HomeMy WebLinkAbout09-112 - Green River Construction - 2009 Small Drainage Program 09 -1120) Council Approval NIA iLa.: sZ CITY OF TUKWILA `N... z CONTRACT CHANGE ORDER NO. 9 1908 DATE: February 26, 2010 BUDGET NO.: 412.02.594.383.63.09 PROJECT NO.: 09 -DR01 CONTRACT NO.: 09 -112 C �)J PROJECT NAME: 2009 Small Drainage Program TO: Jerry Knudson, President, Green River Construction Co., Inc. You are hereby directed to make the herein described changes to the plans and specifications or do the following described work not included in the plans and specifications on this contract: NOTE: This change order is not effective until approved by the "Owner" and a notice to proceed is issued. Conditions: A. The following change, and work affected thereby, are subject to all contract stipulations and covenants; B. The rights of the "Owner" are not prejudiced; C.AII claims against the "Owner" which are incidental to or as a consequence of this change are waived; and D. The Contractor must submit all Field Overhead and Home Office Overhead Rates for approval in advance of all change orders. CHANGE: At Site 4 (on 33 Avenue South between South 130 Street and South 132 Street), the Contractor discovered an existing 1.5 -inch private property yard drain near the new Catch Basin (CB) #6 (roughly Station 11 +83, 12' LT). At the City project staff's direction, the Contractor connected this yard drain to the new CB. The enclosed July 21, 2009 force account cost of $364.77, accounted for the cost needed for this yard drain connection. Page 1 of 2 We the undersigned Contractor, have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all equipment, furnish all materials, except as may otherwise be noted above, and perform all services necessary for the work above specified, and will accept as full payment therefore the prices shown above and below. ACC D: Date VMO Contractor Green River Construction Co.. Inc. By Title /1 Original Contract (with tax) 571,186.50 Approved by City of Tukwila Previous Change Orders 14,162.30 Date b l) This Change Order (with tax) 364.77 By iC18 REV. CONTRACT AMOUNT 585,713.57 Original Contract Time: 84 Calendar Days Additional Calendar Days from Previous Change Orders: 3 Calendar Days Updated Contract Time: 87 Calendar Days ORIGINAL: City Clerk (1 of 2) Contractor (2 of 2) Page 2 of 2 cc: Finance Department (w /encumbrance) Project Management File PW Project Finance File Connect an existing 1.5 -inch yard drain pipe to the new Catch Basin #6 at Site 4. Labor Joel Johnson Markup 29% Total Labor Material 1 -1/2" Pipe 1 -1/2" Fittings Subtotal Markup 21% Total Material Eq Op Equipment Service Truck w /Tools Markup 21% Total Equipment Green River Construction, Inc. Daily Report of Force Account Worked Contract 09 -DR01 City of Tukwila 2009 Small Drainage Project July 21, 2009 Site #4 1.0 Hrs $63.87/Hr 6.0 LF $1.62/LF 4.0 EA $50.70 /EA 1.0 Hrs $20.85 /Hr 63.87 18.52 9.72 202.80 212.52 44.63 20.85 4.38 82.39 257.15 25.23 Total 364.77 Washington State Department of Transportation Contract Number 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 Prime Contractor Line Station 20 Calculated By Ledger Entry Number Insppctor's Signature DOT Font 422 -008 EF Revised 03/2008 Daily Report of Force Account Worked Date Item Number Item Name 11 1 Subcontractor Lower Tier Subcontractor Group Basis of Material Acceptance RAMS Number D escription of Work Performed Q. Time Worked Record Workers and /or Equipment Occupation of Workers or Working Equipment Size *tuLlt` 61 w 4 Too1 13 p 1 Date Checked By Hours Worked Reg. 1 O.T. I I 1 Date Reg. O.T. Rate Rate Total Entered By 1 Date Entry Verified 1 Date Contractor's Representative Signature Title Amount JAN -05 -2010 12:41 HD FOWLER PACIFIC Of FLU FOWLER COMPANY PO Box 160 Bellevue, WA 98009 0160 'fib: GREEN RIVER CONST CO. 6402 S 144 Th St Ste 1 Tukwila WA 98168 100 ft 1 -1/2 SDR 7 POLY PIPE EPSDR76100 1 -1/2 PJ X PJ FOC6666 FORD 1 -1/2 MIP X PJ F008666 FORD 1 ea. 1 ea. 3 ea. 1 -1/2 S.S. Insert Bellingham Bend Bremerton Clackamas Eugene Hayden Hermiston Hillsboro Ship to: Sew the Pacific Northwest since 1911 3 t 64Q2 7/21/09 Tukwila a 14„, 10.1..'•••.i.l•i {11'• i W {�'yl#9•.�.. 0$ifsi•... r I ),I .4 a wi•f I w tY 0�+g +141,404a414 gc "r �.f' i i. 2 i .m.. v 0 11 0" 1 Kt t i. {}4X{1 oili88. 1•. tifr' r. as 1 a ua,,, 7 1 ,.u� "2,..u♦ii,,,IT. au 0,A.,gi...tl1 1i7 tmi. I'Y 4 i 7 2538638681 P.001 360•/34.8400 Olympia 541.389.7577 Pacific 360.377.4507 Pasco 503.656.3900 Redmond 541.607.0081 Spokane 208.772.9060 Wenatchee 541.922.0775 Wilsonville 503.626.2466 Yakima S 144Th At 50.70 73.56 3,14 Sub Total Freight Tax Grand Total 162.00 295.68 295.68 360.459.7300 253.863.8600 509.545.0255 541.923.2090 509.568.8400 509.886.8804 503.783.3490 509.248.8400 50.70 73.56 9.42 CHANGE: Page 1 of 2 09-112(h) Council Approval N/A CITY OF TUKWILA CONTRACT CHANGE ORDER NO. 8 DATE: February 26, 2010 BUDGET NO.: 412.02.594.383.63.09 PROJECT NO.: 09 -DRO1 CONTRACT NO.: 09 -112 C h PROJECT NAME: 2009 Small Drainage Program TO: Jerry Knudson, President, Green River Construction Co., Inc. You are hereby directed to make the herein described changes to the plans and specifications or do the following described work not included in the plans and specifications on this contract: NOTE: This change order is not effective until approved by the "Owner" and a notice to proceed is issued. Conditions: A. The following change, and work affected thereby, are subject to all contract stipulations and covenants; B. The rights of the "Owner" are not prejudiced; C.AII claims against the "Owner" which are incidental to or as a consequence of this change are waived; and D.The Contractor must submit all Field Overhead and Home Office Overhead Rates for approval in advance of all change orders. At Site 1 (on South 146 Street between International Boulevard and 42 Avenue South), the existing 12 -inch corrugated metal pipe at northwest direction from the new Catch Basin (CB) #5A (Station 13 +05.9, 17.16 LT), was not long enough to connect with this new CB. The Contractor needed to extend the existing storm pipe to connect with CB #5A. The enclosed September 15, 2009 force account cost of $614.26, accounted for the cost needed to extend this existing storm pipe. 5161 0 16 /N' We the undersigned Contractor, have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all equipment, furnish all materials, except as may otherwise be noted above, and perform all services necessary for the work above specified, and will accept as full payment therefore the prices shown above and below. ACC Date WCO Contractor Green River Construction Co.. Inc. By Title ��sate Original Contra 4ith tax) 571,186.50 Approved by City of Tukwila Previous Change Orders 13,548.04 Date 9 6 10 This Change Order (with tax) 614.26 By 1 g REV. CONTRACT AMOUNT 585,348.80 M Original Contract Time: Additional Calendar Days from Previous Change Orders: Updated Contract Time: ORIGINAL: City Clerk (1 of 2) Contractor (2 of 2) Page 2 of 2 84 Calendar Days 3 Calendar Days 87 Calendar Days cc: Finance Department (w /encumbrance) Project Management File PW Project Finance File Green River Construction, Inc. Daily Report of Force Account Worked Contract 09 -DR01 City of Tukwila 2009 Small Drainage Project September 15, 2009 Site #1 The existing 12 -inch corrugated metal pipe at northwest direction from the new Catch Basin #5A, was not long enough to connect with the new catch basin. Additional work was conducted by the Contractor to extend the existing pipe to the new catch basin. Labor Joel Johnson Eq Op 1.5 Hrs $63.87/Hr 95.81 Rick Shackelford Laborer 1.5 Hrs $45.06/Hr 67.59 Kyle Copeland Flagger 1.5 Hrs $38.20/Hr 57.30 Labor Subtotal 220.70 Markup 29% 64.01 Total Labor Material 12" CMP 12" Band w /Gasket Material Subtotal Markup 21% Total Material Equipment 580 M Backhoe Service Truck w /Tools Cut -off saw blade Equipment Subtotal Markup 21% Total Equipment 3.0 LF $19.95/LF 1.0 EA $60.00 /EA 1.5 Hrs $47.48/Hr 1.5 Hrs $20.85/Hr 59.85 60.00 119.85 25.17 71.22 31.28 50.00 152.50 S 32.03 284.71 145.02 184.53 Total 614.26 Washington State V// Department of Transportation Contract Number Prime