Loading...
HomeMy WebLinkAboutCAP 2008-11-10 COMPLETE AGENDA PACKET I Distribution: City of Tukwila I Duffle G. Labanara Community Affairs and V Hernandez K. Matej V. Griffin M. Miotke p D. Quinn C. O'Flaherty Q Parks Committee P. Linder N. Olivas D. Robertson 3. Pace CID\ tsi i f Joan Hernandez, Chair Mayor H ggerton D. Speck 1908 R. Berry R. Still Verna Griffin E. Boykan B. Arthur De' Sean Quinn B. Fletcher C. Parrish M. Hart K. Narog(cover) S. Hunstock S. Kirby(emaii) V. Jessop S. Norris(emaii) S. Kerslake L. Verner AGENDA MONDAY, November 10, 2008, 5:00 PM Conference Room #3 ITEM RECOMMENDED ACTION Pace 1. PRESENTATION(S) 2. BUSINESS AGENDA a. Increase fees for Building and Planning; a. Forward to 11/24 C.O.W. Pg.1 Jack Pace, CommunV Development Director. and 12/1 Regular. b. An ordinance establishing levels -of- service b. Forward to 11/10 C.O.W. Pg.11 standards for parks and open space; and 11/17 Regular. Lisa Verner, Project Manager. �P /ease bring your copy of the Parks, Recreation Open Space Plan, distributed in June, Q 3. ANNOUNCEMENTS 4. MISCELLANEOUS Next Scheduled Meeting: Monday, NovemberX 2008 The City of Tukwila strives to accommodate those with disabilities. Please contact the City Clerk's Office at 206 433 -1800 for assistance. To: From: Date: Subject: ISSUE City of Tukwila Jim Haggerton} Mayor Department of Community Deflelopment Jack Pace} Director INFORMATION MEMO Community Affairs and~: Committee Jack Pace, DCD Director November 5, 2008 Proposed Permit fee incre es for 2009 and 2010. Shall the City Council approve increases in the permit fees for Building, Mechanical, Electrical, Plumbing, and Fuel-gas piping permits, such that there is an incremental increase scheduled for each year of each budget cycle. BACKGROUND Building permit and inspection fees can be defined as user fees or service charges. Our system of permit fees, inspection fees and plan review fees are intended to recover a portion of the total cost of code administration and required inspections for each permit. In 2007 the issue of a fee increase was brought to the Council and approval was granted to increase the permit fees by 4% for 2008. This was the first proposed fee increase since the 2003 adoption of the International Codes. The department will be implementing internet access for the application and issuance of certain permits that currently can be issued "across the counter". The intent is to increase efficiency ofthe building permit process and eliminate the current turn around time for these permits. This system will be a key component of code administration and therefore the cost thereof should be recovered by the permit fees. ANALYSIS The fees collected by the permit center for code administration have been maintained at a consistent rate of recovery since the International Codes were adopted by the City. A proposed 5% increase for each year of each budget cycle is proposed. This would index the recovery rate to the increase in administrative costs. For reference the following exhibits are submitted as attachments. 6300 Southcenter Boulevard, Suite #100 · Tukwila, Washington 98188 · Phone: 206-431-3670 · Fax: 206-431-3665 Exhibit "A" is a draft of the fee schedules including a 5% increase in the fee rates. The print format shows the proposed rate schedules and the current rate in the margin. Exhibit "B" is a comparison of the proposed increase and our surrounding jurisdiction's 2008 fee rates REVENUE SOURCE No revenue required for this proposal. No impact to biennium budget. RECOMMENDATION Approve the fee increase, and forward to COW with recommendation for approval. 