Loading...
HomeMy WebLinkAboutPermit D97-0320 - THE PEAKS AT TUKWILA - RETIANING WALLSCity of Tukwila L Community Development / Public Works • 6300 Southcenter Boulevard, Suite 100 • Tukwila, Washington 98188 Parcel No: Address: Suite No: Location: Category: Type: Zoning: Const Type: Gas /Elec.: Units: Setbacks: Water: Wetlands: WARNING: IF CONSTRUCTION BEGINS BEFORE APPEAL PERIOD EXPIRES, APPLICANT IS PROCEEDING AT THEIR OWN RISK. 115720 -0222 15340 MACADAM RD S BUILDING B AAPT DEVPERM HDR V -1 HR 000 North: N/A Contractor License No: Signature: Print Name:_ DEVELOPMENT PERMIT .0 South: .0 Sewer: •N/A Slopes: y Permit Center Authorized Signature: Occupancy: UBC: 1994 Fire Protection: N/A East: .0 West: .0 OCCUPANT THE PEAKS AT 'TUKWILA 15340 MACADAM RD S, TUKWILA, WA 98188" OWNER R S A ASSOCIATES C /O. MARK GOLDBERG, 4038 NE. 58TH ST, SEATTLE WA CONTACT JOHN PATRICK KANE, JR. Phone 206 -938 -1373 3422 BELVIDERE SW,, SEATTLE, WA 98126 CONTRACTOR J KANE & CO INC Phone: 206-246-8642 . 3422 BELVIDERE SW, SEATTLE WA 98126 k**************************************************** ** * * * * * * * * * * * * * * * * * ** * * * * * **** Permit Description: CONSTRUCTION OF RETAINING WALLS PUBLIC: WORKS: BACKFILL FOR THE RETAINING WALLS AND ASSOCIATED STORM DRAINAGE. k************* k********************* * * * * * * * * ** * * * * * * * * * * * * * * * * * * *k *fit * * * ** * * * * * * *•k *** Construction Valuation: $ 200,000.00 PUBLIC WORKS PERMITS: *(Water Meter Permits Listed Separate) Eng..Appr: SAL Curb Cut/Access/Sidewalk/CSS: N Fire Loop Hydrant: N No Size(in): .00 Flood Control Zone: N Hauling: N Start Time: Land Altering: Y Cut: Landscape Irrigation: N Moving Oversized Load: N Start Time: Sanitary Side Sewer: N No: Sewer Main Extension: N Private: Storm Drainage: Y Street Use: N Water Main Extension: N Private: N Public: N k**************************************************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** TOTAL DEVELOPMENT PERMIT FEES: $ 2,333.46 k******* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** * * * * * * * * * ** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** PIO _1 �?YRitx�J�✓_L�_�' Permit No: Status: Issued: Expires: Streams: (206) 431 -3670 D97 -0320 ISSUED 12/29/1997 06/27/1998 End Time: 24 Fill: 24 End Time: Public: N Date t z.2r I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provision of any other state or local laws regulating construction or the performance of work. I am authorized to sign for and obtain this development permit. Dat 7.,'2-9 i ~etg' This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. Address 15340. MACADAM .RCf . - Permit No S u`i to Tenant Status: ISSUED: Tvpe DEVPERM ,Applied:. 09/23/1997 Parcel.4.'115720 0222 Issued: 12/29/1997 * k: k. k• k• k.****•k k• k• k• k*•k*.*•*k**'*'* k***; 4******• A***• kk k.• k** ' *•k•k *kk *•I*•k;k*k` *•k * *** PerMtt Conditions: 1 No changes: "Will be, Made.. to : plans unless approved by the Architect or:Engineer: and the Ttikw,i,la Building Division A ll permits, inspect: iota ; approved plans , ha 11 avai 1ab+1 : 6 at the jio #.'.te Ji5r' tor to the st"ar t of anv Con s truct lOn. .The3e documents are to 'be ma in,taif ed :.and avail = able- until fina'1 l: h speutiori approva is ;granted p,1.1 :tructural c oncrete' sha.l l b'e`spe`cia] in pectel WB.0 Sec 306(aM) f W4 en special inspection ,is required eithe.r the owner arch i tec;ta ;or ,eng i ne'er sha i i ,.:not;i f y, the Tukw.i" a Bu 11 d!i n oivrsinn :af appolntme'nt "af the i`n'spection agencies: pr�:i°or tie fir��t kruilding" inspectlor. cop-as of all special ;,,.•. i rispect,i orb:: r-epor is shal'l: be `submi tted to the Bu ild i ng: Division in a timely manner. 'T'Re.ports shall contain eddres rt rt •. c�• +' pro.j.e.c.;t name,: permit number and type "..of inspection be`1ng: pe` r#'ot; me + They .a'pecial. inspector sha] 1 'submit a .t i:'nal )signed report;;;,, sta'ti :whe.t the war t , requ iring spec `inspection was to fthe bes.t of ' the ins :pe:etor ", ; knowl edge i.n conformane wit ,iapproved. :plans` and specifications : and :the applicabl.e, wor t`p provisions of the, UBC . . Al l.,constr t ct1on t o : : ;be _done' in conformanc:e with approved p l ans�� and requ.i r ements of 'the Un i t,or'rn . Bu l d Tn,g Code ; y`(1994 Editio,n)',asamended, Uniform Mechanical "Code (1994 .Edit)Vn) and Washingt State Energy Code: C19_94:E"d i tion) . Notify54he..,,Cit_y Of Tukwila Bui ld,ing:'Division' to p1acing any: concrete. This procedure . is in to an requirements for Special inspection: L VaTidity ` of Permit. •,The issuance of a'permitor ; appr• oval plans, speeific;a..tl;ons,and computations shall not'.;b"e con strueci to :,bey, a permit for, — or ; an . approval of, any "violat;ion of any of the ,provisions of the' bu i l d,i ng code or of ar y' other ordinance: of the juris.di,et.ion No permit p,res•timing.to . give author;ity'`t.o violate on cancel danCet provisions of this code Shall vat i 9. Temporary erosion . e. ont: r o -j ";measur.es..,,ha.11",�.,be �impleniented as the f i r s t order of bur. i ness to .,p "revent - sedimentation off site or into existing storm drainage f acilities. 10. The site shall have permanent erosion control measurers in place as soon as p o s s i b l e after final grading has been completed and prior to the Final inspection. 11 FILTER FABRIC I5 REQUIRED AROUND THE FREE DRAIi'JING GRANULAR :SACKFUL TO KEEP IT FREE DRAIrNING. ]2. The southeast retaining wall (next to the fire hydrant) shall have a brown coior integrated (e.g., dye mixed) into the concrete. Thi :s condition shall be entered on the first sheet of construction drawings. vu 13. ALL RETAINING WALL FOOTING DRAINS SHALL BE TIGHTLINED AND CONNECTED TO THE EXISTING STORM DRAINAGE SYSTEM ON SITE, WEEP HOLES ARE NOT ALLOWED: 14. PRIOR TO FINAL SIGN OFF APPLICANT SHALL SUBMIT AN "AS- BUILT" SITE PLAN FOR THE 'RETAINING WALLS ROCKERIE'S AND. ASSOCIATED Project Name/Tenant: 44s-4s.. 4 '//)� 04Q-Av.b t -iv) 1716 A /r >'u4'i.i42 Value of Construction: IPA r 0, Dan. &V V. Site Address: City State /Zip: /-T5/0 i 45 /f4e4DAH AVM' 74 411)9 -si,'&8' Tax Parcel Number: i/6 - 72A — O Will there be a change of use? El yes J9 no Property Owner: v« - 40 , 7' ,6 Ley a� Phone: j . 232 - 3J7 Building Square Feet: ,VA, existing r'5 new Street Add ess: City tats /Zip: �7� � 5-4..- .30 /`7B Cee —i - i Fax #: • ,23 z . 9F7y ❑ yes ® no quantities & Material Safety Data Sheets Contractor: Phone: ad t -- .Zw - c VL <7 lifiqic/ / _ , Street Ad ress: City State /Zip: V' 04Z A QG t )7: ) /1L k/ Fax #: otog -- . s- d aeo Architect: i1 a. S.Y►94/ hkrDei4r : Phone: 9 - p / - 72-0 o Street City State/Zip: /o " I 7DA - ,) or/jF - /f. 9,'fvy/ Fax #: yeti (.I.s : /3a z_ Engineer: ,bra& > 1 d o f p . /1 l MA t tgoi sired / 61 7gc4 ate Elul Phone: Street Address: / City State /Zip: ■ Fax it: Contact Pelson: A <.1 ran / '7 ck /4 1/• Phone: 0 "9 i 673 Street Address: City State /Zip: ( 3 1 I7'2- 7APIA c( z/'S_ ''t S n`r. Q10 - Fax #: (zo60 '?3 3? 3 .Asos g -fie Description of work to be done: ,4 /2eff! iAj M.)G Lug; u� d Existing use: ❑ Retail ❑ Restaurant Multi- family ❑ Warehouse Hospital El Church ❑ Manufacturing Motel /Hotel ❑ Office ❑ School /College /University Other Proposed use: ❑ Retail ❑Restaurant Multi family ❑ Warehouse Hospital El Church ❑ Manufacturing Motel /Hotel ❑ Office ❑ School /College /University ❑ Other Will there be a change of use? El yes J9 no If yes, extent of change: Existing fire protection features: 51, sprinklers ❑ automatic fire alarm ❑ none ❑ other (specify) Building Square Feet: ,VA, existing r'5 new Area of Construction: Will there be storage of flammable /combustible hazardous material in the bulding? Attach list of materials and storage location on separate 8 1/2 X 11 paper indicating ❑ yes ® no quantities & Material Safety Data Sheets Date application accepted: CITY OF TUK Permit Center 6300 Southcenter Blvd., Suite 100, Tukwila, WA 98188 (206) 431 -3670 New Commercial / Addition / Multi - Family Permit Application Application and plans must be complete In order to be accepted for plan review. Applications will not be accepted through the mall or facsimile. ❑ Channelization /Striping ❑ Flood Control Zone ❑ Moving an Oversized Load: Start Time: in Sanitary Side Sewer #: ❑ Storm Drainage ❑ Street Use ❑ Water Meter /Exempt #: ❑ Water Meter /Permanent # ❑ Water Meter Temp # ❑ Miscellaneous Value of Construction - In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review - Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The building official may extend the time for action by the applicant for a period not exceeding 180 days upon written request by the applicant as defined in Section 107.4 of the Uniform Building Code (current edition). No application shall be extended more than once. NCPERMIT.DOC 1/29/97 APPLICANT REQUEST FOR PUBLIC WORKS SITE/CIVIL PLAN REVIEW OF THE FOLLOWING: (Additional reviews may be determined by the Public Works Department) ❑ Curb cut/Access /Sidewalk % Fire Loop /Hydrant (main to vault) #: ❑ Hauling ❑ Land Altering 0 Cut Siz S S Date application a Mies: Size(s): cubic yds. 0 Fill cubic yds. End Time: ❑ Sewer Main Extension 0 Private 0 Public ❑ Water Main Extension 0 Private 0 Public e(s): 0 Deduct 0 Water Only e(s): e(s): Est. quantity: gal Schedule: Application taken by: (initials) e PLEASE SIGN BACK OF APPLICATION. FORM BUILDING OWNER O AUTHORIZED AGENT: ,-) Signature: , , ,%r 7, �, � Date: c, 2.3 /c Print name: ` Pho e: r?,' Fax #� 1 r Address: ,,2 , /i2 / „ s �� City /State /Zip :..; xj'ry 4 c 444 ;: �?,ry�e ALL NEW COMMERCIAUADDITION /ILA TI- FAMILY PERMIT APPLICATIONS M E SUBMITTED WITH THE FOLLOWING: • ALL DRAWINGS TO BE STAMPED BY WASHINGTON STATE LICENSED ARCHITECT, STRUCTURAL ENGINEER OR CIVIL ENGINEER • ALL DRAWINGS SHALL BE AT A LEGIBLE SCALE AND NEATLY DRAWN ❑ BUILDING SITE PLANS AND UTILITY PLANS ARE TO BE COMBINED N/A SUBMITTED ❑ ❑ Copy of recorded Legal Description from King County ❑ ❑ Certificate of water /fire flow availability (Form H -11a). Contact the Public Works Department (206) 433- 0179 for servicing district. ❑ ❑ Certificate of sewer availability (Form H -11). Contact the Public Works Department (206) 433-0179 for servicing district. ❑ ❑ Metro: Non - Residential Sewer Use Certification if there is a change in the amount of plumbing fixtures (Form H -13). Business Declaration required (Form H -10). Five (5) sets of working drawings, which include : ❑ ❑ Site Plan 1. North arrow and scale. 2. Existing and proposed utilities and existing hydrant location(s). 3. Property lines, dimensions, setbacks, names of adjacent roads, any proposed or existing easements. 4. Parking Analysis of existing and proposed capacity; proposed stalls with dimensions. 5. Location of driveways, parking, loading & service areas, with parking calculations & location & type of dump - ster recycling screening. 6. Location and screening of outdoor storage. 7. Limits of clearing /grading with existing & proposed topography at 2' intervals extending 5' beyond property's boundaries, erosion control measures & three buffer protection measures. 8. Identify location of sensitive areas slopes 20% or greater, wetlands, watercourses and their buffers (TMC 18.45.040). 9. Identify location and size of existing trees, note by size and species those to be maintained and those to be removed. 10. Landscape plan with irrigation: Existing trees to be saved by size and species. Proposed: Include size, species, location and spacing. Location of service areas and vault with proposed screening. �.�p „�., um . . .. "`I'i t.o$�dtion oT tiig pia er 'artt'alfiLt4Ver/Duwamish River if site is located within 200' of 140ig1ter mark. 12. Lowest finished floor elevation (if flood control zon ifnif u`Ttrar'' 13. Civil plans to include size of water supply to sprinkler vault with documentation from contractor stating supply line will meet or exceed sprinkler system design criteria as identified by the Fire Department. 14. See Public Works Checklist for detailed civil /site plan information required for Public Works Review (Form H -9). ❑ ❑ Vicinity Map showing location of site ❑ ❑ Building Elevations (Include dimensions of all building facades and major architectural elements) ❑ ❑ Mechanical Drawings ❑ ❑ Structural Drawings (detail of sprinkler hangers, pipe, duct & vent penetrations in structure) ❑ ❑ Architectural drawings ❑ ❑ Specifications (if separate document) ❑ ❑ Structural Calculations ❑ ❑ Sprinkler structural calculations indicating load of water - filled sprinkler piping ❑ ❑ Height Analysis ❑ ❑ Soils Report stamped by Washington State licensed Geotechnical Engineer ❑ ❑ Topographical and Boundary Survey ❑ ❑ Tree Coverage Analysis (Multifamily only ) ❑ ❑ Washington State Energy Code Data and Non - Residential Energy Code Compliance Form H -7 ❑ Completed Land Use Applications if not previously submitted (i.e. SEPA, BAR, Variance, Shoreline or Tree permit) ❑ ❑ Attach plans, reports or other documentation required to comply with Sensitive Area Ordinance or other land use or SEPA decisions . ❑ ❑ Food service establishments require two (2) sets of stamped approved plans by the Seattle -King County Department of Public Health prior to submitting for building permit application. The Department of Pub- lic Health is located at 201 Smith Tower, Seattle, WA or call (206) 296 -4787. (Form H -5) ❑ ❑ Copy of Washington State Department of Labor and Industries valid Contractor's License. If no contractor has been selected at time of application a copy of this license will be required before the permit is issued OR submit Form H -4, "Affidavit in Lieu of Contractor Registration ". Building Owner /Authorized Agent if the applicant is other than the owner, registered architect/engineer, or contractor licensed by the State of Washington, a notarized letter from the property owner authorizing the agent to submit this permit application and obtain the permit will be required as part of this submittal. I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. NCPERMIT.DOC 1/29/97 d RD 5 Tot,al ;. Fees: 2,293 4S T his Payment, 9.0. :71 Total ALL Pmts 901.71 Balance: / ' 1 1 '391.75 iv•* * , , * * * * ** * * * * * * * * * * ** ****** r***; iele** * * * * * * * * *x *3:4* * * * * * * * * * 40 • Account Code ,De.hcr� i pt ion Amount :000/345.830 sPL,AN CHECK - NONRES 901.71 �c3,Y,vi tv ;1 �"�4''� 4i * * * * * * * * ** * * * ** * * * ** *** ***;******** * * * *k * * * * ** * * * * * * * * * * * ** tk * ** CITY O TUK lILA A ' , , --, ,TRANSMIT *;**** r ********** • ****:**** * * * * * * * * * * * * * * * * * * * * * * * * * * * *4 !. . TRANSMIT Number: 89700647 :Amo. nit: 901 09/23/97;:,14 :39. :P iyment; Method: CHECK' NNatatiar► J. KANE AND CO. Init;: WAD ermit :No: D97 032() "H Type DEVPERM DEVELOPMENT PERMIT:. Parcel ; No : 115720-02,22 site <: Address -: - 15340 MACADAM INSPECTION RECORD j - Retain a copy with permit - G ;v INSPE ION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 Approved per,applicable codes. ��.J � 206 431 -3670: Type of inspec ion: Project: Address. /,S3iO' rte. •-•, Special instructions: Date called: Date wan a.m. / 19 � p.m. Requester: Phone No.: Corrections required prior to approval. Date: 4 . _ i s /./� F 1 $42.00 REINSPECTION F REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. I Receipt No.: Date: Project: !'# S Type off ' ction: ' 11 I )'7C6,,/ Address: ' _ called: " Date Special instructions: Date wanted: a.m. p.m. Requester: Phone No.: INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300. Southcenter Blvd., #100, Tukwila, WA 98188 Approved per applicable codes. Inspector:, / d z a v 0 " . T INSPECTION RECORD Retain a copy with perms._ ERMIT NO. (206) 431 -3670 COMMENTS: $ €E_ 't ? C" ro/Q, Cp A-t Corrections required prior to approval. Date 7 463 1 $42.00 REINSPECTION FEE REQUIRED. Prior to inspection, tee must be paid at 6300 Southcenter Blvd,, Suite 100. Call to schedule reinspection. Receipt No.: Date: :INSPECTION RECORD Retain copy with perms INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100;' Tukwila, WA 98188 Project: Address: . Special instructions: • COMMENTS: Date wanted: Requester: Phone No.: Approved per applicable codes. Corrections required prior to approval. ERMIT NO. (206) 431 -3670 a.m. P.m. l Inspector: esitACCW eitkr Dater /b /a i $42.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. f Receipt No.: Date: Approved per applicable codes. INSPECTION RECORD Retain a copy with permi INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98181 Project: Type of inspection: r �� `Address:' Date called: Special instructions: Date wanted: a.m. r'7 t. Requester: K�( Phone No.: Corrections required prior to approval. Date: awn (206) 431 -3670 T;( .., l , $42,00 INSPECTIO , FEE • EQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100, Call to schedule reinspection. I Receipt No.: Inspector: Date: / „ Approved per applicable codes. INSPECTION RECORD Retain a copy with permi INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98181 Project: Type of inspection: r �� `Address:' Date called: Special instructions: Date wanted: a.m. r'7 t. Requester: K�( Phone No.: Corrections required prior to approval. Date: awn (206) 431 -3670 T;( .., l , $42,00 INSPECTIO , FEE • EQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100, Call to schedule reinspection. I Receipt No.: Inspector: Date: INSPECTION REc ^RD Retain a copy with .:rm INSPECTION NO. CITY: OF`TUKWILA BUILDING DIVISION • 6300, Southcenter Blvd., #100, Tukwila, WA 98188 Project: .. 14//11 Special m r4c Aug Special . instructions: Type of inspection: L A Date called: Date wanted:thi a.m. p.m. Requester Phone No.: Approved per applicable codes. Corrections required prior to approval. COMMENTS lielfg %JAW /./A- /�►di� ,dac t45 Inspector: Date: / 1 i // [ � $42.00 REINSPECTION FEE REQUIRED. Prior to Inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Receipt No.: Date: cow ENTS: ZI II it (i)Wf,t±tc-1 Of WILt ' - &kai, at - ---1. ) I .E. Pm t4 lb J-) (D' Stz)Lit ktr , Cc> - •,..) 4 (p-Nn..- AALA at ,:.. t, . ) . ,Ciftwo (p St?) A it11 .L.4. L i i gofrt C 0 h qf Le Ai DOuno ou... , r 1 A - 6 ti siNtin tt ( -L.._ "; ...... .coNii , c6.0-O\eA,., 41 v4NO . „st, t3QA:i- s foa kts it)A.1,. c)4.twct,---- ) J.ni_ct_____a____E,6._' Project: ?ea k , s al( .. /7,0<w . da Type of inspection: z i -- /ill e Address: 15. mo co ril F Date called: 2. _ q ..... q e ,:.. Special instruetions: .: ,. Date wanted: /0" 98 're 'Requester: "nit 1, Kane, Phone No.: ' INSPECTION NO. ) ' INSPECTION RECORD Retain a copy with permi CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 9818 CD -.. Approved per applicable codes. Inssector: [Receipt No.: NiaCtIrsPIS. MUM= PERMIT NO. ear 6) 431-3670 Corrections required prior to approval. Date: 1 $42.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Date: Special, instructions: INSPECTION: RECORD Retain a copy with pernii O INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION $ 6300 Southcenter Blvd:, #100, Tukwila, WA 98188 Type of inspection: Date called: 4G/qt& Date ?-1(vig •. Requester: 431 -3670 a.m. I Inspector: Approved per applicable codes. Receipt No.: ?hone No.: Corrections required prior to approval. COMMENTS: LEI A.4..Q-k Date: 1 / (a / $42.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100, Call to schedule reinspection. Date: project:17w s @ - , • tOil:WIL0.- Type of inspection, Address: • - ' - ... n 15 mata.44, ra Date called: . . i-24--elb Special instructions . • , r kta il k , . CO (.t It- Date wante • - 1 1 -`"" Requester: c .. .• . ..i . Phone No.: 44 . . 2 --• Receipt No.: . • • INSPECTION RECORD Retain attopy with permiL T1 Oi CTION N. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 :Southcenter Blvd., #100, Tukwila, WA 98188 r7 Approved per applicable codes. Corrections required prior to approval. (206) 431.4670 Inspector: Date' ow- $42.00 EINSPECTIO EE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection".` Date: • • , , COMMENTS: L �4 ' a , -- - --,...z_ ,r- r-f k-7,-'/ 2 X40, a2, se-x4, Conti 4 , 1 4',-,e r�L /�54 /a /CY - 44 grc,A7z. ( alai A As- 6.3t0.7 / y i i gew-eff - e? A ef7 Ilia . 'c e,4/4/ , pn ,he,c, s ew,/- G )f rll-, - lP_r74 Gt !-G/ fim o ) /�i e..e, ./ _ _ V ee ix-2,d t 44. i ,4,47ti // '- ` 5u 7a� L , / ' c5�{Jil ‘,/, /� U141 /.tie UPI'," C!/f t / A e ifhp, CJJ./A'4 _.&fize..6 ce4- LiA , GIM.i, :ere 5J ,517.e.k /7.7 (5c' / i AUfr 1 . 