A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUKWILA,
WASHINGTON, ADOPTING A SIX -YEAR TRANSPORTATION
IMPROVEMENT PROGRAM (2010- 2015), AND DIRECTING THE SAME
TO BE FILED WITH THE STATE SECRETARY OF TRANSPORTATION
AND THE TRANSPORTATION IMPROVEMENT BOARD.
WHEREAS, pursuant to the requirements of RCW Chapters 35.77 and 47.26 as
amended, the City Council of the City of Tukwila has previously adopted a
Transportation Improvement Program and thereafter periodically modified said
Transportation Improvement Program by resolution; and
WHEREAS, the City Council has reviewed the work accomplished under said
program, determined current and future City street and arterial needs and, based upon
these findings, has prepared a Six -Year Transportation Improvement Program for the
ensuing six calendar years (2010 2015); and
WHEREAS, on June 8, 2009, a public hearing was held regarding the City's Six
Year Transportation Improvement Program;
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA,
WASHINGTON, HEREBY RESOLVES AS FOLLOWS:
Section 1. Program Adopted. A Six -Year Transportation Improvement Program
for the calendar years 2010 -2015 is hereby adopted.
Section 2. Filing of Program. The City Clerk is hereby authorized and directed to
file a copy of this resolution, together with the exhibit attached hereto, with the
Secretary of Transportation and the Transportation Improvement Board of the State of
Washington.
PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON,
at a Regular Meeting thereof this day of iA n) 2009.
ATTEST/ AUTHENTICATED:
Joan Hernandez, Council President
Christy 0 CMC, City Cle
APPR O ORM BY:
Filed with the City Clerk: r
f Passed by the City Council: J
e of the y Attorney Resolution Number:
Attachment: Exhibit A City of Tukwila' s Six -Year Transportation Improvement
Program from 2010 to 2015
WAWord Processing \Resolutions \TIP 2010 -2015 Adophon.uoc
RT:GL:kn 6/9/2009 Page 1 of 1
Washington State Department of Transportation
Agency: Tukwila
Co. No.: 17 Co. Name: King
City No.: 1320 MPO /RTPO: PSRC
1 2
Project Identification
A. PIN /Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road Ending MP or Road
F. Describe Work to be Done
3
19 1 12 S
Neighborhood Traffic Calming Program
Various City Streets
from: to:
Program to address neighborhood traffic concerns using stnping, signage,
roadway improvements, traffic calming, and education to reduce speeding
and improve safety.
14 2 11 S
Annual Bridge Inspections and Repairs
Various City Streets
from: to
Perform load ratings and bi- annual inspections as well as construct
necessary repairs and maintenance
14 3
00 4 32 p 1,000 Ft
Tukwila Urban Center Ped/Bike Bridge
16 5
16 6
17 7
Boeing Access Rd Bridge Replacement
Boeing Access Road
from: Airport Way to 1 -5
Reconstruct bridge.
08002500
from' Baker Blvd. to: West Valley Hwy
Pedestrian bridge over the Green River connecting the CBD and rail station
Southcenter Parkway (S 180 St S 200 St)
Southcenter Parkway
from: S 180 St to: S 200 St
Construct widening to 4 lanes with center tum pockets including curb
gutter, sidewalks, drainage, landscaping, and utility undergrounding
Tukwila Urban Center Access (Klickitat)
Southcenter Parkway
from: 1 -5 Off Ramp to: S 168 St
Design and construct safety and capacity improvements.
