HomeMy WebLinkAboutUtilities 2013-08-19 COMPLETE AGENDA PACKETCity of Tukwila
Utilities Committee
• Joe Duffie, Chair
• Allan Ekberg
• Verna Seal
Distribution:
J. Duffie
A. Ekberg
V. Seal
K. Hougardy
D. Robertson
Mayor Haggerton
D. Cline
K. Matej
L. Humphrey
B. Giberson
F. Iriarte
R. Tischmak
G. Labanara
P. Brodin
S. Kerslake
Clerk File Copy
2 Extra
A. Le (e -mail pkt. pdf)
e -mail cover to:
C. O'Flaherty, D.
Alm berg, B. Saxton,
S. Norris, M. Hart,
D. Robertson
AGENDA
MONDAY, AUGUST 19, 2013
5:00 PM in Conference Room #1 (6300 Bldg.)
Next Scheduled Meeting: Tuesday, September 3, 2013 (due to Holiday)
46. The City of Tukwila strives to accommodate individuals with disabilities
Please contact the Public Works Department at 206 - 433 -0179 for assistance.
Item'
Recommended Action
Page
1.
PRESENTATION(S)
2.
BUSINESS AGENDA
a) 2013 Annual Small Drainage Program
a)
Forward to 9/3/13 Regular
Pg. 1
Bid Award
Consent Agenda
b) National Pollutant Discharge Elimination System
b)
Forward to 9/3/13 Regular
Pg. 5
Acceptance of Two Grants
Consent Agenda
c) National Pollutant Discharge Elimination System
c)
Information Only
Pg. 11
Western WA Phase II Municipal Stormwater Permit Update
3.
ANNOUNCEMENTS
4.
MISCELLANEOUS
Future Agendas:
- Adoption of SWCP
Next Scheduled Meeting: Tuesday, September 3, 2013 (due to Holiday)
46. The City of Tukwila strives to accommodate individuals with disabilities
Please contact the Public Works Department at 206 - 433 -0179 for assistance.
City of Tukwila
Jim Haggerton, Mayor
INFORMATIONAL MEMORANDUM
TO: Mayor Haggerton
Utilities Committee
FROM: Bob Giberson, Public Works Director
By: Ryan Larson, Senior Engineer
DATE: August 16, 2013
SUBJECT: 2013 Annual Small Drainage Program
Project No. 91341201
BID AWARD
ISSUE
Award the bid for construction of the 2013 Annual Small Drainage Program.
BACKGROUND
The Small Drainage Program constructs drainage projects throughout the City that are too large for
City staff to complete, but are smaller than a typical capital improvement project. The projects
originate from citizen complaints and maintenance staff and are compiled on the Small Drainage
Project List. Each year the projects are prioritized based on need, expense, permitting requirements,
and length of time on the list. The highest priority projects are then designed and constructed.
The 2013 Annual Small Drainage Program will provide drainage improvements at four locations
listed on page 2 of this memo.
ANALYSIS
The 2013 Annual Small Drainage Program was advertised for bids on July 30 and August 6, 2013.
Six bids were received and opened on August 13, 2013. The bids were checked and tabulated.
Henderson Partners, LLC is the apparent low bidder with a bid of $339,049.00. The engineer's
estimate was $409,850.00. Henderson Partners, LLC has successfully constructed other municipal
projects but has not done work with the City of Tukwila.
BUDGET AND BID SUMMARY (All amounts include sales tax.)
Bid Amount
SDP (2013) Budget (pg. 138)
Surface Water Lift Station 15 (pg. 140)
Contingency (15 %) 50,857.35
Total $389,906.35
Bid Results
$339,049.00
Estimate
$409,850.00
61,477.50
$471,327.50
2012 Budget
$500,000.00
(43,000.00)
0.00
$4457.000.00
RECOMMENDATION
The Council is being asked to award the construction contract for the 2013 Annual Small Drainage
Program to Henderson Partners, LLC in the amount of $339,049.00 and consider this item at the
September 3, 2013 Regular Consent Agenda.
W: \PW Eng \PROJECTS\A- DR Projects \2013 SDP (91341201) \Info Memo Bid Award 2013.doc
1
INFORMATIONAL MEMO
Page 2
The 2013 Annual Small Drainage Program includes:
Site 1) 34th Ave S — Extend an existing pipe, install a catch basin and connect a private drainage
system to alleviate public and private flooding.
