DL) = 0.50 k P (LL) = 2.50 k P (SEISMIC) = 2.06 k P (TOTAL) = 5.06 k M (SEISMIC) = 0.00 k -in (BRACED TRANSVERSELY) BY: BAO / REV. C / 11.03.93 wo �w iwc-r I- DATE 6/5 /97 SHEET ID OF REVD 6/6 /97 7/8 FILENAME: PR160241.XLS 6/6/97 2:01 PM BLDG 21 -04 B /5 -H /8 PALLET RACK DESIGN BOEING FACILITIES P.O. Box 3707 Seattle, Washington 98124 -2207 Mall Stoc: 46-87 PROJECT RELOCATE FINANCE PROP. MNGMT. FIG. BY JBURKS CHECKED BY COLUMN DESIGN (CONT)- TRY LM30 BY: BAO / REV. C / 11.03.93 Fy = 42 ksi Lx = 39 in Ly= 48 in Kx = 1.5 (LONGITUDINAL) Ky = 1 (TRANSVERSE) A= 0.8inA2 Ix = 1.338 in ^4 Tx = 1.294 in ry = 1.098 in Sx = 0.893 in"4 Sy = 0.604 inA4 f 22E = 116.7 F JOB NO. 160241 -00 DATE 6/5 /97 SHEET I 1 OF REVD 6/6 /97 (kI /r)x = 45.22 < GOVERNS (ki /r)y = 43.72 Fa = 21.53 ksi Pa= 17.22k FOR LONGITUDINAL SEISMIC LOADING - Fb = 0.6 *Fy = 25.2 ksi Ma = Fb*Sx = 22.49 k -in P /Pa + M /Ma = (3/17.22) + (7.04/22.49) = 0.487 < 1.33 OK FOR TRANSVERSE SEISMIC LOADING - P /Pa = (5.06/17.22) = 0.294 < 1.33 OK CHECK DL + LL - P /Pa = (3.00/17.22) = 0.174 < 1.00 OK 8/8 FILENAME: PR160241.XLS 6/6/97 201 PM • EILDG 21 -04 B/5 -H /8 BEAM WELD CAPACITY BOEING FACILITIES P.O. Box 3707 Seattle, Washington 98124 -2207 Mail Stop: 46-87 PROJECT RELOCATE FINANCE PROP. MNGMT. FIG. BY JBURKS CHECKED BY BEAM & WELD GEOMETRY BEAM: LBC50 WELD THICKNESS = 0.125" EFFECTIVE THICKNESS = 0.125 * 0.707 = 0.088" WELD TYPE = A (1) ITEM 1 2 3 4 5 6 TOTALS 1.50" 3.50" COG Y= 2.191176 in BY: BAO /REV. A / 11.13.93 A = 0.751 in2 Y = 2.191176 in 1= 1.339 in4 St = 0.477 in3 Sb = 0.611 in3 r = 1.335 in k 0.88" 4 2.75" 1.88" 3 JOB NO. 160241 -00 DATE 6/6/97 SHEET 12- OF REVD 6/6/97 5.00" (2) (3) (4) (5) (6) (7) (8) (9) (1 0) HEIGHT WIDTH y A Ay (bh ^3)/12 d Ad ^2 (7) + (9) 0.000 0.088 4.250 0.000 0.000 0.000 2.059 0.000 0.000 3.500 0.088 1.750 0.309 0.541 0.316 -0.441 0.060 0.376 5.000 0.088 2.500 0.442 1.105 0.921 0.309 0.042 0.963 0.000 0.088 0.000 0.000 0.000 0.000 -2.191 0.000 0.000 0.000 0.088 3.500 0.000 0.000 0.000 1.309 0.000 0.000 0.000 0.088 5.000 0.000 0.000 0.000 2.809 0.000 0.000 0.751 1.646 1.237 0.102 1.339 ALLOWABLE WELD STRESS = 70 ksi * 0.30 * 1.00 = 21 ksi ALLOWABLE SHEAR = 21.00 ksi * 0.75 = 15.78 k ALLOWABLE BENDING = 21.00 ksi * 0.48 = 10.01 "k 1/1 FILENAME: PR160241.XLS 6/6/97 2:02 PM BLDG 21 -04 B/5 -H /8 BASE PLATE DESIGN I BOEING P. O. Box 3707 FACILITIES Seattle, Washington 981242207 Mall Stoo: 48-87 PROJECT RELOCATE FINANCE PROP. MNGMT. FIG. BY JBURKS CHECKED BY BASE PLATE DESIGN DIMENSIONS: LOADS: BY: BAO / REV. C / 11.03.93 8.00" B= 8.00" d= 3.00" bf= 3.00" x= 1.00" PIER SIZE = 1296 sq in Bolt dia = 0.5 " MATERIAL PROPERTIES: fc' = 3000 psi Fy = 36 ksi Es/Ec = 10 P(DL +LL)= 3.00 k LONGITUDINAL - P (seis)= 0.00 k M (seas)= 0.00 " k V (seas) = 0.18 k TRANSVERSE - P (seis)= 2.06 k M (sels)= 0.00 " k P(uplift)= 1.34 k V (seis) = 0.24 k S min Smin x n JOB NO. 160241 -00 DATE 6/6/97 SHEET 1 3 OF REV'D 6/6/97 bf B n Y Pt + Pc mox a) UNIFORM S max b) TRAPEZOIDAL I S mox c) TRIANGULAR 1/4 FILENAME: PR160241.XLS 6/6/97 2 :04 PM BLDG 21 -04 B/5 -H /8 BASE PLATE DESIGN I BOEING P. 0. Box 3707 FACILITIES Seattle, Washington 98124 -2207 Mail Stop: 46-87 PROJECT RELOCATE FINANCE PROP. MNGMT. FIG. BY JBURKS CHECKED BY tp = m 0.25fy * 1.33 0.156" <----GOVERNS t = n f P = 0.156" < GOVERNS 0.25f *1.33 ACTUAL tp = 0.388" > 0.156" OK BY: BAO / REV. C / 11.03.93 JOB NO. 160241 -00 DATE 6/6/97 SHEET I t OF REVD 6/6/97 DETERMINE CONCRETE AND ANCHOR BOLT STRESSES DUE TO DL, LL AND SEISMIC LOADING IN THE LONGITUDINAL DIRECTION: Pc = P(DL +LL) + P(SEISMIC LONG.) = 3.00 k BOLT AREA, As = 0.20 sq in A= B *N= 8.00 *8.00= 64.Osgin Sx= N *B "2/6= 85.3iO3 f = B/2 - x = (8.00/2) - 1.00 = 3.00" e = M /Pc = 0.00/3.00 = 0.00" BASE PLATE LOAD TYPE: a) UNIFORM (SEE SKETCH ON PREVIOUS SHEET) Smin = 0.05 ksi Smax = 0.05 ksi Pt = 0.00 k NO ANCHOR BOLT TENSION BASE PLATE DESIGN PROCEDURE'FROM AISC 9TH EDITION pp 3 -106 THRU 3 -108. m = (N - d) /2 = (8.0 - 3.0)/2 = 2.50" n = (B - bf) /2 = (8.0 - 3.0)/2 = 2.50" fp = 0.05 ksi A1 = B *N= 8.0 *8.0= 64.Osgin A2 = 1296 sq in (Pier size) DETERMINE tp: 2/4 FILENAME: PR160241.XLS 6/6/97 2:04 PM BLDG 21 -04 B /5 -H /8 BASE PLATE DESIGN BOEING FACILITIES P. O. Box 3707 Seattle, Washington 98124 -2207 Mail Stoo: 46-87 i PROJECT RELOCATE FINANCE PROP. MNGMT. FIG. BY JBURKS CHECKED BY DETERMINE CONCRETE AND ANCHOR BOLT STRESSES DUE TO DL, LL AND SEISMIC LOADING IN THE TRANSVERSE DIRECTION: Pc = P(DL +LL) + P(SEISMIC TRANS.) = 5.06 k BOLT AREA, As = 0.20 sq in A = B *N= 8.00 *8.00= 64.0 sq in Sy = B * NA2/6 = 85.3inA4 f = N/2 = (8.00/2) = 4.00" BASE PLATE LOAD TYPE: a) UNIFORM Smax = 0.08 ksi Smin = 0.08 ksi tp = rn fP = 0.203" < GOVERNS O.25f *1.33 t = n fP = 0.203" < GOVERNS O .25f y * ACTUAL tp = 0.388" > 0.203" OK BENDING DUE TO UPLIFT: MAX Pt = 0.67 k M= Pt *(n -x)= 1.005 "k S = (N * tp ^2)/6 = 0.200 inA3 fb = M/S = 5.02 ksi Fb = 1.33* 0.75 *Fy = 36.00 ksi > 5.02 ksi OK BY: BAO / REV. C / 11.03.93 JOB NO. 160241 -00 DATE 6/6/97 SHEET 13 OF REVD 6/6/97 (SEE SKETCH ON PREVIOUS SHEET) NO ANCHOR BOLT TENSION DUE TO MOMENT Pt = 0.67 k ANCHOR BOLT TENSION DUE TO UPLIFT BASE PLATE DESIGN PROCEDURE FROM AISC 9TH EDITION pp 3 -106 THRU 3 ..108. fp = 0.08 ksi DETERMINE tp: 3/4 FILENAME: PR160241.XLS 6/6/97 2:04 PM BLDG 21 -04 B /5 -H /8 BASE PLATE DESIGN I BOEING P. O. Box 3707 FACILITIES Seattle, Washington 98124 -2207 Mail Stoo: 46-87 PROJECT RELOCATE FINANCE PROP. MNGMT. FIG. BY JBURKS CHECKED BY DETERMINE CONCRETE AND BASE PL STRESSES DUE TO DL AND LL: BASE PLATE LOAD TYPE: UNIFORM Smin = 0.05 ksi Smax = 0.05 ksi fp = 0.05 ksi DETERMINE tp: t = m lel = 0.180" < GOVERNS 0.25 fy fp tp = n 0. fy 0.180" < GOVERNS ACTUAL tp = 0.388" > 0.180" OK CHECK ANCHOR BOLTS: MAX Pt = 0.67 k - 0.52 = MAX V (PER BOLT)= 0.12 k ANCHOR BOLT TYPE: HILTI KWIK BOLT II SPECIAL INSPECTION ?: NO DIAMETER: 0.500" EMBEDMENT: 3.500" TENSILE CAPACITY = 1.00 k SHEAR CAPACITY = 1.84 k INTERACTION: BY: BAO / REV, C / 11.03.93 0.16 k JOB NO. 160241 - 00 DATE 6/6/97 SHEET I OF REV'D 6/6/97 MAX Pt + MAX V 1.00 TENSILE CAPACITY SHEAR CAPACITY 0.670/1.000 + 0.120/1.840 = = 0.670 + 0.065 = 0.736 < 1.00 OK W/O 1.5 FACTOR = 0.220 < 1.00 OK IF 1.5 FACTOR NOT USED 4/4 FILENAME: PR160241.XLS 6/6/97 2:04 PM • BI:DG 21 -04 B /5 -H /8 SLAB CHECK BOEING FACILITIES P. 0. Box 3707 Seattle, Washington 98124 -2207 Mail Stop: 46-87 1 PROJECT RELOCATE FINANCE PROP. MNGMT. FIG. BY JBURKS CHECKED BY CHECK SOIL BEARING TRANSVERSE FORCES: P(DL) = 0.50 k P(LL) = 2.50 k P(S) = 2.06 k P(TOTAL) = 5.06 k SLAB THICKNESS = 9.25 in SLAB DEPTH, d = 7.75 in (TO REBAR) fc'_ BASE PLATE AREA N= B 3,000 psi fy = 40,000 psi ALLOWABLE SOIL BEARING PRESSURE = 1,000 psf ALLOWABLE SOIL BEARING PRESSURE FOR SEISMIC = 1,333 psf 8.00 in 8.00 in Abase = 8.00 = 64 sq in EQUIV CIRCULAR AREA = 711 Peyuiv = Il l Abase — 4.51 in 7C b= 9.03 in L= 13.76 in LOADED AREA = 4.13 sf FOR DL + LL SOIL BEARING PRESSURE = FOR DL + LL + SEISMIC SOIL BEARING PRESSURE = BY: BAO / REV. A / 10.19.93 726 psf 1224 psf 9.3" JOB NO. 160241 -00 DATE 6/6/97 SHEET II OF REVD 6/6/97 1000 OK 1333 OK 1/2 FILENAME: PR160241.XLS 6/6/97 2:05 PM BI:DG 21 -04 B /5 -H /8 SLAB CHECK I BOEING P. O. Box 3707 FACILITIES Seattle, Washington 98124-2207 Mail Stop: 46-87 PROJECT RELOCATE FINANCE PROP. MNGMT. FIG. BY JBURKS CHECKED BY SINCE SOIL BEARING PRESSURE DIRECTLY BELOW BASE PLATE IS OK, BENDING AND SHEAR CALCULATIONS SHOWN BELOW ARE NOT REQUIRED. REQUIRED LOADED AREA = 3.80 sf SOIL BEARING PRESSURE (DL +LL) = 790 psf FACTORED SBP = 1.4D +1.7L = 1,304 psf SOIL BEARING PRESSURE (DL +LL +E) = FACTORED SBP = 0.75(1.4D + 1.7L + 1.7(1.1E)) = REQUIRED LOADED AREA RADIUS = 13.19 in CHECK BENDING: Mu = (1.74 * 9.19 "2) /(2 * 12) = 6.1 in k/ft = 0.51 ft-k/ft FOR PLAIN CONCRETE: S = (bd ^2)/6 = 171.125 in3 Ft = 1.6(fc)A0.5 = 87.6 ft = M/S = 35.8 psi < 87.6 psi OK SLAB "BEAM ACTION" CALCULATIONS F = (b *d^2)/12,000 = 0.0601 Ku = Mu /F = 8.49 Ku= 4f'ccw(1 -.59w) Cu = 0.0033 p REQ'D= w *(fc/fy)= pMIN = 200 /fy = SET p = 4/3 *p = Ast REQ'D =pbd= Ast PROVIDED (IN 1 FT WIDTH) _ CHECK PUNCHING SHEAR: bo = BY: BAO / REV. A / 10.19.93 0.0003 0.0050 0.0003 0.03 inA2 1,333 psf 1,740 psf 0.12 inA2 > 0.03 inA2 OK 2 * [(8.00 + 7.75) + (8.00 + 7.75)] = 63.00 in Vu = 1.4D +1.7L = 4.95 k Vu = 0.75(1.4D + 1.7L + 1.7(1.1E)) = OVo = 0.85 (4) T bod = 90.92 k JOB NO. 160241 - 00 DATE 6/6/97 SHEET I9, OF REVD 6/6/97 6.60 k <--- GOVERNS 6.60 OK 2/2 FILENAME: PR160241.XLS 6/6/97 2:05 PM COMPONENT PER SHELF CAPACITY BEAM 3872 BEAM WELD 1403 COLUMN 3286 • BASE PLATE 4369 SLAB 3347 BOLT 5950 PROJECT RELOCATE FINANCE PROP. MNGMT. . .