HomeMy WebLinkAbout07-012 - WA State Department of Transportation (WSDOT) - Tukwila International Boulevard Phase III 132nd to 138th Street Washington State AGENt-',
fro Department of Transportation Local Agency Agreement Supplement
Agency Supplement Number
City of Tukwila 2
Federal Aid Project Number Agreement Number CFDA No. 20.205
HLP 0099(103) LA 6308 (Catalog of Federal Domestic Assistance)
The Local Agency desires to supplement the agreement entered into and executed on February 9, 2007
All provisions in the basic agreement remain in effect except as expressly modified by this supplement.
The changes to the agreement are described as follows:
Project Description
Name Tukwila International Boulevard Phase 3 Length 0.48 Miles
Termini S 132nd St to S 138th St
Description of Work No Change
Reason for Supplement
Re- program previously obligated funds in the construction phase from Construction Contract (line k) to Construction Engineering
(lines n o). No new funds are being added.
Does this change require additional Right of Way or Easements? Yes No
Estimate of Funding
Ty of Work (2) (3) (4) (5)
yp Previous Supplement Estimated Total Estimated Agency Estimated
Agreement/Suppl. Project Funds Funds Federal Funds
PE a. Aaencv I I I I 1
0 b. Other Nickel funds Consultant 1 70,000.001 1 70,000 00 70,000.00
c. Other 1
Federal Aid d. State 1 I 1
Participation
Ratio for PE e. Total PE Cost Estimate (a +b +c +d) I 70,000.001 1 70,000.00 70,000.00
Right of Way f. Aaencv
0 g. Othe Nickel funds 72.000.001 1 72,000.001 72.000.001
Federal Aid h. Other
Participation
Ratio forRW i.State 0;cKel - ur."dS 3,000.001 1 3,000.001 3,000.001
i. Total R/W Cost Estimate (f +p +h +i) I 75.000.001 1 75.000.001 75.000.00
Construction k. Contract 1 3,527,489.001 250,000 00 1 3,277,489.001 442,461 00 2,835,028.00
I. Other Nickel funds Contract I 2,706,000.001 1 2,706,000.001 2,706,000.00 1
m. Other I I 1 I 1
n. Other Consultant 1 317.474.001 200,000.00 1 517,474.00 1 69.859.001 447.615.00
86.5 o. Aaencv 105,825.00 1 50,000.001 155,825 00 134,789 00
Federal Aid
Participation P• State 10,000.001 I 10,000 00 1,350.00 1 8,650.00
Ratio for CN q. Total CN Cost Estimate (k+l+m+n+o+D) 1 6,666,788.001 I 6,666,788.00 3,240,706.00 3,426,082.00
r. Total Proiect Cost Estimate (e+i+Q) 1 6. 811,788.00 1 1 6 .811.788.00 3 ,385.706.00 1 3. 426,082.00
The Local Agency further stipulates that pursuant to said Title 23, regulations and policies and procedures, and as a condition
to payment of the Federal funds obligated, it accepts and will comply with the applicable provisions.
Agency Official Washington Washington S D artment of Transportation
By By
Title Director of Highways and Local Programs
Date Executed OCT 1 3 2009
DOT Form 140 -041 EF
Revised 1/2007 5 '_ej G'l i /\/11 S
W Stat
AGENCY
VI/ Department of Transportation Local Agency greement Supplement
Agency Supplement Number
City of Tukwila 1
Federal Aid Project Number Agreement Number CFDA No 20.205
HLP 0099(103) LA 63 08 (Catalog of Federal Domestic Assistance)
The Local Agency desires to supplement the agreement entered into and executed on February 9, 2007
All provisions in the basic agreement remain in effect except as expressly modified by this supplement.
The changes to the agreement are described as follows.
Project Description
Name Tukwila International Boulevard Phase 3 Length 0 48 Miles
Termini S 132nd St to S 138th St
Description of Work No Change
Reason for Supplement
Obligate construction funds.
Does this change require additional Right of Way or Easements? Yes
Type of Work
PE a. Aaencv
0 b. Other Nickel funds Consultant
c. Other
Federal Aid
Participation d. State
Ratio for PE e. Total PE Cost Estimate (a +b +c +d)
Right of Way f. Aaencv
0 n (lthar Nickel funds
Federal Aid h. Other
Participation
Ratio for RW j. State N C i< el .'tA Y,d S
i. Total R/W Cost Estimate (f +a +h +i)
Construction k. Contract
I. Other
DOT Form 140 -041 EF
Revised 1/2007
Nickel funds Contract
m. Other
n. Other Consultant
86.5 o. Aaencv
Federal Aid
Participation D. State
Ratio for CN a. Total CN Cost Estimate (k+l+m+n+o+n)1
r. Total Proiect Cost Estimate (e+j+q) 1
Previous
Agreement/Suopl.
70,000 00
70,000.00
72- 000.00
3.000.00
75.000.00
145.000.001
(2)
Supplement
3,527,489 00 1
2,706,000.00
317.474.00 1
105,825.00 1
10,000.001
6,666.788.001
6.666.788.001
No
Estimate of Funding
(3) (4) (5)
Estimated Total Estimated Agency Estimated
Project Funds Funds Federal Funds
70,000 001 70,000.001
1
70,000.001 70,000.00
1
72.000.001 72.000.00
3.000.00 3.000.00
75.000.00 75,000.00
3,527,489 001 476,211 00
2,706,000.00 2,706,000.00
The Local Agency further stipulates that pursuant to said Title 23 regulations and policies and procedures, and as a condition
to payment of the Federal funds obligated, it accepts and will comply with the applicable provisions.
