Loading...
HomeMy WebLinkAbout07-012 - WA State Department of Transportation (WSDOT) - Tukwila International Boulevard Phase III 132nd to 138th Street Washington State AGENt-', fro Department of Transportation Local Agency Agreement Supplement Agency Supplement Number City of Tukwila 2 Federal Aid Project Number Agreement Number CFDA No. 20.205 HLP 0099(103) LA 6308 (Catalog of Federal Domestic Assistance) The Local Agency desires to supplement the agreement entered into and executed on February 9, 2007 All provisions in the basic agreement remain in effect except as expressly modified by this supplement. The changes to the agreement are described as follows: Project Description Name Tukwila International Boulevard Phase 3 Length 0.48 Miles Termini S 132nd St to S 138th St Description of Work No Change Reason for Supplement Re- program previously obligated funds in the construction phase from Construction Contract (line k) to Construction Engineering (lines n o). No new funds are being added. Does this change require additional Right of Way or Easements? Yes No Estimate of Funding Ty of Work (2) (3) (4) (5) yp Previous Supplement Estimated Total Estimated Agency Estimated Agreement/Suppl. Project Funds Funds Federal Funds PE a. Aaencv I I I I 1 0 b. Other Nickel funds Consultant 1 70,000.001 1 70,000 00 70,000.00 c. Other 1 Federal Aid d. State 1 I 1 Participation Ratio for PE e. Total PE Cost Estimate (a +b +c +d) I 70,000.001 1 70,000.00 70,000.00 Right of Way f. Aaencv 0 g. Othe Nickel funds 72.000.001 1 72,000.001 72.000.001 Federal Aid h. Other Participation Ratio forRW i.State 0;cKel - ur."dS 3,000.001 1 3,000.001 3,000.001 i. Total R/W Cost Estimate (f +p +h +i) I 75.000.001 1 75.000.001 75.000.00 Construction k. Contract 1 3,527,489.001 250,000 00 1 3,277,489.001 442,461 00 2,835,028.00 I. Other Nickel funds Contract I 2,706,000.001 1 2,706,000.001 2,706,000.00 1 m. Other I I 1 I 1 n. Other Consultant 1 317.474.001 200,000.00 1 517,474.00 1 69.859.001 447.615.00 86.5 o. Aaencv 105,825.00 1 50,000.001 155,825 00 134,789 00 Federal Aid Participation P• State 10,000.001 I 10,000 00 1,350.00 1 8,650.00 Ratio for CN q. Total CN Cost Estimate (k+l+m+n+o+D) 1 6,666,788.001 I 6,666,788.00 3,240,706.00 3,426,082.00 r. Total Proiect Cost Estimate (e+i+Q) 1 6. 811,788.00 1 1 6 .811.788.00 3 ,385.706.00 1 3. 426,082.00 The Local Agency further stipulates that pursuant to said Title 23, regulations and policies and procedures, and as a condition to payment of the Federal funds obligated, it accepts and will comply with the applicable provisions. Agency Official Washington Washington S D artment of Transportation By By Title Director of Highways and Local Programs Date Executed OCT 1 3 2009 DOT Form 140 -041 EF Revised 1/2007 5 '_ej G'l i /\/11 S W Stat AGENCY VI/ Department of Transportation Local Agency greement Supplement Agency Supplement Number City of Tukwila 1 Federal Aid Project Number Agreement Number CFDA No 20.205 HLP 0099(103) LA 63 08 (Catalog of Federal Domestic Assistance) The Local Agency desires to supplement the agreement entered into and executed on February 9, 2007 All provisions in the basic agreement remain in effect except as expressly modified by this supplement. The changes to the agreement are described as follows. Project Description Name Tukwila International Boulevard Phase 3 Length 0 48 Miles Termini S 132nd St to S 138th St Description of Work No Change Reason for Supplement Obligate construction funds. Does this change require additional Right of Way or Easements? Yes Type of Work PE a. Aaencv 0 b. Other Nickel funds Consultant c. Other Federal Aid Participation d. State Ratio for PE e. Total PE Cost Estimate (a +b +c +d) Right of Way f. Aaencv 0 n (lthar Nickel funds Federal Aid h. Other Participation Ratio for RW j. State N C i< el .'tA Y,d S i. Total R/W Cost Estimate (f +a +h +i) Construction k. Contract I. Other DOT Form 140 -041 EF Revised 1/2007 Nickel funds Contract m. Other n. Other Consultant 86.5 o. Aaencv Federal Aid Participation D. State Ratio for CN a. Total CN Cost Estimate (k+l+m+n+o+n)1 r. Total Proiect Cost Estimate (e+j+q) 1 Previous Agreement/Suopl. 