HomeMy WebLinkAbout08-086 - Ebenal General - Standby Power Upgrades Year 1 0 CITY OF TUKWILA 08- 086(e) of i� Council Approval 6115109 1 r CONTRACT CHANGE ORDER NO. 5 s o 8 DATE 5 -14 -09 BUDGET NO: 303.00.594.190.62.35 City Hall PROJECT NO: 06 -BG01 CONTRACT NO 08 -086 PROJECT NAME: Standby Power Upgrades Year One Construction TO: Ebenal General, Inc. You are hereby directed to make the herein described changes to the plans and specifications or do the following described work not included in the plans and specifications on this contract: NOTE: This change order is not effective until approved by the "Owner" and a notice to proceed is issued. Conditions: A. The following change, and work affected thereby, are subject to all contract stipulations and covenants; B. The rights of the "Owner" are not prejudiced; C. All claims against the "Owner" which are incidental to or as a consequence of this change are waived; and D. The Contractor must submit all Field Overhead and Home Office Overhead Rates for approval in advance of all change orders. CHANGE: The proposed work in Change Order No, 5 initially resulted from the discovery of the proposed generator site location at the west side of was within a stream buffer. This location would create a sizeable amount of mitigation if built in this location. A new site was needed to be determined. New sites were evaluated and design plans were revised with a location in the sloped lawn area in front of City Hall. The costs associated with this location were becoming prohibitive Finally a site was chosen in the furthest westerly stall of the lower parking lot. This is the nearest feasible location in regard to the location of the existing electrical facilities being connected. We the undersigned Contractor, have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all equipment, furnish all materials, except as may otherwise be noted above, and perform all services necessary for the work above specified, and will accept as full payment therefore the prices shown above and below. This change represents a fair, equitable and complete compensation. ACCEPTED: Contractor: Ebenal General, Inc. i By Title A V Original Contract (without tax) 480,000.00 APPROVE,Q BY THE CITY OF TUKWILA Previous Change Order 14742.00 Date L11 x,11 e I rruo1 This Change Order (without tax) 50,565.03 U� l4 By REV. CONTRACT AMOUNT $545,30703 Additional Calendar Days due to this change: 76 for a revised total of 243 days ORIGINAL. City Clerk (1 of 2) cc: Finance Department (wlencumbrance) Contractor (2 of 2) Construction Inspector Construction Engineer file: p:lformsl Sp a 0,0 611 V &T C \Documents and Settmgs0on.EGC\Local Settings \Temporary Internet Files \Content 0utIook\KLX6JY70\Ebenal CO 95 CH 4 -09 -09 draft] doc TO: Ebenal General, Inc Original Contract (without tax) Previous Change Order This Change Order (without tax) ACCEPTED: Date By ORIGINAL. City Clerk (1 of 2) Contractor (2 of 2) CITY OF TUKWILA CONTRACT CHANGE ORDER NO. 4 DATE: 4 -09 -09 BUDGET NO: 303.00.594.190.62.38 Fire Stations PROJECT NO: 06 -BG01 CONTRACT NO 08 -086 C(k) PROJECT NAME: Standby Power Upgrades Year One Construction You are hereby directed to make the herein described changes to the plans and specifications or do the following described work not included in the plans and specifications on this contract: NOTE: This change order is not effective until approved by the "Owner" and a notice to proceed is issued. Conditions: A. The following change, and work affected thereby, are subject to all contract stipulations and covenants; B. The rights of the "Owner" are not prejudiced; C. All claims against the "Owner" which are incidental to or as a consequence of this change are waived, and D. The Contractor must submit all Field Overhead and Home Office Overhead Rates for approval in advance of all change orders. CHANGE: The proposed work in this change order was the result of discovering that the existing electrical panels were not properly grounded at Fire Station 52 and thus not within code compliance. Staff directed the contractor to install the grounding system. This change order will add $785.00 and 1 calendar days to the original contract. The new contract total will become $537,942.00, and the project duration will increase to 167 calendar days. We the undersigned Contractor, have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all equipment, furnish all materials, except as may otherwise be noted above, and perform all services necessary for the work above specified, and will accept as full payment therefore the prices shown above and below. This change represents a fair, equitable and complete compensation. 