Site 2) 33rd Ave S — Provide a drainage system on 33rd Ave S between S 140th St and S 142nd St to
eliminate roadway runoff from entering private property.
Site 3) 33rd Ave S to 35th Ave S — Replace three existing failing catch basins and repair asphalt
within a public drainage easement.
Site 4) S 164th St to 53rd PI S — Replace an existing failing storm pipe and replace two catch basins
within a public drainage easement.
Attachments: Project Location Map
Bid Tabulations
W:IPW EngIPROJECTSW- DR Projects12013 SDP (91341201)11nfo Memo Bid Award 2011doc
2
2013 Annual Neighborhood
Drainage Program
/ 19 11W Si 5 t4gF
Slh ei
I6t h 5t y2`�
Site 3
Site 2
Site 4
If
i22htl St
OtM1 St
zae
5,66tnst
36,a;=r
Site 1
.S21717tM1 St
Date: May 15, 2013 By: R. Linsao
W \PW Eng \GIS \Projects \Ryan \CIP Storm Drainage \2013 drainage program.mxd
s
S
Not to Scale
3
CITY OF TUKWILA
DEPARTMENT OF PUBLIC WORKS
2013 Small Drainage Program
Project No. 91341201
CERTIFIED BID TABULATION
It
�'...,
ROADWAY
SeP.
._-
Item De<.ecri lion
®ty'
unit.
'Engirreet s stint
'
mount
Henderson Partners LLl7
G'r'een River ConairuCfion,
Irtc,
'4
Hoffmali Constsuctbn,
`:.Amount : Unit Price
lnc.
Amount
Laser Underyfoured
EerttaveefkS,
UnitPtice..
&
Inc "
:'Road Constrtrct:on'4
Nor§hvuesf
Dnit Price
lttc.
..Amount
R. L. A1ia:Com
FUnit Price ..,Amount..
"an
Company
Chit Prices
Am
5 10,00010
3 8000.00
S ' 36{050.00
$ 1500000.
$ 30,000 00
a
$10,00000
$ 3,000 00
$ 17,000 00
$ 15,000.00
$ 8 000 00
;'Amount ':
$ 1200000
$. 3 000.00
$ 171 170.00
;$ 15,00000
Unit Prise'
.AmounS
1
104
Minor Crlanc;e
1
1
1
1
FA
LS
ItEll
LS
$10.00000
$ 8,000.00
$35,000 00
$1 00100
00000
$10.05000
$ 510000
10,000.00:'$ 70:060:00
$ 5.500 00 $ 10,25000 ,
$ 10,0130.00 ' 10000.001$
$ 10,250 00 J $ 5,000 00
10,00000 $ 1trg, bt7
$ 10E00 8 16,00000
5. 10,000065
:5: 16,000.00 I
,y 10,000.00
b .:,0,'16.00
$ 16;00h0 ,00
$ 100000
2
1 07 :1
roporary Water Pollution i Erosion Control
1-09 [170
'11
$ 28 208.00
$ 15,000.00
: $ 10,59300
$ 28,208.00
u 15,000.00
$ 10 503.00
$ 27 90100
$ 15,000.00
$ 19 600.00
$ 20,000.00
S 27000 00
S 15,900.00
$ 19,600 00
S 20000 00
$ 6,04090
$ 040 u0
S' 4315.00
$. 24,750 00
5 65;205 00
s 10,11 00
S 564.00
$ 720 OD
$..35,10010
$ 35 000.00. $ 40,000 00
5 40 00000
i X9,000.00.
$ 39,000.00.
1 -09
,11Un.
Resolution 01 TIM Conflicts
$ 15,000.00
$ 15,00090 $ 15,00000
$ 15,000.00
x 15,000.00
5 15,000.00
Project Temporary Traffic Control
y
i
$ 8,00000
', $ 15 000.00
15,000 00
$X36 200.00
. $ 2,200 00
2 9 00
rr -$ 35.25
$' 21.75
,r, 6 00
$ 191.20
$ 5.75
$ 3.50
$__ 300 00
$ 3 6100.00
S 210000
;: 10.4006 10
$- 1 41000..
3 4,458.75.
$.. 5 940.00.