Contractor Line Station Description of Work Performed 5;q-e_ t �t C-1 12 Cl1� D i jT �t� (l P�° f� Pr) `C�n t�U1 CJC f1� �C� lL• L c Workers and /or Equipment Working 111 121 13 141 151 161 17 18 191 201 Calculated By Ledger Entry Number Insp DO ,j• rn 422'008 EF evised 03/2008 Date Item Number Item Name Subcontractor Lower Tier Subcontractor Group Basis of Material Acceptance RAMS Number Time Worked Record Occupation of Workers or Equipment Size a o' e r V 1 Date Checked By Entered By 1 Date Contractor's Representative Signature 1 Hours Worked 1 Reg. 1 O.T. yz 1 Date Entry Verified Title Reg. I O.T. Rate Rate Total 1 Date i Daily Report of Force Account Worked Amount To: JAN -05 -2010 12:41 HD FOWLER PACIFIC H.D. FOWLER COMPANY PO Box 160 Bellevue, WA 98009 0160 GREEN RIVER CONST. CO 6402 S 144Th St Ste 1 Tukwila WA 98168 Tukwila 20' 12" CMP Pipe 1 ea. 12" CMP and 1 Ea. 12" CMP Gasket Serving the Pacific Northwest since 1911 2538638681 P.003 Bellingham 360.134.8400 Olympia 360.459.7300 Bend 541.389.7577 Pacific 253.863.8600 Bremerton 360.377.4507 Pasco 509.545.0255 Clackamas 503.656.3900 Redmond 541.923.2090 Eugene 541.607.0081 Spokane 509.568.8400 Hayden 208.772.9060 Wenatchee 509.886.8804 Hermiston 541.922.0775 Wilsonville 503.783.3490 Hillsboro 503.626.2466 Yakima 509.248.8400 Ship to: 6402 S 144Th St St a 9/15/09 1• 1. 1 %10!• '4 01 8! +y 510 4., 1. 1.'' IL 7W14�$}i!'Y O6 LP e& .v..0'1' 'YI��0,ASS.1• 1.l`s1',`: 6� I.6 Li rf1 1'M'•IP 6011• 4�1 1 i fli. Y' 1 ,y 'I1 v r j F YY•i1l•4,17aIY LY +iT i1.l'R'Ff 411144 ,I.aw n ev i .7 I J'YAI'�II1� Vie filo 6' i'1�1,11. .1" 1 1.' I ■Y.F1 #.114••10 4 .4 .1 .t: 111.1 1. 2! 1 1 1 L.t.aa1.Yl.' 1.'r....1...L44 ;1'. y t9 11 ...T. ...6 r y 1•..'4.1i5111' 1 1 u F 1 a Sub Total Freight Tax Grand Total. 399.00 38.18 21.82 459.00 459.00 TOTAL P.003 CITY OF TUKWILA CONTRACT CHANGE ORDER NO. 7 09-112(g) Council Approval N/A DATE: February 26, 2010 BUDGET NO.: 412.02.594.383.63.09 PROJECT NO.: 09 -DRO1 CONTRACT NO.: 09 -112 (a PROJECT NAME: 2009 Small Drainage Program TO: Jerry Knudson, President, Green River Construction Co., Inc. You are hereby directed to make the herein described changes to the plans and specifications or do the following described work not included in the plans and specifications on this contract: NOTE: This change order is not effective until approved by the "Owner" and a notice to proceed is issued. Conditions: A. The following change, and work affected thereby, are subject to all contract stipulations and covenants; B. The rights of the "Owner" are not prejudiced; C.AII claims against the "Owner" which are incidental to or as a consequence of this change are waived; and D. The Contractor must submit all Field Overhead and Home Office Overhead Rates for approval in advance of all change orders. CHANGE: At Sites 2 (on South 133 Street between South 134 Place and 42 Avenue South) and 2A (at the intersection of South 131 Place and 44 Avenue South), the 4 vented access lids at the roadway were not designed with locks. The Contractor replaced the 4 unlocked lids with 4 locking lids, at $175.00 each, to restrict access to the 2 culverts. The total of this change order is $700.00. Page 1 of 2 d' 4 -1 Z/ 6- /174-e_,5 We the undersigned Contractor, have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all equipment, furnish all materials, except as may otherwise be noted above, and perform all services necessary for the work above specified, and will accept as full payment therefore the prices shown above and below. AC PT: D: Date 4' //W7D Contractor Green River Construction Co., Inc. By Vii, A.,_/ Title /iiA i Ori final Cont .ct (with tax) 571,186.50 Approved by City of Tukwila Previous Change Orders 12,848.04 Date This Change Order (with tax) 700.00 REV. CONTRACT AMOUNT 584,734.54 Original Contract Time: Additional Calendar Days from Previous Change Orders: Updated Contract Time: ORIGINAL: City Clerk (1 of 2) Contractor (2 of 2) Page 2 of 2 84 Calendar Days 3 Calendar Days 87 Calendar Days cc: Finance Department (w /encumbrance) Project Management File PW Project Finance File December 21, 2009 29022 -072 City of Tukwila 6300 Southcenter Boulevard, Suite 100 Tukwila, Washington 98188 Attn: Mr. Peter Lau Dear Peter: Sincerely, Jerry Knudson President GREEN RIVER CONSTRUCTION CO., INC. 6402 South 144th, Suite #1 Tukwila, Washington 98168 Office: (206) 246 -9456 Fax: (206) 246 -2274 Re: 2009 Small Drainage Program 09 -DRO1 Contract No. 09 -112 Change Order Request We are requesting that a change order be issued to our subcontract on the above captioned project. for the following: Replaced four box culvert lids with locking lids. Price Difference $175.00/EA x 4 EA 700.00 09-112(f) Council Approval N/A CITY OF TUKWILA CONTRACT CHANGE ORDER NO. 6 DATE: February 26, 2010 BUDGET NO.: 412.02.594.383.63.09 PROJECT NO.: 09 -DRO1 CONTRACT NO.: 09 -112 PROJECT NAME: 2009 Small Drainage Program TO: Jerry Knudson, President, Green River Construction Co., Inc. You are hereby directed to make the herein described changes to the plans and specifications or do the following described work not included in the plans and specifications on this contract: NOTE: This change order is not effective until approved by the "Owner" and a notice to proceed is issued. Conditions: A. The following change, and work affected thereby, are subject to all contract stipulations and covenants; B. The rights of the "Owner" are not prejudiced; C.AII claims against the "Owner" which are incidental to or as a consequence of this change are waived; and D.The Contractor must submit all Field Overhead and Home Office Overhead Rates for approval in advance of all change orders. CHANGE: At Site 1 (on South 146 Street between International Boulevard and 42 Avenue South), the Contractor removed all existing asphalt berms on September 28, 2009, prior to the new asphalt paving on the next day. With the existing asphalt berm removals, the Contractor had an even road surface to provide quality new asphalt paving. The enclosed September 28, 2009 force account cost of $1,012.99, accounted for the cost needed to provide these asphalt berm removals. Page 1 of 2 We the undersigned Contractor, have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all equipment, furnish all materials, except as may otherwise be noted above, and perform all services necessary for the work above specified, and will accept as full payment therefore the prices shown above and below. ACC Date 6 /A 7 40 Contractor Green River Construction Co., Inc. By e441, Title /lo Ori al Contract (with tax) 571,186.50 Approved by City of Tukwila Previous Change Orders This Change Order (with tax) 1.012.99 By REV. CONTRACT AMOUNT 584,034.54 Original Contract Time: 84 Calendar Days Additional Calendar Days from Previous Change Orders: 3 Calendar Days Updated Contract Time: 87 Calendar Days ORIGINAL: City Clerk (1 of 2) Contractor (2 of 2) 11,835.05 Date `1 Page 2 of 2 y cc: Finance Department (w /encumbrance) Project Management File PW Project Finance File Labor Joel Johnson David Knudson Phil Knudson Pat Wetterlind Chris Parshall Labor Subtotal Markup 29% Total Labor Material Equipment 580M JD Loader Service Truck Small Tools Subtotal Equipment Markup 21% Total Equipment Subcontractor Total Green River Construction, Inc. Daily Report of Force Account Worked Contract 09 -DR01 City of Tukwila 2009 Small Drainage Project Eq Op Eq Op Pipelayer Laborer, Gen'I Flagger September 28, 2009 Site #1 Removing old asphalt berm at Site 1, in order to have quality asphalt paving product the next day. 2.0 Hrs $63.87/Hr 2.0 Hrs $60.49/Hr 2.0 Hrs $45.10/Hr 2.0 Hrs $45.39/Hr 2.0 Hrs $38.20 /Hr 2.0 Hrs $47.48/Hr 2.0 Hrs $55.48/Hr 2.0 Hrs $20.85 /Hr 127.74 120.98 90.20 90.78 76.40 506.10 S 146.77 94.96 110.96 41.70 S 50.00 297.62 62.50 652.87 0.00 360.12 S 0.00 $1,012.99 Washington State Department of Transportation Contract Number Jj Date item Number P Prime Contractor 6 4;e4 Line /Station Group De ription of WorrkPerforme Workers and /or Equipment 1 Workinp VA 2 ei kid-, 4 61 -/e14.-el 14 1 4.4c1 pCa 5 C41-1 /1Q r5 6 5 14,1. 