HomeMy WebLinkAboutPermit D97-0216 - BARGHAUSEN RESTROOM - ADDITIONCity of Tukwila �-
Community Development / Public Works • 6300 Southcenter Boulevard, Suite 100 • Tukwila, Washington 98188
WARNING: IF CONSTRUCTION BEGINS BEFORE APPEAL PERIOD EXPIRES,
APPLICANT IS PROCEEDING AT THEIR OWN RISK.
Parcel No: 779640 -0140
Address: 16440 53 PL S
Suite No:
Location:
Category: NSFR
Type: DEVPERM
Zoning: LDR
Const Type: V -N
Gas /Elec.:
Units: 001
Setbacks: North:
Water: TUKWILA
Wetlands:
Contractor License No:
.0 South:
Sewer:
Slopes:
FORUMCH071D6
OCCUPANT BARGHAUSEN THOMAS
16440 5'3 PL S, TUKWILA WA 98168
OWNER BARGHAUSEN THOMAS A +SAUNDR. Phone: (206)246 -2691
16440 53RD PL S, 'TUKWILA WA 98188
CONTACT CHRIS PLACENTIA Phone: 253 -9293
FORUM .CUSTOM HOMES INC; 1411 24 ST CT NW, GIG HARBOR WA 98335
CONTRACTOR FORUM CUSTOM HOMES & DEV. INC. Phone: 253.858 -9293
P.O. BOX 449, GIG HARBOR, WA 98335
k**************************************************** * * * * * * ** * * * * * * * ** * * * * * * ** ** * * **
Permit Description:
ADDITION TO EXISTING MASTER BEDROOM AND.CLOSET
(151 S..F.).
k***********.***************************************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * **
Construction Valuation: $ 10,710.43
PUBLIC WORKS PERMITS: *(Water Meter Permits Listed Separate) Eng. Appr:
Curb Cut /Access /Sidewalk/CSS: N
Fire Loop Hydrant: N No: Size(in): .00
Flood Control Zone: N
Hauling: N Start Time: End Time:
Land Altering: N Cut: Fill:
Landscape Irrigation: N
Moving : Oversized Load: N Start Time: End Time:
Sanitary Side Sewer: N No:
Sewer Main Extension: N Private: N Public: N
Storm Drainage: N
Street Use: N
Water Main Extension: N Private: N Public: N
r**************************************************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * **
TOTAL DEVELOPMENT PERMIT FEES: $ 292.84
***************************************************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * **
Permit Center Authorized Signature� ja±z0 ate:
I hereby certify that I have read and examined this permit and know the same
to be true and correct. All provisions of law and ordinances governing this
work will be complied with, whether specified herein or not.
The granting of this permit does not presume to give authority to violate or
cancel the prov'sion o any other state or local laws regulating construction
or the perform nce of ;ork. I am authorized to sign for and obtain this
development it,
Signature:
Print Name:
F (Acee
DEVELOPMENT PERMIT
.0
TUKWILA
Y
Permit No:
Status:
Issued:
Expires:
Streams:
(206) 431 -3670
D97 -0216
ISSUED
07/17/1997
01/13/1998
Occupancy: DWELLING
UBC: 1994
Fire Protection:
East: .0 West: .0
Date: 1( -11
This permit shall become null and void if the work is not commenced within
180 days from the date of issuance, or if the work is suspended or abandoned
for a period of 180 days from the last inspection.
CITY OF TUKWILA
Address 16440 53 PL Permit No: 097-0216
Suite:
Tenant: Status: ISSUED
'7ype DEVPERM Applied:.07 /02/1997
P.'a
•
.r.:c l #.'.779640 -0140: Issued: 07/17/1997
.A A* k*l" *'k *•k *•A** * *•k * *•k k•* * * *•k'k * **•k * *•k k•k *k **•A*•A* k'k*•k * *-k•k k•k k k *=k** k-k k*•k * *'•k " * *-k•k
Pe .Conditions
1..:'' No.:changes wil1be. made to the :. plans unless, approved' by the
.Architect ,or Engineer. the Tukwila Building Division,
5'
2 Electrical ; permits shall b e' obtain'ed� through the Washington,
State Division of ; Labor .rand "'In a�',11: electrical
'work wi 1 l: be : inspe.cted by that agency (242 6630)
Al l me chanica.1,work sh',a be „ under •separate,perm' t issued by.
the City :of;Tukwila x�,,, +,,# '? , ,
c. ts`•
4 All permits, inspection records,. and approved plans' shall be
avai:lab1eY,at the a`ob+ksite; .prior to`'the = any con
struct i oni. Ike ieA 0 epnie nts are t o be . maintained filed and avaia
able' :un l 1) h'al inspection `approval is gram -ted =
Engineered truss d,rawings'' an'd: ca16u4:ations shawl 1 be an
::and ;ava'`i 7:ab,le to:s'the b,,iald'irig inspector for inspection ”
-pur poses , t Documents shall bear the seal, and s i gnatur�e
Wasp,i { ngtto'n ' * S t at e Professional,' Engineer .
'Anvk( Spoaed`insulatione- backing material shal 1 . have a Flame
Spread Rating: of 2Sr''or "1ess; and mat shall bear i
f i cation showing -:the f i-re k.perfiormance r ating thereof'.
Validi r a of Fier mi t, The i , a'' permi t or app;rova lf
plans, sp oils �,' and computaat,inns;r.sha11 :not be con,- 7 ;.
:s pled torbe a per mit { , ,or .„ approval rof, any violation
of any of `�ssthe% pro isions�rof the b riding 'code or of;.,anv * '
othe a
. ordilrn of t' he' f ,1.j�i ° risdic on
• t,i,:: - -7s . ti•i�i` permit premi
sung.' t
give 'auth,or<ity to violate or cans.el.rthe° pro /1sions this
code s, h a l .1 :" b'e� va l id. S ,, k :.; _v
Project Namerrenant:
OA RE►/t'6616l
Value of Construction:
JP It, 7 72•'
Site A ress: . City State /Zip:
(, -o 1 ?,yt' 'Plct 7)` . Tukti.11 u IIVA
Tax Parcel Number:
TM
Property Owner:
• T 0 A AI A ' dirt 1/ . ._AA
Phone:
/l-o, ? , 692Z2
Fax #:
2410, 2i I 2
Street Address: City State /Zip:
2 k40 rj - 'Place_ 4'0L)'k TU 'tq lAJPr
Contractor: I
1 I) w‘ (il)' - yv +40144.-:4 1 ( 61 - -•
Phone:
2 , &9 9i , 1 L `j 7 7
Street Address' City State/Zip:
t 4' f 1 . 3Lt. c�- . 1 C�l� a W 6 tv� 2 n
Fax _ #:
2 �, . y r, > 'I2- 9 ,
Architect:
11,/ vvauev, 6614.SU)fi �� 171ju1t'&�‘i , 14 c •
Phone:
28 6.2� 1 .. co 222
Street.Address: '- City State/Zip:
1 a i Zt c - 71 0 - A -Av` ,.; V--e,v 1,14A- (42-30)
Fax #:
2v 4, , 2 1 , 51 3
Engineer:
Phone:
Street Address: City State /Zip:
Fax #:
Contact Person:
6 -4KW-1 ( -1. T /I's f r-r 2 u)-e1 GJ'27 140l'(. , i G •
Phone:
t c= /"� A4? VE
Street Address: City State /Zip:
IA 24 hk. 'T CT K(W CG( t-IA X12 , iJVA �Yr-5
Fax #:
Description of work to be done:
01110.1 To .jcIc - pi. C: h/W, -- 2 P '( i � ; 4-i.c i -
Type of work: ❑ New Single- Family Residence T Addition - Single - Family Residence
❑ Interior Remodel- Single - Family Residence ❑ Residential Accessory Structure'
❑ Remodel /Addition to Accessory Structure ❑ Garage(s)
❑ Deck(s) - Covered & Uncovered ❑ Residential Reroof
Is this site served by: Sewer ❑ Septic (King County Health Dept. approval required - 296 -4722)
Existing Square Footage for Structure: 1.41 1 sq. ft. Dwelling sq. ft. Covered Deck(s)
sq. ft. Garage /Carport sq. ft. Accessory Structure(s) sq. ft. Uncovered Deck
Proposed New Square Footage: 1 sq. ft. Dwelling sq. ft. Covered Deck(s)
sq. ft. Garage /Carport sq. ft. Accessory Structure(s) sq. ft. Uncovered Deck
Floor Area Ratio: (total floor area of all structures divided by the area of the lot)
For an Accessory dwelling, provide the following:
Lot area Floor area of principal dwelling Floor area of accessory dwelling
' Provide documentation that shows the principal owner lives in one of the dwellings as his or her primary residence.
