Loading...
HomeMy WebLinkAboutCAP 2009-03-09 COMPLETE AGENDA PACKET City of Tukwila Distribution: B. Fletcher N. Olivas V. Griffin M. Hart I Pace C ommunity Affairs I Duffle S. Hunstock D. Speck K. Hougardy V. ]essop R. Still I Hernandez S. Kerslake B. Arthur Parks Committee D. Robertson G. Labanara C. Parrish �a O Verna Griffin, Chair Mayor Haggerton K. Matej K. Narog(eover) O Joe Duffie R. Berry M. Miotke S. Kirby(emaiq E. Boykan C. O'Flaherty S. Norris(emaiq O Kathy Hougardy AGENDA M ONDAY, MARCH 9, 2009, 5: PM Conference Room #3 ITEM I RECOMMENDED ACTION Page 1. PRESENTATIONS) 2. BUSINESS AGENDA a. Interlocal Agreement with SeaTac for Community a. Forward to 3/23 C.O.W. Pg.1 Center to Community Center project; and 3/23 Special Mtg. Rick Still, Parks Recreation Deputy Director. b. Briefing on new Growth Targets; b. Information only. Pg.11 Jack Pace, Community Development Director. c. 2008 Fourth Quarter Reports. c. Information only. Pg.15 3. ANNOUNCEMENTS 4. MISCELLANEOUS Next Scheduled Meeting: Monday, March 23, 2009 The City of Tukwila strives to accommodate those with disabilities. Please contact the City Clerk's Office at 206- 433 -1800 for assistance. TO: Mayor Haggerton Community Affairs and Parks Committee FROM: Bruce Fletcher, Parks and Recreation Director DATE: March 3, 2009 SUBJECT: Interlocal Agreement for Tukwila /SeaTac Community Center Trail Connection Study and Preliminary Design ISSUE An Interlocal Agreement between the City of Tukwila and City of SeaTac is needed to move forward with a program study and preliminary design of a multi use trail that will connect the Tukwila Community Center and the SeaTac Community Center. BACKGROUND The City of Tukwila and the City of SeaTac have expressed interest in working together to provide a multi use trail between the Tukwila and SeaTac Community Centers. The first step in this process is to conduct a program study and have a preliminary engineering design completed. DISCUSSION The City of SeaTac has received partial funding from King County for the study and preliminary design work to be completed. It is estimated that the remaining fees will be $24,400, of which $12,200 would be the City of Tukwila's responsibility. This has been accounted for in the 2009/2010 Capital Improvement Program. RECOMMENDATION The Council is being asked to consider the Interlocal Agreement between Tukwila and SeaTac at the March 23, 2009 Committee of the Whole Meeting and the Special Meeting to follow that same evening. ATTACHMENTS City of Tukwila INFORMATIONAL MEMORANDUM Jim Haggerton, Mayor Draft Interlocal Agreement between the cities of Tukwila and SeaTac, to include Attachment A (Scope of Services) INTERLOCAL AGREEMENT for TUKWILA/SEATAC COMMUNITY CENTER TRAIL CONNECTION PROGRAM STUDY AND PRELIMINARY DESIGN BETWEEN THE CITY OF TUKWILA AND THE CITY OF SEATAC This Interlocal Agreement "Agreement is made and entered into pursuant to the Interlocal Cooperation Act, Chapter 39.34 of the Revised Code of Washington, by and between the City of Tukwila, a municipal corporation, hereinafter called "Tukwila" and the City of SeaTac, a municipal corporation, hereinafter called "SeaTac RECITALS WHEREAS, pursuant to these and other authorities, Tukwila provides regional trails, urban and rural parks and recreation facilities for public use; WHEREAS, it is in the best interests of the citizens of Tukwila to participate in the Tukwila /SeaTac Community Center Trail Connection Program Study and Preliminary Design; WHEREAS, Tukwila wishes to participate with other local governments in the study, financing, acquisition, construction, development, improvement, use, maintenance and operation of open space, park, recreation and community facilities; WHEREAS, Tukwila and SeaTac desires to build, construct, care for, control, supervise, improve, operate and maintain parks, bicycle and bridle paths, and other recreational facilities; WHEREAS, Tukwila is a code city organized under RCW Title 35A, and as such is authorized to develop, operate, maintain, and improve park and recreation facilities, including but not limited to bicycle trails, all pursuant to RCW 35A.11.020, RCW 35.23.440(32), RCW 35.22.280(11) and other authorities; WHEREAS, SeaTac has contracted with SBA Landscape Architects (hereinafter "SBA 1148 NW Leary Way, Seattle, Washington 98107, to provide a corridor study and to provide preliminary design documentation and engineering services, all related to connecting the SeaTac Community Center to the Tukwila Community Center via a shared roadway bike lane; WHEREAS, in exchange for receiving a copy of the Study, design and engineering documentation, and otherwise receiving the benefits of the SBA Study, Tukwila is willing to reimburse SeaTac for half (50 of SeaTac's estimated cost of such work, not to exceed $12,200; WHEREAS, in exchange for receiving a copy of the Study and design and engineering documentation, and otherwise receiving the benefits of the SBA Study, design documentation, and engineering services, King County is willing to reimburse the City for half (50 of the estimated cost of such work, not to exceed $24,400, provided that the City shall separately contract with the City of Tukwila to share between them all responsibility for all remaining costs of such work in excess of the County's share; NOW THEREFORE, in consideration of the promises and commitments made herein, Tukwila and SeaTac agree as follows: AGREEMENT 1. Purpose. The purpose of this Agreement is to specify terms and conditions under which Tukwila will reimburse SeaTac for a portion of SeaTac's costs to engage in a third party consultant to prepare a corridor study and preliminary design and engineering services "Study for connecting the City of SeaTac's Community Center to the City of Tukwila's Community Center. 