4 7.6 c yl t/11/ ,rbe1. & Cir rrri // , 47n4S / _Ge4 /.ew6y &Ali teR his - 1 0 . P ct: �je� �6a! Type of inspec I on: i Cm ch Ad Date called: Special instructions: ' ff'' c T` ` /t / Date wanted: _ a.m. Requester: Phone No.: 4JI *j Inspector: Date: INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd.; #100, Tukwila, WA 98188 Approved per applicable codes. INSPECTION RECORD Retain a copy with perm' (206) 431 -3670 Corrections required prior to approval. $42.00 REINSPECTION FEE REQUIRED!. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Receipt No.: Date: 44 COMMENTS: i .Se.._ ,e G1d/i „'.5ed ?4,e-- c,0 /-7)j 4 6.4V--. i1Y1 p �,e4 7 7 &ve Ws c / / a l : : . / 67,--4-2,e,/ 4 ti rOF A. i L L� .� . tee-f 5,/ 2 --6�'s /�/i D! .:,,,,.,:,,,./...„../..,,_ , t -2 - C,2� e e. ' a'1 -17 ? 206-4i(-3C- 'r, ; ;' /iv IN CT( •IfF keQoerrf I4Us.7 Qe 1 A fit'Iff. ,4' r"Vb.s /6/ /tvvAA/Cg, Type S old/. r Address: Date called:(, J Special instructions: // Date wanted: ! G6�� fit',* S - P.m. �')'� Requester: 0 /�� H ` ` e * Phone No.: INSPECTION RECORD Retain a copy with perm, INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 / 7 -0320 PERMIT NO. (206) 431 -3670 Inspector: Approved per applicable codes. Corrections required prior to approval. Date: ■ /, $42.00 REINSPECT' • N FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Receipt No.: Date: INSPECTION RECORD Retain a copy with perm, INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 / 7 -0320 PERMIT NO. (206) 431 -3670 Inspector: Approved per applicable codes. Corrections required prior to approval. Date: ■ /, $42.00 REINSPECT' • N FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Receipt No.: Date: Project: s ' em/f1AlC.R lb 6e.CvnlAo Type of inspec kTA,ni c,.> 4 L. i. SGTPKC Address : .I S ?±O ": CIACAbrft 2..), Date called: : I 72.6 (2"S Special instructions: Date nted: I (226 ( a.m. p.m. Requester: SeFF Phone No.: -6 86 Z Approved per applicable codes. INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 Inspector: L/ U M 6 —fv G�liydnr I Receipt No.: INSPECTION RECORD Retain a copy with perm /2j i Ai n/ //v C c✓�4C Corrections required prior to approval. COMME TS: o M SG T,1CXS '(‹. X S-.-) O.V A / ( 4 7- p Po P 7-"r : C s=r%G V Y 7 £ (c(-/. ?7 PERMIT NO. (206) 431 -3670 Date: ( 2.. G F8 $42.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Date: itt PERMIT NO. . . . • p INSPECTION RECORD Retain a copy with perm; INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 Receipt No.: Date: (206) 431-3670'. Project: Address: } 0 / Art, )/ J) -i ?d S Special instructions: Type ofjnspection: Date called: Date wanted: Requester: Phone No.: Approved per.applicable codes. Corrections required prior to approval. COMMENTS: .P 44- (�- S — Z‘ Ct L- sri N v t , P b Inspector: Date: )1 I I $42.00 REINSP 'gCTION FEE REQUIRED. Prior to ins ectIon fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. INSPECTION NO. ITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 Proj ct: _ Type of inspe do : Address: Date called: • t k. J � 1 Cu Joni • I � 1 15 Specs instructions Date wanted: _ . 1.-.9g . Requester: n I 11� Phone No.: f�L1 l0 %�t�J �'iQ Approved per applicable codes. COMMENTS: INSPECTION RECORD Retain a copy with permi PERMIT NO:' • (206) 431- 3670 Corrections required prior to approval. Inspector: S Datei z4 j6F 1 $42.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. [Receipt No.: Date: - Project . a '�+ NSI�RI E &c � Type inspection: rft 1.1i rKW., W rru.� Address:. ,V7Acn -w ^-.. at). Date called:. \, /- / S Special instructions: • W , cog-A -161 -- � :___ Date wanted: /. - /Co - q .m:-, Requester d Phone Noj.- 810 2A 4 - • INSPECTION NO. CITY TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 INSPECTION: RECORD Retain a copy with `pe nn Approved per applicable codes. COMMENTS: A / ft l et. 0, ( $42. REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Receipt No,: (206) 431 -3670 Corrections required prior to approval. Date: FEB 27 '98 12 :34 FR PSI SEATTLE • Environmental Oeotechnicol ,Construction Consulting • Engineering • Testing Mr. Duane Griffin City.of Tukwila Building Department.. 6300 Soulhcenter Boulevard, Suite 100 Tukwila, WA 98 188 Project Name The Peaks at Tukwila Project Address . 15300 Macadam Road SW Permit No. 097 -0320 • We hive 'completed the requested special inspections on the subject project. Our final report, dated`. :February 26, 1998. is numbered FR257536. 'WORK REQUIRED Reinforced concrete (cast in place) WORK INSPECTED Reinforced concrete (cast in place) Waterproofing for east wall of unit A102 Waterproofing for east wall of unit A102 • To the best of our knowledge, all work inspected conformed to approved plans, specifications, UBC, and related codes, and /or verbal or written instructions from the Engineer of Record. Reviewed by: John F. Vicente, E.1.T., Project Manager, Seattle Construction Services "I Sincerely, PROFESSIONAL SERVICE INDUSTRIES, INC. Rill Kilpatrick, Ph.D., P.E., Vice President BK/jfv cc; John Kane J. KANE AND CO.. 3422 Belvidere SW Sealllc. WA 98126 I n fin'inat1 on lb 13111111 On Professional Service Industilos, Ina. • 3257 16th Avenue West • Seattle. WA 98118 • Phone POR!PAP -onm • Far 2nAl2Aa•A71r SEATTLE DIVISION (206) 282.0666 • FAX (206) 282.0710 • A W4 ASTM TEST METHOD (AS APPLICABLE) L.3 f LL EQUIPMENT IDENTIFICATION AND S/N (AS APPLICABLE) A Division o PACIFIC 'f JAN 22 rob • LABORATORIES ONffiwdr.wn s • Construction • s••.M..•M. • Tooth. REPORT NUMBER FR 119 7 5 PREVIOUS RPT. NO PORTLAND OS ey, t'i SPOKANE DIVISION (503) 2548418 • FAX (503) 252.5608 (509) 535.3571 • FAX (509) 535.1267 EASTSIDE DIVISION TACOMA DIVISION PORTLAND FORENSICS ON, ISIONj N - I PENINSULA DIVISION (425) 4854244 • FAX (425) 4854611 (253) 5891804 • FAX (253) 589.2138 (503) 232.7852' FAX (5031 2327e89 h „ L41) 297.8821 • FAX (360) 297.8828 'This report is provided for the information of the client Only. The reproduction of this report, by any method, and its transmit- tal to a third party, by any means, except in lull, without the written permission of Pacific Testing Laboratories, is prohibited.' 'This certification attests to the accuracy of the results obtained from the actual test performed and/or observations made within the defined scope of the work. Certification shall not be construed to represent in • , Lion, approval or acceptance of other associated work or a warranty of design or workability of the specrfi T a Certified Report by /�/� Pacific Testing Laborato /i� FIELD CONTACT: di ... — / D E J </N D ■0 BY PORT ; ,. <.Z /�ZZ/ ADDRESS S ( 3 jot", Su) BYVI Lr �/' / ?� 27_9 PERMIT , a .�' : i ______.2.140 NUMBE N MBERATE -7Iz "7/ 1 ATTENTION: .30 4 KA I PROJECT h)51- F. PURCH. ORD, LOCATION L ACArblt NUMBER ARCHITECT ENGINEER CONTRACTOR Attn- J • 1.3 c� '- VC .L lb A s jnn.0- f=71 /I'LL(, U•A aLl ' "cR eT `le At, Q . WU- e - Th tvrt G LIM-Lc_ w1 3j tJ S t �Pnt r ,i LL- [ A- ST WALL I // Li )#/c._ MODIFIED YES = NO ` EXPLAIN: COST CODE Contract Min. d95 44.1 ere WORK CONFORMS YES'.. O HOURS ON :ov OFF 3:oo TOTAL HOURS Chargeable Hours ST OT MILE- AGE FR 89.2 - • "FIELD. REPORT (... - 'T 144,41:, ve_1. e . s te-'-: • ... tA,i: V f. ame.44.4,)-, , it I /el- .- . 4 „/ eAN w - / / ...., t) • , 4 _ 44 4 p 4 e I ° i 4..0, eel, r 0114,4ete– 57g." 44' , -4-42_ ek%,...g.f. etiya /0 e . . . _ t _grz:Les IA-% i. - 6 ... . ...41-. a L 10 ) 1 q. ,e kt . e C e 14 y "x 1 1 it.ter_ A) el? A2/3-412. ezA.-ee 14 Sc/ s' &IT/ qertc - 71:e. 4 k...-4.c-c-t:vc_ 4/ a-Wet 6 7-..._ .2 _ 11r.4 -.- . ■ - .i if e■Ile 11.; ___ 1 j___61____44_fAi 7)_4._&.____La//4 7. _____PlAs..%.„ChrLfSe■,4";4: ) . . 1 ll li, inna %..) pa-vp PACIFIC TESTING LABORATORIES EQUIPMENT IDENTIFICATION AND •SIN•(ASAPPUCASIE):.' AI A-• COPIES TO . ., '; . 'MAILED: .•-' INSPECTOR:: r! A A / -, k. pyi.4A 4.) , ”-711 ot r -- ALC,ORFOAMANCEOPNORKty ALL ITEMS.INSPECTED ARE: • • . . . — OWNER:,.. , .. ,— — — ENGINEER AR CONTRACTOR ,••:'. BUILDING DEPT: . SUPPLIER :,) ',, '.• .: FIELD CONTAC_ DATE - I ..„, i i • 11,011," P :-.:,: • • •'''CONFORMING •• NON CONFORMING TO APPROVED PLANS 'This report is provided for the information of the client only. The reproduction of • is r • •rt, by any method, and its Iran al to a third party, by any means, except in full, without the written permission of Prof . sional Service Industries, Inc., is prohibited." This certification attests to the accuracy of the results obtained from the actual test performed and/or observations made within the defined scope of the work Certification shall not be construed to represent inspection, approval or accoptance HOURS MILES NAME ON OFF ST OT A 114.11a......,4, 1.# Da 4 /1 1 of other associated work or a warranty of design or workability of the specification requirements." TOTAL HRS. - 174=17 Information LIZZ.V.To Build On Engineering • Consulting • Testing SEATTLE DIVISION (206)2132.0666 FAX (206)28243710 ADDRESS ATTENTION PONb EASTSIDE OMSION TACOMA DIVISION (425) 485.4244 FAX (425)485-4611 (253) 589-1804 FAX (253)5892136 ka-r, e._ q , 8etti 4: tis Sa.4) k)4 P 4.. ka- 'A PeA,Ks rit,k4A14, PORTLAND CS DIVISION (503) 2544418 FAX (503) 252-5609 PORTLAND FORENSICS DIVISION (503) 232•7852 FAX (503 232.7886 Certified Report by Professional Service Industries FR-98-1 3145 - FILE-NO:',1 - PERMIT:NO: ..', 0 d EN ITY 'GNEEIt'1" , ;: , '', a ARCHITECT .: .:, 4 CONTRACTOR'.:. NT 1-{ai, e.__A___dp , PRO'SADDRES:: /53 LID, esist.71. DATE SPOKANE DIVISION (509)535-3571 FAX (509)535.1287 PENINSULA DIVISION (330) 297-8821 FAX (340) 297-8928 ki-toL DATE ..21 g FOS:NO.; • • ,, ''.• • • • • . , DARROLD E. BOLTON Consulting Engin.er 1 0 . • ar as P4100LC'207•Il SW 7O6I?TW1 Gam li nolII I.NO.,RIOYITOUIPL!I700.775wO ..�-" ¢... is 4 W. 71 e ,6/°'o. X .tD : fdnts . 7 !>i'. //04.0 .. CI. 6" JOS $2.6vs. ,/.�/g •&HEET,NO. . Of - CALCULATED BY PGA DATE .. /a /J 7 CHECKED BY DATE RATA / 9, SCALE � ?( 9 a T/ 7 R0 /fib p 4/ . Apo xJ Ep .1'v /S /.c/AS'a Al f / ' OGINDA t //N M4L I /WOW' /fr /c,4 T/o/l kYe s'T .1/61 -LL ��' Hd/742d3 SAMPLE I.D. SIZE AREA (SQ. IN.) DATE TESTED AGE AT TEST ULTIMATE STRENGTH CHECKED LBS . P.S.I. . , o• 1 2,5oo 80 • R. vg . S gIz 98 /445 533 ,AI C•. 7: 00 loon k 3 Z - /4 '-s' 0 S'' : o b i-A i• _A Y (1 . HOURS MILE - AGE COST CODE ON OFF RT OT j c/ / 0 1 0 7: 00 loon .7.O 5 a4y r, (A O 1: r Il li 1 I i a L 181 B [It i'lt �l t PACIFIC TESTING LABORATORIES (206)282 -0666• FAX (206) 282.0710 • (425) 485.4244 • FAX (425) 485.4611 ADDRESS 3Lta� t`.vl OE_�� S.W. ADDRESS E.1 cc., t,4.1 om ATTENTION• tN r12 -• 1 —t C:N1fta KA •ac_. PROJECT - 7 1 4*-PE RK� CU K W:`IA LOCATION 11"3 `{O C{>. A Division of Environmental o ns trMlon, �� Construction CwmWtM • /M UM•Mg • Ttserq G LABORATORIES PORTLAND CS DIVISION • SPOKANE DIVISION • (503) 254.8418 • FAX (503) 252.5608 (509) 5353571 • FAX (509) 535.1267 EASTSIDE DIVISION TACOMA DIVISION PORTLAND FORENSICS DIVISION PENINSULA DIVISION (253) 589.1804 • FAX (253) 589.2136 (503) 232.7852 • FAX (503) 232-7886 (36 j 21 • FAX (360) 297.8828 PURCH. ORD. *1 NUMBER CONTRACTOR ` ;�� t E GO TU tc■W 1 L ¢1 1A1 1 COMPRESSION TEST RESULTS TEMP.& an' S CONCRETE WEATHER { J (� W TEMP. :SG, CEMENT ( 5K C'SE G FINE GG. PROPORTIONS LJlbs. ��UoSacks /Cu. Yd. tide Lbs. L<)n. Max. Ll7Lbs ••ONL• (Not Certified by P. T. Lab) ` ` L, 19,00 -T/ SAMPLING IN ACCORDANCE WITH APPLICABLE CODE AND SPEC ? PLANT - J1 0N � v`/ 1. I3t TYPE OF CEMENT Z• `= • SLUMP TRUCK 3 a1 TICKET # X 301 (( SUPER PLASTICIZED SLUMP MIX PROPORTIONS VERIFIED BY BATCHING SUPERVISION? ENGINEER NIA POUR LOCATION AND NOTES* £.T tJ110(ti Vs./ lLL LL+ •11 Z1Z L) \T - a �Sc s ► • E.L LAC._ \ Cc • <-1 ih N - `-.3 -1 • • Pt) V LL.O R ` 11J L iO c i AL P f v t o ., S C i f _ T o cULL S c.y L C . ASTM TEST METHOD (AS APPLICABLE) EQUIPMENT IDENTIFICATION AND S/N (AS APPLICABLE) 'This report is provided for the information of the client only. The reproduction ol this report, by any method, and its transmit- tal to a third party, by any means. except in lull. without the written permission of Pacific Testing Laboratories, is prohibited.' This certification attests to the accuracy of the results obtained Irom the actual test performed and/or observations made within the defined scope of the work. Certification shall not be construed to represent inspection, approval or acceptance of other associaled work or a warranty of design or wor. • • y• if cation requirements.' Certified Report by Pacific Testing Laboratori FIELD CONTACT: DATE CR 89.2 DATE . 116/ MODIFIED YES NO. EXPLAIN: REPORT NUMBER CR 257536 PREVIOUS.RPT: NO • BY CAST a-laLgs BY VIEWED Sy DATE GqT V/47/ 9 r^� NUM i ��' o3 2 NU C1 MBER { 5q ARCHITECT W V SSM %SZ`. C . aft RRoLO - &C•T C N DESIGN W/C STRENGTH Ic ZOO C\ RATIO ADMIX #1 ADMIX #2 ADMIX #3 L✓'"fer SeeK I 1 Per Sack Li Per Sack er SO 14 A ins AIR N 1 °o' QUANTITY l CF Q8 Cu Yd MIX # CGOO. t C DATE SAMPLE RECEIVED WORK CONFORMS YES 40 _ Contract Min. I TOTAL HOURS Chargeable Hours tfr.7M*e.t:'Y VHhU • 211998 16:15 i . i • • 1 • • •M _• • i• f ' .1 i . • T ; .. i i �i :• • maw amoid was, MD. NnL Sew AM AuAUtepees FEB 11 '98 10:3? • •• . if 4255621173 1A14 ILL) E. bULIUt! roa. , YJ1 ae ,S/ 1 /SW / R /D6e DARROLD E. BOLTON Consulting Eniinsor • • <• • • •. .1 .... .. . • SHEET NO / a / e CA AMFQ � OATE 1/•�C, JQ OIECAED BY °AYE SCALE • (/J4 .//Nrir 4 O.S. I .__•` •_.r. • .• • ( 1 • •••• • •I.. ..•.• • f _• 1 O..N1�r�QL. P,D Det "I .y • ¢s •Iethiv ' 1r' #4'` • • •••• ••• •• ; • ,• t t 1' •. • • • • • • r . PAGE.01 SAMPLE I.D. SIZE AREA (SO. IN.) DATE TESTED EST AT STRENGTH CHECKED I LBSU�IMATE SI A� -(;q AR,a) o et - 1 112.5oo I 3°i 8o �.. I I Convect Min. TOTAL HOURS 3 .;J 3 t Z p ,......V- I . HOURS MILE. I COST CODE ON I OFF I RT OT AGE III I I I I I /I d if, DI I to Tool Doo p.0 15 I 1 1 1 1 I I I Convect Min. TOTAL HOURS 3 .;J PACIFIC TESTING LABORATORIES SEATTLE C%SION EASTSOE ONtSION (2011 212 46 61 • FAX gee) 2M2.071 D (Alp 4A5 +2 • FAA 142S1415•41 MAILING ADDRESS PROJECT LOCATION ** TX CONFIRMATIOL,.:PORT ** DATE TIME TO /FROM 10 02/11 11:08 2410080 TYPE OF CEMENT kfm.it 3yaV, c €R_ S. w. SE•NRt.c. WIN ATTENTION' M• �10N TEMP. n' u CONCRETE WEATHER E S I�Wa TEMP. SL-) TRUCK :"T TICKET • (a3O1. I I AST*i TE sT ME THOD fA APFL 04 act, tied ``fir EQUIPMENT IDENTIFICATION AND SIN (AS APPLICABLE) A Division of W: Gil fJl l Conserved.. e_rrA • .r••••• • I.. TACOMA DIVISION IS71 519•1104 • FAX (2571 Sa3.a 7a COMPRESSION TEST RESULTS MIXING PLANT . 1 QKt t1V 14., CEEMMENT ( CSE14GG. F ).40. PROPORTIONS I►�Lbs. Ii0 5adc0ICu. YC. (Not Certified by P. T. LAb) JLl lbs MAX. LDS. 4 " C N E : - SUPER PLASTICIZED SLUMP •Tlwrs•.enn pr0woe01:r;nA ■eIAm'we,DIweeMmany TN* oer0aeCIOnel Inc tows, Dy y mtm40.We In snuw• 13143 a Inn party. Dy any r•0•n11. InCt131 d1 lull ••Inaw :ns ..p1131 parmmswn 01 Padie Tseln9 Lauerau:r.et. iX 0ron4r40 • 'T N4 CMI cation gears el Ta accuracy d 0.s r.n,M 00:a0e0lion lee ACtuel toil NRCrm10 aDOOD( ODt9NIDaN mace mVln Ns Od•nee :CO;t W DIa wCfl.CltflbCil.0. Shan Cl n DC eenseueO N IIISeasane nto.CDOn, 303 Or 34:34 ArA: DI OIMr S333e1301•4^r ar a oamNy $l 431134 m roDIAA.ty Al INS 10ACaga1Cn WW1 *Merin Certified Report by Pacific Testing Laboratories DATE FIELD CONTACT: DATE CFI 194 AS OF FEB 11 '98 ( d9 PAGE. 01: PSI SEATTLE MODE MIN /SEC PGS CMDtt STATUS G3 - -S 00'50" 001 150 OK PORTLAND CS OIVIS CN (5071254.1+11 • FAX ISO7) 2s2-5 O/ PORTUJC FORENSICS CIVISION 1S03127b7152 • FAX (S031232.7006 BYPO �btA . Lc _ R CAST a �a��� REVIEWED BY OAT NUMBERCRl ` C C-. 5UMB 1 I'A' i t Sgy ARCHITECT USS611-(4.1 > SSZ f- • ENGINEER REPORT NUMBER Lai L O I O J PREVIOUS RPT. NO CZ- SPOKANE ONMSICrr (5091 5754571 • FAX IS0715)5. PENINSULA DIVISION (7101297.1221 • FAX (7 217.1121 1■1 � p� NUMBER RD CONTRACTOR J % \<- t C4 Tv v.1 A , ' ` SLUMP ' ~ , C ins AIR til`T t.LIA DESIGN p W RATIO STRENGTH lc O ADMIX at ADMIX .a ADMIX .3 Qer Sack ib 3 Per Sack_ -. Per Sack \ 1i1 O•SO A •r.: QUANTITY MIX I Rag 8 Cnarglable HOW'S (nGO Cu YC SAMPLING IN ACCORDANCE WITH MIX PROPORTIONS VERIFIED DATE SAMPLE APPLICABLE CODE AND SPEC ? 1� Y ti ••44 ' BY BATCHING BUPFNISION? C RECEIVED [�• POUR LOCATION AND NOTES. t.TAt E k ".,1 P L. �- � �uc.. lpT!D 'SC:1/4.: s i'c o< t 1 1 - � ae3 L L•�« (�tJ\i tl�s CZt \0t-1 1JL`'t ULTt1 • ' 1 C(OUkLb t R F`4.11J1 r 0 &pf L I-(D r�i7D 2 aft S c.f LID • A /SA /l S /n, /c / ' o/1/ifr2/2 .5 i - c9✓ f r,•'c, s ?er .eiehZ;J o Pme i a e, ae YES NO. EXPLAIN: ?_ /_ 98 WORK CONFORMS YES - NO . SAMPLE I.D. SIZE COST CODE AREA (SO. IN.) DATE TESTED AGE AT TEST ULTIMATE STRENGTH CHECKED LBS. P.S.I. A (c> kkq Gil rP`) 0 C I 1 `)Z5co .3�� c . 1•,Z 9 8 1•k Il L'L =.LL,1 fl on. �i Liu Li HOURS MILE- AGE COST CODE ON OFF RT OT / c,I/o( o Too /oct 3 o s PACIFIC TESTING LAB MAILING ADDRESS PROJECT LOCATION CR 8 +•i SEATTLE DIVISION C TING LABORATORIES �tr EASTSIDE DIVISION (206) 282.0666 • FAX (206) 282.0710 (425) 485.4244 • FAX (425) 485.4611 (253) 589.1804 • FAX (253) 589.2136 .J • k rm.) Cam, 3-laa �3E�•;r� c)Sat. S.w. s�(iti Lc t LA.:4N ATTENTION 6 R • 300N i 1 -VrLPE Mc!) �• t 3 " LO (NA IRc.P'i71(.4,'H NUMBER RD. " t•4rJ L-Pr •lAt }\ TEMP. 8 WEATHER ``- ) t TYPE OF CEMENT - 1 i• ASTM TEST METHOD (AS APPLICABLE) CONCRETE TEMP. • SLUMP EQUIPMENT IDENTIFICATION AND S/N (AS APPLICABLE) A Division of 'p V 3Jy TACOMA DIVISION rvr Envko>«rta► t: ►ca► Construet Co,•xuNM! • !Mi•M•In/ • frrxrw•! COMPRESSION TEST RESULTS ins AIR 'This report is provided for the information of the client only. The reproduction of this report, by any method. and as transmit• tal to a third party, by any means. except in full. without the written permission of Pacific Testing Laboratories. is prohibited This certification attests to the accuracy of the results obtained from the actual test performed and/or observations made within the defined scope of the work Cennccation shall not be construed to represent inspection, approval or acceptance of other associated work or a warranty of design or workability of the specification requirements' Certified Report by Pacific Testing Laboratories DATE FIELD CONTACT: DATE PORTLAND CS DIVISION (503) 254.8418 • FAX (503) 252.5608 ; •„ PORTLAND FORENSICS DIVISION (503) 232.7852 " FAX (503) 232.7886 REP MARL4...�' BY PER NUM ARCHITECT ENGINEER tit► O Ly PL. N D Th-11 al.S S 'To tvu S c.y izt. • aEPORT NUMBER CR 2 5 7 5 3 6 PREVIOUS RPT, NO MODIFIED YES NO EXPLAIN: °• QUANTITY Contract Min. l I TOTAL HOURS SPOKANE DIVISION (509) 535.3571 • FAX (509) 535.1267 PENINSULA DIVISION (360) 297.8821 • FAX (360) 297.8828 DATE CAST a • REVIEWED BY - DATE NEFTIEIG4TFrl "1 l S NUMBER 1 � r•l V ANA 1A:'( 0 IN CZtt L : LT G1� CONTRACTOR ` \`141 MIXING DESIGN W/C PLANT •) tV � W 1 •\1 STRENGTH fc ^ RATIO ,C- EMMENT ( C'SE GG. FgGG. ADMIX #1 ADMIX N2 ADMIX #3 PROPORTIONS lJ Lbs. tia S ry acks /Cu. Yd. . 12 Max. abs u7 L t - ONC 7.11 SacK D Per Sack ill Per Sack (Not Certified by P T. Lab) ` I cF $ TRUCK 2 al TICKET M 30 1 i ( SUPER PLASYICIZED SLUMP M I IN SAMPLING IN ACCORDANCE WITH MIX PROPORTIONS VERIFIED SAMPLE APPLICABLE CODE AND SPEC ? BY BATCHING SUPERVISION? C RECEIVED POUR LOCATION AND NOTES " R £. 1tJ%t -1 (z v....1 ALL. `u C. r'.L jti — R.SI:.STLF.L. IL.) ?L `t 14.•1J7 11 1 4, :.Dttv*Ll.>,hN( . i_ w1'rt -4 ftZ4V`i-.� tRP4:►1J(.n KIC.gt• i� 1� L .. .'>.t - QS' -b-iCi if_ A. X `ct) MIX # Chargeable Hours GOO ScN:s'r14 S inE Oi= L) I.a l'j' Q13 Cu Yd WORK CONFORMS YES NO . - HOURS MILE- AGE COST CODE ON OFF ST OT I o I 1 0 (o l l;ac 13'3C (.5 I `f 'Au:YA i:1L21b:Y i..dreht.av PoWeevtf'..2W'.f.Mhi,.-na: Pi I. • MAILING ADDRESS PROJECT LOCATION 1 SEATTLE DIVISION ASTM TEST METHOD (AS APPLICABLE) •I•u•pe.4••■14• C G LABORATORIES ATTENTION: m t a,. 7-pH tv K A t� v. P .4 (S C 1 LdltL•.z t534o PAY\C.AQAmPURCH ORD. NUMBER TU tcUI�A t NA/ t� EQUIPMENT IDENTIFICATION AND S/N (AS APPLICABLE) A Division of �� a otechn c: Con struction QHnHrMNg • [n/Nw•Np • THIN/ - This report is provided for the information of the client only. The reproduction of this report, by any method, and its transmit• tat to a third party, by any means, except in full, without the written permission of Pacific Testing Laboratories, is prohibited.' This certification attests to the accuracy of the results ob within the defined scope of the work. Certification other associated work or a warranty of desig Certified Report by Pacific Testing Laborat FIELD CONTACT: FR 89.2 d from the actual test performed and/or observations made not be con� • d to represent inspection, approval or acceptance of r worhabihty . - pacification requirements." i DATE ARCHITECT ENGINEER DATE / PORTLAND CS DIVISION (503) 254.8418 • FAX (503) 252.5608 EASTSIDE DIVISION (206) 282.0666 • FAX (206) 282.0710 (425) 485.4244 • FAX (425) 485.4611 (253) 891604 • FAX,(253) 48972f36-•—• (503) 232.7852 • FAX (503) 232.7886 TACOMA DIVISION PORTLAND FORENSICS DIVISION t . hAta� C F (s c? in;SYPOIRDkMvk2l£.2 REVIEWED 1�a �3E�vlo mow. ....... B StA W A °;..