7.S—) F OCL,Lo roc 10 1r 11 12 13 14 15 16 17 18 19 20 Calculated By Inspector's Signature DOT Revised 03/2008 Date Ledger Entry Number Entered By Occupation of Workers or Equipment Size r. (4 p '2 P cr" Zr Checked By Contractor's Representative Signature Daily Report of Force Account Worked !Date Item Name Subcontractor Lower Tier Subcontractor Basis of Material Acceptance digte,j Time Worked Record !Hours Worked I Reg. O.T. i ZAP Z eltv 1 Date Entry Verified Title RAMS Number Reg. O.T. Rate Rate Total 1 Date Amount 09-112(e) Council Approval N/A CITY OF TUKWILA CONTRACT CHANGE ORDER NO. 5 DATE: February 25, 2010 BUDGET NO.: 412.02.594.383.63.09 PROJECT NO.: 09 -DRO1 CONTRACT NO.: 09 -112 (e) PROJECT NAME: 2009 Small Drainage Program TO: Jerry Knudson, President, Green River Construction Co., Inc. You are hereby directed to make the herein described changes to the plans and specifications or do the following described work not included in the plans and specifications on this contract: NOTE: This change order is not effective until approved by the "Owner" and a notice to proceed is issued. Conditions: A. The following change, and work affected thereby, are subject to all contract stipulations and covenants; B. The rights of the "Owner" are not prejudiced; C.AII claims against the "Owner" which are incidental to or as a consequence of this change are waived; and D. The Contractor must submit all Field Overhead and Home Office Overhead Rates for approval in advance of all change orders. CHANGE: Due to the issuance of the enclosed Field Directive #3, several field changes were made in Site #1 (on South 146 Street between International Boulevard and 42 Avenue South): On September 16, 2009, storm pipe fitting changes were made at Catch Basins (CBs) #3B (roughly at Station 11 +60, 3 feet LT) and #4D (roughly at Station 11 +25, 16 feet RT). For both CBs, the catch basin (CB) cutting sections were changed from the configuration of Type 1 CB to Type 1L CB. The enclosed September 16, 2009 force account cost of $1,027.97, accounted for the cost needed to provide these fitting change adjustments. Also on September 16, 2009, an extra knockout was created at the new CB #3A (roughly at Station 12 +12, 3 feet LT), due to the storm pipe realignment shown in Field Directive #3. The enclosed second September 16, 2009 force account cost of $70.29, accounted for the cost needed to provide this extra knockout. On September 17, 2009, extra knockouts and cement mudding were provided for the 18 -inch ductile iron pipe connections at CBs #3B and #3C (roughly at Station 11 +55, 13 feet RT). The enclosed September 17, 2009 force account cost of $634.10, accounted for the cost needed to provide these extra works. Page 1 of 2 Pl (6 s Due to the City's directed storm drainage realignment shown in Field Directive #3, the Contractor no longer needed some of the delivered storm drainage materials. As a result, the Contractor returned these storm drainage materials back to the manufacturer, and paid a restocking fee. The restocking fee was calculated at $413.15, which should be paid for by the City. The total cost of these field changes is $2,145.51. We the undersigned Contractor, have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all equipment, furnish all materials, except as may otherwise be noted above, and perform all services necessary for the work above specified, and will accept as full payment therefore the prices shown above and below. ACC PTE Date M4 Contractor Green River Construction Co.. Inc. Title YZig:aezieif By Origirx`al Contr.Ft (with tax) Previous Change Orders This Change Order (with tax) REV. CONTRACT AMOUNT 571,186.50 Approved by City of Tukwila 9,689.54 Original Contract Time: Additional Calendar Days from Previous Change Orders: Updated Contract Time: ORIGINAL: City Clerk (1 of 2) Contractor (2 of 2) 2,145.51 By 583,021.55 Page 2 of 2 Date -e)6 -/o i 84 Calendar Days 3 Calendar Days 87 Calendar Days cc: Finance Department (w /encumbrance) Project Management File PW Project Finance File To: Green River Construction, Inc. 6402 South 144 Street, Suite No. 1 Tukwila, WA 98168 Attn: Jerry Knudson CITY OF TUKWILA PUBLIC WORKS DEPARTMENT 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: (206) 433 -0179 FIELD DIRECTIVE 3 Date: September 21, 2009 Project Name: 2009 Small Drainage Program Project No.: 09 -DRO1 Contract No.: 09 -112 Work to be performed: As Josh Fedora (our consultant project inspector) and your crew have jointly made storm drainage adjustments on site, some facility revisions were required between catch basin (CB) #1 and CB #3 at Site 1. Please see the enclosed updated Sheet 4 for the storm facility revision details. In summary, CBs #1 and #2 were deleted from the project scope; while CBs #3A, #3B and #3C are added. The storm drainage pipe quantities and dimensions were also changed. Reason for modification: The described storm drainage facility adjustments were made in order to avoid utility conflicts with Puget Sound Energy Gas facilities. Work under this Field Directive modification will be accomplished: With no change to the contract price. For a lump sum increase /decrease of to the contract price. On a unit price basis with a maximum allowable increase /decrease of With work to start immediately and determination of any change to the contract price and /or completion date to be negotiated. Negotiations to be completed by To be finalized (within 14 calendar days or a reasonable time as determined by the Engineer). With no change in contract completion date. With no contract completion date extended /decreased calendar days. Page 1 of 2 R 200 180 i........ 7777. 160 20 180 111 :2,5 /SII 1T_1342cI 10 S 8493'01' W S3' 9. '2' 'W ADS R' :0.7' P8 1 7 4 1 i -!'i 3920 11 1 ElE 435: 9'3E43 7 aft 111:W l2. lr: ,tf S 146TH ST 1 P, 1 A f� .1:;. '7 tk :9IY ,v 72 !y 128:25 EXISTING GROUND -AT CONSTRUCTION. STA -11427.08, 15:96 8T 743 TYPE 1C' CONNECT 10 EX 18 OONNEC7 TO EX 1 2 •L3) 38 FIELD LOCATE CB, TYPE IL SO D' 50CKI472' CO FIELD -LOCAT J'- 7VPE'1L .w..u,,LRM G a 3747 STA .77 +60.76.. 13.33 TIT... C8.119E.1 CONNECT.- TO.EX..B' (N) s r Iefi ke T +2S8 LE. 197.2' 501 10. 723.7' w, LE. 126.0 C. 12 12' LA 21' CUP 135:33 STA 12 +35.07..12.53.RT.. .r. CB ,TYPE..1 0CT..I0.E1. 12'4SW) 55 6F-12' DIA' 13275 .DI SD PIPE 77 7 777. F nI a 5.08x 73 01 S0 PI 12 a: 7 777 9S 12' 77 S e 3 ,a w x STA 12+41.53. 1:86''40 4v CB TYPE 1E"" F....4... ae..J ..i 7777. !H TYPE 11 I "SOW LOCKING "COVER 77. ...133.59. '''131.i4 7 LF 19' DIA PVC SD PIPE 1 1 12 777 7. 4 a.. P UBLIC WORKS ENGINEERING. STREETS •WATER• SEWER *BUILDING b dtfi de pad hi 4 /D5 dma JLF 4/00 5belled NJ 4/09 9701 du field b5 n0I PK NM N: 4958.94 (0 7561 E 4307.74 /Gm 17310 STA 12 +38.18, 18.79' LT LL 4270' rx :2' 111414 LE '037' 54, ,3' ((9.2 LE 1225' L. '3' OW,: 19 134[7 07 rgrn PK 5 N. 4 6:554 C •151 4 0150 tlg64' 1C 72 4011 C W3_0 1-1, STA 12 +82,72.12.63 15 IF 42 488 01'91 PIPE s 0.9 /0: ST0'12 +89.62.'1.88' 46' WTYPE IL IX10 LUCKING 'COVER' ly STA' 13 +05.90: 7.00" LT TYPE "IL `l 128.35. 1(X4' LOCKING COYER .57 STA 13+05 9D. 17.16 LT ........z CB TYPE:I IOON/9E07 -TO EX 12 {NW 5 IUP 15390 11778,781435 AWweN Sine 301 Stalk WA Tacoma WA 95109 (29s) 96402 266.1640 0531 622.0720 120.13 18 Li 78' 010 PVC SD PIPE S.= 12.215 BID DOCUMENTS ,10-7-1/ S 0)5 P 7.397 SD Pip, 13 :4 180 `460, 140 2009 SMALL DRAINAGE PROGRA GENERAL NOTES 1. THE LOCATION OF 0001740 UNDERGROUND UTILITY SYSTEMS, AS SHOW HEREON. ARE TAKEN FROM UTILITY LOCATE PAINT MARKS AND ARE SHOWN IN AN APPROXIMATE WAY ONLY. 'DIE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK AND AGREES TO BE FULLY RESP0898LE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES. ALL LOCATOR SERVICES 500048 BE CONTACTED PRIER TO ANY CONSTRUCTOR OR SUBSURFACE EXPLORATION. CALL I -800- 424 -5505. 2. PROVIDE MINIMUM 5 WORKING DAIS NOTICE TO PROPERTY 0044ER FOR DRIVEWAY CLOSURE. ORIVEWAY MUST BE SAFE AND ACCESSIBLE DURING ALL NON WORKING HOURS. 3. CONTRACTOR LUST PROVIDE CONTINUOUS ACCESS TO ALL DRIVEWAYS ARO WALKWAYS OUTSIDE OF WORKING AREA- 4. CAS, WATER, AND SEWER SERVICES TO 11401417.1501 HOMES OR BUISINESSES ARE TYPICALLY NOT SHOWN. THE CONTRACTOR SHALL LOCATE SERVICES AND COORDINATE 8110 U11111 OWNER 00 RELOCATE SFRMCES THAT CONFLICT NM NEW STORM DRAIN AS NECESSARY. f 1:E 141 5. HAND DIG 9518TH 2 FT OF ALL EXISTING U11U11ES. INSTALL 721HGF0AM PAD AT ALL 0111772 Rw CROSSINGS 14121 LESS THAN 6' CLEARANCE 70 NEW STORM DRAIN. 