2. Scope of Services. Services rendered in this agreement are identified in Attachment A and include a trail and connection program study and preliminary design of bicycle /pedestrian facilities (trail) between the SeaTac Community Center located at 13735 24` Ave South and the Tukwila Community Center located at 12424 42 Ave South. 3. Compensation. As its proportionate share of the Tukwila /SeaTac Community Center Trail Connection Program Study and Preliminary Design, Tukwila shall compensate up to $12,200 for the services provided for by this Agreement. 4. Term. The term of this Agreement shall be for one year commencing on April 1, 2009. 5. Records. Tukwila shall maintain a copy of documents rendered as a result of the Trail Connection Program Study and Preliminary Design study. 6. Termination. Tukwila or SeaTac may terminate this Agreement in writing with 120 days written notice. The terminating party shall be liable for its share of financial obligations entered into on its behalf prior to termination including but not limited to printing costs and media buys. 7. Ownership. Tukwila will retain a copy of the study, design, and engineering documentation, and otherwise will be receiving the benefits of the SBA Study, design documentation, and engineering services, 8. Amendment. This Agreement may be amended or modified in writing at any time with the mutual consent of both parties. 9. Hold Harmless. Tukwila and SeaTac agree that each party shall defend, indemnify, and hold harmless the other party and its officers, officials, agents employees, and volunteers from any and all claims, injuries, actions, damages, losses or suites including reasonable attorney's fees, which arise out of or are connected with any errors, omissions or negligent acts in the performance of this Agreement. IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed. CITY OF TUKWILA CITY OF SEATAC Jim Haggerton, Mayor Craig R. Ward, City Manager Dated: Dated: Attest: Attest: Christy O'Flaherty, City Clerk City Clerk Approved as to Form: Approved as to Form: City Attorney City Attorney August 19, 2008 Kit Ledbetter, Director City of SeaTac Parks and Recreation Department 4800 South 188 Street SeaTac, Washington 98188 Dear Kit: Description of Project LANDSCAPE ARCHITECTS 1148 NW Leary Way, Seattle, Washington 98107 Telephone (206) 789 -2133 Fax (206) 789 -2186 Attachment A This is a scope of work for the study and eventual design of bicycle /pedestrian facilities upgrade between the SeaTac Community Center and the Tukwila Community Center. Working closely with the Cities of SeaTac and Tukwila, this study can be completed quickly and efficiently. The intent of this work is to identify and confirm existing conditions along a known route and to agree upon improvements necessary to allow safe and convenient passage by pedestrians and bicyclists. Once the necessary improvements have been identified, particular sections of the route can be surveyed in expectation of design and engineering plans for the development of the route. The project is a bicycle /pedestrian facilities upgrade along streets between the SeaTac Community Center at 13735 24 Ave S and the Tukwila Community Center at 12424 42 Ave S. The project is within at least three different jurisdictions, as it begins in SeaTac, ends in Tukwila, and a part of the route crosses under the Washington State Department of Transportation (WSDOT) right of way for State Route 599. The corridor is approximately 2.8 miles long on roads that vary in classification and in existing condition. Some portions of the route are fully developed with excellent bicycle facilities, while others are narrow roads that will need significant improvements in order to provide bike lanes. The extended scope of the project will include design of enhancements such as striping, signage, widening, drainage improvements, installation of bicycle traffic sensors for traffic actuated signals, and modifications of curb and sidewalk alignments in some areas to accommodate bicycle lanes. At the design and permit phase, the project will be subject to the storm drainage requirements of the local jurisdiction; in SeaTac the drainage design will be in accordance with the 2005 King County Surface Water Design Manual (KCSWDM, this will be revised soon to meet NPDES), while in Tukwila the drainage design will be in accordance with the 1998 KCSWDM. The trail standards used will include Shared Roadway, Signed Shared Roadway, Bicycle Lane and Shared Use Path trails reflecting City of SeaTac, City of Tukwila, King County Regional Trail Standards, SeaTac Road Standards (King County, MUTCD (for striping and signing). Route Summary: 24 Ave S, from SeaTac Community Center to S 144 St: Existing conditions: C, G, S on both sides; bike lane on west side with no parking; parking on east side; wide lanes; curb bulb on east side at intersection S 144 St, from 24 Ave S to Military Rd S: Existing conditions: narrow two -lane road with ditch and culvert drainage. Some stretches have in SeaTac been widened, but not much —in those areas some CBs have been installed. S 144 St, from Military Rd S to International Blvd: Existing conditions: brand new roadway with excellent bike facilities. No further work needed. S 144thSt, from International Blvd to 42 Ave S: Existing conditions: partially widened, although not to the extent of the previous section; 3 -lane (w/ left turn lane) width at intersection w/ Int'l Blvd; then becomes wide two -lane road w/ C, G, S both sides; parking appears to be allowed both sides. 