-$ "0€7,228:00
$. 9,X6,00
$ 5,000:00
:5 5.00
$ 50.00
$ 25.00
$ 25 00
3 150,00
$ 10.00
S 10.00
as 5,000.00
5,000.00
$ 1600.00.,
0 2,0OG:{Y1
$ 512500
$ 24750.00
$ 47,250.00
5 1U,O10 /' 5
r, 600.ar01
$ 500.00
$ 4,750.00
•
2 -01
5. 00 and GrobSino
1
1120
40
CY
TN
TN__.
TN
$10,000.00 $ 10.00100
9 1100 .$ 11.200.00
,`> 35.00 $ 1400 -00
$ 25.00 $ 5,125 00
$ 30 00 $ 29,700 00
3 150 00 :. 47;250.00
$ 22,00100
$ 14.00
$ 3 00
$ 23 00
$ 22.00
$ 15000
$ 2a000.00 �. 6 2,500 00.
$ 2,500.!;10
($ 10,000 00
$ 1500,1
11 30 00 '
- $ 22 00
3 25 00
�: $ 140 00
f $ 6 00
$ 10 00
I $ $00 00
$ 2 00
$ 10,000,00
$ 1180000
$ 1,200 00
$ 4,51000
$ 24 -,750 00
5 44 100.00
rv'„ 90.1`,0001
$ 600 00
2 -02 :
Pavement Removal
$' 1 S 680.00
$ 1,200.00.
$ 4 715 00
$ 21,780 00 ':
S 47,250.00.
$ 10.00
$ 35.00
1 $ 23.00.
$ 11,200.00
$ , 1,400 00
$ 4315.00
$ 22,770.00 `
$ 56,700,00
$ 5.40
5 1100
$ 2100
:�.... .25.00
3 207.00
3 9.40
$ 9,40
$ 360,00
2 03 ',UnsaifattI
F0Uid at+on E;toaV &tioh (nof 4'ia ?ad
9
2 -03
Gravel Borrow Incl. Haul
.205
10
4 -04
twrushed Surfacin• Top Course
990
315
$ 2100.
11
5 -04
HMA CI 1 f'.G 64 22
$ 180.00
12T
13
5 04
5 04
HMA Thickened F0
It 60.00
60
LF
9,00 5 12,800 00
5 00 rfi 30000
$ 8.00
$ 100
$ 1210000
j 40 0
9 6.00
$ 400.00
-$ 6.007
'$ 6.400.00
`$ 360 -00
:$ 800.00.
$ - 30000 I1
:$ 210.00
14
TRAFFIC
8 4
CONTROL
Cement Conc. Sidewalk
2
SY
LF
�*'
S 150 00 $ 306.00
5 3.00 $ 2,650 00.
$ 200.00
.- .- a. -..�,
$ 5.00
$ 40000
$ 600 00�
'a 5,225 DO
_�_
$ 25000
$ 5.00
DEVICES
5 50
__ ..
15 8 22 Plast,c 61 ide Line ..N.•,
950
$ ^,750,60
4T 5.700.00 $ 5.70 S 5415 00
s ,,§-0-6.-0I- 0
ROADSIDE DEVELOPMENT.
16
17
801
8 01
T0e5nt1f Ine_:Com{icst
50
450
1
GY
�SY
FP
'$ 45.00
$ IT 2,250 00 ,
$ 1,350.0o 3
$ 4000 $ 2,00090
s 4500
$ 350
$ 2,250.00
4 1,579.00
$ 40.00
$ 2,00000 Q 40.00
$. 2,000.00 ' $ 53.00
$. 2,650.00 $ 35.00
J 1,750.00 �.
r
_
Hydroseed
S 3 UO
w 400
$ 1,130.0 iYJ
$ 2.40
$ 1,080 00 $ 2 00
$ 900.00 $ 300
5 1 350 00 t. $ 400
w 1 80090 lii
78
IS
STORM
8 02
Pr Restoratlon
of 0,000.00
$ 10,000 00
$ 10,00a00 00
$ 1C7.C1ti1.
1 $ 2,500.00.
$ 10 000 00
$. 1' (1'10,00
$ 10,000.00
5 10,000 00 $ 10,000 00
$ 8500 ' $ 3,000 00
r S 1t? 00c.c0 _ 10,500.00
$ 10.000 00 $ 10,00000.
$ 10 00000:,
Remove and Replace ii;;oker,
1
LS
3,000.00 1
$. 2,500.00
$ 800.00
S$ 60000
$ 885.00
I $ 3000.00
$ 1,500.00
6700 00
$ 6,700.00.