**L44.fts I BIIDG 21-04 B/5-H/8 SLAB CHECK BOEING FACILITIES P. 0. Box 3707 Seattle, Washington 98124-2207 Mail Stop: 46-87 FIG. BY JBURKS CHECKED BY RACK CAPACITY = BY: BAO / REV. Al 12.4.93 1000 LBS PER SHELF JOB NO. KSC-9-93018 DATE 5/7/97 SHEET OF REVD 6/6/97 1/1 FILENAME: PR160241.XLS 6/6/97 2:05 PM _) BLDG 21 -04 B /5 -H /8 PALLET RACK DESIGN BOEING FACILITIES P. O. Box 3707 Seattle, Washington 981242207 Mall Stop: 46-87 PROJECT RELOCATE FINANCE PROP. MNGMT. FIG. BY JBURKS CHECKED BY PALLET RACK GEOMETRY NUMBER OF SHELVES = 5 (MUST BE < 8) IF NUMBER IS LESS THAN EIGHT, SET LOWER SHELF HEIGHTS (BELOW LEFT) TO ZERO AS REQUIRED. SHELF SPACING = 23" SHELF SPACING = 23" SHELF SPACING = 23" SHELF SPACING = 25" SHELF SPACING = 85" SHELF SPACING = 0" SHELF SPACING = 0" SHELF SPACING = 0" BY: BAO / REV. C / 11.03.93 JOB NO. 160241 -00 DATE 6/5 /97 SHEET Zl, OF, REVD 6/6 /97 BEAM SPAN = 168" SHELF BASE SET SHELF HEIGHTS BELOW TO ZERO BEAM SPAN = 168" 1/8 FILENAME: PR160241.XLS 6/6/97 2:22 PM LEVEL D hx (in) hx (in) wx (k) wxhx wxhx Fx (k) wxhx 23 179 CD CO CD C CD 0 0 0 0 cs000 107.4 0.270 0.049 23 156 93.6 0.235 0.042 23 133 79.8 0.201 0.036 25 110 66 0.166 0.030 • 85 85 51 0.128 0.023 0 0 0 0.000 0.000 0 0 0 0.000 0.000 0 0 0 0.000 0.000 I TOTALS 3 397.8 1.000 0.180 BLDG 21 -04 B /5 -H /8 PALLET RACK DESIGN BOEING FACILITIES P. O. Box 3707 Seattle, Washington 981242207 Mail Stop: 46-87 • v5i'1 ?n PROJECT RELOCATE FINANCE PROP. MNGMT. FIG. BY JBURKS CHECKED BY BEAM LOADS SHELF DL = SHELF LL = MOMENT AT CENTER OF BEAMS: ASSUME 20% FIXITY AT ENDS FOR DETERMINING THE MOMENT AT THE CENTER OF BEAMS. MDL = W * (80 %) _ (80 %) * (0.100 * 168 / 8) k -in = Mu .= W * (80 %) _ (80 %) * (0.500 * 168 / 8) k -in = MOMENT AT END OF BEAMS: MDL = W * (2a� /o) = (20 %) * (0.100 Mu. = WLLL * (2CP/o) = (20 %) * (0.500 8 SEISMIC LOADING - LONGITUDINAL DIRECTION V_ ZIC x W Rw Z = 0.3 I= 1 C = 2.75 W = 5* (200 + 1000/2)/1000 = 3.5 k (FOR BOTH SIDES OF RACK) V= 0.1031 W= 0.361 k LATERAL FORCE DISTRIBUTION - LONGITUDINAL DIRECTION ONE SIDE OF RACK ONLY) BY: BAO / REV. C / 11.03.93 200 LB /SHELF = 1000 LB /SHELF = 100 LB /BEAM 500 LB /BEAM *168 /8)k -in= *168 /8)k-in= JOB NO. 160241 -00 DATE 6/5 /97 SHEET 22 OF REV'D 6/6 /97 1.68 k -in 8.4 k -in 0.42 k -in 2.1 k -in Rw = 8 (FOR MOMENT FRAME, Rw = 8; FOR BRACED FRAME, Rw = 6) 2 <-- - -TYPE 1 FOR 100% LL.; TYPE 2 FOR 50% REDUCTION IN LL (PER UBC STDS) 2/8 FILENAME: PR160241.XLS 6/6/97 2:22 PM 0.28 k -in 0.01 k m = v = 0.049 k m = 0.56 k -in V = 0.804 k -in 0.015 k m = v = 0.091 k m = 1.049 k -in v = 1.257 k -in 0.02 k m = V = 0.127 k m = 1.465 k -in v = 1.716 k -in 0.103 k m= v = 0.157 k m = 1.967 k -in V = 8.653 k -in Ok m = V = 0.18k m = 15.34 k -in v= 0 k -in Ok m = v = O m = 0 k -in V= O k -in Ok m= v= Ok m= 0 k -in v= 0 k -in m = v= O m= 0 k -in BLDG 21 -04 B /5 -H /8 PALLET RACK DESIGN BOEING FACILITIES P. O. Box 3707 Seattle, Washington 98124 -2207 Mail Ston: 48.87 PROJECT RELOCATE FINANCE PROP. MNGMT. FIG. BY JBURKS CHECKED BY SEISMIC LOADING - LONGITUDINAL DIRECTION (cont) USING "PORTAL FRAME METHOD" DETERMINE FORCES AT INTERIOR SECTION DUE TO SEISMIC LOADING BASE FIXITY: TYPE "2" IF BASE IS FIXED; TYPE "1" IF BASE IS PINNED > 1 0.049 k 0.042 k 0.036 k 0.03 k 0.023 k Ok —> FLOOR SLAB Ok Ok BY: BAO / REV. C / 11.03.93 v= 0.003 k m= V= m= v= m= V= m= V= m= V= m= V= V= m= JOB NO. 160241 -00 DATE 6/5 /97 SHEET ?73 OF REVD 6/6 /97 Pd +I +s = 3 k v= 0.003 k 0.28 k -in 0.01 k 0.804 k -in 0.015 k 1.257 k -in 0.02 k 1.716 k -in 0.103 k 8.653 k -in Ok 0 k -in Ok 0 k -in Ok 0 k -in 3/8 FILENAME: PR160241.XLS 6/6/97 2:22 PM BLDG 21 -04 B /5 -H /8 PALLET RACK DESIGN BOEING FACILITIES P.O. Box 3707 Seattle, Washington 98124-2207 Mail Stoo: 46-87 PROJECT RELOCATE FINANCE PROP. MNGMT. FIG. BY JBURKS CHECKED BY SEISMIC LOADING - LONGITUDINAL DIRECTION (cont) BEAM LOADS - VERTICAL LOAD = 600 lb /beam Md +I CENTER = 10.08 k -in Md +I END = 2.52 k -in Mseismic = 8.65 k -in Md +I +s END = 11.17 k -in L= 168" TRY 377B BEAM BY: BAO / REV. C / 11.03.93 Fy = 42 ksi Sx = 2.36 inA3 Ix = 7.349 inA4 Fb = 0.6 * Fy = 25.2 ksi M all = Sx *Fb = 2.36 * 25.2 = 59.47 k -in >= 10.08 OK CHECK SEISMIC - (4/3) * Mall = 79.3 k -in >= 11.17 OK CHECK DEFLECTION - Amax = 1/ 180 = 0.933 in 5 w 1 _ A 80 ` 384E1 CHECK END CONNECTION- WELD TYPE: A 0.17 in <= 0.933 OK PLATE CAPACITY: 36.29 "k > 11.17 OK JOB NO. 160241 -00 DATE 6/5 /97 SHEET2t OF REVD 6/6 /97 WELD CAPACITY: 14.80 "k > 11.17 OK ( -24% UNDERSTRESS CONDITION) PLATE TYPE: 4 PIN END PLATE; COLUMN THICKNESS: 0.105 " 4/8 FILENAME: PR160241.XLS 6/6/97 2:22 PM LEVEL DIST BETW COG & SHELF TOP 1.15 *hx (in) wx (k) wxhx wxhx Fx (k) Mot (k -in) V wxhx 12 " 219.65 N N N N N O O O 263.58 0.703 0.145 31.85 0 " 179.40 35.88 0.096 0.020 3.54 0 " 152.95 30.59 0.082 0.017 2.57 0 " 126.50 25.30 0.067 0.014 1.76 1 0 " 97.75 19.55 0.052 0.011 1.05 0 " 0.00 0.00 0.000 0.000 0.00 0 " 0.00 0.00 0.000 0.000 0.00 0 " 0.00 0.00 0.000 0.000 0.00 I TOTALS 6 2 374.90 1.000 0.206 40.78 LEVEL DIST BETW COG & SHELF TOP 1.15 *hx (in) wx (k) wxhx wxhx Fx (k) Mot (k -in) V wxhx 12 " 219.65 N N N N N O O OI 263.58 0.253 0.122 26.74 12 " 193.20 231.84 0.223 0.107 20.69 12 " 166.75 200.10 0.192 0.092 15.41 13 " 141.45 169.74 0.163 0.078 11.09 1 43 " 147.20 176.64 0.170 0.082 12.01 0 " 0.00 0.00 0.000 0.000 0.00 0 " 0.00 0.00 0.000 0.000 0.00 0 " 0.00 0.00 0.000 0.000 0.00 I TOTALS 6 1041.9 1.000 0.481 85.94 BLDG 21 -04 B /5 -H /8 PALLET RACK DESIGN BOEING FACILITIES P. O. Box 3707 Seattle, Washington 98124 -2207 Mail Stop: 46-87 PROJECT RELOCATE FINANCE PROP. MNGMT. FIG. BY JBURKS CHECKED BY SEISMIC LOADING - TRANSVERSE DIRECTION ASSUMPTION: PALLET RACK IS BRACED IN TRANSVERSE DIRECTION V_ ZIC x W Rw Z= 0.3 I= 1 C = 2.75 Rw = 6 (FOR MOMENT FRAME, Rw = 8; FOR BRACED FRAME, Rw = 6) BY: BAO / REV. C / 11.03.93 2 <-- - -TYPE 1 FOR 100% LL; TYPE 2 FOR 50% REDUCTION IN LL (PER UBC STDS) W1 = 5* (200 + 1000/2)/1000 = V1 = 0.1375 W= 0.481 k W2 = [(5 * 200) + 1000/21/1000 = V2 = 0.1375 W = 0.206 k LATERAL FORCE DISTRIBUTION - ALL SHELVES LOADED - TRANSVERSE DIRECTION ONE BENT OF RACK ONL LATERAL FORCE DISTRIBUTION - ONLY TOP SHELF LOADED - TRANSVERSE DIRECTION ONE BENT OF RACK ONL JOB NO. 160241 -00 DATE 6/5 /97 SHEETaOF REV'D 6/6 /97 3.5 k (ALL SHELVES LOADED) (PER UPRIGHT FRAME) 1.5 k (ONLY TOP SHELF LOADED) (PER UPRIGHT FRAME) 5/8 FILENAME: PR160241.XLS 6/6/97 2:22 PM BLDG 21 -04 B /5 -H /8 PALLET RACK DESIGN BOEING FACILITIES P.O. Box 3707 Seattle, Washington 98124-2207 Mail Stoo: 46-87 PROJECT RELOCATE FINANCE PROP. MNGMT. FIG. BY JBURKS CHECKED BY SEISMIC LOADING - TRANSVERSE DIRECTION (CONTI ALL SHELVES LOADED 0.12 k SHELF DEPTH = 40 in 12" 12" 0.11 k 0.09 k 12" > 0.08 k 13" - > • 0.08 k 4 3" "' ) 0.00 k 0" SHELF BASE - SLA 0.00 k 0" 0.00 k 0 " "' > Ps = 85.94 / 40 = 2.15 k BY: BAO / REV. C / 11.03.93 P= 1200 lb P= 1200 lb P= 1200 lb P= 1200 lb P= 1200 lb B Ps= 85.94/40 = 2.15 k Pd= 0.5 k Pd= 0.5 k PI = 2.5 k PI = 2.5 k 0.15 k 12" " > 0.02 k 0.02 k 0.01 k 0.01 k 0.00 k SHELF BASE - SL 0.00 k 0.00 k Ps = 40.78 / 40 = 1.02 k JOB NO. 160241 - 00 DATE 6/5 /97 SHEET OF REVD 6/6 /97 ONLY TOP SHELF LOADED SHELF DEPTH = 40 in P= 1200 lb P= 200 lb P= 200 lb P= 200 lb P= 200 lb B Ps = 40.78 / 40 = 1.02 k Pd = 0.5 k Pd = 0.5 k P1= 0.5 k PI = 0.5 k 6/8 FILENAME: PR160241.XLS 6/6/97 2:22 PM BLDG 21 -04 B /5 -H /8 PALLET RACK DESIGN BOEING FACILITIES P. O. Box 3707 Seattle, Washington 981242207 ONLY TOP SHELF LOADED Mail Stoo: 46-87 PROJECT RELOCATE FINANCE PROP. MNGMT. FIG. BY JBURKS CHECKED BY SEISMIC LOADING - TRANSVERSE DIRECTION (CONT) JOB NO. 160241 -00 DATE 6/5 /97 SHEET /// OF REVD 6/6 /97 COLUMN DESIGN - CASE 1: DL + LL + SEISMIC (LONGITUDINAL) P(DL)= 0.50k P (LL) = 2.50 k P (SEISMIC) = 0.00 k (AT INTERIOR COLUMNS) P (TOTAL) = 3.00 k M (SEISMIC) = 15.34 k -in CASE 2: DL + LL + SEISMIC (TRANSVERSE) P (DL) = 0.50 k P (LL) = 2.50 k P (SEISMIC) = 2.15 k P (TOTAL) = 5.15 k M (SEISMIC) = 0.00 k -in (BRACED TRANSVERSELY) BY: BAO / REV. C / 11.03.93 7/8 FILENAME: PR160241.XLS 6/6/97 2 :22 PM ALL SHELVES LOADED ONLY TOP SHELF LOADED MAXIMUM DOWNWARD LOAD (k) = 2.15 + 0.5 + 2.5 = 5.15 1.02 + 0.5 + 0.5 = 2.02 FACTOR OF SAFETY AGAINST OVERTURNING = (0.5 + 2.5/2)/ 2.15 = 0.81 (0.5 + 0.5/2)/ 1.02 = 0.74 < 1.5 NG < 1.5 NG BASE UPLIFT LOAD TO BE RESISTED BY ANCHOR BOLTS (k) = (1.5 *2.15) -0.50- 2.50/2 = 1.47 (1.5 *1.02)- 0.50 - 0.50/2= 0.78 PROJECT RELOCATE FINANCE PROP. MNGMT. FIG. BY JBURKS CHECKED BY SEISMIC LOADING - TRANSVERSE DIRECTION (CONT) JOB NO. 160241 -00 DATE 6/5 /97 SHEET /// OF REVD 6/6 /97 COLUMN DESIGN - CASE 1: DL + LL + SEISMIC (LONGITUDINAL) P(DL)= 0.50k P (LL) = 2.50 k P (SEISMIC) = 0.00 k (AT INTERIOR COLUMNS) P (TOTAL) = 3.00 k M (SEISMIC) = 15.34 k -in CASE 2: DL + LL + SEISMIC (TRANSVERSE) P (DL) = 0.50 k P (LL) = 2.50 k P (SEISMIC) = 2.15 k P (TOTAL) = 5.15 k M (SEISMIC) = 0.00 k -in (BRACED TRANSVERSELY) BY: BAO / REV. C / 11.03.93 7/8 FILENAME: PR160241.XLS 6/6/97 2 :22 PM BLDG 21 -04 B/5 -H /8 PALLET RACK DESIGN BOEING FACILITIES P. O. Box 3707 Seattle, Washington 981242207 Mail Stoo: 46-87 PROJECT RELOCATE FINANCE PROP. MNGMT. COLUMN DESIGN (CONT)- TRY LM30 BY: BAO / REV. C / 11.03.93 FIG. BY JBURKS CHECKED BY Fy = 42 ksi Lx = 39 in Ly = 48 in Kx = 1.5 (LONGITUDINAL) Ky = 1 (TRANSVERSE) A = 0.8 inA2 Ix = 1.338 inA4 rx = 1.294 in ry = 1.098 in Sx = 0.893 inA4 Sy = 0.604 inA4 C, 2F2 E = 116.7 v (kI /r)x = 45.22 < GOVERNS JOB NO. 160241 -00 DATE 6/5 /97 SHEET2.,OF REVD 6/6 /97 (kI /r)y = 43.72 Fa = 21.53 ksi Pa= 17.22k FOR LONGITUDINAL SEISMIC LOADING - Fb = 0.6 *Fy = 25.2 ksi Ma = Fb *Sx = 22.49 k -in P /Pa + M /Ma = (3/17.22) + (15.34/22.49) = 0.856 < 1.33 OK FOR TRANSVERSE SEISMIC LOADING - P /Pa = (5.15/17.22) = 0.299 < 1.33 OK CHECK DL + LL - P /Pa = (3.00/17.22) = 0.174 < 1.00 OK 8/8 FILENAME: PR160241.XLS 6/6/97 2:22 PM QLDG 21 -04 B /5 -H /8 BEAM WELD CAPACITY BOEING FACILITIES P. O. Box 3707 Seattle, Washington 98124-2207 Mail Stop: 46-87 • .. ..........