6. PIPE INVERTS AND RIM ELEVATIONS ARE SPECIFIED TO THE PROJECTED CENTER OF THE C8. CATCH BASIN STATION AND OFFSETS ARE APPRO0MATED TO THE CENTER OF STRUCTURE RIM ELEVATIONS ARE FOR REFERENCE. MATCH FINISHED GRADES AND GUTTER FLOWUNES UNLESS OTHERWISE NOTED. 7. COORDINATE MAILBOX R0405/1, REPLACEMENT AND 104206ARY MAIL DROP WIN PROPERTY OWNER A110 POST O MINIMUM 5 DAYS PRIOR TO REMOVAL 8. REMOVE EXISTING STORM DRAIN PIPE AT ALL LOCATIONS WHERE 100 PROPOSED STORM DRAIN 0UGNMENT CONFUCIS 'MTH THE EXISTING STORM DRAIN AUGMENT. FILL AND ABANDON PIPE 00191030 LEFT IN PLACE PER SPECIFICATIONS. 9. CASTINGS ON THIS SITE SHALL BE LOCKING VANED GRATES UNLESS ND1ED OTHERWISE CONSTRUCTION NOTES 0 SAWCUT, RE40VE AND REPLACE CONCRETE CURB AND GUTTER AS NECESSARY 10 INSTA3 STORM DRAIN, Q ABANDON EXISTING 18' STORM DRAIN PIPE PRESERVE AND PROTECT EXISTING UTIU7Y POLE. PROVIDE TEMPORARY UTILITY POLE SUPPORT AS NECESSARY. PRESERVE AND PROTECT EXISTING COMMUNICATOR RISER. Q PRESERVE AND PROTECT EXIS1710 SIGN. SAWCUT, REMOVE AND REPLACE EXISTING CONCRETE SIDEWALK AS NECESSARY TO INSTALL STORM DRAIN CATCH BASIN. 18 REMOVE EXISTING STORM DRAIN STRUCTURE AND STORM DRAIN PIPE 17 INSTALL THICKENED EDGE PER DETAIL SHEET 3. 18 4657581 08 APRON PER DETAIL SHEET 3. 19 CONSTRUCT DRIVEWAY TRANSITION PER DETAIL SHEET 3. 0 REPLACE ALL RE7100D OR DAMAGED CHANNEUZADON TO MATCH *4101182. Qj TO 5505 00UTY CONFLICTS. DELETE CB N0 1 AND CB NO 2. REMSE CB 40 TO A TYPE 1L DELETE THE 12' PIPE RUN BETWEEN CB 4C AND 40. ADD TYPE 1L 08'S AT LOCATION 3A AND 38 AND 3C. CONNECT SHALLOW PIPE BETWEEN CB 40, 3C, AND 3B WTH 28' 20 DUCTILE IRON PIPE ALL WORK TO BE PERFORMED AS SPECIFIED IN THE CONTRACT DOCUMENTS ,J 5 SITE 1 S 146TH ST 0 5 10 20 40 50 SCALE IN FTF7 A b9 /0l FIELD DIRECTIVE I I I I I I I no dak I"P1.9o08 4 12 j file no 1 sale WA dote 3/119 1 Performance of this Field Difective is authorized by all signatures below: Accepted by: /r. Co actor's Rep Name o Title Date 1 c—i City Construction Engineer Date Approved by: Verified by: City Construction Inspector Date 2 10 2-6\-10 Labor Joel Johnson Phil Knudson Chris Parshall Denny Mellott Kyle Copeland Kelly Newnom Labor Subtotal Markup 29% Total Labor Material Cement Sand Material Subtotal Markup 21% Total Material Equipment Hitachi 135 Service Truck Subtotal Equipment Markup 21% Total Equipment Green River Construction, Inc. Daily Report of Force Account Worked Contract 09 -DR01 City of Tukwila 2009 Small Drainage Project September 16, 2009 Site #1 Due to Field Directive #3, fitting changes were made at Catch Basins #3B and #4D. Changed the catch basin cutting sections from Type 1 catch basin to Type 1L catch basin. Eq Op Pipelayer Laborer, Gen'I Eq Op Flagger Flagger 2.5 Hrs $63.87/Hr 2.5 Hrs $45.10/Hr 2.5 Hrs $45.39/Hr 2.0 Hrs $54.83/Hr 2.0 Hrs $38.20/Hr 2.0 Hrs $38.20/Hr 2.0 EA $12.32 2.0 EA $3.50 /EA 1.0 $84.99/Hr 2.0 Hrs $20.85/Hr 159.68 112.75 113.48 109.66 76.40 S 76.40 648.37 188.03 24.64 S 7.00 31.64 6.64 84.99 S 41.70 126.69 26.60 836.40 38.28 153.29 Subcontractor 0.00 Total 1,027.97 Washington State �I/ Department of Transportation Contract Number Prime Contractor Line Station Description of Work Workers and/or Equipment Working 1 j f, glaytY Sen z/1 2 6' P A-L2 3 3 Zb 11 13 14 15 16 17 18 19 Performed 3 Insp is <tup f I,J Form 422 -008 EF Revised 0312008 Date Group 20 Calculated By 1 Date Ledger Entry Number Entered By Daily Report of Force Account Worked Item Number Item Name Subcontractor Lower Tier Subcontractor Basis of Material Acceptance 4,1 l:) C N ew 3 L 'Oko>M Zti i- EL r.. Time Worked Record Occupation of Workers or Equipment Size r %fe �5e ofegctfot F /�ratueS' Checked By I Date Contractor's Representative Signature !Hours Worked) Reg. 1 O.T. 1 y ZA 7Y-t 1 Date Entry Verified Title Reg. Rate RAMS Number O.T. Rate Total 1 Date Amount BILL TO FIC CONSTRUCTI P.O. Box 1616 Bothell, WA 98041 -1616 (425) 489 -2683 FAX (425)489 -2823 GREEN RIVER CONSTRUCTION 6402 S. 144TH. SUITE 1 TUKWILA, WA 98168 yments /Credits Received SEP 1 6 2009 SHIP TO JOB NAME Yard P.O. NO. TERMS DUE D... SALES... SHIP DA... SHIP VIA PURCHASER RESALE PICK TICKET Net 30 10/9/2009 TB 9/9/2009 RYAN JERRY EXP 12/12, 47589 DESCRIPTION I QTY I RATE AMOUNT CEMENT TYPE I II 94 LB. 60 .32 V 739.20 CALCIUM CHLORIDE, HT 94 -97% #501b BAG 8 23.50 188.00 g j°\ tj f SAP 17 2009 Invoice DATE INVOICE 9/9/2009 56090 JOB TAX ZONE Subtotal $927.20 THANK YOU FOR YOUR SUPPORT! Now 11 Years in business! TUKWILA -1729 Sales Tax (9.5 $0.00 WE NOW ACCCEPT VISA, MASTERCARD AMERICA/ T EXPRESS FOR PAYMENT OPTION!! Total $927.20 $0.00 Balance Due $927.20 BILL TO 4) PACIFIC CONSTRUCTION SUPPLY, INC P.O. Box 1616 Bothell, WA -1616 (425) 489 -2613 FA 2 "28 00,. J al GREEN RIVER CONSTRUCTION 6402 S. 144TH. SUITE 1 TUKWILA, WA 98168 SHIP TO P.O. NO. TERMS DUE DATE SALESMAN SHIP DATE SHIP VIA PURCHASER RESALE PICK TICKET Net 30 1/2/2008 TB 12/3/2007 W/C JERRY EXP 3/09, 6005829... dine DESCRIPTION QTY RATE AMOUNT SAND BAG W /40 LB SAND (100) 300 Q 1,050.00T SAND BAG POLYPROP. ORANGE 14" x 26" 1,400 0.50 700.00T JOB NAME YARD DATE INVOICE 12/3/2007 46258 JOB Invoice THANK YOU FOR YOUR SUPPORT Subtotal $1,750.00 NOW 10 YEARS IN BUSINESS! Sales Tax (8.9 $155.75 WE NOW ACCCEPT VISA, MASTERCARD Total $1,905.75 AMERICAN EXPRESS FOR PAYMENT OPTION!! Payments /Credits Received so.00 Balance Due $1,905.75 Green River Construction, Inc. Daily Report of Force Account Worked Contract 09 -DR01 City of Tukwila 2009 Small Drainage Project September 16, 2009 Site #1 Creating an extra knockout at the new Catch Basin #3A, due to the storm drainage pipe realignment shown in Field Directive #3. La bor Joel Johnson Eq Op .5 Hrs $63.87/Hr 31.94 Phil Knudson Pipelayer .5 Hrs $45.10/Hr S 22.55 Labor Subtotal 54.49 Markup 29% S 15.80 Total Labor 70.29 Material 0.00 Equipment 0.00 Subcontractor 0.00 Total 70.29 Contract Number Prime Contractor Line Station Description of Work Performed 5; J e I 1 In I <l/t t101 St 2 JUe Coen 3 C..— (A' CYT •P 4 OA e+ kirf 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Calculated By Washington State Department of Transportation C ,0 1171 Cr E. 3A 7 k rf x.), ft a rs Workers and/or Equipment Working Ledger Entry Number Daily Report of Force Account Worked Date Item Number Item Name Subcontractor Lower Tier Subcontractor Group Basis of Material Acceptance RAMS Number Time Worked Record Occupation of Workers or 1 Hours Worked Equipment Size 1 Rep. 1 O.T. Sus) e Reg. O.T. Rate Rate Date Checked By 1 Date Total Entered By 1 Date Entry Verified 1 Date Ins for gn re Contractor's Representative Signature Title DO. r Form 422 -008 EF Revised 03/2008 Amount Equipment 580M Cut off saw blade Subtotal Equipment Markup 21% Total Equipment Subcontractor Total Green River Construction, Inc. Daily Report of Force Account Worked Contract 09 -DR01 City of Tukwila 2009 Small Drainage Project September 17, 2009 Site #1 Creating knockouts and providing extra cement mudding for the 18 -inch ductile iron pipe connections at Catch Basins #3B #3C in Site 1. Labor Joel Johnson Eq Op 2.0 Hrs $63.87/Hr 127.74 Phil Knudson Pipelayer 2.0 Hrs $45.10/Hr 90.20 Chris Parshall Laborer, Gen'I 2.0 Hrs $45.39/Hr S 90.78 Labor Subtotal 308.72 Markup 29% S 89.53 Total Labor Material Cement 3.0 EA $12.32/EA 36.96 Brick 15.0 EA $0.40 /EA 6.00 Sand 2.0 EA $3.50 /EA S 7.00 Material Subtotal 49.96 Markup 21% S 10.49 Total Material 2.0 Hrs $47.48/Hr 94.96 S 50.00 144.96 S 30.44 398.25 60.45 175.40 S 0.00 634.10 Washington State Department of Transportation Contract Number Prime Contractor Line Station Description of Work Performed c.