CITY OF TUKWILA 08- 086(e)
of i�
Council Approval 6115109
1 r CONTRACT CHANGE ORDER NO. 5
s o 8
DATE 5 -14 -09 BUDGET NO: 303.00.594.190.62.35 City Hall
PROJECT NO: 06 -BG01 CONTRACT NO 08 -086
PROJECT NAME: Standby Power Upgrades Year One Construction
TO: Ebenal General, Inc.
You are hereby directed to make the herein described changes to the plans and specifications or do the following described work
not included in the plans and specifications on this contract:
NOTE: This change order is not effective until approved by the "Owner" and a notice to proceed is issued.
Conditions: A. The following change, and work affected thereby, are subject to all contract
stipulations and covenants;
B. The rights of the "Owner" are not prejudiced;
C. All claims against the "Owner" which are incidental to or as a consequence of
this change are waived; and
D. The Contractor must submit all Field Overhead and Home Office Overhead Rates
for approval in advance of all change orders.
CHANGE:
The proposed work in Change Order No, 5 initially resulted from the discovery of the proposed generator site location at the west
side of was within a stream buffer. This location would create a sizeable amount of mitigation if built in this location. A new site
was needed to be determined. New sites were evaluated and design plans were revised with a location in the sloped lawn area in
front of City Hall. The costs associated with this location were becoming prohibitive Finally a site was chosen in the furthest
westerly stall of the lower parking lot. This is the nearest feasible location in regard to the location of the existing electrical facilities
being connected.
We the undersigned Contractor, have given careful consideration to the change proposed and hereby agree, if this proposal is
approved, that we will provide all equipment, furnish all materials, except as may otherwise be noted above, and perform all
services necessary for the work above specified, and will accept as full payment therefore the prices shown above and below.
This change represents a fair, equitable and complete compensation.
ACCEPTED: Contractor: Ebenal General, Inc.
i
By Title A
V
Original Contract (without tax) 480,000.00 APPROVE,Q BY THE CITY OF TUKWILA
Previous Change Order 14742.00 Date L11 x,11 e I rruo1
This Change Order (without tax) 50,565.03 U� l4
By
REV. CONTRACT AMOUNT $545,30703
Additional Calendar Days due to this change: 76 for a revised total of 243 days
ORIGINAL. City Clerk (1 of 2) cc: Finance Department (wlencumbrance)
Contractor (2 of 2) Construction Inspector
Construction Engineer
file: p:lformsl
Sp a 0,0 611 V &T
C \Documents and Settmgs0on.EGC\Local Settings \Temporary Internet Files \Content 0utIook\KLX6JY70\Ebenal CO 95 CH 4 -09 -09 draft] doc
TO: Ebenal General, Inc
Original Contract (without tax)
Previous Change Order
This Change Order (without tax)
ACCEPTED: Date
By
ORIGINAL. City Clerk (1 of 2)
Contractor (2 of 2)
CITY OF TUKWILA
CONTRACT CHANGE ORDER NO. 4
DATE: 4 -09 -09 BUDGET NO: 303.00.594.190.62.38 Fire Stations
PROJECT NO: 06 -BG01 CONTRACT NO 08 -086 C(k)
PROJECT NAME: Standby Power Upgrades Year One Construction
You are hereby directed to make the herein described changes to the plans and specifications or do the following described work
not included in the plans and specifications on this contract:
NOTE: This change order is not effective until approved by the "Owner" and a notice to proceed is issued.
Conditions: A. The following change, and work affected thereby, are subject to all contract
stipulations and covenants;
B. The rights of the "Owner" are not prejudiced;
C. All claims against the "Owner" which are incidental to or as a consequence of
this change are waived, and
D. The Contractor must submit all Field Overhead and Home Office Overhead Rates
for approval in advance of all change orders.
CHANGE:
The proposed work in this change order was the result of discovering that the existing electrical panels were not properly grounded
at Fire Station 52 and thus not within code compliance. Staff directed the contractor to install the grounding system. This change
order will add $785.00 and 1 calendar days to the original contract. The new contract total will become $537,942.00, and the
project duration will increase to 167 calendar days.
We the undersigned Contractor, have given careful consideration to the change proposed and hereby agree, if this proposal is
approved, that we will provide all equipment, furnish all materials, except as may otherwise be noted above, and perform all
services necessary for the work above specified, and will accept as full payment therefore the prices shown above and below.