+.. ...+.r....w+.Y�.�..ru�..bxrwuuf an.n.v.rnli�MMMnY�::'tN..kM PROJECT RELOCATE FINANCE PROP. MNGMT. FIG. BY JBURKS CHECKED BY BEAM & WELD GEOMETRY BEAM: 377B WELD THICKNESS = 0.125" EFFECTIVE THICKNESS = 0.125 * 0.707 = 0.088" WELD TYPE = A (1) ITEM 1 2 3 4 5 6 TOTALS 1.63" 4.38" A= Y= I= St = Sb = r= COG Y= 2.65738 in 0.917 in2 2.65738 in 2.355 in4 0.705 in3 0.886 in3 1.603 in 0.88" X 4 2.75" 1.88" 3 ALLOWABLE SHEAR = 21.00 ksi * 0.92 = 19.26 k ALLOWABLE BENDING = 21.00 ksi * 0.70 = 14.80 "k JOB NO. 160241 -00 DATE 6/6/97 SHEET 2/ OF REV'D 6/6/97 6.00" (2) (3) (4) (5) (6) (7) (8) (9) (10) HEIGHT WIDTH y A Ay (bhA3)/12 d AdA2 (7) + (9) 0.000 0.088 5.188 0.000 0.000 0.000 2.530 0.000 0.000 4.375 0.088 2.188 0.387 0.846 0.617 -0.470 0.085 0.702 6.000 0.088 3.000 0.530 1.591 1.591 0.343 0.062 1.653 0.000 0.088 0.000 0.000 0.000 0.000 -2.657 0.000 0.000 0.000 0.088 4.375 0.000 0.000 0.000 1.718 0.000 0.000 0.000 0.088 6.000 0.000 0.000 0.000 3.343 0.000 0.000 0.917 2.437 2.208 0.148 2.355 ALLOWABLE WELD STRESS = 70 ksi * 0.30 * 1.00 = 21 ksi BY: BAO / REV. A / 11.13.93 1/1 FILENAME: PR160241.XLS 6/6/97 2:22 PM BLDG 21 -04 B/5 -H /8 PALLET RACK DESIGN BOEING FACILITIES P. O. Box 3707 Seattle, Washington 981242207 Mail Stoo: 46-87 PROJECT RELOCATE FINANCE PROP. MNGMT. FIG. BY JBURKS CHECKED BY PALLET RACK GEOMETRY NUMBER OF SHELVES = 3 (MUST BE < 8) IF NUMBER IS LESS THAN EIGHT, SET LOWER SHELF HEIGHTS (BELOW LEFT) TO ZERO AS REQUIRED. SHELF SPACING = 43" SHELF SPACING = 43" SHELF SPACING = 103" SHELF SPACING = 0" SHELF SPACING = 0" SHELF SPACING = 0" SHELF SPACING = 0" SHELF SPACING = 0" BY: BAO / REV. C / 11.03.93 JOB NO. 160241 -00 DATE 6/9 /97 SHEET{ OF REV'D 6/9 /97 BEAM SPAN = 168" SHELF BASE SET SHELF HEIGHTS BELOW TO ZERO BEAM SPAN = 168" 1/8 FILENAME: PR160241.XLS 6/9/97 1:43 PM LEVEL D hx (in) hx (in) wx (k) wxhx wxhx Fx (k) E wxhx 43 189 0 ;00000 O' 113.4 0.432 0.047 43 146 87.6 0.333 0.036 103 103 61.8 0.235 0.025 0 0 0 0.000 0.000 0 0 0 0 0.000 0.000 0 0 0 0.000 0.000 0 0 0 0.000 0.000 0 0 0 0.000 0.000 TOTALS 1.8 262.8 1.000 0.108 BLDG 21 -04 B /5 -H /8 PALLET RACK DESIGN BOEING FACILITIES P. O. Box 3707 Seattle, Washington 981242207 Mail Stop: 46-87 cfi • JOB NO. 160241 -00 FIG. BY JBURKS CHECKED BY DATE 6/9 /97 SHEET 3g_ OF REVD 6/9 /97 PROJECT RELOCATE FINANCE PROP. MNGMT. BEAM LOADS SHELF DL = SHELF LL = 200 LB /SHELF = 1000 LB /SHELF = 100 LB /BEAM 500 LB /BEAM MOMENT AT CENTER OF BEAMS: ASSUME 20% FIXITY AT ENDS FOR DETERMINING THE MOMENT AT THE CENTER OF BEAMS. MDL = WDLL *(80%)= (80 %) * (0.100 * 168 / 8) k -in = MLL = W 8`� *(80 %) = (80 %) * (0.500 * 168 / 8) k -in = 1.68 k -in 8.4 k -in MOMENT AT END OF BEAMS: MDL = WgLL * (2O /o) _ (20 %) * (0.100 * 168 / 8) k -in = 0.42 k -in Mu_ = WLLL *k20 = (20 %) * (0.500 * 168 / 8) k -in = 2.1 k -in SEISMIC LOADING - LONGITUDINAL DIRECTION ZIC V_ x Rw Z = 0.3 I= 1 C = 2.75 Rw = 8 (FOR MOMENT FRAME, Rw = 8; FOR BRACED FRAME, Rw = 6) BY: BAO /REV. C/11.03.93 2 <-- - -TYPE 1 FOR 100% LL; TYPE 2 FOR 50% REDUCTION IN LL (PER UBC STDS) W = 3* (200 + 1000/2)/1000 = 2.1 k (FOR BOTH SIDES OF RACK) V= 0.1031 W= 0.217 k LATERAL FORCE DISTRIBUTION - LONGITUDINAL DIRECTION ONE SIDE OF RACK ONL 2/8 FILENAME: PR160241.XLS 6/9/971:43 PM BLDG 21 -04 B /5 -H /8 PALLET RACK DESIGN BOEING FACILITIES P. O. Box 3707 Seattle, Washington 98124 -2207 1.393 k -in 0.077 k Mall Stop: 46-87 0.502 k -in 0.017 k v = m = m = 0.047 k 1.005 k -in v = 1.393 k -in 0.077 k V = m = m = 0.083 k 1.781 k -in v = 6.467 k -in Ok v = m= m = 0.108 k 11.15k -in v= 0 k -in Ok v= m= m = Ok 0 k -in v= 0k -in Ok v = m= m= Ok 0 k -in v= 0 k -in Ok v= m = m= Ok 0 k -in v= 0 k -in O k V = m= m= Ok 0 k -in v= 0 k -in v= m= m= Ok 0 k -In RELOCATE FINANCE PROP. MNGMT. FIG. BY JBURKS CHECKED BY SEISMIC LOADING - LONGITUDINAL DIRECTION (cont) USING "PORTAL FRAME METHOD" DETERMINE FORCES AT INTERIOR SECTION DUE TO SEISMIC LOADING BASE FIXITY: TYPE "2" IF BASE IS FIXED; TYPE "1" IF BASE IS PINNED > 1 0.047 k 0.036 k 0.025 k 0k v= SET SHELF m = BELOW TO ZERO 0k Ok Ok Ok BY: BAO / REV. C / 11.03.93 v = 0.006 k m = V= m= v m= v= m = v= m = v= m = V= m = JOB NO. 160241 -00 DATE 6/9 /97 SHEET', 3 OF REVD 6/9 /97 Pd +I +s = 1.8 k v= 0.006 k 0.502 k -in 0.017 k 1.393 k -in 0.077 k 6.467 k -in Ok 0 k -in Ok 0 k -in Ok 0 k -in Ok 0 k -in Ok 0 k -in 3/8 FILENAME: PR160241.XLS 6/9/97 1:43 PM *, • • • BLDG 21-04 B/5-H/8 PALLET RACK DESIGN BOEING FACILITIES P. O. Box 3707 Seattle, Washington 98124-2207 Mail Stop: 46-87 PROJECT RELOCATE FINANCE PROP. MNGMT. FIG. BY JBURKS CHECKED BY SEISMIC LOADING - LONGITUDINAL DIRECTION (cont) BEAM LOADS - VERTICAL LOAD = 600 lb/beam Md+I CENTER = 10.08 k-in Md+I END = 2.52 k-in Mseismic = 6.47 k-in Md+I+s END = 8.99 k-in L= 168" TRY LBC 5() BEAM Fy = 42 ksi Sx = 1.766 inA3 lx = 4.644 inA4 BY: BAO / REV. C / 11.03.93 Fb = 0.6 * Fy = 25.2 ksi M all = Sx*Fb = 1.7655 * 25.2 = 44.49 k-in >= 10.08 OK CHECK SEISMIC - (4/3) * Mall = 59.32 k-in >= 8.99 OK CHECK DEFLECTION - A max = 1/180 = 0.933 in 5N/1 Aact = 384E1 0.28 in <= 0.933 OK CHECK END CONNECTION- WELD TYPE: A num. a.u.lurstor..000.11.3,1.10 PLATE CAPACITY: 36.29 "k > 8.99 OK JOB NO. 160241-00 DATE 6/9 /97 SHEET l4 OF REV'D 6/9 /97 WELD CAPACITY: 13.31 "k > 8.99 OK (-32% UNDERSTRESS CONDITION) PLATE TYPE: 4 PIN END PLATE; COLUMN THICKNESS; 0.105 " 4/8 FILENAME: PR160241.XLS 619/971:43 PM LEVEL DIST BETW COG & SHELF TOP 1.15 *hx (in) wx (k) wxhx wxhx Fx (k) Mot (k -in) '' wxhx 22 " 242.65 O O O O O N N N 291.18 0.836 0.126 30.67 22 " 167.90 33.58 0.096 0.015 2.45 52 " 118.45 23.69 0.068 0.010 1.22 0 " 0.00 0.00 0.000 0.000 0.00 0 0 0.00 0.00 0.000 0.000 0,00 0 " 0.00 0.00 0.000 0.000 0.00 0 " 0.00 0.00 0.000 0.000 0.00 0 " 0.00 0.00 0.000 0.000 0.00 I TOTALS 3.6 1.6 348.45 1.000 0.151 34.33 LEVEL DIST BETW COG & SHELF TOP 1.15 *hx (in) wx (k) wxhx wxhx Fx (k) Mot (k -in) E wxhx 22 " 242.65 N N No (Do O O 291.18 0.395 0.114 27.68 22 " 193.20 231.84 0.315 0.091 17.55 52 " 178.25 213.90 0.290 0.084 14.94 0 " 0.00 0.00 0.000 0.000 0.00 0 0 " 0.00 0.00 0.000 0.000 0.00 0 " 0.00 0.00 0.000 0.000 0.00 0 " 0.00 0.00 0.000 0.000 0.00 0 " 0.00 0.00 0.000 0.000 0.00 I TOTALS 3.6 736.92 1.000 0.289 60.18 BLDG 21 -04 B /5 -H /8 PALLET RACK DESIGN BOEING FACILITIES P. O. Box 3707 Seattle, Washington 981242207 Mall Stoo: 46-87 PROJECT RELOCATE FINANCE PROP. MNGMT. FIG. BY JBURKS CHECKED BY SEISMIC LOADING - TRANSVERSE DIRECTION ASSUMPTION: PALLET RACK IS BRACED IN TRANSVERSE DIRECTION V _ ZIC x W Rw Z = 0.3 I= 1 C = 2.75 Rw = 6 (FOR MOMENT FRAME, Rw = 8; FOR BRACED FRAME, Rw = 6) BY: BAO / REV. C / 11.03.93 JOB NO. 160241 -00 DATE 6/9 /97 SHEET! f OF REV'D 6/9 /97 2 <-- - -TYPE 1 FOR 100% LL; TYPE 2 FOR 50% REDUCTION IN LL (PER UBC STDS) W1 = 3* (200 + 1000/2)/1000 = 2.1 k (ALL SHELVES LOADED) V1 = 0.1375 W = 0.289 k (PER UPRIGHT FRAME) W2 = [(3 * 200) + 1000/20000 = 1.1 k (ONLY TOP SHELF LOADED) V2 = 0.1375 W = 0.151 k (PER UPRIGHT FRAME) LATERAL FORCE DISTRIBUTION - ALL SHELVES LOADED - TRANSVERSE DIRECTION ONE BENT OF RACK ONL LATERAL FORCE DISTRIBUTION - ONLY TOP SHELF LOADED - TRANSVERSE DIRECTION ONE BENT OF RACK ONL 5/8 FILENAME: PR160241.XLS 6/9/97 1:43 PM BLDG 21 -04 B /5 -H /8 PALLET RACK DESIGN BOEING FACILITIES P. O. Box 3707 Seattle, Washington 98124 -2207 Mail Ston: 46-87 PROJECT RELOCATE FINANCE PROP. MNGMT. FIG. BY JBURKS CHECKED BY SEISMIC LOADING - TRANSVERSE DIRECTION (CONT) ALL SHELVES LOADED 0.11 k SHELF DEPTH = 40 in 0.13 k 22" > IP 22" • 0.09 k 22" 0.08 k 52" "� > 0.00 k 0 „ SHELF BASE - SLA 0.00k 0 " ., 0.00 k 0 " 0.00 k 0" 0.00 k 0 " > Ps= 60.18/40 = 1.50 k P= 1200 lb P= 1200 lb P= 1200 lb B Ps= 60.18/40 = 1.50 k Pd= 0.3k Pd= 0.3k PI= 1.5 k PI= 1.5 k BY: BAO / REV. C / 11.03.93 0.01 k 0.01 k 0.00 k SHELF BASE - SLA 0.00 k 0.00 k 0.00 k 0.00 k Ps= 34.33/40 = 0.86 k JOB NO. 160241 -00 DATE 6/9 /97 SHEET 0 OF REV'D 6/9 /97 ONLY TOP SHELF LOADED SHELF DEPTH = 40 in P= 1200 lb P= 200 lb P= 200 lb B a- a- a- a- Ps34.33/40 = 0.86 k Pd= 0.3k Pd= 0.3k PI= 0.5k PI= 0.5k 