Loading...
HomeMy WebLinkAboutRes 1683 - 2010-2015 Transportation Improvement Program f q� i d Q? 7 yL iQ y 'I a 1908' Tu kwi*la C ity o Washington Resolution No. A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, ADOPTING A SIX -YEAR TRANSPORTATION IMPROVEMENT PROGRAM (2010- 2015), AND DIRECTING THE SAME TO BE FILED WITH THE STATE SECRETARY OF TRANSPORTATION AND THE TRANSPORTATION IMPROVEMENT BOARD. WHEREAS, pursuant to the requirements of RCW Chapters 35.77 and 47.26 as amended, the City Council of the City of Tukwila has previously adopted a Transportation Improvement Program and thereafter periodically modified said Transportation Improvement Program by resolution; and WHEREAS, the City Council has reviewed the work accomplished under said program, determined current and future City street and arterial needs and, based upon these findings, has prepared a Six -Year Transportation Improvement Program for the ensuing six calendar years (2010 2015); and WHEREAS, on June 8, 2009, a public hearing was held regarding the City's Six Year Transportation Improvement Program; NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, HEREBY RESOLVES AS FOLLOWS: Section 1. Program Adopted. A Six -Year Transportation Improvement Program for the calendar years 2010 -2015 is hereby adopted. Section 2. Filing of Program. The City Clerk is hereby authorized and directed to file a copy of this resolution, together with the exhibit attached hereto, with the Secretary of Transportation and the Transportation Improvement Board of the State of Washington. PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, at a Regular Meeting thereof this day of iA n) 2009. ATTEST/ AUTHENTICATED: Joan Hernandez, Council President Christy 0 CMC, City Cle APPR O ORM BY: Filed with the City Clerk: r f Passed by the City Council: J e of the y Attorney Resolution Number: Attachment: Exhibit A City of Tukwila' s Six -Year Transportation Improvement Program from 2010 to 2015 WAWord Processing \Resolutions \TIP 2010 -2015 Adophon.uoc RT:GL:kn 6/9/2009 Page 1 of 1 Washington State Department of Transportation Agency: Tukwila Co. No.: 17 Co. Name: King City No.: 1320 MPO /RTPO: PSRC 1 2 Project Identification A. PIN /Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or Road Ending MP or Road F. Describe Work to be Done 3 19 1 12 S Neighborhood Traffic Calming Program Various City Streets from: to: Program to address neighborhood traffic concerns using stnping, signage, roadway improvements, traffic calming, and education to reduce speeding and improve safety. 14 2 11 S Annual Bridge Inspections and Repairs Various City Streets from: to Perform load ratings and bi- annual inspections as well as construct necessary repairs and maintenance 14 3 00 4 32 p 1,000 Ft Tukwila Urban Center Ped/Bike Bridge 16 5 16 6 17 7 Boeing Access Rd Bridge Replacement Boeing Access Road from: Airport Way to 1 -5 Reconstruct bridge. 08002500 from' Baker Blvd. to: West Valley Hwy Pedestrian bridge over the Green River connecting the CBD and rail station Southcenter Parkway (S 180 St S 200 St) Southcenter Parkway from: S 180 St to: S 200 St Construct widening to 4 lanes with center tum pockets including curb gutter, sidewalks, drainage, landscaping, and utility undergrounding Tukwila Urban Center Access (Klickitat) Southcenter Parkway from: 1 -5 Off Ramp to: S 168 St Design and construct safety and capacity improvements. S 144 St (Phase 2) S 144 St from. 42 Ave S to Tukwila Intl Blvd Design and construct paving, curb gutter, sidewalks, drainage, illumination, and utility undergrounding EXHIBIT A Project Costs in Thousands of Dollars Federally Funded t H Fund Source Information Expenditure Schedule Projects Only c I 'LT) w v (Local Agency) m I Federal Funding RIW a l- a 9 Ti Phase Federal Federal State 4th Required o State Local Total Envir. Date Start Fund Cost by Fund Funds Funds Funds 