This change represents a fair, equitable and complete compensation.
523,200.00
13,957.00
785.00
REV. CONTRACT AMOUNT 537,942.00
Contractor: Ebenal General, Inc.
Title
APPROVED BY THE CITY OF TUKWILA
Date t4 r: u±
By
Additional Calendar Days due to this change: 1 for a revised total of 167 days
C'U)nrnmentc and Settings \Lisa.EGC\Local Settings \Tetnoorary Internet Files Content.Outlook \VHODUGQ5 \Ebenal CO #4 4 -09 -09 gl.doc
08- 086(d)
Council Approval 8/18/08
ayor
cc: Finance Department (w /encumbrance) 5 r f l 6/A/4"
Construction Inspector
Construction Engineer
file: p:lformsl
I To: Ebenal general, Inc
P.O. Box 31548
I Bellingham, WA 98228
Attn: Daivd Ebenal
City of Tukwila Public Works Department
6300 Southcenter Boulevard, Suite #100
Tukwila, Washington 98188
Phone: (206) 433 -0179
FIELD DIRECTIVE #4
Work to be performed:
Install the proposed grounding systems as directed in the responses to RFI's 8 and 8.1 at
Station 52.
Reason for modification:
Per the responses to RFI Nos. 8 and 8.1. Provides grounding systems for safety reasons and
moving a panel associated with this grounding system work at Station 52.
Work under this Field Directive modification will be accomplished:
Approved by:
Verified by:
With no change to the contract price.
X For a lump sum increase /decrease of $785.00 to the contract price.
On a unit price basis using existing bid item number
With work to start immediately and determination of any change to the contract price
and /or completion date to be negotiated. Negotiations to be complete by
(within 7 working days).
With no change in contract completion date.
X With contract completion date extended 1 calendar days.
Performance of this Field Directive is authorized by all signatryes below:
Accepted by:
Contractor's Rep Name
Pt\o',oci Mummer
TitlZ JLi
City Construction Engineer
City Construction Inspector
I Date: 3 -31 -09
Project Name: Tukwila Standby Power
Project No.: 06 -BG01
I Contract No.: 08 -086
4
40
l Date
a- Bi
Date
Date
BUDGET NO: 303.00.594.190.62.38 Fire Stations
CONTRACT NO 08 -086 (G)
PROJECT NAME: Standby Power Upgrades Year One Construction
DATE: 4 -09 -09
PROJECT NO. 06 -BG01
TO: Ebenal General, Inc.
You are hereby directed to make the herein described changes to the plans and specifications or do the following described work
not included in the plans and specifications on this contract:
NOTE: This change order is not effective until approved by the "Owner" and a notice to proceed is issued.
Conditions: A. The following change, and work affected thereby, are subject to all contract
stipulations and covenants;
B. The rights of the "Owner" are not prejudiced;
C. All claims against the "Owner" which are incidental to or as a consequence of
this change are waived; and
D. The Contractor must submit all Field Overhead and Home Office Overhead Rates
for approval in advance of all change orders.
CHANGE:
The proposed work in this change order is the result of unforeseen conditions during the course of construction. This change adds
an additional circuit for future auxiliary fuel tanks. Circuits were also added to separate existing battery chargers at Station 54 for
safety compliance. The remote annunciator, which was installed per the plans, was directed by the Fire Marshall to be relocated
next to other equipment to comply with requirements. This change order will add $5,750.00 and 15 calendar days to the original
contract. The new contract total will become $537,157.00, and the project duration will increase to 166 calendar days.
We the undersigned Contractor, have given careful consideration to the change proposed and hereby agree, if this proposal is
approved, that we will provide all equipment, furnish all materials, except as may otherwise be noted above, and perform all
services necessary for the work above specified, and will accept as full payment therefore the prices shown above and below.
This change represents a fair, equitable and complete compensation.
ACCEPTED: Date
By 1
Original Contract (without tax)
Previous Change Order
This Change Order (without tax)
REV. CONTRACT AMOUNT
Additional Calendar Days due to this change: 15 for a revised total of 166 days
ORIGINAL. City Clerk (1 of 2)
Contractor (2 of 2)
08- 086(c)
CITY OF TUKWILA Council Approval 8/18/08
CONTRACT CHANGE ORDER NO. 3
523,200.00
8,207.00
5,750.00
537,157.00
Contractor: Ebenal General, Inc.