6/8 FILENAME: PR160241.XLS 6/9/971:43 PM BLDG 21 -04 B/5 -H /8 PALLET RACK DESIGN BOEING FACILITIES P. O. Box 3707 Seattle, Washington 98124-2207 Mall Stoo: 48-87 PROJECT RELOCATE FINANCE PROP. MNGMT. FIG. BY JBURKS CHECKED BY SEISMIC LOADING - TRANSVERSE DIRECTION (CONT) JOB NO. 160241 -00 DATE 6/9 /97 SHEET'3/7 OF REVD 6/9 /97 COLUMN DESIGN - CASE 1: DL + LL + SEISMIC (LONGITUDINAL) P (DL) = 0.30 k P (LL)= 1.50k P (SEISMIC) = 0.00 k (AT INTERIOR COLUMNS) P (TOTAL) = 1.80 k M (SEISMIC) = 11.15 k -in CASE 2: DL + LL + SEISMIC (TRANSVERSE) P (DL) = 0.30 k P (LL) = 1.50 k P (SEISMIC) = 1.50 k P (TOTAL) = 3.30 k M (SEISMIC) = 0.00 k -in (BRACED TRANSVERSELY) BY: BAO / REV. C / 11.03.93 7/8 FILENAME: PR160241,XLS 6/9/97 1:43 PM ALL SHELVES LOADED ONLY TOP SHELF LOADED MAXIMUM DOWNWARD LOAD (k) = 1.5 + 0.3 + 1.5 = 3.30 0.86 + 0.3 + 0.5 = 1.66 FACTOR OF SAFETY AGAINST OVERTURNING = (0.3 + 1.5/2)/ 1.5 = 0.70 (0.3 + 0.5/2)/ 0.86 = 0.64 < 1.5 NG < 1.5 NG BASE UPLIFT LOAD TO BE RESISTED BY ANCHOR BOLTS (k) = (1.51.50) -0.30- 1.50/2 = 1.21 (1.5"0.86)- 0.30 - 0.50/2= 0.74 BLDG 21 -04 B/5 -H /8 PALLET RACK DESIGN BOEING FACILITIES P. O. Box 3707 Seattle, Washington 98124-2207 Mall Stoo: 48-87 PROJECT RELOCATE FINANCE PROP. MNGMT. FIG. BY JBURKS CHECKED BY SEISMIC LOADING - TRANSVERSE DIRECTION (CONT) JOB NO. 160241 -00 DATE 6/9 /97 SHEET'3/7 OF REVD 6/9 /97 COLUMN DESIGN - CASE 1: DL + LL + SEISMIC (LONGITUDINAL) P (DL) = 0.30 k P (LL)= 1.50k P (SEISMIC) = 0.00 k (AT INTERIOR COLUMNS) P (TOTAL) = 1.80 k M (SEISMIC) = 11.15 k -in CASE 2: DL + LL + SEISMIC (TRANSVERSE) P (DL) = 0.30 k P (LL) = 1.50 k P (SEISMIC) = 1.50 k P (TOTAL) = 3.30 k M (SEISMIC) = 0.00 k -in (BRACED TRANSVERSELY) BY: BAO / REV. C / 11.03.93 7/8 FILENAME: PR160241,XLS 6/9/97 1:43 PM BLDG 21-04 B/5-H/8 PALLET RACK DESIGN BOEING FACILITIES P. 0. Box 3707 Seattle, Washington 981242207 Mail Stoo: 46-87 PROJECT RELOCATE FINANCE PROP. MNGMT. FIG. BY JBURKS CHECKED BY COLUMN DESIGN (CONT)- . BY: BAO / REV. C /11.03,93 Fb = 0.6*Fy = P/Pa = (3.3/17.22) = CHECK DL + LL - P/Pa = (1.80/17.22) = Fy = 42 ksi Lx = 39 in Ly = 48 in Kx = 1.5 (LONGITUDINAL) Ky = 1 (TRANSVERSE) A = 0.8 inA2 Ix = 1.338 lett rx = 1.294 in ry = 1.098 in Sx = 0.893 inA4 Sy = 0.604 inA4 C = 1 27E2E = 116.7 F (kI/r)x = 45.22 <- GOVERNS (kI/r)y = 43.72 Ma = Fb*Sx = 22.49 k-in FOR TRANSVERSE SEISMIC LOADING - 0.105 < 1.00 OK JOB NO. 160241-00 DATE 6/9 /97 SHEET OF REVD 6/9 /97 8/8 FILENAME: PR160241.XLS 6/9/97 1:43 PM Fa = 21.53 ksi Pa= 17.22 k 6 FOR LONGITUDINAL SEISMIC LOADING - 25.2 ksi 0.6 < P/Pa + M/Ma = (1.8/17.22) + (11.15/22.49) = 1.33 OK 0.192 < 1.33 OK BLDG 21 -04 B /5 -H /8 BEAM WELD CAPACITY I BOEING P. O. Box 3707 FACILITIES Seattle, Washington 98124 -2207 Mail Stop: 46-87 Y PROJECT RELOCATE FINANCE PROP. MNGMT. FIG. BY JBURKS CHECKED BY BEAM & WELD GEOMETRY BEAM: LBC50 WELD THICKNESS = 0.125" EFFECTIVE THICKNESS = 0.125 * 0.707 = 0.088" WELD TYPE = A (1) ITEM 1 2 3 4 5 6 TOTALS 1.50" 3.50" V COG Y= 2.191176 in BY: BAO / REV. A / 11.13.93 A = 0.751 in2 Y = 2.191176 in I = 1.339 in4 St = 0.477 in3 Sb = 0.611 in3 r = 1.335 in 0.88" X 4 1.88" 3 k 2.75" (2) (3) (4) (5) (6) (7) (8) (9) (1 0) HEIGHT WIDTH y A Ay (bh ^3)/12 d AdA2 (7) + (9) 0.000 0.088 4.250 0.000 0.000 0.000 2.059 0.000 0.000 3.500 0.088 1.750 0.309 0.541 0.316 -0.441 0.060 0.376 5.000 0.088 2.500 0.442 1.105 0.921 0.309 0.042 0.963 0.000 0.088 0.000 0.000 0.000 0.000 -2.191 0.000 0.000 0.000 0.088 3.500 0.000 0.000 0.000 1.309 0.000 0.000 0.000 0.088 5.000 0.000 0.000 0.000 2.809 0.000 0.000 0.751 1.646 1.237 0.102 1.339 ALLOWABLE WELD STRESS = 70 ksi * 0.30 * 1.33 = 27.93 ksi ALLOWABLE SHEAR = 27.93 ksi * 0.75 = 20.98 k ALLOWABLE BENDING = 27.93 ksi * 0.48 = 13.31 "k JOB NO. 160241 -00 DATE 6/9/97 SHEET 9 OF REV'D 6/9/97 5.00" 1/1 FILENAME: PR160241.XLS 6/9/97 1:43 PM BLDG 21-04 B/5-H/8 PALLET RACK DESIGN BOEING FACILITIES P. O. Box 3707 Seattle, Washington 98124-2207 Mail Stoo: 46-87 INANCE PROP. MNGMT. FIG. BY JBURKS CHECKED BY PALLET RACK GEOMETRY SHELF SPACING = 25" • SHELF SPACING = 29" SHELF SPACING = 35" SHELF SPACING = 95" SHELF SPACING = 0" SHELF SPACING = 0" SHELF SPACING = 0" SHELF SPACING = 0" BY: BAO / REV. C /11.03.93 JOB NO. 160241-00 DATE 6/9 /97 SHEET II I OF REV'D 6/9 /97 NUMBER OF SHELVES = 4 (MUST BE < 8) IF NUMBER IS LESS THAN EIGHT, SET LOWER SHELF HEIGHTS (BELOW LEFT) TO ZERO AS REQUIRED. BEAM SPAN = 120" SHELF BASE SET SHELF HEIGHTS BELOW TO ZERO BEAM SPAN = 120" 1/8 FILENAME: PR160241.XLS 8/9/97 2:21 PM LEVEL D hx (in) hx (in) wx (k) wxhx wxhx Fx (k) wxhx stMNe -0000 25 184 0.45 82.8 0.324 0.037 29 159 0.45 71.55 0.280 0.032 35 130 0.45 58.5 0.229 0.026 95 95 0.45 42.75 0.167 0.019 0 0 0 0 0.000 0.000 0 0 0 0 0.000 0.000 0 0 0 0 0.000 0.000 0 0 0 0 0.000 0.000 TOTALS 1.8 255.6 1.000 0.113 BLDG 21 -04 B /5 -H /8 PALLET RACK DESIGN BOEING FACILITIES P. O. Box 3707 Seattle, Washington 981242207 Mall Stoo: 46-87 PROJECT RELOCATE FINANCE PROP. MNGMT. JOB NO 160241 - 00 FIG. BY JBURKS CHECKED BY DATE 6/9 /97 SHEET fl/OF REV'D 6/9 /97 BEAM LOADS SHELF DL = SHELF LL = BY: BAO / REV. C / 11.03.93 200 LB /SHELF = 700 LB /SHELF = 100 LB /BEAM 350 LB /BEAM MOMENT AT CENTER OF BEAMS: ASSUME 20% FIXITY AT ENDS FOR DETERMINING THE MOMENT AT THE CENTER OF BEAMS. MDL = W8LL *(80%).= (80 %) * (0.100 * 120 / 8) k -in = MLL = W 8 LL *( % ) = (80 %) * (0.350 * 120 / 8) k -in = 1.20 k -in 4.2 k -in MOMENT AT END OF BEAMS: MDL = W * (2O /o) _ (20 %) * (0.100 * 120 / 8) k -in = 0.30 k -in MLL = W8LL *(2�/o) = (20 %) * (0.350 * 120 / 8) k -in = 1.1 k -in SEISMIC LOADING - LONGITUDINAL DIRECTION V _ ZIC x W Rw Z = 0.3 I= 1 C = 2.75 Rw = 8 (FOR MOMENT FRAME, Rw = 8; FOR BRACED FRAME, Rw = 6) 2 <-- - -TYPE 1 FOR 100% LL; TYPE 2 FOR 50% REDUCTION IN LL (PER UBC STDS) W = 4* (200 + 700/2)/1000 = 2.2 k (FOR BOTH SIDES OF RACK) V = 0.1031 W = 0.227 k LATE 2/8 FILENAME: PR160241.XLS 6/9/97 2:21 PM 0.23 k -in 0.012 k m = V = 0.037 k m = 0.459 k -in v = 0.726 k -in 0.022 k m = v = 0.069 k m = 0.993 k -in v = 1.323 k -in 0.104 k m = v = 0.094 k m = 1.653 k -in V = 6.215 k -in Ok m = V = 0.113 k m = 10.78 k -in v= 0 k -in Ok m= v= Ok m= 0 k -in v= 0 k -in 0k m = v= Ok m= 0 k -in V= 0 k -in O k m= v= Ok m= 0 k -in v= • 0 k -in m = v= Ok m= 0 k -in BLDG 21 -04 8/5 -H /8 PALLET RACK DESIGN BOEING FACILITIES P. O. Box 3707 Seattle, Washington 98124 -2207 Mail Stop: 46-87 SEISMIC LOADING - LONGITUDINAL DIRECTION (cont) USING "PORTAL FRAME METHOD" DETERMINE FORCES AT INTERIOR SECTION DUE TO SEISMIC LOADING PROJECT RELOCATE FINANCE PROP. MNGMT. FIG. BY JBURKS CHECKED BY BASE FIXITY: TYPE "2" IF BASE IS FIXED; TYPE "1" IF BASE IS PINNED - - - -> 1 Ok Ok Ok BY: BAO / REV. C / 11.03.93 v= m = v= m = 0.019 k v = m= Ok v SET SHELF m = BELOW TO ZERO v= 0.004k m= V= m: v= m: V= m: JOB NO. 160241 -00 DATE 6/9 /97 SHEET 41../OF REVD 6/9 /97 Pd +I +s = 1.8 k v= 0.004k 0.23 k -in 0.012 k 0.726 k -in 0.022 k 1.323 k -in 0.104 k 6.215 k -in Ok 0 k -in Ok 0 k -in Ok 0 k -in Ok 0 k -in 3/8 FILENAME: PR160241.XLS 6/9/97 2:21 PM BLDG 21 -04 B /5 -H /8 PALLET RACK DESIGN BOEING FACILITIES P. O. Box 3707 Seattle, Washington 98124 -2207 Mail Stoo: 46-87 I PROJECT RELOCATE FINANCE PROP. MNGMT. FIG. BY JBURKS CHECKED BY SEISMIC LOADING - LONGITUDINAL DIRECTION (cont) BEAM LOADS - VERTICAL LOAD = 450 lb /beam Md +I CENTER = 5.40 k -in Md +I END = 1.35 k -in Mseismic = 6.21 k -in Md +I +s END = 7.56 k -in L= 120" BY: BAO / REV. C /11.03.93 Fy = 42 ksi Sx = 0.948 inn Ix = 2.051 iO4 Fb = 0.6 * Fy = 25.2 ksi M all = Sx *Fb = 0.9481 * 25.2 = 23.89 k -in >= 5.40 OK CHECK SEISMIC - (4/3) * Mall = 31.86 k -in >= 7.56 OK CHECK DEFLECTION - Amax = 1/ 180 = 0.667 in 5w1 act = 384E1 0.17 in <= 0.667 OK CHECK END CONNECTION- WELD TYPE: A JOB O. 160241 - 00 DATE 6/9 /97 SHEET /1.1.0F REVD 6/9 /97 WELD CAPACITY: 8.09 "k > 7.56 OK (-7% UNDERSTRESS CONDITION) PLATE TYPE: 4 PIN END PLATE; COLUMN THICKNESS: 0.105 " PLATE CAPACITY: 36.29 "k > 7.56 OK 4/8 FILENAME: PR160241.XLS 6/9/97 2:21 PM LEVEL DIST BETW COG & SHELF TOP 1.15 *hx (in) wx (k) wxhx wxhx Fx (k) Mot (k -in) '' wxhx 13 " 226.55 O) N N N O O O O O O O O 203.90 0.698 0.110 25.00 0 " 182.85 36.57 0.125 0.020 3.62 0 " 149.50 29.90 0.102 0.016 2.42 0 " 109.25 21.85 0.075 0.012 1.29 0 0 " 0.00 0.00 0.000 0.000 0.00 0 " 0.00 0.00 0.000 0.000 0.00 0 " 0.00 0.00 0.000 0.000 0.00 0 " 0.00 0.00 0.000 0.000 0,00 TOTALS 3.6 1.5 292.22 1.000 0.158 32.32 LEVEL DIST BETW COG & SHELF TOP 1.15 *hx (in) wx (k) wxhx wxhx Fx (k) Mot (k -in) E wxhx 13 " 226.55 C) O C) 0 0 0 0 0 O O O O 1 203.90 0.298 0.090 20.39 15 " 200.10 180.09 0.263 0.080 15.91 18 " 170.20 153.18 0.224 0.068 11.51 48 " 164.45 148.01 0.216 0.065 10.75 0 0 " 0.00 0.00 0.000 0.000 0.00 0 " 0.00 0.00 0.000 0.000 0.00 0 " 0.00 0.00 0.000 0.000 0.00 0 " 0.00 0.00 0.000 0.000 0.00 TOTALS 3.6 685.17 1.000 0.303 58.56 BLDG 21 -04 B /5 -H /8 PALLET RACK