CITY OF TUKWILA
Permit Center
6300 Southcenter Blvd., Suite 100, Tukwila, WA 98188
(206) 431 -3670
FOR STAFF USE ONLY
Single - Family Residential Permit Application
Application and plans must be complete in order to be accepted for plan review.
Applications will not be accepted through the mall or facsimile.
APPLICANT REQUEST FOR PUBLIC WORKS SITE/CIVIL PLAN REVIEW OF THE FOLLOWING:
(Additional reviews shall be determined by the Public Works Department)
❑ Channelization /Striping ❑ Curb cut/Access /Sidewalk ❑ Fire Loop /Hydrant (main to vault) #: Size(s):
❑ Flood Control Zone ❑ Hauling ❑ Land Altering: 0 Cut cubic yds. 0 Fill cubic yds.
❑ Moving an Oversized Load: Start Time: End Time:
❑ Sanitary Side Sewer #: ❑ Sewer Main Extension 0 Private 0 Public
❑ Storm Drainage ❑ Street Use in Water Main Extension 0 Private 0 Public
❑ Water Meter /Permanent # Size(s):
❑ Water Meter Temp # Size(s): Est. quantity: gal Schedule:
❑ Miscellaneous
Value of Construction - In all cases, a value of construction amount should be entered by the applicant. This figure will be re-
viewed and is subject to possible revision by the Permit Center to comply with current fee schedules.
Expiration of Plan Review - Applications for which no permit is issued within 180 days following the date of application shall ex-
pire by limitation. The building official may extend the time for action by the applicant for a period not exceeding 180 days upon
written request by the applicant as defined in Section 107.4 of the Uniform Building Code (current edition). No application shall
be extended more than once.
Data application accepted:
'l - a-9 - 7
Data application expires:
8
Application taken by: (initials)
PLEASE SIGN BACK OF APPLICATION FORM
SFPERMIT.UOC 2/13/97
BUILDING O NER_OR AU AOR/ZED AGENT:
Signature: / -
Date: 6 .. am ,._ 1 7
Print name: 1 t' v Pia c evi .1-
Phone: r, f ?
2 5� 2�t >
Fax # 1
�rtvvt e
Address:
141 t 7)4- /-) CT t l IA)
City/State/Zip:
('1 e) FARIxrt2 tt ii 1 ))
5
ALL SINGLE - FAMILY RESIDENTIAL PERMIT APPLICATIONS MUST BE UBMITTED WITH THE FOLLOWING:
DRAWINGS PREPARED B ‘ REGISTERED ARCHITECT OR PRI.. _SSIONAL ENGINEER MAY BE
REQUIRED BY THE BUILDING OFFICIAL
• ALL DRAWINGS SHALL BE AT A LEGIBLE SCALE AND NEATLY DRAWN
➢ BUILDING SITE PLANS AND UTILITY PLANS ARE TO BE COMBINED
N/A SUBMITTED
❑ Copy of recorded Legal Description from King County
T ❑ Certificate of water /fire flow availability (Form H -11a). Contact the Public Works Department
(206) 433 -0179 for servicing district.
a ❑ Certificate of sewer availability (Form H -11). Contact the Public Works Department (206) 433-
0179 for servicing district.
Cr ❑ Metro: Residential Sewer Certification (if Tukwila Sewer District) (Form H -12)
❑ King County Health Department approval for septic - 296 -4722
Four (4) sets of working drawings, which include:
❑ n Site Plan (see example Form H -16)
1. Existing fire hydrant location(s).
2. Proposed access road.
3. Driveway location- driveway shall be 10' wide minimum and 20' wide maximum. If driveway is over
150' long, driveway shall be 20' wide and have an approved turnaround (City Ordinance 1741).
4. North arrow and scale.
5. Building setback from property lines. Any proposed or existing easements must be shown on plan.
6. Public Works review requires the following on site plan: driveway location (10' min., 20' max. width),
show proposed and existing power, water and sewer lines, existing storm drainage system,
downspouts and foundation drains, and where drains tie -in.
7. Parking plan.
8. Lowest building elevation (if in Flood Control Zone).
9. Estimated /proposed topography at 2' intervals and proposed elevation of lowest floor level.
10. Identify location of sensitive areas slopes 20% or greater, wetlands, watercourses and their buffers.
11. Identify location and size of significant trees that are located in sensitive areas and buffers or the
shoreline zone. Of those, identify which are to be removed (Title 18, City of Tukwila Zoning Code).
12. Identify location of high water mark of the Green /Duwamish River if site is located within 200' of the
high water mark.
13. See Public Works Checklist for detailed site plan information required for Public Works Review (Form
H -9).
Foundation plan and details
Floor plan
Roof plan
Building elevations (all views)
Building height
Building cross - section
Structural framing plans and details necessary to completely describe construction
Washington State Energy Code Data (Gas /Electric /Oil /Propane /Heat Pump) Form H -15 available
at Permit Center OR Prescriptive Heating System Sizing Chap 9 Form H -6.
❑ Complete Land Use Applications if not previously submitted (i.e., Reasonable Use Exception,
Variance, Shoreline or Tree Permit).
❑ Attach plans, reports or other documentation required to comply with Sensitive Area Ordinance
and other land use or SEPA decisions.
❑ If dwelling has a septic tank, and a bedroom or bathroom are added, provide written approval
from the King County Health Department or the Tukwila Public Works Department prior to
,-r� submittal of permit application.
❑
Cr Copy of Washington State Department of Labor and Industries Valid Contractor's License. If
not available at the time of application, a copy of this license will be required before the permit
is issued, unless the homeowner will be the builder OR submit Form H -4, "Affidavit in Lieu of
Contractor Registration ".
Building Owner /Authorized Agent If the applicant is other than the owner, registered architect/engineer, or contractor licensed
by the State of Washington, a notarized letter from the property owner authorizing the agent to submit this permit application and
obtain the permit will be required as part of this submittal.