S 144 St (Phase 2)
S 144 St
from. 42 Ave S to Tukwila Intl Blvd
Design and construct paving, curb gutter, sidewalks, drainage,
illumination, and utility undergrounding
EXHIBIT A
Project Costs in Thousands of Dollars Federally Funded
t H
Fund Source Information
Expenditure Schedule Projects Only
c I
'LT)
w v (Local Agency)
m I Federal Funding RIW
a l- a 9 Ti Phase Federal Federal State 4th Required
o State Local Total Envir. Date
Start Fund Cost by Fund Funds Funds Funds 1st 2nd 3rd Thru Type Dat Date
(mm/dd/yyyy) Code Phase Code 6th
4 5 6 7 8 9 I 10 11 12 13 14 15 16 17 18 19 20 21
ALL 1/1/2010
09 P
08
1,000 Ft T
P
0
01 S 7 4 0 0 Ft W
T
S
P
G
05 p 1,500 Ft W
08
S
P
G
03 P 1000 P
T
W
S
G
C
Totals
ALL 1/1/2010
Totals
PE 1/1/2010 BR 2800
CN 1/1/2012 BR 21788
Totals 24,588
PE 1/1/2012 Discretionary 100
RW 1/1/2013 Discretionary 20
CN 1/1/2014 Discretionary 280
Totals
CN 1/1/2010
Totals
CN 1/1/2010
ALL
Totals
1/1/2014
Discretionary
Discretionary
Page 1
400
3683
3,683
3000
Totals 3,000
OTHER
Six Year Transportation Improvement Program
From 2010 to 2015
TPP
15000
Hearing Date: 6/8/2009 Adoption Date: 6/15/2009
Amend Date: Resolution No.: 1683
1240
15000 12319
5250 15230
5250 15230
1750
1240 1240
700 3500
5446 27234
6146 30734
400 500
80 100
1120 1400
1240 I 145
1600 2000
12319 310021 15501
31002 15501
23480 I 23480
23480 23480
17501
145 I 205
745
145 145 205 745
1750 1750
13617 13617 CE
No
1750 1750 13617 13617
500
100 CE
1400 Yes
12/31/13
15501
15501
500 1500
1750
1750 1750 1750
CE
CE
Yes
1/1/2010
Yes
1/1/2010
v. 5.7 Supersedes previous editions
Washington State Department of Transportation
Agency: Tukwila
Co. No.: 17 Co. Name: King
City No.: 1320 MPO /RTPO: PSRC
0
1 2
16 8
16 9
16 10
14 14
Project Identification
A. PIN /Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road Ending MP or Road
F. Describe Work to be Done
3
Annual Overlay and Repair Program
Various City Streets
from: to
Repair, rehabilitate, and overlay City streets as needed in an annual
program.
Tukwila Urban Center Transit Center
Central Business District
from: to
Design and construct a transit center.
Andover Park West
Andover Park West
from. Tukwila Parkway to: Strander Blvd.
Complete widening for center left turn lane
17 11 32 S
Walk Roll Plan (Nonmotorized Trans. Plan)
Various City Streets
from to.
Select, design, and construct non motorized projects including bike lanes,
sidewalks, and trails.
Totals 1000 1000 200 200 200 400
17 12 05 P 1000 PE 1/1/2010 17 17 17
ALL 1/1/2015 610 610 610 CE
Macadam Rd S 144 St Intersection
Macadam Road
from: S 144 St to: 1,000 Ft on south leg
Widen Macadam Road to add a northbound left turn lane.