DESIGN BOEING FACILITIES P. O. Box 3707 Seattle, Washington 981242207 Mail Stoo: 46-87 PROJECT RELOCATE FINANCE PROP. MNGMT. FIG. BY JBURKS CHECKED BY SEISMIC LOADING - TRANSVERSE DIRECTION ASSUMPTION: PALLET RACK IS BRACED IN TRANSVERSE DIRECTION V_ ZIC xW Rw Z = 0.3 I= 1 C = 2.75 Rw = 6 (FOR MOMENT FRAME, Rw = 8; FOR BRACED FRAME, Rw = 6) 2 <-- - -TYPE 1 FOR 100% LL; TYPE 2 FOR 50% REDUCTION IN LL (PER UBC STDS) W1 = 4* (200 + 700/2)/1000 = V1 = 0.1375 W = 0.303 k W2 = [(4 * 200) + 700/21/1000 = V2 = 0.1375 W = 0.158 k LATERAL FORCE DISTRIBUTION - ALL SHELVES LOADED - TRANSVERSE DIRECTION ONE BENT OF RACK ONL LATERAL FORCE DISTRIBUTION - ONLY TOP SHELF LOADED - TRANSVERSE DIRECTION ONE BENT OF RACK ONL BY: BAO / REV. C / 11.03.93 JOB NO. 160241 -00 DATE 6/9 /97 SHEETI L'OF REV'D 6/9 /97 2.2 k (ALL SHELVES LOADED) (PER UPRIGHT FRAME) 1.15 k (ONLY TOP SHELF LOADED) (PER UPRIGHT FRAME) 5/8 FILENAME: PR160241.XLS 6/9/97 2:21 PM BLDG 21 -04 B /5 -H /8 PALLET RACK DESIGN BOEING FACILITIES P.O. Box 3707 Seattle, Washington 98124 -2207 Mail Stop: 46-87 0.09 k 13" 0.08 k 15" 0.07k 18 " > 0.07 k 48" > 0.00 k 0 " > SHELF BASE - SLA 0.00 k 0 " > 0.00 k 0 " .. > 0.00 k 0" > Ps = 58.56 / 40 = 1.46 k BY: BAO / REV. C / 11.03.93 PROJECT RELOCATE FINANCE PROP. MNGMT. FIG. BY JBURKS CHECKED BY SEISMIC LOADING - TRANSVERSE DIRECTION (CONT) ALL SHELVES LOADED SHELF DEPTH = 40 in I P= 900 lb P= 900 lb P= 900 lb P= 900 lb B Ps = 58.56 / 40 = 1.46 k Pd = 0.4 k Pd = 0.4 k PI= 1.4 k PI= 1.4 k 0.11 k 13" "' > 0.02 k 0.02 k 0.01 k 0.00 k SHELF BASE - SLA 0.00 k 0.00 k 0.00 k Ps= 32.32/40 = 0.81 k JOB NO. 160241 - 00 DATE 6/9 /97 SHEET* OF REVD 6/9 /97 ONLY TOP SHELF LOADED SHELF DEPTH = 40 in P= 900 lb P= 200 lb P= 200 lb P= 200 lb B J. Ps= 32.32/40 = 0.81 k Pd = 0.4 k Pd = 0.4 k PI = 0.35 k PI = 0.35 k 6/8 FILENAME: PR160241.XLS 6/9/97 2:21 PM LDG 21 -04 B/5-H/8 PALLET RACK DESIGN I ALL SHELVES LOADED BOEING P. O. Box 3707 FACILITIES Seattle, Washington 98124 -2207 I Mail Stop: 46-87 PROJECT RELOCATE FINANCE PROP. MNGMT. FIG. BY JBURKS CHECKED BY SEISMIC LOADING - TRANSVERSE DIRECTION (CONT) JOB NO. 160241 - 00 DATE 6/9 /97 SHEET 4(7 OF REVD 6/9 /97 COLUMN DESIGN - CASE 1: DL + LL + SEISMIC (LONGITUDINAL) P (DL) = 0.40 k P (LL) = 1.40 k P (SEISMIC) = 0.00 k (AT INTERIOR COLUMNS) P (TOTAL) = 1.80 k M (SEISMIC) = 10.78 k -in CASE 2: DL + LL + SEISMIC (TRANSVERSE) P (DL) = 0.40 k P (LL) = 1.40 k P (SEISMIC) = 1.46 k P (TOTAL) = 3.26 k M (SEISMIC) = 0.00 k -in (BRACED TRANSVERSELY) BY: BAO / REV. C / 11.03.93 7/8 FILENAME: PR160241.XLS 6/9/97 2 :21 PM ALL SHELVES LOADED ONLY TOP SHELF LOADED MAXIMUM DOWNWARD LOAD (k) = 1.46 + 0.4 + 1.4 = 3.26 0.81 + 0.4 + 0.35 = 1.56 FACTOR OF SAFETY AGAINST OVERTURNING = (0.4 + 1.4/2)/ 1.46 = 0.75 (0.4 + 0.35/2)/ 0.81 = 0.71 < 1.5 NG < 1.5 NG BASE UPLIFT LOAD TO BE RESISTED BY ANCHOR BOLTS (k) = (1.5 *1.46) -0.40- 1.40/2 = 1.10 (1.5 *0.81) - 0.40 - 0.35/2= 0.64 PROJECT RELOCATE FINANCE PROP. MNGMT. FIG. BY JBURKS CHECKED BY SEISMIC LOADING - TRANSVERSE DIRECTION (CONT) JOB NO. 160241 - 00 DATE 6/9 /97 SHEET 4(7 OF REVD 6/9 /97 COLUMN DESIGN - CASE 1: DL + LL + SEISMIC (LONGITUDINAL) P (DL) = 0.40 k P (LL) = 1.40 k P (SEISMIC) = 0.00 k (AT INTERIOR COLUMNS) P (TOTAL) = 1.80 k M (SEISMIC) = 10.78 k -in CASE 2: DL + LL + SEISMIC (TRANSVERSE) P (DL) = 0.40 k P (LL) = 1.40 k P (SEISMIC) = 1.46 k P (TOTAL) = 3.26 k M (SEISMIC) = 0.00 k -in (BRACED TRANSVERSELY) BY: BAO / REV. C / 11.03.93 7/8 FILENAME: PR160241.XLS 6/9/97 2 :21 PM BLDG 21-04 B/5-H/8 PALLET RACK DESIGN BOEING FACILITIES P. O. Box 3707 Seattle, Washington 98124-2207 Mall Stop: 46-87 PROJECT RELOCATE FINANCE PROP. MNGMT. FIG. BY JBURKS CHECKED BY COLUMN DESIGN (CONT)- TRY LM30 BY: BAO / REV. C / 11.03.93 Fy = 42 ksi Lx= 39 in Ly = 48 in Kx = 1.5 (LONGITUDINAL) Ky = 1 (TRANSVERSE) A= 0.8 inA2 Ix = 1.338 inA4 Tx = 1.294 in ry = 1.098 in Sx = 0.893 inA4 Sy = 0.604 inA4 welbe•■••••48 JOB NO 160241- DATE 6/9 /97 SHEET 4 OF REV'D 6/9 /97 F 1 127c 2 E = 116.7 (kl/r)x = 45.22 < GOVERNS (kI/r)y = 43.72 Fa = 21.53 ksi Pa= 17.22 k FOR LONGITUDINAL SEISMIC LOADING - Fb = 0.6*Fy = 25.2 ksi Ma = Fb*Sx = 22.49 k-in P/Pa + M/Ma = (1.8/17.22) + (10.78/22.49) = 0.584 < 1.33 OK FOR TRANSVERSE SEISMIC LOADING - P/Pa = (3.26/17.22) = 0.19 < 1.33 OK CHECK DL + LL - P/Pa = (1.80/17.22) = 0.105 < 1.00 OK 8/8 FILENAME: PR160241.XLS 6/9/97 2:21 PM BLDG 21 -04 B /5 -H /8 BEAM WELD CAPACITY I BOEING P. O. Box 3707 FACILITIES Seattle, Washington 981242207 Mail Stop: 46-87 . 1 ' • PROJECT RELOCATE FINANCE PROP. MNGMT. FIG. BY JBURKS CHECKED BY BEAM & WELD GEOMETRY BEAM: LBF404 WELD THICKNESS = 0.125" EFFECTIVE THICKNESS = 0.125 * 0.707 = 0.088" WELD TYPE = A (1) ITEM 1 2 3 4 5 6 TOTALS 1.50" 2.50" BY: BAO / REV. A / 11.13.93 X COG Y= 1.711538 in A = 0.575 in2 Y = 1.711538 in I = 0.663 in4 St = 0.290 in3 Sb = 0.387 in3 r = 1.074 in 4 2.75" 0.88" 1.88" 3 ALLOWABLE SHEAR = 27.93 ksi * 0.57 = 16.05 k ALLOWABLE BENDING = 27.93 ksi * 0.29 = 8.09 "k JOB NO. 160241 -00 DATE 6/9/97 SHEET l! q OF REVD 6/9/97 4.00" (2) (3) (4) (5) (6) (7) (8) (9) (1 0) HEIGHT WIDTH y A Ay (bh ^3)/12 d AdA2 (7) + (9) 0.000 0.088 3.250 0.000 0.000 0.000 1.538 0.000 0.000 2.500 0.088 1.250 0.221 0.276 0.115 -0.462 0.047 0.162 4.000 0.088 2.000 0.354 0.707 0.471 0.288 0.029 0.501 0.000 0.088 0.000 0.000 0.000 0.000 -1.712 0.000 0.000 0.000 0.088 2.500 0.000 0.000 0.000 0.788 0.000 0.000 0.000 0.088 4.000 0.000 0.000 0.000 2.288 0.000 0.000 0.575 0.983 0.586 0.076 0.663 ALLOWABLE WELD STRESS = 70 ksi * 0.30 * 1.33 = 27.93 ksi 1/1 FILENAME: PR160241.XLS 6/9/97 2 :21 PM 603 a •03f5' or% 3 3- .7401- $G 3 0 BC 3 6C 40 6C. 4-6 ac 5 6d 55'A . /OS 6Yz /J% 7.791/ 1 4.. 54197 4105 4 (//7.,7.07 . 0 79 1 1 (Az 1. 'MI /.70, 1,2 •11a2 .9517 .7/4 40)3 .4153 j.O24 .$7S ,405f. /•343 .970s 415 /.535 1.166 .7 M TH C ?1 STEEL, SER. 1"rtC.rAKeaJ D •t¢L1 ►v1„(, METAL TECH., INC. BEAM 56C r110..0 PR 0Pestr ' � �``" ORA NQ N DATE $ /3 Di. CAZIPORNIA Mr!: Ana. O,owM+*rows 4 IM H 234 5 12.: I l4• NO REVISIQNS SY Ar 1.874 R-4 1 hi Hi r. • 2000 psi r. . 3000 psi r, ■ 4000 psi r. ■ 6000 psi Tension S►sr Tension Snow Tension SMu Tension Wiese SO• Yep. *nth' SP. gyp. WIthoue SP- IMP- WNW Sp• M'0. Without' &- in 5 0. WW1' Sp. Wen. • Without' S0. Y'0. WIWI SO. ki84% WIlhouti Sp• WV- S4sw 1 Vs 300 150 525 315 156 540 325 165 550 350 175 550 '/4 2 440 220 550 520 260 550 520 260 550 520 260 550 '/4 520 260 550 520 260 550 520 260 550 520. 260 550 3 / 6 3 /a 400 200 825 460 230 950 515 • 260 1.075 625 315 1.150 • 3 /a 3/4 1 875 440 1.250 1.025 515 1.250 1.175 590 1.250 1 .350 675 1.250 3 /a 3 /2 1.000 500 1.250 1.250 625 1.250 1.350 675 1.250 1 .350 675 1.250 1.100 th 800 400 1.700 1.000 500 1.740 1.200 - 600 1.775 1.250 625 2.085 1 /2 3 1.250 625 2.085 1.625 815 2.085 2.000 1.000 2.085 2.250 1.125 2.085 '4 6 1.375 690 2.085 1.765 880 2.085 2,150 1,075 2,085 2.550 1.275 2.085 3 /1 2 1,175 ' 590 2.625 1.500 750 2.875 1.700 850 3.125 1.800 900 3.125 /a 4 1.750 875 3,125 2.250 1.125 3.125 2.750 1.375 3.125 3.000 1.500 3.125 3/4 7 2.250 1.125 3,125 2.825 1.415 3.125 3.425 1.715 3.125 . 1425 1.715 3.125 3 /4 3 1.450 725 2.700 1.825 915 3,100 2.200 1.100 3.500 2.450 1.225 4 3 /4 4 2.350 1.175 4,225 3,050 1,525 4.365 3.625 1.815 4.500 4.375 2.190 4.500 3 /4 8 2.750 1.375 4.500 3.625 1.815 4.500 4.250 2.125 4,500 4.800 2,400 4.500 1 4 2.925 1,465 5.700 3.625 1.815 6350 •4.325 2.165 7.000 4,500 2.250 7.000 1 6 4.125 2.065 7,000 6.000 3.000 7.000 6.750 3.375 7.000 6,875 3.440 7.000 I 9 5.250 2.625 7.000 7.500 3.750 7,000 8100 4.400 7.000 8.800. , 4.400 7.000 dal DEPTH EASED. (Maw) I•, • 2000 psi r, . 3003 psi r • 4000 psI r.. WOO pea Tension Tension Sneer Tension TsnWsn • Sneer Wiese SO• Yep. Volt o S0. MO• YrM ' Sp. MP• Without' Sp. YsO. Sass WSW Sp. WWI. rrMno,s" Sp. Insp. Witt e Sp. Insp. sp. pupa S4sw I /4 I 250 125 400 310 155 400 . 360 180 400 440 220 4 0 0 1 /4 2 523 265 400 • 550 280 400 590 295 400 625 315 '/4 33/4 625 315 400 625 315 400 625 315 400 625 315 400 3 /a 1 /a 500 250 925 615 310 975 710 355 1.025 800 400 1,025 3/4 1 2'/_ 1.125 563 1.100 1.210 605 1.100 1.290 645 1.100 1.450 725 1.100 3 /2 4 1.250 625 1.100 1.300 650 1.100 1.350 675 1.100 1,450 725 1.100 th 2 1.100 550 1.810 1.230 615 1.840 1.365 680 1.840 1.625 815 1.840 t /3 3'/3 1.750 875 1.840 2.000 1.000 1.840 2.250 1.125 .1.840 2.625 1.315 1.840 1 /2 6 1.950 975 1.840 2.165 1.080 1,840 2.375 1.190 1.840 2.625 1.315 1.840 3 4 2 1.500 750 2.875 1.750 875 2.875 2.000 1.000 2,875 2.500 1.250 2.875 3 /a 4 2.250 1.125 3.125 4670 1.335 3.125 3.090 1.545 3.125 3.925 1.465 3.125 5/4 7 3.000. 