Loading...
HomeMy WebLinkAboutPermit D98-0181 - HARTUNG GLASS COMPANY - ROOMoti 11.WV) \Afe 5 k \I a eit \ (A'k UkC\ City of Tukwila Community Development / Public Works • 6300 Southcenter Boulevard, Suite 100 • Tukwila, Washington 98188 WARNING: IF CONSTRUCTION BEGINS BEFORE APPEAL PERIOD EXPIRES, APPLICANT IS PROCEEDING AT THEIR OWN RISK. Parcel No: 362304 -9097 Address: 17830 WEST VALLEY HY Suite No: Location: Category: AMFG Type: DEVPERM Zoning: C /LI Const Type: Occupancy: Gas /Elec.: UBC: 1994 Units: 001 Fire Protection: SPRINKLERS Setbacks: North: .0 South: .0 East: .0 West: .0 Water: RENTON Sewer: TUKWILA Wetlands: Slopes: N Streams: Contractor License No: OCCUPANT HARTUNG GLASS COMPANY 17830 WEST VALLEY HY, TUKWILA WA 98188 OWNER SCIOLA NICK +PATRICIA ANN Phone: (206)656-2626 6718 134TH CT NE, REDMOND WA 98052 CONTACT ALAN BYLSMA Phone: 206- 433 -8997 12720 GATEWAY DR, #116, SEATTLE WA 98168 ***************************************************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Permit Description: CONSTRUCT A 264 SF ROOM TO DRY CAULKING AROUND WINDOWS. r***************************************************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Construction Valuation: $ 5,000.00 PUBLIC WORKS PERMITS: *(Water Meter Permits Listed Separate) Eng. Appr: Curb Cut/Access/Sidewalk/CSS: N Fire Loop Hydrant: N No: Size(in): .00 Flood Control Zone: N Hauling: N Start Time: End Time: Land Altering: N Cut: Fill: Landscape Irrigation: N Moving Oversized Load: N Start Time: End Time: Sanitary Side Sewer: N No: Sewer Main Extension: N Private: N Public: N Storm Drainage: N Street Use: N. Water Main Extension: N Private: N Public: N ******* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Mfr************* * * ** * *** ** * * * * * * * * * * * * * * * * * * * ** TOTAL DEVELOPMENT PERMIT FEES: $ 169.09 k*************************************** ************** * *. * * * * * * * * * * * * * * * * * * * * * * * * * ** Permit Center Authorized Signature: I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provision of any other state or local laws regulating construction or the perf rmance of work. I am authorized to sign for and obtain this developmen mit. Signaturt Print Name: DEVELOPMENT PERMIT Permit No: D98 -0181 Status: ISSUED Issued: 09/02/1998 Expires: 03/01/1999 Date: 9 -a-v8 AAJAg21 Date: q= ia v (206) 431 -3670 This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. ••• • ......... , i:: , ::::::::: ,, , i:::::::.' , :::::;:::::•Mir , :::':::::: — ::::: , s , ..$ .,•1' :•••••••••:.:4::n:::::::::::::•':::::: ... . . . .. :•!• ''''••••:::*'':•: 11111M11111111111111M 8 -3( I 111111111111 IIIIIIIIIIIIIIIIIIIIIIIIIIIIMIMIMMIIMI Balance Due: $ (04. Need Current Contractor Registration Card: Yes No Need to Enter Contractor Information in Sierra: )(Yes 0 No ACTIVITY NUMBER: ()9a O/ 9 / DATE: 5 /3-8 PROJECT NAME: HaffNa C -- /GSS Co Original Plan Submittal Response to Correction Letter # Response to Incomplete Letter Revision After Permit Is Issued DEPARTMENTS: Building Division Public Works DETERMINATION OF COMPLETENESS: (Tues, Thurs) Complete Comments: TUES /THURS ROUTING: Routed by Staff REVIEWERS INITIALS: APPROVALS OR CORRECTIONS: (ten days) REVIEWERS INITIALS: PLAN REVIEW /ROUTING SLIP CORRECTION DETERMINATION: \PR.ROUTE.DOC 6/98 Fire Prevention Structural Incomplete o �s Please Route No further Review Required (if routed by staff, make copy to master file and enter into Sierra) Planning Division Permit Coordinator 0 DUE DATE: g 5'8 Not Applicable ri DATE: U ( DUE DATE: — 45 Y c3 Approved 0 Approved with Condition Not Approved (attach comments) 0 DATE: 3 DUE DATE: Approved 0 Approved with Conditions 0 Not Approved (attach comments) 0 REVIEWERS INITIALS: DATE: ACTIVITY NUMBER: 8.0 /F 1 DATE: PROJECT NAME: Ha Co Response to Incomplete Letter Response to Correction Letter # Revision After Permit Is Issued Original Plan Submittal DEPARTMENTS: Building Division Public Works 'PR.ROUTE.DOC 6/98 PLAN REVIEW /ROUTING SLIP ❑ Fire Prevention Structural DETERMINATION OF COMPLETENESS: (Tues, Thurs) Complete 0 Incomplete ❑ Comments: TUES /THURS ROUTING: Please Route APPROVALS OR CORRECTIONS: (ten days) Approved Approved with Conditions Routed by Staff ❑ (if routed by staff, make copy to master file and enter into Sierra) Planning Division n Permit Coordinator ❑ DUE DATE: g're - �1 Not Applicable 0 No further Review Required REVIEWERS INITIALS: DATE: DUE DATE: c /' /S'V Not Approved (attach comments) ❑ REVIEWERS INITIALS: -(CSry DATE: 0/3-e fie CORRECTION DETERMINATION: DUE DATE: Approved ❑ Approved with Conditions ❑ Not Approved (attach comments) ❑ REVIEWERS INITIALS: DATE: VI DEPARTMENTS: Building Division Public Works 1PR•ROUTE.DOC 6/98 C PLAN REVIEW /ROUTING SLIP ACTIVITY NUMBER: 1198 -0181 DATE: 5 -29 -98 PROJECT NAME: HARTUNG GLASS COMPANY %x Original Plan Submittal Response to Incomplete Letter Response to Correction Letter # Revision After Permit Is Issued Complete I Incomplete Comments: j P(ak, c- -4- « ( 5 doe.5 t ac�r le CPe_cJ.i- TUES /THURS ROUTING: Please Route Fire Prevention Structural Approved ❑ Approved with Conditions El C7� o. DETERMINATION OF COMPLETENESS: (Tues, Thurs) DUE DATE: 6 - - 98 Not Applicable ITC�1_) r r c ►1 e' W1.E' L-1 e_ Routed by Staff C (if routed by staff, make copy to master file and enter into Sierra) Planning Division Permit Coordinator No further Review Required REVIEWERS INITIALS: l�� DATE: ( 1 APPROVALS OR CORRECTIONS: (ten days) DUE DATE: 6 - 30 - 98 Approved ❑ Approved with Conditions ❑ Not Approved (attach comments) ❑ REVIEWERS INITIALS: DATE: CORRECTION DETERMINATION: DUE DATE: Not Approved (attach comments) ❑ REVIEWERS INITIALS: DATE: S ttot-a o'er ACTIVITY NUMBER: PROJECT