I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF
PERJURY BY THE LAWS OF TH, STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT.
Sl'PERMIT.DOC 2/13/97
+**« ********a+** * k+*****aa*****+****+a******+*****+
CITY OF =`TUK~L' � w� - � � TRANSMIT
t
*+ *+*a*******++a+^* *******+ � `�� � ��***^+A***++****+***+"*****+
TRANSMIT Number: R9700615 Amount: 179.25 O7/17/97 15:19
Payment Method:
'cit S�B
CHECK Notation: FORUM CUSTOM In:
| .` : emit'No: D97�0216 �Type: DEVPERM DEVELOPMENT PERMIT
^''
Parcel ' 779640-0140:
Site Address: 164t0 53 PL `S �
~ Total Fees: 292.84
' This Payment 179.25 Total ALL Pmts: 292.84
Balance': .00
a***
Accoun' Code
080/345.830
000/322.100
000/345.830
000/386~904
Description
PLAN CHECK - NONRES
BUILDING - RES
PLAN CHECK - R[8
STATE BUILDING SURCHARGE
-------__�--~---_-_��.
Amount
-113.59
174"75
113.59
4.50
2215 07/18 /717 TOTAL 179.25
*.***'* *k' * * *iv A * * ** *•. *A * *' * * -kit *A *** ? -r�1 it1. *4*s4 * ' ******•Ak•** ****•k**•A*
CI tY';OF :.TUKWILA .140 lJ '' Q TRANSMIT
* 44.1 " ***** *•h " * *aF *'/1 *i* *•k ** * *•kd *•A *•k*
TRANSMIT .:.Number: 89700607 Amount 113.59 07/02/97 11 :29
Payment : Method CHECK Notation: FORUM CUSTOM Init: KJP
Permit No D97-• 0216 Type: DEVPERM DEVELOPMENT PERMIT
Parcel No: 779 0140.
Site Address: 3 6440 53 PL S
Total Fees: :292.8.4
' Thie".P.ayment 113.59 Total ALL Pmts: 113.,59
Ralante ": ' .179.25
ik*- k * *** **A **414 *. ** ***—* * * *•k** * .k�� ******• A * *i1 * *. * *•k * * * **** * * * * * * **
Account Cole Description Amount
:000/345.83'0 "PLAN CHECK._ NONR,ES 313.59
1101 07/03 9717 TOTAL 113.59
Proje At
PIIACt S.01--
Type of inspe
'1 VI P.1 -
Address:
1 W-I' S3 cil. 3
Da te calle . it -
Special instructions:
•
-
6 V \ . g
Date wanted:
If - S
a.m.
2121
Requester: t
t ...5
Phone No.: .... 4 ::,n, ) ,c)
"iitliAlattISIIIIMeteuctusturmas
INSPECTION NO.
Date:
_zhir
$42.00 REINSPECTION E REQUIRED. Prior to inspection, fee must
be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection.
Date:
• INSPECTION RECORD
Retain a'copy with permit
CITY OF TUKWILA BUILDING DIVISION
6300 Southcenter Blvd., #100, Tukwila, WA 98188
0 4 1 . Approved per applicable codes.
COMMENTS:
I I
PERMIT NO.
■Of
- -3670
Corrections required prior to approval.
ro ect:
JA U�G\Thin, l t C19._ rTh
Type of ' rispection:
�1Q..�
Addy s • s3.0 c , J
ut _qn
Special instructions:
— �
a
p'm'
Regnpste
Pho ``
c tito
_ C
fRSMA7AXC+ =31.tiFpY
INSPE ION NO.
CITY OF TUKWILA BUILDING DIVISION
6300 Southcenter Blvd., #100, Tukwila, WA 98188
•
Approved per applicable codes. [A Corrections required prior to approval.
COMMENTS:
Inspector:
$42.00 REINSPECTI • N FEE REQUIRED. Prior to inspection, fee must
be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection.
Receipt No.:
'INSPECTION RECORD_
Retain a copy with permit k
Date:
Date:
� - CID-1 0
PERMIT NO. /
(206) 431 -3670
l)
Project: 1 A ',` G
T1v�v� -�s�
Type of inspection: W -
t a Y
Address:
Date called:
Special instructions:
L.
Date wanted: 9 /
p.m.
Requester:
Phorie,No.:
jDR — gg79
INSPECIIAN NO.
CITY OF TUKWILA BUILDING DIVISION
6300 Southcenter Blvd., #100, Tukwila, WA 98188
Approved per applicable;codes.
COMMENTS:j.
INSPECTION RECORD
Retain a copy with permit
I
(206) 431 -3670
Corrections required prior to approval.
$42. ' Q - EINSPECTI / FEE REQUIRED. Prior to inspection, fee must
be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection.
�.
Project:
�NLGhl4uS��
Type of inspection.
F I
Address: 5 _d.
Date called:
Special instructions:
Date wanted:
q / h
Pn.
Requester:
C
Phone. No.:
CITY OF TUKWILA BUILDING DIVISION
6300 Southcenter Blvd., #100, Tukwila, WA 98188
[Approved per applicable codes.
INSPECTION NO.
Receipt No.:
INSPECTION RECORD
Retain a copy with permit
Date:
PERMIT NO.
(206) 431 -3670
Corrections required prior to approval.
COMMENTS:
Inspector:
Date: g l
$42.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must
be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection.
ti�
COMMENTS:
W at,t. , Cn U oG , .k f -t.ac) 11. ,oSuL,.q• dk...
PvA' l (L1h,b`it-
— 1 ` 17 .. VPrQ0ft- 3A-tt 4M.- of
1,0 1T I p.:-A,... o+i_ L 5S (-TA W Inc.;
ro i 6( 079-.P-1 Sfr'v CMJ FaR--
V it.. t--. (A -r rl .
Special instructions:;
w 44—,–/O-
9 .:A.....-
R�9u3tt r:
Ph <a t% — tCI
m T,
ype of iautiCn:Q r\S
_ .`
(ti .... p \ .
a
?tc c n
Special instructions:;
w 44—,–/O-
9 .:A.....-
R�9u3tt r:
Ph <a t% — tCI
Appr oved per applicable codes.
INSPECTION RECORD
Retain a cojiy with permit
INSPECTION NO.
CITY OF TUKWILA BUILDING DIVISION
6300 Southcenter Blvd., #100, Tukwila, WA 9818
PERMIT NO.
(206) 431 -3670
Corrections.raquired prior to approval.
Inspector:
Date: al ' )
$42.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must
be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspectlon.
Receipt No.:
Date:
•
ro ect:
T of inspection:,
(v
p \ .C..,
•
lav d�q—.l
Special instructions:
ate wstect
a.m.
POM" Ot
iC(
(206) 431 -3670
Corrections required prior to approval.
COMMENTS:
0 P•F)J J\ 11n O
t t i3 u t,M"C WO-1N 11--
PPaaV- oF.- w►�Ci
Inspector:
(-
Date:
3,k7
$42.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee rust
be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection.