1.500 3.125 3.250 1.625 3.125 3.500 1.750 3,125 3.925 1.965 3.125 3 /4 3'/4 1.850 925 3.875 2.175 1.090 3.875 2500 1.250 3.875 3.000 1.500 3.875 3 / 4 4 2,750 1375 4.225 3.875 1.940 4.225 4.500 2.250 4,225 5.500 2,750 4,225 3 /4 8 3.750 1.875 4.225 4,625 2.315 4.225 5,500 2.750 4,225 5.925 2,965 4.225 I 4'/s 3.125 1.565 6,625 3.800 1.V3-, 7.125 5•h 2.190 7.625 5.250 2,625 8.625 I 6 5.000 2300 8.625 5.815 2,910 •8,625 6.6 3.315 8.625 8.250 4,125 8.625 I 9 6.250 3.125 8.625 7.190 '3.595 8.625 .1 4.065 8.625 10.000 5.000 8.625 Page 3 of 4 P 1: TABLE NO.11 -KB-1I CARBON STEEL ALLOWABLE TENSION AND SHEAR VALUES (In Pounds)'.' Report No. 46: 'The tabulated tension and Shear values are for anchors installed in none - aggregate concrete having the compressive strength at the time of installation. Concrete aggregate must comply with U.B.0 Standard No. 26.2. 2 These tension values are only applicable when the anchors are installed with special inspection as set forth in Section 306 of the code. } These tension values are only applicable when the anchors are installed Without special inspection as set forth in Section 306 of the code. titre tabulated values are for anchors installed a minimum of 12 anchor diameters on center for 100 percent efficiency. Spacing may be reduced to 6 anchor diameters provided the values are 'educed 50 percent. Linear interpolation may be used for intermediate spacings. TABLE NO.111 -AIS1 304 AND 316 STAINLESS STEEL KB-II ALLOWABLE TENSION AND SHEAR VALUES (In Pounds)'.' L / 'The tabulated tension and shear values are for anchors installed ins one - aggregate concrete having the compressive strength at the time of installation. Concrete aggregate must comply with U.B.C. Standard No. 26-2. =These tension values arc only applicable when the anchors are installed with special inspection as set forth in Section 306 of the code. "These tension values are only applicable when the anchors are installed without special inspection as set fonh in Section 306 of the code. *The tabulated values are for anchors installed a minimum of 12 anchor diameters on center for 100 percent efficiency. Spacing may be reduced to 6 anchor diameters provided the values are reduced 50 percent. Linear interpolation may be used for intermediate spacings. FtS trY RTHERN ,I. ,,■ • I. A LODI iglETAL:TECH:itiC. •.- 4 • • • 44, p 7.4•■■. ••■■:. • •1 L., <•1 e_A.z.: • 11%....avelfr./.401 • 1 NO I REVISIONS BY 2 (jp DA r —••—•—•• • — • •" • •• ••• • . :- • • :3.23.1991 10: 27 • P. 2 rtc U'dVrt 40 Of '.,1 I LET (IQ, - 1 7Y-- r 64 ." 44..-- • ' 12.•;/ CATE DRAWING NC 1/ v.7 NIT Ma Bet‘. H Z t AREA wr. ,„ , S X .71.. rgx Tvf 'Y'f ryy % L. M 10 t! t..■" . ,11.5* ii.z . difics ,I.s5, .70t1 .1471 .13%1 ,C.C,3 I •;5'(.4 — 04 15 5 .01i. :t 1,1.1 ,s.T11* .3 \..7.‘44 ,112(: 01 2.0 yr"fiqrg rp.T., S fe• .or ,58 Ill . , 6,;•S' 1.1014 •77.1S ,44.21. t,Ii , 1,51S ---- • ' ", 6 . .. . ''.'s . N„ .105 ,800 t. t,33sel , ,t42.4.1.4.1434'. .94 ,.ii 03e 7r.gra . t.,Mzet4 S 4% .,',..c /JIG ;5,ro ',lc:GI /,/7 /.7,/ 2./742 ,43110 1,4,01.5 2,10.., 2,7/7 Lt-i 2 A.,4 LM' ......... Oil 1' *di , /ill • 45C 1,117.4. /.44.49 4/es, ,, , , ,isq. /,24,7a 1./7/0 rft In I -C 7 i.0i* ' ../ /,ido C4.s' 2,4.// 3 1.7417. /.2.77b 4,31/9 blfgt5 1 , 7 377 /143 , Lgit /.5-P4. 1,004; 4,1.1 s-,21 6 . 1 C 1,4v 472.17 2,5' li,i 1,614,7 /4957 /,C.3!.-6 ),9J (.0178 4205", /.2s.."9 /.1.74.1 2,55 •85 /. 431/ /.7474 044.4 Z,5/ 1,71 2.,7/.! 0. , L.1 L $ c,, .,;;,. 4,78+7 S‘loe. /.5704 3 4 dor .:.--." 1.7/l 1 ./15 0.71a t,(4sa .7 ti,..1. 1,0 LM 47 / b5 / Z Ir ;• • . cart 7 ., z,,9s3 1,gic.41 • " '' .c...1' . 169 birlc. lise.4s betrst /.17s /.7Pla —...• •_, ----- , • ; '..‘' / a0 ...... 'b — j ., ,.-1 - -, , f ..:.-" . ..re • ■• -s ' . 1 dil• - ••• /..e/Ic, . _ . Z.4 ' 12.17. 4,96: " ' ' 71. "Dict.b. . . ,..... " ' 15 "— - • I .• • xl) 0 FtS trY RTHERN ,I. ,,■ • I. A LODI iglETAL:TECH:itiC. •.- 4 • • • 44, p 7.4•■■. ••■■:. • •1 L., <•1 e_A.z.: • 11%....avelfr./.401 • 1 NO I REVISIONS BY 2 (jp DA r —••—•—•• • — • •" • •• ••• • . :- • • :3.23.1991 10: 27 • P. 2 rtc U'dVrt 40 Of '.,1 I LET (IQ, - 1 7Y-- r 64 ." 44..-- • ' 12.•;/ CATE DRAWING NC 1/ v.7 NIT CODE BD x 94 (In.) t (In.) OS (In.) Wcjt. (0 /Ft.) Area (In.2) X - X AXIS Y - Y AXIS I(In. S(I11. r(In.) y(In.) I(In. S(In. r(In.) x(In.) 2010 2 -5/j6 x 2 0.070 0.750 1.90 0.550 0.3697 0.2915 0.0137 1.0669 0 3066 0 2004 0 7410 0 9066 2110 3 -7L16 x 2 0.070 0.750 2.42 0.713 1.0061 0.5570 1.1878 1.6337 0, 4517_ 0.4209 0.7959 0 9269 3110 3 -5/16 x 2 -3/4 0.070 1.625 2.72 0.800 1.1316 0.6292 1.1091 1.5142 0.7945 0.5222 0.9964 1.2280 -MD. 4 33 _L625_ _2.24_ A..065.__ . fi S. 21Q_ _1,1121_ ...1.1,12/......Q.9120_ .Q.6Q39_ 1.4258_ _1.2397_ 0. 10__, D. 1,67¢ _a 08 0 905 1 0 0668 1.4304 1.9016 0,9850 0,6548 1,0431 1,2457 3348 4 -1/16 a 2 -3/4 0,087 1,625 3,00 1,117_ 2,,2065 1 057,_ 1 4306 1,9006 1 1 0.7960 1.0356 1 2447 _ 1518. _E1LjJ(_2-3/4 __.QA30_,_L521L _3..53 LQ59_ ..3.5445_ _lam_ 25000 1.2008 0.8628 1.0947 1.2655 3548 5 -1/4 X 2 -3/4 0,087 1,622 _s 1 320 _4.a1$99 1.5890 _L8212 1.0129 2 4989 1..5613 1 1.0874 1.2648 _40 5 8 / 0 00 1._525 4,7� . 00 5.2146_3.7051 1_7051 1.9303 2.6968 1.6810 = 0512 1.1365 1.1000 1.2701 "^..�i 1 =ir � :21 2:'0520 74 71'09014 ''2;13DS 1 3870 ,9 /16.k 2 -3/4 0.1Q5 1.625 6.32 1.059 9,1936 2.7236 2.2240 3.1645 2.3299 1.5854 . _1',1049.v 7 4.•2743 1.1196 1.2804 �!; '� 14 SECTION PROPERTIES FOR IDDI & SUMFE7t BEAMS 12 -20 -88 U) al ■ ACTIVITY NUMBER PROJECT NAME D ARTMENT: BUILDING DIVISI iz UBLIC WORKS • klPt• 1 -i - COMPLETE COMMENTS REVIEWERS INITIAL REVIEWERS INITIAL Pe%rn c.00rasno c.op. PLAN REVIEW /ROUTING SLIP D97 -0208 BOEING #21 -04 CORRECTION DETERMINATION: C:ROUTE -F FIRE PREVENTION p IAA" 11-1i ❑ STRUCTURAL DETERMINATION OF COMPLETENESS: (T,Th) NOT COMPLETE p REVIEWERS INITIAL DATE APPROVALS OR CORRECTIONS: (ten days) APPROVED p APPROVED W/ CONDITIONS p DATE DATE DATE 6/26/97 PLANNING DIVISION 0 PER l - MIT COORDINATOR DUE DATE 7/01/97 NOT APPLICABLE p TUES /THURS ROUTING: PLEASE ROUTE fl NO FURTHER REVIEW REQUIRED El ROUTED BY STAFF p (If routed by staff, make copy to master file & enter Sierra.) I I DUE DATE 7/15/97 NOT APPROVED (attach comments) p DUE DATE APPROVED APPROVED W/ CONDITIONS p NOT APPROVED (attach comments) 0 (Certification of occupancy required. ) I ■ 0M1 454 1+M1 +Yf + w•:✓�KV�.u.nw.!+C.F + "RSv PLAN REVIEW / ROUTING SLIP ACTIVITY NUMBER PROJECT NAME BOEING 121 -04 DEPARTMENT: BUILDING DIVISION r El PUBLIC WORKS 4 r,,,..a + vneuta r.. w DETERM NATI N OF COMPLETENESS: (T,Th) COMPLETE COMMENTS TUES /THURS ROUTING: PLEASE ROUTE NO FURTHER REVIEW REQUIRED E ROUTED BY STAFF n (If routed by staff, make copy to master file & enter Sierra.) REVIEWERS INITIAL APPROVALS OR CORRECTIONS: (ten days) APPROVED n APPROVED W/ CONDITIONS REVIEWERS INITIAL CORRECTION DETERMINATION: APPROVED I 1 APPROVED W/ CONDITIONS REVIEWERS INITIAL C:ROUTE -F I( er.M114VVINO•Ff D97 -0208 NOT COMPLETE FIRE PREVENTION :J PLANNING DIVISION STRUCTURAL EI PERMIT COORDINATOR Q DATE 7 - DATE 1 17 q DATE h?a•!mn,n, +.+4aan,w,n Uxrn.' fu+ �Rtd+:' Mt7: h 'tixKYGNN ±..psn.»rrmr��+.w..aafe DATE 6/26/97 DUEDATE 7/01/97 NOT APPLICABLE n DUE DATE 7/15/97 NOT APPROVED (attach comments) DUE DATE NOT APPROVED (attach comments) U (Cettificadon of occupancy required. ) ACTIVITY NUMBER PROJECT NAME DEPARTMENT: BUILDING DIVISION I PUBLIC WORKS COMPLETE Ej COMMENTS • REVIEWERS INITIAL REVIEWERS INITIAL REVIEWERS INITIAL C:ROUTE -F lJ D97 -0208 PLAN REVIEW / ROUTING SLIP BOEING #21 -04 1 DETERMINATION OF COMPLETENESS: (T,Th) APPROVALS OR CORRECTIONS: (ten days) CORRECTION DETERMINATION: APPROVED 1 APPROVED W/ CONDITIONS vseolo owns ,cetiNF etkl. itTekiV 9"#11,1".M.4aXatillt s PKOK1SMnhfhA2rotart FIRE PREVENTION 111 PLANNING DIVISION El STRUCTURAL PERMIT COORDINATOR 0 DATE DATE DATE DATE 6/26/97 DUEDATE 7/01/97 NOT COMPLETE El • NOT APPLICABLE - 7/07 TUES /TIiURS ROUTING: PLEASE ROUTE El NO FURTHER REVIEW REQUIRED-- ROUTED BY STAFF n (If routed by staff, make copy to master file & enter Sierra.) t DUEDATE 7/15/97 APPROVED n APPROVED W/ CONDITIONS C NOT APPROVED (attach comments) U DUE DATE NOT APPROVED (attach comments) 0 (Certification of occupancy required. ) '�fw�' �ait��Ys�'xtfis;:sJ• DEPARTMENT: BUILDING DIVISION PUBLIC WORKS COMPLETE n COMMENTS • REVIEWERS INITIAL REVIEWERS INITIAL C:ROUTE -F V;'• ) 7,1 �w A.-.A.lo Yl7;ORFS;SKrArIl .