` >r 9 L_t 7 %V�G.NUMB= MODIFIED YES NO v EXPLAIN: REPORT NUMBER FR 12 7 5 9 PREVIOUS RPT. NO. SPOKANE DIVISION (509) 535.3571 • FAX (509) 535.1267 PENINSULA DIVISION (360) 297.8821 • FAX (360) 297.8029 DATE CONTRACTOR —5- K A -3 Contract Min. I TOTAL HOURS Chargeable Hours astmrcniarat b!A7irg ieleffebtifeCli ' DATE / /a, /er CUMBER AFiI int ' 1 sc �i O ao 111111 1_191%T.:11 aull1 01. SITE_ %( Fo R. C pQ lO r2 TU FCR`M C.+,.aS A� � T{>�tii RLL V T N S�•D� or vt-1,1- aC.3 - .�.����: Poi3PP_5 i 9`.Ptc. e izt� It�t (CWTPL11a1.1( L iT 1. ub E:► l�c Ok iC Ccit..)•TI1Nvc t= ocz.w\Wo WORK CONFORMS YES/ NO SAMPLE I.D. SIZE AREA (SQ. IN.) DATE TESTED AGE AT TEES ULTIMATE STRENGTH CHECKED LBS. P.S.I. / (d( �p V r� 1 I- 1 a Les j 'p- vg (" 0 tA 1aq 0 - 1J q g aE ) sz •ce,rD / - L4 o00 S3 20 L{ Le o .-- C ' ',c , T y \ \ ,d4A HOURS MILE- AGE COST CODE ON OFF RT OT 'p- (. O C -I. O C_ V ' ',c , 5 :co .1.C) T ¢ e..+ 4.. Na4 `-'YL QV.I •trg I �I II. PACIFIC PAC MAILING ADDRESS PROJECT LOCATION rnl 0 L LI MAR — 31998 TEMP. & WEATHER SEATTLE DIVISION y oc CEMENT ASTM TEST METHOD (AS APPLICABLE) G LABORATORIES v- EASTSIDE DIVISION (Not Certified by P. T. Lab) Cr 3�`t EQUIPMENT IDENTIFICATION AND SIN (AS APPLICABLE) A Division of `nviron ntal oaotaehnlcal Conatruetlon ComWfIM • eh. k• .*t • Tomlin. TACOMA DIVISION (206) 282.0666 • FAX (206) 282 -0710 (425) 485.4244 • FAX (425) 485.4611 (253) 589.1804 • FAX (253) 589.2136 Co . bUi4 S,w ATTENTION: OAR.•30 V.RhiT 3N E.� (� UMBE 1�i <% Q ""u 1S 3 't� `h IN - DA NR RD. - r U kw� w FIELD CONTACT: DATE CR 89.2 REVIEWED BY ,PER NU COMPRESSION TEST RESULTS MODIFIED YES NO _ 'This report is provided for the information of the client only. The reproduction of this report, by any method, and its transmit- tal to a third party, by any means, except in full, without the written perm,ssion of Pacific Testing Laboratories, is prohibited.' 'This certification attests to the accuracy of the results obtained from the actual test performed and/or observations made within the defined scope of the work. Certification sh. • •e construed to represent inspection, approval or acceptance of other associated work or a warranty of design o orkability o ff• pecul cation requirements." Certified Report by Pacific Testing Laborato DATE oP/M/Y PORTLAND CS DIVISION (503) 254.8418 • FAX (503) 252-5608 PORTLAND FORENSICS DIVISION REPORT NUMBER CR 2 5 7 5 3 0 PREVIOUS RPT. NO SPOKANE DIVISION (509) 535.3571 • FAX (509) 535.1267 PENINSULA DIVISION (503) 232.7852 • FAX (503) 232.7886 (360) 297.8821 • FAX (360) 297-8828 BY -� CERTIFICA9 N NUMBER [� l ARCHITECT V S�I - s5m ENGINEER No mzR CONTRACTOR • ' \'A'�C Lo • DESIGN W/C TEMPRETE C� PLAN ��N�-v � i 2 - STRENGTH lc t .. RATIO ��/ C'SE AGG. FINE AGG. ADMIX #1 ADMIX I#2 ADMIX $3 PROPORTIONS ❑ Lbs. SO SacksICu. Yd. ❑ Lbs. Min. Max. ❑ Lbs. ❑ Per Sack LI Per Sack ❑ Per Sack i p TYPE OF CEMENT • SLUMP ins AIR ) T % QUANTITY 1 OF 7 Cu Yd TRUCK v.JL TICKET ;7g9 c,Q� Li SUPER PLASTICIZED SLUMP P MIX # O SAMPLING IN ACCORDANCE WITH MIX PROPORTIONS VERIFIED . DATE SAMPLE J �` �/ APPLICABLE CODE AND SPEC.? L BY B�ATCHING SUPERVISION RECEIVED r o POUR LOCATION AND NOTES: Fr rT 11•� t K 1` !J 11•3lZ CONLL... Sr1...T V C : [7 OF V t.1 k'T' I►JJD[<T`th Q CAT y OAF-'TL' : - Co NCR k-cc povvk [")1, f -et f M_tc .y EXPLAIN: Contract Mir. 1 I TOTAL HOURS Chargeable Hours WORK CONFORMS YES VNO _. 9 - C) SAMPLE I.D. SIZE AREA (SQ. IN.) DATE TESTED AGE AT TEST TE ULTIMATE STRENGTH CHECKED LBS. P.S.I. (v •X ° �• �p 7/ O e a I �1 // S9 Q u Q :7z) V C I, ( • t 1 81 a. t-s( gds i-k D r-D . r i n n ,-, ,-, C .0 ■i* 1 u�j f �„ , „ �; , Till u ut HOURS MILE- AGE COST CODE ON I OFF RT OT 1 C O ( • t O (.. :1 3• :et. 1 ) •a' 1•-• . 1 '•I :L rid — 6 I . u I, TACOkIA DIVISION'" (206)282.0666 • FAX 12061282.0710 (425) 485.4244 • FAX (4251385.4611 (2531589.1804 • FAX (253) 589.2136 MAILING ADDRESS PROJECT LOCATION TEMP. & WEATHER SEATTLE DIVISION TYPE OF CEMENT TRUCK C e' a 24 a &L./ I b S :1ry ATTENTION' OAR SOOLIkikt•1 I (-1 �� 1.4c% Q 14J. itA [53 4.o An NUMBER RD, Tu 4... 0, yT' cc Ce s v G LABORATORIES EASTSIDE DIVISION TICKET ;7S `( LI EQUIPMENT IDENTIFICATION AND SIN (AS APPLICABLE) A Division of !M a l crM..nsv • r1"•r• • ?Ming I COMPRESSION TEST RESULTS o • SLUMP ins AIR SUPER PLASTICIZED SLUMP ASTM TEST METHOD (AS APPLICABLE) MODIFIED YES 'This report is provided for true information of the client only. The reproduction of this report. oy any method. and its transmit• tal to a third party, by arty means, except in tull, without the written permission of Pacific Testing Laboratories, is prohibdea. "This certification attests to the accuracy of the results obtained from the actual test performed and/or observations made within the defined stop) of tha work Certification shall not be ccnstruec to represent inspec:An approval or acceptance of other associated work or a warranty of design or workability of me soeOil cation requirements ' Certified Report by Pacific Testing Laboratories DATE FIELD CONTACT: DATE CR 89.2 ARCHITEC ENGINEER ( REPORT NUMBER CR 2 5 7 5 3 0 PREVIOUS RPT, NO PORTLAND CS DIVISION (503) 254.6418 • FAX (503) 252.5608 PORTLAND FORENSICS DIVISION (503) 232.7852 • FAX (503) 232.7886 BY h k% RA -1-R- CAST V 1 ■� t REVIEWED �-->< \\ BY ATE PERMI ' • RTIFICA -p NUMB : gni O c UMBER 1 ( � -- 1 1T ` ' CONTRACTOR 'S = PA r r LO • TEMP. E S� MIXING LL` DI 1 flt t2. STRENGTH IC `-a C) RATIO DESIGN WIC CEMENT C'SE AGG. FINE AGG. ADMIX #1 ADMIX 02 ADMIX 03 PROPORTIONS ❑Lbs, Sacks /Cu. Yd. ❑ Lbs. L - In, Max. ❑ Lbs. Per Sack Per Sack ^ Per Sack (Not Certified by P. T. Lab) 3/1/4i" Nl SAMPLING IN ACCORDANCE WITH MIX PROPORTIONS VERIFIED DATE SAMPLE I J 7 c./ APPLICABLE CODE AND SPEC ? Q BY BATCHING SUPERVISION? RECEIVED r o POUR LOCATION AND NOTES: F c T (1.3 Sc _-r kJ. 5; 1 Ng C F V , � ► 'S F ** `�� 3�t C1 U� = " TV ��W�.`� Ce Kull? 2 ---c 0.5 Qi t '� A-t-�� Nktc N'f�N�C 1��� v' V I vsIZ�T''c.L� • NO EXPLAIN: Chargeable Hours SPOKA P ON (509) 535.3571 • FAX (509) 535.1267 PENINSULA DIVISION (360) 297.8821 • FAX (360) 297.8323 C, °o• QUANTITY 1 Cu Yd WORK CONFORMS YES NO .. Contract Min. I TOTAL HOURS a . ej SAMPLE I.D. SIZE AREA (SQ. IN.) DATE TESTED AGE AT TEST ULTIMATE STRENGTH CHECKED LBS. P.S.I. 4 6 " x iz , 7� /- OF — 9S z -/?- c x 2- /f(_ ?/s 7 .g s 3 // 3000 _.L_ - O / -e0 3‘i 0 S L/ ca 5 ) -- •e 2 C HOURS MILE - AGE COST CODE ON OFF RT OT I l ar39 T.00 3 50 ✓/ T iiLl�l I .i I111i iil' 'y if►' PACIFIC FEB 23MEI SEATTLE DIVISION (206) 282.0666 • FAX (206)282.0710 MAILING ADDRESS 65x CEMENT PROPORTIONS ❑ Lbs. Sacks /Cu.Yd. (Not Certified by P T. Lab) .TLCAu £ Co. 34 22 'BeLV IPERE SA, J. ATTENTION JAR • 70'K► IZ Al-St G LABORATORIES EASTSIDE DIVISION (425) 485.4244 • FAX (425) 485.4611 (253) 589.1804 • FAX (253) 589.2136 PROJECT K w I L 1 ENGINEER :13 eot.L> Ta3 PURCH. ORD. ''j�� �� LOCATION MAC. AW 1 NUMBER CONTRACTOR _ti.!! C11t NE �' at? • TEMP. & WEATHER Oi►FST TEMP. RETE G/ A Division of •I MIXING PLANT 0331 Enrioirn.nta► 1 a bchnlcal Construction Consulting • .Mrn•oNM • Tooting TACOMA DIVISION , , FORENSICS DIVISION PENINSULA DIVISION (503) 232-7852 • FAX (503) 232.7886 (360) 297.8821 • FAX (360) 297.8828 COMPRESSION TEST RESULTS TRUCK 40 TICKET # 73 11°, 5 SUPER PLASTICIZED SLUMP PORTLAND CS DIVISION (503) 254-8418 • FAX (503) 252.5608 i REPOR DATE _ __ BY' .' REVIEWED BY NUMBE PERMITo� r rD1 CERTIFICAT%,* _ - =q � ME Sl. REPORT NUMBER CR 255711 PREVIOUS RPT. NO. DESIGN STRENGTH is 3047) SPOKANE DIVISION (509) 535.3571 • FAX (509) 535.1267 W/C RATIO C'SE AGG. FINE AGG. ADMIX #1 ADMIX #2 ADMIX $3 ❑ Lbs. ❑ In. Max. ❑ Lbs. Li Per Sack Per Sack Per Sack +46x4 TYPE OF CEMENT / • SLUMP 3 'I ins AIR N T, %' QUANTITY MIX # SAMPLING IN ACCORDANCE WITH MIX PROPORTIONS VERIFIED DATE SAMPLE APPLICABLE CODE AND SPEC.? yes BY BATCHING SUPERVISION? 64.0 RECEIVED 3 Cu Yd POUR LOCATION AND NOTES: 1-0Ci T( .i ; Co RETA 4 WALL. Nio'rf % ' RE-77,,4 /.0 & F0,77 1)G Q S/D &Jr4i I _ .4107ES : dzyJCPfe Ta Le) 4 P[A - Aey PUkp ,41u D ittEariora /C.4cd4., Co.1.. 1� f?Esreet, ' /A Qe),O G1i' .A4AA)CE wt7'N G rrY off `7V1 (A)/CA 4PPPoVVD 3o4,ToN SieBTC.i/E.-5 ?M 2' 7/18/97 £ 9N5 ASTM TEST METHOD (AS APPLICABLE) / e../40.3 44 / es 1Z, Cia MODIFIED YES NON( EXPLAIN: EQUIPMENT IDENTIFICATION AND S/N (AS APPLICABLE) 144 £/4 373 - This report is prowoed for the information of the client only. The reproduction 01 this report, by any method. and its transmit- tal to a third party, by any means, except in full, without the written permission of Paoli:: Testing Laboratories, is prohibited.' 'This certification attests to the accuracy of the results Obtained from the actual lest performed and.'or observations made within the del ned scope of the work Certification shall not be construed to represent .nspe :ton, approval or acceptance of other associated work or a warranty of design or workabilit of the . ihcation requirements - Certified Report by Pacific Testing Laboratories FIELD CONTACT: DATE CR892 DATE 21 4/ Contract Min. WORK CONFORMS YES ✓NO TOTAL HOURS Chargeable Hours SAMPLE ID. SIZE AREA (SO. IN) DKfE TESTED '" . AGE AT TEST - �- ULTIMATE STRENGTH , OT LBS ' P,S.I. ; 4 G "uia„ - 21 ; 2 r - PV -911 I // 3000 3 too V Sit C F 2 - /V -9R D HOURS MILE- AGE COST CODE ON OFF RT OT Gig too 3 Sit (208) 282-0666 • FAX (206) 282 -0710 (425) 465.4244 • FAX (425) 485.4611 MAILING ADDRESS PROJECT LOCATION SEATTLE DIVISION IAC 4 CA 1 34ZZ ='Baa.V t7>etE 4->a•W4 SE4tgTT-LE 6.104. c181?6 ATTENTION: KR • I'Drt►/ 14 �►tJ� IWO PE.AIACS ,prr 110 K wI« PURCH. MAa ADM s NUMBER ORD. (Not Certified by P. T. Lab) / 5 K EASTSIDE DIVISION TACOMA DIVISION (253) 589-1804 • FAX (253) 589.2136 PERM NUMB 'This report is provided for the information of the client only. The reproduction of this report, by any method, and its transmit- tal to a third party, by any means, except in full, without the written permission of Pacific Testing Laboratories, is prohibited' Ibis certification attests to the accuracy of the results obtained from the actual test performed and/or observations made within the defined scope of the work Certification shall not be construed to represent inspection, approval or acceptance of other associated work or a warranty of design or workability of the specification requirements.' Certified Report by Pacific Testing Laboratories DATE FIELD CONTACT: DATE CR 89-2 PORTLAND CS DIVISION (503) 254-8416 • FAX (503) 252.5608 PORTLAND FORENSICS DIVISION (503) 232.7852 • FAX (503) 232.7886 COMPRESSION TEST RESULTS t - ' REPORT NUMBER UK L O D Ill PREVIOUS RPT. NO Contract Min. I TOTAL HOURS Chargeable Hours SPOKANE DIVISION (509) 535.3571 • FAX (509) 535.1267 PENINSULA DIVISION (360) 297-8821 • FAX (360)2974828 REPORii�i I��.. - -is ,. BY. `/ REVIEWED BY DATE CERTIFICATi� - 7/ 5k NUMBER r 7 ARCHITECT D SSMAII JJ�� — ENGINEER C. &OD 851.11 CONTRACTOR v 4 MA N6. TEMP. ER imp CONCRETE ST TEMP.R d MIXING LO ESTrAl2 STRENGTH fc 3000 RATIO CEMENT CSE AGG. FINE AGG. ADMIX 61 ADMIX 82 ADMIX 83 PROPORTIONS ❑ Lbs. Ot Sacks /Cu. Yd. ❑ Lbs. ❑ In. Max. ❑ Lbs Cl Per Sack 0 Per Sack ❑ Per Sack 0 4E4 TYPE OF CEMENT /4/ : SLUMP f3 ins AIR N . T. % QUANTITY Cu Yd TRUCK S TICKET IM 75 V SUPER PLASTICIZED SLUMP /40 MIX * 3310 SAMPLING IN ACCORDANCE WITH MIX PROPORTIONS VERIFIED DATE SAMPLE APPLICABLE CODE AND SPEC.? Yeg BY BATCHING SUPERVISION? -� RECEIVED POUR LOCATION AND NOTES: LCCAT108 i i ( R E T 4 � IN dIt G&A Nf r i g J7 . gerothow r FcOT/sJG & 5 _ Alo7ES : a 1CReTE LJAS p4,044sp 8%' po»P �}N htEoi114 J it..ir4fL.c e 044.tShcdt 47 . REsTF.EL. /S /A.) QDAVeveKA4t)CS Lo ail C/t'Y of •rjgwnr4 1q11wRoVED 2301.. .SS TTGNES 'Ab 7//9 97 £ ciA /97 ASTM TEST METHOD (AS APPLICABLE) e1/, ei41.3 d41 G/i MODIFIED YES _ NON( EXPLAIN: EQUIPMENT IDENTIFICATION AND SIN (AS APPLICABLE) RA 4 WORK CONFORMS YES = NO SAMPLE I.D. SIZE AREA (SQ. IN.) DATE TESTED AGE AT TEST ULTIMATE STRENGTH CHECKED LBS. P.S.I. A ) vg. 11x3 1 `'I 3 -S 3 3/ 0 Z _ .42./ it ,-,) 1i3 a /13 08 a8 j 31c'o0 / 9c 9,2 !S . C_- '0 11 ° 3 I Q HOURS MILE- AGE COST CODE ON OFF RT OT I b 1 1 0 1 '0 11 ° 3 I Q { a 0 I FEB 2 3 1998 ,1 r PACIAL-1' sI N SEATTLE DIVISION (206) 282.0666 • FAX (206) 282.0710 MAILING ADDRESS PROJECT LOCATION 3 as Lv .CZ-f S W. S�r� - 1L t („\ ` ATTENTION m 2 • J N� 1� N'N 1 N4-W O . AM kuKvsni I S 3,4 0 mAc.At Awlvb•S PURCH. ORD. NUMBER TEMP. CONCRETE WEATHER S Vl/ < TEMP. CEMENT SK PROPORTIONS 1=1Lbs. OSacks /Cu. Yd. (Not Certified by P. T. Lab) 5 TYPE OF CEMENT SAMPLING IN ACCORDANCE WITH APPLICABLE CODE AND SPEC ? ASTM TEST METHOD (AS APPLICABLE) LABORATORIES EASTSIDE DIVISION (425) 485.4244 • FAX (4251 465.4611 (253) 589.1804 • FAX (253) 589.2136 (503) 232.7852 • FAX (503) 232.7886 7 . C•SE AGG. FINE AGG. ADMIX Ni ADMIX #2 ADMIX k3 Lbs Q. Catrmax. Ef � Lb Fc -b(-s. t EFer Seek V 1) El Per Sack Li Per Sack Ii aO 21 -t" 1Co s 5-64 NE,A- 33/y i ns AIR �T ;SLUMP EQUIPMENT IDENTIFICATION AND S/N (AS APPLICABLE) A Division of � f G•o E"""°' ': Construction Consulting • [MI ,w n • 11.1M/ - This report is provided for the information of the client only. The reproduction of this report, by arty method, and its transmit. tal to a third party, by any means, except in full, without the written permission of Pacific Testing Laboratories. i5 prohibited.' This certification attests to the accuracy of the results fined from the actual test performed and/or observations made within the defined scope of the work. Certihcatio not be construed to represent inspection. approval or acceptance of other associated work or a warranty of desi r workability of • . •: cibcation requirements' Certified Report b Pacific Testing Laborat FIELD CONTACT: DATE CR 89.2 PORTLAND CS DIVISION (503) 254-8418 • FAX (503) 252.5608 TACOMA DIVISION PORTLAND FORENSICS DIVISION PER NUM COMPRESSION TEST RESULTS DATE 21 :2/9 BY y \ AST C REVIEWED RV L.J q MODIFIED YES NO EXPLAIN: Contract Min. REPORT NUMBER CR 2 5 715 0 PREVIOUS APT. NO �.k A►.IF , SPOKANE DIVISION (509) 535.3571 • FAX (509) 535.1267 PENINSULA DIVISION (360) 297.8821 • FAX (360) 297.8828 ►J ASS DATE CERTIFICAi�yla� 71s 9Y NUMBER ( l/ ARCHITECT ENGINEER U (ERR OL'COt,1 CONTRACTOR MIXING LO S PLANT ST YAK— STRENGTH lc 3°C RATIO %. QUANTITY 9 , 0 F Cu Yd TRUCK _ ____ TICKET # ' 1 S e l 10 SUPER PLASTICIZED SLUMP MIX # S 1 6 MIX PROPORTIONS VERIFIED DATE SAMPLE BY BATCHING SUPERVISIONS , RECEIVED POUR LOCATION AflIOTES• R9 1 A 1 N L W LL `W / cOCLNc cz- Zk1 37" l V ."6LflL 4`�S 1 ��L 1�1 LIP '4 k- \tom CbW\. L Av.) r 4 5l� � � � �� L - t 3 c �,� � �� Z_') v -T `\ C ( p WORK CONFORMS YES NO _ TOTAL HOURS Chargeable Hours SAMPLE I.D. SIZE AREA (SQ. IN.) DATE TESTED AGE AT TEST ULTIMATE STRENGTH CHECKED LBS. P.S.I. A „' 24 . E t 1 a3 e l / 3 3 t o --- B c,) ii 0 8 t t y» C.. Utz alf3 3 AO 1 1 n .,,,,,i,-- 42 1 pfl-ff HOURS MILE - AGE COST CODE _ ON OFF RT OT I b t t y» Utz 0:00 3 AO LABORATORIES MAILING ADDRESS PROJECT LOCATION SEATTLE DIVISION EASTSIDE DIVISION Sw. u N ik ATTENTION: A '■ 3 L` kiC ?MKS 0 ‘UK111►t. A IS 3' M C+ ! I1r1LAD AWlVp„S PURCH. ORD. 'TtJK�tL_1>, 6NUMBER TEMP.B CONCRETE WEATHER S N Wiz TEMP. ASTM TEST METHOD (AS APPLICABLE) EQUIPMENT IDENTIFICATION AND S/N (AS APPLICABLE) A Division of ffEl Conatimetion ____ _ • Meen...q • TIMM. MIXING PLANT TACOMA DIVISION (206) 282-0666 • FAX (206) 282 -0710 (425) 485-4244 • FAX (425) 485-4611 (253) 589-1804 • FAX (253) 589.2136 PORTLAND CS DIVISION (503) 254-8118 • FAX (503) 252.5608 PORTLAND FORENSICS DIVISION (503) 232-7852 • FAX (503) 232.7886 REPO matt tR g REVIEWED BY - COMPRESSION TEST RESULTS Loutst 'This report is provided for the information of the client only. The reproduction of this report, by any method. and its transmit- tal to a third party, by any means. except in full, without the written permission of Pacific Testing Laboratories. is prohibited.' 'This certification attests to the accuracy of the results obtained from the actual test performed and/or observations made wMn the defined scope of Ma work. Certification shall not be construed to represent inspection. approval or acceptance of other associated work or • warranty at design or workability of the spoof cation requirements' Certified Report by Pacific Testing Laboratories DATE FIELD CONTACT: DATE CR 89-2 REPORT NUMBER CR 2 5 715 0 . RPT. NO SPOKANE DIVISION (509) 535-3571 • FAX (509) 535 -1267 PENINSULA DIVISION (360) 297-8821 • FAX (360) 297-8828 DATE NUM: R • CERTIFICATV IS 9 y PERM NIiMBER ARCHITECT LSS1\A aTSSOC. ENGINEER A'ttRc u Lo CONTRACTOR kiiha t' Co 7 DESIGN STRENGTH Ic '3000 RA-no , CEMENT (o SK CSE AGG. FII ADMIX 61 ADMIX 12 ADMIX 63 PROPORTIONS CJLbs. gSacks /Cu. Yd. 2ttbs. ax. [Th g _ t O (I Eimer Seek' v 6 ❑ Per Sack ❑ Per Sack (Not Certified by R T. Lab) 5�� 11 '34 4 13(0S 5 t.P 6. TYPE OF CEMENT `.1 ; SLUMP 3 34.4 s ins AIR V.111— %; QUANTITY 9 'O F 14 1 Cu Yd. TRUCK 6 ( TICKET / .5 1 0-3 SUPER PLASTICIZED SLUMP l IN' MIX # 331 b SAMPLING IN ACCORDANCE WITH L P- MIX PROPORTIONS VERIFIED DATE SAMPLE APPLICABLE CODE AND SPEC ? BY BATCHING SUPERVISION? , RECEIVED POUR LOCATION A OTES• R % A \ 1 --.1 N h (x > L.L G.. WI,/ COrt ?_ INC- Zk cZt -r 10 LI \D6. ti (ST L2 -1,._ lN ?lrPCt ' tJZ) \N' (bvV■ isb L1 1Ati1c.0 wv Z t.7). tAl!- V►. S , C_Dt- LI -1 Tt._ u \,J L 1A C•C- pr.,ci) \tt v,Ik C 1 V 'tc( 1LV , 5 &At 1-6o peetb au -1A.- -yn �•,AD MODIFIED YES ._ NO _ EXPLAIN: WORK CONFORMS YES = NO Contract Min. TOTAL HOURS Chargeable Hours .0 SAMPLE I.U. SIZE AREA (SQ. IN.) DATE TESTED AGE AT TEST ULTIMATE STRENGTH CHECKED LBS. P.S.I. N CXVa_ 2 g,z- i I lac. 19 10 Jvzro 3e,o 3 i 28 ) 4 30 a to a e ai3 I SS r 3 oSoa y� � o 6 r ` � 0 C 35 Lt a. 1 It HOURS MILE- AGE COST CODE ON OFF RT OT i o t f 0/ O +a :3c y :oO 35 Ig �atF: xli. S% Yt isriirAtilfwk.,} �.,,? VYn' l�% in;, lln. s' ti. VwP ,rni.R:twJ"r!'.aMU...iI,V. :aata 4:i' tti LOCATION SEATTLE DIVISION CEMENT TYPE OF CEMENT NG LABO rP T' I ' ABORATORIF.S EASTSIDE DIVISION Yud (206) 282.0666 • FAX (206) 282 -0710 (425) 485.4244 • FAX (425) 485.4611 A Division of .S, k>a...1t Co . ADDRE 3 ?ILL - S SEPhTCl4 wA. RQ(c ATTENTION: (V 9.. 4 E RCTIAnr.�t,N PROJECT �E P f fait ,AT w..s �W AL'— r ( ( y MALE>Dratk C S RD. BER C'SE AGG. PROPORTIONS ' Lbs. arsacks /Cu. Yd. 0 bs. Dir. Max. (Not Certified by P. T. Lab) S(° `{ EQUIPMENT IDENTIFICATION AND SIN (AS APPLICABLE) 'SLUMP FIELD CONTACT: / DATE CR 89.2 • EnvMtoerrrnb Gaotachnical Construction Consulting • Engineering • Testing i. I ._ PORTLAND CS DIVISION (503) 254.8418 • FAX (503) 252.5608 Ir, r TACOMA DIVISION r', . .PORTLAND FORENSICS DIVISION (253) 589.1804 • FAX (253) 589.2136 (503) 232.7852 • FAX (503) 232.7886 l93c1 i y l:Sp ins AIR FINE AGG. c�Lbs. 3Lb ( l REVIEWED BY PERMI NUMB) COMPRESSION TEST RESULTS ASTM TEST METHOD (AS APPLICABLE) MODIFIED YES 'This report is provided for the information of the client only. The reproduction of this report, by any method, and its transmit- tal to a third party. by any means, except in lull, without the written remission of Pacific Testing Laboratories, is prohibited.' - This certification attests to the accuracy of the results obtameo lr :n the actual test performed ancl'Or observations made within me defined scope of the work. Certification shall r- : ccnstr represent ■nspe:tion, approval or acceptance of other associated work or a warranty of design or w ability Of in i ication reeuirem ts' Certified Report by Pacific Testing Laboratori DATE ____ _8 ,+r +•.'I �vM't4M1lMMriM1 aY'1rfl�k_ BY 8 691 NUMBERAIta - 7/59 S NV-3 c . Pce o C • ENGINEER Altiz•oL.') F��frT� IJ ARCHITECT U CONTRACTOR V . k PA.35 C� . t0..'A *vx <••rcagP sX ,rtx- R'.w ;r•;:.!ri ^i+aJ?3Ttlii;V tliillir ," DATE CAS �( I DA AO/ REPORT NUMBER CR 257143 -I PREVIOUS RPT. NO. SPOKANE DIVISION (509) 535.3571 • FAX (509) 535.1267 PENINSULA DIVISION (360) 297.8821 • FAX (360) 297.8828 DESIGN TEMP. & {� , S W\AI IZSTEMpBETE /_S ' MIXING PLANT ST �� STRENGTH fc � RATIO WEATHER (O'S NT ADMIX Al LI Per Sack N�W NO EXPLAIN: ADMIX #2 LI Per Sack '6 QUANTITY 9 TRUCK C'g TICKET # 7 ( (7 -aD SUPER PLASTICIZED SLUMP `tPt MIX # 300 Ccnlract Min. TOTAL HOURS 3, Chargeable Hours ADMIX #3 L! Per Sack SAMPLING IN ACCORDANCE WITH MIX PROPORTIONS VERIFIED DATE MPLE APPLICABLE CODE AND SPEC o y t� BY BATCHING SUPERVISION? RECEIVED POUR LOCATION AND NOTES' t1f---t-MA--) i 1-% l Lx-) ILL ST Al'itk•v k..t -L W P LL FT LZ (�J v ,,( cmt_otcL of LX SIST tw_,L -, ZLDr,> 'Rt's —r i2L tN'- Pt..i>c.0 iinst, tv, co,%P�tviNc. E_ W t T 0 • T I P t -OV t_n RAC i 3 Ls . (0 ► J C.CL.'t_Tt p,, w...�n C,O 1' .