Receipt No.:
Date:
ACTIVITY NUMBER D97 -0216 DATE 7/02/97
PROJECT NAME BARGHAUSEN THOMAS
DEPARTMENT:
BUILDING DIVISION C1 FIRE PREVENTION ❑ PLANNING DIVISION ❑
u)C 1'3 u y- 7 - 3 -y7
PUBLIC WORKS ❑ STRUCTURAL ❑ PERMIT COORDINATOR •
Al 11 1 r7 On
4
DETERMINATION OF COMPLETENESS: (T,Th) DUEDATE 7/03/97
COMPLETE
COMMENTS
TUES /THURS ROUTING: PLEASE ROUTE n NO FURTHER REVIEW REQUIRED ❑
ROUTED BY STAFF n (If routed by staff, make copy to master file & enter Sierra.)
REVIEWERS INITIAL
C• C.�rdno&�( C0p3
PLAN REVIEW / ROUTING SLIP
APPROVALS OR CORRECTIONS: (ten days)
APPROVED ❑ APPROVED W/ CONDITIONS ❑ NOT APPROVED (attach comments) El
REVIEWERS INITIAL
CORRECTION DETERMINATION:
REVIEWERS INITIAL
C:ROUTE -F
NOT COMPLETE ❑ NOT APPLICABLE ❑
DATE
DATE
DATE
DUEDATE
7/17/97
DUE DATE
APPROVED ❑ APPROVED W/ CONDITIONS ❑ NOT APPROVED (attach comments) ❑
(Certification of occupancy required. )
. �..
ACTIVITY NUMBER D97 -0216
PROJECT NAME BARGHAUSEN THOMAS
DEPARTMENT:
BUILDING DIVISION ■
PUBLIC WORKS
DETERMINATION OF COMPLETENESS: (T,Th)
COMPLETE
PLAN REVIEW / ROUTING SLIP
COMMENTS •
REVIEWERS INITIAL
APPROVALS OR CORRECTIONS: (ten days)
APPROVED n APPROVED W/ CONDITIONS
REVIEWERS INITIAL
CORRECTION DETERMINATION:
APPROVED n APPROVED W/ CONDITIONS
REVIEWERS INITIAL
C:ROUTE -F
•
ri`tiYY;f'T,i1AI1�N1'!�?;i St. lies° vAs.r . ...v_o£i7. rfr:b'Ra),:iyorS tki•3.. * r
DATE 7/02/97
FIRE PREVENTION [ PLANNING DIVISION U
STRUCTURAL El PERMIT COORDINATOR Q
DUEDATE 7/03/97
NOT COMPLETE • NOT APPLICABLE El
TUES /THURS ROUTING: PLEASE ROUTE fl NO FURTHER REVIEW REQUIRED Er
ROUTED BY STAFF fi (If routed by staff, make copy to master file & enter Sierra.)
DATE 7-5-97
DATE 7 3 -91
DATE
DUE DATE
7/17/97
NOT APPROVED (attach comments) Q
a
DUE DATE
NOT APPROVED (attach comments) 0
(Certification of occupancy required.
\
COMMENTS
DETERMINATION OF COMPLETENESS: (T,Th)
COMPLETE El
REVIEWERS INITIAL
APPROVALS OR CORRECTIONS: (ten days)
REVIEWERS INITIAL
CORRECTION DETERMINATION:
APPROVED n APPROVED W/ CONDITIONS
REVIEWERS INITIAL
C:ROUTE -F
)(940
:ta e.1..4 "f' ..ai YF4s1'agpilvit { Mfr':,` tabs. '.•YR."ir.MAF?ilv.-&9Li5.k7,r.S TJT3R:`•771.ii'�.w :'b!!Neol s! tvrrCv.t,L'R:i"r..t ,
PLAN REVIEW / ROUTING SLIP
ACTIVITY NUMBER D97 -0216 DATE 7/02/97
PROJECT NAME BARGHAUSEN THOMAS
DEPARTMENT:
BUILDING DIVISION f1 FIRE PREVENTION PLANNING DMSION
PUBLIC WORKS STRUCTURAL PERMIT COORDINATOR ❑
4
DUE DATE
NOT COMPLETE El NOT APPLICABLE
7
TUES /THURS ROUTING: PLEASE ROUTE E NO FURTHER REVIEW REQUIRED,
ROUTED BY STAFF El (If routed by staff, make copy to master file & enter Sierra.)
DATE
DATE
DATE
7 / /ri7
DUE DATE
7/17/97
APPROVED fl APPROVED W/ CONDITIONS 17 NOT APPROVED (attach comments) Q
DUE DATE
NOT APPROVED (attach comments) 0
(Certification of occupancy required. )
REVIEWERS INITIAL
APPROVED fl
REVIEWERS INITIAL
C:ROUTE -F
AkiVf
PLAN REVIEW / ROUTING SLIP
ACTIVITY NUMBER D97 -0216
PROJECT NAME BARGHAUSEN THOMAS
DEPARTMENT:
BU]LDING DIVISION
PUBLIC WORKS
L
I
DETERMINATION OF COMPLETENESS: (T,Th) DUE DATE 7/03/97
COMPLETE El NOT COMPLETE Ei ' NOT APPLICABLE El
COMMENTS P/ CLn n r/29 did I nCr, C r Hew( p l,
TUES /THURS ROUTING: PLEASE ROUTE E NO FURTHER REVIEW REQUIRED E
ROUTED BY STAFF n (If routed by staff, make copy to master file & enter Sierra.)
APPROVALS OR CORRECTIONS: (ten days)
REVIEWERS INITIAL
CORRECTION DETERMINATION:
FIRE PREVENTION n PLANNING DIVISION .
STRUCTURAL El PERMIT COORDINATOR Q
DATE
DATE
DATE
tt :tSti�i4
DUE DATE
DUE DATE
DATE 7/02/97
7/17/97
APPROVED WI CONDITIONS E NOT APPROVED (attach comments)
APPROVED n APPROVED W/ CONDITIONS p NOT APPROVED (attach comments) Q
(Certificadon of occupancy required. )
'f:Yd:�%iri.SU.41G)� �� `ti e�`dL3�Kto"x.'i41YN
ACTIVITY NUMBER D97 -0216
TUES /THURS ROUTING:
REVIEWERS INITIAL
r
CORRECTION DETERMINATION:
APPROVED
REVIEWERS INITIAL
C:ROUTE -F
APPROVED W/ CONDITIONS
PROJECT NAME BARGHAUSEN THOMAS
DETERMINATION OF COMPLETENESS: (T,Th)
COMPLETE NOT COMPLETE El
COMMENTS
PLAN REVIEW / ROUTING SLIP
ROUTED BY STAFF - :�r�� ta' , make copy to master file & enter Sierra.)
DATE
DATE
DATE
:"i . R trN �JY'.I
DEPARTMENT:
BUILDING DIVISION El FIRE PREVENTION i --- I PLANNING DIVISION 0
PUBLIC WORKS ■ STRUCTURAL n PERMIT COORDINATOR 0
1
DUE DATE 7/03/97
NOT APPLICABLE ❑
PLEASE ROUTE fl NO FURTHER REVIEW REQUIRED
REVIEWER
APPROVALS OR CORRECTIONS: (ten days)
APPROVED l l APPROVED W/ CONDITIONS E NOT APPROVED (attach comments) Q
DUE DATE
DATE 7/02/97
7/17/97
DUE DATE
NOT APPROVED (attach comments) 0
(Certification of occupancy required.
FORUM CUSTOM
HOMES &
DEVELOPMENT, INC.