DRAINAGE
,_
50 ve and Re lace Wood Fence
15
LE
$ 75.00
$ 1;125 <00
.
$ 55.00 i 5 625.00
$ 40.00
'$ 60000
$ 43.00
$ 645 00 [ 5 55.00 d $ 825.00
r $ 34 00
$ 510 00'1 $ 00.00
$ 7,500_00
21
2 09 $1wn;1;1 or Extra Excavation Class B
t
LS
SY
$i 0;060.6'9
$ 10.00
9 10,000.00
$ 40000
$: 2,00000
$ 2400
0_.
$: 2,000 00 $. 1.000.00
7 960.00 $ 12.00
S 1,000.00
s 460.00
$ 1,000.00
$ 11OD
$ 1,000 00
` 4�iia
$ 3,000 00
$. 10 00
i.b. 70.00.
0 45.00
r $ 140 00
$ 1000
S 90000
$ 1,30000
$ 2,500 00
5 1.00000 00
2,50000
� 1,700.00
�.. $ 2,300.00
$ 3,500.00
u. 400 OD
$ 7W00
S 3,000.00
$ 400 00
& 3,200.00
$ +i
$ 1 <000 00
5 25.0.0
$ 125,00
: $ 125.00
) $ 30000
'$ 10.00
i$ 1,500,00
i$ 1,000.00
, $ 20700 00
' $ .1,500.00
$ 7,000.00
$ 2500.00
2500.0015
_$ 5.000.00
w 1,000,00
0
$ 1 000.00
4, 1,000.00
$ 83,00000
$ 76.250,00
$ 61,500.00.
$ 2,900.00?
$ 3,00000':
ti' 1000.00
.$e 4 000.00
22
212 Construction Geotextrle for Separation
40
I,$ 4 00
$ 9200
$ 65 00
�-
$ 125.00
$ 11 00
$ 1,20000
160.00
$ 160 00
"$ 45,632.00
5 39 650 00
$ 25 625.00
$ 3,190 00
$ . 240000
0 112500
,. 1 510.111
23
23
_,._.
7.04
Ductile Iron Storm Sewer r:)pe 12 In Diem.
Storro Sewer pipe �..,..,.__.,.. -�..
High Oerts11 - 011reth =Sere HDPE Pie 18 In. Diam.
' p
496
610
205
LF
LF
S 55 00
$ 100.00
$ 15.00
$ 37,200.00
a 33;`.hSG 00
:$ 4.35000
$ 69.00
$ 30 00
$ 65,00
' $ 22 00
3 14;.'20 00j $ 7100
? 1836ll 110 $ 6200
�° 1332 5 99 0
^ $ 99.00
5 6 380.00' :$ 15.00
$ 85.216.00
$ 37 820.00
$ 20 295.00
-'$ 4 350.0(Y
$ 57.00
$ 35.00
a77g,2_, •.
$ 21,350 00
$ 21,912 Sq
S 3,770 00
$ 190000
5 2,77500
$ 1;100 00
u 4,620 DO
$0,8C+O.UY3
0,
$ 10.450 00
$ 3,00000
C 1$:750 00
„p 620 0(7
$ 3+7 720 00
$. 27,450 00
87
+ .?8.700 DO
$ 2 900 W
$ 1,80200
$ 130000
$ 5.000.00
0 14.000.00
$..1200000
$ .18700.00
$. 6900.00'.$
$ 17 500.00
b 800.00
.$. 630000
24
25
7 -04
7 04
i $ 102.50
$ 13.00
26
7 04 :. Remove /Abandon Fxistin• Storm Sewer P4.e
,_27
28
7-04 Cr3 +ven t Cp0C,: Pluo: Anchor
,..290
2
1
EA
EA
m
FA
$ 2,00000
$ 1,00000
$ 1,00000
$ 500 00
$ 4,00000
$ 1,170000
b 2 000 00
$ 7,UUd'1,00
$ 90000
$ 2,200 00
$ 600 00
$ 400 00
.$ 60000
$ 1 500 00
$ 1,500.00
$ 3,000.00
$ 900 00
$ 900 00
$ 2,00
$ 60 00
.,�
$ 1,800.00 $ 1,000.00
$:` 2, ?00 t7?): $ 775.00
S 2,tX}Ct. "u.0
$ 775,00
$ .2.95000
$ 2775.00
550.00
$ 330,W
85000
704 'Gaoas,P3r Reduction Insert
5. 117500
. S. 835 00
29
705
Connection to 011 ((age Structure
i 2
14
1,200 00
$ 5 600 60.