% ‘D , 44.1_ 44.1 D Fr_ mafta ic..�- ∎,I..../ v ∎bCt-1(a- S . l WORK CONFORMS YES". NO Cu Yd SAMPLE I.D. SIZE AREA (SQ. IN.) DATE TESTED AGE AT TEST LTIMATE STRENGTH CHECKED LBSU. P.S.I. A Coxa 2- 8•2", 1 1 i'1 'to /oz 34, / 0 10 t2) a ho d t. i C. 1 0 afro o a ia 3S �6 10 R HOURS MILE. AGE COST CODE ON OFF RT OT o t. i o ! 0 i1 :3C 3S �6 �u (206) 282 -0666 • FAX (206) 282 -0710 (425)485-4244* FAX (425) 485.4611 MAILING ADDRESS PROJECT S PURCH. ORD. LOCATION I • bA ' . ` .NUMBER TRUCK SEATTLE DIVISION k ay.s t` i Co . 3'-4Q s t�s:Lv,, z L SW ATTENTION. Mit. 7.)cAkw 4t 1 NE.Pf Nak �TTU -�IL 1 `W TEMP.& L {s ' ` CONCRETE WEATHER �w1ZSTEMP. r� C'SE AGG. FINE AGG. PROPORTIONS ErLbs. �.1Sacks /Cu. Yd. �s. 01 Erbs. � (Not Certified by P. T. Lab) S( ` 1 CEMENT 1 1 " TYPE OF CEMENT • SLUMP a ins AIR C a C I TICKET N 7(0 l °D- SAMPLING IN ACCORDANCE WITH MIX PROPORTIONS VERIFIED t . _ APPLICABLE CODE AND SPEC ? BY BATCHING SUPERVISION? [� POUR LOCATION AND NOTES _ tTPA t t>; 6 Lo LL ST Al (mo 1,1w • I,.)t(— 6F- LMT %J LIP L t TEt.L tN - • LACC W IT N A f) P toV t ) RAC \N bS ASTM TEST METHOD (AS APPLICABLE) EQUIPMENT IDENTIFICATION AND SIN (AS APPLICABLE) 'This report is provided for the information of the client only. The reproduction of this report, by any method. and its transmit- tal to a third party, by any means, except in full, without the wrinen permission of Pacific Testing Laboratories, is prohibited.' 'This certification attests to the accuracy of the results obtained from the actual test performed and/or observations made within the defined scope of the work. Certification shall . • constr represent inspection, approval or acceptance of n 0.� other associated work or a warranty of design or w• ability of I cation requiem ts. Certified Report by Pacific Testing Laboratori • - � /w���� DATE FIELD CONTACT: CR 89-2 LABORATORIES EASTSIOE DIVISION (9S 19 39 3i ti s 13a S SUPER PLASTICIZED SLUMP A Division of Ma..t.chnical a.n.f.rac8ten c•owmg•I L 't •TM•k". TACOMA DIVISION (253) 589.1804 • FAX (253) 589.2136 COMPRESSION TEST RESULTS MIXING Lo ST Mt- PLANT DATE PORTLAND CS DIVISION ; (503) 254.8418 • FAX (503) 252.56011 PORTLAND FORENSICS DIVISION (503) 232.7852 • FAX (503) 232.7886 REPORT NUMBER CR 257143 PREVIOUS RPT. NO ..SPOKANE DIVISION 509) 535.3571 • FAX (509) 535.1267 PENINSULA DIVISION 297.8821 • FAX (360) 297.6828 BY \' ► 0044M S AT 1 f 11118 REVIEWED BY DATE X CERTIEICATE 79 5/ / % NUMBER , (a ! / PERMIT NUMBE \ ' ARCHITECT t<V SS MAID . rtgS0 C • ENGINEER b AR•VC)Lb Nt)LTCt N CONTRACTOR V • ADMIX N1 ADMIX 62 ADMIX 63 0 Per Sack 0 Per Sack ❑ Per Sack ' DESIGN WIC STRENGTH fc row RATIO MODIFIED YES ._ NO _ EXPLAIN: %. QUANTITY MIX it 300 Cu Yd DATE SAMPLE RECEIVED (a !J C tL-t_n t u vet cif 1-►.1 44-lb L C E. WORK CONFORMS YES _ NO Contract Min. TOTAL HOURS L 3, Chargeable Hours C ... '/02/1990 16:15 /? • • ‘; , r• : 0 '' ''• 4 . ka i , , .. .,, • 1 g , t :,' • • . • I .... , i ..... , ; . • -, , • ,• .,,r . , , •••• ;.•---;-•-• • • • . • / •• 1 .q.....41!.. .. . •• 1 ; .. .• • 1k. • ; VI ''' •• 1 ••• 11”.• tow S • • ; ii. ,,,,.. T1 • • • i i i , ; .; .... %... " • . . ! • .. • -X , •-• ' • : ; i • ,/ 1 I 1 i 1 • 1 • • • i : . ,..: . i • - . .!'0V'' ' ' ; • ', ". 1 • ; ...,;,•••• •••.' • ,.; •a • . • ••T O'CF. (': • ., e • •,' t r 0 ! • R104:11•141,4.1evotrfteci. .11.11.4.1;14.~11 1 111.■1111 11 1, PTV . 1 ......4.../..f • 1...........,491./...57.''',:.R64./(1 . .. ... . a re. .,, --4., 42556211(: ••:•t DARROLD E. BOLTON Consulting Engineer • • • • • • i• • 13 .....00........................i•■•■••••... 1 • • •• ' 1 i I • ' • • i ' .• ' ........ • • ...........m.-**.a........•••...04.a0mvano.wmtaamsfatarayteart;~# DARROLD E BOLTOr jos 511A/SWALe 1 </DIS.0 MEET NO OAL01.11 ATM 'P OA 1/36/ m NECAID . ''4 • . . .. • i • a . • , • , : • • .. • • • . • • • • 1 i . : I i I . • • • • • PAGE 01 I DisIviirry • , • • • i • ; ' as Itt . .; . i i .. • . p . .............. .:. .4...:67ai.tc, .:/e.R i •. . ; , .. . i . ! ; ! • •• i .; • • ,. • i • • • 1 , • 0 •E - "*VIVOV I u ‘ c140 '• • vtB. A. Asta : 0 1\1901\ 1 ; •-. • • w . I : ; • • RECENED• " ' OITY . OF'TUKV,VILA: Ali, ,: • • F,Eg. 1 p • 4 "A:I? ... A 2 • . , PERMIT cENtER; " • .;••• ... .. ••••••,•-•••••-.••••••••!---:-. STRUCTURAL NOTES Governing Code: Uniform Building Code, 1994. Edition 3. Concrete: Concrete shall have ultimate 28 day strength as follows: Slab on grade - F'c = 2,000 PSI 14" and 12" Round Columns - F'c = 4,000 PSI All other concrete - F'c = 3,000 PSI EIV ,`'DEC ► 1 7997 ?ME PEAKS AT EUKWILA MAIMING WALLS 1. Design Loads: Apt. Floors 40 PSF Recreation Area 100 PSF Stairways 100 PSF Corridors 100 PSF Parking Level 50 PSF or 2,000 Lb. Concentrated load Snow 25 PSF Basic Wind Speed 80 MPH Exposure B Equiv. Fluid Pressure 35 LBS /CF + 100 PSF Seismic Zone 3 2. Soil and Founds ' Qn� Data: A. o tfoundation is based on the Geotechnical Engineering Study performed' by OeoTech :Consultants dated May 13; .1994, report number .3N94076. All construction to be made in accordance with this report and is • ' a part of the construction requirements. Ats. SufPLEMEM7AL Re.f•xra. �Areu.. aor.. ;4,►9gt4:..N.a: - 2c. zz, i1.95 • All footings shall bear on original firm undisturbed native soil. Prior to construction, the adequacy of all foundation soils, shall be verified by a soils engineer. Unsuitable material, including debris, vegetation, existing fill, organic matter or deleterious materials shall be removed from all area which support foundations, floor slabs, sidewalks, driveways and parking areas. D. Exterior footings shall extend to a minimum depth of 18" below finish grade. Allowable soil bearing pressure = 3,000 PSF. CITY OF TUKWNILA P,"; 7'('VED LIL 1 199' , LI) • . '(VISION All concrete exposed to weather shall be air - entrained with an air - entraining agent conforming to U.B.C. Standard 26 -9. The amount shall be 5% by volume for 3/4" max. aggregate size. 4. Reinforcing Steel: ASTM A615, No. 4 bars and larger to be grade 60; No. 3 bars to be grade 40. Lap bars 30 diameters Min. Reinforcing shall be continuous around all corners and intersections. 5. Special inspection coslosaing to Section 1701.5, 1994 USC shall be provided by the owner for coscsete and placement of reinforcing steel. 4., 44r._ 242s'1.14 ea.!: "11 Arnree-4s/itb4' f(5*# .0 ,dpiveltoppotrz.b pozn,A./ P/Pt 0 • i 4 4 e ie i PAGE 5 OF COMP -.1i 0 DATE ,,, ....... ..... DARROLD E. BOLTON ( 44//46i 1441-4 CONSULTING ENGINEER 7 CKD DATE DARROLD E. BOL Consulting Engine& RECEIVED NOV 2 5 1997 I r 1 1 VA 9 6' . 'IV 4gEf.e.: A6,4/. 1 IL�I i/ '.r r I NmIXT 201.1 No Most Tml Mir co.0,..i.um 1Y. 01111 If or Rd[ TOLL/NI 1•0222•10 P..z 4.V 3-4 . SHEET NO. 5 7 OF CALCULATED BY j DATE • 7/0. 9 � CHECKED SY DATE SCALE • RE TAJ/J /uG WALL. AT S I,DEWAL k 61-/A RD AP4IL DIMES 49 /2 7 0 SEP 2 3 1997 _ • PERMIT CENTER /2" ZA1YeR .OF ,FREE DMA /,c/ /ive; /5 4G, /cit L - 7 ,vD To ii4L4 /Y7 ?(75 - "O 1'►!g�P f>�. s ........ ............................... RECEIVED CITY OF TUKWILA..... t I DARROLD E. BOLTr' CONSULTING ENGINE c . " %,4' 'e ``TA /.</ /�c%. �il//4LL jos 5crovs�' .P. / � /• \--,- COMP. 4' DATE CKD DATE PAGE 33c OF i _._ ... - --_ ... . -___ . . . -- - - - �- — I i I GL '— .. • _._._.. E 7Q o 4-440. I .n.Za k6 . ,-E r; ._.... - - -- - - - .... . An - -- - .. tI' I. ', • 1 - • -- __ 4f 5 ._ . .1 � I . , � - - , (5, ) 3 5 = 3 = .h8 0 ,r_ �. o,Sru , ______; ; — - I ' '- 0 , Ac9,4vsr.. .5 — _ 1 • - — ._ - T .._ .._ _. " - .: L--_ (4.5 Ar !/E' /Z ' 2M (75 i .F3� 2 ,7 • 30 -I _ __ - I - . _ m i _ _ _ _06 7 i `` �' - ' - -- • i '. . ' - � & X4S r.�,vr 445 : s 3 OD nM 7 kg 1 t ' , 1 _ ' Il/'7G -0 /5. F.1 , � � s r . . -. .4c . ' ... - . , � .t • DARROLD E. 80 Consulting Eng V 44. :.. 5..." / S- .51/,11 ; 09 k 2 1/5_ A -g/ . T.. i.,N... P.:, .; ;�..5 P/.4 5 ✓ms . . f', .ter /..›iif 3 461(. ) = 3/9 -c-WA S4,= 7'Y. = • • w rs- P$ S i.,ro.):S251 MOM WM mop (P) ` Alas n.4 Oar IIOL Tall MSHOMO SHEET NO. 330 OF CALCULATED BY -) DATE CHECKED BY DATE SCALE DARROLD E.. BOLTON CONSULTING ENGINEER! 1 _.�..._ un -tr r COMP E 8 DATE� • 1, I ; • r ¢ @ /Z , 6, f DATE PAGE s B OF L ife 20 4/ _ � I ; .... /2 L, D 47.0/1/4/4 1111 GRyNNI44R . B.ceky[.a . . i th`5 ¢" Pcn nnkre-A - /JRA /,✓ P /Pt ..... DARROLD E. BOLTON CONSULTING ENGINE( = 3 ODD f�, _ 60 &S1 - i / ✓, f . /7( -2 3 S _ s /5 /A/4 41v4 - COMP 2 2 h g . " 5 DATE 7 -/ GKD.... ' . DATE L. - 2 1' • / P 6 ..- . --- - -( 4 .40./7)•)` - -/s1 • PAGE Or wr, i LEgvd-e`UfaM. - - .... '4 LL ' , - /3 )� /.o) .X /sai v- .._./ Z,.:S .. 7 .. 3, . 370 .Satz_ Ay "r-4 - ('5,12.3 i-) X i '" 45Co K75 Zf .:_. 7640 30,/9. • I s ; � 41a 3= (3 Si( /1, l7) 5 ;, I 1 2 ,cZ A/1.ii.- .�I vn..__ .. _ 6. .. . ; G . . -.._ , I i �o Cgs ./=,f.G 7..408 AG4- zAzir_.. D, .= . /460d " 1, ,6 2 OTC' I 76 /. 7B x 31- DARROLD E. BOLTON CONSULTING ENGINEER _ -KZ¢B)(9S) /.88 X13 1 . -- 'fi4 i /, ¢7 7 6 0 '`_� ��X/,Z.- 4,92.`'). I&L YO (d ' 96 .� - Mu /2. 92 _ _ _ P • o. 6 3 __.Q 0.2L , / 4 _ _. 0.06 3.4 0, 09 s; vs .__ O /3..__ 7,22 9 .9 92 ,,.itg — 'j L psb 4 - 34 CC COMP DcB DATE ���'' CKD ° ATE PAGE -.OP' OF WIF , 4 ) 7 A (4(8/6) 28.. 411. • ll 1 y ll 3.S 4 n �(� --- 5 •,72 x!:7 = 972 - L I Q. Q.b.S83 = -... �..�il /.7iW = D,; 00992 h3 S 07/22 "_ < - 1 G 55 - /z a - H - (q; 7 ) ; ; ; .• , • • • •, •• : • • • • . • 1 • • . 1 • : i . . : 1 .. . . .• . , . , liA/0' n4ti 4.]...//r... .i.o.fg.w r..........;........... i • . . , • • DARROLD E. BOLTON Consulting Engineer • ; • ' • ' • aramm•A■41...iir;Minam..41.6.4.0 • 408 S*11.5/1/VE RIDOE- e ' SHEET NO. OF-C CALCULATED BY P6B DATE S/29/7 CHECKED BY DATE SCALE I i I i 1 i i 1 I ; i % • .... ..._. _ __..L... 1 i t i , . • 1 • i i • ' 1 I I 4 ••••••••••••■•••••••■ 7 / ■ I I 1 i . E i ' ', i 1 • i 1 1 , i 1 i ; ; hiralT6S2 ..41.46......_.............4_1-....._.„....i.............:._ . . ! • 14 .. 1 541 1: .... 4 •• ..s.:. ., i . . ... , . .• , , IW AIIV I , I I Pi .... .....„ ,2. ..... -.J.- . . , I ; . I ! I I , ■ ; • , P76 - 1,F6- ; • ***; • *- ; ! ••• i . ..... • . .. . ... . — . — . .. . ... r . ^ ^ ... • • 1610) bx.. Goa Ws 01411.1.0161140MRIIIIM010 sEcrioit/ A / " s z 4R4 • I I . .. . . . . . ... ; . — ! , • ' . •• 4.. ; • 41,6; 7.4% • --i — — AAI ... .. . .. ri---• -. ---. -Li :: ' / 2 , :....:_i...:....J.........:., ........... .:....... ...... ...........;,.... ....... ........._. .. .. ...... ... 1---- . • : . .. . , , .. . ...; • .. • • • .... . • .... I 1 1 I i I t t r i' . -- . . ,- a I i r 1 • • T --f l _............_._ ............... DARROLD E. BOLTON Consulting Engineer #• ' .70.'1_234.e : 4. ! .' 4 L KF/L.L_ ; _. _..11.1;4 %# ' d�-ac. -- _.. - _ I � - .� - •.... J3• -•-r- i ..: r_ .... /BD .'04x. I c. 11101.0 201• (Mye Uebl 105. I 118601) Q• Mc. fait WI 0147 1. 18 Ob HOE MI rxu 10027500 Joe Su/ism/owe fliaae OF CALCULATED BY 1050 DATE 0 9M CHECKED RY DATE SCALE SHEET N. • • • • • • • • • • _... iP57.41N 4(/C� �✓�#Z L- . T HYbw�t/ . ••••-ar• • • DARROLD E. BOLTON Consulting Engineer MOM 104.1 tiM7, lc. Wok 01471 I I I I I I I I L I ii • I I -4,?4/1/t/ I 1 t I II , n- i .■•••■■, a • ! ! # r i t /7/ 44. , • . ' • ..i__ I • i i .14(0.!..7124. • . j-- .1-.. i • ,.•i . 4. 4 GRANtit-A of # •. ,11" - . , _2 t/ i C ic 4.L._ v - . : • !I . • I 4 '0• tVEV 1/04 55 & ..0 0 • 06 1 . 2 -€4 a --- ---- , ! , • .. g , ...-;_ ,,„ ,,; • . .— • . JOB . cy,ft<Iiix/E .. lel.4 46 - SHEET NO. 3;fs • OF - / CALCULATED BY DATE 1/2 9/ 97 CHECKED BY DATE I SCALE 6,..53) -,—. ' I i : ______....L....___.,..rp......./go..Wook. ., , : p• 2 (.': • • , * .• • 7 : 7 • • I ; • 7 .3 /0 . • .4: • : ..! i • • i ; 7 • • • • • • ; • „ • • • r , • • • • • • .! • • 1 , ,,,, . 1 ! • .4k '; 1410 A .. "- , 7-7,1)...::4 : : • — (5, „.. J.. it ,,, // : 7f., ie.. : • x y 2 ; • . ....._ I ,i/ 2 1 . 4 : . . . . ' ' • 1,8/.. 1 . ..'...f..-.1.3..........._ • : • is--: , ., ; • , i , ii fi 1 r.5) 76 35 • ., i = .7......?.2 /......._ . . .5-4 .z•• ...A.. ..ae:- - 7 , .. .2. .5 2 . • 110111r1 MAIM/ ix, tar rr11471 DARROLD E. BOLTON Consulting Engines _11111111 I ; III I i!!FT1 ! { i I! f� 4 ! .,--- / I I 1 .e---."1/ Z... 7' S.a . tL .J WA. - :i..44..._`S T ......16. ._ 0, /._J 4 _ 1`�biLJ,- � 6 �..__i__•_ I + + I f ,f _ I i i ! I X..,_.0/4.. __. A .E1.ss ....... _ 2 _ =./ y._ 2 2 ' % ' f 1 0.e ' f ! { , Z I 1 t 1 I I I I 1 I { r� _ 3 7 " _ ...._.._......._....�....._. _.._._ ' I ! ' { ; i ; r- ? I 1 __ 1 1 f I ! j i I ' f vi �� - z I .._.___._.__._w.._.. ..,. .._. __..__._._ .__.... ___ _. __ , ,e.',,',; .- T _ `I/ /'76�) 7, 7) '2/? i � ' ! I { ! ! 7 i , . r 4 4 _dxe-j # 5 cdi -lie, ; I 1 t . i ! ; I .N. i' ! 1 i I ■ I I I /� ' 'lJ�� , .. . i G • SHEET NO }� /� p A /// Q CALCULATED SY, f/ -Q o/` DATE 7 CHECKED BY SCALE JOB SWwsH/,V R/D9E OF DATE { • G EOTEC I'•I CONSULTANTS, INC. 13256 N.E. 20th St. iNortimp Way), Suite 16 E, , .I c11wuR, WA 11$003 (200) 747a010 PAX 7478501 RSA Associates Limited Partnership Go M.S. Cavoad Company, Inc. 4739 University Way Northeast, Suite 1607 Seattle, Washington 96105 Attention: Mark Goldberg Dear Mr. Goldberg: 1.111116•111111111111•11211 r ..- ...., RECEIVE, :: z 194'4-- Subject: Geotechnical Engineering Considerations Proposed Sunshine Ridge Condominiums Macadam Road Tukwila, Washington /6340 f' cw December 22, 1996 11 JN 94078 On May 13, 1994, we completed a geotechnical engineering report, which included six test pits, for the proposed project. However, the project plans changed after the test pits were excavated, and excavation depths for the project now exceed the maximum depths of the six original test pits. Our report recommends additional explorations if deep project excavations are proposed. Recently, the City of Tukwila required additional explorations, and shortly thereafter we returned to the site to observe the excavation of additional test pits. This letter mostly addresses geotechnlcal engineering considerations for temporary cut slopes based on soil Information from all of the test pits. Other geotechnical information is also Included In this letter. In addition to this letter and our geotechnical engineering report, we also provided a letter dated November 14, 1995 that addresses the concerns the City of Tukwila raised. On December 4, 1995, a senior engineer from our office met with you on the site to observe the excavation of three additional test pits. The test pits were excavated with a track -hoe near the site's southeastern corner, northeastern corner, and about 120 feet west of the northeastern corner. The proposed excavation depth in the northeastern corner is approximately 18 feet, and the test pit In that area was excavated to about 17 feet. The other two test pits were excavated to about 10 feet, as the excavation depths In these areas are less than the excavation depth in the northeastern corner. In the southeastern corner, the test pit revealed approximately 1 foot of loose fill over medium - dense, native, gravelly, silty sand. In the northeastern test pit, the uppermost soil consisted of 2 feet of loose fill over gravelly, silty sand that was medium -dense at the top and became dense with depth. Under the gravelly, silty sand, sandy silt was found at a depth of about 12 feet. Heavy groundwater seepage was encountered at the silty sand and sandy slit interface. In the test pit on the northern side of the site, we encountered loose fill over medium -dense to dense, gravelly, silty sand. 17.-Z3Z RBA Associates Limited Pemrship December 22, 1995 JN 94070 Page 2 Following our exploration, we had numerous conversations with Mr. Goldberg and the project Architect, Lyle Kussman, regarding the temporary cut slopes. Based on our conversations, Mr. Kussman designed the project to avoid shoring on the eastern side of the project. We reviewed Sheets Al, A18, and A19 of the project plans dated December 15, 1995. These plans Include numerous cross sections of the proposed excavation. CONCLUSIONS 6ND RECOMMENDATIONa In general, the soil conditions we observed in the recent test pits were very similar to conditions In our earlier test pits. Temporary cuts of 1:1 (Horizontal:Vertical) are suitable for the project. Each 1:1 (H:V) cut should extend continuously between Its top and bottom; no near - vertical cut should be made at the base. Based on the December 15 plans, It appears that temporary cuts of 1:1 (H:V) can be made within the property lines. Significant groundwater was observed in one of the recent test pits, and therefore seepage from the temporary cut slopes Is likely. If any caving occurs due to the seepage, the caving area should be armored using 2- to 4 -Inch quarry spells. In addition, we recommend that at least four concrete ecology blocks be available on the site during excavation in case some Instability occurs In the Cut slopes. Additional blocks may be needed, and they should be available within eight working hours. We understand that on -site soil wilt be used as backfill where possible. Most of the soil encountered in the test pits consisted of silty and slightly silty sand. Because of the silt content, we recommend that the backfill within at least 18 inches of the building foundation walls consist of washed rock. The washed rock should be separated from the silty backfill with a non - woven, geotextlle filter fabric, as noted in the Drainage section of our geotechnical engineering report. The silty and slightly silty sand was generally above its optimum moisture content during our recent test pit excavation, although some of the less silty material was near Its optimum moisture level. Soil used as structural fill should be at, or near, its optimum moisture condition in order to be adequately compacted. We understand that the owner wishes to utilize structural fill beneath footings on the building's southem edge, and that the use of the on -site sand as structural fill is desired. It is our opinion that unless most of the sand can be dried somewhat, it will likely be too wet to achieve compaction recommendations under footings. (These recommendations are given in the OeneraI earthwork and Structgr F111 section of our geotechnical engineering report.) Drying could be done by aeration during warm weather or by the addition of kiln dust. The on -site sand is likely suitable to use as fill beneath the slab, but some drying may be needed If the sand Is very wet. 01.:OT iCIl CONSULTANTS, INC. 1: DRWAIRFicv cc: au !loch Construction - George Bu lloch Kussman and Associates - Lyle Kussman . Roben P.E. Senior Geotechnical Engineer ixo) 4 ".r ' viaafi riireincs 6 / 17 /41-4 I James A. Finley, R., ir.E: Principal KAsidelatet Limited po.... ‘iioarobir 22,11905 , If you have any questions gd' the recommendations presented in this letter or If we can be o f further service, please do not hesitate to contact us. Respectfully submitted, • . • GE. CONSULT t1TS, INC. L. `. OgOTZCIICONSI/1.TANTS, INC. I ." . • GEOTECH CONSULTANTS, INC. • )13256 N.E. 20th St. (No,thup Way), Suite 16 Bellevue, WA 98005 (206) 7475618 FAX 747.8561 Attention: Mark Goldberg Dear Mr. Goldberg: c RSA Associates Limited Partnership c/o M.S. Cavoad Company Incorporated 4739 University Way Northeast, Suite 1607 Seattle, Washington 98105 Subject Response to City of Tukwila Memorandum 11 -4 =94 Proposed Sunshine Ridge Condominiums Tukwila, Washington . Project Number L94 -0077 RECEIVED DEC 1 1 1897 FkCEIVED NOV 1 6 199i November 14, 1994 JN 94076 FILE /31/-0 nuete-daiwgi-J This letter Is In response to a memorandum from Phil Fraser of the City of Tukwila, dated November 4, 1994, that requested additional geotechnical information regarding the Sunshine Ridge site. On November 10,:•1994,.the project architect, Kussman and Associates, provided us with preliminary plans for the project. . We were provided with Sheet A1, dated November 7, 1994, and site grading and cross section plans, dated November 9, 1994. Most of the questions contained In the City of Tukwila memorandum are answered by the plans recently provided to us. In response to the city's letter, the following comments are made. 1. The architectural plan and profile indicated the proposed cuts and fills to be made on the project. 2. Rockeries of 4 feet or less are planned for the project, consistent with the city's 4-foot maximum criteria. 3. As illustrated on Section G -2, maximum cuts will be on the order of 18 to 20 feet. The plans show the proposed cuts. 4. The plans depict project profiles from McAdam Road to the top of the development. 5. Soldier pile wail construction Is not required. Based on the plans available to us, it Is apparent that a 1:1 (Horizontal:Vertical) slope can be excavated within the property lines. Dev-outo • 6. It Is our understanding that OSHA and VVISHA regulations allow a 4-foot vertical • cut without bracing. 