Title /M
cc: Finance Department (wlencumbrance)
Construction Inspector
Construction Engineer
file: p:Uormsl
P IPROJECTSIA BG Projects106B001 Stand -by Power Upgrade \Constructton\EbenallEbenal CO N3 4 -09 -09 gl.doc
APPROVED BY THE CITY OF TUKWILA
Date sday..., 17, U`7
Byr
L iayor
51-6 f Ci 4) C i AIr4v -,s
I To: Ebenal General, Inc.
P.O. Box 31548
Bellingham, WA 98228
Attn: David Ebenal
--
City of Tukwila Public Works Department
6300 Southcenter Boulevard, Suite #100
Tukwila, Washington 98188
Phone: (206) 433 -0179
FIELD DIRECTIVE #3
Work to be performed:
Please see the encloseded RF1's 4 and 5 for Electrical revision and details. Add extra circuit
for future auxiliary fuel tanks at all three Fire Station sites. Added additional Circuits to
separate the existing battery charger at the Fire Station 54. Relocate the remote annunciator at
Station 54 from adjacent to the ATS' per Fire Marshall's request.
Reason for modification:
Additional circuits were needed to separate new equipment from existing in order to prevent
overloading and tripping of the charging circuit.
The annunciator at Station 54 was relocated at the request of the Fire Marshall. The annuciator
will be relocated from next to the Captain's office to the existing alarm monitoring panel.
Work under this Field Directive modification will be accomplished:
Accepted by:
Verified by:
I Date: 3 -31 -09
I Project Name: Tukwila Standby Power
Project No.: 06 -B001
I Contract No.: 08 -086
o With no change to the contract price.
X Fora lump sum increase of $5,750.00 to the contract price.
o On a unit price basis using existing bid item number
o With work to start immediately and determination of any change to the contract price
and /or completion date to be negotiated. Negotiations to be complete by
(within 7 working days).
With no change in contract completion date. r
X With contract completion date extended7calendar days.
Performance of this Field Directive is authorized by all signatures below:
Approved by:
Contractor's Rep Name
iM tiv«r 1'
Title
City Construction Engineer
City Construction Inspector
L ab
Date
3 7?Di v
Date
Date
BUDGET NO: 303.00.594.190.62.38 Fire Stations
CONTRACT NO 08 -086 C h�
PROJECT NAME: Standby Power Upgrades Year One Construction
DATE: 4 -09 -09
PROJECT NO: 06 -BG01
TO: Ebenal General, Inc.
08- 086(b)
CITY OF TUKWILA
CONTRACT CHANGE ORDER NO. 2
You are hereby directed to make the herein described changes to the plans and specifications or do the following described work
not included in the plans and specifications on this contract:
NOTE: This change order is not effective until approved by the "Owner and a notice to proceed is issued.
Conditions. A. The following change, and work affected Thereby, are subject to all contract
stipulations and covenants;
B. The rights of the "Owner" are not prejudiced;
C. All claims against the "Owner" which are incidental to or as a consequence of
this change are waived; and
D. The Contractor must submit all Field Overhead and Home Office Overhead Rates
for approval in advance of all change orders.
CHANGE:
This work is the result of conditions encountered in the field during construction which require additional efforts by the contractor to
complete the proposed systems at Fire Station 52 53. These conditions were because of physical constraints of the existing
buildings and the clearance requirements needed to effectively locate the new equipment. This work includes moving existing
electrical cabinets, wiring, and conduits, to physically accommodate the new equipment required for the generator systems. Repair
work of the existing walls is required to include patching, replacing, and painting both inside and outside wall areas.
We the undersigned Contractor, have given careful consideration to the change proposed and hereby agree, if this proposal is
approved, that we will provide all equipment, furnish all materials, except as may otherwise be noted above, and perform all
services necessary for the work above specified, and will accept as full payment therefore the prices shown above and below.
This change represents a fair, equitable and complete compensation.
ACCEPTED: Date y e9 Contractor: Ebenal General, Inc.