` '!MliCtI S�'Uw "S"nFM PLAN REVIEW / ROUTING SLIP ACTIVITY NUMBER D97 -0208 PROJECT NAME BOEING 121 -04 4 DETERMINATION OF COMPLETENESS: (T,Th) TUES /THT RS ROUTING: PLEASE ROUTE n NO FURTHER REVIEW REQUIRED ROUTED BY STAFF n (If routed by staff, make copy to master file & enter Sierra.) REVIEWERS INITIAL \J 1 - - �" — DATE 7 / °l 3 I, 1 APPROVALS OR CORRECTIONS: (ten days) APPROVED n APPROVED W/ CONDITIONS . NOT APPROVED (attach comments) Q CORRECTION DETERMINATION: APPROVED n APPROVED W/ CONDITIONS t DATE DATE • ix DUE DATE 7/01/97 NOT COMPLETE E NOT APPLICABLE El DUE DATE 7/15/97 DATE 6/26/97 FIRE PREVENTION E PLANNING DIVISION . STRUCTURAL El PERMIT COORDINATOR El DUE DATE NOT APPROVED (attach comments) 0 (Certificadon of occupancy required. ACTIVITY NUMBER PROJECT NAME DEPARTMENT: BUILDING DIVISION PUBLIC WORKS ■ REVIEWERS INITIAL APPROVED C:ROUTE -F PLAN REVIEW / ROUTING SLIP D97 -0208 BOEING #21 - CORRECTION DETERMINATION: DETERMINATION OF COMPLETENESS: (T,Th) COMPLETE n NOT COMPLETE COMMENTS APPROVALS OR CORRECTIONS: (ten days) .....,. o-,... w......... ... .ws.e�,,taeavb� +rvba4�aTitMn FIRE PREVENTION E PLANNING DIVISION El STRUCTURAL El PERMIT COORDINATOR Q I TUES /THURS ROUTING: PLEASE ROUTE E NO FURTHER REVIEW REQUIRED ROUTED BY STAFF El (If routed by staff, make copy to master file & enter Sierra.) APPROVED n APPROVED W/ CONDITIONS El NOT APPROVED (attach comments) ID DATE DATE 6/26/97 DUEDATE 7/01/97 NOT APPLICABLE El DUE DATE 7/15/97 REVIEWERS INITIAL DATE DUE DATE APPROVED W/ CONDITIONS p NOT APPROVED (attach comments) Q (Certification of occupancy required. ) VICINITY MAP 99 19G COUNTY AIRPORT mina OA) FROM SEATTLE TACOMA AIRPORT U EST i!✓dK#NL WAY A 1E PA 99 BOuflG MOLUTARY A]PPLAWk!1ES � SEATT 00. 21 04 RELOCATE FAANCE PROPMaY MANN FROM DON?ITONNI SEATTLE 599 TUKWILA PROJECT SITE DEVELOPMENTAL CENTER FROM KENT & AUBURN NC SCALE 157 EAST MARGINAL WAY CORPORATE PARK BOEING DEVELOPMENTAL CENTER 9725 EAST MARGINAL WAY SOUTH SEATTLE, WASHINGTON 98108 AREA MAP ADDRESS: (EAST MARGINAL WAY CORPORATE PARK) 3417 SO. '120TH PLACE SEATTLE, WA BUILDING 21 -04 REHOUSE NO SCALE 80E/ 4W FACILITIES DEPARTMENT GENERAL NO I ES CONSTRUCTION KT DOCUMIEWiS, REVELED AND STAMPED BY CITY OF TUKWILA MUST BE ON SITE WRAC QINISTIRUCHCAL DO NOT PROCEED 'BATH CONSTRUCTION WITHOUT ABOVE IETHIOIED SEA CF DOCUMENTS. VERY ALL DRUl)SI M PRIOR 10 START CF CONSTRICTION_ NOWT EACi!PY DICE_ NS SILO EYEING NG REQUIRED DESIGN REVISIONS. REVISIONS TO EE APPROVED BY WY OF MO IRA PRIOR TO PROCEEDING WITH PROPOSED WISED WCRIC RETURN! RIS SAIE'KT 10 CARRY TAMER AT BOLDING 9--512 COL N/1 AFTER COUPLE OF TINS CONSiRDUCK PROJECT CHECKLIST a RIM DRAWINGS iXTEORM 1D TIE : - u c UL C. U_P_C., AND 1W WAC 51-20 AS ADAPTED OR MENDED BY LOCAL ORDINANCES ANT CC4KILATKI VOI RE CITY iUKwsjs Molt. ROOMS LASCLE PER OCCLIPA Y PER I B_C_ TAKE 10 —A_ BILLOW ELI= MINER ON PEMT FOP AREA OF CONS1RIJC110N. NUMBER OF SITS REQUITED FOR PERT NT PACKAGE: M 1. TENANT DLPROVEKENT (STRUCTURAL): 0 5 SUS I F', ARoe HECTURAL DBATUNGS I 5 SEA OF STRUCTURAL ORANNNGS 0 5 SSE OF STAROARDD DETAILS 0 5 SETS OF ENGINEERING CALCULATIONS 0 5 SE OF ENERGY CALCULATIONS 0 5 SLIS OF CONSTRUCTION SPEGI-ICATIONS 2 1E NANT OIIPROVEMEN T (NON— STRUCTURAL }_ 0 4 SETS GE ARCHITECTURAL DRAYIiNGS 0 4 SETS OF STANDARD DETAILS ❑ 4 SETS OF ENERGY CALCULATIONS 0 4 Si IS OF CONSTRUCTION S'EGFICA TIONS L3 3_ TENANT BIPOROWMENIS (REVISIONS), 2 COMPLETE SETS D 4 MECHANICAL, 4 COMPLETE KTS El 5_ FIRE PROtEC1IEN/SPRINIQERS, 3 COMPLETE ST.S lLl Tom= PRO.ECT NARRATNE USE EXISTING Miff RACK UPRIGYTS AND BEAMS. REARRANGE S4!_1 F HEMS AND LOCATIONS. t?qa. O2O8 ACCEPT"ABILUY Tr6 DF3R1 AND/OR suoN s OCCUPANCY GROUT' OCCUPANCY, CHANGE DRAWN S• SHEET NO Al 1 Al l' 1Al2 SHEET TITLE FLOOR PLAN FLOOR PLAN LAND USE CODE CODE REFERENCES CONSTRUCTOR TYPE FIRE PROTECTIONS SMOKE VENTS & CURTAIN BD. SEISMIC ZONE FIRE ZONE PARKING PROVIDED PARKING REQUIRED VPROYM APPROVED COVER SHEET, LEGALS & NOTES PALLET RAC STRUCTURAL CALCS. REMODELED AREA: 36,584 sf OCCUPANT LOAD: a that the Plan Check approvals are II ilnoetsio errors omissMns and approval of 5iecttors and the Motion of any 4 pians does not authorize . Receipt of con to =adopted code or ordinance R cknti COn 6 `t rs copy of approved plan • V. i'• DRAWING INDEX CODE SUMMARY M HP 1994 UBC, KING COUNTY /TUKWILA WASHINGTON STATE ENERGY CODE WASHINGTON STATE BARRIER FREE CODE ADDITIONS TO THE CITY OF TUKWILLA 13-2' STORAGE FOR COMBUSI1BLE GOODS B '2 OFFICE B 2 (WAREHOUSE - STORAGE OF GOODS TO F-2 FACTORY AND INDUSTRIAL - LOW HAZARD AT NORTH PORTON' ONLY - (36,584 SF).' V —N SPRINKLERED THROUGHOUT AREA SEPARATION WALLS- 2 HOUR + HORIZ. SEPARATION B THE ROOF (IN LIEU C- PARAPET WALL) NOTE 3 BLDG. PORTIONS N. POR110N (BOX SHOP) CENTER & S. POR IONS (NO CHANGE) LOCATION ON PROPERTY SEPARATIONS (3 SIDES) N. & S. PORTIONS AND (2 SIDES) S CENTER PORTION OF THE BUILDING. FLOOR AREA (ACTUAL) BUILDING FOOTPRINT = 113,724 S.F. BUILDING HEIGHT: 26' 5 -1/2 FLOOR TO TOP PLATE STORIES: 1, W/ 5,220sf MEZZANINE IN THE S. PORTION CHANGES FROM B -2 TO F -2: [36,584 sf /200] — [36,584 sf /500] _ (183 — 73) = 110 WAREHOUSE = 44,080 C. PORTION + 30,740 S. PORTION 0 500 = 150 STORAGE = 1550sf @ 300 = 5 MECHANICAL = 1,850sf B 300 = 7 MANUFACT = 36,584sf N 200 = 183 for the N. PORTION OFFICE = 8,092sf ® 100 = 81 in the S. PORTION MEZZ. CONFERENCE= 140sf B 15 = 10 FULLY AUTOMATIC, WET PIPE THROUGHOUT INSTALLED IN ENTIRE BUILDING IN 1993. 3 3 739 725 By Data Permit No. E€w: 1602241 REV. NO. A SHEET NO. SHEET TITLE 9 0 \I FL Cam TITLE SHEET �tJ BLDG. I — O`a'r. I ARCHITECTURAL MASTER COL. A— K/1 -11 F-7.mir t C .J 1 .i' DMEC:-.:AIIICAL 0 ELECTRICAL ❑ PLUMBING 0 GAS PIPING CITY OF TUKNI BUILDING DIVISIO 1O RECEIVED CITY OF TUKWILA JUN 2 6 199? PERMIT CENTER SHEET NO. D.C. REV. NO. .a oaos LAST RESIO4 SHEET Al B NO. D. NO. 21 -04 —Al OA' • � cr v,o 2.ii r i 0 IA rhRATL CE KAIDI Y 1�i4�ER BUCKER 1 SPORAGE GARBAGE I 1A�1 B SEE T. 1AIC FOB <OO ,U-a FON 0 FED- A202 F1' :a @BOARD STORAGE FOAM STORAGE F SE SIFT. 1110 FOR CON11NUATION u �. N . RU !O NO S: EXISTING PALLET RACK UPRIGHTS ARE 18' HIGH LMT 30 WITH 3/8 ", X 8" X 8" BASEPLATES. ANCHOR BOLTS ARE (2) HILT 1/2' DIA. WITH 3 1/2" MIN. EMBED. EXISTING BEAMS' ARE 14' L. LBC 50, 4 -PIN CONNECTION WITH TYPE 'A` VERTICAL WELDS. CURRENT LOAD LIMIT IS 1000 LBS PER SHELF UNIFORMLY DISTRIBUTED. THESE ELEMENTS ARE ADEQUATE FOR THE NEW SHELF CONFIGURATION AS FOLLOWS: FROM CONCRETE FLOOR TO BOTTOM OF SHELF 95 FROM BOTTOM OF SHELF TO TOP OF SHELF = 35" FROM BOTTOM OF SHELF TO TOP OF SHELF = 29" FROM BOTTOM OF SHELF TO TOP OF SHELF = 25" WIRE DECK IS 2 X 4 MESH (2 GA. ) WITH 4 — 12 GA SUPPORTS. (EXISTING) CONTRACTOR SHALL REPOSITION EXISTING SHELF BEAMS TO NEW CONFIGURATION. EXISTING PALLET RACK UPRIGHTS ARE 18' HIGH LMT 30 WITH 3/8" X 8" X 8" BASEPLATES. ANCHOR BOLTS ARE (2) HILT 1 /2 "'DIA. WITH 3 1/2" MIN. EMBED. EXISTING BEAMS ARE 10' L. LBF 404, 4 —PIN CONNECTION WITH TYPE 'A' VERTICAL WELDS. CURRENT LOAD LIMIT IS 1000 LBS PER SHELF UNIFORMLY DISTRIBUTED. THESE SHELVES SHALL BE DOWN RATED TO 700 LBS PER SHELF UNIFORMLY DISTRIBUTED. REMOVE EXISTING SIGNS AND REPLACE WITH NEW. SHELF CONFIG. AS FOLLOWS: FROM CONCRETE FLOOR TO BOTTOM OF SHELF 95" FROM BOTTOM OF SHELF TO TOP OF SHELF = 35" FROM BOTTOM OF SHELF TO TOP OF SHELF = 29" FROM BOTTOM OF SHELF TO TOP OF SHELF= 25" WIRE DECK IS 2 X 4 MESH (2 GA. ) WITH 4 — 12 GA SUPPORTS. (EXISTING) CONTRACTOR SHALL REPOSITION EXISTING SHELF BEAMS TO NEW CONFIGURATION. REMOVE (9) SECTIONS OF EXISTING' ALLET RACK. USE BEAMS AS REQUIRED FOR NEW CONFIGURATION. BAND PALLETIZE AND SEND TO BOEING AGING WAREHOUSE. 1Al2 po L RACK LEGEND: EXISTING WALL NEW WALL r 5' SYMBOLS �6) • SERVICE SINK Hyy HOT WATER TANK TR TRASH CAN (30 GAL) O TRASH CAN WI FIPPER TOP 0 PT PAPER TOWEL DISPENSOR o FD FLOOR DRAIN OFE FIRE EXTINGUISHER GENERAL NOTES: ASBESTOS NOTIFICATION: A good faith survey of the work area has been conducted and asbestos containing material was not doscovered that would be involved in the construction of this project. Do not remove, damage or disturb any asbestos material adjacent to the work area. Please contact Boeing Facilities Department if asbestos containing material is damaged or discovered that is required to be removed to support work. RECEIVED cs-i OF TUKWILA UN 261997 PERMIT CENTER KEY PLAN SCALE: NONE 1A13 IT J F 1 `r 7 1891 sw A RELOCATE BOX SHOP 4160086 -00 B FINAN _ ••1•. MN M 1.1 41— N p understand that Ch approvalsare ct to error, d approval mns does 7, t, 41, : of an dcptA cooe ." of con I a actor's copy of 2:: edged By Date Permit No. 1A10 B Dq1-02.08 E' PLAN SCALE: 1/B = 1 12:>. NSTALL (96) SECTIONS OF 36" X36" METAL SHELVING. 7 SHELVES PER SECTION SPACED @ 12'' O.C. INSTALL BACK BRACE EVERY OTHER BAY, CROSS AISLE BRACE EVERY FOURTH BAY. METAL SHELVING TO BE INSTALLED UNDER EXISTING PALLET RACK. (8. 5 ciTy JUN 2 6 1997 PERMIT CENTER KEY PLAN SCALE NONE GENERAL NOTES: ASBESTOS NOTIFICATION: A good faith survey of the work meo has been conducted and asbestos containkrg material was not Mscovered that would be involmi in the consbuction of this project Do not remove, damage or disturb any asbestos material adjacent to the work area Please contact Boeing Faulilies Depar if asbestos contag material is damaged or d'scrvered that is required to be removed to support work. CONSTRUCTION NOTES: DIMING PALLET RACK UPRIGHTS ARE 18 HIGH LMT30 WITH 3/8" X 8" X 8" BASEPLATES. ANCHOR BOLTS ARE (2) 1/2" DIA. WITH 3 1/2" MIN. EMBED. EXISTING BEAMS ARE 14' L LBC 50 4- PIN CONNECTION WITH TYPE 'A' WELDS. CURRENT LOAD LIMIT IS 1000 LBS PER SHELF UNIFORMLY DISTRIBUTED. THESE ELEMENTS ARE ADEQUATE FOR THE NEW SHELF CONFIGURATION AS FOLLOWS: FROM CONCRETE FLOOR TO BOTTOM OF SHELF = 95" FROM BOTTOM OF SHELF TO TOP OF SHELF = 35" FROM BOTTOM OF SHELF TO TOP OF SHELF = 29" FROM BOTTOM OF SHELF TO TOP OF SHELF = 25" WIRE DECK IS 2 X 4 MESH (2 GA. ) WITH 4-12 GA SUPTS. (EXISTING). CONTRACTOR SHALL REPOSITION EXIST. SHELF BEAMS TO NEW CONFIGURATION. F›.