Totals 627 627 17 610
PE 1/1/2010 75 75
16 13 12 S 1,000 Ft ALL 1/1/2015 602 602 75 602 CE
Andover Park E Minkler Blvd. Intersection
from. 500 Ft. on each leg to 500 Ft. on each leg
Design and construct intersection and traffic signal improvements and
widening for left turn lanes
West Valley Hwy S 156 St
from. Southcenter Blvd. to: S 158 St
Construct additional northbound left turn lane at S 156 St for northbound
HOV to northbound 1 -405
-S
m N 0 V
mm 0 U
J
6 f N 0
1-
4 5 6 7
07 S C
G
O
P
S
T
W
21 P T
W
P
S
05 P 2000 C
G
P
S
T
W
Project Costs in Thousands of Dollars Federally Funded
Fund Source Information Expenditure Schedule Projects Only
E (Local Agency)
.c Federal Funding RNV
d
r, Phase Federal Federal State 4th Required
State Local Total Date
o Start Fund Cost by Fund Funds Funds Funds 1st 2nd 3rd Tm Type (MM/YY)
L (mm/dd/yyyy) Code Phase Code 6th
8 9 10 11 12 13 14 15 16 17 18 19 20 21
ALL 1/1/2010 7500 7500 1250 1250 1250 3750
Totals
CN 1/1/2010
ALL 1/1/2015
Totals
ALL 1/1/2011
Totals
ALL 1/1/2010
STP(U) 920
CMAQ 3700
Totals 677 677 75 602
T PE 1/1/2010 75 75 75
1 ,500 Ft
12 P T ALL 1/1/2015 STP(U) 440 592 1032 1032 CE
Totals 440 667 1107 75 1032
Page 2
Six Year Transportation Improvement Program
From 2010 to 2015
452
4,620 452
Hearing Date: 6/8/2009 Adoption Date: 6/15/2009
Amend Date: Resolution No.: 1683
7500 7500
928 2300
600 4300
1528 6600
1461 1461
1461 1461 1461
1000
1000 200
1250 1250 1250 3750
1150 1150
1150 1150 4300
1461
200
200
4300 CE
400
CE
Yes
12/31/14
No
No
No
No
v. 5.7 Supersedes previous editions
Washington State Department of Transportation
Agency: Tukwila
Co. No.: 17 Co. Name: King
City No.: 1320 MPO /RTPO: PSRC
Project Identification Project Costs in Thousands of Dollars
A. PIN/Federal Aid No. B. Bridge No. m v d Fund Source Information
y E C. Pro Title m m d Federal Funding
ti Z D. Street/Road Name or Number ar CO a Phase Federal Federal State
t E. Beginning MP or Road Ending MP or Road E r Start Fund Cost by Fund State
F. Describe Work to be Done a (mnvdd/yyyy) Code Phase Code
1 2 3 4 5 6 7 8 9 10 11 12 I 13
PE 1/1/2010
16 15 12 P 1,000 Ft W CN 1/1/2015
Andover PkE /Industry Dr. Signal T
S
from. 500 Ft. on each leg to: 500 Ft. on each leg P
Design and construct a traffic signal and intersection improvements.
16 16 12
S 133 St /SR 599 Ramps Intersection
14 18
17 19
16 20
14 21
from: 500 Ft. on each leg to: 500 Ft. on each leg
Design and construct intersection improvements including a new traffic
signal.
16 17 03
East Marginal Way
East Marginal Way
from: Boeing Access Rd to' S 112 St
Design and construct widening to 3 lanes including curb gutter, sidewalks.
drainage, landscaping, and utility undergrounding
Interurban Ave S
Interurban Ave S
from: S 143 St to. Fort Dent Way
Reconstruct street including paving, curb gutter, drainage, illumination,
sidewalk, and landscaping
TUC/TOD Pedestrian Improvements
from Tukwila Urban Center to Rail Station
Construct bike /pedestrian connection between Tukwila Urban Center and
Commuter Rail Station/TOD area.
Minkler Blvd
Minkler Blvd
from: Southcenter Pkwy to: Andover Park W
Consruct widening for 3 lanes inlcuding curb gutter, sidewalk, drainage,
and landscaping.