By Title Pi/c1
Original Contract (without tax)
Previous Change Order
This Change Order (without tax)
REV. CONTRACT AMOUNT
ORIGINAL: City Clerk (1 of 2)
Contractor (2 of 2)
523,200.00
1,000.00
7,207.00
By
531,407.00 ayor
Additional Calendar Days due to this change: 29 for a revised total of 151 days
cc: Finance Department (w /encumbrance)
Construction Inspector
Construction Engineer
file: p:lforms\
P:IPROJECTS'A BG Projects106BG01 Stand -by Power Upgrade\Construction\Ebenal benal CO 42 Ste 52 4 -09 -09 gl,doc
Council Approval 8/18/08
APPROVED BY THE CITY OF TUKWILA
Date Ay \41/) 4 .7 7)23
of 6
To: Ebenal General Inc.
P.O. Box 31548
Bellingham, WA 98228
Attn: David Ebenal
City of Tukwila Public Works Department
6300 Southcenter Boulevard, Suite #100
Tukwila, Washington 98188
Phone: (206) 433 -0179
FIELD DIRECTIVE #2
Date: 3 -31 -09
Project Name: Tukwila Standby Power
Project No.: 06 -BG01
I Contract No.: 08 -086
Work to be performed:
In response to the requested work under COP005 for work at Fire Stations 52 53 provided by
Mac Stanton and dated 27- MAR -09.
Reason for modification:
Because of issues regarding the location of equipment in the field versus the design plans,
relocation of some existing equipment along with design modifications are needed to provide
the necessary items to provide the complete systems as specified.
Work under this Field Directive modification will be accomplished:
Performance of this Field Directive is authorized by aflsignatures below
Accepted by:
Contractor's Rep Name
ib�C�C.T
MCirtIdar
v J
Title
City Construction Engineer
City Construction Inspector
Approved by:
Verified by:
With no change to the contract price.
X For a lump sum increase of 7,207.00 to the contract price.
On a unit price basis using existing bid item number
With work to start immediately and determination of any change to the contract price
and /or completion date to be negotiated. Negotiations to be complete by
(within 7 working days).
With no change in contract completion date.
X With contract completion date extended 29 calendar days.
t
Date
0 -07
Date
Date
DATE: 4 -09 -09 BUDGET NO 303.00.594.190.62.38 Fire Stations
PROJECT NO: 06 -BG01 CONTRACT NO: 08 -086 C(;)
PROJECT NAME: Standby Power Upgrades Year One Construction
TO: Ebenal General, Inc.
You are hereby directed to make the herein described changes to the plans and specifications or do the following described work
not included in the plans and specifications on this contract:
NOTE: This change order is not effective until approved by the "Owner" and a notice to proceed is issued.
Conditions: A. The following change, and work affected thereby, are subject to all contract
stipulations and covenants;
B. The rights of the "Owner" are not prejudiced;
C. All claims against the "Owner" which are incidental to or as a consequence of
this change are waived; and
D. The Contractor must submit all Field Overhead and Home Office Overhead Rates
for approval in advance of all change orders.
CHANGE:
The proposed work in this change order is the result of unforeseen conditions encountered in the field at Fire Stations #52 during
the course of construction. Public Works staff has issued the attached Field Directive #1 to address the additional work items
necessary for the completion of the work at this site. Field Directive #1 involves the excavation of an existing planter area to
provide a code required three foot clearance for maintenance access around the generator. The work also includes hauling and
material disposal, repair of an existing irrigation line, and preparation of the excavated area to provide an accessible, 3 -foot wide
flat area for maintenance required by code.
We the undersigned Contractor, have given careful consideration to the change proposed and hereby agree, if this proposal is
approved, that we will provide all equipment, furnish all materials, except as may otherwise be noted above, and perform all
services necessary for the work above specified, and will accept as full payment therefore the prices shown above and below.
This change represents a fair, equitable and complete compensation.
ACCEPTED: Date 4- 4' _0 9 Contractor: Ebenal General, Inc.
BY
Original Contract (without tax)
Previous Change Order
This Change Order (without tax)
REV. CONTRACT AMOUNT
Additional Calendar Days due to this change: 2 for a revised total of 122 days
ORIGINAL. City Clerk (1 of 2)
Contractor (2 of 2)
CITY OF TUKWILA
CONTRACT CHANGE ORDER NO. 1
Title
523,200.00
0.00
1.000.00
524,200.00
APPROVED BY THE CITY OF TUKWILA
Date t L' ii 71 °1
By
cc: Finance Department (w /encumbrance)
Construction Inspector
Construction Engineer
file: p:lformsl
4
Mayor
C:\Documents and Settings\Lisa.EGC\Local Settings \Temporary Internet Files Content.Outlook \VHODUGQ5\Ebenal CO #1 Sta 52 4 -09 -09 gl.doc
08 -086 (a)
Council Approval 8/18/08
To: Ebenal General, Inc.