42 Ave S, from S 144 St to S 139 St: Existing conditions: widened to 38 feet in some sections, and 29 feet in others; curb bulbs go in and out quite a bit; no parking where curb bulbs are, parking allowed where full width; C, G, S both sides. 42 Ave S, from S 139 St to improved area south of S 137 St: Existing conditions: two lanes w/ paved shoulder varying in width; road appears to be offset toward the west half of the r /w; intermittent CBs and ditch drainage; parking does not appear to be restricted, but I would guess people don't park on the street often. 42 Ave S, from improved area south of S 137 St to north end of improved area: Existing conditions: C, G, S on east side, ditch with periodic CBs on west side; wider east lane adjacent to recent housing development; 6+ foot paved shoulder west side; no parking both sides. 42 Ave S /40 Ave S, from north end of improved area north of S 137 St to East Marginal Way S: Existing conditions: some areas two lanes with 5 -foot shoulder and ditch drainage; some areas with wider section and C, G, S; parking does not appear to be restricted, but I would guess people don't park on the street often; awkward intersection w/ Marginal has a narrowed section that would need some careful planning to be safe for cyclists. East Marginal Way S, from 40 Ave S to S 130 St: Existing conditions: wide section w/ full C, G, S improvements on both sides; parking allowed both sides. S 130 St, from East Marginal Way S to 42n Ave S: Existing conditions: partially widened with approx 12 -ft lane each direction; existing catch basin and UG pipe drainage system. Parking appears to be unrestricted. 42 Ave S, from S 130` St to Tukwila Community Center: Existing conditions: narrow lanes with C, G, S on the east side from S 130` St to the SR 599 r /w; partially widened without edge treatment through SR 599 underpass; widened to 3 lanes at intersection w/ Interurban Ave S; narrows at existing steel truss bridge; somewhat wider after bridge w/ C, G, S on east side and guardrail on west side (next to river). Parking appears to be allowed under SR 599, but not elsewhere on this stretch. Scope of Services This proposal is for planning; design and engineering services associated with the assessment of the route and preliminary design recommendations, including multiple options where applicable. It is anticipated that this phase of the project includes the production of a SeaTac /Tukwila Bike Lane Design Report for the selected route. Our scope of services and the anticipated work process is detailed as follows: 1. Meet with jurisdiction's representatives and review proposed route and known issues for each section of route. Confirm at this meeting the route and sections of the route for the feasibility analysis. 2. Research available existing information from the various jurisdictions including drainage and utility system as- builts, right of way widths, existing street cross sections, existing bike facilities, roadway classifications, parking restrictions, and possible master plan impacts. It is anticipated that the Bike Lane Project Manager for each jurisdiction will work with the design team to establish a collaborative relationship with the individuals within the jurisdiction that will have impact on the process and may be able to provide the needed information stated above. Project team to coordinate with the designated personnel from each jurisdiction. 3. Coordinate and research available resources and requirements within the City regarding bicycle facility construction including bike lane widths, signage, separation, pavement markings etc. Confirm master plan or local jurisdictional requirements for road improvements that may be triggered by work within corridor. 4. Conduct a site visit to record "typical" detailed cross section measurements and photo- document existing roadway conditions at major points along the route where the cross section changes. 5. Create a bike lane zone map for the corridor to assist in identifying existing conditions and areas where challenges exist. Meet with design team to discuss challenges along the route and brainstorm to formulate the design and engineering approach to each of the bike lane zones along the corridor 6. Meet with jurisdiction's representatives to present the draft concept road with bike lane sections for each zone. Discuss challenges along the route and confirm the design and engineering approach to each of the bike lane zones along the corridor. 7. Prepare a design recommendations report that will be divided into sections relating to each individual jurisdiction. Included in the design report are preliminary civil design guidelines for zones where civil site improvements are needed. These would include assessment of drainage requirements, preliminary analysis, and written documentation of approach. It is anticipated that not all zones will require civil site improvements. Finalize Bike Lane Zone Map to be included in the design recommendations report. The report will also recommend which Zones will need to be surveyed along with the cost of such survey. 8. Meet w/ jurisdictional representatives to review the Design Recommendation Report, and confirm the recommendations. The jurisdictions at this meeting will confirm the necessary survey recommendations and authorize a notice to proceed with the survey. The survey is not a part of this Scope of Work. 9. Consultant will arrange to have the survey performed. At this time, the consultant will provide a scope of work and estimate of costs to provide design and engineering services for the eventual development of the SeaTac /Tukwila Bike Lane between the two Community Centers. 