Agency Official Washington Department of `transportation
By /4 By CIA c -,°`P
Title Mayor/ Director of Highways id Local Programs
r�e Date Executed SEP 1 D 2008
317.474.00
105,825 00
10,000.001
6.666.788.001
6.811.788.001
fJ /6iiV4- -S
v7- ot1<<<)
42.859.00
14,286.00
1,350 00
3.240,706.00
3.385.706.001
3,051,278.00
274.615.00
91,539 00
8,650 00
3,426,082.00
3.426.082.00
CITTF TUKWILA CAPITAL PROJECT SUM ARY
LINE ITEM: 104 19
2008 to 2013
PROJECT Tukwila Int'I Blvd Phase 111 (S 132 St S 138 St)
Upgrade roadway with curbs, gutters, sidewalks, and landscaping. Continuation of improvements to Tukwila
DESCRIPTION International Blvd. Phase II and III will be constructed together
JUSTIFICATION. Pedestrian safety access control, vehicle accidents, lighting and drainage improvements needed.
STATUS Design report complete, plans, specifications and engineering began in 2004 Construction to begin in 2008.
MAINT IMPACT Negligible.
COMMENT Awarded four Federal STP grants; Regional $2.645 million, King Co $349,559 V King (various agencies)
$288,227 another Regional for $142,835 State WSDOT Nickel Package for $2.851 million.
FINANCIAL Through Estimated
(in $000's) 2006 2007 2008 2009 2010 2011 2012 2013 BEYOND TOTAL
EXPENSES
Design 423 86 150 659
Land (R/W) 83 83
Const. Mgmt. 1 1 245 456 703
Construction 3,400 3,316 6,716
TOTAL EXPENSES 424 170 3,795 3,772 0 0 0 0 0 8,161
FUND SOURCES
Awarded Grant 1 780 1,646
WSDOT Nickel 128 1,265 1 458
Mitigation Actual 0
Mitigation Expected
City Oper Revenue 424 42 750 668 0 0
TOTAL SOURCES 424 170 3,795 3,772
Project Location
r
41
0
PROJECT NO 95 -RWO4
0
0
0
3,426
Nye
0
0 0 1,884
0 0 8,161
�Washington State s p y Loca gency Agreement
-fP Department of Transport C
r
Agency City of Tukwila CFDA No 20.205
(Catalog of Federal Domestic Assistance)
Address 6300 Southcenter Blvd., Suite 100 Project No
Tukwila, WA 98188
Agreement No
For OSC WSDOT Use Only
The Local Agency having complied, or hereby agreeing to comply with the terms and conditions set forth in (1) Title 23, U.S. Code Highways, (2) the
regulations issued pursuant thereto, (3) Office of Management and Budget Circulars A 102, A -87 and A -133 (4) the policies and procedures
promulgated by the Washington State Department of Transportation, and (5) the federal aid project agreement entered into between the State and
Federal Government, relative to the above project, the Washington State Department of Transportation will authorize the Local Agency to proceed on
the project by a separate notification. Federal funds which are to be obligated for the project may not exceed the amount shown herein on line r column
3 without written authority by the State, subject to the approval of the Federal Highway Administration. All project costs not reimbursed by the Federal
Government shall be the responsibility of the Local Agency
Project Description
Name Tukwila International Boulevard Phase 3 Length 0 48 Miles
Termini S 132nd St to S 138th St
Description of Work
Construct urban roadway improvements on Tukwila International Boulevard from S 132nd St to S 138th St.
Improvements will include curb and gutter, sidewalks, storm drainage facilities, landscaping, interconnect, ACP overlay,
utility relocations, illumination, channehzation, bus pullouts, and signage.
Estimate of Funding
Ty of Work
yp Estimated Total Estimated ed Agency Esti
Project Funds Funds Federal Funds
PE a. Agency
0 b. Other Nickel funds Consultant 70,000 001 70,000 001
c. Other
Federal Aid d. State
Participation 70,000.001 70,000.00
Ratio for PE e. Total PE Cost Estimate (a +b +c +d)
Right of Way f Agency 1
0 a. Other Nickel funds 72,000 00 1 72,000 00 1
h. Other I
Federal Aid i. State N iCkel 4uvtid5 3,000 00 3,000 OO
Participation
Ratio for RW i. Total R/W Cost Estimate (f +q +h +i) I 75,000.001 75,000.001
Construction k. Contract I I
I. Other
m. Other I I
n. Other 1
o Agency
Federal Aid P. State 1
Participation
Ratio for CN a. Total CN Cost Estimate (k +l +m +n +o +o)
r Total Project Cost Estimate (e +j +q) 145,000.001 145,000.001
Agency Official Washington State Department of Transportation
BT� By
Title 1V4avnr Assistant Secretary for Highways and Local Programs
Date Executed
DOT Form 140 -039 EF �Wh�—S
Revised 0112004