523,200.00 13,957.00 785.00 REV. CONTRACT AMOUNT 537,942.00 Contractor: Ebenal General, Inc. Title APPROVED BY THE CITY OF TUKWILA Date t4 r: u± By Additional Calendar Days due to this change: 1 for a revised total of 167 days C'U)nrnmentc and Settings \Lisa.EGC\Local Settings \Tetnoorary Internet Files Content.Outlook \VHODUGQ5 \Ebenal CO #4 4 -09 -09 gl.doc 08- 086(d) Council Approval 8/18/08 ayor cc: Finance Department (w /encumbrance) 5 r f l 6/A/4" Construction Inspector Construction Engineer file: p:lformsl I To: Ebenal general, Inc P.O. Box 31548 I Bellingham, WA 98228 Attn: Daivd Ebenal City of Tukwila Public Works Department 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: (206) 433 -0179 FIELD DIRECTIVE #4 Work to be performed: Install the proposed grounding systems as directed in the responses to RFI's 8 and 8.1 at Station 52. Reason for modification: Per the responses to RFI Nos. 8 and 8.1. Provides grounding systems for safety reasons and moving a panel associated with this grounding system work at Station 52. Work under this Field Directive modification will be accomplished: Approved by: Verified by: With no change to the contract price. X For a lump sum increase /decrease of $785.00 to the contract price. On a unit price basis using existing bid item number With work to start immediately and determination of any change to the contract price and /or completion date to be negotiated. Negotiations to be complete by (within 7 working days). With no change in contract completion date. X With contract completion date extended 1 calendar days. Performance of this Field Directive is authorized by all signatryes below: Accepted by: Contractor's Rep Name Pt\o',oci Mummer TitlZ JLi City Construction Engineer City Construction Inspector I Date: 3 -31 -09 Project Name: Tukwila Standby Power Project No.: 06 -BG01 I Contract No.: 08 -086 4 40 l Date a- Bi Date Date BUDGET NO: 303.00.594.190.62.38 Fire Stations CONTRACT NO 08 -086 (G) PROJECT NAME: Standby Power Upgrades Year One Construction DATE: 4 -09 -09 PROJECT NO. 06 -BG01 TO: Ebenal General, Inc. You are hereby directed to make the herein described changes to the plans and specifications or do the following described work not included in the plans and specifications on this contract: NOTE: This change order is not effective until approved by the "Owner" and a notice to proceed is issued. Conditions: A. The following change, and work affected thereby, are subject to all contract stipulations and covenants; B. The rights of the "Owner" are not prejudiced; C. All claims against the "Owner" which are incidental to or as a consequence of this change are waived; and D. The Contractor must submit all Field Overhead and Home Office Overhead Rates for approval in advance of all change orders. CHANGE: The proposed work in this change order is the result of unforeseen conditions during the course of construction. This change adds an additional circuit for future auxiliary fuel tanks. Circuits were also added to separate existing battery chargers at Station 54 for safety compliance. The remote annunciator, which was installed per the plans, was directed by the Fire Marshall to be relocated next to other equipment to comply with requirements. This change order will add $5,750.00 and 15 calendar days to the original contract. The new contract total will become $537,157.00, and the project duration will increase to 166 calendar days. We the undersigned Contractor, have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all equipment, furnish all materials, except as may otherwise be noted above, and perform all services necessary for the work above specified, and will accept as full payment therefore the prices shown above and below. This change represents a fair, equitable and complete compensation. ACCEPTED: Date By 1 Original Contract (without tax) Previous Change Order This Change Order (without tax) REV. CONTRACT AMOUNT Additional Calendar Days due to this change: 15 for