NAME: HARTUNG GLASS COMPANY D98 -0181 DATE: 5 -29 -98 xx Original Plan Submittal Response to Incomplete Letter Response to Correction Letter # Revision After Permit Is Issued DEPARTMENTS: Building Division Public Works DETERMINATION OF COMPLETENESS: (Tues, Thurs) DUE DATE: 6 -2 -98 Complete ❑ Incomplete ❑ Not Applicable ❑ Comments: TUES /THURS ROUTING: Please Route C:g3 Routed by Staff ❑ (if routed by staff, make copy to master file and enter into Sierra) REVIEWERS INITIALS: \PR•KOUTE.DOC 6/98 PLAN REVIEW /ROUTING SLIP C Fire Prevention Structural arp a Planning Division Permit Coordinator No further Review Required DATE: ❑ APPROVALS OR CORRECTIONS: (ten days) DUE DATE: 6 -30 -98 Approved ❑ Approved with Conditions ❑ Not Approved (attach comments) ❑ REVIEWERS INITIALS. DATE: CORRECTION DETERMINATION: DUE DATE: Approved ❑ Approved with Conditions ❑ Not Approved (attach comments) ❑ REVIEWERS INITIALS: DATE: DEPARTMENTS: Building Division Public Works 1PR•ROUTE.DOC W9tl PLAN REVIEW /ROUTING SLIP ACTIVITY NUMBER: D98 -0181 DATE: 5 -29 -98 PROJECT NAME: HARTUNG GLASS COMPANY Xx Original Plan Submittal Response to Incomplete Letter Response to Correction Letter # Revision After Permit Is Issued Fire Prevention Structural TUES /THURS ROUTING: Please Route ❑ Approved Approved with Conditions ❑ C Planning Division Permit Coordinator DETERMINATION OF COMPL TENESS: (Tues, Thurs) DUE DATE: 6 -2 -98 Complete ❑ Incomplete ❑ Not Applicable E Comments: No further Review Required Routed by Staff ❑ (if routed by staff, make copy to master file and enter into Sierra) MC Z b ( l g REVIEWERS INITIALS: DATE: APPROVALS OR CORRECTIONS: (ten days) DUE DATE: 6 -30 -98 rt Not Approved (attach comments) C REVIEWERS INITIALS: DATE: CORRECTION DETERMINATION: DUE DATE. Approved ❑ Approved with Conditions 0 Not Approved (attach comments) ❑ REVIEWERS INITIALS: DATE: DEPARTMENTS: Building Division Public Works TUES /THURS ROUTING: REVIEWERS INITIALS: \PR•ROUTE.DOC 6/78 PLAN REVIEW /ROUTING SLIP ACTIVITY NUMBER: 098 -0181 DATE: 5 -29 -98 PROJECT NAME: HARTUNG GLASS COMPANY xx Original Plan Submittal Response to Incomplete Letter Response to Correction Letter # Revision After Permit Is Issued Fire Prevention Structural Planning Division Permit Coordinator DETERMINATION OF COMPLETENESS: (Tues, Thurs) DUE DATE: 6 -2 -98 Complete ❑ Incomplete Li Not Applicable ❑ Comments: Approved ❑ Approved with Conditions❑ Please Route ❑ No further Review Required Routed by Staff ❑ (if routed by staff, make copy to master file and enter into Sierra) DATE: 6- -02 '6c1 APPROVALS OR CORRECTIONS: (ten days) DUE DATE: 6 -30 -98 Approved ❑ Approved with Conditions ❑ Not Approved (attach comments) n REVIEWERS INITIALS: DATE: CORRECTION DETERMINATION: DUE DATE: Not Approved (attach comments) ❑ REVIEWERS INITIALS: DATE: Project Name/Tenant: 1 I . _ !, _ _ L b /) /—� �f' `tzUf t� ' 'T n 441 City State /Zip: g 9Pi IM Value of Construction: 4'5,000, Q -= Tax Parcel Number: -1p - ciogi Site Address: I 1 0 - \e„51 Vaile, 14W9 Tu Property Owner: 9 (a� �o -- ma._ 5ciol Phone: 5 /0 5(0 - A loa[o / Street Address: City State /Zip: 17A3o Welt- Va,Ue j I-/w� - oLiAtt(a q8, Fax #: L1,5 - 1v - ..1400 Contractor: 'r Building Square Feet: ' i4, - lO existing Phone: Street Address: City State /Zip: Fax #: Architect: Q,� • a Qv-roC... ieVite.. Arch k(',� Phone: � , 43.S - Sgg7 Street Address: -70,0 / ^♦ fit be' # /1 (aGU L Cit State /Zip: :.X Fax #a - c-4 _ OgW Engineer: Phone: Street Address: City State /Zip: Fax #: Contact Person: lama l AL,,,,,, Phone:aA� -1/ S / 7 Street Address: / 72,0 6ede .v. # l/GQ Cit State /Zip: A 9xilek Fax #: AolQ fo- ?iiR Description of work to be done: ( - Q (.9.1.04-6(-- room -Ft, dry caG ln9 arokoaC- t atIzit )j , Existing use: ❑ Retail ❑ Restaurant El Multi- family El Warehouse ❑ Hospital El Church ,Manufacturing ❑ Motel /Hotel El Office ❑ School /College /University El Other Proposed use: El Retail ❑ Restaurant ❑ Multi- family ❑ Warehouse El Hospital El Church ,,lXvlanufacturing in MoteVHotel ❑ Office El School /College /University ❑ Other Will there be a change of use? El yes PC no If yes, extent of change: (Attach additional sheet if necessary) Will there be rack storage? ❑ yes 7-44 no Existing fire protection features: res: sprinklers El automatic fire alarm El none El other (specify) Area of Construction: (sq. ft.) ■ ALOL 'r Building Square Feet: ' i4, - lO existing Will there be storage of flammable /combustible hazardous material in the building? ❑ yes no Attach list of materials and storage location on se•arate 8 1/2 X 11 •a•er indicatin• • uantities & Material Safet Data Sheets CITY OF TUIcVILA Permit Center 6300 Southcenter Blvd., Suite 100, Tukwila, WA 98188 (206) 431 -3670 Permit Number Commercial / Multi - Family Tenant Improvement / Alteration Permit Application Application and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or facsimile. APPLICANT. REQUEST FOR PUBLIC WORKS.SITE/CIVIL PLAN REVIEW OF THE:F,OLLOWING: (Additional reviews may be determined by the Public Works Departmerit) ❑ Channelization /Striping El ❑ Fire Loop /Hydrant (main to vault) #: ❑ Land Altering 0 Cut El Sanitary Side Sewer #: El Storm Drainage El Street Use El Water Meter /Exempt #: Size(s): ❑ Water Meter /Permanent # Size(s): El Water Meter Temp # Size(s): ❑ Miscellaneous Curb cut/Access /Sidewalk ❑ Flood Control Zone Size(s): cubic yds. 0 Fill cubic yds. ❑ Sewer Main Extension ❑ Water Main Extension 0 Deduct Est. quantity: El Hauling El Landscape Irrigation O Private 0 Public O Private 0 Public 0 Water Only gal Schedule: Value of Construction - In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review - Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The building official may extend the time for action by the applicant for a period not exceeding 180 days upon written request by the applicant as defined in Section 107.4 of the Uniform Building Code (current edition). No application shall be extended more than once. Date application accepted: tj Date application expires: L Appllca on taken by: (initials) PLEASE SIGN BACK OF APPLICATION FORM CTPERM1T.DOC 1/29/97 BUILDING OWNER OR AUTORI ED AGENT: Signature: ( z:;41/1 ��VJJJ �� Date: 572 - )aj (Ci b Print name: /1 La4L, \'�nta --- Phone:aup .43 - Fax #: e oip . o)4i.O . 