� e1; 4 t 00Y l 4 -3-= e 13 3 C-- 3 2 c•chi4- Time Worked Record 1 2 3 4 5 6 1;3'g �'�rJe's 7 x Str_/c, etvc 041 8 25 t3- /c 9 10 11 12 13 14 15 16 17 18 19 Workers and/or Equipment Working jc di,, t• e .1001 �4 20 Calculated By I Date Ledger Entry Number Entered By n Form 422 -008 EF Revised 03/2008 Date Item Number Item Name Subcontractor Lower Tier Subcontractor Group Basis of Material Acceptance 1 Hours Worked Reg. Equipment Size Reg. 1 O.T. Rate Occupation of Workers or •We._ r- Checked By Contractor's Representative Signature Daily Report of Force Account Worked 1 Date 1 Date Entry Verified Title RAMS Number O.T. Rate Total 1 Date Amount CONSTRUCTIO G P.O. Box 1616 Bothell, WA 98041 -1616 t SEP 1 6 2009 (425) 489 -2683 FAX (425)489 -2823 BILL TO' GREEN RIVER CONSTRUCTION 6402 S. 144TH. SUITE 1 TUKWILA, WA 98168 SHIP TO JOB NAME Yard Invoice DATE INVOICE 9/9/2009 56090 JOB P.O. NO. TERMS DUE D... SALES... SHIP DA... SHIP VIA PUB.. URCHASER RESALE PICK TICKET Net 30 10/9/2009 TB 9/9/2009 RYAN JERRY EXP 12/12, 47589 CEMENT TYPE III 94 LB. CALCIUM CHLORIDE, HT 94 -97% 4501b BAG DESCRIPTION QTY RATE AMOUNT 60 2.3 739.20 8 23.50 188.00 P OS TED i SEP 172009 TAX ZONE I Subtotal $927.20 THANK YOU FOR YOUR SUPPORT! Now 11 Years in business! TUKWILA -1729 Sales Tax (9.5 $0.00 WE NOW ACCCEPT VISA, MASTERCARD AMERICAV EXPRESS FOR PAYMENT OPTION!! Total $927.20 rf; r rments /Credits Received $0.00 Balance Due $927.20 YY3 Job Number: 0 Ship to: Sold to: fly 1M1 9/21/2009 D42296 Qty Item 6402 S. 144TH STREET, STE. #1 TUKWILA, WA 98168 GREEN RIVER CONSTRUCTION 6402 S. 144TH STREET, STE. #1 TUKWILA, WA 98168 Description WON GRANITE PRECASTING CONCRETE 4116 BAKERVIEW SPUR BELLINGHAM, WA 98226 Phone: (360) 671 -2251 Fax: (360) 671 -0780 Structure: 720 MB -BRICK 2" X 4" X 8" CONCRETE BRICKS 1 MDRY PALLET PALLET 10 CBR -02 2" CB RISER Total Weight 4,600 POSTED SEP:30 fir' 6 213 SEP 2 9 2009 INVOICE 34816 Invoice Date: 9/21/2009 IWEISSU 1 EFEREN:9E r Weight Unit Price TX Extension 1 3,600 0.40 $288.00 0 $16.00 $16.00 1,000 $31.00/ $310.00 Structure Total $614.00 Taxable $0.00 Non Taxable $614.00 Sub Total $614.00 Tax $0.00 Invoice Total $614.00 Less Deposit $0.00 Invoice Balance $614.00 BILL TO PACIFIC CONSTRUCTION .SUPPLY, INC P.O. Box 1616 Bothell, WA ..-B-Q�4.1. -.1616 (425) 489 -26 3� F 2 2-3 Ut.L; alit GREEN RIVER CONSTRUCTION 6402 S. 144TH. SUITE 1 TUKWILA, WA 98168 P.O. NO. TERMS DUE DATE SALESMAN SHIP DATE SHIP VIA Net 30 1/2/2008 TB 12/3/2007 DESCRIPTION SAND BAG W /40 LB SAND (100) SAND BAG POLYPROP. ORANGE 14" x 26" THANK YOU FOR YOUR SUPPORT NOW 10 YEARS INT BUSINESS! WE NOW ACCCEPT VISA, MASTERCARD AMERICAN EXPRESS FOR PAYMENT OPTION!! Payments /Credits Received $o.00 SHIP TO W/C JERRY EXP 3/09, 6005829... PURCHASER RESALE PICK TICKET QTY 300 1,400 Subtotal Sales Tax (8.9 Total JOB NAME YARD Invoice DATE INVOICE 12/3/2007 46258 JOB RATE AMOUNT 50 0.50 POSTED DEC 1. 2007 1,050.00T 700.00T $1,750.00 $155.75 $1,905.75 Balance Due $1,905.75 January 6, 2010 29022 -075 City of Tukwila 6300 Southcenter Boulevard, Suite 100 Tukwila, Washington 98188 Attn: Mr. Peter Lau Dear Peter: Sincerely, Jerry Knudson President GREEN RIVER CONSTRUCTION CO., INC. Re: 2009 Small Drainage Program Project No. 98 -DRO1 6402 South 144th, Suite #1 Tukwila, Washington 98168 Office: (206) 246 -9456 Fax: (206) 246 -2274 We are requesting a change order to our subcontract on the above captioned project for the following costs on the above captioned project. Structures ordered and delivered as indicated on the plans. Due to pipe conflict these structures were not installed were returned. A restocking fee was charged. Original cost 1,365.75 Credit S 1.024.31) Restocking Fee 341.44 Markup 21% S 71.71 Total Change Order Request 413.15 Job Number: 3573 Ship to: 2009 SMALL DRAINAGE PROGRAM TUKWILA VARIOUS PLACES IN TUKWILA TUKWILA, WA Sold to: GREEN RIVER CONSTRUCTION 8402 8. 144TH STREET, STE. #1 TUKWILA, WA 98188 GRANITE PRECASTING CONCRETE 4116 SAKERVIEW SPUR BELLINGHAM, WA 98226 Phone: (360) 671 -2251 Pax: (360) 671 -0780 CREDIT MEMO 34817 �tt„ 2k;: ,._.SFOPsCi'/C"I'V.:= ;x.o4+t,.: ::.SH11tiV1 y,•a:• t::z 'h- ,.3��.,. rr��'z�= A N q .fy_ w iF:Q:B'r� ..ae �s� ";�r ��r• 5� ja ':��•?:,'.rtiN�• .r. 9/21/2009 1 I 1 NET 10TH I 1 ;4? "CUSTOM g :po f.; .7-A O •71. :..47: r..,?':r�r6,15A[ E z EX M PT IF, y�u. AM�Fi,S ?RGP�'y 'A"dlu,�. )•9.r:::,EX$IIIIP;�i�� NS 4''4 ^r,. ?:Y.N: SCM5450 SITE 1 I 1 YS 1 600. 582449 1 Item Description Weight Unit Price TX Extension Structure: -1 048X01R 48" X 1' RISER -950 5111.75 (5111.75) -5 048RG 48" GASKET 0 90.00 80.00 -2 LO4P 4STEP POLY MH LADDER 0 80.00 80.00 -2 048X05BNKC 48" X 5' BASE HIGH KO. -10500 $381.00 (8782.00) -1 048X04R 48" X 4' RISER 3800 9235.50 (8235.50) -1 048X04RWC 48" X 4' RISER W/ CORE -3600 $0.00 50.00 -2 048TSR 48" FLATTOP/ ROUND HOLE -3160 $128.25 (8256.50) 1 RESTOCK RESTOCKING 25% 0 341.44 341.44 Structure Total (31,024.31) Taxable 50.00 Non•Taxable (81,024.31) Sub Total (31,024.151) Tax 50.00 Invoice Total (51,024,3) Less Deposit 80.00 Invoice Balance (51,024.31) Sold to: 3573 2009 SMALL DRAINAGE PROGRAM- TUKWILA VARIOUS PLACES IN TUKWILA TUKWILA, WA 8/25/2009 AVOW S42136 SITE #1 I Qty Item Structure: 1 048X05BHKO 1 048X01R 1 048TSR 1 CR -06X24 1 LO4P 4 CB -1 1 CBR -06 1 CBR-04 1 CBR -12 5 CBR -06 3 CBR -04 1 CBR -02 2 048RG GREEN RIVER CONSTRUCTION 6402 S. 144TH STREET, STE. #1 TUKWILA, WA 98168 Description tkANITE PRECASTING CONCRETE 4116 BAKERVIEW SPUR BELLINGHAM, WA 98226 Phone: (360) 671 -2251 Fax: (360) 671 -0780 48" X 5' BASE HIGH K.O. (CB 7) 48" X 1' RISER (CB 7) 48" FLATTOP/ ROUND HOLE (CB 7) 6" X 24" GRADE RING (CB 7) 4 STEP POLY MH LADDER (CB 7) TYPE I CATCH BASIN (CB 8B, 5A, 4A, 4B) 6" CB RISER 4" CB RISER 12" CB RISER 6" CB RISER 4" CB RISER 2" CB RISER 48" GASKET YS Total Weight POSTED SEP 0 4 2000 REC N cc') n 3 2009 cra 600 582 -949 18,210 INVOICE 34396 Invoice Date: 8/25/2009 Weight Unit Price TX Extension 1 5,300 $381.00 $381.00 950 $111.75 $111.75 1,580 $128.25" El $128.25 240 $29.00" $29.00 0 $0.00 $0.00 7,200 $96.75` j❑ $387.00 260 $42.00" $42.00 180 $41.00 $41.00 560 $49.00✓ $49.00 1,300 $42.00 $210.00 540 $41.0% $123.00 100 $31.00 $31.00 0 $0.00 $0.00 Structure Total Taxable Non Taxable Sub Total Tax Invoice Total Less Deposit Invoice Balance $1,533.00 $0.00 $1,533.00 $1,533.00 $0.00 $1,533.00 $0.00 $1,533.00 1 CHANGE: 09-112(d) Council Approval N/A CITY OF TUKWILA CONTRACT CHANGE ORDER NO. 4 DATE: February 25, 2010 BUDGET NO.: 412.02.594.383.63.09 PROJECT NO.: 09 -DRO1 CONTRACT NO.: 09 -112 PROJECT NAME: 2009 Small Drainage Program TO: Jerry Knudson, President, Green River Construction Co., Inc. You are hereby directed to make the herein described changes to the plans and specifications or do the following described work not included in the plans and specifications on this contract: NOTE: This change order is not effective until approved by the "Owner" and a notice to proceed is issued. Conditions: A. The following change, and work affected thereby, are subject to all contract stipulations and covenants; B. The rights of the "Owner" are not prejudiced; C.AII claims against the "Owner" which are incidental to or as a consequence of this change are waived; and D. The Contractor must submit all Field Overhead and Home Office Overhead Rates for approval in advance of all change orders. At Site 1 (on South 146 Street between International Boulevard and 42 Avenue South), the new 18 -inch storm drainage pipe connecting from Catch Basin (CB) #5 (Station 13 +5.9, 4 feet LT) to CB #4 (Station 12 +87.62, 1.86 feet LT), needed to be lowered to avoid conflict with an uncovered existing communication conduit. The enclosed September 3, 2009 force account cost of $2,664.54, accounted for the cost needed to provide this storm drainage pipe adjustment. Page 1 of 2 r 5 f Gil6,A./ S We the undersigned Contractor, have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all equipment, furnish all materials, except as may otherwise be noted above, and perform all services necessary for the work above specified, and will accept as full payment therefore the prices shown above and below. D: Date WeaD AC By Title f/,,.