7. No significant groundwater is anticipated during this project, as there Is no • seepage along McAdam 'Road, which is lower than the proposed development. However, foundation drains are required and should discharge Into the storm •water system. IL Standard temporary erosion techniques may be utilized on this project. These • techniques Include covering all cut slopes with plastic in wet weather, constructing a silt fence along the base of the slope near McAdam Road; providing an entrance apron. of quarry spells to reduce siltation on the roadway; and utilizing a temporary detention system as determined by the project civil engineer. The proposed construction schedule remains unknown, but it is our opinion that the site may be developed in any weather conditions, If the mentioned erosion control procedures are followed. In very wet weather, it may be necessary to also protect the foundation bearing surfaces by placing a layer of lean mix concrete or crushed rock in the bottom of the excavation. It is •Impractical and unnecessary to phase the project construction. The project design has changed since the preparation of our report, dated May 13, 1994, eliminating the need for large cuts near the property Inc. l It is our opinion that the cuts may now be made at a 1:1 (Horizontal:Vertical) inclination. It may be necessary to rebuild the existing rockery on the eastern side of the project where it encroaches on the property line and a retaining wail Is below it (see Section G-2). The preliminary plans we reviewed are in conformance with our recommendations. If you have any additional questions, or if we can be of further service, please do not hesitate to contact us. RSA ASSOciatel. Unified Partnership. November 14, 1994 JRF:jcv • cc: Kussman and Associates Architects GEOTECH CONSULTANTS. INC. Respectfully Submitted, GEOTECH CONSULTANTS, INC. Aod James R. Finley, Jr., P.E. Principal JN 94076 Page 2 t. RECEIVED DEC 1 11 GEOTECH .... CONSULTANTS, INC. 13256 N.E. 20th St. (Northup Way), Suite 16 Bellevue, WA 98005 (206) 7475618 FAX 747.8561 RSA Associates Umited Partnership c/o The M.S. Cavoad Company, Inc. 4739 University Way Northeast, Suite 1607 Seattle, Washington 98105 .iKV'�� t ylliri Subject: Geotechnical Engineering Study Proposed Sunshine Ridge Condominiums Macadam Road near 57th Avenue South .. _. • •' • Tukwila, Washington ) t / ' Dear Mr. Goldberg: Attention: Mark Goldberg Respectfully submitted, TECH C • NS ' LTANTS, INC. D. • obert Ward, P.E. Senior Engineer RECEIVED MAY 1 8 1994 May 13, 1994 • JN 94076 We are pleased to present this geotechnicai engineering report for the proposed apartment development to be constructed in Tukwila, Washington. The scope of our work consisted of exploring site surface and subsurface conditions and then developing this report to provide design criteria for foundations, retaining walls, and temporary shoring and recommendations for general earthwork. You authorized our work by accepting our • proposal, P -3226, dated February 8, 1994. We had earlier provided a summary memoranda on our preliminary findings and recommendations dated March 17, 1994. The subsurface conditions of the proposed building site were explored with six test pits that encountered some surficial, unenglneered fill soils, underlain by native sand soils that became medium -dense to dense at depths of approximately 3 to 7 feet. These sand soils are suitable to support the proposed building loads using conventional footings. Cuts up to approximately 22 feet are proposed on the north and east sides of the site. Because of developments on the adjacent property near these areas, we recommend that temporary cuts no steeper than 1.25:1 (H:V) be made in those areas. It appears that some temporary shoring may be required. The attached report contains a discussion of the study and our recommendations. Please contact us if there are any questions regarding this report, or if we can be of further assistance during the design and construction phases of this project. A D6r7-0526 • Surface GEOTECHNICAL ENGINEERING STUDY PROPOSED SUNSHINE RIDGE CONDOMINIUMS MACADAM ROAD TUKWILA, WASHINGTON This report presents the findings and recommendations of our geotechnical engineering study for the site of the proposed condominiums in Tukwila, Washington. The general location of the site Is illustrated on the Vicinity Map, Plate 1. Following our explorations, we were provided with a topography map and site plan, dated April 29, 1994 and developed by Kussman Associates. Based on these plans and conver- sations with Lyle Kussman, we anticipate that the development will consist of two, three - story, condominium buildings constructed over a parking garage. The parking garage will be located approximately 20 feet from the north and east property lines, and approximately 30 feet from the south and west property lines. The finish floor elevation of the garage varies from approximately 107.3 feet to 118.2 feet, and thus cuts for the garage vary from approximately 4 to 22 feet. Some small rockeries are proposed on the southern slope of the site below the buildings. A driveway will extend along the west edge of the building from Macadam Road. Cuts up to 6 feet and fills of a few feet are proposed for it. Development of the property is in the planning stage, and detailed plans were not made available to us. The plans provided to us indicated the topography and directly adjacent features, and the proposed driveway and first floor building locations. SITE CONDITIONS The 1 -acre, nearly rectangular tract is located on the north side of Macadam Road in Tukwila. It is just north of Southcenter Mall, near the intersection of Interstate 5 and Inter- state 405. The topography of the site and surrounding area slopes moderately downward to the south and west; the area is the southwest corner of a large hillside. The north and east edges of the site are flat, and it is apparent that this is due to past grading for an adjacent apartment complex. We did not observe any surficial indication of soil instability on the site slopes. The construction of Macadam road has resulted In relatively steep cuts In the road right -of -way adjacent to the south side of the site. Near the southwest corner of the site, however, the road grade Is near the grade of the site. Blackberry vines generally cover the undeveloped property. In addition to the noted apartments on the north and east sides of the site, a condominium complex is located on the west side. GROUCH CONSULTANTS, INC. RSA Associates Limited Partnership May 13, 1994 Subsurface Groundwater OBO1ECII CONSUI: PAMs, INC. JN 94076 Page 2 The subsurface conditions were explored by excavating six test pits at the approximate locations shown on the Site Exploration Plan, Plate 2. The field exploration program was based upon the proposed construction and required design criteria, the site topography and access, the subsurface conditions revealed during excavation, the scope of work outlined in our proposal, and the time and budget constraints: In addition, we had not received a detailed site plan prior to our explorations, and it was not apparent where the northern and eastern property lines were located because of the apartment building development. Once we received the detailed plan, we realized that our test pits were only excavated to within about 50 feet of the north and east property lines. The test pits were excavated on March 2, 1994 with a rubber -tired backhoe. A geotechnical engineer from our staff observed the excavation process, logged the test pits, and obtained representative samples of the soils encountered. 'Grab' samples of selected subsurface soils were collected from the backhoe bucket. The Test Pit Logs are attached to this report as Plates 3 through 5. The uppermost soil unit in a portion of the test pits consists of a relatively shallow layer of unengineered fill. It is probable that fill soil is on the north and east sides of the site due to the apartment complex grading. The native soils generally consist of a loose to. medium- dense, gravelly silty sand that becomes denser and less silty with depth. We encountered the sand to a maximum explored depth of 13 feet. The final logs represent our interpretations of the field logs and laboratory tests. The stratifi- cation lines on the logs represent the approximate boundaries between soil types at the ex- ploration locations. The actual transition between soil types may be gradual, and subsurface conditions can vary between exploration locations. The logs provide specific subsurface information only at the locations tested. The relative densities and moisture descriptions Indicated on the test pit logs are interpretive descriptions based on the conditions observed during excavation. Compaction of backfill was not In the scope of our services. Loose soils will therefore be found in the area of the test pits. If this presents a problem, the backfill will need to be removed and replaced with structural fill during construction. Groundwater seepage was observed at a depth of 5 to 10 feet in two of the test pits. The test pits were left open for only a short time period, and therefore the seepage levels on the logs represent the location of transient water seepage and may not indicate the static General RSA Associates Limited Partnership May 13, 1994 groundwater level. It should be noted that groundwater levels vary seasonally with rainfall and other factors. CONCLUSIONS ANDEGQMMENDAUQNS The test pits encountered sand soils that became medium -dense to dense at depths of approximately 3 to 7 feet below the ground surface. The building loads can be supported on these soils with the use of conventional footings. However, a major geotechnical engi- neering consideration for this project are the large cuts on the north and east sides of the site. Because of adjacent buildings and rockeries in these areas, we recommend that any temporary cuts be sloped no steeper than 1.25:1 (Horizontal:Vertical). A temporary cut slope would encroach on the property lines. Where temporary cut slopes cannot be made within the property lines, it will be necessary to obtain slope easements from the adjacent property owners. If these easements cannot be obtained or if there are utilities or structures that would be affected, we recommend the temporary slopes be retained with wood - lagged, steel - column shoring. In addition, we recommend that the footings of the northern and eastern foundation walls be L- shaped so they will not widen the cut area outside the 6uildlna envelope. — If temporary shoring is required, we recommend that further exploration be conducted, including drilling two test borings to the anticipated depth of the soldier piles. We understand that some rockeries are proposed on the slope at the south portion of the site, If fill soils are used in conjunction with the rockeries, they should be compacted in level lifts. However, if the rockeries are greater than 4 feet in height, the fill should be reinforced with a geogrid material as the compaction proceeds. Some moderately steep slopes presently exist on the site. Some of these slopes were created by unengineered fill soils, and there is thus a small potential for shallow soil movement. However, the fill areas will be retained with foundation walls or regraded during construction, and thus the post - construction potential for soil movement will be lessened. Also, the potential for any shallow soil movement on the post - construction, southern portion of the site will be small if the recommendations in this report are followed. When we provided our proposal for this geotechnical engineering study, Geotech Consult- ants, Inc. was not aware that cuts on the order of 22 feet would be proposed and that tem- porary shoring would be needed for this project. We excavated test pits to 13 feet and found competent soils at relatively shallow depths and only a small amount of groundwater. We anticipate that competent soils continue below the depth of our test pits, but we cannot predict the amount of groundwater below our test pit depths without any deeper CEO 113 1 1 CONSULTANTS, INC. JN 94076' Page 3 • RSA Associates Limited Partnership May 13, 1994 JN 94076 Page 4 explorations such as borings. Our personnel would be available to provide a proposal for deeper explorations if it Is desirable to the owner. Groundwater could potentially increase the amount of caving in the sand soils in the excavation and shoring pile holes. Geotech Consultants, Inc. should be allowed to review the final development plans to verify that the recommendations presented in this report are adequately addressed in the design. Such a plan review would be additional work beyond the current scope of work for this study, and may include revisions to our recommendations to accommodate site, development, and geotechnical constraints that become more evident during the review process. Conventional Foundations The proposed structure can be supported on conventional continuous and spread footings bearing on undisturbed, medium -dense or denser, native sand soils. We recommend that continuous and Individual spread footings have minimum widths of 16 and 24 inches, respectively, and be bottomed at least 12 inches below the lowest adjacent finish ground surface for frost protection. The footing subgrade must be cleaned of loose or disturbed soil prior to pouring concrete. Depending upon site and equipment constraints, this may require removing the disturbed soil by hand. We recommend that an allowable bearing pressure of 3000 pounds per square foot (psf) be used to design footings bearing on the competent, sand soils. A one -third increase in this design bearing pressure may be used when considering short term wind or seismic loads. For the above design criteria, it is anticipated that the total post - construction settlement of footings founded on competent, native soils will be about one -half inch, with differential settlements on the order of less than 1 inch in a distance of 100 feet along a continuous footing. Lateral loads due to wind or seismic forces may be resisted by friction between the foundations and the bearing soils, or by passive earth pressure acting on the vertical, embedded portions of the foundations. For the latter condition, the foundations must be either poured directly against relatively level, undisturbed soil, or surrounded by level structural fill. We recommend the following design values be used for the foundation's resistance to lateral loading: Parameter Coefficient of Friction Passive Earth Pressure Design Value 0.5 350 pcf GRO711CI1 CONSULTANTS, INC, RSA Associates Umited Partnership May 13, 1994 Where: (1) pcf is pounds per cubic foot. (2) Passive earth pressure is computed using the equivalent fluid density. JN 94076 Page 5 if the ground in front of the foundation is loose or sloping, the passive earth pressure given above will not be appropriate. We recommend that a safety factor of at least 1.5 be maintained for the foundation's resistance to lateral loading when using the above design values. Seismic Considerations The site is located within Seismic Zone 3 as illustrated on Figure No. 23 -2 of the 1991 Uniform Building Code (UBC). In accordance with Table 23-J of the 1991 UBC, the site soil profile is best represented by Profile Type S2. Slabs -on -Grade The building floors may be constructed as slabs -on -grade atop competent, native sand soils. The subgrade soils must be in a firm, non - yielding condition at the time of slab construction. Any soft areas encountered should be excavated and replaced with select imported structural fill. All slabs -on -grade should be underlain by a capillary break or drainage layer consisting of a minimum 4 -inch thickness of coarse, free - draining structural fill with a gradation similar to that discussed later in Permanent Foundation and Retaining Walls. in areas where the passage of moisture through the slab is undesirable, a vapor barrier such as a 6-mil plastic membrane should be placed beneath the slab. Additionally, sand should be used in the fine - grading process to reduce damage to the vapor barrier, to provide uniform support under the slab, and to reduce shrinkage cracking by improving the concrete curing process. We recommend that concrete slabs be placed over at least 1 foot of structural fill to provide more uniform support for the slab where the subgrade Is soft or settles more rapidly than the surrounding ground. Isolation joints should be provided where the slabs Intersect columns and walls. Control and expansion joints should also be used to control cracking from expansion and contraction. Saw cuts or preformed strip joints used to control shrinkage cracking should extend through the upper one - fourth of the slab. The spacing of control or expansion joints depends on the slab shape and the amount of steel placed in it. Reducing the water to cement ratio of the concrete and curing the concrete, by preventing the evaporation of free water until cement hydration occurs, will also reduce shrinkage cracking. C CONSULTANTS, rS, INC. RSA Associates Umited Partnership May 13, 1994 JN 94076 Page 6 We recommend that the slab areas be proof - rolled with a heavy truck or a large piece of construction equipment prior to slab construction. Any soft areas encountered during proof- rolling should be excavated and replaced with select imported structural fill. Permanent Foundation and Retaining.Walla Retaining walls backfilled on only one side should be designed to resist the lateral earth pressures imposed by the soils they retain. The following recommended design parameters are for walls less than 15 feet in height: Parameter Design Value Active Earth Pressure* 35 pcf - level backflli Active Earth Pressure 45 pcf - backfill sloped between 2:1 and 3:1 (H:V) Passive Earth Pressure 350 pcf Coefficient of Friction 0.50 Soil Unit Weight 130 pcf Where: (1) pcf is pounds per cubic foot. (2) Active and passive earth pressures are computed using the equivalent fluid densities. * For restrained walls which cannot deflect at least 0.002 times the wall height, a uniform lateral pressure of 100 psf should be added to the above active equivalent fluid pressure. For the foundation walls on the north and east sides of the building, an additional 5 pcf should be added to the active earth pressure due to the adjacent buildings. The values given above are to be used to design permanent foundation and retaining walls only. The passive pressure given above is appropriate only for the depth of level structural fill placed In front of a retaining or foundation wall. We recommend a safety factor of at least 1.5 for overturning and sliding, when using the above recommended values to design the walls. Heavy construction equipment should not be operated behind retaining and foundation walls within a distance equal to the height of the wall, unless the walls are designed for the additional lateral pressures resulting from the equipment. The compaction of backfill near GL'OT13CH CONSULTANTS, INC. RSA Associates Umited Partnership May 13, 1994 the wall should be accomplished with hand- operated equipment to prevent the wall from being. overloaded by the higher soil forces that occur during compaction. Retaining Wall Backfill Backfill placed behind retaining or foundation walls should be coarse, free - draining structural fill containing no organics. This backfill should contain no more than 5 percent silt or clay particles and have no gravel greater than 4 inches in diameter. The percentage of particles passing the No. 4 sieve should be between 25 and 70 percent. The less silty, native soils are suitable as backfill; these soils were generally encountered below a depth of about 8 feet In the test pits. A drainage composite similar to Miradrain 6000 should be placed between the shoring wall and permanent #wrideition wall. The dieinage composites should be hydraulically connected to the foundation drain system. The purpose of these backfill requirements is to assure that the design criteria for the retaining wall are not exceeded because of a build -up of hydrostatic pressure behind the wall. The top 12 to 18 inches of the backfill should consist of a relatively Impermeable soil or topsoil, or the surface should be paved. The sub - section entitled General Earthwork and Structural Fill contains