23/11 Address I(�.�at0 / , IIK I Jo City /State /Zip ALL COMMERCIAL/MULTI -FA Y TENANT IMPROVEMENT /AL ATION PERMIT APPLICATIONS MU BE SUBMITTED WITH THE FOLLOWING: bl:Q(�F WTI 011E STAMPED BY WASHINGTON STATE LICENSED ARCHITECT, T RAL NGI EER OR CIVIL ENGINEER ➢ ALL DRAWINGS SHALL BE AT A LEGIBLE SCALE AND NEATLY DRAWN • BUILDING SITE PLANS AND UTILITY PLANS ARE TO BE COMBINED N/A SUBMITTED ❑ ❑ Complete Legal Description ❑ ❑ Metro: Non - Residential Sewer Use Certification if there is a change in the amount of plumbing fixtures (Form H -13). Business Declaration required (Form H -10). Four (4) sets of working drawings (five(5) sets for structural work), which include : ❑ ❑ Site Plan (including existing fire hydrant location(s) 1. North arrow and scale 2. Property lines, dimensions, setbacks, names of adjacent roads, any proposed or existing easements 3. Parking Analysis of existing and proposed capacity; proposed stalls with dimensions 4. Location of driveways, parking, loading & service areas 5. Recycle collection location and area calculations (change of use only) 6. Location and screening of outdoor storage (change of use only) 7. Limits of clearing /grading with existing and proposed topography at 2' intervals extending 5' beyond property's boundaries 8. Identify location of sensitive area slopes 20% or greater, wetlands, watercourses and their buffers (change of use only) 9. Identify location and size of existing trees that are located in sensitive areas and buffer (TMC 18.45.040), of those, identify by size and species which are to be removed and saved 10. Landscape plan with irrigation and existing trees to be saved by size and species (exterior changes or change of use only) 11. Location and gross floor area of existing structure with dimensions and setback 12. Lowest finished floor elevation (if in flood control zone) 13. See Public Works Checklist for detailed civil /site plan information required for Public Works Review (Form H- 9). ❑ ❑ Floor plan: show location of tenant space with proposed use of each room labeled ❑ ❑ Overall building floor plan with adjacent tenant use; identify tenant space use and location of storage of any hazardous materials; dimensions of proposed tenant space. ❑ ❑ Vicinity Map showing location of site ❑ ❑ Rack Storage: If adding new racks or altering existing rack storage, provide a floor plan identifying rack layout and all exit doors. Show dimensions of aisles, include dimensions of height, length, and width of rack. Structural calculations are required for rack storage eight feet and over. ❑ ❑ Indicate proposed construction of tenant space or addition and walls being demolished ❑ ❑ Construction details ❑ ❑ Sprinkler details - details of sprinkler hangers, specifically penetrations in structure, i.e., roof; size of water supply to sprinkler vault with documentation from contractor stating supply line will meet or exceed sprinkler system design criteria as identified by the Fire Department. ❑ El Washington State Non - Residential Energy Code Data shall be noted on the construction drawings. ❑ ❑ SEPA Checklist - if intensification of use (check with Planning Department for thresholds). ❑ ❑ Attach plans, reports or other documentation required to comply with Sensitive Area Ordinance other land use or SEPA decisions. ❑ ❑ Food service establishments require two (2) sets of stamped approved plans by the Seattle -King County Department of Public Health prior to submitting for building permit application. The Department of Public Health is located at 201 Smith Tower, Seattle, WA or call (206) 296 -4787. (Form H -5) ❑ ❑ Copy of Washington State Department of Labor and Industries Valid Contractor's License. If no contractor has been selected at time of application a copy of this license will be required before the permit is issued OR submit Form H -4, "Affidavit in Lieu of Contractor Registration ". Building Owner /Authorized Agent If the applicant is other than the owner, registered architect/engineer, or contractor licensed by the State of Washington, a notarized letter from the property owner authorizing the agent to submit this permit application and obtain the permit will be required as part of this submittal I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. CTPERMIT.DOC 1 /29/97 Project: Type of inspection: Address: 1'1 �3o i ) .Ca 1)01,4/ f s: 1 Date called: Date wanted 1 2 0...19) ," t Special instructio Requester: 1 i (t h Phone No.: ; mfvett 9. ."y"',t�?"t'sd"R'�'� .,S'IT"` a- r ;�'x° INSPECTION RECORD Retain a copy with permit INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 9818 Approved per applicable codes: COMMENTS: Inspecto I Corrections required prior to. approval. Date: t( 1 -ola\ PERMIT NO. (206) 431 -3670 El $42.rREINSPECTION EE REQUIRED. Prior to Inspection, fee must be paid at 6300 Southcenter Blvd„ Suite 100. Call to schedule reinspection. Receipt No.: Date: �jofec : /) ao, Type t,inspection: y� Address: ,.,�/ , i 1 i r ... 4 , 43 „ 30 L % 1 J .. V �l .,. °, t -t Date ca led /'/ 2 / 1 l �O Special instructions: P c. / Date wantQd: / - � a.m. Requestg�r:, , - Pho eN INSPECTION RECORD Retain a copy with permit INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 Approved per applicable codes. (20 431 -3670 Corrections required prior to approval. COMMENTS: �-� 4 5 / % —I 11 , ,4 FA Fizz i 1 ---- I $42.