16.04.250 A. Building Permit Fee Schedule: 1 Total Valuation $1 to $500 $501 to $2,000 $2,001 to $25,000 $25,001 to $50,000 $50,001 to $100,000 $100,001 to $500,000 $500,001 to $1,000,000 $1,000,001 and up B. C. Other Fees: 1. EXHIBIT A" SCHEDULE OF PERMIT FEES. Building Permit Fees I Formatted: Centered Deleted: 29 I Deleted: 29 Deleted: 3.78 1 Deleted: 85.70 r Deleted: 72 $60., Deleted: 17.36 $60. for the first $500, plus $4.00 for each additional $10,0,:;or( Deleted: 550.00 fraction thereof, to and including $2,000 $120.00 for the first $2,000, plus $18.20ior each addit#''ortall $1,000, or fraction thereof, to and including $25,000 Deleted: 13.52 $556.80 for the first $25,000, plus $14.20 for each additi irt al 1 t Deleted: 12.52 $1,000, or fraction thereof, to and including $50,000 i Deleted: 888.00 $911.80 for the first $50,000, plus $9.80 for each additional $1,000, or fraction thereof, to and including $100,000 Deleted: 797.98 $1,401.80 for the first $100,000, plus $7.87 for each additionall- Deleted' 9.36 $1,000, or fraction thereof to and including $500,000 s Deleted: 8.68 $4,549.80 for the first $500,000, plus $6.56 for each additidriall Deleted: 1,356.00 $1,000, or fraction thereof, to and including $1,000,000 t, Deleted: 1,231.98 $7829.80 for the first $1,000,000, plus $4.35 for each additi4 all Deleted: 7.50 $1,000, or fraction thereof l Deleted: 6.94 1 Deleted: 4,356.00 Plan Review Fee: plan review fee shall be paid at the time of I Deleted: 4,007.98 submitting plans and specifications for review. The plan review fee shall be 65% `',l Deleted: 6.25 t I Deleted: 5.89 of the permit fee as set forth in the permit fee schedule. The plan review fee t specified herein is a separate fee from the permit fee and is in addition to the f Deleted: 7,480.00 permit fee. Deleted: 6,952.98 Deleted: f Deleted: 4.15 1 Deleted: 3.90 r Formatted: Font: Bold Inspections outside normal business hours: $60,,per hour with a three, hour minimum charge, 2. Re- inspection fee: $60. hour, assessed upon call for third inspection of same correction notice. 3. Inspections for which no fee is specifically indicated: $60. _per hour (1/2 -hour minimum charge). 4. Additional plan review necessary due to additions or revisions to the plans: $60. per hour (1 2 hour minimum chase'., Deleted: Whensubmittaldocl fil 1 I Deleted: a Formatted: Font: Bold 1 58 Deleted: j Deleted: two jDeleted: Deleted: 58 1 Deleted: 58 1 Deleted: 58 1 Deleted: :1 Deleted: 484.98 1 1 1 1 J I 121 1 5. Commencing work before permit issuance shall be subject to an investigation fee of 100% of the usual permit fee. 6. Renewal of expired Permits: The fee shall be one half the amount required for a new Permit for such work, provided that suspension or i Formatted: Font: Not Italic abandonment has not exceeded one tear. Renewals after expiration of 1 Formatted: Font: Not Italic 1 Deleted: 58 where applicable. Deleted: 58 more than one near, shall require a full permit fee and plan review Valuation of Work (Total Contract Amount) 1 $250 or less $251 to $500 $501 to $1,000 $1,001 to $5,000 $5,001 to $50,000 $50,001 to $250,000 $250,001 to $1,000,000 $1,000,001 and up $60.00. i Deleted: 11232 $60.00, for first $250, plus $7.00 or each $100 or frafition, Deleted: 8.95 thereof, to and including $500 4 Deleted: 8.31 $78.60 for the first $500, plus $7.85 for each $100 or fra nl Deleted:55 thereof, to and including $1,000 roeieted: 145.56 $117.85 for the first $1,000, plus $9.18 for each $1,08 /Oil Deleted: 935 fraction thereof, to and including $5,000 i Deleted: 9.22 $154.57for the first $5,000, plus $9.68 for each $1,004= or) Deleted: 575.30 fraction thereof, to and including $50,000 l Deleted: 414.90 $590.20_ for the first $50,000, plus $7.55 for each $1,0017v, Deleted: fraction thereof to and including $250,000 $2,100.20, for the first $250,000, plus $6 .70_ for each $1,000 x� fraction thereof, to and including $1,000,000 $7,125.20 for first $1,000,000, plus $195, for each $1,000'pri 1 1 fraction thereof 3. Plan review fee: 25% of the calculated permit fee. 4. Work commencing beforepermit issuance shall be subject to an investigation fee of 100% of the usual permit fee. Inspections outside of normal business hours: $60,per hour with a three hour minimum charge,_ 6. Re- inspection fee assessed: $60 per hour. Mechanical Permit Fees fee Deleted: Work c Formatted: Font: Not Italic ,4 Formatted: Font: Not Italic Formatted: Font: Not Italic Deleted: 25 Deleted: 74.87 4 Deleted: 30 :'a Deleted: 6.75 Deleted: 8.10 ,.'1 Deleted: 7.49 Deleted: Deleted: 80 Deleted: 7.19 Deleted: 35.30 Deleted: 1,852.90 Deleted: 6.85 Deleted: 6.39 Deleted: 272.80 Deleted: 4,79250 Deleted: 6.25 I Deleted:5.68 j Formatted: Font: Not Italic Deleted: y I Formatted: Font: Not Italic Deleted: f .,i Deleted: 58 1 Deleted: 1 Deleted: 58 I [31 1 7. Additional plan review required by changes, additions or revisions to plans or to plans for which an initial review has been completed: $60. per hour (one -half hour minimum). 8. Renewal of expired _permits: The fee shall be one half the amount -I Formatted: Font: Not Italic required for a new permit for such work, provided that suspension Formatted: Font: Not Italic or abandonment has not exceeded one year. -1 Formatted: Font: Not Italic Renewals after expiration of more than one year, shall require a full Formatted: Font: Not Italic permit fee and plan review fee where applicable. -I Formatted: Font: Not Italic E. Plumbing Permit Fee Schedule 1. Permit Issuance Issuance of each permit (base fee): $32.00, 2. Issuance of each supplemental permit $15.75, 3. Unit Fee Schedule (in addition to Items 1 2 above): For one plumbing fixture (a fixture is a sink, toilet, bathtub, etc.) For each additional fixture For each building sewer and each trailer park sewer Rain water system per drain (inside building) For each water heater and /or vent For each industrial waste pretreatment interceptor, including its trap and vent, except for kitchen type grease interceptors For each grease trap (connected to not more than four fixtures 7 gal.), For each grease interceptor for commercial kitchens Greater than 750 gallon capacity) For each repair or alteration of water piping and/or water treating equipment, each occurrence For each repair or alteration of drainage or vent piping, each fixture For each lawn sprinkler system on any meter including backflow protection devices therefore. For atmospheric -type vacuum breakers not included in lawn sprinkler backflow protection. 1 to 5 $13.00 Over 5, $13.00 for first 5 plus $3.00 for each additional For each backflow protective device other than atmospheric -type vacuum breakers: 2 inch diameter and smaller: $27.00 Over 2 inch in diameter: $29.00 For each medical gas piping system serving one to five inlets /outlets for a specific gas For each additional medical as inlet(s) outlet(s) Deleted: 58 Formatted: Font: Bold Deleted: 30.00. Deleted: 60 Deleted: 15.00 $60_ -1 Deleted: 58 1 $13.13th Deleted: 10 $23.001 Deleted: 21 $13.11Q1 Deleted: 10 $13 00rDeleted:10 $13.0 10 1 $162 -5 Deleted: $27.001 Deleted: 515 Deleted: less $13.001 Deleted: 25 'I Deleted: 10 1 $27.00 $76001 Deleted: 70 $15.00 I. Other Inspections and Fees. 1. When a plan or other data is reauired to be submitted with a permit application. a plan review fee shall be paid at the time of submitting plans and specifications for review. The Plan review fee shall be 25% of the calculated permit fee and shall be in addition to the permit fee. 2. Inspections outside of normal business ours: $60.00./ Hr. With a three hour minimum. 