70,000 00 70,000.00 72- 000.00 3.000.00 75.000.00 145.000.001 (2) Supplement 3,527,489 00 1 2,706,000.00 317.474.00 1 105,825.00 1 10,000.001 6,666.788.001 6.666.788.001 No Estimate of Funding (3) (4) (5) Estimated Total Estimated Agency Estimated Project Funds Funds Federal Funds 70,000 001 70,000.001 1 70,000.001 70,000.00 1 72.000.001 72.000.00 3.000.00 3.000.00 75.000.00 75,000.00 3,527,489 001 476,211 00 2,706,000.00 2,706,000.00 The Local Agency further stipulates that pursuant to said Title 23 regulations and policies and procedures, and as a condition to payment of the Federal funds obligated, it accepts and will comply with the applicable provisions. Agency Official Washington Department of `transportation By /4 By CIA c -,°`P Title Mayor/ Director of Highways id Local Programs r�e Date Executed SEP 1 D 2008 317.474.00 105,825 00 10,000.001 6.666.788.001 6.811.788.001 fJ /6iiV4- -S v7- ot1<<<) 42.859.00 14,286.00 1,350 00 3.240,706.00 3.385.706.001 3,051,278.00 274.615.00 91,539 00 8,650 00 3,426,082.00 3.426.082.00 CITTF TUKWILA CAPITAL PROJECT SUM ARY LINE ITEM: 104 19 2008 to 2013 PROJECT Tukwila Int'I Blvd Phase 111 (S 132 St S 138 St) Upgrade roadway with curbs, gutters, sidewalks, and landscaping. Continuation of improvements to Tukwila DESCRIPTION International Blvd. Phase II and III will be constructed together JUSTIFICATION. Pedestrian safety access control, vehicle accidents, lighting and drainage improvements needed. STATUS Design report complete, plans, specifications and engineering began in 2004 Construction to begin in 2008. MAINT IMPACT Negligible. COMMENT Awarded four Federal STP grants; Regional $2.645 million, King Co $349,559 V King (various agencies) $288,227 another Regional for $142,835 State WSDOT Nickel Package for $2.851 million. FINANCIAL Through Estimated (in $000's) 2006 2007 2008 2009 2010 2011 2012 2013 BEYOND TOTAL EXPENSES Design 423 86 150 659 Land (R/W) 83 83 Const. Mgmt. 1 1 245 456 703 Construction 3,400 3,316 6,716 TOTAL EXPENSES 424 170 3,795 3,772 0 0 0 0 0 8,161 FUND SOURCES Awarded Grant 1 780 1,646 WSDOT Nickel 128 1,265 1 458 Mitigation Actual 0 Mitigation Expected City Oper Revenue 424 42 750 668 0 0 TOTAL SOURCES 424 170 3,795 3,772 Project Location r 41 0 PROJECT NO 95 -RWO4 0 0 0 3,426 Nye 0 0 0 1,884 0 0 8,161 �Washington State s p y Loca gency Agreement -fP Department of Transport C r Agency City of Tukwila CFDA No 20.205 (Catalog of Federal Domestic Assistance) Address 6300 Southcenter Blvd., Suite 100 Project No Tukwila, WA 98188 Agreement No For OSC WSDOT Use Only The Local Agency having complied, or hereby agreeing to comply with the terms and conditions set forth in (1) Title 23, U.S. Code Highways, (2) the regulations issued pursuant thereto, (3) Office of Management and Budget Circulars A 102, A -87 and A -133 (4) the policies and procedures promulgated by the Washington State Department of Transportation, and (5) the federal aid project agreement entered into between the State and Federal Government, relative to the above project, the Washington State Department of Transportation will authorize the Local Agency to proceed on the project by a separate notification. Federal funds which are to be obligated for the project may not exceed the amount shown herein on line r column 3 without written authority by the State, subject to the approval of the Federal Highway Administration. All project costs not reimbursed by the Federal Government shall be the responsibility of the Local Agency Project Description Name Tukwila International Boulevard Phase 3 Length 0 48 Miles Termini S 132nd St to S 138th St Description of Work Construct urban roadway improvements on Tukwila International Boulevard from S 132nd St to S 138th St. Improvements will include curb and gutter, sidewalks, storm drainage facilities, landscaping, interconnect, ACP overlay, utility relocations, illumination, channehzation, bus pullouts, and signage. Estimate of Funding Ty of Work yp Estimated Total Estimated ed Agency Esti Project Funds Funds Federal Funds PE a. Agency 0 b. Other Nickel funds Consultant 70,000 001 70,000 001 c. Other Federal Aid d. State Participation 70,000.001 70,000.00 Ratio for PE e. Total PE Cost Estimate (a +b +c +d) Right of Way f Agency 1 0 a. Other Nickel funds 72,000 00 1 72,000 00 1 h. Other I Federal Aid i. State N iCkel 4uvtid5 3,000 00 3,000 OO Participation Ratio for RW i. Total R/W Cost Estimate (f +q +h +i) I 75,000.001 75,000.001 Construction k. Contract I I I. Other m. Other I I n. Other 1 o Agency Federal Aid P. State 1 Participation Ratio for CN a. Total CN Cost Estimate (k +l +m +n +o +o) r Total Project Cost Estimate (e +j +q) 145,000.001 145,000.001 Agency Official Washington State Department of Transportation BT� By Title 1V4avnr Assistant Secretary for Highways and Local Programs Date Executed DOT Form 140 -039 EF �Wh�—S Revised 0112004