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Receipt No.: Date: Q January 13, 2000 Dear Mr Bylsma C Cizy of Tukwila Department of Community Development Steve Lancaster, Director Alan Bylsma 12720 Gateway Dr Suite 116 Tukwila WA 98168 RE: Permit Status D98 -0181 17830 West Valley Hwy In reviewing our current permit files, it appears that your permit for a dry room construction, issued on September 2, 1998, has not received a fmal inspection as of the date of this letter by the City of Tukwila Building Division. Per the Uniform Building Code and/or Uniform Mechanical Code, every permit issued by the building official under the provision of this code shall expire by limitation and become null and void if the building or work authorized by such permit is not commenced within 180 days from the date of such permit, or if the building or work authorized by such permit is suspended or abandoned at any time after the work is commenced for a period of 180 days. Based on the above, if a final inspection is not called for within ten (10) business days from the date of this letter, the Permit Center will close your file and the work completed to date will be considered non - complying and not in conformance with the Uniform Building Code and/or Mechanical Code. Please contact the Permit Center at (206)431 -3670 if you wish to schedule a final inspection. Thank you for your cooperation in this matter. Sincerely, C2›iil Bill Rambo Permit Technician Xc: Permit File No. D98 -0181 Duane Griffin, Building Official Steven M..Mullet, Mayor 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206. 431.3670 • Fax: 206 - 431 -3665 . r HY CITY OF TUKWILA. Permit No:, D98- 01881 Address: 17830 WEST VALLEY Suite: Ten,cnt Type: DEVPERM. Parcel #: 362304- 9097 •k k*•k•k •k k•k•k•k•k* k•k * *•k•k•k1•k k•k•k k k•k k•k•k•k•kk* k k k•k•k•k•k•k•k•k*•k k•k•k k k•k* *•k•k k•k•k•k k k•k kk k•k•k k* kk4, Status: ISSUED. Applied: 05/29/1998 Issued: 09/02/1998 Permit Cond t ions 1. No changes wi 11 be made to the plans unless approved by the Architect or Engineer and t_ha„. kw.i:..l:a� Division. Electrical permits si�a l he ,610ied. :.t.hrfaugh the Washington State Division of ;L:abor. and. IndustrieS el ectrical work will be irtsDPt. :te`d by ,that agency All mez han:i cep l . "wt.', ,sNa l 1 4be under, Seuarate p er. m:i the Ci ty l'a °.M .ra ,,, z. 4. All perm i nspection ''records.— and appro tiled p•l ansha + ll 4 . a at the i b site. prior to the s of an cc?it ; struct to? The se...tdocum`ents.;are `to be main-t i ned { ar�`d ava,l. pt : . ; � r ` able 40",01 t1rial inspect ion'' aipprova.l is 9 r�ant�ezi .:;< \ All construction t:t be done din : conformance with, approved' pla :an r eau i r +.` Un i 8u i l.d i.n Code r z(1397 Ed i 0:On) as ameOAe.d Un i f o riOeMe. ehan i ca l Code (1 9'97 Edi t i Sri and Washington State Energy Code (1997 E d i t i o n ) . Validitir of °Pe The ifssuan of a permit or approval pi 40 . srecif, ic. ., - c shall not bp '.con sti ued to be ;a permik. for , Qr ,an:`.app:r o +J.al of any violent ofjPa a s io.n•. of,`,,th'e bui'14) hg.:_code or o ther ord ,o Vthe cur 1sdi ct:ion, `'.. iio.-•permi.t presuming give' authori to. violate' d - r cance`i,r` the p rovisions cif this code. shall' be. valid r t f, Account Code 000/322,100 • 000/30.904 Desciption BUILDING. NONPES . A STATE BUILDING SURZM•RGE, ' 40.44v****7-A*A:k.**k**A4A.?r**** tITY.OF TR.NSNIT 1 4;,ANSMIT Amount: .104•.2.5' 0910219S 15:0A. Payment Methocir,CHE“ Nctationr'DAVID:AEHLE ARCH Permit 14o 1)98-0IOI - Typel,,DEVPERM DEVELOPMENT PERMU • Parcel'iNer, 362304.9997 • Site Address:.17830.WEST. VALLEY :HY fatal Feeei: • This' Payment • . •94.25 • Total- ALL Tmte: 00 '• Balancer , A*****It***A****ikll*i.A*A*AA**.**** 5415 09/08 STATE OF WASHINGTON COUNTY OF KING AFFCONT.DOC 5/29/96 CITY OF T( ,VILA Permit Center 6300 Southcenter Boulevard, Suite 100, Tukwila, WA 98188 Telephone: (206) 431 -3670 ss. , states as follows: H -4 AFFIDAVIT IN LIEU OF CONTRACTOR REGISTRATION 1. I have made application for a building permit from the City of Tukwila, Washington. 2. I understand that state law requires that all building construction contractors be registered with the State of Washington. The exceptions to this requirement are stated under Section 18.27.090 of the Revised Code Washington, a copy of which is printed on the reverse side of this Affidavit. I have read or am familiar with RCW 18.27.090. 3. I understand that prior to issuance of a building permit for work which is to be done by any contractor, the City of Tukwila must verify either that the contractor is registered by the State of Washington, or that one of the exemptions stated under RCW 18.27.090 applies. 4. In order to provide verification to the City of Tukwila of my compliance with this requirement, I hereby attest that after reading the exemptions from the registration requirement of RCW 18.27.090, I consider the work authorized under this building permit to be exempt under No. Oqq -- () LAI , and will therefore not be performed by a registered contractor. I understand that I may be waiving certain rights that I might otherwise have under state law in any decision to engage an unregistered contractor to perform construction work. ALO 0• (2 APPLICANT Signed and sworn to before me this day of 9.44,,t_ , 19, ?(1 . 2001111 0 • i t 0740 ,,...