RE: Building Permit Application for Barghausen Remodel
■ 16440 53' Place South (lot 14- Silver-view)
PO. BOX 449
Dear Sir or Madam:
GIG HARBOR, WA
98333 At this time we are submitting a complete application package for the
construction of an addition to the above referenced single family residence.
A building permit was previously issued for the construction of a larger
addition, which expired on November 16, 1993 (reference permit no. B93-
0108).
Fax 206 858 9293
Phone 206 858 9193
City of Tukwila
Permit Center
6300 Southcenter Boulevard, Suite 100
Tukwila, WA 98188
30 June, 1997
An exhaustive Energy Code Compliance Report was prepared in conjunction
with the earlier building permit application package, which concluded that
the addition and existing residential structure are in compliance with the
Washington State Energy Code. Rather than re- calculating the entire
structure, we are submitting the original report with the following notations:
1. The proposed addition's floor area of 151 sf has been reduced by
approximately 40 %, as compared to the original 258 sf addition area.
2. The current proposal's glazing area of 96 sf has been reduced by
approximately 63 %, as compared to the original 264 sf of glazing area.
The existing calculations should therefore provide sufficient evidence that
the current proposal is in compliance with the Energy Code.
Please process the attached information and application as soon as possible
and let us know if any other information will be needed to complete your
review. Thank you for your assistance in this regard.
Sin =rely,
cc: Tom Barghausen
Chris Placentia
Forum Custom Homes & Development, Inc.
enc.: Application, legal description, site plan and addition plans
RECEIVED
CITY OF TUKWILA
0 >1997
PERMIT CENTER
zq7 •oars
TABRemodelCvr.doc
ENERGY CODE COMPLIANCE REPORT FOR
Additions for Tom & Sandy Barghausen
Lot 14, Silverview
Xing County, Washington
REPORT PREPARED BY
Felix L. Touza, P.E.
j & S Consulting Engineers
175 E. Olive Ave. # 202
Burbank, CA 91502
(818) 841 0303
Job Number:
Date: 5/13/1993
• RECEIVED
CITY OF TUKWILA
JUL 0 2 1997
PERMIT CENTER
RECEIVED
•Wf OF TUKWI
M AY 1993
ERMIT CE>E44
The COMPLY 24 computer program has been used to perform the calculations
summarized in this compliance report.
crl • Oal6
WASHINGTON STATE ENERGY CODE
COMPONENT PERFORMANCE APPROACH ANALYSIS FORM
Residential Occupancies
Based on Table 5 -1 of chapter 55 -11 WAC (Washington Energy Code)
For Climate Zone 1, Heating with fuels other than electrical
Project: Addition to Tom & Sandy Barghausen's Residence
Compliance based on Section 101.3.2.1 WAC
Conditioned Floor Area:
Component/
Assembly Name
GLAZING
Exercise Room Windows 120
2nd Flr Addtn Windows
Max. Allowed glazing:
(15% of Addtn.Flr.Area)
Existing Windows
Glass removed by Ex.Rm.
Glass rem'd by 2ndFlr.A
WALLS
Excess glazing( >15% CFA)
Existing Walls
Exercise Room Walls
Walls removed by above
2nd Fl. Addtn Walls
Walls removed by above
DOORS
Main Entry Door
CEILINGS /ROOFS
Existing Roof
Skylight
Exercise Room Roof
2nd Fl. Addtn Roof
FLOORS
Existing floor 2025
Exercise Room floor 452
2nd Fl. Addtn floor •-2-5.84
2025 SF Existing
452 SF First Addition
258 SF Second Addition
710 SF Total Additions
EXISTING
PLUS CODE - COMPLYING
ADDITION
Area U -Val. UxA
EXISTING
PLUS NON- COMPLYING
ADDITION
U - Val. UxA
0.5800
0.5800
69.60
153. 1255.65
107 0.650 69.23 -- --
813 0.580 471.54 0.5800 471.54
-6 - -- - -- 0.5800 -3.48
-78 - -- - -- 0.5800 -45.24
278 0.062 17.21 - -- - --
2916 0.059 172.04 0.0590 172.04
551 0.062 34.16 0.0590 32.51
-230 0.059 -13.57 0.0590 -13.57
344 0.062 21.33 0.0590 20.30
-260 0.059 -15.34 0.0590 -15.34
33 0.400 13.2 0.3870 12.77
2021 0.035 70.74 0.0350 70.74
24 0.580 13.92 0.5800 13.92
452 0.034 15.37 0.0350 15.82
258 0.034 8.77 0.0290 7.48
0.049 99.23 0.0000 0.00
0.041 18.53 0.0000 0.00
0.041 fi. ff •6 - 5r8' 0.0000 0.00
Total Area(Ao): 9957 Tot.0 *A: .1046 Tot.0 *A:
standard Uo: .0.1011 IOOZ. (002.53 8
Proposed Uo: 8-6966 4144..1?
Standard Uo> Proposed Uo: Buildinq Complie«
c R w 111 .i)
PROPOSED CONSTRUCTION ASSEMBLY
Project Name: Additions for Tom & Sandy Barghausen
Documentation: J & S Consulting Engineers Inc.
COMPONENT DESCRIPTION
Sketch of Construction Assembly
ASSEMBLY IT-VALUE
Construction Components
Outside Air Film 0.17 0.17
1. Siding, Wood Shingles 7 1/2" Exposure 0.750 0.87 0.87
2. Plywood 0.500 0.62 0.62
3. Insulation, Mineral Fiber, R-17.8 * 5.500 17.80 5.45
4. Gypsum or Plaster Board 0.500 0.45 0.45
5.
6 .
7,
8.
9 .
Inside Air Film 0.68 0.68
Ab.IUSTMENT FOR FRAMING
(1 /20.59) x (0.85) + (1 / 8.23) x (0.15) = 0.059
Weight: 8.1 lb /sgft
Heat capacity: 2.55
Unadjusted R- Values
TOTAL R -VALUE =
Date: 5 /13/1993
COMPLY 24 User 2936
Assembly Name: R -19 Resdn'tl wall
Assembly Type: Wall
Assembly Tilt: 90 deg (Vertical)
Framing Material: Wood
Framing Spacing: " Q.C.
Framing Percent: 15.0 %
Absorptivity: 0.70
Roughness: Stucco, Wood Shingles
Th R -Value
Fr (in) Cavity Frame
20.59 8.23
TOTAL U -VALUE = 0.059
16.81 '
PROPOSED CONSTRUCTION ASSEMBLY
Project Name: Additions for Tom & Sandy Barghausen
Documentation: J & S Consulting Engineers Inc.
COMPONENT DESCRIPTION
Sketch of Construction. Assembly
ASSEMBLY U -VALUE
Construction Components
Weight:
Outside Air Film
1. Roofing, Wood Shingles
2. Membrane, Vapor - Permeable Felt
3. Plywood
4. Insulation, Mineral Fiber, R -30
5. Gypsum or Plaster board
6.
7.
8 .
9.
Inside Air Film
9.5 lb /sgft
Heat Capacity: 2.95
Assembly Name:
Assembly Type:
Assembly Tilt:
ADJUSTMENT FOR FRAMING
(1 /33.12) x (0.90) + (1 /12.27) x (0.10) =
Date: 5/13/1993
COMPLY 24 User 2936
R -30 Shingle Roof
Roof
22 deg (Tilted Up)
Framing Material: Wood
Framing Spacing: " O.C.