3. Reinspection fee: $60.00/ Hr. 4. Inspections for which no fee is specifically indicated: $60.00/ Hr. 5. Additional plan review reauired by changes. additions. or revisions to approved plans $60.00 (minimum charge one -half hour). F. Fuel Gas Piping Permit Fees 1. Permit Issuance: For issuing each permit (base fee): ($0 if permit is in conjunction with $33 a plumbing permit for an appliance with both plumbing and gas connection.) For issuing each supplemental permit 2. Unit Fee Schedule (in addition to items in F.1. above): 1 For each gas piping system of one to five outlets 1 For each additional gas piping system outlet, per outlet 3. Other Inspections and Fees (fuel gas piping): 1 Inspections outside of normal business hours (Three hour minimum) j 1 Re- inspection fee 1 Inspection for which no fee is specifically indicated Additional plan review required by changes, additions, or revisions to approved plans (minimum charge one -half hour) Work commencing before permit issuance shall be subject to an investigation fee equal to 100% of the permit fee -1 Formatted: Font: Not Bold -1 Formatted: Font: Bold j Formatted: Font: Bold Deleted: 30 $15.75 Deleted: 60 $60.00, -I Deleted: 58 $13.00 4 Deleted: 57 $60.00 /hour( Deleted: 58 $60.00 /h0ur' Deleted: 58 $60.00 /hour -j Deleted: 58 $60.00 /hour -j Deleted: 58 100% of the permit fee Formatted: Bullets and Numbering 1 Deleted: 15 Plan review fee: The fee for review shall be 25% of the total fuel gas piping permit fee. The plan review fee is a separate fee from the permit fee and is required when plans are required in order to show compliance with the code. G. Electrical Permit Fees. NEW SINGLE FAMILY DWELLINGS l New single family dwellings (including a garage) $145.60,_ 1 Deleted: 140. Garages, pools, spas and outbuildings 78 00 Deleted: 75 Low voltage systems 57.O� Deleted: 55 SINGLE FAMILY REMODEL AND SERVICE CHANGES. Serivice change or alteration no added /altered circuits 78 00 Deleted: 75 Service change with added /altered circuits 78.00,_ --j Deleted: 75. plus $11.00,for each added circuit (maximumpermit fee $145.60). -1 Deleted: 10 Circuits added /altered without service change (includes up to 5 circuits) 52.00, Deleted: 140 1 Deleted: 50 Circuits added/ altered without service change (more than 5 circuits) $52.00., Deleted: so plus $7.30, for each added circuit (maximumpermit fee $94.00. Deleted: 7. Meter /mast repair $65.00 Deleted: 90. Low voltage systems $57.00 Deleted: 65. 1 Deleted: 55. Deleted: MULTIFAMILY AND /VIULTIFAMILY AND COMMERCIAL (ncluding low voltage). VALUATION of electrical contract. PERMIT FEE 250 or less $60.00 1 Deleted: 58 Deleted: Renewal of expired permits: The fee shall be one half the amount required for a new permit for such work, provided that suspension or abandonment has not exceeded one year. Renewals after expiration of more than one year, shall require a full permit fee and plan review fee where applicable. COMMERCIAL (Including low voltage). Formatted: Font: Bold 251 $1000 $1,001 $5,000 $5001 $50,000 $50,001 $250,000 $250,001 $1,000,000. Over $1,000,000. $60.00 for the first $250 plus $4.00 for each $100 or fraction thereof, to and including $1000. $90.00_for the first $1000 plus $20 for each $1000 or fraction thereof, to and including $5,000. $170.00,for the first $5000 plus $16.40 for each $1000 or fraction thereof, to and including $50,000. $908.00,for the first,$50,000 plus $12.00 for each $1000 or fraction thereof, to and including $250,000. $3.308.00.for the first $250,000 plus $8.50 for each $1000 or fraction thereof, to and including $1,000,000. $9.683.00,plus 0.5 of cost over one million. Other Inspections and Miscellaneous Fees: Plan review fee In addition to the permit fee, when