„r . NOTARY PUBLIC in and for the State of Washington, a � AUILt� + residing at County. '� l Odle. 1 . WAII0V Name as commissioned: /"Ie {Q fi r e, lioc'.EE�_ My commission expires: , ' / - de- a ny. (k►ce�a.J 18.27.090 Exemptions. This chapt ^ "all not apply to: 1. An authorized representative of the United States Government, the State of Washington, or any incorporated city, town, county, township, irrigation district, reclamation district, or other municipal or political corporation or subdivision of this state; 2. Officers of a court when they are acting within the scope of their office; 3. Public utilities operating under the regulations of the utilities and transportation commission in construction, maintenance, or development work incidental to their own business; 4. Any construction, repair, or operation incidental to the discovering or producing of petroleum or gas, or the drilling, testing, abandoning, or other operation of any petroleum or gas well or any surface or underground mine or mineral deposit when performed by an owner or lessee; 5. The safe or installation of any finished products, materials, or articles of merchandise which are not actually fabricated into and do not become a permanent fixed part of a structure; 6. Any construction, alteration, improvement, or repair of personal property, except this chapter shall apply to all mobile /manufactured housing. A mobile /manufactured home may be installed, set up, or repaired by the registered or legal owner, by a contractor licensed under this chapter, or by a mobile /manufactured home retail dealer or manufacturer licensed under chapter 46.70 RCW; 7. Any construction, alteration, improvement, or repair carried on within the limits and boundaries of any site or reservation under the legal jurisdiction of the federal government; 8. Any person who only furnished materials, supplies, or equipment without fabricating them into, or consuming them in the performance of, the work of the contractor; 9. Any work or operation on one undertaking or project by one or more contracts, the aggregate contract price of which for labor and materials and all other items is Tess than $500, such work, or operations being considered as of a casual, minor, or inconsequential nature. The exemption prescribed in this subsection does not apply in any instance wherein the work or construction is only a part of a larger or major operation, whether undertaken by the same or a different contractor, or in which a division AFFCONT.DOC 5/29/96 of the operation is made into contracts of amounts less than $500 for the purpose of evasion of this chapter or otherwise. The exemption prescribed in this subsection does not apply to a person who advertises or puts out any sign or card or other device which might indicate to the public that he is a contractor, or that he is qualified to engage in the business of contractor; 10. Any construction or operation incidental to the construction and repair of irrigation and drainage ditches of regularly constituted irrigation districts or reclamation districts; or to farming, dairying, agriculture, viticulture, horticulture, or stock or poultry raising; or to clearing or other work upon land in rural districts for fire prevention purposes; except when any of the above work is performed by a registered contractor; 11. An owner who contracts for a project with a registered contractor; 12. Any person working on his own property, whether occupied by him or not, and any person working on his residence, whether owned by him or not but this exemption shall not apply to any person otherwise covered by this chapter who constructs an improvement on his own property with the intention and for the purpose of selling the improved property; 13. Owners of commercial properties who use their own employees to do maintenance, repair, and alteration work in or upon their own properties; 14. A licensed architect or civil or professional engineer acting solely in his professional capacity, an electrician licensed under the laws of the state of Washington, or a plumber licensed under the laws of the state of Washington while operating within the boundaries of such political subdivision. The exemption provided in this subsection is applicable only when the licensee is operating within the scope of his license; 15. Any person vvAvolgNes in the activities herein regulates ,: 40 a * 1 0,,of a registered contractor with wa 9 ,; Art ensation; 16. Contractors onitiftghWay pYojegtts who have been preg as requtred by chapter 13 of the Laws of 1961;; :RCW' 47x28 ;070 witti.,1l�a department of transpol' ibn }.o perf914: construction, reconstructiq j); or' maiti#enpce work. PROJECT NAME: H 1r 1 a (,La.& ) L anj CONTACT PERSON: A-1;w 63 1.5nle- REVISION SUMMARY: SHEET NUMBER(S) A- A "Cloud" or highlight all areas of revisions and date revisions. SUBMITTED TO: ht. JV eion) B/d • Plannin Fire CITY OF TUKWILA Department of Community Development Building Division - Permit Center 6300 Southcenter Boulevard, Tukwila, WA 98188 Telephone: (206) 431 -3670 • REVISION SUBMITTAL DATE: 8 - 1- q • PLAN CHECK/PERMIT NUMBER: J ^ o ( S I PROJECT ADDRESS: 17 Vv V i-LI &. Ykg Ji 14 PHONE: (ate 45'3 8qq 1 CI Y OF (UKWILA APPROVED AUG 3 1 1998 IILDINC DIVISION Neti iRSCE4 - 1 00 G oy of kfi 2 1 199% CITY USE ONLY Public Works 3/19/96 REVISION SUBMITTAL DATE: 8- 6 PLAN CHECK/PERMIT NUMBER: Di8'0181 PROJECT NAME: 1•144941ai Oss coufguit PROJECT ADDRESS: 11153o We VAlley rf y CONTACT PERSON: Alosi 45 PHONE: REVISION SUMMARY: C. 1 o f $!7 5 s. �e �, a r e � D ca 4-/ s o tDe.0 14 t t4 Bldg.. CITY OF TUKWILA Department of Community Development Building Division - Permit Center 6300 Southcenter Boulevard, Tukwila, WA 98188 Telephone: (206) 431 -3670 r aw o', 4- -' W fc; ( Li' -Pow- G 2 l (1 H 9 P 4) le a bo r SHEET NUMBER(S) A "Cloud" or highlight all areas of revisions and date revisions. SUBMITTED TO: K I ) 9-d1S a CITY USE ONLY Planning Fire' RECEIVED CITY OF TUnlrvrLA AUG 1 3 1998 PERMIT CENTER Putilic:Works 3/19/96 FR k, n davit k ehie August 12, 1998 City of Tukwila 6200 Southcenter Blvd. Tukwila, Washington 98188 Attn: Mr. Ken Nelson Re: Hartung Glass Application #D98 -0181 Dear Ken, The following is in response to your letter dated 8/4/98: Item #1: The new drying room is 11' x 24' and is 10' clear from finished floor to underside of ceiling. There are two 10' x 10' openings in the west wall. All four walls of the room are new. Item #2: Note #2 on sheet A -2 indicates the loading of 50 psf is to be posted above the °` new room.. hope ,this answers your questions. Sincerely, 0 - 1 2-6 1 W1 Alan Bylsma AB /mt Congo rUFO 41/ 6 1 3 ; s t a:\972111et8-12 12720 GATEWAY DRIVE, SUITE 116 SEATTLE, WA 98168 • T Fq (206) .4338997 FAX (206) 246. 