1st 2nd 3rd Thru Type Dat Date (mm/dd/yyyy) Code Phase Code 6th 4 5 6 7 8 9 I 10 11 12 13 14 15 16 17 18 19 20 21 ALL 1/1/2010 09 P 08 1,000 Ft T P 0 01 S 7 4 0 0 Ft W T S P G 05 p 1,500 Ft W 08 S P G 03 P 1000 P T W S G C Totals ALL 1/1/2010 Totals PE 1/1/2010 BR 2800 CN 1/1/2012 BR 21788 Totals 24,588 PE 1/1/2012 Discretionary 100 RW 1/1/2013 Discretionary 20 CN 1/1/2014 Discretionary 280 Totals CN 1/1/2010 Totals CN 1/1/2010 ALL Totals 1/1/2014 Discretionary Discretionary Page 1 400 3683 3,683 3000 Totals 3,000 OTHER Six Year Transportation Improvement Program From 2010 to 2015 TPP 15000 Hearing Date: 6/8/2009 Adoption Date: 6/15/2009 Amend Date: Resolution No.: 1683 1240 15000 12319 5250 15230 5250 15230 1750 1240 1240 700 3500 5446 27234 6146 30734 400 500 80 100 1120 1400 1240 I 145 1600 2000 12319 310021 15501 31002 15501 23480 I 23480 23480 23480 17501 145 I 205 745 145 145 205 745 1750 1750 13617 13617 CE No 1750 1750 13617 13617 500 100 CE 1400 Yes 12/31/13 15501 15501 500 1500 1750 1750 1750 1750 CE CE Yes 1/1/2010 Yes 1/1/2010 v. 5.7 Supersedes previous editions Washington State Department of Transportation Agency: Tukwila Co. No.: 17 Co. Name: King City No.: 1320 MPO /RTPO: PSRC 0 1 2 16 8 16 9 16 10 14 14 Project Identification A. PIN /Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or Road Ending MP or Road F. Describe Work to be Done 3 Annual Overlay and Repair Program Various City Streets from: to Repair, rehabilitate, and overlay City streets as needed in an annual program. Tukwila Urban Center Transit Center Central Business District from: to Design and construct a transit center. Andover Park West Andover Park West from. Tukwila Parkway to: Strander Blvd. Complete widening for center left turn lane 17 11 32 S Walk Roll Plan (Nonmotorized Trans. Plan) Various City Streets from to. Select, design, and construct non motorized projects including bike lanes, sidewalks, and trails. Totals 1000 1000 200 200 200 400 17 12 05 P 1000 PE 1/1/2010 17 17 17 ALL 1/1/2015 610 610 610 CE Macadam Rd S 144 St Intersection Macadam Road from: S 144 St to: 1,000 Ft on south leg Widen Macadam Road to add a northbound left turn lane. Totals 627 627 17 610 PE 1/1/2010 75 75 16 13 12 S 1,000 Ft ALL 1/1/2015 602 602 75 602 CE Andover Park E Minkler Blvd. Intersection from. 500 Ft. on each leg to 500 Ft. on each leg Design and construct intersection and traffic signal improvements and widening for left turn lanes West Valley Hwy S 156 St from. Southcenter Blvd. to: S 158 St Construct additional northbound left turn lane at S 156 St for northbound HOV to northbound 1 -405 -S m N 0 V mm 0 U J 6 f N 0 1- 4 5 6 7 07 S C G O P S T W 21 P T W P S 05 P 2000 C G P S T W Project Costs in Thousands of Dollars Federally Funded Fund Source Information Expenditure Schedule Projects Only E (Local Agency) .c Federal Funding RNV d r, Phase Federal Federal State 4th Required State Local Total Date o Start Fund Cost by Fund Funds Funds Funds 1st 2nd 3rd Tm Type (MM/YY) L (mm/dd/yyyy) Code Phase Code 6th 8 9 10 11 12 13 14 15 16 17 18 19 20 21 ALL 1/1/2010 7500 7500 1250 1250 1250 3750 Totals CN 1/1/2010 ALL 1/1/2015 Totals ALL 1/1/2011 Totals ALL 1/1/2010 STP(U) 920 CMAQ 3700 Totals 677 677 75 602 T PE 1/1/2010 75 75 75 1 ,500 Ft 12 P T ALL 1/1/2015 STP(U) 440 592 1032 1032 CE Totals 440 667 1107 75 1032 Page 2 Six Year Transportation Improvement Program From 2010 to 2015 452 4,620 452 Hearing Date: 6/8/2009 Adoption Date: 6/15/2009 Amend Date: Resolution No.: 1683 7500 7500 928 2300 600 4300 1528 6600 1461 1461 1461 1461 1461 1000 1000 200 1250 1250 1250 3750 1150 1150 1150 1150 4300 1461 200 200 4300 CE 400 CE Yes 12/31/14 No No No No v. 5.7 Supersedes previous editions Washington State Department of Transportation Agency: Tukwila Co. No.: 17 Co. Name: King City No.: 1320 MPO /RTPO: PSRC Project Identification Project Costs in Thousands of Dollars A. PIN/Federal Aid No. B. Bridge No. m v d Fund Source Information y E C. Pro Title m m d Federal Funding ti Z D. Street/Road Name or Number ar CO a Phase Federal Federal State t E. Beginning MP or Road Ending MP or Road E r Start Fund Cost by Fund State F. Describe Work to be Done a (mnvdd/yyyy) Code Phase Code 1 2 3 4 5 6 7 8 9 10 11 12 I 13 PE 1/1/2010 16 15 12 P 1,000 Ft W CN 1/1/2015 Andover PkE /Industry Dr. Signal T S from. 500 Ft. on each leg to: 500 Ft. on each leg P Design and construct a traffic signal and intersection improvements. 