- /g.a Ori inaI :Ton (with tax) 571,186.50 Approved by City of Tukwila Previous Change Orders 7,025.00 Date q --e-)-6 /0 This Change Order (with tax) 2.664.54 By Ma REV. CONTRACT AMOUNT 580,876.04 Original Contract Time: Additional Calendar Days from Previous Change Orders: Updated Contract Time: ORIGINAL: City Clerk (1 of 2) Contractor (2 of 2) Contractor Green River Construction Co.. Inc. Page 2 of 2 84 Calendar Days 3 Calendar Days 87 Calendar Days cc: Finance Department (w /encumbrance) Project Management File PW Project Finance File Labor Denny Mellott Bob Parshall Phil Knudson Chris Parshall Kyle Copeland Kelly Newnom Labor Subtotal Markup 29% Total Labor Material 1' CB Riser Markup 21% Total Material Equipment UHO 135 580M JD Loader Service Truck Small Tools Concrete Saw Subtotal Equipment Markup 21% Total Equipment Green River Construction, Inc. Daily Report of Force Account Worked Contract 09 -DR01 City of Tukwila 2009 Small Drainage Project September 3, 2009 Site #1 Lowering /Dropping the 18" storm pipe connection into Catch Basin #4 from Catch Basin #5, due to conflict with an uncovered communication conduit crossing. Eq Op Owner /Eq Op Pipelayer Laborer, Gen'I Flagger Flagger 4.0 Hrs $54.83/Hr 4.0 Hrs $63.87/Hr 4.0 Hrs $45.10/Hr 4.0 Hrs $45.39/Hr 4.0 Hrs $38.20/Hr 4.0 Hrs $38.20/Hr 1.0 EA $49.00 /EA 4.0 Hrs $84.99/Hr 4.0 Hrs $47.48/Hr 4.0 Hrs $55.48/Hr 4.0 Hrs $20.85/Hr 219.32 255.48 180.40 181.56 152.80 152.80 1,142.36 331.29 49.00 10.29 339.96 189.92 221.92 83.40 50.00 50.00 935.20 196.40 1,473.65 59.29 1,131.60 Subcontractor 0.00 Total 2,664.54 A Washington State �IAI Department of Transportation Contract Number Prime Contractor Line Station Description of Work Performed PIT Group Workers and /or Equipment Working jp 1 1 Verk(A -1 Il/LLI(p V 3 P;t t ve,P 4 ve- t I TO 5 C� PG r 6 N. 1 /e_ 7 f(Lf eti, 8 vt‘i-v 9 ,"IS b1""-,, Tb tYatitK Vt -,x,11 loi> 10 11 12 13 14 15 16 17 18 19 20 Calculated By Ledger Entry Number Entered By Inspecjgrs dnaJu Q a q hs D �te v sed 03/2008 Date 1 Date (r) Checked By Contractor's Representative Signature Daily Report of Force Account Worked Item Number Item Name Subcontractor Lower Tier Subcontractor Basis of Material Acceptance t L 1/ C13 S/ ten, Time Worked Record Occupation of Workers or Equipment Size 1 Date 1 Hours Worked Reg. O.T. 7t 1 Date Entry Verified Title Reg. Rate RAMS Number O.T. Rate Total 1 Date Amount Job Number: Ship to: Sold to: Qty Item Structure: 1 048X05BHKO 1 048X01R 1 048TSR 1 CR -06X24 1 LO4P 4 CB -1 1 CBR -06 1 CBR -04 1 CBR -12 5 CBR -06 3 CBR -04 1 CBR -02 2 048RG 3573 2009 SMALL DRAINAGE PROGRAM- TUKWILA VARIOUS PLACES IN TUKWILA TUKWILA, WA GREEN RIVER CONSTRUCTION 6402 S. 144TH STREET, STE. #1 TUKWILA, WA 98168 1.461k.afgati 111 8/25/2009 S42136 SITE #1 Description IIP GRANITE PRECASTING CONCRETE 4116 BAKERVIEW SPUR BELLINGHAM, WA 98226 Phone: (360) 671 -2251 Fax: (360) 671 -0780 AlNikliTtgq YS 48" X 5' BASE HIGH K.O. (CB 7) 48" X 1' RISER (CB 7) 48" FLATTOP/ ROUND HOLE (CB 7) 6" X 24" GRADE RING (CB 7) 4 STEP POLY MH LADDER (CB 7) TYPE I CATCH BASIN (CB 8B, 5A, 4A, 4B) 6" CB RISER 4" CB RISER 12" CB RISER 6' CB RISER 4" CB RISER 2" CB RISER 48" GASKET Total Weight S P 0 4 2009 R G b cco fl3200+ yr.`. REFER01.PP' 600 582 -949 NET 10TH 18,210 INVOICE 34396 Invoice Date: 8/25/2009 Weight Unit Price TX Extension 5,300 $381.00 $381.00 950 $111.75 $111.75 1,580 $128.25" $128.25 240 $29.00 $29.00 0 $0.00 0 $0.00 7,200 $96.75✓/ $387.00 260 $42.00 I $42.00 180 00■ LJ $41.00 560 $49.0 0 $49.00 1,300 $42.00/ $210.00 540 $41.00 1 $123.00 100 $31.0070 $31.00 0 $0.00 $0.00 Structure Total $1,533.00 Taxable Non Taxable Sub Total Tax Invoice Total Less Deposit $0.00 Invoice Balance $1,533.00 $0.00 $1,533.00 $1,533.00 $0.00 $1,533.00 TO: Jerry Knudson, President, Green River Construction Co., Inc. CHANGE: Page 1 of 2 09-112(c) Council Approval N/A CITY OF TUKWILA CONTRACT CHANGE ORDER NO. 3 DATE: February 22, 2010 BUDGET NO.: 412.02.594.383.63.09 PROJECT NO.: 09 -DR01 CONTRACT NO.: 09 -112 (G PROJECT NAME: 2009 Small Drainage Program You are hereby directed to make the herein described changes to the plans and specifications or do the following described work not included in the plans and specifications on this contract: NOTE: This change order is not effective until approved by the "Owner" and a notice to proceed is issued. Conditions: A. The following change, and work affected thereby, are subject to all contract stipulations and covenants; B. The rights of the "Owner" are not prejudiced; C.AII claims against the "Owner" which are incidental to or as a consequence of this change are waived; and D.The Contractor must submit all Field Overhead and Home Office Overhead Rates for approval in advance of all change orders. At Site 1 (on South 146 Street between International Boulevard and 42 Avenue South), the existing 12 -inch storm drainage pipe at northwest direction from Catch Basin (CB) #7 (Station 14 +14.76, 17.1 feet LT), was too high to connect with CB #7. The Contractor needed to install a new Type 1 CB between CB #7 and this existing 12 -inch storm pipe, in order to carry out the storm drainage connection. The enclosed September 2, 2009 force account cost of $2,750.00, accounted for the cost needed to provide this storm drainage addition. We the undersigned Contractor, have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all equipment, furnish all materials, except as may otherwise be noted above, and perform all services necessary for the work above specified, and will accept as full payment therefore the prices shown above and below. ACC D: Date 9A ‘A2 By Origi al Contra" (with tax) Previous Change Orders This Change Order (with tax) REV. CONTRACT AMOUNT Original Contract Time: Additional Calendar Days from Previous Change Orders: Updated Contract Time: ORIGINAL: City Clerk (1 of 2) Contractor (2 of 2) Contractor Green River Construction Co., Inc. Title 571,186.50 4,275.00 Date `J 2.750.00 578,211.50 Page 2 of 2 Approved by City of Tukwila B \clay" By i 84 Calendar Days 3 Calendar Days 87 Calendar Days cc: Finance Department (w /encumbrance) Project Management File PW Project Finance File The existing 12 -inch storm drainage pipe at northwest direction from Catch Basin #7 was too high for storm pipe connection. The Contractor needed to add Type 1 catch basin in order to make the storm pipe connection. Labor Denny Mellott Joel Johnson Phil Knudson Chris Parshall Pat Wetterlind Kyle Copeland Kelly Newnom Labor Subtotal Markup 29% Total Labor Material Type 1 CB 1' CB Riser 6" CB Riser 20 "x24" Solid Casting Cement Sand Calcium 12" Storm Pipe (CMP) Material Subtotal Markup 21% Total Material Equipment UHO 135 580M JD Loader Service Truck Small Tools Subtotal Equipment Markup 21% Total Equipment Green River Construction, Inc. Daily Report of Force Account Worked Contract 09 -DR01 City of Tukwila 2009 Small Drainage Project Eq Op Eq Op Pipelayer Laborer, Gen'I Laborer, Gen'I Flagger Flagger September 2, 2009 Site #1 3.0 Hrs $54.83/Hr 3.0 Hrs $63.87/Hr 3.0 Hrs $45.10/Hr 3.0 Hrs $45.39/Hr 3.0 Hrs $45.39/Hr 3.0 Hrs $38.20/Hr 3.0 Hrs $38.20/Hr 1.0 EA $96.75/EA 1.0 EA $49.00 /EA 1.0 EA $42.00 /EA 1.0 EA $210.00 /EA 2.0 EA $12.32/EA 4.0 EA $3.50 /EA .5 EA $23.50/EA 5.0 LF $17.92/LF 3.0 Hrs $84.99/Hr 3.0 Hrs $47.48/Hr 3.0 Hrs $55.48/Hr 3.0 Hrs $20.85/Hr 164.49 191.61 135.30 136.17 136.17 114.60 114.60 992.94 287.95 96.75 49.00 42.00 210.00 24.64 14.00 11.75 89.60 537.74 112.93 254.97 142.44 166.44 62.55 50.00 676.40 142.04 1,280.89 650.67 818.44 Subcontractor 0.00 Total 2,750.00 W Washington State Department of Transportation Contract Number Date Prime Contractor Line Station Group Basis of Material Acceptance Description of Work Performed re-1- rre- 1 _nn ra /L 5406 tv n'f" Ca. ¶b q �'.�?J/ ie) Time Worked Record Occupation of Workers or Equipment Size d F�-J a0 r Workers and /or Equipment Working 19 .S 1 l z4-1/ 20 t7 Calculated By In spec rs i�r atgr ji OT orm 422 -008 EF evised 03/2008 1 1 P CrA0- 7 1 -Mt77` 2 I tfotn 3 fkiiC 4 e 5 P� r l 1 5 Mt- 6 I i 7 r A161/N 8 Efv 13< 9�� tVic 19 D 11 12 (1)Types 1 1 13 l'/ I\ Q.