8369-:. August 4, 1998 Alan Bylsma David Kehle Architect 12720 Gateway Dr, #116 Seattle, WA 98168 Dear Mr. Bylsma: C City of Tukwila SUBIECT: LETTER OF INCOMPLETE APPLICATION Development Permit Application Number D98 -0181 Hartung Glass Company 17830 West Valley Hy John W. Rants, Mayor Department of Community Development Steve Lancaster, Director This letter is to inform you that your permit application received at the City of Tukwila Permit Center on May 29, 1998, was determined to be incomplete. Before your permit application can begin the plan review process the following items need to be addressed. Building Department: Contact Ken Nelsen, Plans Examiner at (206)431 -3677 if you have any questions regarding the following items. 1. Plan details of room required. 2. Does work create a new mezzanine? If so, please provide the necessary information on the plans. The City requires that two (2) complete sets of revised plans be resubmitted with the appropriate revision block. If your revision does not require revised plans but requires additional reports or other documentation please submit two (2) copies of each document. In order to better expedite your resubmittal a Revision Sheet must accompany every resubmittal. I have enclosed one for your convenience. Revisions must be made in person and will not be accepted through the mail or by a messenger service. If you have any questions please contact me at the City of Tukwila Permit Center at (206) 431 -3671. Sincerely, Brenda Holt Permit Technician encl File: D98 -0181 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • (206) 431-3670 • Fax (206) 431-3665 PLAN REVIEW /ROUTING SLIP Prirr welt. Co Py ACTIVITY NUMBER: OR - /49! DATE: Fs -13 -d/5 PROJECT NAME: t G Co 4. Original Plan Submittal Response to Correction Letter # X Response to Incomplete Letter Revision After Permit Is Issued DEPARTMENTS: Building Division Public Works TUES /THURS ROUTING: Please Route APPROVALS OR CORRECTIONS: (ten days) %PR•ROUTE.DOC 6/98 CORRECTION DETERMINATION: Fire Prevention 20 -qt oa Structural Planning Division Eh Permit Coordinator Routed by Staff (if routed by staff, make copy to master file and enter into Sierra) DUE DATE: g ` ?b Not Applicable 0 DETERMINATION OF COMPLETENESS: (Tues, Thurs) Complete El Incomplete 0 Comments: No further Review Required REVIEWERS INITIALS: DATE: DUE DATE: 1 /S Approved El Approved with Conditions E Not Approved (attach comments) REVIEWERS INITIALS: DATE: DUE DATE: Approved 0 Approved with Conditions fl Not Approved (attach comments) 0 REVIEWERS INITIALS: DATE. \. CITY OF TUKWILA Department of Community Development Building Division - Permit Center 6300 Southcenter Boulevard, Tukwila, WA 98188 Telephone: (206) 431 -3670 REVISION SUBMITTAL DATE: 15 -- 4 1-618 . PLAN CHECK/PERMIT NUMBER: b q13 - 0151 PROJECT NAME: F1 1 l_g (- L& 0 PROJECT ADDRESS: l 38a) Mot Y a-Li '//-aj Jiwey A'LOL. /ill&, PHONE: c OL,- 46s-8.99 CONTACT PERSON: REVISION SUMMARY: Rce-- F try P .4 4 ab 14 0 .fir GZ, lay lb. pare/ '&t 3 ri SHEET NUMBER(S) /T "Cloud" or highlight all areas of revisions and date revisions. SUBMITTED TO htn )V t Lord CITY USE ONLY Ftecoto , 1 1 1 U S 21 \s'At A� I Cis" R 3/19/96 City of Tukwila Fire Department Fire Department Review Control ##D98 -0181 (512) August 20, 1998 Re: Hartung Glass Company - 17830 West Valley Highway Dear Sir: Thomas P. Keefe, Fire Chief The attached set of building plans have been reviewed by The Fire Prevention Bureau and are acceptable with the following concerns: 1. Maintain fire extinguisher coverage throughout. 2. Exit doors shall be openable from the inside without the use of a key or any special knowledge or effort. Exit doors shall not be locked, chained, bolted, barred, latched or otherwise rendered unusable. All locking devices shall be of an approved type. (UFC 1207.3) Obstructions, including storage, shall not be placed in the required width of an exit, except projections . as permitted by the Building Code. Exits shall not be obstructed in any manner and shall remain free of any material or matter where its presence would obstruct or render the exit hazardous. (UFC 1203) Dead bolts are not allowed on auxiliary exit doors unless the dead bolt is automatically retracted when the door handle is engaged from inside the tenant space. Exit hardware and marking shall meet the requirements of the Uniform Fire Code. (UFC 1207.1- 1212.8) Exits shall not pass through kitchens, storerooms, restrooms, closets or spaces used for similar purposes. (UBC 1003.5) Combustible material shall not be stored in exits or John W. Rants, Mayor Headquarters Station: 444 Andover Park East • Tukwila, Washington 98188 • Phone: (206) 5754404 • Fax: (206) 575.4439 City of Tukwila Fire Department Page number 2 exit enclosures. (UFC 1103.3.2.3) Thomas P. Keefe, Fire Chief 3. Maintain sprinkler coverage per N.F.P.A. 13. Addition /relocation of walls, closets or partitions may require