16 16 12 S 133 St /SR 599 Ramps Intersection 14 18 17 19 16 20 14 21 from: 500 Ft. on each leg to: 500 Ft. on each leg Design and construct intersection improvements including a new traffic signal. 16 17 03 East Marginal Way East Marginal Way from: Boeing Access Rd to' S 112 St Design and construct widening to 3 lanes including curb gutter, sidewalks. drainage, landscaping, and utility undergrounding Interurban Ave S Interurban Ave S from: S 143 St to. Fort Dent Way Reconstruct street including paving, curb gutter, drainage, illumination, sidewalk, and landscaping TUC/TOD Pedestrian Improvements from Tukwila Urban Center to Rail Station Construct bike /pedestrian connection between Tukwila Urban Center and Commuter Rail Station/TOD area. Minkler Blvd Minkler Blvd from: Southcenter Pkwy to: Andover Park W Consruct widening for 3 lanes inlcuding curb gutter, sidewalk, drainage, and landscaping. Tukwila Intl Blvd. (Phase 4) Tukwila Intl Blvd from: Boeing Access Rd to: S 116 St Design and construct widening including paving, curb gutter, sidewalk, drainage, illumination, landscaping, and utility undergrounding 03 P G p 1,000 Ft W T S G C P p 1,500 Ft P S 32 S 0 75 06 T W 4,500 Ft W T s P G C 04 p 2,000 Ft W T S P 03 p 3,500 Ft P S W O Totals PE 1/1/2011 ALL 1/1/2015 Totals PE 1/1/2011 ALL 1/1/2015 Totals ALL 1/1/2012 Totals ALL 1/1/2015 Totals ALL 1/1/2015 Totals ALL 1/1/2015 Totals STP(U) 460 STP(U) STP(U) STP(U) 1 2500 CMAQ Page 3 460 500 Six Year Transportation Improvement Program From 2010 to 2015 AIP 1300 AIP 2,500 2500 6100 11100 500 600 1100 TPP 1300 2500 3500 Hearing Date: 6/8/2009 Adoption Date: 6/15/2009 Amend Date: Resolution No.: 1683 Local Total Funds Funds 14 75 75 575 575 650 650 20 20 170 630 190 650 50 50 2000 3300 2050 3350 111001 6100 600 425 425 425 1091 Federally Funded Expenditure Schedule Projects Only (Local Agency) RAN 4th Required Thru Envir. Date 1st 2nd 3rd Type (MM/yy) 6th 15 16 17 18 19 20 21 1100 4251 4591 1 75 575 CE No 75 575 20 20 630 50 50 400 400 10700 1100 CE 3500 1091 4591 4591 630 CE 3300 CE 3300 10700 CE 1100 425 CE 425 4591 CE No No Yes 1/1/12 No No No v. 5.7 Supersedes previous editions Washington State Department of Transportation Agency: Tukwila Co. No.: 17 Co. Name: King City No.: 1320 MPO /RTPO: PSRC 1 2 16 22 14 23 16 28 Project Costs in Thousands of Dollars Federally Funded v Ex Schedule Projects Only c d m Fund Source Informat m m Et; m w L Federal Funding Local Agency) RAN a q I co -1 t Phase Federal Federal State 4th R Date d r 01 Start Fund Cost by Fund State Local Total 1st 2nd 3rd Thru Envir. d (mm/dd/yyyy) Code Phase Code Funds Funds Funds 6th Type (tghyyy) 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 W ALL 1/1/2015 CMAQ 1200 1800 3000 3000 CE 12 S Traffic Signal Interconnect Program T No Various City Streets G from: to: Design and install hard wire interconnect system between traffic signals and the Traffic Operations Center. Project Identification A. PIN /Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or Road Ending MP or Road F. Describe Work to be Done 3 SC Blvd. Widening Southcenter Blvd from. 1 -5 to: 61 Ave S Widen Southcenter Blvd and the 61st Ave S Bridge to add a lane for future traffic growth. 