10. The deliverables for this report will include: o Base map of the corridor using existing, available information o Summary of the standards for street, bicycle lanes, pathways and crossings for SeaTac, Tukwila and King County pertinent to this project o A bike lane zone map for the corridor identifying existing conditions and areas where challenges exist o Design Recommendations for each jurisdiction (SeaTac and Tukwila) o Cost opinion for the construction of the Design Recommendations o Identify zone that will require surveying along with the cost of the surveys o Scope of work and estimate of costs to provide design and engineering services for the eventual development of the SeaTac/Tukwila Bike Lane between the two Community Centers It is anticipated that the design necessary to begin to prepare construction documents will include the following tasks. However, these tasks will be reviewed and likely modified to reflect the finding of the above Scope of Work and are not now budgeted. Prepare Design Development Documents (60% Design) A. Design Documents and Outline Specifications Legends, Details and Typical Sections Erosion Control /Site Preparation Plan Plan and Profile Wall Profile Signing and Channelization/Striping Plan Landscape Plan Cost Estimate B. Hydraulic Design Memorandum The consultant will prepare a brief Hydraulic Design Memorandum. This data will be used in preparation of the environmental documents and in support of establishing the trail vertical alignment. The memorandum shall include: Findings from the review of existing drainage conditions Calculation of net new impervious area Findings and recommendations for stormwater infiltration C. Geotechnical Memorandum The purpose of this task is to characterize the anticipated subsurface conditions and based on those conditions, provide geotechnical recommendations for design of the trail and construction considerations. Review preliminary design plans, aerial photos, geologic maps and available subsurface information for relevant projects completed near the proposed trail alignment. Complete a reconnaissance of the trail alignment to characterize surface conditions as a means to aid with interpretation o likely subsurface conditions. E. Environmental The environmental process for the development of this connector trail will involve compliance with the Washington State Environmental Police Act (SEPA). To comply with SEPA an Environmental Checklist will be prepared for this project. These will be based on description information provided by the Cities and gathered during this assignment. Attached is a chart that describes the hours and costs to perform the above Scope of Work which totals $49,600.00. Based on my experience, I estimate that the work described in the "Prepare Design Development Documents (60% Design)" could be accomplished for the remainder of the $100,000.00 budget. The cost of the survey of the various sections of the corridor is unknown at this time and could impact the remaining budget. Please let me know if you have any questions. Sincerely Charles A. Warsinske, ASLA SB &A Landscape Architects Community Center to Community Center Pedestrian /Bicycle TralDevelopment Study Cities of SeaTac and Tukwila and King County I I I Estimate of Planning and Design Fees I I I I I I I I I SB &A Hrsl Rate ICost Tasks I I I I Task I. Meet with jurisdiction's representatives Task 2. Research available existing information Task 3. Confirm jurisdictional road improvements Task 4. Conduct a site visit I I Task 5. Create a bike lane zone map Task 6. Meet with jurisdiction's representatives Task 7. Prepare design recommendations report Task 8. Meet w/ jurisdictional representative Task 9. Scope of work and estimate of costs I Subtotal I Expenses I Total I 10 24 6 12 4 6 36 6 8 $140 $1,400 $140 $3,380• $140 1 $840 $140 $1,680. $140 I $560 $840 $140 $5,040 $140 $840 $140 $1,120 $15,680 $2,500 $18,180 ISB &A Hrs Rate (Cost 4 12 .40 40 4 40 4 2 $70 I $280 $70 I $840 $0 $70 I $2,800 $70 I $2,800 $70 I $280 $70 I $2,800 $70 I $280 I $140 I $10,220 I I I $10,220 'I LPD Hrs. 6 16 12 12 8 6 18 6 8 Rate Cost ILPD Hrs. $150 I $900 $150 $2,400 $150 I $1,800 $150 I $1,800 $150 $1,200; $150 I'' $900 $150 I $2,700 $150 I $900 $150 $1,200 I $13,800, I I $1,000 I I $14,800 I 0 6 4 24 12 4 24 4 2 Rate Cost Subtotal I L $80 $0 I $2,580 $80 $480 I $7,080 $320 I $2,960 $80 $1,920 I $8,200 $80 I $960 I i' $5,520 I $320 I $2,340 $80 $1,920 I $12,460 $80 I $320 I i' $2,340 $80 I $160 I $2,620 I $46,100, I s`, L $3,50 I $6,400 I $49,600 DATE: March 4, 2009 City of Tukwila Jim Haggerton, Mayor Department of Community Development Jack Pace, Director SUBJECT: Briefing on new Growth Targets INFORMATIONAL MEMORANDUM TO: Mayor Haggerton Community Affairs an PE ks Committee FROM: Jack Pace, DCD Director ISSUE Briefing on new Growth Targets for King County and Cities BACKGROUND Under Washington State's GMA, King County and its cities must adopt Comprehensive Plans that accommodate 20 years of anticipated population and employment growth. Plans must provide for land uses and densities, capital facilities and transportation infrastructure that are sufficient to meet future needs. Local governments have discretion as to how they will accommodate the growth within their borders. Local jurisdictions must update their comprehensive plans at least every 7 years. Cities in King County last completed their plan updates in 2004. The deadline for the next plan update is December 2011. Every five years, the state Office of Financial Management (OFM) issues population projections for each county in the state as a basis for GMA planning. Based