recommendations regarding the placement and compaction of structural fill behind retaining and foundation walls. The above recommendations are not intended to waterproof the below -grade walls. If moist conditions or some seepage through the wails Is not acceptable, then damp - proofing or waterproofing should be provided. This could include limiting cold - joints and wall penetrations, and possibly using bentonite panels or membranes on the outside of the walls. Applying a thin coat of asphalt emulsion Is not considered waterproofing, but it will help to prevent moisture, generated from water vapor or capillary action, from seeping through the concrete. IampQrary Shoring - Cantilevered Soldier ilea g$dier Pile Installation Soldier pile walls would be constructed prior to commencing the excavation by setting steel H -beams in a drilled hole and grouting the space between the beam and the soil with concrete for the entire height of the drilled hole. We anticipate that the holes could be drilled without casing, but the contractor should be prepared to case the holes or use a slurry method if caving soils are encountered. Concrete OEOTECI I CONSULTANTS, INC JN 94076 Page 7 (1) RSA Associates Umited Partnership May 13, 1994 should be poured into the holes as quickly as possible to avoid the need for casing or slurrying. Excessive ground loss in the drilled holes must be avoided to reduce the potential for settlement on adjacent properties. If water Is present in the hole at the time the soldier piles are poured, concrete must be tremied to the bottom of the hole. As excavation proceeds downward, the space between the piles should be lagged with treated timber, and any voids behind the timbers should be filled with pea gravel or a sand and flyash slurry. Prompt and careful installation of lagging is important, particularly in loose or caving soils, to maintain the Integrity of the excavation and provide safer working conditions. Additionally,care must be taken by the excavator to remove no more soil between the soldier piles than is necessary to install the lagging. Caving or overexcavation during lagging placement could result in loss -of- ground on neighboring properties. For the excavation depths anticipated and with pile spacings of about 6 feet, nominal 4 -inch lagging can be used. (2) Timber lagging should be designed for an applied lateral pressure of 30 percent of the design wall pressure if the pile spacing is less than three pile diameters. For pile spacings larger than this, the lagging should be designed for 50 percent of the design load. If permanent building walls are to be constructed against shoring walls, drainage should be provided by attaching a geotextile drainage composite with a solid plastic backing, similar to Miradrain 6000, to the face of the lagging, prior to pouring the foundation wall. These drainage composites should be hydraulically connected to the foundation drainage system by weep holes placed in the foundation walls. Soldier Pile Wall Design Temporary cantilevered shoring with a level backslope should be designed for an active soil pressure equal to that pressure exerted by an equivalent fluid having a unit weight of 35 pcf. The active soil pressure should be increased to 50 pcf where the slope above the wall is sloped at 1.25 :1 (H:V). Lateral movement of the soldier piles below the excavation level will be resisted by an allowable passive soil pressure equal to that exerted by a fluid having a density of 400 pcf. This soli pressure is valid only for a level excavation in front of the soldier pile; it acts on two times the grouted pile diameter. The minimum embedment below the floor of the excavation for cantilever soldier piles should be equal to the height of the "stick -up." The maximum bending moment in the soldier pile will occur OEOTECN CONSULTANTS, INC. JN 94076 Page 8 Rockeries RSA Associates Limited Partnership May 13, 1994 OEOTECII CONSULTANTS, INC JN 94076 Page 9 at the point of zero shear, where the active and passive soil forces are equivalent. The depth of embedment below the bottom of the excavation can be calculated by determining the embedment that will satisfy moment equilibrium about the bottom of the pile and then adding 20 percent to that length to satisfy force equilibrium. We anticipate that rockeries will be used in the site development. A rockery is not intended to function as an engineered structure to resist lateral earth pressures, as a retaining wall would do. The primary function of a rockery is to cover the exposed excavated surface and thereby retard the erosion process. We recommend that rockeries be limited to a height of 8 feet and that they be placed only against dense, competent, native soils. The construction of rockeries is to a large extent an art not entirely controllable by engineering methods and standards. It is imperative that rockeries, if used, be constructed with care and in a proper manner by an experienced contractor with proven ability In rockery construction. The rockeries should be constructed with hard, sound, durable rock in accordance with accepted local practice and City of Tukwila standards. Soft rock, or rock with a significant number of fractures or inclusions, should not be used in order to limit the amount of maintenance and repair needed over time. Provisions for maintenance, such as access to the rockery, should be considered in the design. In general, we recommend that the bases of rockeries have a minimum dimension of one -third the height of the slopes cut behind them. Tiered rockeries are not recommended unless there is sufficient space to construct upper tiers that do not exert lateral pressure on the lower tiers. The base of the upper wall of a tiered rockery should be set back from the rear of the lower rocks an amount equal to the height of the lower tiers. Excavations and Slopes in no case should excavation slopes be greater than the limits specified in local, state, and national government safety regulations. Temporary cuts to a depth of about 4 feet in unsaturated soils may be attempted vertically. Based upon Washington Administrative Code (WAC) 296, Part N, the soil type at the subject site would be classified as Type B. Therefore, temporary cut slopes greater than 4 feet in height cannot be excavated at an inclination steeper 1:1 (Horizontal:Vertical) extending continuously between the top and the bottom of the cut. This temporary cut slope assumes that there are no structures near the cut area. On the north and east sides of the site, temporary cut slopes should be sloped no steeper than 1.25:1 (H:V). RSA Associates Limited Partnership May 13, 1994 The above recommended temporary slope inclinations are based on what has been successful at other sites having similar soil conditions. Temporary cuts are those that will remain unsupported for a relatively short duration to allow for the construction of founda- tions, retaining walls, or utilities. Temporary cut slopes should be protected with plastic sheeting during wet weather. The cut slopes should also be backfilled or retained as soon as possible to reduce the potential for instability. Please note that sands can cave suddenly and without warning. Contractors should be made especially aware of this potential danger. All permanent cuts into native soils should be inclined no steeper than 2 :1 (H:V). Compacted, engineered fill slopes should also not be constructed with an inclination greater than 2:1 (H:V). Water should not be allowed to flow uncontrolled over the top of any temporary or permanent slope. Also, all permanently exposed slopes should be seeded with an appropriate species of vegetation to reduce erosion and improve stability of the surficial layer of soil. Drainage Considerations JN 94076 Page 10 We anticipate that the foundation walls will be constructed against the shoring walls. As discussed in Permanent Foundation and Retaining Walls, 'a drainage composite would be placed against the lagging prior to pouring the foundation wall. Weep pipes located no more than 6- feet -on- center should be connected to the drainage composite and poured into the foundation walls or the perimeter footing. A footing drain installed along the inside of the perimeter footing will be used to collect and carry the water discharged by the weep pipes to the storm system. We also recommend the use of footing drains at the base of footings and backfilled earth - retaining walls. These drains should be surrounded by at Least 6 inches of 1 -inch -minus washed rock, wrapped in non -woven geotextile filter fabric (Mirafi 140N, Supac 4NP, or similar material). At the highest point, the perforated pipe Invert should 'be =at least.&s low as the bottom of the footing, and it should be sloped for drainage. All roof and surface water drains must be kept separate from the foundation drain system. A typical drain detail is attached to this report as Plate 7. For the best long -term performance, perforated PVC pipe is recommended for the footing drains. Groundwater was observed during our field work. If seepage is encountered in the excavations, it should be drained from the site by directing it through drainage ditches, perforated pipe, or French drains, or by pumping it from sumps interconnected by shallow connector trenches at the bottom of the excavation. The excavation and site should be graded so that surface water is directed oft the site and away from the tops of slopes. Water should not be allowed to stand in any area where foundations, slabs, or pavements are to be constructed. Final site grading In areas adjacent to buildings should slope away at least 2 percent, except where the area is paved. QEOTECII CONSULTANTS. INC RSA Associates Limited Partnership May 13, 1994 Additionally, a drainage swell) should be provided upslope of the buildings to intercept surface run -off and direct it into the storm drains. Water from roof, stormwater, and foundation drains should not be discharged onto the slope, but should be tightlined to a suitable outfall located away from the slope. PavemeniAreas JN 94076 Page 11 All pavement sections may be supported on competent, native soils or structural fill, provided these soils can be compacted to a 95 percent density and are in a stable, non- yielding condition at the time of paving. Structural fill or fabric may be needed to stabilize soft, wet, or unstable areas. We recommend using Supac 5NP, manufactured by Phillips Petroleum Company, or a non -woven fabric with equivalent strength and permeability characteristics. In most instances where unstable subgrade conditions are encountered, 12 inches of granular structural fill will stabilize the subgrade, except for very soft areas where additional fill could be required. The subgrade should be evaluated by Geotech Consultants, Inc. after the site Is stripped and cut to grade. Recommendations for compaction of structural fill beneath pavements are given in a later sub - section entitled General Earthwork and Structural Fill. The performance of site pavements Is directly related to the strength and stability of the underlying subgrade. The pavement section should be provided with 3 inches of AC over 6 Inches of CRB or 4 inches of ATB. The pavement section recommendation and guidelines presented In this report are based on our experience in the area and on what has been successful In similar situations. We can provide recommendations based on expected traffic loads and R -value tests, if requested. Some maintenance and repair of limited areas can be expected. To provide a design without the need for any repair would be uneconomical. General Earthwork and Structural Fill All building and pavement areas should be stripped of surface vegetation, topsoil, organic soils, and other deleterious material. The stripped or removed materials should not be mixed with any materials to be used as structural fill, but could be used in non - structural areas such as landscape beds. Structural fill is defined as any fill placed under the building, behind permanent retaining or foundation walls, or in other areas where the underlying soils need to support loads. All structural fill should be placed In horizontal lifts with a moisture content at, or near, the optimum moisture content. The optimum moisture content is that moisture content which results in the greatest compacted dry density. The moisture content of fill soils is very important and must be closely controlled during the filling and compaction process. OfOTECIl CONSULTANTS, INC. "� �: RSA Associates Umited Partnership May 13, 1994 The allowable thickness of the fill lift will depend on the material type selected, . the compaction equipment used, and the number of passes made to compact the lift. In no case should the loose lift thickness exceed 12 inches. The following table presents recommended relative compaction for structural fill: Where: Minimum Relative Location of Fill Placement Compaction -- Beneath footings, slabs or 95% walkways Behind retaining walls 90% Beneath pavements Minimum Relative Compaction is the ratio, expressed in percentages, of the compacted dry density to the maximum dry density, as determined in accordance with ASTM Test Designation D- 1557 -78 (Modified Proctor). We do not anticipate that any structural fill will be needed beneath the building. It will be needed only in a portion of the driveway area and in the landscape area on the south end of the site. Provided the on -site sand soils are not excessively wet, they should be suitable to use as structural fill. Ideally, structural fill which is to be placed in wet weather or at the top foot of pavement subgrade should consist of a coarse, granular soil having a sift or clay content of no more than 5 percent. The percentage of particles passing the No. 200 sieve should be measured from that portion of the soil passing the 3 /4 -inch sieve. LIMITATIONS The analyses, conclusions, and recommendations contained in this report are based on site conditions as they existed at the time of our exploration and assume that the soils en- countered in the test pits are representative of the subsurface conditions of the site. If the subsurface conditions encountered during construction are significantly different from those observed in our explorations, we should be advised at once so that we can review these conditions and reconsider our recommendations where necessary. Unanticipated soil condi- tions are commonly encountered on construction sites and cannot be fully anticipated by merely taking soil samples in test pits. Subsurface conditions can also vary between explor- OUO'n:CII CONSULTANTS, INC 95% for upper 12 inches of subgrade, 90% below that level JN 94076 Page 12 0 RSA Associates Limited Partnership May 13, 1994 JN 94076 Page 13 ation locations. Such unexpected conditions frequently require that additional expenditures be made to attain a properly constructed project. It is recommended that the owner con - sider providing a contingency fund to accommodate such potential extra costs and risks. This is a standard recommendation for all projects. This report has been prepared for the exclusive use of RSA Associates and their represent- atives for specific application to this project and site. Our recommendations and conclusions are based on observed site materials, and selective laboratory testing and engineering analyses. Our conclusions and recommendations are professional opinions derived in accordance with current standards of practice within the scope of our services and within budget and time constraints. No warranty is expressed or implied. The scope of our services does not include services related to construction safety precautions, and our rec- ommendations are not Intended to direct the contractor's methods, techniques, sequences, or procedures, except as specifically described in our report for consideration In design. We recommend that this report, in its entirety, be included in the project contract docu- • ments so the contractor may be aware of our findings. ADDITIONAL SERVICES In addition to reviewing the final plans, Geotech Consultants, Inc. should be retained to provide geotechnical consultation, testing, and observation services during construction. This Is to confirm that subsurface conditions are consistent with those indicated by our exploration, to evaluate whether earthwork and foundation construction activities comply with the intent of contract plans and specifications, and to provide recommendations for design changes in the event subsurface conditions differ from those anticipated prior to the start of construction. However, our work will not include supervision or direction of the actual work of the contractor and his or her employees or agents. Also, job and site safety, and dimensional measurements, will be the responsibility of the contractor. The following plates are attached and complete this report: Plate 1 Vicinity Map Plate 2 Site Exploration Plan Plates 3 - 5 Test Pit Logs Plates 6 - 7 Grain Size Analysis Plate 8 Footing Drain Detail OEOTECH CONSULTANTS, INC James R. Finley, Jr., P.E. Principal /■.'ASSOCIateaUrnited layl3, 1994 Page 14 . . '..• .•. ,'„ • : eappreolata the opportunity to be of service on this project. if you have any questions, or If we may be of further service, please do not hesitate to contact Ott:• • , Respectfully submitted, GEOTECH CONSULTANTS, INC: GROUCH CONSULTANTS, INC • - ?I" 156TH ST in SBTN a T $ at S 170 1 ST 176TH 169TH ST GEOTEC1I CONSULTANTS SIGAtvawj I. i w R/ • s la / I � i t tL1 / .• I • ��Jb 4Oi S VA I.. ( ___. x • 4, L• • ). mom ST I S MIN I I N � ,_ S _1ND j �� 1CMQ VICINITY MAP MACADAM ROAD TUKWILA, WA 8 I M 1004 I I "WV 1 94070 I MAY 1994 I NTS I • 2 1 .............rr�w�`.«nw rw N: MSbhxrml•wu�noMawnr�w ••�••••�•µ•••���•••••�• 4 W O LEGEND: TP -4 r — TP -3 —_-■ • FF.1 10.6 \\ FF :107.33 0 a 0 ac APPROXIMATE TEST PIT LOCATIONS t GEOTECH CONSULTANTS 3' 0 TP -2�� FF °110.2 TP -S ti \ I \ O TP -1 � 1 FF0116.0 1 I \\ 1 MAC4AM ROAD \4* EXISTING ROCKERY \ \ / 1 1 1 PROPOSED BUILDING l I 1 1 j 1 t / 1 / 1 1 It/ � -I SITE EXPLORATION PLAN MACADAM ROAD TUKWILA, WA 10 10.1 15— 10 MNO 15_ 19.0 USCS Uscs Topsoil Topsoil TEST PIT 1 TEST PIT 2 GEOTECH CONSULTANTS, INC. l ymgc•--=semE,.•■ Description Reddish brown, silty SAND with gravel, some organics, medium - grained, very moist, loose - becomes grayish, less silty, no organics, medium -dense - becomes denser Gray, slightly silty SAND, course - grained, moist, medium -dense to dense Test pit terminated at 12 feet below grade on 3 -2 -94. No groundwater seepage encountered during excavation. No caving. Description Reddish brown/tan, silty SAND with gravel, organics, medium - grained, very moist, loose - becomes grayish, less silty, no organics, medium -dense - becomes denser Gray, slightly silty' SAND with some gravel, course - grained, moist, medium -dense to dense Test pit terminated at 12 feet below grade on 3 -2 -94. No groundwater seepage encountered during excavation. No caving. TEST PIT LOGS MACADAM ROAD TUKWILA, WA Job No: 94071 I MAR 1994 1LOg%dbY: � 0/►► • 10 15 10 15 t %‘" tt crd cp° asp, • 4 . 4 " iv 4 G 0 10.9 USCS Description FILL Gray, gravelly, silty SAND, wet, loose (FILL) USCS GP SP Old topsoil TEST PIT 3 -few boulders encountered becomes gray, less silty, dense Topsoil TEST PIT 4 �,.. GEOTECH CONSUI ;VANTS, INC. Brown, gravelly, silty SAND, some organics, very moist, loose to medium -dense Test pit terminated at 13 feet below grade on 3 -2 -94, No groundwater seepage encountered during excavation. Caving above 4 feet. Description Brown, very gravelly, silty SAND, many cobbles, wet, loose to medium -dense - becomes tan/orange, dense -some boulders encountered - becomes grayish, less gravelly, less dense Gray, slightly silty SAND with gravel, medium - grained, wet, medium -dense to dense Test pit terminated at 11.5 feet below grade on 3 -2 -94. Slight groundwater seepage encountered at 5 feet during excavation. No caving. TEST PIT LOGS MACADAM ROAD TUKWILA, WA Job No: 94078 Dote: MAR 1994 Loyd by: 4 10 15_ 10 15 . 