relocating and /or adding sprinkler heads. All new sprinkler systems and all modifications to existing sprinkler systems shall have fire department review and approval of drawings prior to installation or modification. New sprinkler systems and all modifications to sprinkler systems involving more than 50 heads shall have the written approval of the W.S.R.B., Factory Mutual, Industrial Risk Insurers, Kemper or any other representative designated and /or recognized by The City of Tukwila, prior to submittal to the Tukwila Fire Prevention Bureau. No sprinkler work shall commence without approved drawings. (City Ordinance #1742) Contact The Tukwila Fire Prevention Bureau to witness all required inspections and tests. (UFC 10.503) (City Ordinance #1742) 4. All electrical work and equipment shall conform strictly to the standards of The National Electrical Code. (NFPA 70) 5. Required fire resistive construction, including occupancy separations, area separation walls, exterior walls due to location on property, fire resistive requirements based on type of construction, draft stop partitions and roof coverings shall be maintained as specified in the Building Code and Fire Code and shall be properly repaired, restored or replaced when damaged, altered, breached, penetrated, removed or improperly installed. (UFC 701) This review limited to speculative tenant space only - special fire permits may be necessary depending on detailed description of intended use. John W. Rants, Mayor Headquarters Station: 444 Andover Park East • Tukwila, Washington 98188 • Phone: (206) 575.4404 • Fax (206) 5754439 Page number. Yours truly,, Fire Department Thomas P. Keefe, Fire Chief Any overlooked hazardous condition and /or violation .. of the adopted. Fire or Building Codes does not imply approval of such condition or violation. The Tukwila Fire Prevention Bureau cc: TFD file ncd Headquarters Station: 444 Andover Park East • Tukwila, Washington 98188 • Phone: (206) 575404. • Fax: (206) 5754439 CITY OF TUKWILA Department of Community Development Building Division - Permit Center 6300 Southcenter Boulevard, Tukwila, WA 98188 Telephone: (206) 431 -3670 REVISION SUBMITTAL DATE: 6- 13-98 PLAN CHECK/PERMIT NUMBER: P'7. 0,81 PROJECT NAME: fF44'LuI.1 4 alu PROJECT ADDRESS: 11 3o We Y f y CONTACT PERSON: A14&1 1501014 PHONE: REVISION SUMMARY: C. t a.r t f t 5 2 'e k 1, c4.4-1.;.3 -J - o 1. � I1/J rt,,, 07 - so d W 12 o v Gel i tIAJ SHEET NUMBER(S) "Cloud" or highlight all areas of revisions and date revisions. SUBMITTED TO: K—e-tI fe.\S a eI RECEIVED CITY OF TUKUtul AUG 1 3 1998 PERMIT CENTER CITY USE ONLY 3/19/96 ( tik • david kehle August 12, 1998 City of Tukwila 6200 Southcenter Blvd. Tukwila, Washington 98188 Attn: Mr. Ken Nelson Re: Hartung Glass Application #D98-0181 Dear Ken, The following is in response to your letter dated 8/4/98: Item #1: The new drying room is 11' x 24' and is 10' clear from finished floor to underside of ceiling. There are two 10' x 10' openings in the west wall. All four walls of the room are new. Item #2: Note #2 on sheet A-2 indicates the loading of 50 psf is to be posted above the new room.. I hope this answers your questions. Sincerely, C 62041 4-4A/Leot Alan Bylsma AB/mt aA9721\let8-12 12720 GATEWAY DRIVE, SUITE 116 SEATTLE, WA 98168 c ' 7 ? 4 118 W t4 41/r 3 19 • '7 Ap . • • (206) 433-8997 FAX (206),246-8369 • August 4, 1998 Alan Bylsma David Kehle Architect 12720 Gateway Dr, #116 Seattle, WA 98168 Dear Mr. Bylsma: SUBIECT: LETTER OF INCOMPLETE APPLICATION Development Permit Application Number D98 -0181 Hartung Glass Company 17830 West Valley Hy This letter is to inform you that your permit application received at the City of Tukwila Permit Center on May 29, 1998, was determined to be incomplete. Before your permit application can begin the plan review process the following items need to be addressed. Building Department: Contact Ken Nelsen, Plans Examiner at (206)431 -3677 if you have any questions regarding the following items. 1. Plan details of room required. 2. Does work create a new mezzanine? If so, please provide the necessary information on the plans. The City requires that two (2) complete sets of revised plans be resubmitted with the appropriate revision block. If your revision does not require revised plans but requires additional reports or other documentation please submit two (2) copies of each document. In order to better expedite your resubmittal a Revision Sheet must accompany every resubmittal. I have enclosed one for your convenience. Revisions must be made in person and will not be accepted through the mail or by a messenger service. If you have any questions please contact me at the City of Tukwila Permit Center at (206) 431 -3671. Sincerely, Brenda Holt Permit Technician encl File: D98 -0181 City of Tukwila John W. Rants, Mayor Department of Community Development Steve Lancaster, Director 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • (206) 431-3670 • Fax (206) 431-3665 DEPARTMENTS: uilding Division 1 g V Z � S P,t�l� is pr TUES /THURS ROUTING: \PR•ROUTE.DOC 6/98 PL REVI Ect ACTIVITY NUMBER: D98 -0181 DATE: 5 -29 -98 PROJECT NAME: HARTUNG GLASS COMPANY %X Original Plan Submittal Response to Correction Letter # Response to Incomplete Letter Revision After Permit Is Issued CORRECTION DETERMINATION: Fire Prevention Structural DETERMINATION OF COMPLETENESS: (Tues, Thurs) Incomplete Please Route Approved El Approved with Conditions ij Complete ❑ Comments: tire' Routed by Staff El (if routed by staff, make copy to master file and enter into Sierra) Planning ivision Nl r Permit Coordinator DUE DATE: 6 -2-98 Not Applicable E No further Review Required REVIEWERS INITIALS: DATE: APPROVALS OR CORRECTIONS: (ten days) DUE DATE: 6 - 30 - 98 Not Approved (attach comments) REVIEWERS INITIALS: DATE: DUE DATE: Approved El Approved with Conditions [1 Not Approved (attach comments) El REVIEWERS INITIALS: DATE. 71?SN ekj r � e r . r + - r*kAk :S*** **AhA�hA *A*A ** *h•k•k•k *AAA .k'k•A *A* •kA-4•AkA*A*•k•A:4fikA:•*A* um OF 1'UKW]:LA„ WA YRANgM11 *:. **h*k *kA***A'*AA1 A *.dr:t *•k *A* **A ** *A•kA• *A* *AA:k•A * *•; *A *A•k * *A #•kkk**: TRANSMIT.' Numt,er% R9'/00771. Amount: 64.834 05/291/98. 