Framing Percent: 10.0 %
Absorptivity: 0.70
Roughness: Concrete, Asph. Shingles
Unadjusted R- -Values
Th R -Value
Fr (in) Cavity Frame
0.17
0.750 0.94
0.010 0.06
0.625 0.77
* 9.250 30.00
0.625 0.56
0.035
0.61 0.61
33.12 12.27
TOTAL U -VALUE = 0.035
TOTAL R -VALUE = 28.31
0.17
0.94
0.06
0.77
9.16
0.56
:PROP6SED CONSTRUCTION ASSEMBLY
Project Name: Additions for Tom & Sandy Barghausen
Documentation: J & S Consulting Engineers Inc.
COMPONENT DESCRIPTION
Sketch of Constrl±ction Assembly
ASSEMBLY U -VALUE
Construction Components
outside. Air Film
1. Roofing, Wood Shingles
2. Membrane, Vapor - Permeable Pelt
3. Plywood
4. Insulation, Mineral Fiber, R -38
5. Gypsum or Plaster Board
6.
7.
8 .
9.
Inside Air Film
Weight:
Heat Capacity: 3.22
10.3 lb /sgft
Assembly Name: R -38 Shingle Roof
Assembly Type: Roof
Assembly Tilt: 22 deg (Tilted Up)
Framing Material: Wood
Framing Spacing: O.C.
0.C.
Framing Percent: 10.0 %
Absorptivity: 0.70
Roughness: Concrete, Asph. Shingles
Unadjusted R- Values
ADJUSTMENT FOR FRAMING
(1 /41.12) x (0.90) + (1 /14.50) x (0.10) _
Th R -Value
Fr (in) cavity Frame
0.750
0.010
0.625
* 11.500
0.625
0.029
;Date: 5/13/1993
;COMPLY 24 User 2936
0.17 0.17
0.94 0.94
0.06 0.06
0.77 0.77
38.00 11.39
0.56 0.56
0.61 0.61
41.12 14.50
TOTAL U -VALUE = 0.029
TOTAL R- -VALUE = 34.74
ASSEMBLY U- -VALUE
PROPOSED CONSTRUCTION ASSEMBLY
Project Name: Additions for Tom & Sandy Barghausen
Documentation: J & S Consulting Engineers Inc.
Construction Components
Outside Air Film
1. Insulation, Mineral Fiber, R -19
2. Plywood
3. Flooring, Carpet and Fibrous Pad
4.
5 .
6.
7.
8 .
9.
Inside Air Film
Unadjusted R- Values
ADJUSTMENT FOR FRAMING
(1 /22.95) x (0.90) + (1 / 9.89) x (0.10) = 0.049
Weight:
Heat Capacity: 1.27
3.9 lb/sqft
TOTAL U -VALUE
TOTAL R -VALUE =
Date: 5/13/1993
COMPLY 24 User 2936
COMPONENT DESCRIPTION Assembly Name: R -19 Floor(F.3.9.2x8.16)
Assembly Type: Floor
Assembly Tilt: 180 deg (Horizontal Floor)
Framing Material: Wood
Framing Spacing: O.C.
O.C.
Framing Percent: 10.0 %
Absorptivity: 0.70
Sketch of Construction Assembly Roughn2ss: Stucco, Wood Shingles
Th R -Value
Fr (in) Cavity Frame
0.17
6.000 19.00
0.625 0.77
0.250 2.08
0.92 0.92
22.95 9.89
0.049
20.27
0.17
5.94
0.77
2.08
6
PROPUak;U CONSTRUCTION ASSEMBLY
Project Name: Additions for Tom & Sandy Barghausen
Documentation: J & S Consulting Engineers Inc.
COMPONENT DESCRIPTION
Sketch of Construction Assembly
ASSEMBLY U -VALUE
Construction Components
Outside Air Film
1. Softwood, Douglas Fir -Larch
2.
3.
4.
5.
6.
7 .
8 .
9.
Inside Air Film
ADJUSTMENT FOR FRAMING
(1 / 2.58) x (1.00) + (1 / 2.58) x (0.00) - 0.387
5.1 lb /sqft
Heat Capacity: 1.99
Weight:
Assembly Name: Solid Wood Door
Assembly Type: Door
Assembly Tilt: 90 deg (Vertical)
Framing Material: None
Framing Spacing: " O.C.
Framing Percent: 0.0 %
Absorptivity: 0.70
Roughness: Glass, Paint on Pine
Unadjusted R- Values
Th R -Value
Fr (in) Cavity Frame
-w-
1.750
TOTAL U -VALUE =
TOTAL R -VALUE =
Date: 5/13/1993
COMPLY 24 User 2936
0.17 0.17
1.73 1.73
0.68 0.68
2.58 2.58
0.387
2.58
HVAC ZONE HEATING & COOLING LOAD SUMMARY
Project Name: Additions for Tom & Sandy Barghausen
Documentation: J & S Consulting Engineers Inc.
HVAC ZONE DESCRIPTION
HVAC Zone Name:
Heating System Name:
Cooling System Name:
System Multiplier:
Fan Schedule:
Peak Load Method:
Relative Humidity:
;Date: 5/13/1993
;COMPLY 24 User 2936
Whole House
YORK B2CH060A06
1
All On Load Calcs
COINCIDENT
50 %
COOLING
SPACES IN THIS ZONE PEAK HEATING PEAK SENSIBLE LATENT
Existing Residence (Jan 12am) 67997 (Aug 2pm) 40458 4158
Exercise Room (Jan 12am) 12571 (Aug 2pm) 8184 928
Addition to 2nd Story (Jan 12am) 10156 (Aug 2pm) 13918 530
TOTAL SPACE LOAD 90724 62560 5616
Duct Gains & Losses: 9072 6256
Return Air Lighting Gain 0
TOTAL SYSTEM LOAD 99796 68816 5616
SYSTEM OUTPUT AT DESIGN CONDITIONS 55330 46430 18627
NOTE: The TOTAL SYSTEM LOAD shown represents the minimum size equipment
which will heat or cool this zone during the design conditions indicated.
These numbers include no safety factor, and the HVAC contractor should
oversize by a reasonable margin to account for variations in weather
conditions and the pick -up capacity required to bring the zone to temper-
ature as a result of a setback thermostat. Those responsible for final
equipment selection should note that Sensible and Latent cooling Loads are
indicated to allow for accurate comparison with manufacturer's output data.
•
RESIDENTIAL: SPACE HEATING LOAD SUMMARY
Project Name: Additions for Tom & Sandy Barghausen
Documentation: J 6 S Consulting Engineers Inc.
Space Name:
Design Indoor Dry Bulb Temperature:
Design Outdoor Winter Dry Bulb Temperature:
Design Temperature Difference:
Conduction
R -19 Resdn'tl Wall
Solid Wood Door
Double Clear (NR Std)
Double Clear (NR Std)
R -30 Shingle Roof
R -19 Floor(F.19.2x8.16)
Infiltration: 1.00 x 0.018 x
Ventilation: 1.0 x
(Date: 5/13/1993
•iCOMPLY 24 User 2936
Existing Residence
Area U -Value TV
2916.0 x 0.0595 x 41.0
33.0 x 0.3872 x 41.0
740.0 x 0.8800 x 41.0
73.0 x 0.7200 x 41.0
2025.0 x 0.0353 x 41.0
2025.0 x 0.0493 x 41.0
2025 sf x 9.0 ft x 0.50 AC x 41.0
2025 sf x 20.0 cfm / 100.0 x 41.0
TOTAL HOURLY HEAT LOSS FOR SPACE
68 F
27 F
41 '
6676
= 17802
Heating AirFlow: 67997 Btu /hr / (1.07 x 37 F DeltaT)) = 1714 cfm
Btu /hr
= 7113
= 524
26699
= 2155
- 2933
.4095'
67997
RESIDENTIAL SPACE COOLING LOAD SUMMARY
Project Name: Additions for Tom & Sandy Barghausen
Documentation: J & S Consulting Engineers Inc.