0.47,1,0 9.5 USCS USCS • M TEST PIT 5 Topsoil & old FILL �.._ GEOTECH CONSULTANTS, INC. Description Reddish brown, gravelly, silty SAND, some organics, very moist, loose - becomes grayish, no organics, wet, loose to medium -dense -becomes intermixed with rust color, some boulders, medium -dense Gray, slightly silty SAND, medium- grained, very wet, medium -dense Test pit terminated at 11 feet below grade on 3 -2 -94. Groundwater seepage encountered 7.5 & 10 feet during excavation. Slight caving below 10 feet. Topsoil TEST PIT 6 Descri ' lion Reddish brown/tan, gravelly, silty SAND, few organics, some boulders, fine to medium - grained, moist, loose to medium -dense - becomes gray, very moist, medium -dense Gray, slightly silty SAND, fine to medium - grained, moist, medium -dense Test pit terminated at 11 feet below grade on 3 -2 -94. No groundwater seepage encountered during excavation. No caving. TEST PIT LOGS MACADAM ROAD TUKWILA, WA Job No: 94076 I Da MAR 1994 IiPI.t.:s 0 100 90 90 "V 70 m Z 60 Z30 m CD '•C 40 m 2 30 20 10 SIEVE ANALYSIS SIZE OF OPENING IN INCHES J NUNSER OF MESH PER INCH US STD HYDROMETER ANALYSIS GRAIN SIZE IN MILUMETERS w - u 0 g _ 4 4 .. • . • u •o : ffi a SS 8§ N _id w i w GRAIN SIZE IN MILLIMETERS 8• j . b 8 •■ - - -• IM. M. ML -�7. MEN MM/11111111•1111111MI— El= - - -MI MN= =MO MEI LEI ■—M■ ENE My. .".". MIME MP .—■— M11111111= ___&M■M.- ■MI --M6 •• MEN= - - MIME - IMO -- ELM -- .E— M— MMM■■■MM —V - - --.M ---- IN - -■Ra —M N IOW ■■■■a• - - -■■ - -- IN= MIMI -- 111MIN ■Ri-- ■MM --_ in= -- MM■.I_— .MM —MI — IMO NO IMIE Mil EWE 1=1 ME — ■a■RaMIII■M\M M1MI —M-- ■Ra■aRRM■M-- ■R■Ra__ ENE R ■RM111M11=—►M■ElNEMIME 11111111111111■ MINIM KM —RM1EN ■MM■■■■■=MEIURI■M—■ —■M I — MIN= — . EMS . MEN M NMM I AM—U—=1 - -- -. - -MI _ —M-- MN MUM. ■ — RM ■M■a■ -- -IM- -.I _M1•M—MMMI ■ -- M-- . - -■I'_ --. -- _ MINIM M.. III — =ME ■ ---- ■-- ■-- -- BIM = MM■ .- - ._�MM —■■■1■ -- IMF.MMI•OS \�M — M�■ I MME— MMIMM.— M.■IIMPME— M-- MMMI MIN — NM= MIL ) EN -- MME_■--■_MVirk_■ M■M■1— — NE.— —. N — ■■M► ' ■ \� -- - NMI R■ —dlE11— M Elh.111 MO MIR =NM —MME —MME MM■ R■ — MEI.IN =EMI I■ — M— Ell M INENI EN =MEE - --I-■M IN M ___— .M1 ■-1 ■mmal-- MMIainMIN IN am= - --■M I.__ MIME — NNE — MI1 ■MM.M se NM= ---- I_Nom I= -- - -I.—_ . ■■� - - -- a. MINN - ■ Min MM MEN MA1- NM IN •_- - - - ■ —• .-- -- MMMI.M —= .MMM- -MME.■ ■MI ■� MIEN —M-M■ NEM �MM!• - - -■— ■M-- ---M—.MMM. .- --- _IMM —M ■MMMM ■ MN= —_I11■M ■Ml . MMM---- M>•1IM —� MM>•- -MMIII ■__■—M` iilik■IM ._—MMII—=I IMM.M■ M--- M- ■—M■■M --MME -"'!! 1■■M•MMI■- -111 —M al .111111..■M ■M ■ ■1011.11n ■!111111111— MI■Z TM ■ —MR --- ■■.. - -UM IIMMI ■ III MMMM ■ — M.I 1 \. INN= MM!•MMi— — .-- 111=— .MM--- M`r0-MMIEl MENEM= =MI IIIM,M!• EMI OEM !•■MMM— M■ =II ENMJ•■10=11 MEEMO MOM IN MEN EMMEN ni MI w=1 MB in= NIMIVI NI MMl• I— __.—MI•=M IMM■■—IM.M!•■MMMM■MN MIN MI MEN M\M. MM>s MM1oM!•Ma.-- ■MMM!•MJ•IMII MMM-- ■M!•1l MM■1• -- MMI M I—. — — ■ _ — M— MIE . ■!_-- M— =NM — ■MMM EM IENE a MI MMMM— MI-- ■mi■■--■MI..MM■ m ■—IEM.--■EI—M —■ NMMM —■ MMMMM- --•••■•••••■••••••• • MMMM - --MM> .= MIMEO ■EI — M!•1•MRM —■ -- -MMINI Ml— I.IMMI.MMI.MMIEI■ --. IN - -- ■ --■■a INM -- El EMI MI —■a— ■� �0 =II M IME I .� � M_MME— M—i ■RI• MItRRI• ■■�� �Ra M1M --MIS EINIMMINE ■■� E —MO- IM _ IM MME MMI IMM I ■M' �� EMI MMIM E - -- MI MIME MEN ■MIEME• EMI --- EN EM EmEms NMI ■a Mil M! — ■1111111—MMa IMMIMMIla am. MR MM•M • — MIN M)• — INE1 l NMI — HIM MI--- MI IMO M EMM N - -M- -M1M— MI MUMS IN — MMMMMMMI IN MM. NM MINE MN MIN MI - -M— IM --- ____•_ ` ►,■ MINIM MINI — M-- =MEMOS LI.:i' J!'MR ■— - - - M ■ ■ . M M . � � � —=M- --- MM■1. ■—_ M■MMMME r MM-- --- 111MM ■111111=11•11111=11 - -- 111111111_111111111■111•1- I= 111•1111111111•11M111•11111•1111•111101 . —_MM>• MM II= MI M INN — ■■— .- - -MM!• � = N� ■M —. M - - ■■■— MEE NM — ■■■RRa ■ R ■R ■RRR ■R� — .Ml - -� - -.M1 -- MM .MI - - M!• � ■ ENEM— _— ■-- - ■a■a— I.— ■--- MMMMM■ M— .-- -MM■M— I. M■ ■ RM—E RMRM- -■OM -- M MB= NUM ■ ■— .■a —M■a� MEM NI MINN MINN. OM= NMI MM. -- MMMMI • NUM EMI � —.M■— NMI MMMM- -. MI= — MIME N.11•11■1 II• .-- -MRMM— MMI MEIN MMMM— =En NM1MI NMI MMMMM■ MI— .MM - - M� MO —.--IM= ON MIMS - ■-M ■ �� =MN . -- - M!• MM —■MMI =— =MM — MIN NI IMEN M— .- -MMIll IIM— .MII -1■ MM—■SSIMI M— IMNIM MI= MINN M- ■- -MM- Imo mum —NMI• mama -- - p J 88 Y w 8 8 S 8 COBBLES 1 COARSE 1 FINE 1 COARSE 1 YEOIUY GRAVEL 1 SAND FINE 1 FINES BORING/ TEST PIT Co 4 DEPTH 9" 3" SAMPLE i MOISTURE 9 KEY SYMBOL SP /SM GM SOIL CLASSIFICATION 8P9.1 D Si�fY GRAVEL, 0 10 20 m 30 Cf f RV- -4 40 n O co 50 m GO f m 0 TO -4 80 90 10o 0 a v • 0 ,,j 00 4 P - C a Z N m 0 D D 1) 100 90 80 D 70 = 60 z ,„ m m { 40 m = 30 20 10 SIEVE ANALYSIS SIZE OF OPENING IN INCHES i NUMBER OF MESH PER INCH US STD HYDROMETER ANALYSIS GRAIN SIZE IN WILUMETERS • • W /1 r . 1111111111= MIN .•4011•100100. '4 INI ■111010 MB BBB.IIMMIIBB►11118■B.■a\ 78881!■ MEI ERMINE MO MOM= 888.8 ■888 BMI■M.7 ! ■881EM11881•01 MN MOM= 88■ ■- M■- -M-- 88- l8 - -. -El !VIM 888■ - 888818881 ■!RC i iM81 8888188. 888.8■ 888.88. ■ 8..8\ m ►\ 88818888188. - 5888. RIM III 1!.8\__EN 888.8 ■ =OM MIMNNB ■■• !MOMS 888.8■....... ■ - -. -Kl 13- MR- 888.88..8....- .8►∎ - 8ii.88.88.■8 ■8. ■E-B-INIP MMMMM� MME � MM- M-. � �. M■ M� M-.: -- _1 ■l- . - -5l- .�..R... 101101•100 - MINIM 8..88 - 888. 8..88..8. In= _ ■_ - =MEN .881..8. - .8.. .8.. - ! . - -.-.. ...1 8.8. -.88..8.. - -. - - _- ..� ----■ --.- -M-- - l_- ■-- . --M51 -- MOM - ■- -■ MIN -- e!•---- ■--.--8-- .-- RUM= MOIRE ---- ■-- ■11111-MINIM l---- .-- .- -11-181111 MMM1 M.. -.ME MME. - -. - - M-M M8� INEBINIMM MM. ■ - - MUM MME - MMMM- - .-- .ONOMMM.■. - MO NM. --.M. MI MI I - Ml- ■--.--M -1 1---- ■-- MINIM M-- MEM MN ME MEMO --■-- ■-- ■ - -M -- ----.--MM---- - M-- .-- .__ ME= MINN MEM 11111111M MINI MO mom - ..i ■ ..IE.II.I1•11011....EI...1.8I 00 =NAM 01=0100 - i - -.-M. - 888■ -! ■-M I IMO =IM - MOO ..-MI OM NM Mil WM IIIMIN IN IIIMIAMIMMIN MI IM MI OM -- "I Fr 88■ ■ 88\\ 8111 MIN -- .88.8• 88 ■ .88888M M _ - _ ■ _ _ 88 ■ .888 88► M - MME 88■ MI � .-- 1■■• - - ■-.1 � .-- 1 WW1 I= BM IBM NI .8. 8888.. -..8 b - _. -1 M . - = IMMNI MI MIMI 11111 EMI III ... - _ _-- NMI ■:O -■ 5M )31111=1 IN MIIMM1.( )1EMEMIM MMMM -.-MilNM ate.. RMRR- .1101..0.u e.. 04 MIEN= NM I■I ■■1111 MN MM11111111111111.1MM 88888 -.i -i 888888\ I MMIE - 888. - - \ ■ - BB 88888- K 888. - 8•1•1 88888 - :: IMO= - MIN l -I.R-- 88888- III IMO -- MMMMMMM ■ \' ∎Mme.- -Mme.MME MMMMMMM.■MMM.MIMM.. .....- ........► , 1 - .8. 11 Mlle I . -- 8-1 X5 .5- -► ∎ - -. MIio su.- -.M- 551 .58.- IWO-8 NI81_t88888 -IMMIIII1i .85. - - . ► ∎ MB • k • r. --- MI ■MENIII74 4111 M MI MI MMIIIII■IMINII 551 .58. - -lINN Mal M.58 -. - -- MMMMMM� .MMMMM. -.- Mme.. ■ate.•MMMMMMM... -=MM ■I Ste .SM.- NOM I...1■11\! . -l- .----- 5 ■8111\Ml 1 . -0- MMM1 .8M- Imo= -MM ■ ■r a AM= .i -- 8 8888- .88- 8...R - -. MINN VIMMONNI.1 MEMO SM- S -- -1 - .5.: .\ a --- .-- i - MIME= c( , MEW s =III -MS Mi- •SM■-- -1._1%` -' 17-0 - ■o--- !WOE .lM =MI - Inn E-- ■- E.I- I..I- .58.8 -8.M .■•- ■ �... BBB. . 888■ 8.81 888. . MIN - NNW .888■ .iiMUM EU UM .888■ RIM - .888■- •MEIMN- �888■ 88 I ME. =AMA I■IN . - - 888■ ..�.B...BB. ■8.8888. 8. 8..8. -- 8888888 -- ■ MOM 88- 8888.ME NO1 NMI MUM =MINI 8888. M NMI ME IN= --.- -888. - - ■ MINIM= 888888. -- ■M. - - MMB- - - ■ -- 888.888888. - MEMO -- 888888■ - - ■� -- 888888■ - -. M. - • M. 1INN ■M - - 888- ME REIM =NM M.- ■ EMI MIN 885. A0m110 00=9 -- 818. - 888. 888888. MN ISM NM =II ._ EMI - - - -. - ems -� 8.-.8.8.1 M•- ■8.•8111IM 8■ -- ■M■1i8MM- NM= IIM- - 588■ =MIN 8. -- --■ME-i --■-- -.MME MINN ■M■ -- 588. 8.- ■8 ■B0SM -- .-- 1888888. --.-- -M� MOM .--.m -- .-1- M....- NM= -- - lam MINIM 881-■ - -- -...- - MN MIN 1.- 11=11 - -..- - M.-. MOM =MI 8888- 0 § COBBLES I COARSE I FINE GRAVEL COARSE 1 MEDIUM [ SAND FINE .FINES BORING/ TEST PIT C O O DEPTH 4 1 8' O 8 O as • SAMPLE 2. B • • • W MOISTURE • KEY 0 F. $ ffi8 88 8§ • •- • • • W N GRAIN SIZE IN MILLIMETERS SYMBOL 8 • W N • Y W SOIL CLASSIFICATION 5ILTr S P.M P SP ND o gg 0 0 0 • W 0 N 8 8 0 10 20 m 30 n z 40 0 0 50 rn CD 60 m 0 70 -.1 80 90 100 O O • �n�.iW�JhY`X4� ' 4v. W�cnrr w +'�w..w.v.ws:v.r+.+r.+iMww.w.v� WASHED ROCK —• T /GHTL /NE ROOF DRAIN Do not connect •*, fooling. drain. 4" PERFORATED HARD PVC PIPE Invert at Most oS low os fooling and /or crow/ space. Slops to drain. Place weepho /is downward. — VAPOR . BARRIER 4 " ra FREE -DRAINING SAND /GRAVEL FOOTING DRAIN DETAIL MACADAM ROAD TUKWILA, WA bat NL� 'Stoles Nolo I 84078 lekofts MAY 1004 1 N.T.S. S fr if "im�1SdduC+iaw:s % ra✓ x........,,.,,.-.,.,..........,..-..-..-•.-.....................,. w..,,. v..wmvwa.�wawnveuwwn�.w:....vrvz .awwr��.n.us.a....�,.ewe.wi wnww..nr,a.�vn.i+.�wixixna aernhanww..v�w.eaw�!+ ti.w. Y D PARTMENT- REVIEWERS INITIAL REVIEWERS INITIAL Per mg+ CoYci COP y PLAN REVIEW / ROUTING SLIP ACTIVITY NUMBER b7 O3 a O DATE :2y7� PROJECT NAME flealliS 0 V ilwi Re�l4,�,i�iy at; IN DTVISI P P 53 G D M�ION 11 IWORKS STRU CTURAL PERMIT COORDIN�T�R i DETERMINATION OF COMPLETENESS: (T,Th) COMPLETE Ei NOT COMPLETE 0 COMMENTS APPROVALS OR CORRECTIONS: (ten days) CORRECTION DETERMINATION: DATE DATE DATE DUE DATE t /pasei 97 NOT APPLICABLE 0 TUES /THURS ROUTING: PLEASE ROUTE El NO FURTHER REVIEW REQUIRED El ROUTED BY STAFF n (If routed by staff, make copy to master file & enter Sierra.) I i DUE DATE it•±17 APPROVED n APPROVED W/ CONDITIONS fl NOT APPROVED (attach comments) 0 DUE DATE APPROVED I 1 APPROVED W/ CONDITIONS p NOT APPROVED (attach comments) 0 REVIEWERS INITIAL C:ROUTE -F (Ccrdficadon of occupancy required. ) ACTIVITY NUMBER PROJECT NAME DEPARTMENT: BUILDING DIVISION • PUBLIC WORKS ❑ REVIEWERS INITIAL ` REVIEWERS INITIAL PLAN REVIEW / ROUTING SLIP b97o3ao DATE ibrt.97 APPROVALS OR CORRECTIONS: (ten days) APPROVED n APPROVED W/ CONDITIONS a .. Reanf' P1411 FIRE PREVENTION ❑ STRUCTURAL ❑ 1 DETERMINATION OF COMPLETENESS: (T,Th) COMPLETF NOT COMPLETE ❑ COMMENTS TUES /THURS ROUTING: PLEASE ROUTE C ROUTED BY STAFF ri (If r ted by staff, make copy to master file & enter Sierra.) CORRECTION DETERMINATION: APPROVED ❑ APPROVED W/ CONDITIONS REVIEWERS INITIAL C:ROUTE -F DATE • PLANNING DIVISION (Certification of occupancy required. PERMIT COORDINATOR ❑ DUE DATE �,• 5. 97 NOT APPLICABLE ❑ NO FURTHER REVIEW REQUIRED. DUE DATE I Q • 1-.97 NOT PR VED (attach comments) ❑ (/" DATE ( 1, DUE DATE NOT APPROVED (attach comments) ❑ ACTIVITY NUMBER PROJECT NAME DEPARTMENT: BUILDING DIVISION J_) PUBLIC WORKS DETERMINATION OF COMPLETENESS: (T,Th) COMPLETE E COMMENTS REVIEWERS INITIAL PLAN REVIEW / ROUTING SLIP APPROVALS OR CORRECTIONS: (ten days) APPROVED El APPROVED W/ CONDITIONS REVIEWERS INITIAL CORRECTION DETERMINATION: APPROVED I I APPROVED W/ CONDITIONS p REVIEWERS INITIAL C:ROUTE -F b97'03a0 naTE -97 Q Mini %t�l/ FIRE PREVENTION 1l PLANNING DIVISION STRUCTURAL PERMIT COORDINATOR Q 4 DATE 1'1 21 c q DATE L DATE El DUE DATE - as . 97 NOT COMPLETE n NOT APPLICABLE 0 TUES /THURS ROUTING: PLEASE ROUTE NO FURTHER REVIEW REQUIRED El ROUTED BY STAFF n (If routed by staff, make copy to master file & enter Sierra.) DUE DATE !� • Cr . • 9 7 NOT APPROVED (attach comments) DUE DATE NOT APPROVED (attach comments) 0 (Cettifcatioa of occupancy required. 1 • ; , ACTIVITY NUMBER PROJECT NAME DEPARTMENT: BUILDING DIVISION PUBLIC WORKS COMPLETE COMMENTS • REVIEWERS INITIAL El PLAN REVIEW / ROUTING SLIP DETERMINATION OF COMPLETENESS: (T,Th) NOT COMPLETE ❑ • Dif o3ao na� -?it:97 s a+ MA hwi (nf Irst115 W2/ FIRE PREVENTION STRUCTURAL ❑ I TUES /THURS ROUTING: PLEASE ROUTE fl NO FURTHER REVIEW REQUIRED El ROUTED BY STAFF I l (If routed by staff, make copy to master file & enter Sierra.) DATE PLANNING DIVISION' ' ❑ PERMIT COORDINATOR ❑ DUE DATE 11-45"97 NOT APPLICABLE ❑ APPROVALS OR CORRECTIONS: (ten days) APPROVED APPROVED W/ CONDITION REVIEWERS INITIAL APPROVED CORRECTION DETERMINATION: APPROVED W/ CONDITIONS -d 516 DATE 1 Zl r I REVIEWERS INITIAL DATE C :ROUTE -F DUE DATE IQ • 1•• 9 7 NOT APPROVED (attach comments) ❑ DUE DATE NOT APPROVED (attach comments) ❑ (Ccnuficadoa of occupancy required. g'li'�'��11i** PLAN REVIEW / ROUTING SLIP ACTIVITY NUMBER b97O DAM 21797 PROJECT NAME f a+ TuIWI lo.. PteMmt BUILDING DIVISION FIRE PREVENTION El PLANNING DIVISION ' s ' DEPARTMENT: PUBLIC WORKS STRUCTURAL [J PERMIT COORDINATOR Q I DUE DATE II 5-97 COMPLETE [ NOT COMPLETE Q NOT APPLICABLE 0 COMMENTS • DETERMINATION OF COMPLETENESS: (T,Th) TUES /THURS ROUTING: PLEASE ROUTE U NO FURTHER REVIEW REQUIRED Ej ROUTED BY STAFF f1 (If routed by staff, make copy to master file & enter Sierra.) REVIEWERS INITIAL APPROVALS OR CORRECTIONS: (ten days) APPROVED El APPROVED W/ CONDITIONS REVIEWERS INITIAL VC/t CORRECTION DETERMINATION: APPROVED REVIEWERS INITIAL C:ROUTE -F DATE DATE DATE DUE DATE IQ • 01•• 97 NOT APPROVED (attach comments) 0 4)A DUE DATE APPROVED W/ CONDITIONS NOT APPROVED (attach comments) 0 (Certification of occupancy required. ) ACTIVITY NUMBER PROJECT NAME DF4PARTMENT: 'LTG DIVISION El PUBLIC WO Mel l0 C n COMPLETE COMMENTS REVIEWERS INITIAL �ro* C.cxttir-&v %py PLAN REVIEW / ROUTING SLIP D97 -0320 SUNSHINE RIDGE CONDOMINIUMS FIRE PREVENTION 2qI STRUC DETERMINATION OF COMPLETENESS: (T,Th) TUES /THURS ROUTING: PLEASE ROUTE p ROUTED BY STAFF l ! (If routed by staff, make copy to master file & enter Sierra.) DATE APPROVALS OR CORRECTIONS: (ten days) DUE DATE 10 /09/97 Oa Wi 9 APPROVED APPROVED WI CONDITIONS p . NOT APPROVED (attach comments) EY CbuechoRLkke( I (.a I Lb-d . iz,/p REVIEWERS INITIAL DATE CORRECTION DETERMINATION: APPROVED D APPROVED W/ CONDITIONS p NOT APPROVED (attach comments) 0 REVIEWERS INITIAL DATE C:ROUTE -F DATE 9/23/97 e.rna r1 ANNIN IVISION nt�ec to ai RMIT COORDINATOR DUE DATE 9/25/97 NOT COMPLETE p NOT APPLICABLE p NO FURTHER REVIEW REQUIRED p DUE DATE (Certification of occupancy required. ) 4 ACTIVITY. NUMBER 'PROJECT NAME DEPARTMENT: BUILDING DIVISION 11 PUBLIC WORKS DETERMINATION OF COMPLETENESS: (T,Th) COMPLETE COMMENTS PLAN REVIEW / ROUTING SLIP LJ D97 -0320 SUNSHINE RIDGE CONDOMINIUMS TUES /THURS ROUTING: PLEASE ROUTE n NO FURTHER REVIEW REQU ROUTED BY STAFF n (If routed by staff, make copy to master file & enter Sierra.) REVIEWERS INITIAL l I APPROVALS OR CORRECTIONS: (ten days) APPROVED n APPROVED W/ CONDITION REVIEWERS INITIAL CORRECTION. DETERMINATION: REVIEWERS INITIAL C:ROUTE -F NOT COMPLETE L __. I ' NOT APPLICABLE DATE 4( DATE DATE ci/ DATE 9/23/97 FIRE PREVENTION Q PLANNING DIVISION. a STRUCTURAL PERMIT COORDINATOR 0 DUE DATE 9/25/97 DUE DATE 10/09/97 NOT APPROVED (attach comments) Q DUE DATE. APPROVED I 1 APPROVED W/ CONDITIONS 4l 'NOT APPROVED (attach comments) Q (Certificadon of occupancy required. _ ci PLAN REVIEW I. ROUTING SLIP ACTIVITY NUMBER D97 -0320 PROJECT . NAME • SUNSHINE RIDGE CONDOMINIUMS DEPARTMENT: BUILDING DIVISION C FIRE PREVENTION X PLANNING DIVISION' PUBLIC WORKS ❑ STRUCTURAL ❑ PERMIT COORDINATOR ❑ 4 DETERMINATION OF COMPLETENESS: (T,Th) COMPLETE ❑ NOT COMPLETE ❑ COMMENTS TUES /THURS ROUTING: PLEASE ROUTE fl NO FURTHER REVIEW REQUll ED-❑}- ROUTED BY STAFF ❑ (If routed by staff, make copy to master file & enter Sierra.) REVIEWERS INITIAL APPROVALS OR CORRECTIONS: (ten days) APPROVED n APPROVED W/ CONDITIONS 17 NOT APPROVED (attach comments) Q REVIEWERS INITIAL CORRECTION. DETERMINATION: C:ROUTE -F DATE � DATE DUE DATE DUE DATE APPROVED ' ❑ APPROVED WI CONDITIONS ❑ NOT APPROVED (attach comments) REVIEWERS INITIAL DATE DATE 9/23/97 9/25/97 NOT APPLICABLE.Q 10/09/97 DUE DATE (Certification of occupancy required. ) 34, U PROJECT • NAME • REVIEWERS INITIAL PLAN REVIEW / ROUTING SLIP ACTIVITY NUMBER DEPARTMENT: BUILDING DIVISION El PUBLIC WORKS L D97 -0320 SUNSHINE RIDGE CONDOMINIUMS FIRE PREVENTION STRUCTURAL Ej DETERMINATION OF COMPLETENESS: (T,Th) COMPLETE n • NOT COMPLETE El ' NOT APPLICABLE a COMMENTS TUES /THURS ROUTING: PLEASE ROUTE fl ROUTED BY STAFF ri (If routed by staff, make copy to master file & enter Sierra.) DATE I I APPROVALS OR CORRECTIONS: (ten days) APPROVED n APPROVED W/ CONDITIONS E REVIEWERS INITIAL VA DATE CORRECTION. DETERMINATION: APPROVED ' APPROVED W/ CONDITIONS REVIEWERS INITIAL C:ROUTE -F DATE PLANNING DIVISION PERMIT COORDINATOR Q DUE DATE . NO FURTHER REVIEW REQUIRED DUE DATE iolal? DATE 9/23/97 9/25/97 • 10/09/97 NOT APPROVED (attach comments DUE DATE NOT APPROVED (attach comments) (Cerdficadon of occupancy required. ) ACTIVITY NUMBER : PROJECT • NAME SUNSHINE RIDGE CONDOMINIUMS DEPARTMENT: BUILDING DIVISION El FIRE PREVENTION PLANNING DIVISION El PUBLIC WORKS STRUCTURAL PERMIT COORDINATOR Q 1 DETERMINATION OF COMPLETENESS: (T,Th) COMPLETE El COMMENTS TUES /THURS ROUTING: PLEASE ROUTE $ NO REVIEW REQUIRED E ROUTED BY STAFF El (If routed by staff, make copy to master file, 8c enter Sierra.) REVIEWERS INITIAL I 1 APPROVALS OR CORRECTIONS: (ten days) APPROVED n APPROVED WI CONDITIONS tgl. NOT APPROVED (attach comments) 0 REVIEWERS INITIAL PLAN REVIEW / ROUTING SLIP D97 -0320 CORRECTION. DETERMINATION: APPROVED I 1 APPROVED WI CONDITIONS 111 NOT APPROVED (attach comments) Q REVIEWERS INITIAL C:ROUTE -F NOT COMPLETE U o..E'gs/ai DATE DATE DUE DATE DUE DATE DATE 9/23/97 NOT APPLICABLE 1 ion 0n14 9/25/97 10/09/97 DUE DATE (Certification of occupancy required, ) FROM: DATE: City of Tukwila John W. Rants, Mayor Department of Public Works Ross A. Earnst, P E, Director THE FOLLOWING PUBLIC WORKS PERMITS HAVE BEEN APPROVED FOR ISSUANCE IN ACCORDANCE WITH THE PLANS APPROVED ON DECEMBER 19, 1997. Permit Center Public Works Engineering December 19, 1997 SUBJECT: Peaks at Tukwila Retaining Walls (4 total) 15340 Macadam Road South Permit Number: D97 -0320 Contact Person: John Kane Phone: 206- 938 -1373 JJH /jh Storm Drainage Land Altering Two copies of the confirmed Utility Permit Application and plans are attached for inclusion in the permit file. CF: Development File (with copy of application and plans) Public Works File (with copy of application and plans) PERMIT FEE $25.00 $15.00 TOTAL: $40.00 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: (206) 433.0179 • Fax (206) 4313665 A PROFESSIONAL 2030 FIRST AVENUE TELEPHONE: (200) 256-1803 SERVICES SUITE 203 EV: (200) 258.0197 CORITRATION SEATTLE, WASHINGTON 98121 .. '"1 - SSOCIATES CONSUMING ENGINEF,ES : 1997 . , Mr. Duane Griffin City of Tukwila 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 Regarding: 97-T-23 The Peaks at Tukwila Retaining Walls (D97-0320) • • Dear Mr. Griffin: We have reviewed additional information for, the proposed retaining walls with the structural provisions of the 1994 Edition of the Uniform Building Code as adopted and amended by the City of Tulcwila. We have no additional comments. Enclosed are the originally submitted drawings, including the attached 8-1/2" x 11" sheets containing structural information. We are also forwarding a revised Sheet S8, structural notes, and the geotechnical report with supplemental letters. We have forwarded a copy of this letter to J. Kane & Co., Inc. and Kussman Associates for your convenience. If you have any questions or require any additional clarification, please call me directly at (425) 255-3099. ROBERT FOSSATTI ASSOCIATES, INC., P.S. Ciystdl Kolke Senior Plan Reviewer B FOSS \Ill Sincerely, E 'R c:\Fossatti\Tukwila\97t23^1.doc cc: Mr. Jefferey J. Rich, J. Kane & Co., Inc Kussman Associates RFA #97102-23 R 0 B FOSS ' NTT! l A S S O C I A T E S . CONSUCrING ENGINEERS December 8, 1997 Crystal Kolke Senior Plan Reviewer a:11 ossutti \TukwiIaW7123 "1.doe f‘fe,c. A PROFESSIONAL. SERVICES CORPORATION cc: Mr. Jefferey J. Rich, J. Kane & Co., Inc Kussman Associates • 2030 FIRST AVENUE SUITE 203 • SEATTLIi, %VASIIINGTON 90121 Mr. Duane Griffin City of Tukwila 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 Regarding: 97 -T -23 The Peaks at Tukwila Retaining Walls (D97 -0320) Dear Mr. Griffin: • TELEI'IIONE: (200) 250.1003 FAX: (206) 256.0107 RECFAVED DEC 0 9 1997 COMMUN i•Y DEVELOPMENT RFA #97102 -23 We have reviewed information for the proposed retaining walls with the structural provisions of the 1994 Edition of the Uniform Building Code as adopted and amended by the City of Tukwila. The following comments should be addressed by the permit applicant: 1. The information we received did not include Structural Notes. This information needs to be provided on the drawings to verify that the retaining walls will be constructed as the Engineer of Record has assumed in the calculations. Complete information needs to be provided for our review. 2. Required special inspections must be called out on the drawings. Refer to UBC Section 1701.5 for requirements. 3. The geotechnical report must be submitted for our review. The geotechnical report, along with the recommended design values, must be referenced on the drawings. Refer to UBC Section 1804. 