on these projections, counties and cities collaborate in determining local allocations of that growth. The act requires that local growth numbers be updated at least every ten years. New Population and Employment Projections for King County In King County, growth targets are policy statements indicating the minimum number of households and jobs each jurisdiction plans to accommodate during the current Growth Management period. The targets are based on the OFM population projections along with employment forecasts produced by the Puget Sound Regional Council (PSRC). The county is an attractive region which, over the long term, is expected to see robust amounts of growth. OFM released new projections in 2007, which show King County growing at a faster rate than previously forecasted. The result: nearly 100,000 more people countywide in 2022 than currently planned for. Overall, the county is expected to grow by about 450,000 people P \Admin\A- Jack\KC Growth Targets Briefing Paper 2- 5- 09.docJP Page I of 4 03/04/2009 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone 206-431-3670 Fax: 206-431-3665 between 2006 and 2031 to a total population of 2.3 million. The graph below shows the new projection as an extension of historical trends and compared with the 2002 OFM projection. The latest employment forecasts released by PSRC in 2006 show growth in the county, over this same period, of nearly 450,000 jobs to a total of 1.7 million jobs. 2,500 2,300 2,100 1,900 1,700 1,500 1,300 700 500 P:Wdmin\A- Jack\KC Growth Targets Briefine Paper 2- 5- 09.docJP OFM Population Trends /Forecasts for King County Numbers in thousands 1,100 1;14a 900 935 1,507 N a Population Trend OFM 2007 2,263_, Forecast 2,11 1,9 2,019 1,8080 ,861 1,73 i;764 OFM 2002 Forecast 1960 1965 1970 1975 1980 1985 1990 1995 2000 2005 2010 2015 2020 2025 2030 Adoption of Growth Targets by the Growth Management Planning Council The GMPC is a formal body consisting of elected officials from King County, Seattle, Bellevue, other cities and towns, special purpose districts, and the Port of Seattle. The GMPC responds to the GMA requirement that counties and cities collaborate to develop and adopt Countywide Planning Policies (CPP). Household and job growth targets are contained in the CPP. The CPP were originally adopted by the GMPC in 1994. Growth targets were updated in 2002, for a planning period extending to 2022. The county and cities incorporated those targets into their 2004 plan updates. The GMPC will be considering new updates to the targets based on the new population projections from OFM, thus providing substantive guidance to cities as they update their 20 -year Comprehensive Plans once again. New growth targets would extend the countywide planning period out another 9 years, with a horizon of 2031, 20 years beyond the 2011 Comprehensive Plan update requirement. The CPP establish the policy framework for allocating growth targets. Those policies include: 1) Limiting growth in Rural and Resource areas, 2) Focusing growth within the existing Urban Growth Area, within cities, and within designated Urban Centers and Manufacturing /Industrial Centers, 3) Improving jobs- housing balance within four planning subareas, and 4) Fostering a pattern of growth that ensures efficient use of infrastructure and can be served by public transportation. Paee 2 of 4 03/04/2009 Development of the targets, which are formally adopted by the GMPC and ratified by the county and cities, involves extensive coordination among staff from throughout the county. Through this process, every jurisdiction is expected to take its fair share of growth. The rationale for the staff recommended target allocation is based on best available demographic, economic, and land use data, and also incorporates unique factors and local policies. The timeline below gives an overview of the schedule for GMA planning actions for King County. CPFS OFM Projections Comp Ran Updates Growth Targets (current) Growth Targets (update) New Policy Guidance from Vision 2040 P: \Admin''A- Jack\KC Growth Targets Briefing Paper 2- 5- 09.docJP r o The Puget Sound Regional Council recently adopted Vision 2040, a growth management, transportation, and economic development strategy for the 4- county region. With Vision 2040, the PSRC has amended its Multicounty Planning Policies (Mops) to address coordinated action around a range of policy areas, including land use and development patterns. The GMPC will be updating its countywide policies in 2010 to bring them into consistency with the Mops. Vision 2040 also contains a Regional Growth Strategy that provides substantive guidance for planning for the roughly 1.7 million additional people and 1.2 million additional jobs expected in the region between 2000 and 2040. The Strategy retains much of the discretion that counties and cities have in setting local targets, while calling for broad shifts in where growth locates within the region. In comparison to current targets and plans, the Strategy calls for: Increasing the amount of growth targeted to cities that contain regionally designated urban centers (to include both metropolitan centers and many suburban cities) Increasing the amount of growth targeted to other large cities (with combined population and employment of at least 22,500) Decreasing the amount of growth targeted to Urban designated unincorporated areas, Rural designated unincorporated areas, and to smaller cities Achieving a greater jobs- housing balance within the region New growth targets for King County are expected to move toward achieving the desired pattern of growth laid out in Vision 2040, while recognizing the long -term nature of the regional land use goals and the many challenges involved in "bending the trend" away from past growth patterns. Page 3 of 4 03/04/2009 Next Steps Staffs work toward updated growth targets for King County is underway now. In the coming months, cities will be asked to review and provide input on a range of potential future growth scenarios. Based on this process, recommended draft targets may go to the GMPC as early as July 2009, with a vote for adoption possible at the council's September 2009 meeting. Once adopted, growth targets must be ratified by the county, council and cities. Adopting targets ahead of the 2011 Comprehensive Plan updates will ensure that appropriate and timely planning can be done to accommodate projected growth. P:\AdminW- Jack\KC Growth Targets Briefing Paper 2- 5- 09.docJP Page 4 of 4 03/04/2009 City of Tukwila FOURTH QUARTER YEAR -END REPORT TO COUNCIL October 1 December 31, 2008 Prepared for Community Parks Committee DEPARTMENT OF COMMUNITY DEVELOPMENT 2008 YEAR END SUMMARY Staffing Changes In 2008, we had four vacant positions filled, Deputy Director (Nora Gierloff), Senior Electrical Inspector (Jim Benner), Code Enforcement officer (Mary Hulvey) and Assistant Planner (Stacy MacGregor). Planning Division Development Activity There were 22 land use decisions issued, the applications included three Comprehensive Plan Amendments /Rezone applications, two Board of Architectural Review approvals, one Administrative Design Review approval, four SEPA decisions, seven Special Permissions for deviations from code for sensitive areas /parking /signs, and five Administrative decisions for noise variances /shoreline exemptions. Code Enforcement In 2008, code enforcement investigated 608 complaints, of which 372 required further action, and 244 cases were closed. The 372 Request for Action cases consisted of: 62 Building, 50 trash /Debris, 39 Junk Vehicles, 41 Signs, 26 Housing, 24 Graffiti, 30 Weeds/ Overgrowth, 58 Parking, and 42 Other. Permit Coordination and Building Year end permit activity hit an all time record with 2,730 permits issued (522 building, 321 mechanical, 313 plumbing, and 1,473 electrical) with a $134,638,107 total project valuation. 4 QUARTER SIGNIFICANT ISSUES Westfield Southcenter Mall Expansion The increase in Building, Mechanical and Electrical permits was mainly due to the Westfield Mall expansion project. At the beginning of this project the Westfield project managers made clear their need for on -call inspection services after business hours and for weekends and holidays, if they were to meet their opening deadline. Hiring additional staff was not a viable option. Consequently, this challenge was met by contracting with a private inspection services company to handle the Westfield Mall expansion project. Four additional inspectors were necessary to handle the work load of the Mall expansion project alone. The result allowed the Westfield expansion to open on schedule and allowed staff to maintain a normal level of inspection services for all other projects in Tukwila. BUDGET PROGRAM GOALS Jim Haggerton, Mayor 1. Complete Tukwila South Master Plan and Annexation: Awaiting resolution of Development Agreement issues. 2. Adopt new Shoreline Management Master Program: The Planning Commission has completed public hearings and will forward their recommendations to City Council first quarter of 2009. 3. Adopt Tukwila Urban Center Plan and Planned Action: In October 2008, consultants and staff held a public workshop at the Westfield Southcenter Mall and a joint City Council /Planning Commission worksession on the Urban Center Draft Plan. The presentation included an overview of the planning process to date, the community's goals and vision for the urban center, and how the city has already been testing and implementing some of the key concepts of the draft plan. 4. Review /update Manufacturing Industrial Center Policies and Planned Action: This project is on hold due to the delay on Boeing completing their Facilities Plan. AFTER ACTION REVIEW Page 2 5. Adopt new Sign Code: The Sign Code Advisory Committee has completed their input on the new sign code. A joint meeting of the City Council and Planning Commission is scheduled for January 29, 2009. An emergency moratorium was adopted to prevent the installation of signs that might not be permitted under the new sign code. Planning staff has scheduled additional briefings with the Chamber and with the Hwy 99 Action Committee. 6. Review Small Lot Residential Development Policies and Standards: No activity this quarter. 7. Develop a Climate Change Plan to reduce green house gases from the community: Staff has been working with other city departments in examining ways to reduce energy consumption. The City Council briefing on 2008 activities is scheduled for January 5, 2009. Planning Staff has met with the Cascade Land Conservancy to discuss involving them in a community outreach program. Code Enforcement 1. Assist in updating the Noise Ordinance, Home Occupation Standards and Parking Standards in residential neighborhoods: Noise ordinance: First draft has been reviewed by staff twice and is in to the city attorney for final revision prior to presentation to the CAP. Present to CAP first quarter 2009. Home occupation standards. No activity this quarter. Residential parking standards. No activity this quarter. 2. Develop proposal for Rental Housing Licensing Program: Awaiting draft ordinance from City Attorney. Tentatively presentation to CAP will occur first quarter 2009. Permit Coordination and Building 1. Develop a Combination Building Permit for single family residential construction: No activity this quarter. 