Space Name: Existing Residence
Design Indoor Dry Bulb Temperature: 78 F
Design Outdoor Summer Dry Bulb Temperature: 82 F
Design Temperature Difference: 4 F
Conduction
R -19 Resdn'tl Wall
Solid Wood Door
Double Clear (NR Std)
Double Clear (NR Std)
R -30 Shingle Roof
R -19 Floor(F.19.2x8.16)
Infiltration: 0.00 x 0.018 x 2025 sf
Ventilation: 1.072 x 2025 sf
Solar Gain Orient.
Double Clear
Double Clear
Internal Gain
Lighting
Equipment
Occupants
Latent Gain
(NR Std) North
(NR Std) North
Op
Frac.
1.00
0.00
1.00
Area U -Value DETD Btu /hr
2916.0 x 0.059: x 5.1 = 885
33.0 x 0.3872 x 5.1 = 65
740.0 x 0.8800 x 4.0 = 2605
73.0 x 0.7200 x 4.0 - 210
2025.0 x 0.0353 x 25.5 = 1824
2025.0 x 0.0493 x 0.0 = 0
x 9.0 ft x 0.50 AC x 4.0 - 0
x 20.0 cfm / 100.0 x 4.0 = 1737
Shaded
Area SGF
0.0 x 15 + 740.0 x 15] x 0.55 = 6105
0.0 x 15 + 73.0 x 15) x 0.88 = 964
Area Heat Gain
x 2025.0
x 2025.0
x 2025.0
x
x
x
Date: 5/13/1993
COMPLY 24 User 2936
Unshaded
Area SGF SC
3.000
0.000
225
Cony.
x 3.413
x 3.413
/ 100
TOTAL HOURLY SENSIBLE HEAT GAIN FOR SPACE
Op Frac. Area Heat Gain Cony.
Equipment 0.00 x 2025.0 X 0.000 x 3.413
Occupants 1.00 x 2025.0 x 225 / 100
Infiltration: 0.00 x 0.018 x 2025 sf x 9.0 ft x 0,50 AC x -0.8
Ventilation: 1.072 x 2025 sf x 20.0 cfm / 100.0 x -0.8
TOTAL HOURLY LATENT HEAT GAIN FOR SPACE
Cooling AirFlow: 40458 Btu /hr / [1.07 x 23 F DeltaT)) = 1641 cfm
20734
0
4556
40458
Btu /hr
0
4556
-0
-366
4158
4 • • .„
, , •
• " '
. , •
RESIDENTIAL SPACE HEATING LOAD SUMMARY
Project Name: Additions for To & Sandy Barghausen ;Date: 5/13/1993
Documentation: J & S Consulting Engineers Inc. ICOmpbY 24 user 2936
Space Name: Exercise Room
Design Indoor Dry Bulb Temperature:
Design Outdoor Winter Dry Bulb Temperature:
Design Temperature Difference:
Conduction
•
R-19 Resdn'tl Wall
Double Clear (NR Std)
Double Clear (NR Std)
R-38 Shingle Roof
R-19 Floor(F.19.2x8.16)
. Area U-Value
68 F
27 F
41 F
Btu/hr
579.0 x 0.0595 x 41.0 = 1412
103.0 x 0.8800 x 41.0 = 3716
18.0 x 0.7200 x 41.0 = 531
452.0 x 0.0288 x 41.0 = 533
452.0 x 0.0493 x 41.0 = 914
Infiltration: 1.00 x 0.018 x 452 sf x 9.0 ft x 0.50 AC x 41.0 = 1490
Ventilation: 1.072 x 452 sf x 20.0 cfm / 100.0 x 41.0 3974
TOTAL HOURLY HEAT LOSS FOR SPACE 12571
'Heating AirFlow: 12571 Btu/hr / [1.07 x 37 F DeltaT)] = 317 cfm
'41
RESIDENTIAL SPACE COOLING LOAD SUMMARY
Project Name: Additions for Tom & Sandy aarghausen
Documentation: J & S Consulting Engineers Inc.
Space Name:
Design indoor Dry Bulb Temperature:
Design Outdoor Summer Dry Bulb Temperature:
Design Temperature Difference:
Conduction
Latent Gain
Date: 5/13/1993
COMPLY 24 User 2936
Exercise Room
78 F
82 F
4 F
Area U -Value DETD Btu /hr
R-19 Resdn'tl Wall 579.0 x 0.0595 x 5.1. _ 176
Double Clear (NR Std) 103.0 x 0.8800 X 4.0 = 363
Double Clear (NR Std) 18.0 x 0.7200 x 4.0 = 52
R -38 Shingle Roof 452.0 x 0.0288 x 25.5 ' 332
R -19 Floor(F.19.2x8.16) 452.0 x 0.0493 x 0.0 = 0
Infiltration: 0.00 x 0.018 x 452 sf x 9.0 ft x 0.50 AC x 4.0 = 0
Ventilation: 1.072 x 452 sf x 20.0 cfm / 100.0 x 4.0 = 388
Shaded Unshaded
Solar Gain Orient. Area SGF Area SGF SC
- -- - - -- - -- - - ---
Double Clear (NR Std) North [ 0.0 x 15 + 103.0 x 153 x 0.55 = 850
Double Clear (NR Std) North [ 0.0 x 15 + 18.0 x 15] x 0.88 = 238
Internal Gain Op Frac. Area Heat Gain Conv.
Lighting 1.00 x 452.0 x 3.000 x 3.413 = 4628
Equipment 0.00 x 452.0 x 0.000 x 3.413 0
Occupants 1.00 x 452.0 x 225 / 100 = 1017
TOTAL HOURLY SENSIBLE HEAT GAIN FOR SPACE 8184
Op Frac. Area Heat Gain Conv. Btu /hr
Equipment 0.00 x 452.0 x 0.000 x 3.413 = 0
Occupants 1.00 X 452.0 x 225 / 100 = 1017
Infiltration: 0.00 x 0.018 x 452 sf x 9.0 ft x 0.50 AC x -0.8 -0
Ventilation: 1.072 x 452 sf x 20.0 cfm / 100.0 x -0.8 = -82
TOTAL HOURLY LATENT HEAT GAIN FOR SPACE 928
Cooling AirFlow: 8184 Btu /hr / [1.07 x 23 F DeltaT)] = 332 cfm
Conduction
R-13 ShearWall(W2x4.16)
Double Clear (NR Std)
R-42 Shingle Roof
R-19 Floor(F.19.2x8.16)
Heating. Air Flow:
- .
RESIDENTIAL SPACE :HEATING ,LOAD
• Project Name: Additions for Tom & Sandy Barghausen
Documentation: J & S Consulting Engineers Inc.