a revised total of 166 days ORIGINAL. City Clerk (1 of 2) Contractor (2 of 2) 08- 086(c) CITY OF TUKWILA Council Approval 8/18/08 CONTRACT CHANGE ORDER NO. 3 523,200.00 8,207.00 5,750.00 537,157.00 Contractor: Ebenal General, Inc. Title /M cc: Finance Department (wlencumbrance) Construction Inspector Construction Engineer file: p:Uormsl P IPROJECTSIA BG Projects106B001 Stand -by Power Upgrade \Constructton\EbenallEbenal CO N3 4 -09 -09 gl.doc APPROVED BY THE CITY OF TUKWILA Date sday..., 17, U`7 Byr L iayor 51-6 f Ci 4) C i AIr4v -,s I To: Ebenal General, Inc. P.O. Box 31548 Bellingham, WA 98228 Attn: David Ebenal -- City of Tukwila Public Works Department 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: (206) 433 -0179 FIELD DIRECTIVE #3 Work to be performed: Please see the encloseded RF1's 4 and 5 for Electrical revision and details. Add extra circuit for future auxiliary fuel tanks at all three Fire Station sites. Added additional Circuits to separate the existing battery charger at the Fire Station 54. Relocate the remote annunciator at Station 54 from adjacent to the ATS' per Fire Marshall's request. Reason for modification: Additional circuits were needed to separate new equipment from existing in order to prevent overloading and tripping of the charging circuit. The annunciator at Station 54 was relocated at the request of the Fire Marshall. The annuciator will be relocated from next to the Captain's office to the existing alarm monitoring panel. Work under this Field Directive modification will be accomplished: Accepted by: Verified by: I Date: 3 -31 -09 I Project Name: Tukwila Standby Power Project No.: 06 -B001 I Contract No.: 08 -086 o With no change to the contract price. X Fora lump sum increase of $5,750.00 to the contract price. o On a unit price basis using existing bid item number o With work to start immediately and determination of any change to the contract price and /or completion date to be negotiated. Negotiations to be complete by (within 7 working days). With no change in contract completion date. r X With contract completion date extended7calendar days. Performance of this Field Directive is authorized by all signatures below: Approved by: Contractor's Rep Name iM tiv«r 1' Title City Construction Engineer City Construction Inspector L ab Date 3 7?Di v Date Date BUDGET NO: 303.00.594.190.62.38 Fire Stations CONTRACT NO 08 -086 C h� PROJECT NAME: Standby Power Upgrades Year One Construction DATE: 4 -09 -09 PROJECT NO: 06 -BG01 TO: Ebenal General, Inc. 08- 086(b) CITY OF TUKWILA CONTRACT CHANGE ORDER NO. 2 You are hereby directed to make the herein described changes to the plans and specifications or do the following described work not included in the plans and specifications on this contract: NOTE: This change order is not effective until approved by the "Owner and a notice to proceed is issued. Conditions. A. The following change, and work affected Thereby, are subject to all contract stipulations and covenants; B. The rights of the "Owner" are not prejudiced; C. All claims against the "Owner" which are incidental to or as a consequence of this change are waived; and D. The Contractor must submit all Field Overhead and Home Office Overhead Rates for approval in advance of all change orders. CHANGE: This work is the result of conditions encountered in the field during construction which require additional efforts by the contractor to complete the proposed systems at Fire Station 52 53. These conditions were because of physical constraints of the existing buildings and the clearance requirements needed to effectively locate the new equipment. This work includes moving existing electrical cabinets, wiring, and conduits, to physically accommodate the new equipment required for the generator systems. Repair work of the existing walls is required to include patching, replacing, and painting both inside and outside wall areas. We the undersigned Contractor, have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all equipment, furnish all materials, except as may otherwise be noted above, and perform all services necessary for the work above specified, and will accept as full payment therefore the prices shown above and below. This change represents a fair, equitable and complete compensation. ACCEPTED: Date y e9 Contractor: Ebenal