plan review is required, a plan review fee must be paid at the time of permit application equal to 25% of the permit fee with a minimum of $60.00, Temporary service, $60.00, Temporary service /generators $75. Manufactured /mobile home service (Excluding garage or outbuildings) 80. Carnivals Base fee $75. Each concession 10. Inspections or plan review not specified elsewhere $60.00IHr. (one half hour minimum). Work covered without inspection or work not ready at the time of inspection may be charged a reinsoection fee at the hourly rate listed above. Work without a permit: Any person who commences electrical work before obtaining the necessary peiutits, shall be subiect to an investigation fee. The investigation fee shall be twice the established Permit fee as set forth in the electrical fee schedule or $100.00 minimum. This fee shall be collected in all cases. whether or not a permit is subseauently issued. 1 Deleted: 58 Deleted: 84 -1 Deleted: 164 j Deleted: 902 1 Deleted: S i Deleted: 3302 Deleted: 9 I Deleted: ,677 ,1 Formatted: Font: Bold 1 Deleted: 58 Deleted: M SCELLANEOUS FEES. 1 Deleted: (residential) 1 Deleted: 58 L_____________________________________________________---------~/ / / Deleted: Inspections or plan revi.ew not specified elsewhere $58./ Hr.~ Work covered without inspection or work not ready at the time of inspection may be charged a trip fee at the hourly rate listed above. "I Work wi.thout a permit Any person who commences electrical work before obtaining the necessary permits shall be subject to tw:ice the established fees as set forth in the electrical fee schedule or increased by $100, whichever is greater. This fee, which shall constitute an I investigation fee, shall be imposed . ., .., . and collected in all cases, whether or H. Fee Refunds L JJ1! _~u!~d!1'!g 9Jfj0!!~ 1}l!!Y !if!!.1}g _a!!y y.~1J1!-~t J~e_pa!g _1?Y t~ _o!,~~qJ ___ I not a permit is subsequently issued. 'i pemit applicant that was erroneously paid or collected. The Building Official may also " ' , 'i authorize the refund of not more than 80 % of the permit fee when no work has been done', i Deleted: Fee Refullds under a permit issued in accordance with the code. Where a plan review fee has been 'i Formatted: Font: Bold collected, no refund will be authorized once it has been determined that the plan review process has commenced. Refund of any permit fee paid shall be requested by the original permittee in writing and not later than one hundred and eighty (180) days after the date of fee payment. End EXHIBIT B City min. val. fee Per MilVal plus/1000 Renton $500.00 $28.00 $6,615.50 $4.35 Kent $500.00 $25.30 $6,042.10 $3.40 Fed.Way $500.00 $34.00 $8,135.50 $5.50 SeaTac $500.00 $50.00 $7,010.94 $3.94 Tukwila* $500.00 $60.00 $7,829.80 $4.35 Valuation Index Tukwila* Renton Kent Fed. Way SeaTac Average $1.00 to $500. Min. $60.00 $28.00 $25.30 $34.00 $50.00 $39.46 $501 to $2000. Per$C $4.00 $3.65 $3.30 $4.50 $3.81 $3.85 $2001 to $25,000. Per $K. $18.20 $16.75 $15.10 $20.50 $17.50 $17.61 $25,001 to $50,000. $14.20 $12.00 $10.90 $14.50 $12.63 $12.84 $50,001 to $100,000. $9.80 $8.35 $7.55 $8.00 $8.75 $8.49 $100,001 to $500,000. $7.87 $6.70 $6.05 $8.00 $7.00 $7.12 $500,001 to $1,000,000. $6.56 $5.65 $5.10 $7.00 $5.94 $6.05 $1,000,001 and up $4.35 $4.35 $3.40 $5.56 $3.94 $4.30 City of Tukwila Department of Community Development Jim Haggertol1, Mayor Jack Pace, Director MEMORANDUM TO: Mayor Haggerton Community Affairs and Parks c01'ttee Nora Gierloff, Deputy DCD Directo . Proposed Land Use Fee Update November 3, 2008 FROM: RE: DATE: BACKGROUND The Council last updated the Land Use Fee Schedule in 2007 with implementation at the beginning of2008. Staff has since identified additional items that