P.O. Box 31548
Bellingham, WA 98228
Attn: David Ebenal
Work to be performed:
In response to the requested work under COPOO4R at fire Station 52 provided by Mac Stanton
and dated 17- MAR -09. Please do not construct the proposed retaining wall or remove the
existing wall. Please excavate the adjacent area above the existing, lower retaining wall to
provide a flat earthen area approximately 3 feet measured from the face of wall into the planter
and 3 inches below the top of the wall. Extend each side, a minimum of 3 feet beyond each end
of the generator. Taper slopes at a ratio of 1:1 to daylight at existing grades.
Reason for modification:
To provide a 3 foot minimum clearance area adjacent to the generator for maintenance access.
Work under this Field Directive modification will be accomplished:
With no change to the contract price. T &M not to exceed
X ►,,,u00 9 ,$1000.00
On a unit price basis using existing bid item number
With work to start immediately and determination of any change to the
contract price and /or completion date to be negotiated, Negotiations to be complete
by within 7 working days. fire stations to be
With no change in contract completion date. complete by May 4,
X etto 2009.
Performance of this Field Directive is- authorized by all signatures below:
Contractor's Rep Name
N 7CT t J 0 tl�
Title
Approved by:
Accepted by:
Verified by:
City of Tukwila Public Works Department
6300 Southcenter Boulevard, Suite #100
Tukwila, Washington 98188
Phone: (2061433-0179
FIELD DIRECTIVE #1
City Construction Engineer
City Construction Inspector
I Date: 3 -31 -09
Project Name: Tukwila Standby Power
Project No.: 06 -BG01
I Contract No.: 08 -086
1-1 /0 01
G Date
9 2/ (99
Date
Date
AGREEMENT FORM p, �/o
xP
CONTRACT NO va
THIS AGREEMENT is made and entered into on this 1SPday t�� ll�
�?f Ll 20k, by and between
the City of Tukwila, Washington "Owner and A c�t lam_ "Contractor Now,
therefore the parties agree as follows
1 Project. Contractor shall complete all work and furnish all labor, tools, materials, and
equipment for the project entitled "Standby Power Upgrades Year 1" Project No 06 -BG01, including all
changes to the Work and force account work, in accordance with the Contract Documents, as described in
Section 1 -04 2 of the Supplemental General Requirements
2 Payments. Owner shall pay Contractor at the unit and lump sum prices, and by force
account as specified in the Proposal according to the Contract Documents as to time, manner, and condition
of payment. The payments to Contractor include the costs for all labor, tools, materials and equipment for the
Work.
3 Completion Date. Contract time shall commence upon Owner's Notice to Proceed date
The Work under this Agreement shall be completed within the time specified in the Proposal If the Work
under this Agreement is not completed within the time specified, as detailed in the Contract Documents,
Contractor shall pay liquidated damages and all engineering inspection and supervision costs to Owner as
specified in the Proposal
4 Attorney's Fees. In the event litigation is commenced to enforce this Agreement, the
prevailing party shall be entitled to recover its costs, including reasonable attorney's and expert witness fees
5 Disclaimer. No liability of Contractor shall attach to Owner by reason of entering into this
Agreement, except as expressly provided in this Agreement.
6 Counterparts. This Agreement is executed in two (2) identical counterparts, by the parties,
each of which shall for all purposes be deemed an original
CITY OF TUKWILA, WASHINGTON-
(Owner) (Contractor) f
By ���>'`�J� e
C By
May �ckU�cb Lnc�\
��G� Title
Attest: AV 44 Attest:
1 1
A Thi JO day of 1� 2006 This IB day of l�I QLIS 20 L)g
Z Z t
J
City Clerk
Approved as to FQrJn Contractor's License No
17 04
City Attorney
Address for giving notices Address for giving notices
�x2'J Avo S %F /oo
l f� V W q SQ 0.5
/,(V S