2. Develop tracking and notifications system for Backflow Test Reports: Complete. 3. Expand usage of "Permits Plus" tracking system: No activity this quarter. 4. Adopt 2008 National Electrical Code and consolidate Administrative Provisions for TMC Title 16: The Department of Labor Industries is due to release the adopted form of the 2008 NEC with amendments as WAC rule changes on December 31, 2008. An adopted ordinance will submitted to Council during the first quarter 2009. Planning Commission 1 Review Sign Code update: No activity this quarter. 2. Review Shoreline Management Master Proaram update: Planning Commission completed public hearings and is finalizing their deliberation. 3. Review Tukwila Urban Center Plan: In October, a Joint City Council /Planning Commission Worksession was held on the Urban Center Plan prior to taking the draft plan for public review early in 2009. 4. Review Small Lot Residential Development Policies and Standards: No activity this quarter. PARKS AND RECREATION DEPARTMENT 2008 YEAR END SUMMARY The Parks and Recreation Department continued to offer a variety of recreational and leisure opportunities to residents and visitors throughout 2008. The department hosted many citywide special events including the annual Backyard Wildlife Festival, Tukwila Days event at the Community Center, and the Family Forth Event at Fort Dent Park to name a few. The Tukwila Community Center continued to be a focal meeting point for local residents, business, and regional meetings and in 2008 we implemented new software that allows us to schedule and track facility rentals. Two park celebrations were held in 2008; the new playground at Fort Dent Park and the Water Spray Park at the community center. Each addition has provided several recreational opportunities to children and families that live and visit Tukwila. The golf course replaced tee markers and upgraded storm pumps adding to the overall appearance and functionality of the course. The City continues to celebrate the Tukwila Centennial with several events and festivals in celebration of our 100 years! C indata\ Councilllnfoh;errrcQuadedies.doc AFTER ACTION REVIEW Page 3 4 QUARTER SIGNIFICANT ISSUES The Parks and Recreation Department wrapped up a busy year with many successful programs and community celebrations including, Breakfast with Santa, the annual Senior Thanksgiving Dinner, and a Tree Lighting Celebration. Over 30 Tukwila families were assisted with holiday gifts to over 100 children through the Holiday Adopt -A- Family program. Codiga Farm and Duwamish Riverbend Hill developments are in the permitting process and we are looking forward to beginning these park projects in early 2009. BUDGET PROGRAM GOALS Administration 1. Design and construct Phase I of the Duwamish Riverbend Hill to include trail system. interpretive markers and interim parking area: Phase I Construction Design Consultant hired, design currently in permitting process. 2. Staff will apply for open space grants to purchase needed park land and needed open space as determined by our updated Park Master Plan: Received $240,000 from Land Water Conservation Funds grant program. 3. Redesign and construct Phase II of Codiga Farm Park to include trail system, interpretive markers. picnic area, hand boat launch and parking area: Construction Plans and Specifications 95% complete. 4. Design and construct a passive neighborhood Dark with the recent purchase of the 57 Avenue Park expansion: In process. Recreation 1. Add one additional youth sports league. i.e.: T -ball, curls fast pitch, summer basketball, flag football, etc: Complete We added a Start Smart Program for 3 -5 year olds and a Kid's First Basketball Clinic for k-4 grade. 2. Incorporate the new Spray Park at TCC into the Summer Playground Program: Re- directed With delays in Spray Park completion, we re- directed Playground Program efforts to Foster Memorial Park as an additional site to Cascade View Park. Will look at incorporating Spray Park into '09 program. 3. Increase participation and activities with the Teen Council Program by implementing new activities once a month: In progress Staff is meeting with students to focus on education, community service and event planning. 4. Work with the Tukwila School District to run the Summer Day Camp programs (Camp Tukwilly. Adventure Camp, and Teen Camp) at a school site: Complete Summer Day Camp was at Showalter Middle School for 7 out of 10 weeks. We are working with the District to secure the building for Summer '09. 5. Host a Family Fun Field Day Event in conjunction with Spring Break Camp: Complete Kids Appreciation Day was held on March 29, 2008. 6. Develop an 8 team Co -Ed Senior Softball Tournament: Cancelled— Tournament was cancelled due to lack of available fields. 7. Plan a number of events on Thursdays before and after lunch to increase the daily numbers by 15% to the Senior Lunch Program, including new entertainment during the lunch hour: In progress We have added some Thursday activities, such as a Wii Bowling League in additional to forging relationship with water exercise class. 8. Provide leadership and staff support for 2008 Tukwila Centennial events: Completed No Tukwila Centennial events were held during the 4 quarter of 2008. Recreation staff did work with other community groups to plan for 2009 Tukwila Centennial sanctioned events. 