14 24 Tukwila Intl Blvd /S 116 St Tukwila Int'I Blvd from: 1,000 Ft. on each leg to 1,000 Ft on each leg Design and construct widening on Tukwila Intl Blvd and intersection improvements at T.I.B. /S 116 St. 16 25 01 S 168 St S 168 St from Southcenter Pkwy to Andover Pk E Construct new roadway including curb gutter, sidewalk. drainage, illumination, and landscaping. 14 26 05 West Valley Highway West Valley Hwy from: 1 -405 to: Strander Blvd Design and construct widening to 7 lanes including curb gutter, sidewalks, illumination, and drainage. S 180 St /Andover Park W Intersection from. 500 Ft on each leg to. 500 Ft. on each leg Widen for nodh south turn lanes C P S 04 P 0.5 C G P S T W 04 p 2000 P p 4,000 Ft P T W S ID 0.5Mi W T S P G 17 27 03 p 600 Ft Nelson Place Nelson Place from: S 156 St lo• S 158 St Design and construct paving, curb gutter, sidewalks, drainage, and illumination 12 P 1000 W T P Totals ALL 1/1/2015 Totals ALL 1/1/2015 Totals ALL 1/1/2015 Totals ALL 1/1/2015 Totals ALL 1/1/2015 Totals ALL 1/1/2015 STP(U) STP(U) Page 4 1,200 1800 3000 1900 1,900 100 Six Year Transportation Improvement Program From 2010 to 2015 Hearing Date: 6/8/2009 Adoption Date: 6/15/2009 Amend Date: Resolution No.: 1683 20000 20000 20000 2775 2775 4675 4675 23244 23244 23244 630 630 630 630 200 200 200 110 20000 4675 23244 630 200 210 l 3000 20000 CE 20000 4675 CE 23244 Totals 100 110 210 210 23244 630 CE 200 200 210 CE Yes 12/31/2015 No Yes 12/31/2015 No No v. 5.7 Supersedes previous editions Washing ington State Department of Transportation ri tuKwila tgencY Co. No.: 17 City No 132 I d e ntifica tio n I Project PINIFeder 0 n C. Projec load Name or Numb Ending MP or Road E. o m o D. Beginning l MP or Road v n Z F ribe worlt to be pone 3 Co. Nam MPOIRtP�: PSRC B Bridge N 17 29 S 144 St Bridge Sidewalks 53 Ave S Je S and 53rd $144 St ot5between 5lst from' 51 Ave apes on bodge Widen ousting side+ Ave S. ose Trails 30 Mu16Pu� and b �yc1e 00 Greenbelt to tom, toPuot rs btoraed safe connections Aatwn n peu Provide ot transPa 1 m odes totals for tuK`Ntla Gran p rogram tion Improvement 2O Transp °rta 200 to Six Year From 6t151 Adoption Date: No; 166 6181 Resolutio Fun Nearing Date: Federally s Only Amend Date: Project RAN Schedu Expenditure Agency) Required Thousands of Dollars (Local A5 pate in Thou So ation dth Envir. M Costs Source Mfottn '4,1-11110.1 Typ lM Dud 1 2nd 3rd 6th 2i Local Total 1st 19 20 Federal State d State unds Funds Funds 16 17 18 100 CE Cost by Code Phase 13 14 12 I 100 11 1 100 100 �E 43 43 l 100 43' 100 172 172 I 43 43 70 28,00 28,002 111, 'V8 5 43,76 43 43 16,21 1 01,729) No No v. 5.7 Supersedes previous editions City of Tukwila 6200 Southcenter Boulevard Tukwila, Washington 98188 Jim Haggerton, Mayor 1908 June 17, 2009 PAULA J. HAMMOND, SECRETARY Washington State Department of Transportation PO BOX 47316 Olympia, WA 98504 -7316 RE: CITY OF TUKWILA 2010 -2015 TRANSPORTATION IMPROVEMENT PROGRAM Dear Ms. Hammond: Enclosed is City of Tukwila Resolution #1683, passed June 15, 2009, adopting the Transportation Improvement Program for 2010 -2015. Please contact me with any questions at 206 433 -1855. Sincerely yours, Christy O'Flaherty, CMC City Clerk Enclosures xc: Jim Morrow, Public Works Director Phone: 206 433 -1800 City Hall Fax: 206- 433 -1833 www.ci.tukwila.wa.us City of Tukwila ��p 6200 Southcenter Boulevard Tukwila, Washington 98188 Jim Haggerton, Mayor 1908 June 17, 2009 JEANNE BURBIDGE, CHAIR, TRANSPORTATION IMPROVEMENT BOARD Washington State Department of Transportation PO BOX 40901 Olympia, WA 98504 -0901 RE: CITY OF TUKWILA 2010 -2015 TRANSPORTATION IMPROVEMENT PROGRAM Dear Ms. Burbidge: Enclosed is City of Tukwila Resolution #1683, passed June 15, 2009, adopting the Transportation Improvement Program for 2010 -2015. Please contact me with any questions at 206 433 -1855. Sincerely yours, �T Christy O'Flaherty, CMC City Clerk Enclosures xc: Jim Morrow, Public Works Director Phone: 206 433 -1800 City Hall Fax. 206 433 -1833 www.ci.tukwila.wa.us