09:24 Payment Method: CHECK Notation: DAVID I(EHI.1 ARCH Init: l3LH Permit Not I?98• -0181 Tvoe: I?EVPI RM • DEVELOPMENT PERMIT Parcel No% 362304-9097 Site Address :17830 WEST VALLEY HY Tetal I"ees r 169.09 This Payment 64.€14 Total ALL Pmts: 64.84 I3rt1 ance: 104.25 AEI•AlsAkA *** *ak %AAAAA* * *:A *ti ** A *k.** * *k M*• * *k+Fk *AAAA *AA *A *A*AfiAik** Account Code Descr i of i Uri 000/345.830 PLAN CHECK -• NONRES (......, _"...„ Amount 2435 Q6/01 9717 TOTAL 64.84 �ro�a *k"i + »,Ttu}. "OAT.. > ir44 , , r ^ s ' - �9�r Rwa.y �i.r+� yxas� -sj.; sr`r. "{ F2 14-1 14 " .IaNt F�¢eINC 4 4b. curt 4btrrr k M r ��IN (r vIi-t I I I 1 I I PL.. pt-. x.21' bbl�i I1 k I om F4444 0 Gt?awNcp, it 4 Vntira fAiawrl Rmrna Flee pe rillath1 Get a41.1l i v Ido: Jcn is -341 LL- 1 G?2Ii - fi1a[4 PARCEL A THAT PORTION OF THE NORTHWEST QUARTER OF SECTION 36, TOWNSHIP 23 NORTH, RANGE 4 EAST, W.M., SITUATE IN THE CITY OF RENTON, KING COUNTY, WASHINGTON, DEP^_RIBED AS FOLLOWS: BEGINNING AT THE INTERSECTION OF THE EAST RIGHT -OF -WAY LINE OF THE WEST VALLEY HIGHWAY (SR 181) AND THE NORTH LINE OF THE SOUTH 480.00 FEET IN WIDTH OF THE NORTH HALF OF SAID NORTHWEST QUARTER OF SECTION 36; THENCE SOUTH 88 ° 21'00" EAST ALONG SAID NORTH LINE FOR 533.49 FEET; THENCE NORTH 01 ° 39'00" EAST FOR 306.00 FEET; THENCE NORTH 88 ° 21'00" WEST FOR 555.27 FEET TO SAID EAST RIGHT - OF -WAY LINE OF 48E WEST VALLEY HIGHWAY; THENCE SOUTH 02 ° 26'02" EAST ALONG SAID RIGHT -OF -WAY LINE FOR 306.78 FEET TO THE POINT OF BEGINNING. THE ABOVE PARCEL CONTAINS 166,580 SQUARE FEET OR 3.82 ACRES. r NEKL - VEriFT RL1 viiMENSIONS f P zE `NGv - Fr-IGK - Co a-K-1 uc nON - THIS pEl(Mrr cow -Ks GOw-ff -i& Iorl or A r Wlr1Po•N O�ftN �coM 0?, 9 I r- - .. V.r ALGw; 60GLEli.O t D98O81 EXPIRED y , d 5 A III I � i' I t' ) I w ■ t HVL.rrll at LE: I ° = 4 '' osoY �I W', Lt Uih / 2 ;c/,1Gw% - CcG 02101-t a. -7L LIEx LIftui I2 fr -iG 4INU M -1 — a64P"41 crop t 3'2 - GfGE, FP1 1 / A1¢iute:Of - EXISTING VIII YOIrIU G2� Lf xUt;� Q 1-OIZL �fF9>bG1IINE 1091 G ( to rim = M( OCHIr ?u !; QFQEO CF f/; jurlu (2aIH Iarrc. GtW12�D IE 1r1 O 22, d 7c7r p�ING 11 11,370 =c 2.S /Io2: - 11,1OU(2IYL = 1 1,IvfItf ( /ice 4 �UY; FbQLING tiriNN 0 , I;��GJrnI,1 V/c �IUr Y�ico-lq I r iN2 T2r1AL- pA Y1 NG 1 sTtvu; Date Permit No 1 --------_ — _ — _ — _ --,, ILE COPY ___ i ,, ,iiar and that the Pltrn Check eCW� Isere �„Djeci to errotS Efll[9B t +laoc does a i dl� Reteit W i racto d code w RSeRVOM4.004 Tractor'. � pYOfappo tvedf7la SEPARATE PERM!T REQUIRED FOP 0 MECHANIC - LECTR!Ck_ ❑ PLUMBING ❑ Gas CITY OF .. 1 b's- o►8r flECEIVED CITY OF TUKWIL4 9A4 2 9 1998 PERMIT CENTER, 0 L411:43.2 SECTION SCALE 3x .... ' ,. .1.06ci .x4ILS - • POST ,--45.14‘ PON BASE U. '2 i65INAL,i RAIL-BCC( 11 Ex5YING SLAB ..,-GRADE _r 0 0 0 ® 0 0 IF TYPE GYP BC 5ECTION 3/4 1 ---- 3/4 T•G PLYLII0017), 2, 12 • OC BLOCKNG , 2x4 DC pLra.000 2X4 TREATED SILL PLATE 1/ 2 - 16,31 NAILS EXISTING SLAB ON-GRADE -- e7 0132bc !F■e-7ez;r4 ! o dD uHP6R 1n-1* %r-1 0 EX f7 0 OF rirA 111 I I E rELrs ) ! 4.-oci o 15 e. .- 1€E NW iod E)c t LUU WOK-- ---- . ---" N ELI I \--Hew Olor - 4 9 =41 t-i riao-7 I:604 / 0 = c; 7 2cxxj, loN1 — 11P 7 ° " " Q ° 5,et11-14 P EXPIRED 4xs POST / 24 FRAMING PLAN SCALE V4 • r z_ 4 - .1 Lt pt,Tledop wive GA, • EDGE5 11' 0 C. .IEL D AND A' DC B01..41, 1/2 CEX PLYIJOOD OvER 2 4 • I, Of.. WS, GA1, • 6` 0.C. ELC,E, P" OL. FIELD 40 4 0.0 150.DARY. ATTACH BOTTOM PLATE El/? DIA EXPANNO, COLTS • OL 414D12,111 (.•1 EACH ENE I INSTALL 5/, X GYP BD ON INSIDE CF WALLS AND ON UNDERSIDE OF 0E10 JOISTS AND F1RETAPE 2 a L . ,0 x 10 b%- 0 ® CO 0 1 L/3 RECEIVED CITY OF TUKWILA ! , PERMIT CENTER r Z CO 0/ CD 0 00 DO HI6 fn II Z. ' C'0 ) N ES< CD ED >- Ui 0 0 N N 3 ■ O DE < < QE :I Cn CR \1 \ 9 1 • o E rn°. l•Axe _ — — - - JOIST V.IANGER s‘A\ '‘\ _5 MI 15 BAYS (- 24 -0" c "C.,01-01' P . gX 10'.v., L5 2 4X6 POST ' 10 a � _ lc t \ 2 / / / : I / 14 \1 \ - - Y • W O 40A _ — — - - 24 -� 15 BAYS (- 24 -0" c "C.,01-01' , z_4-'--69' / EXTE N'[ OF T (6 i rEIZMIT 7,01 NEW t7 *I - (O 11; Eyrei2I012 MG nc — - VZ� bwitiN({ / INS QIOkit'l �XC?fl _ \ ANEW 3°x'1° 4M-1 km 2 tie' EXISTI ICT I , 0 � 1 a - uN IX rye �k 2 Houtz - t u? - - - L 1 t1 N!N" P•O11N44i5 11 1q0 ' O 1111 �NbW : r / 0 II - _ A of wDR-K � E2 (H 15 earl! � Y- k 'TI► I� X } I � � // 4 A , v - pl 2 DVGt1DII EX, hlblf�i F2oM r)(14I`lu 1 EX- PE EX.Ser /. 1 '(rHANr No NVOKr \. :1i a — 1 2._ _ EX. EpiC1> Mt 4 LL,CAr�4 LECA Ex aril - i $ # irm MI E — •, f� ,N',. "'a i - 4 _ -- � . -.__- 1 7 ‘, G PL1 ) ` Io _10 . f f'C 46 POST CA ll W/1601 NAILS 4x POST O 5/5' TYPE "X' GYP. BD. ® N SECTIO O 3 /4`T4G PL YWOOD 2x T2•i6•OC. N F ' I :MU 2X4 16" O.G. IR ° PL'WOO 2X4 TREATED SILL PLATE UI/ Q - 1661 NAILS ISTRdi SLAB ON-GRADE L O L7 0104 *" fAci 0 Iu-th4 ad 10 c ID98 -0081 EXPIRED /blk V1 " I 67 FRAMING PLAN SCALE 1/4" • I' 3/4' T4& PLTJOOD tlVIDd GALV. • 6' O EDGE8,12" OC. FIELD AND 4" OC. BOUP) I/2" COX PLYWOOD OVER 2 x 4 • 16" DC- W/Ed GALV. • b OC. EDGE, V" OC. FIELD AND 4' OC. BOUNDARY. ATTACH BOTTOM PLATE UVI/2' DIA EXPANSION BOLTS 36" OC. AND 12" NR! FROM EACH END C621E L INSTALL 5/S' TYPE 'X' GYP. BD. ON MS OE O WALLS AND CN UNDERSIDE OF CEILING JOISTS AND FIRETAPE. 2 POSTED LL•12S ! G\ l0'x10 °PENINGs b98- DISI RECEIVED CITY OF TUKWILA AUG 2 7 1998 PERMIT CENTER ECM'