$ $800,00;$
$; 16,500 00
5 4,500.9
$ 1 000.00
d 700 00
1,000.00
. w. 2,000,00
' ;5 9,800.00
$ 8,000.001$
30
7 -05
'COaanectioi. to Orate,ago Pipe
L$ 800 00
$ .1,10000
$ 1.225.00
1,62500
$ 3,650 00
$ 500,00
5 11,200.00
'$. 8,800.00
$ .13,47500
$ 4871:001$
,$ 10,250.001
$ 1,ODD 0
2LGCi7.it0.
31
32...-
32
7 -05
Concrete Inlet
i 8
EA
"
EA
EA
EA
EA
LA
LF
GY
ISIR
,.
$ 90000
$ 1 J 00 00
$.1.20000
$ 4,500 00
$ 400.00
$ 400 00
5 .5.00
$ 150.00
$ 7,20000
$ 12,100 00
$ 360000
$ ?2,500 t)G
$ .800 00.
_ 0
$ 3,600 00
$ 1000.00
$ 2,00.00
409,600 04
v 0.Otl
.... ! ..._
7 05 tlCatch Bask'', Type 1
t" - ---
11
t. 3
0
9
$ 1 200 00>
$ 150000
t. $ 4.300.00
4 500 00
$ /50 00
$ 4,00
j $ 42 OO
�r �
K 13.200.00
4
$ 4500.00
S 24,00000
$ 1 00000
��.+ 0,75000
5 900139
$ 672.00
$ ,38 T29330
._..9._....
$ 950.00
$. 1,000,00
$. 1350.00
$ 310.00
$ 250.00
S 130
$ 5100
_85
S 27,500.00-
7,500,001
n 45.1100:05
$ 2,000.00;
33
7-05 Catch easih, Type L
34
7 -05
,1
Catch Basin 1$$1 2 48 In Dram.
Remove and Replace Sewer Frame and Grate
"" "tr ._:,.._„._
Pothole Existing Utilities
$ 15,000 00
$ _ 1,80000
$. 8,100 00
$ 40000
$ 960 00
$239 Fi§946
35
36,06
37
7 05
""Pothol
$ 2.26?000
;I $ 45000
370
$ 105 00
-�-1
$ 4050.00
, 740.00
S 1080.00
^4} 419,483.75
$ 1,100.00 $ 13,500.00
$ 10.00 $ 2,800.00
$ 50.00 $ 800.00
$ 527 276 170
861 .11iah
Visibility Fence
1 200
16
TAL
$ 660006$ 100.
816.00 $ 60.00
2 3 2042
$ 1,00000!$.
$ 960.00
$394 815_
36.
6-15
Quarry 'pails
4
City of Tukwila
Jim Haggerton, Mayor
INFORMATIONAL MEMORANDUM
TO: Mayor Haggerton
Utilities Committee
FROM: Bob Giberson, Public Works Director
BY: Greg Villanueva, NPDES Coordinator
DATE: August 16, 2013
SUBJECT: NPDES (National Pollutant Discharge Elimination System)
Project No. 99341210
Dept of Ecology Biennial Municipal Stormwater Capacity Grant Program
ISSUE
Authorize the grant acceptance of the 2013 -2015 Biennial Municipal Stormwater Capacity Grant
Program for NPDES and Surface Water project funding.
BACKGROUND
The 2013 State Legislature has provided funding through two separate appropriations:
1. $5.85 million for the 2013 -2015 Biennial Municipal Stormwater Capacity Grant Program
of which NPDES Phase I and II communities will be awarded $50,000 for NPDES permit
compliance activities.
2. $15 million for Project Specific Planning and Design for Retrofit /LID Projects, of which up
to $120,000 is available for each of the NPDES Phase I and II communities.
ANALYSIS
Both grants are non - competitive and no matching funds are required.
The City must submit the Grant Acceptance Intent Notice (GAIN) by August 30, 2013 indicating
the acceptance or decline of the Project Specific Planning offer, which is design funding. Staff
has identified the East Marginal Way South Stormwater Outfalls project for this grant funding.
Attached is the project specific CIP page.
RECOMMENDATION
Council is being asked to accept the two NPDES grants and consider this item on the Consent
Agenda at the September 3, 2013 Regular Meeting.