Space Name:
Design indoor Dry Bulb Temperature:
Design outdoor Winter Dry Bulb Temperature:
Design Temperature Difference:
• Area
Infiltration: 1.00 x 0.018 x 258 st x 9.0 ft
Ventilation: 1.072 x 258 sf x 20.0 cfm
10156 Btu/hr /
Date: 5/13/1993
COMPLY 24 User 2936
Addition to 2nd Story
68 1
,27F
41 F
U -Value
TD
629.0 X 0.0792 x 41.0
116.0 x 0.8800 x 41.0
258.0 x 0.0273 x 41.0
258.0 x 0.0493 x 41.0
TOTAL HOURLY HEAT LOSS FOR SPACE
(1.07 x 37 F DeltaT)) = 256 cfm
• Btu/hr
= 2042
= 4185
288
= 522
Y 0.50 AC x 41.0 = 851
/ 100.0 x 41.0 = 2268
3.0156
'RESIDENTIAL SPACE COOLING LOAD SUMMARY
Project Name: Additions for Tom & Sandy Barghausen
Documentation: J & s consulting Engineers Inc.
Space Name:
Design Indoor Dry Bulb Temperature:
Design Outdoor Summer Dry Bulb Temperature:
Design Temperature Difference:
Conduction
R -13 ShearWall(W2x4.16)
Double Clear (NR Std)
R -42 Shingle Roof
R -19 Floor(F.19.2x8.16)
Infiltration: 0.00 x 0.018 x 258 sf x 9.0 ft
Ventilation: 1.072 x 258 sf x 20.0 cfm
Solar Gain Orient.
Double Clear (NR Std) West [
Internal Gain Op Frac.
Lighting
Equipment
Occupants
Latent Gain
Equipment
Occupants
infiltration:
Ventilation:
Cooling AirFlow:
Shaded
Area SGF
Date: 5/13/1993
COMPLY 24 User 2936
Addition to 2nd Story
Area U -Value DETD
629.0 x 0.0792 x 5.1
116.0 x 0.8800 x 4.0
258.0 x 0.0273 x 25.5
258.0 x 0.0493 x 0.0
x 0.50 AC x
/ 100.0 X
Unshaded
Area SGF
0.0 x 15 + 116.0 x 73]
78 F
82 F
4 F
4.0
Area Heat Gain Cony.
1.00 x 258.0 x 0.457 x 3.413
1.00 x 258.0 x 8.000 x 3.413
1.00 x 258.0 x 225 / 100
Op Frac. Area Heat Gain Cony.
TOTAL HOURLY LATENT HEAT GAIN FOR SPACE
4.0
SC
ow wr
x 0.55 =
1.00 x 258.0 x 0.000 x 3.413
1.00 x 258.0 x 225 / 100
0.00 x 0.018 x 258 sf x 9.0 ft x 0.50 AC x -0.8
1.072 x 258 sf x 20.0 cfm / 100.0 x -0.8
13918 Btu /hr / (1.07 x 23 F DeltaT)) = 564 cfm
Btu /hr
254
408
179
0
0
221
4657
403
7044
581.
TOTAL HOURLY SENSIBLE HEAT GAIN FOR SPACE 13918
Btu /hr
0
= 581
-0
-47
530
w Lo a t sh 14 in o gi f on the Plat of Silverview as recorded under A.F.L. #8710080483, records of King County,
LEGAL DESCRIPTI ON
RECEIVED
CITY OF TUKWILA
JUL 2 1997
PERMIT CENTER
D
BarghausaaRemLEGAL.doc
FIEGISTRATION't■IILIA.1Bdii f :1!' . ,',','
2:* EXPIRATION [ATE'.
cil
: ; ,.•,,,,••■::. , k ,,',,
, : ,1 ,.,••:0 41:i'',
si.*,,!*:-.—....,c
p
'••••••:■; 4 . •.i.'.... *""
'T.., r 4....r 4,;': Ci l';',.!' V* (.,
7i15
.., '.!„.' •••••: ,
.J:17)40
,':-,. 61/23/
',. ;...: ., •• .....
;' I. 2.;&t.9 ':.'.
..•
' • • .
, „ •• •• • ". • • . • •• ' . • •
G . A94Q F?' td A
• . .
ISSUED BY DEPARTM, T OF LABOR AND INDUSTRIES •
.**.
,..' ..!' '. '...•.*..., ' * • : •*,. '
- .. *:' • -. : : .. ... .
; , : .:;: ".:',', ... .. :.• ..:::' .: : .. , %,',.:.. .
,. * : ''*: ' : , , • :..' ', ,;',* ,.;',. .. .,.:, : .:, .
".. ; ''■• .' ' : ''' ..,:'..: %."...... •
• • : ,•; • ' • •
„ .
*,.
,•'_ . • '
; : •-•
• •
•
• .
.•
•
t .; •
• • .• • • •• • .
'••• •
•
• ' '••• • • • .
. .
•• •• • . •.• • • • .
' • ' • *•-• ' • '*;
. ' • *.
, • * ' •
• . . '
�.'f
/
,
/ , --
N , N
N ,\
0 .0
‘7
N
I
_A
15
Iii t
<
-
g
- -
6,
111— I
rr i
c7,
•• di
4
Fs, Ft-g-
e VAP.G. t
...
44) ;LAG .g4 wALA-
("}=}}-)
&,(11.- e. - ...a., - ..-4-4
} T
- } 4
'. : } }
T
„1,
•
D11
}Hac.‘wr
Va T
c--}
n
- 72?
; *Jr:
=-•)
- /loss-)
es.,67 e>64
Pa.51
4)03
p-r)r.4 -1O PL
11
-
sr.
pg.CM
i SEW 1A1414-
4.F..6+
- 1.
14E4 F}:}
2,02. Pis-Pi .6
L WA-4.4
(:--) i .0---
tt
1 /
\ \ 3
- .so 4 1.2-1-7A.”
3j
* , 1
it* • a er".7P:TW-A14 - - T2-.1444 +t2.TPA44 1
'Ir''' ts des° 4-04*-3' ru, ;t aw 506541)
#
h
)
(s) A24
F
it•o-tp VD.44P1'
sp.
A.C
; 1■1_ 1 4c44
P—Ar4„
v L.
4" ,
4t -1
5647
Lfl
1
pri
Fi P-10C.I.S
WALL.
\
Wag WM.
1-1_1or:41
wou-
I
wr
1}}-
Ha:
MFrL To r1,14 ir Pi-
•cA.r.rsr 4 rfr 1•70 H.
• 12.-19
Pa1WeZr4 s
•
■S : psi-14.de •
! PA 4 PE.P1,4-c-a
w/ leo Pa.C.
p- -19 11-1L1
5-14-
W/ 2(t rrr1 1.4.41t.... 4 127E-
*4 p 1.4.44:22
1 1'6H P4A-rE.
12.er,F FLA.re Cs ME.A.r45
°S. EN- d 5u rpop2-
* 24 e 14. vte
WIAYPI PO - T,c r-wre-4-1-
- 14
CITY OF TUKWILA
APPROVED
JUL 0 8 1997
AS NOILD
BUILDING DivrsION
RECEIVED
CITY OF TUKWILA
JUL 13 2 1997
PERMIT CENTER
STAkIP
' 1