-8 \„is 1 14 C r/ L (g ♦�,�J 1 15 a 1 c� 9 C. i r r^ 16 SL° wl t� 17 1 G�..t( 5 �cn. 18 G bv� E c :URA 5-�b ra p (c- 1 P 1 Date Ledger Entry Number Entered By Daily Report of Force Account Worked Item Number Item Name Checked By Subcontractor Lower Tier Subcontractor 1 Date 1 Hours Worked) 1 Reg. O.T. 1 13 13 Ig 1 1 1 I Date Entry Verified Contractor's Representative Signature Title TyP L `}U co Reg. Rate RAMS Number O.T. Rate Total 1 Date Amount Job Number: Ship to: Sold to: SHIP DAT)r'•;; 8/25/2009 S42136 SITE #1 Qty Item 3573 2009 SMALL DRAINAGE PROGRAM TUKWILA VARIOUS PLACES IN TUKWILA TUKWILA, WA GREEN RIVER CONSTRUCTION 6402 S. 144TH STREET, STE. #1 TUKWILA, WA 98168 Structure: 1 048X05BHKO 1 048X01R 1 048TSR 1 CR -06X24 1 LO4P 4 CB -1 1 CBR -06 1 CBR -04 1 CBR -12 5 CBR -06 3 CBR -04 1 CBR -02 2 048RG Description GRANITE PRECASTING CONCRETE 4116 BAKERVIEW SPUR BELLINGHAM, WA 98226 Phone: (360) 671 -2251 Fax: (360) 671 -0780 48" X 5' BASE HIGH K.O. (CB 7) 48" X 1' RISER (CB 7) 48" FLATTOP/ ROUND HOLE (CB 7) 6" X 24" GRADE RING (CB 7) 4 STEP POLY MH LADDER (CB 7) TYPE I CATCH BASIN (CB 8B, 5A, 4A, 4B) 6" CB RISER 4" CB RISER 12" CB RISER 6" CB RISER 4" CB RISER 2" CB RISER 48" GASKET Total Weight POSTED SEP 0 4 2009 RE CE boo` r. t n 3 7009 TERMS NET 10TH EXEMPT* 600 582 -949 INVOICE 34396 Invoice Date: 8/25/2009 PAGE 1 ,REFERENCE'• Weight Unit Price TX Extension 5,300 $381.00` 1-1 $381.00 950 $111.75 $111.75 1,580 $128.25 $128.25 240 $29.00 $29.00 0 $0. 0 $0.00 7,200 $96.7 $387.00 260 .0J $42.00 180 $41.00✓ $41.00 560 049_00 El $49.00 1,300 x$42.0 $210.00 540 $41.00V p $123.00 100 $31.00✓0 $31.00 0 $0.00 $0.00 Structure Total $1,533.00 18,210 Taxable Non Taxable Sub Total Tax Invoice Total Less Deposit Invoice Balance $0.00 $1,533.00 $1,533.00 $0.00 $1,533.00 $0.00 $1,533.00 Olympic Foundry QUALITY CASTINGS SINCE 1900 Sold To Shi To JAC 12- 4520SET 12- 4525SET Contact: Rhonda Green River Construction 6402 S 144th Street Ste 1 Tukwila, WA 98168 USA Customer P.O. Shi I Via F.O.B Terms Terms and Conditions of Sale Olympic Foundry, Inc. 5200 Airport Way South Seattle, WA 98108 (206) 764 -6200 Will Call Invoice 06 SM60 CB FRAME/SOLID DI DT 06 SM60 CB FRAME/VANED DI DT Quantity variations must be reported within5 days of receipt of materiaL All other claims and returns must be accompanied by an invoice within 30 days. All returns are subject to a re- stocking fee. 0.c,0 RECEIVED SEP 1 7 2009 PO SEP 18 2009 OFCO -SEA Item Warehouse Descri )tion Qt Shi )cd Price Amount 1726 2009 DRAINAGE PROJECT TUKWILA WILL CALL 06 Seattle, WA 98108 -1725 USA 3 3 Invoice No.: Invoice Date: Customer No.: Branch: Salesperson:: Our Order No: SH Code: Subtotal Shipping Handling Sales Tax Trade Discount Payment/Credit Amount Balance Page: 1 210.000 205.000 0000198692 9/15/2009 GrRiCoJAC 06 Lee H. SO- m28317 W/C 1 %10 Net 30 630.00 615.00 1,245.00 0.00 0.00 0.00 0.00 1,245.00 You may deduct $12.45 if paid by 9/25/2009 BILL TO FIC CONSTRUCTI P.O. Box 1616 Bothell, WA 98041 -1616 (425) 489 -2683 FAX (425)489 -2823 GREEN RIVER CONSTRUCTION 6402 S. 144TH. SUITE 1 TUKWILA, WA 98168 P.O. NO. TERMS DUE D... SALES... SHIP DA... SHIP VIA PURCHASER RESALE PICK TICKET CEMENT TYPE III 94 LB. CALCIUM CHLORIDE, HT 94 -97% #501b BAG Net 30 10/9/2009 TB 9/9/2009 RYAN JERRY EXP 12/12, 47589 THANK YOU FOR YOUR SUPPORT! Now 11 Years in business! WE NOW ACCCEPT VISA, MASTERCARD AMERICA? EXPRESS FOR PAYMENT OPTION!! DESCRIPTION QTY RATE AMOUNT tjNC SEP 1 6 2009 TAX ZONE TUKWILA -1729 SHIP TO DATE INVOICE 9/9/2009 56090 JOB NAME JOB Yard 60 739.20 8 23.5 188.00 POSTED SEP 17 2009 i Invoice Subtotal $927.20 Sales Tax (9.5 $o.00 Total $927.20 yments /Credits Received 50.00 Balance Due $927.20 BILL TO PACIFIC CONSTRUCTION SUPPLY, INC P.O. Box 1616 Bothell, WA 98 -1616 (425) 489-263 F�(, #25 �28 Liu, 6 0 'au/ GREEN RIVER CONSTRUCTION 6402 S. 144TH. SUITE 1 TUKWILA, WA 98168 P.O. NO. TERMS DUE DATE SALESMAN SHIP DATE SHIP VIA PURCHASER RESALE PICK TICKET Net 30 1/2/2008 TB 12/3/2007 W/C JERRY EXP 3/09, 6005829... eine DESCRIPTION QTY RATE AMOUNT SAND BAG W /40 LB SAND (100) 300 x.50- 1,050.00T SAND BAG POLYPROP. ORANGE 14" x 26" 1,400 0.50 700.00T THANK YOU FOR YOUR SUPPORT NOW 10 YEARS IN BUSINESS! WE NOW ACCCEPT VISA, MASTERCARD AMERICAN EXPRESS FOR PAYMENT OPTION!! SHIP TO JOB NAME YARD POSTED DEC L 2007 aver^ .''.enr nwn. Invoice DATE INVOICE 12/3/2007 46258 JOB Subtotal $1,750.00 Sales Tax (8.9 $155.75 Total $1,905.75 Payments /Credits Received so.00 Balance Due $1,905.75 DEC-10-2009 16:18 Bid No 3141009 Estimator: Jan Brooks Job Name CMP PRICING Location TUKWILA WA FOB Point: HD FOWLER PACIFIC 2538638681 P.001/001 H.1) Fowler Company PAGE 1 Unit Extended Line Qty UGH Descrintlon _Price Price 1 20 FT 12“ 16 GA ALUMINUM CNIP CULVERT 17.92 358.40 SPIRAL END, 20' LENGTHS •I Bid Date: 12/10/09 TOTAL P.001 CITY OF TUKWILA CONTRACT CHANGE ORDER NO. 2 DATE November 9, 2009 BUDGET NO. 412 02.594 383 63 09 PROJECT NO.: 09 -DRO1 CONTRACT NO 09 -112 PROJECT NAME: 2009 Small Drainage Program TO: Jerry Knudson, President, Green River Construction Co., Inc. 09-112(b) Council Approval N/A You are hereby directed to make the herein described changes to the plans and specifications or do the following described work not included in the plans and specifications on this contract: NOTE This change order is not effective until approved by the "Owner" and a notice to proceed is issued. Conditions: A. The following change, and work affected thereby, are subject to all contract stipulations and covenants; B. The rights of the "Owner" are not prejudiced; C.AII claims against the "Owner" which are incidental to or as a consequence of this change are waived; and D The Contractor must submit all Field Overhead and Home Office Overhead Rates for approval in advance of all change orders. CHANGE: Reference to the enclosed Request For Information (RFI) Numbers 1 and 1 a, the City Project staff did not initially provide the correct maximum flow rate unit for the South 143 Street storm drainage outfall. As a result, the Contractor needed more time to work with the manufacturer to produce a Series TF -2 tide flex check valve that will support the outfall maximum flow rate As of October 5, 2009 or the 85 calendar day, the only major project element remained to be finished was the installation of this Site 5 tide flex check valve. Due to the described miscommunication on the outfall maximum flow rate unit, the Contractor requested for suspension of the contract until the valve was manufactured and delivered by the manufacturer Subsequently, the check valve was delivered on October 23, 2009; and the Contractor installed the valve in the same day Once this change order is executed, the contract completion date would become October 24, 2009, or the 87 calendar day. Page 1 of 2 131-04 al6,/Vf We the undersigned Contractor, have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all equipment, furnish all materials, except as may otherwise be noted above, and perform all services necessary for the work above specified, and will accept as full payment therefore the prices shown above and below. ACC TEE Date By Ori f naI Con e ct (without tax) Previous Change Order This Change Order (without tax) REV. CONTRACT AMOUNT ORIGINAL. City Clerk (1 of 2) Contractor (2 of 2) Title 571,186.50 4,275.00 0.00 575,461.50 Original Contract Time: Additional Calendar Days from Previous Change Order: Updated Contract Time: Contractor Green River Construction Co.. Inc. Page 2 of 2 Approved by City of Tukwila Date By x- i 4 )auy /v42-**e--4/ Mav9f/� 84 Calendar Days 3 Calendar Days 87 Calendar Days cc Finance Department (w /encumbrance) Project Management File PW Project Finance File REQUEST FOR INFORMATION Green River Construction, Inc. 6402 S 144 St., #1 Tukwila, WA 98168 PROJECT 2009 Small Drainage Program DATE 9/29/2009 Tukwila Project No 09 -DR -1 RETURN BY Tukwila Contract: 09 -112 RFI NUMBER: la FROM TO Jerry Knudson QUESTION: Peter Lau City of Tukwila Department of Public Works 6300 Southcenter Boulevard, Suite 100 Tukwila, Washington 98188 SUBJECT Maximum Flow Rate unit correction at the Outfall and Maximum Back Pressure The Contractor did not initiate a RFI, but only verbally asked questions about the Site 5 Tide Flex Check Valve REPLY: (attach page(s) as necessary) To formally document the response to the Contractor's 9 -29 -09 question, the maximum flow rate at the outfall should be 5,500 gallons per minute, rather than 5,500 cubic feet per second To formally document the response to the Contractor's 10 -1 -09 question, the maximum