Attachments: Grant Acceptance Intent Notice
East Marginal Way S Stormwater Outfalls GIP page
W: \PW Eng\ PROJECTS \A- DR Projects \NPDES Program (99341210) \2013 Capacity Grant $50K & $120K\Info Memo 2013 50K Capacity Grant.doc
5
Grant Acceptance Intent Notice (GAIN)
Formally Accepting the Funding Offer from the
2013 -15 Biennial Municipal Stormwater Capacity Grant Program
(This GAIN will include the recipient's intent to accept or decline the Pre - construction Funding offer
as described in the Funding Guidance found at:
http:// www. ecy. wa. gov/ programs /wg/ funding/ FundingPrograms/ OtherFundingPrograms /StWal2a /FY12aStWa.html
Please Note: This GAIN does not replace a formal agreement. A formal grant agreement must be
signed by the prospective grant recipient and Ecology before eligible costs are reimbursed.
Lead Applicant Name: Ryan Larson, P.E.
Federal ID No: 91- 6001519
Applicant(s) including partner "Designated Local Government" Names (City, Town or County):
City of Tukwila
Project Title:
East Marginal Way So. Stormwater Outfalls
Name of Lead Local Government Signatory (Please Print): Signature:
David Cline, City Administrator
Name of Lead Local Government Staff Contact: Greg Villanueva
Title: NPDES Coordinator
Telephone Number:
206 - 431 -2442
Email Address:
greg.villanueva @tukwilawa.gov
Mailing Address: 6300 Southcenter Blvd. Suite 100
Tukwila, WA 98188 -2544
Please Note: You must select a primary location and then provide additional location information as
applicable. All separate designations (County, Legislative District, Congressional District, and WRIA) must
equal 100% (list from greatest to least percentage, and please break any ties by at least one percentage point).
County(ies) for the Project:
Number
Name
%
Primary
9
58
King
42
100
3
Congressional District(s) for the
Project:
Number
%
Primary
Primary
9
58
7
42
37
3
Legislative District(s) for the
Project:
Number
%
Primary
Primary
11
92
33
5
37
3
WRIA(s) for the Project:
Number
%
Primary
9
100
Are you accepting the offer for Preconstruction activities? YesL1 Non
6
For Task 2 ($50,000) — Permit Implementation, the following is a NON - BINDING list of
elements your project may include:
A. If the RECIPIENT is out of compliance with the municipal stormwater National Pollutant
Discharge Elimination System (NPDES) permit, the RECIPIENT must ensure funds are used
to attain compliance where applicable.
B. The RECIPIENT may conduct work related to implementation of additional activities
required by the municipal stormwater NPDES permits. The following is a list of elements
your project may include. Please check all boxes that apply to your project.
Public education and outreach activities, including stewardship activities
Public involvement and participation activities
Illicit discharge detection and elimination (IDDE) program activities, including:
1. Mapping or geographic information systems of municipal separate storm sewer
systems (MS4s);
2. Staff training;
3. Activities to identify and remove illicit stormwater discharges;
4. Field screening procedures;
5. Complaint hotline database or tracking system improvements.
Activities to support programs to control runoff from new development, redevelopment, and
construction sites, including:
1. Development of an ordinance and associated technical manual or update of
applicable codes;
2. Inspections before, during, and upon completion of construction, or for post -
construction long -term maintenance;
3. Training for plan review and /or inspection staff
4. Participation in applicable watershed planning effort.
Pollution prevention, good housekeeping, and operation and maintenance program activities,
such as:
1. Inspecting and /or maintaining the MS4 infrastructure;
2. Developing and /or implementing policies, procedures, or stormwater pollution
prevention plans at municipal properties or facilities.
Annual reporting activities.
Establishing and refining stormwater utilities, including stable rate structures.
Water quality monitoring to implement permit requirements for a Water Cleanup Plan
(TMDL). Note that any monitoring funded by this program requires submittal of a
Quality Assurance Project Plan that Ecology approves prior to awarding funding for
monitoring.
Monitoring, including:
1. Development of applicable QAPPs ;
2. Monitoring activities, in accordance with an Ecology- approved QAPP, to meet Phase
I/II permit requirements;
Structural stormwater controls program activities (Phase I permit requirement)
Source control for existing development (Phase I permit requirement), including:
1. Inventory and inspection program;
2. Technical assistance and enforcement;
3. Staff training.
Equipment purchases that result directly in improved compliance with permit requirements.