Tukwila Intl Blvd. (Phase 4)
Tukwila Intl Blvd
from: Boeing Access Rd to: S 116 St
Design and construct widening including paving, curb gutter, sidewalk,
drainage, illumination, landscaping, and utility undergrounding
03 P
G
p 1,000 Ft W
T
S
G
C
P
p 1,500 Ft P
S
32 S 0 75
06
T
W
4,500 Ft W
T
s
P
G
C
04 p 2,000 Ft W
T
S
P
03 p 3,500 Ft P
S
W
O
Totals
PE 1/1/2011
ALL 1/1/2015
Totals
PE 1/1/2011
ALL 1/1/2015
Totals
ALL 1/1/2012
Totals
ALL 1/1/2015
Totals
ALL 1/1/2015
Totals
ALL 1/1/2015
Totals
STP(U) 460
STP(U)
STP(U)
STP(U) 1 2500
CMAQ
Page 3
460
500
Six Year Transportation Improvement Program
From 2010 to 2015
AIP 1300
AIP
2,500 2500 6100 11100
500 600 1100
TPP
1300
2500
3500
Hearing Date: 6/8/2009 Adoption Date: 6/15/2009
Amend Date: Resolution No.: 1683
Local Total
Funds Funds
14
75 75
575 575
650 650
20 20
170 630
190 650
50 50
2000 3300
2050 3350
111001
6100
600
425
425 425
1091
Federally Funded
Expenditure Schedule Projects Only
(Local Agency)
RAN
4th Required
Thru Envir. Date
1st 2nd 3rd Type (MM/yy)
6th
15 16 17 18 19 20 21
1100
4251
4591 1
75
575 CE
No
75 575
20
20 630
50
50
400
400 10700
1100 CE
3500 1091 4591 4591
630 CE
3300 CE
3300
10700 CE
1100
425 CE
425
4591 CE
No
No
Yes
1/1/12
No
No
No
v. 5.7 Supersedes previous editions
Washington State Department of Transportation
Agency: Tukwila
Co. No.: 17 Co. Name: King
City No.: 1320 MPO /RTPO: PSRC
1 2
16 22
14 23
16 28
Project Costs in Thousands of Dollars Federally Funded
v Ex Schedule Projects Only
c d m Fund Source Informat
m m
Et; m w L Federal Funding Local Agency)
RAN
a q
I co -1 t Phase Federal Federal State 4th R Date d
r 01 Start Fund Cost by Fund State Local Total 1st 2nd 3rd Thru Envir.
d (mm/dd/yyyy) Code Phase Code Funds Funds Funds 6th Type (tghyyy)
4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
W ALL 1/1/2015 CMAQ 1200 1800 3000 3000 CE
12 S
Traffic Signal Interconnect Program T No
Various City Streets G
from: to:
Design and install hard wire interconnect system between traffic signals and
the Traffic Operations Center.
Project Identification
A. PIN /Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road Ending MP or Road
F. Describe Work to be Done
3
SC Blvd. Widening
Southcenter Blvd
from. 1 -5 to: 61 Ave S
Widen Southcenter Blvd and the 61st Ave S Bridge to add a lane for future
traffic growth.
14 24
Tukwila Intl Blvd /S 116 St
Tukwila Int'I Blvd
from: 1,000 Ft. on each leg to 1,000 Ft on each leg
Design and construct widening on Tukwila Intl Blvd and intersection
improvements at T.I.B. /S 116 St.
16 25 01
S 168 St
S 168 St
from Southcenter Pkwy to Andover Pk E
Construct new roadway including curb gutter, sidewalk. drainage,
illumination, and landscaping.
14 26 05
West Valley Highway
West Valley Hwy
from: 1 -405 to: Strander Blvd
Design and construct widening to 7 lanes including curb gutter, sidewalks,
illumination, and drainage.