water elevation in the receiving water body at the tide flex check valve is approximately 7 feet above the invert of the storm drain outfall The velocity of the receiving water body is negligible Please see the enclosed drawing for the response detail The Contractor's manufacturer is welcomed to convert the 7 feet of head to the maximum back pressure the manufacturer deems necessary BY Peter Lau (Name- Print) (Sigyritd'e) October 6, 2009 (Date) -I 753 9th Avenue Noah Seattle, WA 98109 Phone: 206.286.1640 SEATTLE TACOMA Fax: 206.286.1639 XPQ ENGINEERS job No. Subject Reference f 1 ARCHITECTS LANDSCAPE ARCHITECTS SURVEYORS ...1;7, "1"-; t.1., 1 ,J rYti C A O. ;,2:c; t<3.1 t 1117 Broadway, Suite 501 Tacoma, WA 98402 Phone: 253.627.0720 }:ax: 253.6274144 Sheet Date Chkd. Date CALCULATION SHEET of CITY OF TUKWILA CONTRACT CHANGE ORDER NO. 1 DATE: October 27, 2009 BUDGET NO.. 412 02 594.383 63.09 PROJECT NO.: 09 -DR01 CONTRACT NO 09 -112 Cam) PROJECT NAME: 2009 Small Drainage Program TO: Jerry Knudson, President, Green River Construction Co Inc 09-112(a) Council Approval N/A You are hereby directed to make the herein described changes to the plans and specifications or do the following described work not included in the plans and specifications on this contract NOTE: This change order is not effective until approved by the "Owner" and a notice to proceed is issued. Conditions: A. The following change, and work affected thereby, are subject to all contract stipulations and covenants; B. The rights of the "Owner" are not prejudiced; C.AII claims against the "Owner" which are incidental to or as a consequence of this change are waived; and D.The Contractor must submit all Field Overhead and Home Office Overhead Rates for approval in advance of all change orders CHANGE: At Site 2 on south side of South 133 Street, a rockery wall was constructed to reinforce the soil slope south of the 60 -inch diameter Type 2 catch basin The Contractor needed to slightly cut into the soil slope, in order to create enough room for the catch basin installation A total of 95 square feet (SF) of rockery wall was installed. At $45.00 /SF, the total cost of this change order is $4,275.00. Please see the enclosed rockery wall unit cost proposed by the Contractor for reference. We the undersigned Contractor, have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all equipment, furnish all materials, except as may otherwise be noted above, and perform all services necessary for the work above specified, and will accept as full payment therefore the prices shown above and below. ACC D: Date /6 a 9 ezZLt By 4.4 Contractor Green River Construction Co.. Inc. Title A Es o N Page 1 of 2 $71 O 'C'o /v/g-L-c REQUEST FOR INFORMATION Green River Construction, Inc. 6402 S 144` St., #1 Tukwila, WA 98168 PROJECT 2009 Small Drainage Program DATE 06/30/2009 Tukwila Project No 09 -DR -1 RETURN BY Tukwila Contract: 09 -112 RFI NUMBER: 1 TO Peter Lau City of Tukwila Department of Public Works 6300 Southcenter Boulevard, Suite 100 Tukwila, Washington 98188 FROM Jerry Knudson SUBJECT. 18" Tide Flex Valve i QUESTION: Our supplier needs the foot pounds of pressure and the PSI for the 18" tide flex valve See HD Fowler request attached. REPLY: (attach page(s) as necessary) The tide flex valve should be suited fora low pressure, gravity system The maximum flow rate at the outfall is approximately 5,500 cubic feet per second (CFS) According to the "Head in Pipe vs. Flow (Free Discharge)" curve for 18" Tideflex TF -2 or TF -1, this flow corresponds to 4.1 feet of head at the valve The valve material shall be EPDM with stainless steel clamps The City herein also directs the Contractor to use Tide Flex Check Valve, Series TF -1, instead of Series TF -2. See the attached Project Plan Sheet 12 revision for the change details The Series TF -1 Check Valve requires less clearance below the pipe invert, making this Series more suitable for this installation The Contractor shall advise the City if there is any cost increase /decrease due to this material change BY Peter Lau (Name- Print) July 31. 2009 (SignatuFtf (Date) PARKING LOT FOR 14228 INTERURBAN AVE S 0 5 10 20 40 60 SCALE IN F777 PUBLIC' WO re DEPT. ENGINEERING STREETS WATER SEW ER +BUILDING• dale 931:'8 4/09 MD JLF 4/09 checked I KM 4/09 10 eD JLF 1 4/09 K 7539th 1117 Broadway AVM! PI SMk53/ Orol 00' l Sonia WA Tama, WA 981091200 98402 Geld bk 289-7940 12531627 -0720 BID .I 2009 SMALL DRAINAGE PROGRAM DOCUMENTS ADDITIVE ITEM NO 2 SITE 5 S 143RD ST OUTFALL GENERAL NOTES 1 THE LOCARCW OF EXISTING UNCERGR04ND Ui1LTY 5YS545, AS SHOW HEREON, ARE TAKEN FROM U10)77 LOCATE PAIN? NARKS AND ARE SHOWN IN AN 55530015A WAY ONLY. THE CC7:TRAC'CR SHALL DETERMINE THE EXACT LOCATION CF AL_ EXISTING UTlLMES BEFORE COMMENCING WORK, AND AGREES TO BE FULLY RESPONSIBLE FCR ANY AND ALL DAMAGES ND IPPE50; E 580 394D OCCASIONED UNDERGROUND UTILITIES. FAALL L075OEXACTLY ES 5 BE CONTACTED PRIOR TO ANY CONSTRUCTION OR SUBSURFACE EXPLORATION CALL I 800 -5555. 2. ALL WORK ON 1115 517E MUST 3E COMPLETED 557WEEN JUNE 15 AND SEP7EMBER 15, 2009 INCLUDING ALL 401)74AION. 3. NO WORK OR DI5TUR5AM10E 75AG OCCUR BELOW THE ORIDNARY H)2H— WATER ,MARK. 4. 7HE GREEN RIVER IRA: PROVIDES RECREATIONAL PEDESTRIAN AND BICYCLE USE. THE CONTRACTOR SHALL SUBMIT TRAFFIC CONTROL PLANS FOR APPROVAL PRIOR TO STARTING WORK ON THIS 5178. 5. NO EQUIPMENT 9111 BE ALLOWED NORTH OF THE GREEN RIVER TRAIL. \b/09 CONSTRUCTION NOTES 0 INSTALL TIDE FLEX CHECK VALVE, g SIZED TO FIT 714E EXISTING SOLID WALL HDPE OUTFALL. USE STAINLESS STEEL MOUNTING BANDS. CLEAR AND GRUB THE 5U942430WG AREA AS NECESSARY FOR INSTALLA71ON AND PROPER OPERATION OF THE VALVE. PREPARE SURFACE OF EXISTING HDPE PIPE AS REQUIRED FOR INSTALLATION OF 7HE CHECK VALVE. FINE GRADE DISTURBED AREAS AND HYDROSEED. KF1 REVISION NO 1401. REVISE VALVE TYPE TO 1)050(EX CHECK VALVE SERIES IF-1. no I dale' revision 12 I 12 I pe no I I N/A lid 3/ 0 9 THIS AGREEMENT is made and entered into on this ay of 62� 20 by and between the City of Tukwila, Washington "Owner and G '.D24-Lj r ,L/Z7M 9ntractor Now, therefore the parties agree as follows: 1 Project. Contractor shall complete all work and furnish all labor, tools, materials, and equipment for the project entitled 2009 Small Drainage Program, Project No. 09 -DR01, including all changes to the Work and force account work, in accordance with the Contract Documents, as described in Section 1 -04 2 of the Supplemental General Requirements. 2. Payments. Owner shall pay Contractor at the unit and lump sum prices, and by force account as specified in the Proposal according to the Contract Documents as to time, manner, and condition of payment. The payments to Contractor include the costs for all labor, tools, materials and equipment for the Work. 3. Completion Date. Contract time shall commence upon Owner's Notice to Proceed date The Work under this Agreement shall be completed within the time specified in the Proposal. If the Work under this Agreement is not completed within the time specified, as detailed in the Contract Documents, Contractor shall pay liquidated damages and all engineering inspection and supervision costs to Owner as specified in the Proposal. 4. Attorney's Fees. In the event litigation is commenced to enforce this Agreement, the prevailing party shall be entitled to recover its costs, including reasonable attorney's and expert witness fees 5. Disclaimer. No liability of Contractor shall attach to Owner by reason of entering into this Agreement, except as expressly provided in this Agreement. 6. Counterparts. This Agreement is executed in two (2) identical counterparts, by the parties, each of which shall for all purposes be deemed an original. CITY OF TUKWILA, WASHINGTON (Owner) By: Attest: This 1 day of i r a J 12W1.4,/ B citicAttftey Address for giving notices: 3ji ,,,tom d /vd ik t ic._ r8i AGREEMENT FORM (Cont Title: Attest: L This 4 day of 7;1 CONTRACT NO. Council Approval 6/15/09 Contractor's License No Address for giving notices' 09 -112 <e/ 4}A Q(eie 5i /f d /6/,V Page 27 Agreement Form Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com Always Verify Scale C -1 Rev 2006