General, Inc. By Title Pi/c1 Original Contract (without tax) Previous Change Order This Change Order (without tax) REV. CONTRACT AMOUNT ORIGINAL: City Clerk (1 of 2) Contractor (2 of 2) 523,200.00 1,000.00 7,207.00 By 531,407.00 ayor Additional Calendar Days due to this change: 29 for a revised total of 151 days cc: Finance Department (w /encumbrance) Construction Inspector Construction Engineer file: p:lforms\ P:IPROJECTS'A BG Projects106BG01 Stand -by Power Upgrade\Construction\Ebenal benal CO 42 Ste 52 4 -09 -09 gl,doc Council Approval 8/18/08 APPROVED BY THE CITY OF TUKWILA Date Ay \41/) 4 .7 7)23 of 6 To: Ebenal General Inc. P.O. Box 31548 Bellingham, WA 98228 Attn: David Ebenal City of Tukwila Public Works Department 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: (206) 433 -0179 FIELD DIRECTIVE #2 Date: 3 -31 -09 Project Name: Tukwila Standby Power Project No.: 06 -BG01 I Contract No.: 08 -086 Work to be performed: In response to the requested work under COP005 for work at Fire Stations 52 53 provided by Mac Stanton and dated 27- MAR -09. Reason for modification: Because of issues regarding the location of equipment in the field versus the design plans, relocation of some existing equipment along with design modifications are needed to provide the necessary items to provide the complete systems as specified. Work under this Field Directive modification will be accomplished: Performance of this Field Directive is authorized by aflsignatures below Accepted by: Contractor's Rep Name ib�C�C.T MCirtIdar v J Title City Construction Engineer City Construction Inspector Approved by: Verified by: With no change to the contract price. X For a lump sum increase of 7,207.00 to the contract price. On a unit price basis using existing bid item number With work to start immediately and determination of any change to the contract price and /or completion date to be negotiated. Negotiations to be complete by (within 7 working days). With no change in contract completion date. X With contract completion date extended 29 calendar days. t Date 0 -07 Date Date DATE: 4 -09 -09 BUDGET NO 303.00.594.190.62.38 Fire Stations PROJECT NO: 06 -BG01 CONTRACT NO: 08 -086 C(;) PROJECT NAME: Standby Power Upgrades Year One Construction TO: Ebenal General, Inc. You are hereby directed to make the herein described changes to the plans and specifications or do the following described work not included in the plans and specifications on this contract: NOTE: This change order is not effective until approved by the "Owner" and a notice to proceed is issued. Conditions: A. The following change, and work affected thereby, are subject to all contract stipulations and covenants; B. The rights of the "Owner" are not prejudiced; C. All claims against the "Owner" which are incidental to or as a consequence of this change are waived; and D. The Contractor must submit all Field Overhead and Home Office Overhead Rates for approval in advance of all change orders. CHANGE: The proposed work in this change order is the result of unforeseen conditions encountered in the field at Fire Stations #52 during the course of construction. Public Works staff has issued the attached Field Directive #1 to address the additional work items necessary for the completion of the work at this site. Field Directive #1 involves the excavation of an existing planter area to provide a code required three foot clearance for maintenance access around the generator. The work also includes hauling and material disposal, repair of an existing irrigation line, and preparation of the excavated area to provide an accessible, 3 -foot wide flat area for maintenance required by code. We the undersigned Contractor, have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all equipment, furnish all materials, except as may otherwise be noted above, and perform all services necessary for the work above specified, and will accept as full payment therefore the prices shown above and below. This change represents a fair, equitable and complete compensation. ACCEPTED: Date 4- 4' _0 9 Contractor: Ebenal General, Inc. BY Original Contract (without tax) Previous Change Order This Change Order (without tax) REV. CONTRACT AMOUNT Additional Calendar Days due to this change: 2 for a revised total of 122 days ORIGINAL. City Clerk (1 of 2) Contractor (2 