9. Increase vendor participation at Tukwila special events including the Backyard Wildlife Festival. Family 4 at the Fort and the Tukwila Days Community Festival: Completed Staff increased the number and variety of food vendors participating at the Family 4 at the Fort celebration in July and was also successful in recruiting new vendors for Tukwila Days. 10. Increase participation in the City of Tukwila Volunteer Program by 10 Complete Participation in the City of Tukwila Volunteer Program has continued to grow in the 4th quarter of 2008. During the 4 quarter staff worked to process approximately 50 new volunteer coaches for the Youth Teen basketball program. Staff also developed a new system for tracking volunteer hours. Volunteers continued to work on group projects throughout Tukwila. In C:\w:ndata\CoundhInfohlemoQuartedies.doc AFTER ACTION REVIEW Page 4 2008 there were approximately 20 group projects involving 811 volunteers and 3,325.75 volunteer hours contributing to restoration, enhancement and clean -up projects in City parks and facilities. 11. Implement Facility Bookina software for rental reservations of park facilities: Complete Reservations for Picnic Shelters and Athletic Fields are now taken and processed through CLASS Facility Booking software. 12. Increase weekday (Monday throuah Thursday) rentals at the TCC by 10 Complete Weekday rentals increased by 20 Aquatics 1. Increase Aquatic Program Fee revenue by 10% of the 2007 total: Ongoing. At the end of November, Program Fee revenue was up 12% for the year. 2. Significantly improve the facility's look and feel by replacing missing tile and uparadina the underwater lighting: On hold. Natatorium tile and underwater lighting is on hold for lease extension decision by the Tukwila School District. Overhead natatorium lighting upgrade was completed in June. 3. Offer CPR classes or challenges to the community and /or City of Tukwila personnel at least once per Quarter: Ongoing. CPR challenges are held as needed by appointment with one of the pool's two Instructor Trainers. 4. Offer Lifeguard Trainina classes or challenges at least once per quarter to help keep up optimum part- time staff levels at the Tukwila City Pool: Ongoing. The last class offered ended June 5 tr, with five graduates and three hired from it. We are now taking names for the next potential class. 5. Offer after school Special Olympics Swim Team proaram for Tukwila and other local School District students in the spring: Complete. The season ended June 1" at the State Games where the "Turtles" collected thirty -seven medals. The "Turtles" met the Mayor and Council members July 29 6. Continue to work with the Tukwila Community Center in marketing and making pool time available for TCC's special events and camps: Complete. Camp Tukwilly booked ten dates and Adventure Camp booked eleven plus Teen Camp had five bookings over the summer of 2008. Parents night out had bookings the first Friday of each month in the fall. Parks Maintenance 1. Assimilate new parks into the Parks Division (Codiaa Farm Park. Macadam Winter Garden, 57 Avenue Park expansion. Cascade View Community Park Phase II) and develop maintenance plans for each: Ongoing. 2. Provide park expertise in the desian phase of the Duwamish Riverbend Hill project: Ongoing. Attended Phase 1 Design Workshop on 6/24/08. 3. Inspect trail surfaces for safety hazards and repair (tree root damage, trail edge reinforcement and asphalt overlay): Completed 2008 repairs. 4. Provide assistance to Recreation Division for City -wide events: Ongoing. 5. Oversee park enhancement proiects annually: Ongoing. Golf Course Maintenance 1. Redesian and construct new partitions in the women's on- course restroom: Complete. 2. Design and install new tee signs: Complete. 3. Purchase and install new fairway vardaae markers: Complete. th 4. Replace and fix surface water drainaae pumps on 9 fairway: Complete. 5. Expand first tee area: Complete. Golf Course Pro Shop 1. New market approach and strategy for 2008 tournament play: Complete. 2. Increase tournament revenues: Mini shotgun tournament play increased throughout 2008. 3. Seek advertising sponsorship for new tee marker sians: On hold. 4. Update 2008 promotional discount tee times: Complete. C:\ v .indata \Coundl \InfofaerraQUarter ies.doc AFTER ACTION REVIEW Page 5 Arts Commission 1. Participate in the 2008 Centennial Celebration planning: Complete. 2. Apply for Grant and sponsorship funding and reauest a "Call for Artists" to purchase and install a maior Centennial art piece at the new Klickitat off -ramp: In process. 3. Apply for arant funding from 4 Culture's Sustained Support performina arts program: Complete grant awarded in April in the amount of $9,000. 4. Implement the new art selection policy: In process. Parks Commission 1. Participate in the 2008 Centennial Celebration planning: Ongoing. 2. Attend Board Commission workshops sponsored by the Washinaton Recreation and Parks Association: Complete. 3. Review design and construction drawinas for Phase I of Duwamish Riverbend Hill and Phase II of Codiaa Farm Park projects: In progress. Consultant hired, for both projects. Permitting requests in process. Library Advisory Board 1. Report annually to the City Council on the status of library services and facilities available to Tukwila citizens: Complete. 2. Maintain and improve communication between the three libraries within Tukwila city limits, the Tukwila Library Advisory Board, the Tukwila City Council, the Kina County Library System, the "Friends of the Library" organization and the Tukwila aeneral public: Ongoing. 3. Provide support to literacy in Tukwila and to the Parks and Recreation, and Kina County Library System special events: Ongoing, provided 500+ books for Dr. Seuss Birthday Celebration. 4. Provide support to the Friends of Tukwila Libraries to promote literacy in Tukwila: Ongoing. C.'winda•.a \Coun61 \InfaMer noQuartedies.doc