should be added to the list and is recommending that the fees be updated to reflect increased City costs. FINDINGS Periodically we review Tukwila's fees against the average charged by our south King County neighbors and the overall increase in cost to provide City services. Attachment A shows Tukwila's current land use fees compared to the fees charged by Auburn, Burien, Kent, Federal Way, Renton and SeaTac for similar permits. In calculating the average fees charged by adjacent jurisdictions we tried to compare "apples to apples," but we also found that there were many different approaches to fee calculation. Most jurisdictions used systems more complex than Tukwila's flat fee approach, for example: o Burien's flat fee acts as a retainer with any staff or consultant time over a certain number of hours charged back to the applicant at $70 per hour. The cost of any special studies is also passed through to the applicant. o Many of SeaTac and Federal Way's fees are calculated on a sliding scale based on either square footage or value of construction. o When two or more applications for a project are processed together Kirkland and Renton charge the full amount for the highest fee and reduce the associated permit fees by 50%. However on average Kirkland's fees were significantly higher than those charged in the south County. PROPOSED FEE CHANGES Staff is recommending that Tukwila's permit fees be increased by at least 5% annually, the amount Tukwila's overall budget has grown in recent years, rounded to the nearest $5. In some NG Page 1 of2 10/3112008 P:\Users\Nora\FeeUpdateMemo.doc 6300 Southcenter Boulevard, Suite #100 . Tuhvila, Washington 98188. Phone 206-431-3670 . Fax: 206-431-3665 cases where are fees are significantly lower than the average or are inconsistent with other permits that require a similar level of review we recommend an additional increase. This would still put us at or near the average of our neighboring jurisdictions. Attachment B shows the complete list of current land use fees, the proposed increases and the potential revenue generated by the changes. The only fee that would be lowered under the proposal is for shoreline substantial development permits in the LDR Zone. Our current fee is a bit higher than the average and the reduction would have minimal effect on revenue since most o\vner-occupied single family houses are exempt from permitting requirements. Staff is also recommending that we start charging a fee for annexations and development agreements. The fee for development agreements is proposed to be $500 for the first 20 hours of staff time with additional staffhours charged at $50. FUTURE UPDATES Redmond, Kirkland and Federal Way update their fees on an annual basis so that they stay CUlTent with City expenses. Given our new two-year budget cycle staff is also suggesting fees for 2010 tied to the growth ofthe City budget, rounded to the nearest $5, see Attachment B. Council could adopt a two year fee schedule to align with the two year budget cycle. REQUESTED ACTION Review the proposed fee schedule, provide Staff with policy direction about the fee changes and forward the proposal to the COW for review. NG P:\Users\Nora\FeeUpdateMemo.doc Page 2 of2 10/31/2008 Comparison of Neighboring Jurisdictions' Land Use Permit Fees 2009 Proposed: Fees +j Tukwila Pricing j Minimum 5 %'.Increaso Appeal of Type 2 Decision ;Tiding Site Improvement Plan Shoreline Substantial Development Permit Short Plat (2 -4 lots) Short Plat (5 -9 lots) Variance Apps of Type 4 Decision SEPA Checklist Anexation Petition Other LDR Zones $110 $1,215 $2,435 $610 $1,215 $730 $110 $215 $1,215 $2,435 $1,215 $1,215 $1,215 $215 Conditional Use Permit $2,435 $2,435 Public Ileanng uesign