of 2) CITY OF TUKWILA CONTRACT CHANGE ORDER NO. 1 Title 523,200.00 0.00 1.000.00 524,200.00 APPROVED BY THE CITY OF TUKWILA Date t L' ii 71 °1 By cc: Finance Department (w /encumbrance) Construction Inspector Construction Engineer file: p:lformsl 4 Mayor C:\Documents and Settings\Lisa.EGC\Local Settings \Temporary Internet Files Content.Outlook \VHODUGQ5\Ebenal CO #1 Sta 52 4 -09 -09 gl.doc 08 -086 (a) Council Approval 8/18/08 To: Ebenal General, Inc. P.O. Box 31548 Bellingham, WA 98228 Attn: David Ebenal Work to be performed: In response to the requested work under COPOO4R at fire Station 52 provided by Mac Stanton and dated 17- MAR -09. Please do not construct the proposed retaining wall or remove the existing wall. Please excavate the adjacent area above the existing, lower retaining wall to provide a flat earthen area approximately 3 feet measured from the face of wall into the planter and 3 inches below the top of the wall. Extend each side, a minimum of 3 feet beyond each end of the generator. Taper slopes at a ratio of 1:1 to daylight at existing grades. Reason for modification: To provide a 3 foot minimum clearance area adjacent to the generator for maintenance access. Work under this Field Directive modification will be accomplished: With no change to the contract price. T &M not to exceed X ►,,,u00 9 ,$1000.00 On a unit price basis using existing bid item number With work to start immediately and determination of any change to the contract price and /or completion date to be negotiated, Negotiations to be complete by within 7 working days. fire stations to be With no change in contract completion date. complete by May 4, X etto 2009. Performance of this Field Directive is- authorized by all signatures below: Contractor's Rep Name N 7CT t J 0 tl� Title Approved by: Accepted by: Verified by: City of Tukwila Public Works Department 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: (2061433-0179 FIELD DIRECTIVE #1 City Construction Engineer City Construction Inspector I Date: 3 -31 -09 Project Name: Tukwila Standby Power Project No.: 06 -BG01 I Contract No.: 08 -086 1-1 /0 01 G Date 9 2/ (99 Date Date AGREEMENT FORM p, �/o xP CONTRACT NO va THIS AGREEMENT is made and entered into on this 1SPday t�� ll� �?f Ll 20k, by and between the City of Tukwila, Washington "Owner and A c�t lam_ "Contractor Now, therefore the parties agree as follows 1 Project. Contractor shall complete all work and furnish all labor, tools, materials, and equipment for the project entitled "Standby Power Upgrades Year 1" Project No 06 -BG01, including all changes to the Work and force account work, in accordance with the Contract Documents, as described in Section 1 -04 2 of the Supplemental General Requirements 2 Payments. Owner shall pay Contractor at the unit and lump sum prices, and by force account as specified in the Proposal according to the Contract Documents as to time, manner, and condition of payment. The payments to Contractor include the costs for all labor, tools, materials and equipment for the Work. 3 Completion Date. Contract time shall commence upon Owner's Notice to Proceed date The Work under this Agreement shall be completed within the time specified in the Proposal If the Work under this Agreement is not completed within the time specified, as detailed in the Contract Documents, Contractor shall pay liquidated damages and all engineering inspection and supervision costs to Owner as specified in the Proposal 4 Attorney's Fees. In the event litigation is commenced to enforce this Agreement, the prevailing party shall be entitled to recover its costs, including reasonable attorney's and expert witness fees 5 Disclaimer. No liability of Contractor shall attach to Owner by reason of entering into this Agreement, except as expressly provided in this Agreement. 6 Counterparts. This Agreement is executed in two (2) identical counterparts, by the parties, each of which shall for all purposes be deemed an original CITY OF TUKWILA, WASHINGTON- (Owner) (Contractor) f By ���>'`�J� e C By May �ckU�cb Lnc�\ ��G� Title Attest: AV 44 Attest: 1 1 A Thi JO day of 1� 2006 This IB day of l�I QLIS 20 L)g Z Z t J City Clerk Approved as to FQrJn Contractor's License No 17 04 City Attorney Address for giving notices Address for giving notices �x2'J Avo S %F /oo l f� V W q SQ 0.5 /,(V S