- EXISTING PALLET RACK UPRIGHTS ARE 18' HIGH LMT30 WITH 3/8" X 8" X 8" BASEPLATES. ANCHOR BOLTS ARE (2) 1/2" DIA. WITH 3 1/2" MIN. EMBED. EXISTING BEAMS ARE 10' L. F 404 4- PIN CONNECTION RE TYPE 'A' WELDS. CURRENT AD LIMIT IS 1000 LBS PER SHELF UNIFORMLY DISTRIBUTED. ESE SHELVES SHALL BE DOWNRATED TO 700 LBS UNIF, DIST MOVE EXIST. SIGNS A REPLACE W/ NEW. CONFIG. SHELVES: OM CONCRETE FLOOR TO BOTTOM OF SHELF = 95" OM BOTTOM OF SHELF TO TOP OF SHELF = 35" OM BOTTOM OF SHELF TO TOP OF SHELF = 29" OM BOTTOM OF SHELF TO TOP OF SHELF = 25" E DECK IS 2 X 4- MESH (2 Gk ) WITH 4-12 GA SUPTS. STING). CONTRACTOR SHALL REPOSITION EXIST. SHELF AMS TO NEW CONFIGURATION. EXISTING PALLET RACK UPRIGHTS ARE 18' HIGH LMT30 WITH 3/8" X 8 X 8" BASEPLATES. ANCHOR BOLTS ARE (2) 1/2 DIA. WITH 3 1/2" MIN. EMBED. EXISTING BEAMS ARE 14' L. LBC 50 4- PIN CONNECTION WITH TYPE 'A' WELDS. CURRENT LOAD LIMIT IS 1000 LBS PER SHELF UNIFORMLY DISTRIBUTED. THESE ELEMENTS ARE ADEQUATE FOR THE NEW SHELF CONFIGURATION AS FOLLOWS: FROM CONCRETE FLOOR TO BOTTOM OF SHELF = 103" FROM BOTTOM OF SHELF TO TOP OF SHELF = 43" FROM BOSOM OF SHELF TO TOP OF SHELF = 43" WIRE DECK IS 2 X 4 MESH (2 GA. ) WITH 4-12 GA SUPTS. (EXISTING). CONTRACTOR SHALL REPOSITION EXIST. SHELF BEAMS TO NEW CONFIGURATION. F- EXISTING PALLET RACK UPRIGHTS ARE 18' HIGH LMT30 WITH 3/8" X 8" X 8" BASEPLATES. ANCHOR BOLTS ARE (2) 1/2" DIA. WITH 3 1/2" MIN. EMBED. EXISTING BEAMS ARE 14' L LBC 50 4- PIN CONNECTION WITH TYPE 'A' WELDS. CURRENT LOAD LIMIT IS 1000 LBS PER SHELF UNIFORMLY DISTRIBUTED, THESE ELEMENTS ARE ADEQUATE FOR THE NEW SHELF CONFIGURATION AS FOLLOWS: FROM CONCRETE FLOOR TO BOTTOM OF SHELF = 39" FROM BOTTOM OF SHELF TO TOP OF SHELF = 39 FROM BOTTOM OF SHELF TO TOP OF SHELF = 37" FROM BOTTOM OF SHELF TO TOP OF SHELF = 37 FROM BOTTOM OF SHELF TO TOP OF SHELF = 27" WIRE DECK IS 2 X 4 MESH (2 Gk ) WITH 4-12 GA SUpTS. (EXISTING). CONTRACTOR SHALL REPOSITION EXIST. SHELF BEAMS TO NEW CONFIGURATION. EXISTING PALLET RACK UPRIGHTS ARE 18' HIGH LMT30 WITH 3/8" X 8" X 8" BASEPLATES. ANCHOR BOLTS ARE (2) 1/2" DIA. WITH 3 1/2" MIN. EMBED. EXISTING BEAMS ARE 10' L LBF 404 4- PIN CONNECTION WITH TYPE 'A' WELDS. CURRENT LOAD LIMIT IS 1000 LBS PER SHELPINIFORMLY DISTRIBUTED. THESE SHELVES SHALL BE DOWN RATED TO 700 LBS PER SHE UNIF. DIST. REMOVE EXIST. SIGN REPLACE W/ NEW. CONFIGURE SHELVES AS FOLLOWS: FROM CONCRETE FLOOR TO BOTTOM OF SHELF = 39" FROM BOTTOM OF SHELF TO TOP OF SHELF = 39" FROM BOTTOM OF SHELF TO TOP OF SHELF = 37" FROM BOTTOM OF SHELF TO TOP OF SHELF = 37" FROM BOTTOM OF SHELF TO TOP OF SHELF = 27" WIRE DECK IS 2 X 4 MESH (2 GA. ) WITH 4-12 GA SUPTS. (EXISTING).-CONTRACTOR SHALL REPOSITION EXIST. SHELF -- - BEAMS TO NEW CONFIGURATION. EXISTING PALLET RACK UPRIGHTS ARE 18' HIGH LMT30 WITH 3/8" X 8" X 8" BASEPLATES. ANCHOR BOLTS ARE (2) 1/2" DIA. 99TH 3 1/2" MIN. EMBED. EXISTING BEAMS ARE 14' L 377B 4- PIN CONNECTION WITH TYPE 'A' WELDS. CURRENT LOAD LIMIT IS 1000 LBS PER SHELF UNIFORMLY DISTRIBUTED. CONFIGURE SHELVES AS FOLLOWS: FROM CONCRETE FLOOR TO BOTTOM OF SHELF = 85" FROM BOTTOM OF SHELF TO TOP OF SHELF = 25" FROM BOTTOM OF SHELF TO TOP OF SHELF = 23" FROM BOTTOM OF SHELF TO TOP OF SHELF = 23" FROM BOTTOM OF SHELF TO TOP OF SHELF = " PP:MN Erf CA7 . Ail'APIEZAW FACILITES DEPARTMENT AG TO jipill --- 4 . i --%:.....-_,44 SCIDPTAINg .,,,,,......".... DRAWN BY M. DITTMAR miE 8-6-96 UERTF11 FLOOR " , MI, LAST REVISION ,= A RELOC. FINANCE PROP. MNMGMT. 160241-00 JBURKS G , ,..,,,_00 MN ...0 s lA 1 2 'I'S, BLDG. 21- 04.1 7 ,-, VA- _, ARCHITECTURAL MASTER COL. A-K/5-7.5 O7:7,;:,C CHO. JOB NO. 763042-00 MIIIMIE= IErPF.L.S.r2,,,C6 APPROVED 21- 04- 1 Al2 p understand that Ch approvalsare ct to error, d approval mns does 7, t, 41, : of an dcptA cooe ." of con I a actor's copy of 2:: edged By Date Permit No. 1A10 B Dq1-02.08 E' PLAN SCALE: 1/B = 1 12:>. NSTALL (96) SECTIONS OF 36" X36" METAL SHELVING. 7 SHELVES PER SECTION SPACED @ 12'' O.C. INSTALL BACK BRACE EVERY OTHER BAY, CROSS AISLE BRACE EVERY FOURTH BAY. METAL SHELVING TO BE INSTALLED UNDER EXISTING PALLET RACK. (8. 5 ciTy JUN 2 6 1997 PERMIT CENTER KEY PLAN SCALE NONE GENERAL NOTES: ASBESTOS NOTIFICATION: A good faith survey of the work meo has been conducted and asbestos containkrg material was not Mscovered that would be involmi in the consbuction of this project Do not remove, damage or disturb any asbestos material adjacent to the work area Please contact Boeing Faulilies Depar if asbestos contag material is damaged or d'scrvered that is required to be removed to support work. CONSTRUCTION NOTES: DIMING PALLET RACK UPRIGHTS ARE 18 HIGH LMT30 WITH 3/8" X 8" X 8" BASEPLATES. ANCHOR BOLTS ARE (2) 1/2" DIA. WITH 3 1/2" MIN. EMBED. EXISTING BEAMS ARE 14' L LBC 50 4- PIN CONNECTION WITH TYPE 'A' WELDS. CURRENT LOAD LIMIT IS 1000 LBS PER SHELF UNIFORMLY DISTRIBUTED. THESE ELEMENTS ARE ADEQUATE FOR THE NEW SHELF CONFIGURATION AS FOLLOWS: FROM CONCRETE FLOOR TO BOTTOM OF SHELF = 95" FROM BOTTOM OF SHELF TO TOP OF SHELF = 35" FROM BOTTOM OF SHELF TO TOP OF SHELF = 29" FROM BOTTOM OF SHELF TO TOP OF SHELF = 25" WIRE DECK IS 2 X 4 MESH (2 GA. ) WITH 4-12 GA SUPTS. (EXISTING). CONTRACTOR SHALL REPOSITION EXIST. SHELF BEAMS TO NEW CONFIGURATION. F›.- EXISTING PALLET RACK UPRIGHTS ARE 18' HIGH LMT30 WITH 3/8" X 8" X 8" BASEPLATES. ANCHOR BOLTS ARE (2) 1/2" DIA. WITH 3 1/2" MIN. EMBED. EXISTING BEAMS ARE 10' L. F 404 4- PIN CONNECTION RE TYPE 'A' WELDS. CURRENT AD LIMIT IS 1000 LBS PER SHELF UNIFORMLY DISTRIBUTED. ESE SHELVES SHALL BE DOWNRATED TO 700 LBS UNIF, DIST MOVE EXIST. SIGNS A REPLACE W/ NEW. CONFIG. SHELVES: OM CONCRETE FLOOR TO BOTTOM OF SHELF = 95" OM BOTTOM OF SHELF TO TOP OF SHELF = 35" OM BOTTOM OF SHELF TO TOP OF SHELF = 29" OM BOTTOM OF SHELF TO TOP OF SHELF = 25" E DECK IS 2 X 4- MESH (2 Gk ) WITH 4-12 GA SUPTS. STING). CONTRACTOR SHALL REPOSITION EXIST. SHELF AMS TO NEW CONFIGURATION. EXISTING PALLET RACK UPRIGHTS ARE 18' HIGH LMT30 WITH 3/8" X 8 X 8" BASEPLATES. ANCHOR BOLTS ARE (2) 1/2 DIA. WITH 3 1/2" MIN. EMBED. EXISTING BEAMS ARE 14' L. LBC 50 4- PIN CONNECTION WITH TYPE 'A' WELDS. CURRENT LOAD LIMIT IS 1000 LBS PER SHELF UNIFORMLY DISTRIBUTED. THESE ELEMENTS ARE ADEQUATE FOR THE NEW SHELF CONFIGURATION AS FOLLOWS: FROM CONCRETE FLOOR TO BOTTOM OF SHELF = 103" FROM BOTTOM OF SHELF TO TOP OF SHELF = 43" FROM BOSOM OF SHELF TO TOP OF SHELF = 43" WIRE DECK IS 2 X 4 MESH (2 GA. ) WITH 4-12 GA SUPTS. (EXISTING). CONTRACTOR SHALL REPOSITION EXIST. SHELF BEAMS TO NEW CONFIGURATION. F- EXISTING PALLET RACK UPRIGHTS ARE 18' HIGH LMT30 WITH 3/8" X 8" X 8" BASEPLATES. ANCHOR BOLTS ARE (2) 1/2" DIA. WITH 3 1/2" MIN. EMBED. EXISTING BEAMS ARE 14' L LBC 50 4- PIN CONNECTION WITH TYPE 'A' WELDS. CURRENT LOAD LIMIT IS 1000 LBS PER SHELF UNIFORMLY DISTRIBUTED, THESE ELEMENTS ARE ADEQUATE FOR THE NEW SHELF CONFIGURATION AS FOLLOWS: FROM CONCRETE FLOOR TO BOTTOM OF SHELF = 39" FROM BOTTOM OF SHELF TO TOP OF SHELF = 39 FROM BOTTOM OF SHELF TO TOP OF SHELF = 37" FROM BOTTOM OF SHELF TO TOP OF SHELF = 37 FROM BOTTOM OF SHELF TO TOP OF SHELF = 27" WIRE DECK IS 2 X 4 MESH (2 Gk ) WITH 4-12 GA SUpTS. (EXISTING). CONTRACTOR SHALL REPOSITION EXIST. SHELF BEAMS TO NEW CONFIGURATION. EXISTING PALLET RACK UPRIGHTS ARE 18' HIGH LMT30 WITH 3/8" X 8" X 8" BASEPLATES. ANCHOR BOLTS ARE (2) 1/2" DIA. WITH 3 1/2" MIN. EMBED. EXISTING BEAMS ARE 10' L LBF 404 4- PIN CONNECTION WITH TYPE 'A' WELDS. CURRENT LOAD LIMIT IS 1000 LBS PER SHELPINIFORMLY DISTRIBUTED. THESE SHELVES SHALL BE DOWN RATED TO 700 LBS PER SHE UNIF. DIST. REMOVE EXIST. SIGN REPLACE W/ NEW. CONFIGURE SHELVES AS FOLLOWS: FROM CONCRETE FLOOR TO BOTTOM OF SHELF = 39" FROM BOTTOM OF SHELF TO TOP OF SHELF = 39" FROM BOTTOM OF SHELF TO TOP OF SHELF = 37" FROM BOTTOM OF SHELF TO TOP OF SHELF = 37" FROM BOTTOM OF SHELF TO TOP OF SHELF = 27" WIRE DECK IS 2 X 4 MESH (2 GA. ) WITH 4-12 GA SUPTS. (EXISTING).-CONTRACTOR SHALL REPOSITION EXIST. SHELF -- - BEAMS TO NEW CONFIGURATION. EXISTING PALLET RACK UPRIGHTS ARE 18' HIGH LMT30 WITH 3/8" X 8" X 8" BASEPLATES. ANCHOR BOLTS ARE (2) 1/2" DIA. 99TH 3 1/2" MIN. EMBED. EXISTING BEAMS ARE 14' L 377B 4- PIN CONNECTION WITH TYPE 'A' WELDS. CURRENT LOAD LIMIT IS 1000 LBS PER SHELF UNIFORMLY DISTRIBUTED. CONFIGURE SHELVES AS FOLLOWS: FROM CONCRETE FLOOR TO BOTTOM OF SHELF = 85" FROM BOTTOM OF SHELF TO TOP OF SHELF = 25" FROM BOTTOM OF SHELF TO TOP OF SHELF = 23" FROM BOTTOM OF SHELF TO TOP OF SHELF = 23" FROM BOTTOM OF SHELF TO TOP OF SHELF = "