Review $1,700 $1,700 Subdivision Preliminary $3510 +12 $3510 +12 Plat(10+ lots) 0 new unit 0 new unit Rezone (Map Cnange) or Zoning Code Text Amendment Subdivision Final Plat (10+ lots) $143 $1,093 $1,182 $2,576 $2,576 $1,722 $134 $2,429 $1,242 $3,640 $615 $615 $1,934 $1215 +$6 $1215 +$6 5 new unit 5 new unit $1,793 $615 $615 $1,111 No Fee No Fee $2,500 Average Net of Net Difference Neighbor Difference Other Cities LDR Zones -$33 $122 $1,254 $1,966 $1,361 -$992 -$24 $6 $458 -$130 $1,319 -$578 -$496 $72 $122 $1,254 $1,361 $1,361 -$507 $82 $6 $458 -$130 $1,319 -$578 -$496 Hier; Auburn 8115 2,0001. $2,555 $1,100 $1,400 082,000`;;! °'82,SOD:. $1,400 $1,706ir„ N/A ;q 1 N/A 82,555` $2,555';, $467 400 535 $1,785 $2',555 I1 N/A $3685 +1�5 $3685+125 new unit new unit $1,100 $250 Plus $1,100 $60 /lot $1;000, ,$1,000r "I $1,700 I $127,*t 70 $1275;1. ''I %new unit new unit';;: $1,500 $1',000 "i: "1'81;000 1 $2,500 $2,500 N/A 2009 Feel ncreaseProposa I.xls Burien $271 4868 for $1,460 major $1,055 $3,570 $3,570 $2,110 $271 N/A $2,110 $4,868 map amendme $1,623 nt only $1,460 $775 Plus costs $2,110 N/A Federal Way Kent $164 $215 $1,271 $635 $654 /over $1,458 $15,000 $1,126 $1,271 $3,919 $1,271 $3,919 ($816 for $2,187 res) $2,213 $163 $25 $3,464 $327 over $1,027 $25,000 $3,772 $4,101 $989 $1,593 $989 N/A Renton $75 $1,000 $2,000 $ $2,000 N/A $4,000 N/A $2,000 $6,000 $1000 for Plus 10-20 $1800 /acr $790 $2,000 acres $4,500 e Plus $2,203 $22 /lot $1,000 $3,000 $790 $1,000 $1,000 N/A $2,500 N/A 2010 Proposed Fees, Tukwila Pricing Min, 5% Increase Other Revenue Total Othero:' LDR Zones Increase Revenue Zones:;:' 5110 NA 50 50 5490 5490 S25 S515 S610 S610 50 SO No Fee No Fee SO 5110 S215 SO SO $110 $215 SO SO Sl10 S215 SO SO Sl10 S215 SO SO Sl.215 Sl,215 SO SO S305 $545 13 $1,235 S5,200 5110 $110 55 Sl15 $1,215 51,215 S3,140 58,000 Conditional Use Permit $2,435 52,435 S240 S5,110 Design Review Major Modification S490 5490 S25 S515 Devalo ment reemc...nt No Fee No Fee Environmenta Sensitive Areas Deviation (mC 18AS.08O and ,100 5240 S365 5 548 Sl,248 Exception from Single Family . n Standard S240 NA S10 S250 $95 $165 S5 Sl00 S240 5365 510 S250 Pennanent S' n Permit 120 S600 515,600 S329O;,135 ment -Co -rie\Y'unjt~ S240 S240 35 S336 58,736 51,700 $1,700 15 512,825 538,325 Sl10 5110 10 S900 S2,OOO S730 $1,215 50 SO $615 5615 S770 52,000 51.215 $1,215 50 $0 SEPA Oled<list 5615 $615 19 57,315 519,000 SEPA EIS Administrative Fee 51,215 $1,215 50 SO SEPA MDNS eel 5110 5215 SO SO SEPA Planned Acti<ln 5NA 5305 4 5180 Sl,4oo Shoreline Conditional Use Permit S2,435 52,435 SO 50 Shoreline Environment Red . nation 51,215 Sl,215 50 50 Shoreline Permit Exemption Letter SO $125 S15 S390 Shoreline Substantial Devalo t Permit 52,435 52,435 9 (S585 521,330 Short Plat 5610 Sl,215 11 54,290 Sll,ooO $1,215 Sl,215 3 S2,355 S6,ooo S240 S365 SO SO S240 S365 S10 $250 S240 $365 S30 S750 S365 S30 S760 S1215>S65 new unit SO ~3510+120 new unit 5240 S4,950 10/3112008 2009FeelncreaseProposal.xls ATTACHMENT B -- ------ .-.--- Permit Type Tukwila Pricing Other LDR Zones 565 565 $25 $25 Undassified Use Permit $2.435 $2.435 Unique Sign Detennination (TNC 1,9.28.010 $240 $365 Variance $730 $1,215 \-'\Iireless Communkation Fadlity, Administrative $490 $490 52.435 52.435 5240 $240 Zoni Verification Letter $0 5125 ,CO Yearly Perm its . Suggest lowering cost for Shoneline Substantial Development Peoot in LDR ** Fee wouJd cover first 20 hours of staff time, additional time charged at $50fhour 10/31/2008 2009FeelncreaseProposaLxls Revenue Increase Total Revenue 70 5350 $4.900 SO 550 5120 $2,555 $10 5250 5140 51,600 525 5515 SO 50 510 5250 525 5550 $34,731 $164,561 2 2 - -----------. 2010 Proposed Fees, Min. 5% Increase Other: '" Zones .:c