4. The 12 -inch retaining wall in Section 1 /S8 does not contain minimum reinforcing as required in UBC Section 1914.3. The above listed review comments should be responded in itemized letter form. We, therefore, recommend that the permit applicant have the structural Engineer of Record, Darrold E. Bolton, respond to the above comments and resubmit two copies of revised drawings and one copy of supplemental structural calculations directly to our office. We have forwarded a copy of this letter to J. Kane & Co., Inc. and Kussman Associates for your convenience. If you have any questions or require any additional clarification, please call me directly at (425) 255 -3099. Sincerely, ROBERT FOSSATTI ASSOCIATES, INC., P.S. City of Tukwila Fire Department Re: .Peaks'At'Tukwi.la 15340 Macadam Road South John W. Rants, Mayor Thomas P. Keefe, Fire Chief Dear Sir: The attached set of building plans have been reviewed by The Fire Prevention Bureau and are acceptable with the following concerns: 1. Every building shall be accessible to Fire Department apparatus by way of access roadways with all - weather driving surface of not less than 20' wide and 13'6" vertical clearance. Access roads in excess of 150' shall be provided with an approved turn- around area. Access shall be within 150' of all portions of the buildings. (UFC 902.2.2.1, UFC 902.2.1) 2. For all commercial, multifamily and single family subdivisions, hydrants shall be placed so that a hydrant is within 150 feet of a building and so that no point of a building (around it's perimeter) is greater than 300 feet from a hydrant. Distance from a hydrant to a building is measured along the path of vehicular travel. Any overlooked hazardous condition and /or violation of the adopted Fire or Building Codes does not imply approval of such condition or violation. Headquarters Station: 444 Andover Park East • Tukwila, Washington 98188 • Phone: (206) 5754404 • Fax (206) 57.5-4439 Headquarters Station: 444 Andover Park East • Tukwila, Washington. 98188 • Phone :(206) 3754104 • Fax: (206) 575-4439 C CITY OF TUKWILA Department of Community Development Building Division - Permit Center 6300 Southcenter Boulevard, Tukwila, WA 98188 Telephone: (206) 431 -3670 bin. o Sza DATE: YVAI'A / PLAN CHECK/PERMIT NUMBE PROJECT NAME: 'rte .PamAS i \T TuzCU,;: CoQJ\\eP i3 SAIA6H Z PROJECT ADDRESS: � D IY14A C P t11v\ 1Z1"j 3 CONTACT PERSON: `iZ?,1k V-t\t• G PHONE: '2_0 tv •- �.�(. -2_ REVISION SUMMARY: Bldg. SHEET NUMBER(S) ) M L ` Lt L'Z l__ , Lt* "Cloud" or highlight all areas of revisions and date rev SUBMITTED TO: Ark • CITY USE ONLY Planning Fire RECEIVED CITY OF TUKWILA NOV 2 1 11997 PERMIT CENTER 43z0 Public Works 3/19/96 ,•. ' • • • • . DATE PROJECT NAME .1. :•:•-•:',.:APPLICATION NO:. • PLAN REVIEWER The proposed walls are approved subject to the following condition which shall be entered on the . first sheet: • "The southeast retaining wall (next to the fire hydrant) shall have a brown color integrated (e.g., dye mixed) into the concrete." This retaining wall review does NOT address any of the other site revisions which are needed for consistency with the approved PRD design (L95-0054, Res. 1383, 10/20/97). However, it does reflect a preliminary check that the approved walls do not preclude implementation of the approved PRD design. file q/95/sunshin/walls, PLANNING DIVISION REVIEW 11/24/97 Peaks Retaining Wall D97-0320 Vernon Umetsu, Associate Planner. (206) 431-3684 rystal Kolke Robert Fossatti Associates Consulting Engineers 2212 Camas Circle S.E. Renton, WA 98055 • Dear Ms. Kolke: Please do structural review per U.B.C., 1994 Edition. If you have any questions, please call me at 206-431-3671. Sincerely, Department of Community Development Steve Lancaster Director 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • (206) 4313670 • Fax (206) 4313665 'h is application cannot be reviewed or approved without City Council approval of a revised esign for its planned residential development permit (L95-0054). This revision process is on- omg. City of Tukwila Department of Community Development John W Rants, Mayor Steve Lancaster, Director " September 294997 '• . . Mr. John Kane •• ' , 3422 Belvidere Southwest. Seattle, Washingt on 98126 Dear Mr. Kane: SUBJECT: LETTER OF COMPLETE APPLICATION Development Permit Application Number D97-0320 The Peaks At Tukwila 15310 & 15340 Macadam Rd S This letter is to inform you that your permit application received at the City of Tukwila Permit Center on September 23, 1997, was reviewed at the September 25, 1997, plan review meeting. Your application was determined to be complete. Your permit has begun the plan review process, you will be notified of any required corrections or when your plan is approved. If you have any concerns or questions please contact nie at the City of Tukwila Permit Center at (206) 431-3672. Sincerely, Kelcie J. Peterson Permit Coordinator File: D97-0320 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • (206) 431-3670 • Fax (206) 431-3665 9e12A • � r ar-t; •r - +�re; ...�:;..-: i .., ..,�. s. ya"n•. ! x tr7acr ., fi/+fl NuMBEF? c'� : v j1 �i +`' +Fj Afl TE `" c, :t In { � '• .� r. i ��Y F , . i •a � 5;r L •q � , 1 .��;.� ktn 4i'Y p ^: r New 44.4 Roo t- \ 117..5c 95o4 a 4 o 4 A. P' \ 95,14 14'3 .kQ 2o4 140. IA • \ \ - -� GS^OIVA \ \ S-8 i ? K dt::::::::1 ' r ti. A9 a ?52. s4 E.r_' • los tcz (%5 k ukk 'T ie IrP 31 311 1 1 Ty t 4 ■ yi �GTON NTON LEGAL DESCRIPTION THAT PORTION OF TRACTS 22 AND 23, BROONYALE GARDEN TRAr TS, ACCORDING TO THE PLAT RECORDED IN Y•LUMF 10 Q< M_ATC, RAC.F 17, IN NINO COUNTY, WAR/IINwoN, I•r ': Frr nlrU AS WI tow, BEGINNING AT A POINT ON THE NOR. LINE OF SAID TRACT 23, WfICH IS 220 FEET EAST OF THE NORTHWEST CORNER OF SAID TRACT 23. THENCE EAST, ALONG SAID NORTH UNE • FEET TO A PONT YMICH IS 22' FEET EAST OF THE INTERSECTION OF THE SOUTH UNE Or SAID TRACT 22 MTH THE EASTERLY MARGIN OF THE COUNTY ROAD; THENCE NORTH, AT RIGHT ANGLES. 140.0 FEET MORE OR LESS TO LINE 0" OF A BOUNDARY UNE AGREEMENT RECORDED JANUAFIY S, 1972, UNDER AUDITOR'S FILE NO. 7201050122, THENCE SOUTH 138"33'07• EAST ALONG SAID UNE • D • , 223.09 FEET MORE OR LESS TO LINE • C • OF SAID AGREEMENT; THENCE SOUTH 0'30'41" EAST ALONG SAID LINE •C" TO NORTHERLY RN*IT -OF -WAY MARGIN. Of STATE HIGHWAY NO. 1, AS CON0EYED TO 1111: STATE OF WASHINGTON BY DEED RECORDED UNDER AUDITORS FILE NO 8480008, RECORDS OF SAID COUNTY; THENCE WESTERLY ALONG SAID R1GNT- OF -WAY MARGIN TO A POINT SOUTH OF THE POINT OF BEGIN000, THENCE NORTH TO THE POINT OF BEGINNING. 1 s PARGG{. '* 115720 - 0222 SHEET NO. Al A1.2 A2 A3 A4 A5 A6 A7 A7.1 A7.2 A7.3 Al A8.1 A9 A10 All Al2 A13 A14 All A16 A17 All A19 A20 A21 STRUCTURAL S1 FOUNDATION PLAN S2 BLDG. A FLOOR 6 ROOF FRAMING PLANS S3 BLDG. B FLOOR & ROOF FRAMING PLANS S4 STRUCTURAL NOTES, SHEAR WALL SCHEDULE 6 DETAILS S5 FOUNDATION SECTIONS 6 DETAILS POST TENSION. SLAB FL 1 r PS1 PS2 PS3 P54 P55 PS6 LANDSCAPE L1 CIVIL Cl GRADING & DRAINAGE PLAN C2 GRADING 6 DRAINAGE NOTES 6 DETAILS C3 SEWER & WATER PLANS C4 SEWER 6 WATER NOTES 6 DETAILS C5 DRAINAGE SEWER 6 WATER PROFILES C6 SEWER 6 WATER PROFILES mil j P i6) e4rAttlIUG DaFl LANDSCAPE PLAN J ITE >rL ^j /3 ■ SIEET CONTENTS. SITE PLAN PROJECT DESCRIPTION 6 GENERAL NOTES PARKING GARAGE 4 1 & BLDG. A LEVEL 1 PARKING GARAGE 4 2 6 BLDG. A LEVEL 2 BLDG. A LEVEL 3 & BLDG. 0 LEVEL 1 BLDG. B LEVEL 2 & ROOF of BLDG. A BLDG. B LEVEL 3 6 BLDG. B LEVEL 4 BLDG. B LEVEL 5 6 part of ROOF PLAN BLDG. A ACCESSIBLE UNIT PLANS BLDG. A UNIT PLANS BLDG. 0 UNIT PLANS 6 WINDOW,DOOP SCHEDULES BLDG. A SOUTH ELEVATION BLDG. B SOUTH ELEVATION BLDG. B NORTH ELEVATION BLDG. A 6 BLDG. B EAST and WEST ELEVATIONS BLDG. A NORTH ELEVATION 6 SECTIONS BLDG. B SECTIONS BLDG. B SECTIONS BLDG. B STAIR 6 ELEVATOR SECTIONS BLDG. A SECTIONS BAG. A SECTIONS 6 TWO HOUR WALL DETAILS BLDG. B SECTIONS EXCAVATION PLAN EXCAVATION PROFILE SECTIONS COVERAGE CALCULATIONS RECREATION PLAN 6 CALCULATIONS RECEIVED PIG RECEIOED CITY OF TUKWILA' PERMIT CENTER D —q4 -oLo E NTON NCTIO GENERAL NOTES yC T - P.T. DETAILS RsINF. PLANS P SST TENSIONING PLAN SS MILD REINF. P LAEF AaP a. APPS ;ABLE ORDNANCE J J -.T 'J RL E '75 R�INF. PLANS S Or THE ar,ni�, -,ii �J 1� ,N1cA ?R_'Tr INN .77 7 • VUL0 1 1 Date Job No. Sheet C. 1 1• 1 '17 Of .<.� RM. It RE.CTcL1.14 F.F. 117.5e I 4r2sc:cr C txrro 71 = 4ve A• IS/ _ntl10aoo11111•1111 19 - $. • " 7 =8 167'- 6" A I FF 117.6 x •' + 1 16.75 OYE.! _ To A80VE 1 O1 /L N- mil. R' lot.iHiil - C7 E. ;qi'o3w C 5 9 '2) 8" inn j 30 1_ oh ! - - e 1155] - -- --- 1 4" - 114.se — - --- 1 - - - --1 — r 2 14c. I Y 3 t-!c —1— I I I I I I I L r$ 5 I 1 4 5 I-- 90 29 r3 - - - ... ICKIIJ6 6A1 6,744.5• +' .IFS ARCH CO '9 GARA0P. NTIUTts,J 1.5 C.f./M4 = 18,114.7 CF.,4,4. l6 -2" 2c, I 4 122_' I'LL" 10 MAX.a{l.O.i LT G4b GE L I41d11N6 .2o W J -. s. 8744.50 x.e0 a 1,748.9 t{'4 TTs 114.10' 22 I6- 0 '6 14 20 I` 16 9 t" alk o r 33� fe 'on IE 18 " \ 17 t0 ) — 1' - y 1 0 C 4N 7 o - C 0 Tr, DO ci cam°° C u 4. tt a. 0=1 • In og CA • — _/ V r a �- x L.. O N a a OyT,4 q, ECEIVED CITY R OF iUKWILq PERMIT CENTER RECEIVE _. 2 N\G 154.m.m•A Lem. ass fAXXaers Gp,+uGC 5C toYr Ii•• 1 ND CONC. MON --= ROS v.tt PG.t6A 33' NORTH __ EAST 8 • n N 8 FOU O. DA PERF MON N CASE,' ow SILT FENCE ALONG E ROCKERY 4 � • ' r �' _''V I I . MA7L HEIGHT NIPc •u,_� 6' PERF. DRAIN L 4ARD t1R+ .-- _ SEE_SEG11ON A - $: '34'28 \ Ex. CB TYPE II RIM =9$.33 INV= 92.03. 12" (N) INA- 90.03. 2 (E &W) EXISTING BUILDING 11"1 ..-, L! !1 ICY/ PLAYGROUNDA :MCAPING OVER UNDER GROUND RAGE \ 'kB= 15.33 y CONNECT PE \ 1 . TO FOOTING DRRF.11 I N e s 1 B �TILDI G IIGHTUN / =117.1 CUT CB AS REVD FOUND 1 IP 0.73' NORTH 0.69' WEST \ORry W ST AY CURB CUT FOR ACCESS ROM 6' P . 00TNG P AIN YARD DRURE FF =135.50 55'12 YARD DRAIN, TYP. 8• DRAIN FOOTING LYE 'COON* ^'EXIsf CRUSHED GRA WALKWAY PERF. FOOTING DRAIN ELEV - 116± 6' PERF. ROCKERY DRAIN, TYPICAL BLDG - 6' PERE. ADS F. • NG DRAIN • ELEV 1071 • WEST END TO ELEV - 129t • EA END 1332 I. PLACES fig 4Z�16 w CONSTRUCT 8' WIDE (W CRUSHED ROCK SURFACE). TRAIL BETWEEN SE CORNER OF PROJECT a EXIST. TRAIL AT 57TH AVE S., UNDER SEPARATE PERMIT EX. MANHOLE RIM =129.82 JEET INDE 3 C4 C5 Ce SCALE 1 = 20' 46.721. sq ft. 1.07 acres EI' .EVATION 1ATUM: K.GAS. 1 ° +ENCH MAI 'C: a a • SW CORNER OF CONCRETE L.P. BASE LOCATED 50UT± rr 11. TMLA PK170 0 S. UNE BRIDE a THE N1ERSEC1101^ ''HEREOF. ELEV. -.36.44 L' °SAL DESC IPTIbN THAI PORTION OF TRA ?S 22 AIID 2 . BROOKVALE GARMN TRACTS, ACCORT1IG TO THE PL'':' RECORDED WI VOLUM' 10 OF PLATS, PAGE 47. IN a COUNTY, v.SMM,TON, DESCRIBED AS FOLLOWS: BEG110 4G AT A PORI 7N UNE OF SAID TRACT 23, WHICH IS 220 F_:- eT EAST OF RE CORNER LT SAID TRACT 23: THENCE EAST, ALONE; SAID NORTH LU 4 FEET 10 A PONT K :ICH IS. 224 FEET EAST OF THE IN- C1WGCDON OF # SOUH1 ERIE. OF SAID TRACT 22 WITH THE EASTERLY MARGIN OF THE COUNT'- ROAD; THENCE NORTH, AT RIGHT ANGLES. 140.0 FEET MORE , c1 LESS TO UNE. D OF BOUNDARY UNE AGREEMENT RECORDED JANUl!' Y 5,. 1972, KNEE - AUDITOR'S FILE NO. 7201050122. THENCE SOUTH 8833" EAST ALONG ' - ID Lit '13'. 223.09 FEET MORE OR LESS 70 LAZE • C' ter SAID AGREEMEN THENCE SOUTH 03041' EAST, ALONG SAID UNE �C 70 F :T/TREBLY RIGHT-4:. WAY MARGIN OF STATE HIGHWAY NO. 1, AS CONVEYED TO .1E STATE OF WASHIT TON BY DEED RECORDED UNDER AUDITOR'S FILE NO. 54' J08. RECORDS OF IT O COUNTS; THENCE WESTERLY ALONG SAID RIGHT- OF- - "NY MARGIN TO A F ?!T SOUTH OF THE POINT OF BEGINNING, THENCE NOP ' TO THE PONT OF DARNING. GRADING IN DI .NAGE GRADING IN ,. ::AGE NOTES a DETAILS WATER PLAT- NOTES SEWER PLA '. !OYES IN DETAILS DRAINAGE, :'. 'ER IN WATER PROFILE T.ES.C. PLO APPROXIM[ E EARTHWORK QUANTITIES 1500 C.Y. SRBPN;. 3500 CY. CUT 5000 GT. FILL MON IN CASE AN AT rtdW CONNECT 1111H EXIST. TRAIL These Fr have been 'TTY» I hi, rh. pubYT Works t City aI, Orr. •..;1 f nec or cre,r to 1 • de: 11 se G dept , revised i r Final ac ice is subject to field tin by the PuL. J:!orks utilities inspector. Date: 6y: RECEIVED C RY OF TUKWILA of PERMIT CENTER A1,t .T ' NOV .. 7 1",.7 P EaT'E 04 27 95 I AB ma, 997 -002 , BRAVING 10. 997 -201 W _ 1 W z 2 H Z \r i SET . . M Hoot I:IIR71WW I - rwtA �����i��t�5���`������������� AMOruaRINIO - .. OO MARttiOAMIMM • b . ®7RI000OIC/ TMrr014TA• -. .. . . . O ROWAUMRRlA ENN IISCEPPOWIA1101WWWA'MLIAIR WASIMAWNINSTWIIIII IIMIOORIWIRTRNMS • &MittORM.OM. ■IOIIrMR AIATAXONFACIW ERNIMP IMAM . :R MI AN MNW01160 lVIIRONINArITRAANIWINT annum euudanuoli•ent to. EWE Man OVARARMI 11101 WWWW WW, WORN INE IMISUlpNr WARM Plr WM PID RAlB Awl NTORAAOd1 MSl'^OTW IONIWWWWRI@M MUM GAT ORM. ��� WAIONNAQUARIUM •.. , ORAr! d ; MRADRMAINSIN TGRAOIIMI! MORN GRASS PAR NINOCNRA1RR07MATA SCAMP WY PROfRNA/1GIM R! R®IOF MOM. prentwomb. LLTO►TIM WALL...ROI MARIE W AIRRORO[Ut07r ORO MR. bums_ OOMi1RPALUMRY RIOOOMPORMIWPR1 RM.INO111RT MR. NIM. RINIOGINPONWIN WOWS OONM.A1lR. ANGDOWSWENIONVOGINW ... .MAT A-*A Ru,IOA MIOMMO MUSA MOATA 'RIRIeIRRMOla11R TRC'710MORR* WWI* WINIANIUSI RINANNWIRJO lwTOSNW ISON n ooI1w19rRa...... , ,rp. Thvus 'SPt:: EkkoZ . (waeusrous Au •Iii LAWN - - - A - _ --- A.= / G • J r'_.' 01, :I LAWN FL OG, 4 P Lf4 'Conked rock Pathway / 11ai - Ci..`A-i r- f •-•... ./ ""•-..../ t —NM M A4 /G K 44 5 PLANT LEGEND o?H "sLeorr,MW T. FIILw '/ FbrIFY LfJCU ST GG G15 a 16_x / {V M I °IN ^ -4Q AU,L r+nlJ�. M..JwlF 'l -d rrrXErcy J per., Ntn 7 aware: wAu. 4— Prv9RNW* wixemef STATE OF WASHINGTON REGISTERED DAVID W. r•WOW CERWfKATt t "tab. '1C! ors 2 . A lrH, Teo( LANDSCAPE PLAN SCALE r _ 10'-0 - RECEIVED CITY OF TUKWILA PERMIT CENTER RECEIVED NOV 99 ummosatir • Z Poi c }} 47 ti! rm / e ' Large Tree Guying N.T.S. N,T.S Shrub rlar ing H.T.S. r't: - Re eifuY1nG INFO PRO, - 0 GUY LN+E� 1•j/6T/etr{m FOR �R6% SIZED 4 - C ®H. - * Ga` .. 14 / STAfrfi.t n?!Y t-ste O uP •rACr_ a +sr._r AgLetot•D e . tn IV2 [,.AO R✓pgCR OR z �v�c�RtrN c•. Cry C�Gd� - EE £ ATV rCS 12 6.A. WIRt, T, el" - To T16HTEN. f'•E w RG '"IK Cx° 6 I LeE •- o LG�6, IDG vEN A.evC've ■OTE.) 11p tEe c '� c eG D�pJe) Shruh /Gre'_ind Cover Mass Planting LePT ti AS &RC "'��G ••, IOt v.. As 6°1ci'i f '•t l b _ G I' gc�`WLL(� ^ove Ems' Ai OK co*AI r G IR.) E.' .LL AS 15 ♦,!O, r.ATC 4 N, ('Y cp.. OBE lWt._I,.ON w,. c_ -we a rrco"Iv� Ci' PI11t. ac r nLL K"EATH aoeTEALL 'TPA 0 C' x c. ; f,- t- PARKIr5 LOT ♦ —' —► �i O�wfC, WALL D0. ;Apo * nN T e f I RO N Flan A r� ICs 6aDGW.�.+a TO Z• _ ver' c a KOw. ( TYr) I ED II I : 111, 11' 11111!1 ill , (IIII `'lit > �y1t 'ill - 1 't 01/YaI19n Evergreen Tree Planting Cre (I i L x2 pO46 PIP. gTAK P"'EBTniN cA 4c. E <LGM Nsdrsr- ocy"1Er'`_‘ TAP, rG f ,- -Go Oc c'YAKG INTO Pr f�MlrArT r . r7 GIREGr''crc - -- MUt.GN P'fl -I A6 SPCGIFIGD ?IPII' H GRAPE Ds2 1vF ! TG SE FJG,AL A., CAP, X OFF TOF OF FOG"CaAL L. ruAc ♦<FILL AE 5o!_E:Ir�eo, wA�ta IN. — GGMrAGT c ...NG Or TGPOOIL O 6drrrKT iFCG' 4H es rAGI MILLING. LANDSCAPE GENERAL NOTES: Protection of Site: Locale all existing and new undergromd utility lines prior to any construction Save and protecI c-isting trees designated to remain. Repair am damaged curbing. sidewalks, fences, and all oilier construction elements of the site at no additional cost In the owners satisfaction. Soil Preparation: Scarify a:itive soils to 6" depth and remove from site all existing vegetation and rocks / debris larger Than a 2" size from planting areas prior to placing topsoil and as uncovered during planting. Gradin Landscape contractor to be responsible for maintaining finish grading in all planting areas. Rough grading by general contractor to plus or minus one kith foot. Topsoil Placement: Landscape Contractor I place imported topsoil to p 6" min depth in shrub planting areas and to a 4 "nrin.depih in lawn areas and as required during finish grading to insure positive surface drainage. Pit plant all trees and shrubs with 50% native soil and 50% import topsoil and backlll per Typical Planting Details. Berm as shown on landscape plans / sections. Imported topsoil shall be from commercial supplier. Sec Landscape Specifications for mixture. Submit topsoil sample to Landscape Architect for approval prior to delivery to site. Plant Materials: All plants shall conform to Cole of standard set forth in the latest edition of AMERICAN STANDARDS FOR NURSERY STOCK. All deciduous trees with single trunk A be size and varier as specified in Plant li_gcnd. straight tntnked, symmetrically branched, with lower limbs ponied for head room. All evergreen bees to be size and variety as specif ed in Plant Legend with f dl lnmct ma branching low to the ground. All plant materials to be nursery grown and purciuscdm conimctnr to match within each varier in size, quality, and character as indicated in Plant Legend- Si Reunarks All ground coyer planting to he triangularly space on ecnler as noted A Plant legend' throughout designated planting areas to drip line of low branching shrubs and evergreen trees. Plantunatcrialc not meeting Mese requirements shall be rejected. Fertilize 41 •pl:i t inmerials with " Osmocotei controlled release granules as manufactured by Sierra Chemical Company. I1 -13-13 anafsis at the following rates of application: w N.T.S. Plain ' ) Elevation Deciduous Tree Planting - {M'DIn.CLTGC rria OR Deciduous Tree - Erergreen Tree - Shrubs - Ground covers - T W 4Q TO 7 4, rvp"er, - Are -! l=ogs Al �TnK!6 1•AGft ev LT AROAre TRUE K, s•-/ 4nP61p` .Of 14 p_As - rlG H06Lr 2 W. t 'taE - -- (3r 2x2 Ob1J6 sTAkES, ^'t�6TAINEC7 DA 67c e .p 4 - ',Tye T/cl O Y e w • — 0 GCv'N AS ?rCc F &D. rAcm.F AS ,•E, TA/ 17>'l irverre ce,- OF 'TO Ot.CIt. ?O �r�vORT ¶ E A lLll eY•GesFILLlrb. SCAM fY 5I0Ee Sol 1 Of nT. r cacla I IC f lrcc .I of -. Osmocetc granules pc caliper 3 or Osnrocote granules per each I' -A of tree height, 4 or. Osmocote granules per shrub_ One S oz cup Osmoeole gear :;ICs per 107 sq. R of ground cover planting area Broadcast granules around roodrall after backfilling by 50% for tree and shrub plantings For ground cover plantings. broadcast by had throughout planting areas after planting, backSlling. and finish grading Bark Mulch: Provider depth Fine mnlclt tw Pae∎.Cerc `rani all ground cover and shrub planting areas- Finish grade mulch no be held down !IC from top of adjacent curbing or paving. Staking and Colin, See typical Planting Details 9_ Maintenance and Guarantee Maintain all planting areas until final acceptance of the job by flue owner. Maintenance stall include removal of weeds , spraying of pesticides.additionaffertilizing as required and clean cap. Clean cap Al litter, soil on walks, etc and leave site spotless throughout construction. Guarantee A a healthy thriving condition trees, shrubs, and ground cover for (I) one year from the date of Final Acceptance and and throughout the guarantee period, all dead diseased, dying. or broken plant materMls shallbc replaced immediately by the Contractor at no additional expense A the owner. All replacements shall match specified plant malcrial and shall be guaranteed as sated herein T hr REVED CITY OF CEI TUKWILA PERMIT CEKT €B • REC :EIv-1ED V'Ii }`' °MAO w INI M st :: i �1 T, TE ma M Scale: As Shorn 4 L -2 K7 O — 4�r1feY CONCRETE WALL 'Vest: (533 SF) — CONNECT TO GARAC ROOF DRAINS (TY — C 'lIANNEL DRAIN EDGE OF CURB - XISTING ROCKERY _ 7 ` CONCRETE WALL RECREATION TRAIL ( 5,431 SF) WOOD FENCE EXISTING ROC 7 GRADING LEGEND B.S. BOTTOM OF STEP B.W. BOTTOM OF WALL H.P. HIGH POINT F.G. FINISH GRADE R.E. RIM ELEVATION T.P. TOP OF PAVING T.S. TOP OF STEP T.W. TOP OF WALL TRENCH DRAINLINE (4" perforated Pipe and drainroek cover) CHANNEL DRAIN (Connected to storm drain system) LANDSCAPE DRAIN (Connected to storm drain system) REQUIRED RECREATION AREAS 31 Units x 400 SF = 12,400 SF Req'd Play Area of 25% = 3,000 SF EIOVIDED (Revised 7/3/97) Indoor Recreation Area @ 2 to 1 Ratio = 4,322 SF Outdoor Recreation Trail — 5,43I SF SUBTOTAL: = 9,753 SF CHILDREN'S PLAY AREAS: - West: = 535 SF Central: = 1,700 SF Hass - = 1.010 SF SUBTOTAL: = 3,245 SF TOTAL: = 12,998 SF {E-TAIL- A-A (MeL.J.P. t Reap p.CLE SS) MVO W DOOM 3.9.., -+ Y eartrsiuusr�o sin ; LAYOUT .nd GRADING PLAN SCALE r 2 RECEIVED CITY CF TUKWIL,p ��„� taa.�t Cyr rsltyy i PERMIT CENTER ZW y 8 'R 1 . / :• ,� ..:; ! z° ` n , T") l �l ` - .� \ ° : - . _ .� iii ❑ *. ,.�: s� atvyz r. EXTEND ROCKERY V1 LU TO TRANSFOFRI .. _ _ r � 6 , 7 a it LW OW- P+'4 i`: 'P-CO S'ene- 0 %i A r aY: "405, 2 osc-rtot -{ CHANNEL DRAIN D 1 1-- 0 37-0 Not Telltale 4 .� 6, PJ Nt= l OF4 e0.611-1 O W /Co" PIV4LJM 413•as IN •'H -UE, AV,* (L At ) . • Ski IHE:w.A.Tes 127F apv-re Fos 61120InNAPtiPrOm.e . I �tNKH 4P PL c'Mf T� ellie s �x 4tt - ts71904N 1 'IP* g> �` 4 4 ra`1 Fo 'r PP-"IN PIPE 6e*0 ? ION LANDSCAPE DRAIN Not TttlIcalt N r 7e-TAI L B V r Woof, t �IJC `fiaN'7�R^ /fitl :ILA t7E 7G FL+6UL - r NI C.� Mi Ig■FI F11.TRR rtmsettc+t oplis on. ar0141 . m4•iNuoUS.I.. Q InR otir cue4c FT I.VPRAIN PAR LI Nt R+- Fa'T Fira J4 r-'%1 rinua.aa. PIDOMMPsV TUBING. avNNiCT - ro 4M417 Wosfl, PtQa, N �e SYSTEM, stge 5HT. RECEIVED CITV OF TUKV: iLA PERMIT CENTER RECOV L -4 t s