Allowed costs for equipment purchases must be specific to implementing a permit
requirement (such as a vactor truck) rather than general use (such as a general use pick-
up truck). Qualified equipment purchases include but are not limited to:
7
1. Illicit discharge testing equipment and materials;
2. Vactor truck or sweeper truck or MS4 maintenance activities;
3. Electronic devices dedicated to mapping of MS4 facilities and attributes;
4. Software dedicated to tracking permit implementation activities.
If you are accepting the funding offer for project- specific planning and design activities
the following Task3 will be included in your funding agreement:
Task 3 — Preconstruction Planning and Design (Up to $120,000)
A. The RECIPIENT will submit to the DEPARTMENT's Project Manager for review and
acceptance and no later than October 1, 2013, an initial one to two page Project Summary.
The Project Summary will include a description of the proposed project identifying: 1) the
area where the proposed project is to be installed or constructed (including maps), 2) the
stormwater best management practice(s) to be designed, 3) the name of the appropriate
design manual planned for use in the final design (see item D), and 4) the water quality issue
mitigated by the proposed project. The DEPARTMENT will provide comments to the
RECIPIENT within 14 calendar days of receipt of the Project Summary. The
DEPARTMENT's Project Manager will work with the DEPARTMENT's engineer to review
the Project Summary for consistency with the appropriate design criteria and grant
requirements. Detailed calculations and /or drawings are not required at this time.
B. The RECIPIENT will submit two hard copies and one digital copy of the Pre - design report to
the DEPARTMENT's Project Manager for review and acceptance and no later than January
31, 2014. The DEPARTMENT's Project Manager will work with the DEPARTMENT's
engineer to review the Project Summary for consistency with the appropriate design criteria
and grant requirements. Detailed calculations and /or drawings are required in the Pre - design
Report. The DEPARTMENT will provide comments to the RECIPIENT within 45 days of
receipt of the plans.
C. The RECIPIENT will submit two hard copies and one digital copy of the 90 percent design
plans to the DEPARTMENT's Project Manager for review and acceptance. The
DEPARTMENT will provide comments to the RECIPIENT within 45 days of receipt of the
plans. The DEPARTMENT's Project Manager will work with the DEPARTMENT's
engineer to review the plans and specifications for consistency with the appropriate design
criteria and grant requirements.
D. For items A -C above, the RECIPIENT must provide reasons for deviations from design
criteria in the following:
1. The appropriate guidance manual below depends on the region that your project is
conducted:
2005 or 2012 Stormwater Management Manual for Western Washington
(SWMMWW), (the appropriate manual depends on the requirements of the
jurisdiction) or the
2004 Stormwater Management Manual for Eastern Washington (SWMMEW),
both can be found at:
http: / /www.ecy.wa.gov/ programs /wq /stormwater /tech.html, or the
Low Impact Development Technical Guidance Manual for Puget Sound found
at:
http: / /www.psp.wa.gov /downloads /LID/20121221 LlDmanual FINAL secure.pdf,
or equivalent design manuals,
8
Eastern Washington Low Impact Development Manual found at
http : / /www.wastormwatercenter.org /ew -lid- guidance- manual, or
2. Equivalent manual as developed by the local jurisdiction and approved by the
DEPARTMENT.
3. Good engineering practices and generally recognized engineering standards.
E. If applicable, the RECIPIENT will submit to the DEPARTMENT's Project Manager, a copy
of the State Environmental Review Act (SEPA) Lead Agency's signed and dated SEPA
determination.
F. If applicable, the RECIPIENT will submit to the DEPARTMENT's Project Manager a DAHP
EZ -1 form to initiate review of project activities by DAHP and tribal governments.
G. The RECIPIENT will submit all pre - design figures and construction plans to the
DEPARTMENT, reduced to 11" x 17" in size. The RECIPIENT may bind them with the
specifications or related construction contract documents or bound as a separate document.
All reduced drawings must be legible.
Required Performance:
1. Submit a Project Summary including maps, no later than October 1, 2013 to the
DEPARTMENT for review and acceptance of the proposed design project.
2. Submit a Pre - design report, no later than January 31, 2014, to the DEPARTMENT
for review and acceptance.
3. Submit 90 percent design plans, no later than August 1, 2014, to the DEPARTMENT
for review and acceptance.