S 180 St /Andover Park W Intersection
from. 500 Ft on each leg to. 500 Ft. on each leg
Widen for nodh south turn lanes
C
P
S
04 P 0.5 C
G
P
S
T
W
04 p 2000 P
p 4,000 Ft P
T
W
S
ID 0.5Mi W
T
S
P
G
17 27 03 p 600 Ft
Nelson Place
Nelson Place
from: S 156 St lo• S 158 St
Design and construct paving, curb gutter, sidewalks, drainage, and
illumination
12 P
1000 W
T
P
Totals
ALL 1/1/2015
Totals
ALL 1/1/2015
Totals
ALL 1/1/2015
Totals
ALL 1/1/2015
Totals
ALL 1/1/2015
Totals
ALL 1/1/2015
STP(U)
STP(U)
Page 4
1,200 1800 3000
1900
1,900
100
Six Year Transportation Improvement Program
From 2010 to 2015
Hearing Date: 6/8/2009 Adoption Date: 6/15/2009
Amend Date: Resolution No.: 1683
20000
20000 20000
2775
2775 4675 4675
23244
23244 23244
630
630 630 630
200
200 200
110
20000
4675
23244
630
200
210 l
3000
20000 CE
20000
4675 CE
23244
Totals 100 110 210 210
23244
630 CE
200
200
210 CE
Yes
12/31/2015
No
Yes
12/31/2015
No
No
v. 5.7 Supersedes previous editions
Washing ington State Department of Transportation
ri tuKwila
tgencY
Co. No.: 17
City No 132
I d e ntifica tio n
I Project
PINIFeder
0 n C. Projec load Name or Numb Ending MP or Road
E. o m o D. Beginning l MP or Road
v n Z F ribe worlt to be pone
3
Co. Nam
MPOIRtP�: PSRC
B Bridge N
17 29 S 144 St Bridge Sidewalks 53 Ave S Je S and 53rd
$144 St
ot5between 5lst
from' 51 Ave
apes on bodge
Widen ousting side+
Ave S.
ose Trails
30 Mu16Pu� and b �yc1e
00 Greenbelt to
tom, toPuot rs
btoraed
safe connections Aatwn n peu
Provide ot transPa
1
m odes
totals for tuK`Ntla
Gran
p rogram
tion Improvement 2O
Transp °rta 200 to
Six Year From 6t151
Adoption Date:
No; 166
6181 Resolutio Fun
Nearing Date: Federally s Only
Amend Date: Project
RAN
Schedu
Expenditure Agency) Required
Thousands of Dollars (Local A5 pate
in Thou So ation dth Envir. M
Costs Source Mfottn '4,1-11110.1 Typ lM
Dud 1 2nd 3rd 6th 2i
Local Total 1st 19 20
Federal State d State
unds Funds Funds 16 17 18 100 CE
Cost by Code
Phase 13 14
12 I 100
11 1
100
100
�E
43 43 l
100 43'
100 172 172 I
43
43
70
28,00 28,002 111, 'V8 5 43,76
43
43
16,21 1 01,729)
No
No
v.
5.7 Supersedes previous editions
City of Tukwila
6200 Southcenter Boulevard Tukwila, Washington 98188 Jim Haggerton, Mayor
1908
June 17, 2009
PAULA J. HAMMOND, SECRETARY
Washington State Department of Transportation
PO BOX 47316
Olympia, WA 98504 -7316
RE: CITY OF TUKWILA 2010 -2015 TRANSPORTATION IMPROVEMENT PROGRAM
Dear Ms. Hammond:
Enclosed is City of Tukwila Resolution #1683, passed June 15, 2009, adopting the
Transportation Improvement Program for 2010 -2015.
Please contact me with any questions at 206 433 -1855.
Sincerely yours,
Christy O'Flaherty, CMC
City Clerk
Enclosures
xc: Jim Morrow, Public Works Director
Phone: 206 433 -1800 City Hall Fax: 206- 433 -1833 www.ci.tukwila.wa.us
City of Tukwila
��p 6200 Southcenter Boulevard Tukwila, Washington 98188 Jim Haggerton, Mayor
1908
June 17, 2009
JEANNE BURBIDGE, CHAIR, TRANSPORTATION IMPROVEMENT BOARD
Washington State Department of Transportation
PO BOX 40901
Olympia, WA 98504 -0901
RE: CITY OF TUKWILA 2010 -2015 TRANSPORTATION IMPROVEMENT PROGRAM
Dear Ms. Burbidge:
Enclosed is City of Tukwila Resolution #1683, passed June 15, 2009, adopting the
Transportation Improvement Program for 2010 -2015.
Please contact me with any questions at 206 433 -1855.
Sincerely yours,
�T
Christy O'Flaherty, CMC
City Clerk
Enclosures
xc: Jim Morrow, Public Works Director
Phone: 206 433 -1800 City Hall Fax. 206 433 -1833 www.ci.tukwila.wa.us