4. If applicable, submit a copy of the signed and dated SEPA determination to the
DEPARTMENT.
5. If applicable, submit a copy of the DAHP EZ -1 form, for DEPARTMENT
coordination on compliance with Executive Order 05 -05.
Please note that these grant monies cannot be used to support legal costs related to appealing
the MS4 permits or to implement mitigation projects.
Questions about the program, contact:
Patricia Brommer
(360) 407 -6566
Patricia.brommer@ecy.wa.gov
Where to submit your signed GAIN form:
By email:
Mindy.ballinger@ecy.wa.gov
Or by FAX
Mindy Ballinger, WQProgram -FMS
FAX (360) 407 -7151
9
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2014 to 2019
PROJECT: East Marginal Wy S Stormwater Outfalls Project No. 91041204
DESCRIPTION: Establish legal drainage connections from East Marginal Way South to the Duwamish River.
JUSTIFICATION: Drainage from E Marginal Wy S is discharged through outfalls owned and operated by the Boeing Co.,
Jorgensen Forge, and two King County Airport storm systems without easements.
STATUS: Jorgensen Forge outfall was closed in 2011 under an order from the US EPA. The Boeing Company
contacted the City in 2009 requesting that the City take over ownership of their storm line and outfall.
MAINT. IMPACT: Clarifies maintenance responsibility and will ensure reliability of system.
City Attorney is working on the easements for Jorgensen's and Boeing's outfalls. Phase I: Adopt Boeing's
COMMENT: Z Line and then line lower portion of pipe in 2014. Phase II: Line pipe, add water quality device and connect
Jorgenson's drainage to Boeing's Z Line in 2015 and 2016.
FINANCIAL Through Estimated
in $000's)
2012 2013 2014
2015
2016
2017
2018
2019
BEYOND TOTAL
EXPENSES
Design
56
10
170
236
Land (R/W)
0
Const. Mgmt.
10
30
94
134
Construction
100
191
550
841
TOTAL EXPENSES
56
0
0
120
391
644
0
0
0
1,211
FUND SOURCES
Awarded Grant
0
Proposed Grant
0
Mitigation Actual
0
Mitigation Expected
0
Utility Revenue
56
0
0
120
391
644
0
0
0
1,211
TOTAL SOURCES
56
0
0
120
391
644
0
0
0
1,211
2014 - 2019 Capital Improvement Program
90
10
TO:
City of Tukwila
Jim Haggerton, Mayor
INFORMATIONAL MEMORANDUM
Mayor Haggerton
Utilities Committee
FROM: Bob Giberson, Public Works Director
BY: Greg Villanueva, NPDES Coordinator
DATE: August 16, 2013
SUBJECT: NPDES (National Pollutant Discharge Elimination System)
Project No. 99341210
Western Washington Phase II Municipal Stormwater Permit Update
ISSUE
New Department of Ecology (DOE) National Pollutant Discharge Elimination System (NPDES)
Phase II Permit stormwater monitoring requirements.
BACKGROUND
On August 1, 2013, additional requirements to the City's Phase II Municipal Stormwater Permit
went into effect. One of the conditions of the permit requires the City to either monitor stormwater
systems within the City for water quality effectiveness or participate in a regional monitoring effort
sponsored by the DOE. The City must notify the DOE in writing by December 1, 2013 of our
decision.
ANALYSIS
There are three stormwater monitoring requirements:
1. Status and Trends (measure whether things are getting better or worse and identify
patterns in healthy and impaired Puget lowland streams and Puget Sound urban shoreline
areas).
2. Effectiveness Studies (provide widely applicable information about what works and what
doesn't work in certain situations, and how to improve stormwater management).
3. Source Identification and Diagnostic Monitoring (provide information about source
identification and elimination methods and identify opportunities for regional solutions to
common illicit discharges and pollution problems).
Staff has reviewed the monitoring requirements and concluded that it would be more cost effective
for the City to participate in the DOE's regional monitoring program.
FINANCIAL IMPACT
Annual costs will be $12,536.00 to conduct all three stormwater monitoring requirements for the
duration of this five year permit term.
RECOMMENDATION
Information only. No action needed as costs will be absorbed in current budget.
W: \PW Eng \ PROJECTS \A- DR Projects \NPDES Program (99341210) \Info Memo 2013 UC NPDES Storm Monitoring Update gl.doc
11